Sequential updating system for controlled earth pressure
The system addresses the challenge of inaccurate earth pressure management by directly measuring mud pressure and displacement, enabling real-time adjustments for stable shield excavation.
Patent Information
- Application Number
- JP2024045998
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-09-27
- Estimated Expiration
- 2044-03-22
AI Technical Summary
Existing methods for managing mud pressure in earth pressure shields are inadequate in dynamically changing soil conditions, leading to inaccurate earth pressure calculations and potential instability during shield excavation.
A system that includes an earth removal device, pressure gauge, displacement measuring means, and an analysis section to directly measure the relationship between mud pressure and face displacement, allowing for sequential updates of control earth pressure.
Enables accurate and dynamic adjustment of earth pressure settings based on real-time measurements, ensuring stable shield excavation and minimizing ground displacement.
Smart Images

Figure 0007557644000001
Abstract
Description
[Technical field]
[0001] The present invention relates to a system for successively updating the controlled earth pressure of mud pressure in a chamber used in a shield tunneling machine. [Background technology]
[0002] Traditionally, managing the mud pressure inside the chamber of an earth pressure shield has been essential for maintaining the stability of the face while allowing the shield to excavate without causing deformation or subsidence of the surrounding ground, and proper management can suppress displacement of the surrounding ground.
[0003] In an earth pressure shield, the controlled earth pressure of muddy soil pressure inside the chamber is set within the following range. (Passive earth pressure + water pressure) > Muddy earth pressure in chamber (controlled earth pressure) > (Active earth pressure + water pressure) If the mud pressure in the chamber is kept within the above range, the stability of the face is theoretically ensured, but since high mud pressure in the chamber leads to increased cutter torque and jack thrust, resulting in inefficiencies in construction, it is desirable to set the controlled earth pressure low within the range where the stability of the face is ensured. Therefore, it is common to set the lower limit to a value obtained by adding α to (active earth pressure + water pressure), and the upper limit to a value that further takes into account the range of construction fluctuations in addition to the above-mentioned lower limit (active earth pressure + water pressure + α), or to (static earth pressure + water pressure). Note that passive earth pressure, active earth pressure, and earth pressure at rest refer to the effective earth pressure transmitted between soil particles, and do not include pore water pressure. Meanwhile, muddy earth pressure in the chamber refers to the total earth pressure considering the soil particles and pore water in the chamber as a whole, and includes pore water pressure.
[0004] Conventional methods for controlling mud pressure inside the chamber of earth pressure shield tunneling include the following two methods 1) and 2). 1) A method of calculating active earth pressure, passive earth pressure, static earth pressure, etc. using a formula for calculating earth pressure from the soil constants (φ, C, γ, etc.) of the target ground estimated by a prior soil survey, the groundwater level, and the overburden load, and then setting and managing upper and lower limits of the mud soil pressure in the chamber based on these values (see, for example, Patent Document 1). 2) A method of setting the controlled earth pressure based on the muddy earth pressure in the chamber measured when the shield is stopped (see, for example, non-patent document 1). [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2012-233372 A [Non-Patent Document 1] "Guidelines for safe and secure construction of shield tunnels," Shield Tunnel Construction Technology Review Committee, December 2021, p. 19 Summary of the Invention [Problem to be solved by the invention]
[0006] · Management method 1) Issues: A preliminary soil survey is usually carried out by boring, and is often carried out at intervals of about 200 m along the length of the line. Therefore, if the soil conditions change between survey points, it may not be possible to calculate the appropriate control earth pressure. In addition, since the calculation formula for earth pressure is a theoretical one based only on a simplified two-dimensional balance of forces, it is not necessarily possible to accurately calculate the earth pressure on the shield face ground in an actual three-dimensional state.
[0007] · Management method 2) Issues: The mud pressure at stop measured when the shield is stopped is thought to reflect the earth pressure acting on the face relatively accurately if the shield itself is not moving and the cutter head does not have a face plate, but if these conditions are not maintained, the mud pressure at stop does not necessarily represent the static earth pressure of the ground or the active earth pressure plus water pressure.
[0008] In the above-mentioned methods 1) and 2) for controlling muddy soil pressure, if ground conditions change, it is not possible to set an appropriate controlled soil pressure.
[0009] Therefore, the present invention aims to provide a system for sequentially updating the controlled earth pressure in a shield tunneling machine, which confirms the validity of the controlled earth pressure by directly measuring the relationship between the mud pressure in the chamber and the displacement near the face, rather than setting the controlled earth pressure based on assumptions or estimates. [Means for solving the problem]
[0010] In order to achieve the above-mentioned objective, the sequential updating system for controlled earth pressure in a shield tunneling machine of the present invention comprises an earth removal device for discharging mud from within a chamber, a pressure gauge for measuring the mud pressure in the chamber, a displacement measuring means for measuring displacement near the face, an analysis unit for analyzing the deformation characteristics of the ground based on the measured mud pressure and the measured displacement near the face, and a setting unit for setting the controlled earth pressure based on the analyzed deformation characteristics. Effect of the Invention
[0011] In this way, the system for successively updating the controlled earth pressure in a shield machine of the present invention comprises an earth removal device that discharges mud from within the chamber, a pressure gauge that measures the mud pressure in the chamber, a displacement measurement means that measures displacement near the face, an analysis unit that analyzes the deformation characteristics of the ground based on the measured mud pressure and the measured displacement near the face, and a setting unit that sets the controlled earth pressure based on the analyzed deformation characteristics. Because of this configuration, the controlled earth pressure can be set by directly measuring the relationship between the mud pressure in the chamber and the face displacement, rather than setting the controlled earth pressure based on assumptions or estimates, and the correctness of the set controlled earth pressure can be determined by a safer and simpler method. [Brief description of the drawings]
[0012] [Figure 1] FIG. 2 is a cross-sectional view illustrating the internal structure of a shield tunneling machine. [Diagram 2]4 is a cross-sectional view illustrating the configuration of an exploration jig and a measurement sensor. FIG. [Diagram 3] An explanatory diagram of the on-board measurement method for measuring face displacement. (a) is an explanatory diagram during excavation, (b) is an explanatory diagram of the insertion of the detection tool, and (c) is an explanatory diagram during displacement measurement. [Figure 4] An explanatory diagram of the pre-installed face displacement measurement method, (a) being a horizontal cross-sectional view and (b) being a vertical cross-sectional view. [Diagram 5] 1 is a flowchart illustrating the procedure of a system for sequentially updating managed earth pressure. [Figure 6] FIG. 1 is a schematic explanatory diagram for explaining linear regression judgment (judgment method 1) using a graph showing the relationship between mud pressure and horizontal displacement while the shield machine is stopped. [Figure 7] FIG. 13 is a schematic explanatory diagram for explaining gradient determination (determination method 2) using a graph showing the relationship between mud pressure and horizontal displacement while the shield machine is stopped. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. However, the components described in the following embodiments are merely examples, and are not intended to limit the technical scope of the present invention to these alone. In the following, an earth pressure shield 1 will be described as an example, but the present invention can also be applied to other types of shield tunneling machines. In the following description, a pressure control device is included, but the present invention can be implemented without the pressure control device. EXAMPLES
[0014] (Shield tunneling machine configuration) Fig. 1 is a vertical cross-sectional side view showing an embodiment of the present invention. As shown in Fig. 1, an earth pressure shield 1 as a shield tunneling machine of this embodiment includes a skin plate (shield body cylinder) 2, a bulkhead 3, a cutter head 5, a cutter rotating shaft 10, a cutter driving unit 12, a chamber 16, an earth removal device 17, a shield propulsion jack 18, a mud material supply pipe 21, a pressure gauge 22, a water pressure gauge 23, and a control unit 40 including an analysis unit 41 and a setting unit 42 arranged inside an operation room or the like.
[0015] The cutter head 5 has cutter spokes 51, a plurality of cutter bits 52, ... provided on the front surface of the cutter spokes 51, a fishtail bit 53 provided in the center of the front surface of the cutter spokes 51, and a plurality of stirring blades 54, ... provided on the back surface of the cutter spokes 51. The cutter head 5 is attached integrally to the cutter rotation shaft 10.
[0016] The cutter rotating shaft 10 is rotatably supported by a bearing 11 provided in the partition 3 and a bearing provided at the rear of a gear box 13 described below. The cutter rotating shaft 10 is connected to a cutter driving unit 12. The cutter driving unit 12 has a gear box 13 installed on the rear side of the partition 3, a rotational drive source 14 connected to the gear box 13, and a reduction gear (arranged in the gear box 13; not shown) interposed between the output shaft of the rotational drive source 14 and the cutter rotating shaft 10.
[0017] The chamber 16 is formed in a space surrounded by the hood portion 2a of the skin plate 2, the partition wall 3, and the face F. As the soil discharge device 17, for example, a screw conveyor is used. The mud intake port of the soil discharge device 17 is opened and installed so as to face the chamber 16.
[0018] Furthermore, an erector 15 for assembling the segments 90 is installed in the tail portion 2b of the skin plate 2. Furthermore, a plurality of shield propulsion jacks 18 are installed inside the skin plate 2 at required intervals in the circumferential direction. Mud pressure is generated by the thrust of these shield propulsion jacks 18. In the case of an earth pressure type shield 1, it is considered that the magnitude of the jack thrust is roughly balanced with the sum of the mud pressure in the chamber and the peripheral friction force. In addition, a tail seal 19 is provided at the rear end of the skin plate 2. During shield tunneling, mud working material (also called additive material) is appropriately injected into the face and cutter chamber depending on the soil quality of the tunneling ground.
[0019] While there is a possibility that displacement may progress temporarily after excavation is stopped, the following measures are taken during measurement setup to ensure the purpose of the present invention. Specifically, between the stop of excavation and the start of measurement, a measure (A) is taken to prevent the mud pressure from decreasing, a measure (B) is taken to allow measurement even if the mud pressure decreases, or a measure (C) is taken to allow measurement before the mud pressure decreases. After drilling is stopped, the pressure in the chamber is maintained by the pressure maintaining device (e.g., by continuing to inject mud material)...means (A). - Before stopping excavation, increase the mud pressure above the controlled mud pressure and terminate excavation (for example, reduce the screw conveyor rotation speed and adjust it higher)...Measure (B). Measurement arrangements are made during excavation (for example, a bit-type measuring device (face vicinity property measuring device 8) is sent to the vicinity of the face before excavation is stopped)...means (C). The present invention can be realized even if the above three means are not adopted.
[0020] The earth pressure shield 1 as the shield tunneling machine of this embodiment further comprises displacement measurement means 6, 7 that measure the displacement of the tunnel face or the vicinity of the tunnel face. Here, first, the on-board measurement type displacement measurement means 6 that measures the displacement of the tunnel face from inside the machine will be described with reference to Figures 2 and 3, and then the pre-installation type displacement measurement means 7, in which an instrument is installed in advance from the ground, will be described with reference to Figure 4.
[0021] As shown in Figure 2, the on-board displacement measuring means 6 is composed of a rod-shaped detection jig 61 having a sufficient length to penetrate the bulkhead 3 and have its tip 61a reach the FA near the face, a hydraulic chuck 63 that grasps / releases the detection jig 61 and moves / releases the detection jig 61 as the jacks 62, 62 extend and retract, a detection unit 64 that is attached integrally to the end of the detection jig 61, a guide 65 that supports the sliding movement of the detection unit 64, a displacement sensor 66 that measures the amount of displacement of the detection jig 61 by measuring the distance from the detection unit 64, a water stop device 67 for the detection jig 61, and water stop valves 68, 68.
[0022] Therefore, when the hydraulic chuck 63 grips the exploration jig 61, the exploration jig 61 retreats when the jacks 62, 62 extend, and the exploration jig 61 advances when the jacks 62 retract. When the hydraulic chuck 63 is released, the exploration jig 61 is free. Therefore, in the open state (the exploration jig 61 can move freely), if the tip 61a of the exploration jig 61 is in contact with the face F or slightly penetrates the face F, the exploration jig 61 moves (in the tunnel longitudinal direction) in accordance with the displacement of the face vicinity FA. As described later, in the present invention, the face vicinity FA protrudes slightly due to a natural pressure drop when the shield in the chamber 16 is stopped - for example, when the segments are assembled - so that the exploration jig 61 moves in the tunnel longitudinal direction toward the tunnel mouth.
[0023] Next, the configuration of the face vicinity property measuring device 8 that realizes the above-mentioned means (C) for setting up measurements during excavation will be described with reference to Figure 2. In the face vicinity property measuring device 8 serving as the displacement measuring means of this modified example, the cylinder and rod parts of the jack serving as the advancing and retreating means are stored inside the cutter spokes 51, although this is not shown in detail. Furthermore, when the length of the face vicinity property measuring device 8 is longer than the depth of the cutter spokes 51, it is also preferable to dispose the rear part of the face vicinity property measuring device 8 inside the (moving) stirring blade 54.
[0024] Next, the operation procedure of the displacement measuring means 6 having the detection jig 61 and the displacement sensor 66 when the shield is stopped in this embodiment, for example, when the segments are being assembled, will be described with reference to FIG. 2 and FIGS. 1. During shield tunneling, the exploration jig 61 is retracted to the partition wall 3 position (Figure 3(a)). 2. After the shield stops, the hydraulic chuck 63 grips the detection jig 61 and slides it to a position where the tip 61a contacts the face F or a position where it slightly penetrates the face F (see FIG. 3(b)). The jack 62 is retracted. 3. When the tip 61a of the detection jig 61 is pressed against or penetrates the face F, the hydraulic chuck 63 is released. 4. The mud pressure inside the chamber is basically set higher than the surrounding soil and water pressure. Therefore, when the soil removal device 17 (and the shield propulsion jack 18) is stopped, the mud pressure inside the chamber 16 gradually decreases while balancing with the surrounding soil and water pressure. The mud pressure inside the chamber that changes at this time is measured one by one. 5. When the FA near the face is displaced due to the decrease in mud pressure, the displacement pushes the exploration jig 61 back into the shield (see FIG. 3(c)). 6. A measuring device (detection unit 64, displacement sensor 66) is attached inside the shield of the detection jig 61. The amount of displacement is measured by the displacement sensor 66 through the detection unit 64. 7. The measurement value is sent from the displacement sensor 66 to the PC. At the same time, the pressure gauge 22 installed in the bulkhead 3 measures the mud pressure in the chamber 16. At the same time, the water pressure gauge 23 also measures the water pressure. 8. Using the above procedure, the relationship between the mud pressure in chamber 16 and the displacement of FA near the face is obtained. 9. Once the displacement gradient of the face displacement has been determined, the displacement measurement and mud pressure measurement are stopped. 10. After that, the shield propulsion jack 18 is driven to increase the mud pressure in the chamber 16 to the initial state. 11. The detection jig 61 is gripped by the hydraulic chuck 63, and the detection jig 61 is pulled back by operating the jack 62 to retract the detection jig 61 to the partition wall 3 position (FIG. 3(a)). The jack 62 is extended.
[0025] Of the components of the on-board displacement measuring means 6 described above, the components for measuring displacement can be replaced with pre-installed multi-stage inclinometers (or layer-by-layer settlement gauges) 71-74, 75-78 that are installed in advance from the ground. That is, the pre-installed displacement measuring means 7 is configured such that a plurality of multi-stage inclinometers 71-74, 75-78 are installed at a predetermined depth position from the ground surface, as shown in Fig. 4. The installation positions preferably include, for example, in addition to the vicinity of the face at the planned position for tunnel excavation, positions directly above it and positions shifted to the left and right (and directly above it).
[0026] In other words, by installing the multi-stage inclinometers 71-74 and layer-by-layer settlement meters in advance from the ground in the cross section where the shield is scheduled to pass, and temporarily suspending the shield excavation just before the measuring device, the mud pressure in the chamber will decrease while nearly balanced with the surrounding soil and water pressure, making it possible to measure the displacement of the ground. It is preferable that these multi-stage inclinometers 71-74 are buried at a specified interval in the area where the shield is scheduled to pass. In this case, it is preferable to bury them at an interval narrower than the conventional boring interval (200 (m)).
[0027] In addition, the earth pressure shield 1 further includes a control unit 40. The control unit 40 is, for example, a general-purpose personal computer having a memory, a CPU, an SSD, and the like. The control unit 40 sets the managed earth pressure of the earth pressure shield 1 and controls the excavation. That is, during excavation, the earth pressure is changed by discharging the mud with the soil discharge device 17 (for example, a screw conveyor) while advancing the earth pressure shield 1 with the shield propulsion jack 18, and at the same time, the mud pressure is measured with the pressure gauge 22. Furthermore, the water pressure is measured with the water pressure gauge 23. It is of course possible that the functions of the analysis unit 41 and the setting unit 42 described later are executed by a control unit (computing device; personal computer) separate from the control unit 40 that controls the excavation of the earth pressure shield 1. In this sense, the control unit can also be called a "computing unit".
[0028] The control unit 40 of this embodiment further has a function as an analysis unit 41 that analyzes the deformation characteristics of the ground based on the measured mud pressure and the measured displacement (e.g. horizontal displacement) of the face, and a function as a setting unit 42 that sets the controlled earth pressure based on the analyzed deformation characteristics. The control unit 40 is connected to input means such as a keyboard and a mouse, as well as to receive the mud pressure value from the pressure gauge 22, the water pressure value from the water pressure gauge 23, and the input value (displacement) from the displacement sensor 66 via a communication cable 43. Furthermore, the control unit 40 is connected to a monitor, a separate PC for excavation management, and the like as output means. The functions of the analysis unit 41 and the setting unit 42 will be described in the control flow described next.
[0029] The above-mentioned soil removal device 17, the pressure gauge 22, the displacement measuring means 6 (7), and the control unit 40 including the analysis unit 41 and the setting unit 42 constitute the managed earth pressure sequential updating system S of the present invention. In addition, the managed earth pressure sequential updating system S may include a water pressure gauge 23.
[0030] (Controlled earth pressure setting flow) Next, the flow of the system S for successively updating the managed earth pressure of this embodiment will be described with reference to Figures 5 to 6. As shown in Figure 5, the flow of the system S for successively updating the managed earth pressure is realized by executing the following steps S1 to S7.
[0031] Initial value processing (step S1) First, an initial value of the controlled earth pressure is set (step S2) based on the initial calculated earth pressure set by a boring test or the like (step S1). Then, the shield is advanced according to this initial value of the controlled earth pressure (step S3). That is, in the initial stage after the shield starts advancing (before the shield is stopped), the controlled earth pressure is set based on the theoretical earth pressure calculated from the soil constants obtained from a preliminary soil survey. Alternatively, the mechanical constants of the ground obtained from the preliminary soil survey are given to the 3D-FEM model, and the controlled earth pressure is set from the relationship between the earth pressure and the displacement of the ground.
[0032] When the shield is stopped (steps S4 to S7) Next, while the shield machine is stopped, the earth removal device 17 (and the shield driving jack 18) is stopped (step S4). That is, when the excavation is stopped, such as when the segment 90 is assembled, the screw conveyor is stopped. Then, the pressure (mud pressure) in the chamber 16 gradually decreases because it is balanced with the soil and water pressure acting on the face. During this pressure decrease, the mud pressure is measured by the pressure gauge 22. At the same time, the water pressure is measured by the water pressure gauge 23. Furthermore, during this pressure decrease, the displacement of the FA near the face is directly measured by the displacement measuring means 6, 7 (step S5). The deformation characteristics are grasped based on the measured mud pressure and face displacement (for example, horizontal displacement) (step S6). That is, the mud pressure-face displacement is plotted on a graph to obtain the deformation characteristics. Once the deformation characteristics are grasped, the appropriateness / inappropriateness of the managed earth pressure value is determined (step S7). Step S7 will be described in detail below.
[0033] (Details of step S7) The amount of displacement of the face is measured by measuring the face displacement when the shield is stopped, and the mud pressure in the chamber is measured by simultaneously measuring the pressure. From these measurement results, it is possible to draw a graph of mud pressure in the chamber (e.g., horizontal axis) vs. horizontal face displacement (e.g., vertical axis) as shown in Figures 6 and 7 (understanding deformation characteristics: step S6).
[0034] Judgment method 1: Judgment by linear regression If the obtained deformation characteristics are approximated by a straight line, it is judged to be in the elastic region, and if they are curved, it is judged to be in the plastic region (see Figure 6). In other words, if they are approximated by a straight line, it is judged that the controlled earth pressure is being properly controlled, and the shield tunneling continues (YES in step S7: proceed to step S3), and if they are approximated by a curve, the controlled earth pressure is reset (updated) (NO in step S7: proceed to step S2).
[0035] Judgment method 2: Judgment by gradient When the changing mud pressure inside the chamber is minute, it may be difficult to determine whether the understood deformation characteristics are linear or curved. Therefore, a comparison is made to determine whether the gradient of the understood deformation characteristics is similar to the gradient of the elastic region or the plastic region. The mud pressure - face horizontal displacement graph to be compared is a graph of the relevant ground estimated by an FEM model set from the soil constants obtained from a prior soil survey. By comparing with the graph obtained from this prior analysis result, it is determined whether the gradient is in the elastic region or the plastic region (see Figure 7), and the success or failure of the controlled earth pressure is judged.
[0036] That is, if the gradient of the deformation characteristics is close to the elastic region of the preliminary analysis, it is determined that the appropriate controlled earth pressure is being applied and shield excavation continues (YES in step S7: proceed to step S3), and if the gradient of the deformation characteristics is close to the plastic region of the preliminary analysis, the controlled earth pressure is reset (updated) (NO in step S7: proceed to step S2).The analysis results to be compared are not necessarily limited to the results obtained from the preliminary soil survey, and previous analysis results updated during construction may also be used for comparison.
[0037] (Correction of controlled earth pressure) In general, the controlled earth pressure is (active earth pressure + water pressure) + α (for example, α = 10~30kN / m 2 ) In other words, during shield tunneling, the mud pressure in the chamber is controlled to be slightly higher than the "active earth pressure + water pressure." For this reason, when tunneling is stopped, the mud pressure in chamber 16 slowly decreases as it balances with the soil and water pressure acting on the tunnel face.
[0038] Then, if the analysis unit 41 judges that the above-mentioned linear regression judgment, gradient judgment, or both methods are appropriate (YES in step S7), the setting unit 42 determines that it is appropriate to maintain the current mud pressure in the chamber, and excavation continues as is. On the other hand, if the analysis unit 41 judges that the current mud pressure in the chamber is inappropriate (NO in step S7), the setting unit 42 determines that the current mud pressure in the chamber is lower than the appropriate value, and increases the mud pressure in the chamber by a predetermined amount (step S2). The predetermined amount of increase is 10 to 20 kN / m2 The specified amount to be increased varies depending on various conditions such as soil quality and the set controlled earth pressure, so it is desirable to carry out the test of the present invention again when the next cycle of excavation is completed (measurements may be taken continuously in that cycle) to check whether it is judged to be in the elastic region.
[0039] After that, it is possible to carry out the 3D-FEM model analysis described below as a separate process. However, the 3D-FEM model analysis is not essential to the present invention, and it is sufficient to reset (correct) the controlled earth pressure based on the gradient judgment. (3D-FEM model analysis) Then, a 3D-FEM analysis is performed using the mechanical constants of the ground analyzed while the shield machine is stopped. This 3D-FEM model analysis predicts the impact on the surrounding ground and adjacent structures.
[0040] In other words, once the deformation characteristics of the target ground are clarified based on measurements of displacement and mud pressure when excavation is stopped, the mechanical constants of the ground are calculated by back analysis of a ground model based on the in-situ boundary conditions such as the ground structure assumed from boring surveys and the measured water pressure, etc. Using the mechanical constants of the ground calculated in this way, a 3D-FEM analysis is performed.
[0041] As a result of the analysis, the presence or absence of harmful effects is judged by judging whether the amount of ground surface subsidence is below the allowable displacement amount, etc. If harmful, the controlled earth pressure is changed and the analysis is repeated. On the other hand, if harmless, the sequential update system S of the controlled earth pressure is executed at the next position and time.
[0042] Here, the mechanical constants are, for example, Young's modulus, Poisson's ratio, internal friction angle, and cohesion. A rational simulation of behavior can be performed by adopting an FEM model based on the ground characteristics obtained based on this on-site behavior. A rational simulation based on the above-mentioned on-site behavior makes it possible to predict the ground surface subsidence and the impact on adjacent structures in advance and more accurately, minimizing the impact on the surrounding area or setting the controlled earth pressure corresponding to the regulated values for ground displacement, etc.
[0043] (Analysis and Settings) On the other hand, if the deformation characteristics of the ground are understood, the yield point earth pressure can be obtained by analysis from a muddy earth pressure-displacement graph as shown in FIG. 6. That is, the analysis unit 41 of the control unit 40 finds the point where the gradient suddenly increases, regards this point as the yield point, and obtains the active earth pressure. For example, an approximation line can be obtained from multiple plots in the elastic region by the least squares method, and an approximation line can be obtained from multiple plots in the plastic region by the least squares method, and the intersection of these can be regarded as the yield point. Alternatively, it can be estimated that the transition region has been entered by the appearance of consecutive plots that are significantly different from the moving average. Then, if a 3D-FEM model analysis is required due to the presence of buildings nearby, the impact on the surrounding ground and adjacent structures is predicted by the 3D-FEM analysis. If a 3D-FEM model analysis is not required, the controlled earth pressure is reset based on the active earth pressure. Specifically, the controlled earth pressure in the chamber 16 during excavation must not fall below the active earth pressure plus water pressure, so it is necessary to add a factor of α (for example, 10 to 30 kN / m 2 ) is the lower limit of the controlled earth pressure. On the other hand, the upper limit of the controlled earth pressure may be theoretically calculated using C and φ calculated backward from the active earth pressure (yield point earth pressure), or may be a value that further takes into account the above lower limit and the range of construction fluctuation. On the other hand, if a 3D-FEM model analysis is required, a 3D-FEM model analysis is performed.
[0044] In this way, the observed digital values (observed values) are compared with the digital values (analytical values) obtained through analysis using a model ground, and the model is constantly corrected to create a model ground that is consistent with changes in the ground as the shield face progresses (the so-called "digital twin").
[0045] (effect) Next, the effects of the sequential updating system S for managed earth pressure according to this embodiment will be listed and explained.
[0046] (1) As described above, the sequential updating system S of the controlled earth pressure of this embodiment is a sequential updating system S of the controlled earth pressure in the earth pressure type shield 1 as a shield tunneling machine, and includes an earth discharge device 17 that discharges mud in the chamber 16, a pressure gauge 22 that measures the mud pressure in the chamber 16, displacement measuring means 6, 7 that measure the displacement of the FA in the vicinity of the face, an analysis unit 41 that analyzes the deformation characteristics of the ground based on the measured mud pressure and the measured displacement of the face, and a setting unit 42 that sets the controlled earth pressure based on the analyzed deformation characteristics. Because of this configuration, the sequential updating system S of the controlled earth pressure can set (or update) the controlled earth pressure by directly measuring the relationship between the mud pressure in the chamber and the displacement of the face, rather than setting the controlled earth pressure based on assumptions or estimates.
[0047] (2) Furthermore, when the shield is stopped, as the mud pressure in the chamber 16 changes, the analysis unit 41 analyzes the deformation characteristics of the ground, and the setting unit 42 sets the controlled earth pressure based on the analyzed deformation characteristics of the ground. In this way, by utilizing the pressure drop when the shield is stopped, it is possible to analyze the deformation characteristics and set (or revise) the controlled earth pressure by using the drop in mud pressure in the chamber caused by trying to balance it with the surrounding soil-water pressure, without carrying out a decompression test or the like (without actively reducing pressure).
[0048] Specifically, when the shield is stopped, for example during segment assembly, while the soil removal device 17 is stopped and the mud pressure in the chamber 16 is decreasing, the analysis unit 41 analyzes the deformation characteristics of the ground, and the setting unit 42 sets the controlled earth pressure based on the analyzed deformation characteristics of the ground, so the work is very simple and does not affect the shield excavation process. Also, the risk of inducing loosening of the surrounding ground is reduced, allowing the shield excavation to continue safely.
[0049] (3) Furthermore, the analysis unit 41 calculates the gradient of the graph of mud earth pressure and face displacement, and the setting unit 42 updates the controlled earth pressure by at least one of linear regression judgment and gradient judgment. With this configuration, it is only necessary to judge whether the controlled earth pressure is correct or not using measurement values at several points, so that the controlled earth pressure can be set (or revised or updated) safely and reliably without changing the pressure up to the yield point earth pressure such as the active earth pressure.
[0050] (4) The displacement measuring means 6 includes an exploration tool 61 that penetrates the bulkhead 3 to reach the FA near the face, and a displacement sensor 66 that measures the displacement of the exploration tool 61 on the minehead side of the bulkhead 3. Therefore, the exploration tool 61 and the displacement sensor 66 can directly measure the displacement of the FA near the face from inside the machine. Therefore, the displacement sensor 66 itself is less likely to become dirty and to break down. Note that the displacement measuring means 6 may have a structure that does not penetrate the bulkhead 3 by installing the exploration tool, displacement sensor, etc. in the chamber 16 in front of the bulkhead.
[0051] (5) Furthermore, as the displacement measurement means 7, a multi-stage inclinometer and / or layer-specific settlement meter 71-78 are installed in advance in the ground where excavation is planned, so that in addition to the FA near the face, the displacement of a wide area can be directly measured up to the measurement point near the ground surface.
[0052] (6) In addition, the analysis unit 41 estimates the mechanical constants of the ground by inverse analysis based on the analyzed deformation characteristics of the ground, updates the FEM model using the estimated mechanical constants of the ground, and predicts the impact on the surrounding ground and / or structures using the updated FEM model. Therefore, although not completely in real time, by updating the FEM model at intervals that are close to real time updates and much shorter than conventional intervals, the characteristics of the ground can be made much closer to the actual characteristics. Therefore, prediction and impact assessment using the FEM model can be realized with extremely high accuracy.
[0053] Although an embodiment of the present invention has been described in detail above with reference to the drawings, the specific configuration is not limited to this embodiment, and design changes that do not deviate from the gist of the present invention are included in the present invention.
[0054] For example, in the embodiment, an example has been described in which the detection jig 61 penetrates the bulkhead 3 to reach the FA near the face as a displacement measuring means, but this is not limited thereto, and as long as the detection jig 61 is configured to be movable forward and backward within the chamber 16, it does not have to penetrate the bulkhead 3, and it may be disposed on the cutter spokes (using the measurement device 8 for properties near the face). Also, in the embodiment, the water pressure gauge 23 is attached to the upper part of the skin plate 2, but this is not limited thereto, and it may be attached to, for example, another part of the skin plate 2, the cutter head 5, etc.
[0055] In the embodiment, the gradient of the graph of the mud pressure in the chamber vs. the amount of displacement was compared with the gradient estimated (predicted) from the results of the FEM analysis in advance, but this is not limiting. As a comparison target, in addition to the analysis results, it is also possible to consider a comparison with the gradient (actual value) of the graph of the mud pressure in the chamber vs. the amount of displacement at each segment assembly (the previous or the time before that). [Explanation of symbols]
[0056] 1: Earth pressure shield 2: Skin plate 2a: Hood section 2b: Tail section 3: Bulkhead 5: Cutter head 6: Displacement measurement means 7: Displacement measurement means 8: Measuring device for characteristics near the face (displacement measuring means) 10: Cutter rotation axis 11: Bearings 12: Cutter drive unit 13: Gearbox 14: Rotation drive source 15: Erector 16: Chamber 17:Earth removal equipment 17A: Pressure control device (including soil removal device) 18: Shield propulsion jack 19: Tail seal 21:Soil supply piping 22: Pressure gauge 23: Water pressure gauge 40: Control section 41:Analysis Department 42: Setting section 43: Communication cable 51: Cutter Spoke 52: Cutter Bit 53: Fishtail bit 54: Mixing blade 61: Inspection tool 61a: Tip 62: Jack 63: Hydraulic chuck 64: Detection unit 65: Guide 66: Displacement sensor 67: Water stop device 68: Valve 71-78: Multi-stage inclinometer (or layer-by-layer settlement meter) 90 :Segment S: Sequential update system of controlled earth pressure F: Face FA: Near the face
Claims
1. A system for sequentially updating managed earth pressure in a shield tunneling machine, comprising: a soil discharge device for discharging mud from the chamber; a pressure gauge for measuring the mud pressure in the chamber; A displacement measuring means for measuring a displacement in the vicinity of the face; an analysis unit that analyzes deformation characteristics of the ground based on the measured mud pressure and the measured displacement in the vicinity of the tunnel face; A setting unit that sets an earth pressure control based on the analyzed deformation characteristics; A system for sequentially updating controlled earth pressure.
2. A sequential update system for controlled earth pressure as described in claim 1, wherein when the shield is stopped, as the mud soil pressure in the chamber changes, the analysis unit analyzes the deformation characteristics of the ground, and the setting unit sets the controlled earth pressure based on the analyzed deformation characteristics of the ground.
3. The sequential update system for controlled earth pressure as described in claim 2, wherein the analysis unit analyzes the mud earth pressure and a displacement graph near the face, and the setting unit sets the controlled earth pressure by determining at least one of a linear regression judgment or a gradient judgment of the graph.
4. The sequential update system for managed earth pressure according to any one of claims 1 to 3, comprising, as the displacement measurement means, an exploration tool that reaches the vicinity of the face and a displacement sensor that measures the displacement of the exploration tool.
5. A sequential update system for managed earth pressure as described in any one of claims 1 to 3, wherein a multi-stage inclinometer and / or a layer-by-layer settlement meter are pre-installed in the ground where excavation is planned as the displacement measurement means.
6. The analysis unit is Based on the analyzed deformation characteristics of the ground, the mechanical constants of the ground are estimated by back analysis, and the FEM model is updated using the mechanical constants of the ground.
5. The system for successively updating controlled earth pressure according to claim 4, further comprising a step of predicting an effect on the surrounding ground and / or structures using the updated FEM model.
7. The analysis unit is Based on the analyzed deformation characteristics of the ground, the mechanical constants of the ground are estimated by back analysis, and the FEM model is updated using the mechanical constants of the ground.
6. The system for successively updating controlled earth pressure according to claim 5, further comprising a step of predicting an effect on the surrounding ground and / or structures using the updated FEM model.
Citation Information
Patent Citations
Method and device for holding mud pressure in chamber in soil pressure type shield
JP2007162407A
Soil pressure management device
JP2012233372A
Property evaluation and determination method for excavated sediment in chamber used with various types of excavation methods, and property evaluation and determination method for soil at working face in front of cutter head
JP2017096049A
Controlled earth pressure setting system
JP7496916B1
JPP7496916B