Pile head construction method

The described method addresses alignment issues in pile cap structures by using a template with mounting holes and displacement prevention members to ensure proper torque application and prevent interference, enhancing the performance and durability of reinforcing bars.

JP7556827B2Active Publication Date: 2024-09-26OKABE CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2021102991
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-06-22
Publication Date
2024-09-26
Estimated Expiration
2041-06-22

AI Technical Summary

Technical Problem

Conventional pile cap structures face difficulties in ensuring that the sleeve surface and the connecting bolt collar align properly, leading to insufficient torque application and potential damage during manufacturing and concrete pouring due to protruding joint materials.

Method used

A method involving a template with mounting holes for protruding pile inner joint materials, allowing for secure torque application and integration with pile cap reinforcing bars, while using a displacement prevention member to maintain bar alignment and prevent interference with manufacturing machinery.

Benefits of technology

Ensures reliable torque application and full performance of reinforcing bars, preventing interference and damage during manufacturing and concrete pouring, while maintaining structural integrity and alignment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007556827000003
    Figure 0007556827000003
  • Figure 0007556827000008
    Figure 0007556827000008
  • Figure 0007556827000005
    Figure 0007556827000005
Patent Text Reader

Abstract

To provide a pile head structure, where in-pile joint members are projected from an end plate of a pile head by preventing interference with a manufacturing machine upon constructing the pile structure and damage upon concrete casting even in a state where tips of the in-pile joint members have been previously projected from the end plate of the pile head, allowing both features of pile head reinforcement bars and in-pile reinforcement bars to be realized sufficiently through securely introducing torque to each of the joint members.SOLUTION: A pile head structure of an existing concrete pile is provided with a plurality of in-pile reinforcement bars with in-pile joint members arranged at the end part, in a concrete part which is installed in a steel pipe, wherein, in an upper part of the steel pipe, pile head reinforcement bars with out-of-pile joint members arranged at the end part and the in-pile reinforcement bars are jointed through the in-pile joint members and the out-of-pile joint members, and the in-pile joint members have protruded parts protruded in a specific length upward from a hole arranged in an end plate fixed on a top end of the steel pipe.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a pile head structure of a precast concrete pile and a construction method thereof. [Background technology]

[0002] Steel pipe concrete composite piles, which are constructed by casting concrete into a steel pipe as an outer shell and integrating the concrete into the steel pipe by centrifugal molding, are widely used in the fields of architecture and civil engineering. For example, Patent Document 1 discloses a technique for using such steel pipe concrete composite piles as precast concrete piles and connecting the piles to footings, in which a sleeve pressure screw joint is attached to the end plate of a precast concrete pile, and a reinforcing steel bar pressure-attached to the sleeve pressure screw joint is embedded in one end of the concrete part.

[0003] According to the configuration disclosed in Patent Document 1, for example, when connecting a pile and a footing, it is possible to exhibit a predetermined performance as a connection structure using a joint means by introducing torque into the sleeve without taking measures such as chipping work to expose the reinforcing steel bars for connecting the footing or welding the reinforcing steel bars for connecting the footing to the outer periphery of the pile. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2010-144391 A Summary of the Invention [Problem to be solved by the invention]

[0005] As described above, even in the configuration according to the conventional technology disclosed in, for example, Patent Document 1, it is possible to introduce torque into the sleeve to achieve a predetermined performance as a joint structure, but the conventional configuration has the following problems. That is, in the conventional configuration, it is difficult to make the surface of the end plate and the surface of the sleeve the same. For example, if the surface of the sleeve is located below the end plate, when torque is introduced into the flange of the connection bolt, the flange hits the end plate, and the torque cannot be introduced sufficiently, and there is a risk that the reinforcing bars to be connected cannot achieve their full performance. In order to reliably introduce torque, it is necessary for the surface of the sleeve and the flange of the connection bolt to abut reliably. To achieve this, it is possible to make the surface of the sleeve protrude from above the end plate, but in the first place, when manufacturing a pile structure, if the surface of the sleeve is located above the end plate and a protruding portion is provided, the protruding portion may interfere with the manufacturing machine and cause damage, so there was no pile head structure of this configuration in the past.

[0006] Therefore, the inventors conducted extensive research into a pile head structure and its construction method that can fully demonstrate the mechanical performance of the pile head reinforcing bar and the pile interior reinforcing bar when connecting the pile head reinforcing bar and the pile interior reinforcing bar in the pile head structure of a precast concrete pile.

[0007] In view of the above circumstances, the object of the present invention is to provide a pile head structure and its construction method which can avoid problems such as interference with manufacturing machinery during the manufacture of the pile structure and damage during concrete pouring, even when the tip of the internal joint material is pre-protruding from the pile head end plate, and which can reliably introduce torque into each joint material and fully demonstrate the performance of both the pile head reinforcing bar and the internal pile reinforcing bar, since the pile structure has the internal joint material protruding from the pile head end plate. [Means for solving the problem]

[0010] According to the present invention, there is provided a method for constructing a pile head structure of a precast concrete pile, the method comprising the steps of: inserting a plurality of internal pile reinforcing bars each having an internal pile joint material at its end into a steel pipe; fixing the internal pile reinforcing bars in a state in which the tips of the internal pile joint materials protrude as protrusions of a predetermined length from holes formed in an end plate fixed to the top end of the steel pipe; providing a template having mounting holes formed therein on the upper surface of the end plate so that the protrusions can be inserted into the mounting holes; fixing the template to the end plate; pouring concrete into the steel pipe; removing the template after the concrete has hardened; connecting the internal pile reinforcing bars each having an external pile joint material at its end to the protrusions; and crimping the internal pile joint materials and the external pile joint materials together. Effect of the Invention

[0011] According to the present invention, even if the tip of the joint material inside the pile is pre-protruding from the pile head end plate, problems such as interference with manufacturing machinery during the manufacture of the pile structure and damage during concrete pouring can be avoided, and a pile structure in which the joint material inside the pile protrudes from the end plate of the pile head can be realized, which allows torque to be reliably introduced to each joint material and enables the performance of both the pile head reinforcing bar and the reinforcing bar inside the pile to be fully demonstrated. [Brief description of the drawings]

[0012] [Figure 1] 1 is a schematic explanatory diagram showing a configuration of a pile head structure according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a schematic explanatory diagram showing a pile structure in a stage prior to connecting the pile head reinforcing bar. [Diagram 3] FIG. 2 is a schematic enlarged view of the upper end of the pile structure. [Figure 4] FIG. 2 is a schematic plan view of a displacement prevention material. [Diagram 5] FIG. 1 is a schematic explanatory diagram of a manufacturing method of a pile structure. [Figure 6] FIG. 1 is a schematic explanatory diagram of a manufacturing method of a pile structure. [Figure 7] FIG. 1 is a schematic explanatory diagram of a manufacturing method of a pile structure. [Figure 8]FIG. 1 is a schematic explanatory diagram of a manufacturing method of a pile structure. [Figure 9] FIG. 1 is a schematic explanatory diagram of a construction method for a pile head structure. [Figure 10] FIG. 13 is a schematic explanatory diagram of a template according to a first modified example of the present invention. [Figure 11] FIG. 13 is a schematic explanatory diagram of a template according to a 2-1st modified example of the present invention. [Figure 12] FIG. 13 is a schematic explanatory diagram of a template according to Modification 2-2 of the present invention. [Figure 13] FIG. 13 is a schematic explanatory view of a protective member according to a third modified example of the present invention. [Figure 14] FIG. 13 is a schematic explanatory view of a protective member according to a fourth modified example of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In this specification and the drawings, components having substantially the same functional configurations are denoted by the same reference numerals, and duplicated description will be omitted.

[0014] <Pile head structure configuration> FIG. 1 is a schematic explanatory diagram showing the configuration of a pile head structure 1 according to an embodiment of the present invention, and is a side cross-sectional view of the pile head structure 1. As shown in FIG. 1, the pile head structure 1 includes a cylindrical steel pipe 10, a concrete portion 20 that is cast with the steel pipe 10 as an outer shell and integrated by centrifugal force forming, and a plurality of pile inner reinforcing bars 30 arranged inside the concrete portion 20, and the pile inner reinforcing bars 30 and the pile head reinforcing bars 40 are connected via a pile inner joint material 32 and a pile outer joint material 42. An end plate 50 is provided on the top end of the steel pipe 10 (one end shown in FIG. 1). The end plate 50 may be, for example, a flat steel member or a rubber plate.

[0015] As shown in FIG. 1, a hole 52 is formed in an end plate 50, and an internal joint material 32 provided at an end of an internal reinforcing bar 30 is inserted into the hole 52, and a part (upper end) of the internal joint material 32 protrudes from the upper surface of the end plate 50 to form a protruding portion 32a. A pile head reinforcing bar 40 equipped with an external joint material 42 is connected to the upper end of the internal joint material 32 (protruding portion 32a). The internal joint material 32 and the external joint material 42 are cylindrical so-called sleeve members, and are fixed to the internal reinforcing bar 30 and the external reinforcing bar 40, respectively, by means of crimping or the like. A threaded portion may be formed on the inner peripheral surface of the internal joint material 32 and the external joint material 42 at a portion where a relay bolt 55 is screwed. The means of connection between the pile inner joint material 32 and the pile outer joint material 42 is arbitrary, but may be, for example, an intermediate bolt 55, and the structure of the intermediate bolt 55 may be, for example, a general fully threaded bolt or a fully threaded bolt with a flange formed in the center.

[0016] <Pile structure before connecting pile head reinforcing bars> Fig. 2 is a schematic explanatory diagram showing a pile structure 2 in a stage prior to constructing a pile head structure 1, i.e., a stage prior to connecting a pile head reinforcing bar 40 equipped with a pile outer joint material 42. Fig. 2(a) is a schematic plan view, and Fig. 2(b) is a schematic vertical sectional view. Fig. 3 is a schematic enlarged view of the upper end portion of the pile structure 2. As shown in Fig. 2(a), a plurality of holes 52 and mounting holes 62 are formed in the circumferential direction in an end plate 50 and a template 60, which will be described later, and a plurality of pile inner joint materials 32 provided at the ends of a plurality of pile inner reinforcing bars 30 are inserted into each of the holes 52 and mounting holes 62.

[0017] As shown in Figs. 2 and 3, an end plate 50 is provided on the top end of the steel pipe 10, and a template 60 is attached to the upper surface of the end plate 50. The template 60 is, for example, a flat plate member, and may be made of steel or rubber. The template 60 is formed with mounting holes 62 through which the joint material 32 in the pile can be inserted. The arrangement of the mounting holes 62 is designed to correspond to the hole 52 formed in the end plate 50. The thickness of the template 60 can be designed arbitrarily, and is preferably designed to be greater than the height of the protruding portion 32a, for example, so that the protruding portion 32a of the joint material 32 in the pile does not protrude from the surface of the template 60 when the template 60 is attached.

[0018] Also, a displacement prevention member 70 may be provided in the concrete portion 20, for example, in the center of the longitudinal direction inside the steel pipe 10. Fig. 4 is a schematic plan view of the displacement prevention member 70. As shown in Fig. 4, the displacement prevention member 70 is formed with a plurality of notches 73 along the outer periphery of a circular steel flat plate 71 through which the pile reinforcing bar 30 is inserted and attached, and a band-shaped plate 75 is provided around the entire outer periphery of the steel flat plate 71 to close the notches 73. Also, the band-shaped plate 75 is provided with spacing retainers 77 at predetermined positions (four positions around the periphery in Fig. 4) that suitably maintain the spacing between the reinforcing bars and the spacing between the reinforcing bars and the inner periphery of the steel pipe when the pile reinforcing bar 30 is attached. A plurality of reinforcing bars 30 inside the pile are fitted into the cutouts 73, and in this state, a band-shaped plate 75 is placed to cover the cutouts 73, and the reinforcing bars 30 inside the pile are fixed in place, whereby the anti-slip material 70 and the reinforcing bars 30 inside the pile are integrated together so that each reinforcing bar 30 inside the pile is in an appropriate position.

[0019] <Pile head structure construction method> Next, a method from manufacturing the pile structure 2 to constructing the pile head structure 1 according to the embodiment of the present invention will be described. Figures 5 to 8 are schematic explanatory diagrams of the manufacturing method of the pile structure 2, and Figure 9 is a schematic explanatory diagram of the constructing method of the pile head structure 1. Note that in Figures 5 to 9, the components described above with reference to Figures 1 to 4 are illustrated with the same reference numerals, and their explanation may be omitted.

[0020] First, as shown in Fig. 5, a plurality of reinforcing bars 30 in the pile, each having an internal joint material 32 attached to its tip and integrated with a displacement prevention material 70, are inserted into the opening (one end that becomes the top end) of a steel pipe 10. After insertion, the ends of the internal joint material 32 attached to the tips of the reinforcing bars 30 in the pile are protruded so as to be positioned above the top end of the steel pipe 10.

[0021] Next, as shown in Fig. 6, an end plate 50 is provided on the top end of the steel pipe 10 with the pile internal joint material 32 protruding from the top end of the steel pipe 10. At this time, the pile internal joint material 32 is inserted into a hole 52 formed in the end plate 50, and is arranged so that the protruding portion 32a protrudes upward from the end plate 50. At this time, an adhesive may be applied between the inner circumference of the hole 52 of the end plate 50 and the pile internal joint material 32 to fix the pile internal joint material 32. The end plate 50 may also be fixed to the end of the steel pipe 10 by a fixing means such as full circumference welding.

[0022] Here, the procedure is described in which the end plate 50 is provided after inserting the pile reinforcing bar 30 to which the pile joint material 32 is attached into the steel pipe 10. However, the procedure is not limited to this. For example, it is also possible to fix the end plate 50 to the steel pipe 10 in advance, insert the pile reinforcing bar 30 to which the pile joint material 32 is attached from the lower end (the other end) of the steel pipe 10, and then fix the pile reinforcing bar 30 so that the protruding portion 32a of the pile joint material 32 protrudes from the hole portion 52 of the end plate 50.

[0023] 7, a template 60 is provided on the upper surface of the end plate 50 so that the protrusions 32a are inserted into the mounting holes 62. The template 60 is then fixed to the end plate 50. The protrusions 32a are not allowed to protrude upward from the mounting holes 62. The fixing means at this time may be, for example, welding or a locking bolt.

[0024] Then, as shown in Fig. 8, concrete U is poured inside the steel pipe 10. The concrete U is poured, for example, by centrifugal force forming so as to be integrated with the inner peripheral surface of the steel pipe 10. After the concrete U has hardened to form the concrete portion 20, the template 60 is removed and the pile structure 2 is completed.

[0025] 9, the completed pile structure 2 is erected and inserted as a precast concrete pile into a desired ground (not shown), and the pile head reinforcing bar 40 to which the pile outside joint member 42 has been attached in advance is connected to the protruding portion 32a of the pile inside joint member 32 protruding from the pile head using a relay bolt 55. Then, torque is introduced to each joint member (pile inside joint member 32, pile outside joint member 42) to pressure-bond the pile inside reinforcing bar 30 and the pile head reinforcing bar 40. In this manner, construction of the pile head structure 1 according to the embodiment of the present invention is completed.

[0026] (Action and effect) According to the pile head structure 1 of this embodiment, when the pile structure 2 is used as a precast concrete pile, it can be manufactured in a state in which the protruding portion 32a of the joint material 32 in the pile protrudes from the hole 52 in the end plate 50. In the pile structure 2, since the joint material 32 in the pile has the protruding portion 32a, the pile reinforcing bar 30 in the pile and the pile head reinforcing bar 40 can be effectively crimped. That is, the opposing surfaces of the joint material 32 in the pile and the joint material 42 in the pile outside can be reliably abutted against each other, and torque can be effectively introduced, so that the reinforcing bar performance of both the pile reinforcing bar 30 in the pile and the pile head reinforcing bar 40 can be fully exhibited.

[0027] Furthermore, in the pile head structure 1 according to this embodiment, a displacement prevention material 70 is provided inside the steel pipe 10, for example, in the concrete part 20 at the center in the longitudinal direction, during the manufacture of the pile structure 2. This reliably ensures the spacing between the multiple reinforcing bars 30 provided inside the pile and the spacing between the reinforcing bars 30 inside the pile and the inner circumference of the steel pipe 10, thereby realizing a desired reinforcement arrangement configuration.

[0028] In particular, when manufacturing the pile structure 2, interference with the manufacturing machine during manufacturing of the pile structure 2 (precast concrete pile) and damage to the protruding portion 32a during concrete pouring, which occur due to the provision of the protruding portion 32a of the joint material 32 within the pile, can be reduced by adopting a manufacturing method using the template 60.

[0029] Although an example of an embodiment of the present invention has been described above, the present invention is not limited to the illustrated embodiment. It is clear that a person skilled in the art can come up with various modified or revised examples within the scope of the ideas described in the claims, and it is understood that these also naturally belong to the technical scope of the present invention.

[0030] <Modifications Related to Templates> In the above embodiment, when manufacturing the pile structure 2, the protruding portion 32a of the joint material 32 in the pile is inserted into the mounting hole 62 of the template 60, thereby suppressing interference of the protruding portion 32a with a manufacturing machine during manufacturing of the pile structure 2 and damage to the protruding portion 32a during concrete pouring. The configuration of the template 60 is not limited to that described in the above embodiment. Therefore, other forms of the template 60 will be described below with reference to the drawings as the first modified example, the second modified example, and the second modified example of the present invention. In the following description, components having the same functional configuration as those in the above embodiment are illustrated with the same reference numerals, and their description may be omitted.

[0031] <First Modification> 10 is a schematic diagram of a template 60a according to a first modified example of the present invention, where (a) is a plan view, (b) is a vertical cross-sectional view, and (c) is an enlarged explanatory view. As shown in Fig. 10, the template 60a according to this modified example has a counterbore 80 having a diameter larger than the diameter of the mounting hole 62 formed around the mounting hole 62. The design of the diameter and depth of the counterbore 80 is arbitrary, and it is designed so that, for example, a bolt 81 of a predetermined dimension can be screwed in.

[0032] According to the configuration of this modification, it is possible to prevent foreign matter from being mixed in when concrete is poured by screwing the bolt 81 into the upper end of the joint material in the pile 32. Furthermore, when the template 60a is a rubber plate, it is possible to fix the template 60a in close contact with the steel pipe 10 by fastening a bolt into the countersunk portion 80 without using means such as welding, and it is possible to prevent concrete from leaking.

[0033] <Modification No. 2-1> 11 is a schematic diagram of a template 60b according to the modified example 2-1 of the present invention, where (a) is a plan view and (b) is a vertical cross-sectional view. As shown in FIG. 11, the template 60b according to this modified example is a so-called notched template in which a notch 85 is formed around the mounting hole 62.

[0034] It is known that the pile structure 2 may be manufactured with the joint material 32 in a state of being shifted inward. According to the configuration of this modified example, the construction error of the pile head structure 1 caused by such a manufacturing error can be absorbed by forming the notch portion 85 around the mounting hole 62, thereby enabling efficient construction.

[0035] <Modification No. 2-2> 12 is a schematic diagram of a template 60c according to the 2-2 modification of the present invention, where (a) is a plan view, (b) is a vertical cross-sectional view, and (c) is an enlarged explanatory view. As shown in FIG. 12, the template 60c according to this modification has a notched counterbore 87 formed around the mounting hole 62. That is, the notched portion 85 of the above-mentioned 2-1 modification is provided with a predetermined depth and also has a counterbore shape. The depth of the notched counterbore 87 is arbitrary, and is designed so that, for example, a bolt 88 of a predetermined dimension can be screwed in.

[0036] According to the configuration of this modified example, in addition to the same action effects as those of the above-mentioned modified example 2-1, by forming a notched countersink portion 87 and screwing a bolt 88 into the upper end of the pile joint material 32, it is possible to prevent foreign matter from being mixed in when pouring concrete.

[0037] <Modifications Related to Protective Member> In addition, in the construction method of the pile head structure 1 described in the above embodiment, when the pile structure 2 is erected and inserted into the ground as a precast concrete pile, a protective member 100 may be used to protect the protruding portion 32a of the joint material 32 protruding from the end plate 50. Therefore, the following will describe configurations using the protective member 100 (hereinafter, referred to as 100a or 100b) as the third and fourth modified examples of the present invention with reference to the drawings. In the following description, components having the same functional configuration as those in the above embodiment and modified examples are illustrated with the same reference numerals, and their description may be omitted.

[0038] <Third Modification> Fig. 13 is a schematic explanatory diagram of a protective member 100a in a third modified example of the present invention, where (a) is a plan view, (b) is a longitudinal sectional view, and (c) is an enlarged explanatory view. As shown in Fig. 13, the protective member 100a has a so-called split type configuration in which multiple divided parts of the protective member are arranged above the joint material 32 in the pile on the same circumference. Each part of the protective member 100a is formed with a counterbore 91, which is designed so that, for example, a bolt 93 of a predetermined dimension can be screwed in.

[0039] According to this modification, when the manufactured pile structure 2 is inserted into the ground as a precast concrete pile, the precast concrete pile can be inserted while the protruding portion 32a protruding upward from the end plate 50 is protected by the protective member 100a. By protecting the protruding portion 32a, the pile interior reinforcing bar 30 and the pile head reinforcing bar 40 can be effectively crimped together, and the pile head structure 1 is realized in which the performance of both the pile head reinforcing bar 40 and the pile interior reinforcing bar 30 is fully exhibited.

[0040] <Fourth Modification> FIG. 14 is a schematic explanatory diagram of a protection member 100b in a fourth modified example of the present invention, where (a) is a plan view and (b) is a vertical cross-sectional view. As shown in FIG. 14, the protection member 100b is a concrete member having a through hole 95 that penetrates vertically. The protection member 100b is made of concrete, and has a certain degree of thickness from the viewpoint that reinforcing bars must be arranged inside or a certain amount of concrete must be filled in order to ensure its strength. In this modified example, the protection member 100b may be fixed to the end plate 50 by, for example, screwing a bolt 97 into the upper end of the joint material 32 in the pile through the through hole 95. The shape of the through hole 95 is arbitrary, and for example, as shown in the figure, a configuration in which a bolt 97 screwed in at two points in the circumferential direction is held by one through hole 95 may be used.

[0041] According to this modification, as in the above-described third modification, when the manufactured pile structure 2 is inserted into the ground as a precast concrete pile, the precast concrete pile can be inserted while the protruding portion 32a protruding upward from the end plate 50 is protected by the protective member 100b. By protecting the protruding portion 32a, the pile interior reinforcing bar 30 and the pile head reinforcing bar 40 can be effectively crimped together, and the pile head structure 1 in which the performance of both the pile head reinforcing bar 40 and the pile interior reinforcing bar 30 is fully exhibited is realized. [Industrial Applicability]

[0042] The present invention can be applied to a pile head structure of a precast concrete pile and a construction method thereof. [Explanation of symbols]

[0043] 1…Pile cap structure 2…Pile structure 10…Steel pipe 20…Concrete section 30…Reinforcing bar inside pile 32…Pile joint material 32a...Protrusion 40…Pile head reinforcement bar 42…Pile outer joint material 50...end plate 52...hole 55...Relay bolt 60…Templates 60a to 60c...Templates (related to modified examples) 62...Mounting hole 70...Material to prevent misalignment 71…Steel flat plate 73…Notch 75…Strip 77... Spacing material 80, 91…Counterbore 81, 88, 93, 97...Bolts 85…Notch 87…Notched countersunk section 95...Through hole 100 (100a, 100b)...protective member U…Concrete

Claims

[Claim 1] A method for constructing a pile head structure for a precast concrete pile, comprising: A plurality of reinforcing bars having joint members at their ends are inserted into the steel pipe, The pile reinforcing steel bar is fixed in a state in which the tip of the pile joint material protrudes as a protrusion of a predetermined length from a hole provided in an end plate fixed to the top end of the steel pipe, a template having mounting holes formed therein is provided on an upper surface of the end plate such that the protrusions are inserted into the mounting holes, and the template is fixed to the end plate; pouring concrete into the steel pipe, and removing the template after the concrete has hardened; A construction method for a pile head structure, characterized in that a pile head reinforcing bar having an outer pile joint material at its end is connected to the protrusion, and the inner pile joint material and the outer pile joint material are crimped together.

Citation Information

Patent Citations

  • Pile head structure of existing concrete pile and method for forming pile head

    JP2010144391A

  • Prestressed concrete pile, method of manufacturing the same, and connection structure between pile and footing

    JP2010174474A

  • SC pile and method for manufacturing the same

    JP2011137320A

  • SC pile having axial reinforcement, method for manufacturing SC pile having axial reinforcement, and method for exposing axial reinforcement of SC pile

    JP2018119385A