Substrate inspection method, substrate inspection program, and substrate inspection device
The substrate inspection method uses capacitance measurements and differential calculations to accurately locate multiple disconnection points in capacitive touch panels, enhancing defect detection in capacitive touch panels.
Patent Information
- Application Number
- JP2021553529
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2019-10-25
- Filing Date
- 2020-10-22
- Publication Date
- 2024-10-02
- Estimated Expiration
- 2040-10-22
AI Technical Summary
Existing methods struggle to accurately identify multiple disconnection points in capacitive touch panels when a single Y electrode is broken at multiple locations, as the capacitance changes are not significant enough to differentiate between them.
A method involving a substrate inspection apparatus that measures capacitance between intersecting X and Y electrodes, selects specific electrodes, grounds others, and calculates capacitance differences to determine disconnection points, using a board inspection program to execute these processes.
Enables easy determination of disconnection positions even when multiple electrode breaks occur, improving accuracy and efficiency in identifying defects in capacitive touch panels.
Smart Images

Figure 0007559764000001 
Figure 0007559764000002 
Figure 0007559764000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a substrate inspection method, a substrate inspection program, and a substrate inspection apparatus for inspecting a substrate. [Background technology]
[0002] In recent years, with the rapid spread of electronic devices such as smartphones and tablets, there has been a particularly high demand for touch panels (Touch Screen Panels: TSPs) that detect the position touched by a human finger or a stylus pen. A widely used type of touch panel is a capacitive touch panel, which has transparent electrodes arranged in a grid pattern on the touch surface and detects the touch position based on the capacitance generated when a user touches the panel with their finger.
[0003] In a capacitive touch panel, two-dimensional XY coordinates are set on the panel surface, and multiple transparent electrodes (X electrodes) extending in the X direction and multiple transparent electrodes (Y electrodes) extending in the Y direction are arranged opposite each other and insulated from each other on a transparent substrate such as glass to correspond to the XY coordinates.
[0004] A known method for inspecting such touch panels is to measure the capacitance between each X electrode of the X coordinate and each Y electrode of the Y coordinate, and compare the measured capacitance with a pre-stored judgment value (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0005] [Patent Document 1] International Publication No. 2016 / 067709 Summary of the Invention [Problem to be solved by the invention]
[0006] In the above-mentioned inspection method, if one Y electrode is broken at one point, the capacitance of the X electrodes before and after the breakage point changes significantly, so the breakage point of the Y electrode can be estimated. However, if one Y electrode is broken at multiple points, although the breakage point closest to the measurement unit can be identified, at the second or subsequent breakage points as viewed from the measurement unit, there is no significant difference in the capacitance measured for the X electrodes before and after that. Therefore, it is difficult to identify the second or subsequent breakage points as viewed from the measurement unit.
[0007] An object of the present invention is to provide a substrate inspection method, a substrate inspection program, and a substrate inspection apparatus that can easily determine the location of a break even when a single electrode is broken in multiple places. [Means for solving the problem]
[0008] A substrate inspection method according to one example of the present invention is a substrate inspection method for inspecting a substrate in which a plurality of first electrodes extending along a predetermined first direction and a second electrode extending along a second direction intersecting the first direction are formed to face each other, and includes a first selection process in which the number of first electrodes sandwiched between one of the first electrodes and the other of the first electrodes is defined as the number of inter-electrode spaces, one of the plurality of first electrodes is selected as a first selected electrode, and a first electrode having a number of inter-electrode spaces between the first selected electrode that is one or more as a second selected electrode, a first grounding process in which the first electrode other than the first and second selected electrodes and the second electrode are connected to ground, a first measurement process in which an AC voltage is supplied to the first selected electrode and a first capacitance is measured based on a current value measured at the second selected electrode, and a determination process in which the presence or absence of a break in at least one of the first electrodes and the second electrodes in the region between the first selected electrode and the second selected electrode is determined based on the first capacitance.
[0009] Furthermore, a substrate inspection program according to one example of the present invention is a substrate inspection program for executing the above-mentioned substrate inspection method, and causes a computer to execute the first selection process, the first ground process, the first measurement process, and the judgment process.
[0010] Furthermore, a substrate inspection apparatus according to one embodiment of the present invention is a substrate inspection apparatus that executes the above-mentioned substrate inspection method, and is provided with a measurement processing unit that executes the first selection process, the first ground process, and the first measurement process, and a judgment processing unit that executes the judgment process. Effect of the Invention
[0011] The substrate inspection method, substrate inspection program, and substrate inspection device configured as above make it easy to determine the location of a break even when a single electrode is broken in multiple places. [Brief description of the drawings]
[0012] [Figure 1] 1 is a block diagram conceptually showing an example of the configuration of a substrate inspection device that executes a substrate inspection method according to an embodiment of the present invention. [Diagram 2] 10 is a flowchart showing an example of a broken electrode identifying step. [Diagram 3] 11 is a flowchart showing an example of a first selection step, a first ground step, a first measurement step, a second selection step, a second ground step, a second measurement step, and a difference step. [Figure 4] 13 is a flowchart showing an example of a determination process. [Diagram 5] FIG. 11 is an explanatory diagram illustrating a schematic connection relationship between the X electrode X and the Y electrode Y and the AC power supply 2, the ammeter 3, and the ground in step S14 when the variable i is 0, the first selected electrode is the Y electrode Y0, and the second selected electrode is the Y electrode Y2. [Figure 6] FIG. 4 is an explanatory diagram illustrating a method for measuring a first capacitance. [Figure 7] 7 is an explanatory diagram roughly showing a case where a disconnection portion F occurs in the X electrode X3 shown in FIG. 6. FIG. [Figure 8] 11 is a graph showing an example of capacitance measured in the first and second measuring steps. [Figure 9] 11 is a graph showing an example of measurement differences D0 to D16. [Figure 10]FIG. 11 is an explanatory diagram for illustrating the states corresponding to the graphs G1 to G4, that is, the state in which the electrode X3 is disconnected at two locations: a position where it intersects with and faces the Y electrode Y6, and a position where it intersects with and faces the Y electrode Y17. [Figure 11] 4 is a flowchart showing a modification of FIG. 3 in the case where the number of inter-electrodes is two. [Figure 12] 5 is a flowchart showing a modification of FIG. 4 in the case where the number of inter-electrodes is two. [Figure 13] 1. FIG. 4 is an explanatory diagram showing a modified example of the touch panel substrate P shown in FIG. [Figure 14] 14 is an explanatory diagram showing an example of a measurement method when the touch panel substrate P' shown in FIG. 13 is the object to be inspected. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In addition, components with the same reference numerals in each drawing are the same components, and the description thereof will be omitted. The circuit board inspection device 1 shown in Fig. 1 includes an AC power source 2, an ammeter 3, a control unit 4, a display unit 5, an operation unit 6, connection terminals Ty0 to Ty19 (first connection terminals), connection terminals Tx0 to Tx3 (second connection terminals), and changeover switches SW1 and SW2.
[0014] A touch panel substrate P (substrate) to be inspected is connected to the substrate inspection device 1 shown in Fig. 1. XY coordinates are set for the touch panel substrate P shown in Fig. 1, and in the example shown in Fig. 1, the horizontal direction is the X axis and the vertical direction is the Y axis.
[0015] In the touch panel substrate P, a plurality of Y electrodes Y0 to Y19 (first electrodes) and a plurality of X electrodes X0 to X3 (second electrodes) are formed on the surface of a plate-shaped transparent base material Pa such as glass. The Y electrodes Y0 to Y19 extend along the X-axis direction (first direction) at intervals from each other. The X electrodes X0 to X3 extend along the Y-axis direction (second direction) that is spaced apart from each other and perpendicularly intersects with the X-axis direction. The Y electrodes Y0 to Y19 and the X electrodes X0 to X3 are formed to face each other in the thickness direction of the touch panel substrate P (depth direction into the paper). As a result, the X electrodes X0 to X3 correspond to the X coordinate, and the Y electrodes Y0 to Y19 correspond to the Y coordinate.
[0016] That is, the combination of the X electrode X1 and the Y electrode Y1 corresponds to a coordinate position (X1, Y1) on the touch panel substrate P, and the combination of the X electrode Xm and the Y electrode Yn corresponds to a coordinate position (Xm, Yn) on the touch panel substrate P (m and n are any integers).
[0017] The substrate does not necessarily have to be a substrate for a touch panel, but may be any of a variety of substrates, such as a printed wiring board, a flexible board, a ceramic multilayer wiring board, an electrode plate for a liquid crystal display or a plasma display, or a package substrate or film carrier for a semiconductor package.
[0018] In the example shown in FIG. 1, for the sake of simplicity, an example is shown in which there are four X electrodes and twenty Y electrodes. However, the number of electrodes is set appropriately depending on the size of the touch panel substrate P and the position detection accuracy.
[0019] The X electrodes X0 to X3 and the Y electrodes Y0 to Y19 are so-called transparent electrodes, and are made of, for example, indium tin oxide (ITO), indium zinc oxide (IZO), etc. Note that various materials can be used for the X electrodes X0 to X3 and the Y electrodes Y0 to Y19, and they do not necessarily have to be transparent electrodes.
[0020] At positions where the X electrodes X0 to X3 and the Y electrodes Y0 to Y19 intersect, an insulating film is formed between the X electrodes X0 to X3 and the Y electrodes Y0 to Y19, and they are electrically insulated from each other. Also, due to the thickness of the insulating film, a small gap is generated between the X electrodes X0 to X3 and the Y electrodes Y0 to Y19. As a result, at the positions where the X electrodes X0 to X3 and the Y electrodes Y0 to Y19 intersect, i.e., at the coordinate position (Xm, Yn), a capacitance is generated between the X electrode Xm and the Y electrode Yn.
[0021] The X electrodes X0 to X3 and the Y electrodes Y0 to Y19 have a pattern shape in which a plurality of small wide portions W of a uniform size are skewered. In the X electrodes X0 to X3 and the Y electrodes Y0 to Y19, narrow portions N and wide portions W wider than the narrow portions N are repeatedly arranged alternately in the longitudinal direction. The X electrodes X0 to X3 and the Y electrodes Y0 to Y19 cross and face each other in a plan view at the narrow portions N. As a result, almost the entire area where a touch position can be detected (hereinafter referred to as a touch area) is covered by one of the X electrodes X0 to X3 and the Y electrodes Y0 to Y19.
[0022] Wirings Px0 to Px3 conductively connected to the X electrodes X0 to X3 and wirings Py0 to Py19 conductively connected to the Y electrodes Y0 to Y19 are formed on the touch panel substrate P. The wirings Px0 to Px3 and wirings Py0 to Py19 are formed by screen printing using a conductive paste material such as silver paste or copper paste.
[0023] The wirings Px0-Px3, Py0-Py19 are not limited to the above example as long as they electrically connect the X electrodes X0-X3, Y electrodes Y0-Y19 and the connection terminals Tx0-Tx3, Ty0-Ty19. Also, the wirings Px0-Px3, Py0-Py19 may not be provided, and the X electrodes X0-X3, Y electrodes Y0-Y19 and the connection terminals Tx0-Tx3, Ty0-Ty19 may be directly electrically connected.
[0024] Hereinafter, the X electrodes X0 to X3 and the Y electrodes Y0 to Y19 may be collectively referred to as the X electrodes X and the Y electrodes Y, the wirings Px0 to Px3 and Py0 to Py19 may be collectively referred to as the wirings Px and Py, and the connection terminals Tx0 to Tx3 and Ty0 to Ty19 may be collectively referred to as the connection terminals Tx and Ty.
[0025] 13, the substrate to be inspected may be a touch panel substrate P'. The touch panel substrate P' differs from the touch panel substrate P in the following points.
[0026] That is, in the touch panel substrate P', the Y electrode Y0 is composed of the child electrodes Ya0 and Yb0, the Y electrode Y1 is composed of the child electrodes Ya1 and Yb1,..., the Y electrode Y19 is composed of the child electrodes Ya19 and Yb19. Hereinafter, the child electrodes Ya0 to Ya19, Yb0 to Yb19 are collectively referred to as child electrodes Ya and Yb. Note that each Y electrode Y may have more than one child electrode, and may have three or more.
[0027] The Y electrode Y of the touch panel substrate P' is configured by connecting a subsidiary electrode Ya and a subsidiary electrode Yb in parallel. The subsidiary electrodes Ya, Yb have substantially the same shape as the Y electrode Y of the touch panel substrate P. In the subsidiary electrodes Ya, Yb, narrow portions N and wide portions W that are wider than the narrow portions N are repeatedly arranged alternately in the longitudinal direction. The X electrode X and the subsidiary electrodes Ya, Yb cross and face each other in a planar view at the narrow portions N of each other.
[0028] The touch panel substrate P' may further include wirings Py'0 to Py'19. Hereinafter, the wirings Py'0 to Py'19 are collectively referred to as wirings Py'. The wirings Py' are connected to the Y electrode Y on the side opposite to the wirings Py.
[0029] The connection terminals Tx and Ty are configured to be connectable to the ends of the wirings Px and Py. The ends of the wirings Px and Py are, for example, pads, board edge connectors, etc., and are electrically connectable to the connection terminals Tx and Ty.
[0030] For example, the connection terminals Tx0-Tx3, Ty0-Ty19 and the wirings Px0-Px3, Py0-Py19 are connected by a user mounting the touch panel substrates P, P' to be inspected in a predetermined mounting position of the substrate inspection apparatus 1. As a result, the connection terminals Tx0-Tx3 and the connection terminals Ty0-Ty19 are electrically connected to the X electrodes X0-X3 and the Y electrodes Y0-Y19.
[0031] The changeover switch SW1 switches the connection destination of each of the connection terminals Ty0 to Ty19 between any one of the AC power supply 2, the ammeter 3, and the circuit ground (hereinafter referred to as ground) in response to a control signal from the control unit 4. The changeover switch SW2 switches the connection destination of each of the connection terminals Tx0 to Tx3 between the ammeter 3 and the circuit ground in response to a control signal from the control unit 4.
[0032] In addition, the substrate inspection device 1 may further include connection terminals Ty'0 to Ty'19 that can be connected to ends of the wiring Py', and the changeover switch SW1 may further be capable of switching the connection destination of the connection terminals Ty'0 to Ty'19 between one of the AC power source 2, the ammeter 3, and ground, respectively.
[0033] The AC power supply 2 supplies an AC voltage SA having an effective value of, for example, a voltage V to a connection terminal Ty selected by a changeover switch SW1. The AC voltage SA is, for example, a sine wave having a frequency f.
[0034] The ammeter 3 detects the current flowing through the connection terminal Tx selected by the changeover switch SW2, and outputs information indicating the effective current value I to the control unit 4.
[0035] The display unit 5 is, for example, a display device such as a liquid crystal display device or an organic EL (Electro Luminescence) display. The operation unit 6 is an operation device that accepts operation inputs from a user. As the operation unit 6, for example, an operation switch, a keyboard, a touch panel, etc. are used.
[0036] The control unit 4 is a so-called computer, and is composed of, for example, a CPU (Central Processing Unit) that executes predetermined arithmetic processing, a RAM (Random Access Memory) that temporarily stores data, a memory unit 44 such as a non-volatile flash memory or HDD (Hard Disk Drive) that stores a predetermined board inspection program, and peripheral circuits thereof.
[0037] The control unit 4 executes a substrate inspection program stored in, for example, the memory unit 44, thereby functioning as a broken electrode identification processing unit 41, a measurement processing unit 42, and a judgment processing unit 43. The memory unit 44 stores in advance reference differences Dc(0) to Dc(16), which will be described later, obtained based on a touch panel substrate P known to have no breaks in the X electrodes X0 to X3 and the Y electrodes Y0 to Y19.
[0038] The broken electrode identification processing unit 41 executes a broken electrode identification step of detecting the presence or absence of a break for each of the X electrodes X0 to X3. The broken electrode identification processing unit 41 can use various known break detection methods, such as those described in Patent Document 1, as a method for detecting the presence or absence of a break.
[0039] Specifically, for example, when detecting the presence or absence of a disconnection of the X electrode X0, the broken electrode identification processing unit 41 connects the AC power supply 2 to the wiring Py0 with the change-over switch SW1, and connects the ammeter 3 to the X electrode X0 with the change-over switch SW2. Then, the broken electrode identification processing unit 41 supplies an AC voltage SA from the AC power supply 2 to the Y electrode Y0.
[0040] If there is no break in the X electrode X0, the X electrode X0 and Y electrode Y0 are capacitively coupled at the coordinate position (X0, Y0) via the electrostatic capacitance C(0,0). Therefore, when an AC voltage SA is supplied to the Y electrode Y0, a current flows from the Y electrode Y0 to the X electrode X0 via the electrostatic capacitance C(0,0), and this current is detected by the ammeter 3.
[0041] On the other hand, if the X electrode X0 is disconnected, the current flowing from the Y electrode Y0 to the X electrode X0 via the capacitance C(0,0) stops at the point of disconnection and is not detected by the ammeter 3 except for a minute leakage current.
[0042] Therefore, the broken electrode identification processing unit 41 compares the current value I detected by the ammeter 3 with a preset broken line determination value Iref, and if the current value I exceeds the broken line determination value Iref, it can determine that there is no broken line in the X electrode X0. On the other hand, if the current value I is equal to or less than the broken line determination value Iref, the broken electrode identification processing unit 41 can determine that there is a broken line in the X electrode X0. In the same manner, the broken electrode identification processing unit 41 can also determine the presence or absence of a broken line in the other X electrodes X1 to X3.
[0043] Here, if the capacitance of the entire measurement path from the AC power supply 2 to the ammeter 3 is C, the capacitance C can be approximated by the following equation (1). C = I / (2πfV) (1)
[0044] Therefore, the capacitance C can be calculated based on the current value I. Furthermore, the effective voltage V of the AC voltage SA and the frequency f are fixed values. From equation (1), the current value I and the capacitance C are proportional to each other. Therefore, the current value I has significance as information that directly represents the capacitance C. Therefore, detecting the current value I is nothing but measuring the capacitance C.
[0045] The measurement processing unit 42 executes a first selection step, a first ground step, a first measurement step, a second selection step, a second ground step, and a second measurement step, which will be described later. The judgment processing unit 43 executes a difference step and a judgment step, which will be described later.
[0046] Next, an example of a board inspection method executed by the board inspection apparatus 1 configured as described above will be described with reference to Figures 2 to 4. In the following flowchart, the same processes are given the same step numbers and the description thereof will be omitted.
[0047] The broken electrode identification processing unit 41 first executes a broken electrode identification process of steps S1 to S9 to check for the presence or absence of breaks in the X electrodes X0 to X3. Specifically, the broken electrode identification processing unit 41 initializes a variable i to 0 (step S1).
[0048] Next, the broken electrode identification processing unit 41 connects the ammeter 3 to the connection terminal Txi using the changeover switch SW2 (step S2). Next, the broken electrode identification processing unit 41 connects the AC power source 2 to the connection terminal Ty0 using the changeover switch SW1, and supplies an AC voltage SA from the AC power source 2 to the Y electrode Y0 (step S3). At this time, the broken electrode identification processing unit 41 may connect the connection terminal Tx other than the connection terminal Txi and the connection terminals Ty1 to Ty19 other than the connection terminal Ty0 to ground.
[0049] Next, the broken electrode identification processing unit 41 compares the current value I detected by the ammeter 3 with the broken electrode determination value Iref (step S4). If the current value I is less than the broken electrode determination value Iref (YES in step S4), the broken electrode identification processing unit 41 stores the X electrode Xi as having a broken electrode in the storage unit 44 (step S5). This makes it possible to identify the X electrode X in which a break has occurred.
[0050] On the other hand, if the current value I is equal to or greater than the disconnection determination value Iref (NO in step S4), it can be determined that the X electrode Xi is not disconnected, and the disconnected electrode identification processing unit 41 proceeds to step S6.
[0051] Next, the broken electrode identification processing unit 41 determines whether the variable i is equal to 3, that is, whether or not the inspection for broken wires has been completed for all of the X electrodes X0 to X3 (step S6). If the variable i is not equal to 3, the broken electrode identification processing unit 41 adds 1 to the variable i (step S7) and repeats steps S2 to S6 again.
[0052] Then, when the variable i becomes equal to 3 (YES in step S6), the broken electrode identification processing unit 41 refers to the storage unit 44 and checks whether or not there is a break in any of the X electrodes X0 to X3 (step S8). Then, if the X electrode X determined to have a break is not stored in the storage unit 44 (NO in step S8), the broken electrode identification processing unit 41 determines that there is no break in the X electrodes X0 to X3 (step S9), and ends the process.
[0053] On the other hand, if the X electrode X determined to have a disconnection is stored in the storage unit 44 (YES in step S8), the process proceeds to step S11 to determine the position in the Y-axis direction where the disconnection occurs in the X electrode X.
[0054] In step S11, the measurement processing unit 42 initializes a variable i to 0 (step S11). Next, the measurement processing unit 42 selects the Y electrode Yi as a third selected electrode and the Y electrode Y(i+2) as a fourth selected electrode (step S12: second selection step). In this case, the Y electrode Y sandwiched between the Y electrode Yi and the Y electrode Y(i+2) is only the Y electrode Y(i+1), and the number of inter-electrodes is 1.
[0055] Next, the measurement processing unit 42 connects the Y electrodes Y other than the Y electrodes Yi, Y(i+2), i.e., the Y electrodes Y other than the third and fourth selected electrodes, to ground by the change-over switch SW1, and further connects all the X electrodes X0 to X3 to ground by the change-over switch SW2 (step S13: second grounding step).
[0056] Next, when the AC voltage SA is supplied to the connection terminal Tyi corresponding to the third selected electrode, the measurement processing unit 42 measures the current at the connection terminal Ty(i+2) corresponding to the fourth selected electrode as a current value I, and measures the second capacitance Cb based on the current value I (step S14: second measurement step). Specifically, the measurement processing unit 42 connects the AC power source 2 to the connection terminal Tyi by the changeover switch SW1, and connects the ammeter 3 to the connection terminal Ty(i+2) by the changeover switch SW1. The measurement processing unit 42 calculates the second capacitance Cb based on the current value I detected by the ammeter 3, for example, by using formula (1). Note that, similar to the broken electrode identification processing unit 41, the current value I may be used as it is as information representing the second capacitance Cb.
[0057] 5, when the variable i is 0, in step S14, the AC power supply 2 is connected to the connection terminal Ty0, and the ammeter 3 is connected to the connection terminal Ty2. Then, an AC voltage SA is supplied from the AC power supply 2 between the Y electrodes Y0 and Y2.
[0058] Then, if the X electrodes X0 to X3 are not disconnected between the Y electrodes Y0 and Y2, current paths A0 to A3 are formed via electrostatic coupling between the X electrodes X0 to X3 and the Y electrodes Y0, Y2.
[0059] Therefore, the sum of the currents flowing through the current paths A0 to A3 is detected by the ammeter 3 as a current with a current value I. Based on the current value I obtained in this manner, the measurement processing unit 42 can obtain the second capacitance Cb between the connection terminal Tyi and the connection terminal Ty(i+2).
[0060] 1, parasitic capacitances are generated in each of the wirings Py0 to Py19. The parasitic capacitance values are roughly proportional to the wiring lengths between the changeover switch SW1 and each of the Y electrodes Y. Therefore, the second capacitance Cb measured in step S14 includes parasitic capacitances according to the wiring lengths.
[0061] If the test object is a touch panel substrate P', the measurement processing unit 42 may connect the AC power source 2 to the connection terminals Tyi, Ty'i by the changeover switch SW1 and may connect the ammeter 3 to the connection terminals Ty(i+2), Ty'(i+2) by the changeover switch SW1 in step S14. As a result, as shown in Fig. 14, an AC voltage SA may be supplied to both ends of the Y electrode Yi and the current flowing out from both ends of the Y electrode Y(i+2) may be measured as a current value I. Even if the test object is a touch panel substrate P', the connection terminal Ty' may be left open and the above-mentioned step S14 may be executed as it is.
[0062] Hereinafter, in steps S17, S14a, and S17a, the AC power supply 2 and the ammeter 3 may be connected in the same manner as in FIG.
[0063] Next, the measurement processing unit 42 selects the Y electrode Y(i+1) as the first selected electrode and the Y electrode Y(i+3) as the second selected electrode (step S15: first selection step). The number of inter-electrode spaces between the Y electrode Y(i+1) as the first selected electrode and the Y electrode Y(i+3) as the second selected electrode is equal to the number of inter-electrode spaces between the Y electrode Yi as the third selected electrode and the Y electrode Y(i+2) as the fourth selected electrode, which is 1.
[0064] Next, the measurement processing unit 42 connects the Y electrodes Y other than the Y electrodes Y(i+1) and Y(i+3), i.e., the Y electrodes Y other than the first and second selected electrodes, to ground by the changeover switch SW1, and further connects all the X electrodes X0 to X3 to ground by the changeover switch SW2 (step S16: first grounding step).
[0065] Next, when the measurement processing unit 42 supplies the AC voltage SA to the connection terminal Ty(i+1) corresponding to the first selected electrode, it measures the current at the connection terminal Ty(i+3) corresponding to the second selected electrode as a current value I, and measures the first capacitance Ca based on the current value I (step S17: first measurement step). The measurement processing unit 42 connects the AC power source 2 to the connection terminal Ty(i+1) by the changeover switch SW1, and connects the ammeter 3 to the connection terminal Ty(i+3) by the changeover switch SW2.
[0066] Referring to Figure 6, when variable i = 0, the connection terminal Ty(i+1) is connected to the Y electrode Y1, and therefore the AC power supply 2 is connected to the Y electrode Y1, and the connection terminal Ty(i+3) is connected to the Y electrode Y3, and therefore the ammeter 3 is connected to the Y electrode Y3.
[0067] In step S17, the measurement processing section 42 measures the first capacitance Ca based on the current value I detected by the ammeter 3 in the same manner as the second capacitance Cb in step S14.
[0068] In the example shown in steps S14 and S17, the measurement processing unit 42 measures the second capacitance Cb and the first capacitance Ca including the parasitic capacitance of the wiring Py via the wiring Py. However, the second capacitance Cb and the first capacitance Ca not including the parasitic capacitance of the wiring Py may be measured without going through the wiring Py by, for example, directly contacting the connection terminals Tx and Ty with the ends of the connection terminal Ty.
[0069] Furthermore, the measurement processing unit 42 may measure the second capacitance Cb and the first capacitance Ca in steps S14 and S17, and the measurement method is not limited to the above-mentioned method. The measurement processing unit 42 may use various capacitance measurement methods in steps S14 and S17.
[0070] Next, the determination processing unit 43 subtracts the first capacitance Ca from the second capacitance Cb, and calculates the difference between the first capacitance Ca and the second capacitance Cb as the measurement difference Di (step S18: difference step).
[0071] Next, the determination processing unit 43 reads out the reference difference Dc(i) from the storage unit 44, and calculates the determination target difference DDi by subtracting the reference difference Dc(i) from the measurement difference Di (step S20: determination step).
[0072] Next, the determination processing unit 43 compares the determination target difference DDi with a preset determination reference value Dref (step S21: determination process). Then, when the determination target difference DDi exceeds the determination reference value Dref (YES in step S21), the determination processing unit 43 determines that there is a break in at least one of the X electrodes X at a position intersecting and facing the Y electrode Y(i+2) disposed between the Y electrode Y(i+1) which is the first selected electrode and the Y electrode Y(i+3) which is the second selected electrode (step S22: determination process). The "between the Y electrode Y(i+1) which is the first selected electrode and the Y electrode Y(i+3) which is the second selected electrode" includes the first selected electrode and the second selected electrode themselves.
[0073] Here, since the difference DDi to be judged is a value obtained based on the first capacitance Ca by steps S17, S18, and S20, steps S21 and S22 are nothing more than a judgment process for judging the presence or absence of a break in the second electrode in the region between the first selected electrode and the second selected electrode based on the first capacitance Ca.
[0074] Next, the determination processing unit 43 stores the disconnection position determined in step S22 in the storage unit 44 (step S23).
[0075] On the other hand, in step S21, if the judgment target difference DDi is equal to or less than the judgment reference value Dref (NO in step S21), the judgment processing unit 43 can determine that none of the X electrodes X is disconnected between the Y electrode Y(i+1) which is the first selected electrode and the Y electrode Y(i+3) which is the second selected electrode, and therefore proceeds to step S24 without executing steps S22 and S23.
[0076] In step S24, the judgment processing unit 43 compares the variable i with 19-3=16 (step S24). If the variable i=16, the judgment processing unit 43 determines that the inspection of the disconnection position is completed, and ends the process. On the other hand, if the variable i=16 is not, the judgment processing unit 43 adds 1, which is the number of inter-electrode spaces, to the variable i (step S25), and repeats steps S12 to S24 again.
[0077] 2 to 4 illustrate an example in which the touch panel substrate P having the Y electrodes Y0 to Y19 shown in Fig. 1 is to be inspected. Therefore, in step S24, the end condition of the process is determined based on 19, which is the maximum number of the Y electrodes Y. The end condition of step S24 may be set appropriately according to the number of Y electrodes Y to be inspected.
[0078] As a result, a series of group steps including step S15 (first selection step), step S16 (first ground step), step S17 (first measurement step), step S12 (second selection step), step S13 (second ground step), step S14 (second measurement step), and step S18 (difference step) are repeatedly executed while shifting the first to fourth selected electrodes by the number of inter-electrode gaps (=1), and the disconnection position of the X electrode X is inspected.
[0079] 8, the vertical axis indicates capacitance (fF), and the horizontal axis indicates the measurement position of the capacitance. "Ty0-Ty2" on the horizontal axis indicates the distance between the connection terminals Ty0 and Ty2, "Ty1-Ty3" indicates the distance between the connection terminals Ty1 and Ty3, and so on from the distance between the connection terminals Ty2 and Ty4 to the distance between the connection terminals Ty17 and Ty19.
[0080] 8, the capacitance in a normal state when there is no disconnection among the X electrodes X0 to X3 is shown by dashed graph G1, and the capacitance when there is a disconnection in the X electrode X3 is shown by solid graph G2. Graph G2 shows an example when the electrode X3 is disconnected at two positions, one where it intersects with and faces the Y electrode Y6, and the other where it intersects with and faces the Y electrode Y17.
[0081] The data in Fig. 8 and Fig. 9 are data measured using the touch panel substrate P' shown in Fig. 13 as the test object. However, regardless of whether the test object is the touch panel substrate P or P', the same test method can basically be applied, so the following description will be mainly based on Figs. 5 to 7 and Fig. 10, and will also refer to Fig. 13 as necessary.
[0082] 1, among the wirings Py0 to Py19, the wiring Py0 is the longest, and the wiring Py19 becomes shorter as it approaches the wiring Py19. As a result, the parasitic capacitance of the wiring Py0 is the largest, and the parasitic capacitance of the wiring Py19 is the smallest. Therefore, in the graphs G1 and G2 shown in FIG. 8, the capacitance is the largest between the connection terminals Ty0 and Ty2, and the capacitance decreases as it approaches the connection terminals Ty17 and Ty19.
[0083] Furthermore, if there is a break in the X-electrode X, the portion beyond the break when viewed from the end of the X-electrode X connected to the ground becomes a floating island. When a potential is supplied to the floating island, the capacitance generated in the floating island increases. When no potential is supplied to the floating island, the capacitance can be ignored. The capacitance was measured for the defective sample and the non-defective sample in FIG. 10 by the same measurement method as in steps S12 to S14, while changing the variable i from 0 to 17. As a result, as shown in FIG. 8, the capacitance was generally larger in the graph G2 of the defective sample than in the graph G1 of the non-defective sample.
[0084] Graph G2 generally changes in a substantially linear manner, but there are some points where the capacitance drops nonlinearly. Possible reasons for obtaining graph G2 will be explained below.
[0085] In the case of Ty0-Ty2 to Ty3-Ty5, the defective sample has a break at the electrode positions Y17 and Y6, so the X electrode X3 becomes a floating island FI1 in the section Y0 to Y6. Since the AC voltage SA is supplied to this floating island FI1, it is considered that the parasitic capacitance of the metal part of the floating island FI1 is increased compared to the non-defective sample.
[0086] In the case of Ty4-Ty6, the defective sample has breaks at the electrode positions of Y17 and Y6, so Y0 to Y6 become a floating island FI1. Since an AC voltage SA is supplied to this floating island FI1, the parasitic capacitance of the metal part of the floating island FI1 increases compared to the non-defective sample. Since the X electrode X3 is broken at the position where it intersects with the Y electrode Y6, it is considered that the capacitance between the X electrode X3 and the Y electrode Y6 at the intersection position decreases. However, it is considered that the X electrode X3 and the Y electrode Y6 are capacitively coupled to a certain extent, even though they are broken. As a result, it is considered that the parasitic capacitance of the floating island FI1 of Y0 to Y6 is added to the capacitance of the non-defective sample, and the capacitance of Ty4 to Ty6 in the defective sample is larger than that of the non-defective sample.
[0087] In the case of Ty5-Ty7, the capacitance between the X electrode X and the Y electrode Y at the coordinate positions (X3,Y5), (X2,Y5), (X2,Y6), and (X3,Y7) is the same as that of the non-defective sample. At this time, the capacitance between the X electrode X and the Y electrode Y at the coordinate position (X3,Y6) is not measured. The ammeter 3 is connected to the floating islands FI2 of Y6-Y17, but the AC power source 2 is not connected to the floating islands FI2 of Y6-Y17, so they are in a floating state, and the effect of the floating islands FI2 of Y6-Y17 on the capacitance is small. For this reason, it is considered that the capacitance in the case of Ty5-Ty7 is closer to that of the non-defective sample than in the case of Ty4-Ty6.
[0088] In the case of Ty7-Ty9 to Ty14-Ty16, the AC power supply 2 supplies a potential to a portion of Y6-Y17 corresponding to the floating island FI2. It is considered that the capacitance is larger than that of the non-defective sample due to the parasitic capacitance of the portion corresponding to this floating island FI2.
[0089] The case of Ty6-Ty8 will be described with reference to the touch panel substrate P' shown in FIG. 13. In the touch panel substrate P' on which the data in FIG. 8 and FIG. 9 was measured, the X electrode X3 is disconnected at the position where the child electrode Ya6 and the X electrode X3 intersect with the child electrode Ya6, among the child electrodes Ya6 and Yb6 included in the Y electrode Y6. Although not shown in FIG. 13, the X electrode X3 of the touch panel substrate P' is a floating island similar to the floating island FI2 shown in FIG. 10 in the section Y6 to Y17. The AC power supply 2 supplies a potential to the portion of Y6 to Y17 corresponding to the floating island FI2. It is considered that the capacitance of Ty6-Ty8 is larger than the capacitance of the non-defective sample due to the parasitic capacitance of the portion corresponding to this floating island FI2.
[0090] In this way, when a break occurs somewhere in the X-electrode X, the capacitance measured at a position where there is no break may also change from the normal value. Therefore, it is easier to determine the presence or absence of a break by comparing the determination target difference DDi with the determination reference value Dref than by a determination method in which the second capacitance Cb measured in step S14 is simply compared with a reference value.
[0091] Therefore, the second capacitance Cb and the first capacitance Ca are measured in steps S14 and S17, the measurement difference Di is calculated in step S18, a target difference DDi is calculated in step S20, and the target difference DDi is compared with a reference value Dref in step S21 to determine whether or not there is a break in the X electrode X at the position corresponding to the variable i.
[0092] Hereinafter, the measurement differences D0 to D16 are collectively referred to as the measurement difference D. With reference to Fig. 9, a dashed line graph G3 indicates the measurement difference D in a normal state when there is no disconnection in the X electrodes X0 to X3, and a solid line graph G4 indicates the measurement difference D when the electrode X3 is disconnected at two locations, at a position where it intersects with and faces the Y electrode Y6, and at a position where it intersects with and faces the Y electrode Y17.
[0093] Between graphs G1 and G2 shown in FIG. 8, there is an overall difference in capacitance, whereas between graphs G3 and G4 shown in FIG. 9, there is no significant difference in the value of the measurement difference D, except for D3, D4, D6, and D14 to D16, which are affected by the disconnection of electrode X3.
[0094] Therefore, steps S11 to S18, S24, and S25 are experimentally performed in advance for a touch panel substrate P in which there are no breaks in the X electrodes X0 to X3, and the obtained measurement differences D0 to D16 are stored as reference differences Dc(0) to Dc(16) in the storage unit 44. For example, the capacitances corresponding to the measurement differences D0 to D16 of the graph G3 shown in FIG. 9 can be used as the reference differences Dc(0) to Dc(16).
[0095] Then, the judgment reference value Dref may be set in advance so as to distinguish between an increase in the measurement difference D caused when a disconnection occurs in the X-electrode X and an increase in the measurement difference D caused by variations or the like. For example, in the example shown in FIG. 9, the judgment reference value Dref may be set to 20 fF.
[0096] For example, the capacitances corresponding to the measurement differences D0 to D16 of graph G3 shown in Fig. 9 are set as the reference differences Dc(0) to Dc(16), and the judgment reference value Dref is set to 20 fF. According to Fig. 9, from graph G4, the measurement differences D4 and D15 are 80 fF and 78 fF, and from graph G3, the reference differences Dc(4) and Dc(15) corresponding to the measurement differences D4 and D15 are 45 fF and 45 fF.
[0097] Then, in step S20, the difference to be determined DD4=D4-Dc(4)=80-45=35, and the difference to be determined DD15=D15-Dc(15)=78-45=33. Therefore, both of the differences to be determined DD4 and DD15 are greater than the reference value Dref=20fF (YES in step S21). Therefore, in step S22, the determination processing unit 43 determines that the X electrode X is disconnected at a position facing the Y electrode Y(4+2) between the Y electrodes Y(4+1) and Y electrodes Y(4+3) and at a position facing the Y electrode Y(15+2) between the Y electrodes Y(15+1) and Y electrodes Y(15+3). That is, it can be determined that the X electrode X is disconnected at two positions facing the Y electrodes Y(6) and Y(17).
[0098] Even when the test object is the touch panel substrate P', the determination processor 43 can determine in step S22 that the X electrode X is disconnected at a position facing the Y electrode Y(i+2). In this case, the determination processor 43 can determine that the X electrode X is disconnected at a position facing the Y electrode Y(i+2), that is, at a position facing at least one of the child electrodes Ya(i+2) and Yb(i+2).
[0099] Furthermore, according to steps S1 to S9, the X electrode X in which the disconnection has occurred is specified in step S5, and information indicating the X electrode X in which the disconnection has occurred is stored in the storage unit 44. Therefore, by combining the information obtained in step S5 with the information indicating the disconnection position obtained in step S22, it is possible to know which X electrode X is disconnected and at what position.
[0100] As described above, according to steps S11 to S25, even if one X electrode X is broken at multiple points as shown in FIG. 10, it is easy to determine the respective breakage positions.
[0101] 8, when the X-electrode X (second electrode) is not disconnected in the touch panel substrate P, the capacitance (first and second capacitances) decreases as the positions of the connection terminals Tyi to Ty(i+3) corresponding to the first to fourth selection electrodes move in the direction from Y coordinate 0 (one side in the second direction) to Y coordinate 19 (the other side in the second direction) which has a larger coordinate value. That is, the graph G1 slopes downward from left to right in FIG.
[0102] Then, in step S15, the Y electrode Y(i+1) is selected as the first selected electrode, and the Y electrode Y(i+3) is selected as the second selected electrode, and in step S12, the Y electrode Yi is selected as the third selected electrode, and the Y electrode Y(i+2) is selected as the fourth selected electrode, so that the first selected electrode is located on the other side with a larger coordinate value than the third selected electrode, and the second selected electrode is located on the other side with a larger coordinate value than the fourth selected electrode.
[0103] As a result, the second capacitance Cb is measured at a position where the capacitance is large according to the slope of the graph G1 (step S14), and the first capacitance Ca is measured at a position where the capacitance is small according to the slope of the graph G1 (step S17). Therefore, the measurement difference Di calculated in step S18 includes the sum of the amount of decrease in the first capacitance Ca according to the presence or absence of a break and the amount of decrease in capacitance according to the slope of the graph G1.
[0104] On the other hand, if the first selected electrode is located on one side with a smaller coordinate value than the third selected electrode, and the second selected electrode is located on one side with a smaller coordinate value than the fourth selected electrode, the measurement difference Di calculated in step S18 is calculated by adding the increase in capacitance associated with the slope of the graph G1 to the decrease in the first capacitance Ca associated with the presence or absence of a disconnection. That is, the decrease in the first capacitance Ca is offset by the increase in capacitance associated with the slope of the graph G1. Therefore, the value of the measurement difference Di becomes smaller, and it becomes more difficult to determine the presence or absence of a disconnection based on the measurement difference Di.
[0105] Therefore, as shown in Figure 8, if the capacitance (first and second capacitances) decreases as the positions of the connection terminals Tyi to Ty(i+3) corresponding to the first to fourth selection electrodes move in the direction from Y coordinate 0 (one side in the second direction) to Y coordinate 19 (the other side in the second direction) which has a larger coordinate value, it is more preferable that the first selection electrode is located on the other side which has a larger coordinate value than the third selection electrode, and the second selection electrode is located on the other side which has a larger coordinate value than the fourth selection electrode.
[0106] Although an example in which the number of inter-electrodes is one has been shown, the number of inter-electrodes may be two or more. With reference to Fig. 11 and Fig. 12, when the number of inter-electrodes is two, in step S12a, the Y electrode Yi is selected as the third selected electrode, and the Y electrode Y(i+3) is selected as the fourth selected electrode, and steps S13a and S14a are executed with the Y electrodes Yi, Y(i+3) as the third and fourth selected electrodes.
[0107] In step S15a, the Y electrode Y(i+2) is selected as the first selected electrode, and the Y electrode Y(i+5) is selected as the second selected electrode, and steps S16a, S17a, and S22a are executed with the Y electrodes Y(i+2) and Y(i+5) as the first and second selected electrodes. Furthermore, in step S24a, the variable i is compared with 19-4, and in step S25a, 2, which is the number of inter-electrodes, is added to the variable i.
[0108] Even in this way, the disconnection position of the X-electrode X can be inspected. Since the first selected electrode is shifted by the number of inter-electrode spaces and selected and measured repeatedly, doubling the number of inter-electrode spaces can reduce the number of measurements by about half. Reducing the number of measurements can shorten the inspection time. Note that the shift amount when selecting the first selected electrode does not have to be the same as the number of inter-electrode spaces.
[0109] 11 and 12 illustrate an example in which the touch panel substrate P having the Y electrodes Y0 to Y19 shown in FIG. 1 is inspected and the number of inter-electrodes is 2. Therefore, in step S24a, the end condition of the process is determined based on 19, which is the maximum number of the Y electrodes Y, and 4, which is the number of inter-electrodes added by 2. The end condition of step S24a may be set appropriately according to the number of Y electrodes Y to be inspected and the number of inter-electrodes.
[0110] Alternatively, the first selection electrode may be located on one side having a smaller coordinate value than the third selection electrode, and the second selection electrode may be located on one side having a smaller coordinate value than the fourth selection electrode.
[0111] Furthermore, although an example has been shown in which the Y electrode Y is the first electrode and the X electrode X is the second electrode, the Y electrode Y may be the second electrode and the X electrode X may be the first electrode.
[0112] Furthermore, the broken electrode identification processing unit 41 may not be provided, and the broken electrode identification process of steps S1 to S9 may not be executed.
[0113] Alternatively, steps S24 (S24a) and S25 (S25a) may be omitted, and a variable i indicating an inspection location may be appropriately set in step S11, and steps S12 (S12a) to S23 may be executed once. Even in this case, it is possible to inspect the X-electrode X for disconnection at a location according to the variable i.
[0114] Also, in step S22, the disconnection location may not be specified as a position facing the Y electrode Y(i+2), but may be "between the Y electrode Y(i+1) (first selected electrode) and the Y electrode Y(i+3) (second selected electrode)." When the X electrode X has a shape including a narrow portion N and a wide portion W as shown in FIG. 1, the wide portion W is less likely to break, so there is a high possibility that the disconnection has occurred in the narrow portion N intersecting with the Y electrode Y. Therefore, in step S22, the disconnection location can be specified as a position facing the Y electrode Y(i+2).
[0115] However, there is a low possibility that the wire may break at the narrow portion N. Furthermore, the X electrode X may not have the narrow portion N and the wide portion W, and may have a band shape with a substantially constant width.
[0116] Therefore, in step S22, the disconnection position may not be specified as a position facing the Y electrode Y(i+2) but may be "between the Y electrode Y(i+1) (first selected electrode) and the Y electrode Y(i+3) (second selected electrode)." Similarly, in step S22a, the disconnection position may not be specified as a position facing the Y electrodes Y(i+3), (i+4) but may be "between the Y electrode Y(i+2) (first selected electrode) and the Y electrode Y(i+5) (second selected electrode)."
[0117] In addition, in step S11, a variable i indicating the inspection location may be appropriately set, and only steps S15 to S17 (steps S15a to S17a) may be executed, and the presence or absence of a break in the second electrode in the region between the first selected electrode and the second selected electrode may be determined based only on the obtained first capacitance Ca.
[0118] 8, the capacitances of "Ty6-Ty8" and "Ty16-Ty18" measured as the first capacitance Ca decrease nonlinearly compared to a portion without a disconnection. Therefore, it is possible to determine the presence or absence of a disconnection of the second electrode in the region between the first selected electrode and the second selected electrode based only on the first capacitance Ca.
[0119] That is, a substrate inspection method according to one example of the present invention is a substrate inspection method for inspecting a substrate in which a plurality of first electrodes extending along a predetermined first direction and a second electrode extending along a second direction intersecting the first direction are formed to face each other, and includes a first selection process in which the number of first electrodes sandwiched between one of the first electrodes and the other of the first electrodes is defined as the number of inter-electrode spaces, one of the plurality of first electrodes is selected as a first selected electrode, and a first electrode having a number of inter-electrode spaces between the first selected electrode of one or more is selected as a second selected electrode, a first grounding process in which the first electrode other than the first and second selected electrodes and the second electrode are connected to ground, a first measurement process in which an AC voltage is supplied to the first selected electrode and a first capacitance is measured based on a current value measured at the second selected electrode, and a determination process in which the presence or absence of a break in at least one of the first electrodes and the second electrodes in the region between the first selected electrode and the second selected electrode is determined based on the first capacitance.
[0120] According to this method, the first capacitance measured in the first measurement step is the capacitance of a path from the first selected electrode to the second selected electrode via the second electrode. If the second electrode is disconnected in the region between the first selected electrode and the second selected electrode, the capacitance of this path changes significantly compared to when there is no disconnection. Therefore, it is possible to determine whether or not the second electrode is disconnected in the region between the first selected electrode and the second selected electrode. In this case, even if the second electrode is disconnected in a region other than the region between the first selected electrode and the second selected electrode, it is unlikely to affect the first capacitance. As a result, even if one second electrode is disconnected at multiple locations, it is easy to determine the location of the disconnection.
[0121] Furthermore, the method further includes a second selection process in which a pair of first electrodes having an electrode spacing equal to that between the first and second selected electrodes are selected as third and fourth selected electrodes, and the fourth selected electrode is the first electrode between the first selected electrode and the second selected electrode, a second grounding process in which the first electrode other than the third and fourth selected electrodes and the second electrode are connected to ground, a second measurement process in which an AC voltage is supplied to the third selected electrode and a second capacitance is measured based on a current value measured at the fourth selected electrode, and a difference process in which a difference between the first capacitance and the second capacitance is calculated as a measurement difference, and it is preferable that the determination process determines the presence or absence of a break in at least one of the first electrode and the second electrode in the region between the first selected electrode and the second selected electrode based on the measurement difference.
[0122] The first capacitance may vary depending on the measurement position and the presence or absence of a break. In such a case, it may be difficult to determine the presence or absence of a break in at least one of the first and second electrodes in the region between the first and second selected electrodes based only on the first capacitance. However, the measurement difference, which is the difference between the first and second capacitances in the region without a break, varies less depending on the measurement position and the presence or absence of a break than the first capacitance alone. Therefore, if the presence or absence of a break in the region between the first and second selected electrodes is determined based on the measurement difference, the difficulty of the determination is lower than that of determining the presence or absence of a break based only on the first capacitance.
[0123] In addition, it is preferable that the second electrode includes a narrow portion that faces the multiple first electrodes at a position where it intersects with them, and a wide portion that is wider than the narrow portion at a position not facing the multiple first electrodes, and the determination process determines the presence or absence of a break in the second electrode at a position facing at least one of the first electrodes between the first selected electrode and the second selected electrode based on the measurement difference.
[0124] When the second electrode includes a narrow portion and a wide portion, the narrow portion is more likely to be disconnected than the wide portion. Therefore, in the determination step, it is possible to determine whether or not the second electrode is disconnected at a position facing at least one of the first electrodes between the first selected electrode and the second selected electrode based on the measurement difference.
[0125] In addition, each of the multiple first electrodes is formed by connecting multiple child electrodes extending along the first direction in parallel, and the second electrode includes a narrow portion that faces the multiple child electrodes at a position where it intersects with them, and a wide portion that is wider than the narrow portion at a position not facing the multiple child electrodes, and the determination process may determine, based on the measurement difference, whether or not there is a break in the second electrode at a position facing at least one of the multiple child electrodes in at least one of the first electrodes between the first selection electrode and the second selection electrode.
[0126] According to this configuration, it is possible to inspect a substrate in which the first electrode has a structure in which a plurality of child electrodes extending along the first direction are connected in parallel.
[0127] Furthermore, a series of group steps including the first selection step, the first ground step, the first measurement step, the second selection step, the second ground step, the second measurement step, and the difference step are repeatedly executed while shifting the first, second, third, and fourth selected electrodes selected in the first and second selection steps by the number of inter-electrode gaps, and the judgment step can judge the presence or absence of a break in the second electrode in the region between the first selected electrode and the second selected electrode in each step based on the measurement difference corresponding to each of the group steps.
[0128] According to this configuration, the position of the break in the second electrode is searched for while shifting the first, second, third, and fourth selected electrodes by the number of electrode spaces, i.e., while changing the inspection position, so that it is possible to search for the position of the break in multiple places in the second electrode.
[0129] Furthermore, it is preferable that wiring is connected to each of the first electrodes, the first measurement process measures the first capacitance via the wiring, and the second measurement process measures the second capacitance via the wiring, and when the second electrodes are not broken, the first and second capacitances decrease as the positions of the first, second, third, and fourth selective electrodes move in a direction from one side to the other side of the second direction, and the first selective electrode is located on the other side of the third selective electrode, and the second selective electrode is located on the other side of the fourth selective electrode.
[0130] According to this configuration, when the substrate to be inspected has a characteristic in which the first and second capacitances decrease as the positions of the first, second, third, and fourth selected electrodes move in a direction from one side to the other side in the second direction when the second electrode is not broken, it becomes easy to determine whether or not there is a break based on the difference to be determined.
[0131] The number of inter-electrode spaces may be one.
[0132] According to this configuration, since there is only one first electrode located between the first and second selection electrodes, the area between the first and second selection electrodes is narrowed, thereby improving the accuracy of identifying the disconnection position of the second electrode.
[0133] Preferably, the second electrodes are multiple, and the method further includes a broken electrode identifying step of detecting the presence or absence of a break in each of the second electrodes.
[0134] According to this configuration, by combining the judgment result of the judgment process with the detection result of the broken electrode of each second electrode by the broken electrode identification process, it becomes easy to identify the broken second electrode and the location of the break in that second electrode.
[0135] Furthermore, a substrate inspection program according to one example of the present invention is a substrate inspection program for executing the above-mentioned substrate inspection method, and causes a computer to execute the first selection process, the first ground process, the first measurement process, and the judgment process.
[0136] This program enables a computer to execute the above-mentioned substrate inspection method.
[0137] Furthermore, a substrate inspection apparatus according to one embodiment of the present invention is a substrate inspection apparatus that executes the above-mentioned substrate inspection method, and is provided with a measurement processing unit that executes the first selection process, the first ground process, and the first measurement process, and a judgment processing unit that executes the judgment process.
[0138] According to this configuration, the above-mentioned substrate inspection method can be carried out. [Explanation of symbols]
[0139] 1: circuit board inspection device, 2: AC power supply, 3: ammeter, 4: control unit, 5: display unit, 6: operation unit, 41: broken electrode identification processing unit, 42: measurement processing unit, 43: judgment processing unit, 44: memory unit, A0 to A3: current path, C: capacitance, Ca: first capacitance, Cb: second capacitance, D, D0 to D16, DD, DDi, DD1 to DD16: judgment target difference, Dc, Dc(i), Dc(0) to Dc(16): reference difference, Di, D1 to D16: measurement difference, Dref: judgment reference value, F: broken part, FI1, FI2: floating island, I: current value, Iref: Disconnection judgment value, N: narrow part, P, P': touch panel board (substrate), Pa: base material, Px, Py, Px0-Px3, Py0-Py19, Py'0-Py'19: wiring, SA: AC voltage, SW1, SW2: changeover switches, Tx, Ty, Txi, Tx0-Tx3, Ty0-Ty19, Ty'0-Ty'19: connection terminals, V: voltage, W: wide part, X, Xi, X0-X3: X electrodes (second electrodes), Y, Yi, Y0-Y19: Y electrodes (first electrodes), Ya, Ya0-Ya19, Yb, Yb0-Yb19: child electrodes, f: frequency
Claims
1. A substrate inspection method for inspecting a substrate on which a plurality of first electrodes extending along a predetermined first direction and a plurality of second electrodes extending along a second direction intersecting the first direction are formed so as to face each other, comprising: a first selection step of determining the number of first electrodes sandwiched between one of the first electrodes and the other of the first electrodes as an inter-electrode number, selecting one of the plurality of first electrodes as a first selected electrode, and selecting a first electrode having one or more inter-electrode numbers between the first selected electrode and the first selected electrode as a second selected electrode; a first grounding step of connecting the first electrode other than the first and second selected electrodes and the second electrode to ground; a first measuring step of supplying an AC voltage to the first selected electrode and measuring a first capacitance based on a current value measured at the second selected electrode; and determining whether or not at least one of the first electrode and the second electrode is disconnected in the region between the first selected electrode and the second selected electrode based on the first capacitance.
2. a second selection step of selecting a pair of the first electrodes as third and fourth selected electrodes, the pair of the first electrodes being equal in number to the number between the first and second selected electrodes, the fourth selected electrode being the first electrode between the first selected electrode and the second selected electrode; a second grounding step of connecting the first electrodes other than the third and fourth selected electrodes and the second electrode to ground; a second measuring step of supplying an AC voltage to the third selected electrode and measuring a second capacitance based on a current value measured at the fourth selected electrode; and calculating a difference between the first volume and the second volume as a measurement difference. The substrate inspection method according to claim 1 , wherein the determination step determines whether or not at least one of the first electrode and the second electrode is disconnected in the region between the first selected electrode and the second selected electrode based on the measurement difference.
3. The second electrode is a narrow portion facing the first electrodes at a position intersecting the first electrodes; a wide portion that is wider than the narrow portion at a position not facing the plurality of first electrodes, The determination step includes: The substrate inspection method according to claim 2 , further comprising the step of determining whether or not there is a break in the second electrode at a position between the first selected electrode and the second selected electrode that faces at least one of the first electrodes based on the measurement difference.
4. Each of the first electrodes is formed by connecting a plurality of sub-electrodes extending along the first direction in parallel, The second electrode is a narrow portion facing the plurality of child electrodes at a position intersecting the plurality of child electrodes; a wide portion that is wider than the narrow portion and is not opposed to the plurality of child electrodes; The determination step includes: The substrate inspection method according to claim 2, further comprising: determining whether or not there is a break in the second electrode at a position facing at least one of the plurality of sub-electrodes in at least one of the first electrodes between the first selected electrode and the second selected electrode based on the measurement difference.
5. a series of group steps including the first selection step, the first ground step, the first measurement step, the second selection step, the second ground step, the second measurement step, and the difference step are repeatedly executed while shifting the first, second, third, and fourth selected electrodes selected in the first and second selection steps by the number of inter-electrode spaces; The substrate inspection method according to any one of claims 2 to 4, wherein the determination step determines whether or not there is a break in the second electrode in the region between the first selected electrode and the second selected electrode in each of the steps based on the measurement difference corresponding to each of the group steps.
6. A wiring is connected to each of the first electrodes, the first measurement step measures the first capacitance via the wiring; the second measurement step measures the second capacitance via the wiring; when the second electrode is not broken, the first and second capacitances of the substrate decrease as the positions of the first, second, third, and fourth selection electrodes move in a direction from one side to the other side in the second direction; A substrate inspection method according to any one of claims 2 to 5, wherein the first selection electrode is located on the other side of the third selection electrode, and the second selection electrode is located on the other side of the fourth selection electrode.
7. The substrate inspection method according to any one of claims 1 to 6, wherein the number of inter-electrode spaces is one.
8. the second electrode is a plurality of electrodes; The substrate inspection method according to any one of claims 1 to 7, further comprising a broken electrode identifying step of detecting the presence or absence of a break in each of the second electrodes.
9. A substrate inspection program for executing the substrate inspection method according to any one of claims 1 to 8, On the computer, A substrate inspection program that executes the first selection step, the first ground step, the first measurement step, and the determination step.
10. A substrate inspection apparatus for carrying out the substrate inspection method according to any one of claims 1 to 8, a measurement processing unit that executes the first selection step, the first ground step, and the first measurement step; A substrate inspection apparatus comprising: a judgment processing unit that executes the judgment step.
Citation Information
Patent Citations
Defect detection method and defect detection device for linear electrode
JP1995270477A
Method and instrument for inspecting simple matrix type liquid crystal panel, method and instrument for inspecting plasma display panel
JP2001201753A
Noncontact single side probe, and apparatus and method for testing breakage of wire and short circuit of pattern electrode using the same
JP2008026320A
Method and device for inspecting defect of conductor pattern
JP2009121894A
Contact type single side probe and inspection apparatus and method for open / short test of conductive lines used thereof
KR1020080092523A
