AI Technical Summary
Conventional methods for integrating a soil-cement column-type continuous wall with a building's underground structure require extensive on-site processing time due to the need for numerous stud dowels to achieve sufficient connection strength, which is inefficient.
The method involves connecting the building's side wall to a soil-cement column-type continuous wall using a tendon material with introduced tension force, forming a load transmission mechanism based on frictional force at the contact surface, and utilizing tension steel and soil cement through holes for enhanced connection strength.
This approach allows for efficient construction of buildings with significantly higher connection strength by reducing on-site processing time and leveraging frictional and bearing forces for load transmission, effectively resisting vertical loads and shear displacement.
Smart Images

Figure 0007562924000001 
Figure 0007562924000002 
Figure 0007562924000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a building and a construction method thereof. [Background technology]
[0002] Retaining walls include prefabricated sheet pile walls, such as parent pile horizontal sheet pile walls and steel sheet pile walls, and cast-in-place walls, such as column-row retaining walls and continuous underground walls. Column-row retaining walls include cast-in-place reinforced concrete column-row retaining walls, steel pipe column-row retaining walls, and soil cement column-row retaining walls (soil cement column-row continuous walls).
[0003] For example, while the above-mentioned soil cement continuous column wall is a temporary structure, there are also configurations in which the soil cement continuous column wall is connected to the underground side walls of a permanent building, thereby being used as part of the foundation of a building, which is a permanent structure.
[0004] A soil cement continuous column wall is constructed by wrapping cylindrical soil cement around each other, with a core material made of H-shaped steel or the like buried inside each soil cement. The soil cement continuous column wall can be connected to the permanent structure by removing the upper area of the soil cement facing the permanent structure to expose part of the core material, welding a number of stud dowels or the like to the exposed part of the core material to make it protrude to the side, and constructing the underground side walls of the permanent structure in such a way that the stud dowels or the like are buried, thereby integrating the two.
[0005] Here, Patent Document 1 discloses a soil cement wall pile consisting of a soil cement column wall that is installed so as to reach the supporting layer underground. In this soil cement wall pile, the soil cement in the supporting layer is made of high-strength soil cement, a core member including a plurality of steel beams arranged horizontally and a horizontally extending steel member that connects the plurality of steel beams to each other on both sides of the wall surface is buried in the soil cement, and studs are provided on the surface of the steel member facing the other steel member and on the surface of the steel beam on the inner wall surface, including the area located in the supporting layer. It also describes that when constructing the underground structure of a building after constructing the soil cement column wall, shear connectors or the like are attached to the soil cement column wall, and the soil cement column wall and the underground structure of the building are constructed as a single unit. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] Patent No. 4466418 Summary of the Invention [Problem to be solved by the invention]
[0007] As described in Patent Document 1, when integrating a soil cement diaphragm wall with the underground structure of a building, a measure has been taken in the past to embed shear connectors such as stud dowels protruding from a core material, for example, H-shaped steel, constituting the soil cement diaphragm wall, in the side wall of the building. However, since the stud dowels protruding from one flange constituting the H-shaped steel are only embedded halfway through the thickness of the side wall of the building, a large number of stud dowels are required to obtain a certain level of connection strength, and therefore, when welding stud dowels to the core material on-site, the processing time and effort becomes a major issue.
[0008] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a building in which the side walls of the building are firmly connected to a soil cement prismatic continuous wall constructed around the building, and a construction method for the building that can efficiently construct the building. [Means for solving the problem]
[0009] In order to achieve the above object, one aspect of the building according to the present invention is as follows: A building in which a side wall of an underground part of the building located in the ground is connected to a soil cement column-type continuous wall provided around the building, The side wall of the underground portion and the soil cement diaphragm wall are connected to each other by a tendon through which tension is introduced, A load transfer mechanism based on frictional force is formed at the contact surface between the side wall and the soil cement columnar continuous wall.
[0010] According to this aspect, the side wall of the underground part of the building in the ground and the soil cement diaphragm column wall are mutually fastened by the tendons to which tension is applied, so that, for example, the soil cement diaphragm column wall and the entire side wall of the building (total thickness of the side wall) can be fastened by the tendons, and a building can be formed with significantly higher connection strength than a connection structure using stud dowels or the like that are only buried up to a part of the thickness of the side wall. Furthermore, a load transfer mechanism based on frictional force is formed at the contact surface between the side wall and the soil cement diaphragm column wall that are mutually fastened by the tendons to which tension is applied, so that a vertical load caused by the building's own weight, etc. can be transferred to the ground via the soil cement diaphragm column wall through the load transfer mechanism based on frictional force.
[0011] In this embodiment, a structure is formed by a building and a soil cement diaphragm wall that is constructed around the building and integrated with the building.
[0012] For example, if the building is made of RC (Reinforced Concrete), a load transfer mechanism based on friction will be formed between the soil cement column-type continuous wall and the RC wall, and if the building is made of S (Steel), a load transfer mechanism based on friction will be formed between the soil cement column-type continuous wall and the S wall.
[0013] In another aspect of the building according to the present invention, The tension member includes a tension steel member and a first anchor body and a second anchor body at both ends of the tension steel member, The soil cement pier-type continuous wall includes a core material embedded in the soil cement, The core material is formed of an H-shaped steel having a first flange on the building side, a second flange on the opposite side to the building, and a web, A first through hole and a second through hole through which the tension steel passes are provided at corresponding positions of the first flange and the side wall, respectively; The present invention is characterized in that one end of the tension steel material passing through the corresponding first through hole and second through hole is fixed to the first flange via the first anchor, and the other end of the tension steel material is fixed to the side wall via the second anchor.
[0014] According to this aspect, the tension steel constituting the tension member is inserted into the through holes (first through hole and second through hole) of both the first flange and the side wall on the building side of the core member formed of H-shaped steel, and one end of the tension steel is fixed to the first flange via the first fixing body and the other end is fixed to the side wall via the second fixing body, thereby forming a load transfer mechanism with high frictional force at the contact surface between the first flange and the side wall of the building. Also, since one end of the tension steel is fixed (fixed) to the first flange on the building side of the core member formed of H-shaped steel via the first fixing body, the core member and the tension steel can be easily fixed.
[0015] In another aspect of the building according to the present invention, The core material has a third through hole formed therein, The present invention is characterized in that soil cement enters the third through hole, forming a load transfer mechanism by the supporting pressure of the soil cement.
[0016] According to this embodiment, the soil cement enters the third through hole in the core material, forming a load transfer mechanism by the bearing pressure of the soil cement, and the bearing pressure of the concrete can effectively resist shear displacement. Here, reinforcing bars may be inserted into the third through hole, in which case the reinforcing bars will further increase the resistance.
[0017] In another aspect of the building according to the present invention, A stud dowel is attached to the core material, The present invention is characterized in that a load transfer mechanism is formed by the shear force and / or bearing pressure of the stud dowel embedded inside the soil cement.
[0018] According to this aspect, by attaching the stud dowel to the core material, it is possible to effectively resist shear slippage by the load transfer mechanism due to the shear force and / or bearing pressure of the stud dowel.
[0019] In another aspect of the building according to the present invention, The contact surface of the first flange is provided with a surface irregularity, The side walls are formed of reinforced concrete, and the concrete is engaged with the surface irregularities.
[0020] According to the present embodiment, the contact surface of the first flange is provided with surface irregularities, and the concrete of the reinforced concrete side wall engages with the surface irregularities, thereby further improving the load transmission performance of the load transmission mechanism due to the frictional force formed on both contact surfaces.
[0021] In addition, one aspect of the construction method for a building according to the present invention is to A construction method for a building, in which a side wall of an underground portion of a building located in the ground and a soil cement diaphragm wall provided around the building are connected by a tension member having a tension steel member and a first anchor member and a second anchor member at both ends of the tension steel member, A process A is a process for constructing a soil cement column-type continuous wall comprising soil cement and a core material embedded in the soil cement, the core material being formed of an H-shaped steel having a first flange on the building side, a second flange on the opposite side to the building, and a web; The soil cement at the upper end of the soil cement diaphragm wall is cut to expose a portion of the first flange; A step B includes inserting one end of the tension steel into a first through hole formed in the first flange and fixing the one end of the tension steel to the first fixing body installed on the rear surface of the first flange; and C process of constructing at least the side wall of the building that abuts against the first flange, penetrating the other end of the tensioning steel into the side wall, fixing the other end of the tensioning steel to the second anchor installed on the indoor side of the side wall, and introducing tension into the tensioning steel to tightly connect the side wall of the underground portion and the soil cement pilaster-type continuous wall to each other, thereby forming a load transfer mechanism by friction force at the contact surface between the side wall and the soil cement pilaster-type continuous wall.
[0022] According to this embodiment, in step B, the soil cement at the upper end of the soil cement column-type continuous wall constructed in step A is cut to expose a portion of the first flange on the building side of the H-shaped steel that constitutes the core material, and one end of the tensioning steel is fixed to the first flange via a first anchor. In step C, the side wall of the underground part of the building is constructed and the other end of the tensioning steel is fixed to the side wall via a second anchor, and then tension is introduced into the tensioning material. This makes it possible to efficiently construct a load transfer mechanism using frictional force at the contact surface between the side wall and the soil cement column-type continuous wall, leading to efficient construction of buildings. Effect of the Invention
[0023] As can be understood from the above explanation, according to the building and construction method of the present invention, it is possible to provide a building in which the side walls of the building are firmly connected to a soil cement prismatic continuous wall constructed around the building, and a construction method for the building that can efficiently construct this building. [Brief description of the drawings]
[0024] [Figure 1] FIG. 2 is a vertical cross-sectional view showing an example of a building according to an embodiment, and is also a diagram illustrating step C of an example of a construction method for a building according to an embodiment. [Diagram 2] 2 is a cross-sectional view taken along the line II-II in FIG. 1, showing an example of a load transfer mechanism using frictional force. [Diagram 3] 3 is a cross-sectional view taken along the line III-III in FIG. 2, showing an example of a load transfer mechanism using a bearing pressure of soil cement. [Figure 4] FIG. 2 is a diagram illustrating step A of an example of a construction method for a building according to an embodiment. [Diagram 5] FIG. 2 is a diagram illustrating step B of an example of a construction method for a building according to an embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0025] Hereinafter, a building and a construction method thereof according to an embodiment will be described with reference to the accompanying drawings. In this specification and the drawings, substantially identical components are designated by the same reference numerals, and duplicated explanations may be omitted.
[0026] [Building according to the embodiment] First, an example of a building according to the embodiment will be described with reference to Fig. 1 to Fig. 3. Fig. 1 is a vertical cross-sectional view showing an example of a building according to the embodiment, Fig. 2 is a cross-sectional view taken along line II-II in Fig. 1, showing an example of a load transfer mechanism using frictional force, and Fig. 3 is a cross-sectional view taken along line III-III in Fig. 2, showing an example of a load transfer mechanism using the bearing pressure of soil cement. Fig. 1 is also a view explaining step C of an example of a construction method for a building according to the embodiment, and is also applied to the construction method described in detail below.
[0027] The illustrated building 100 is constructed by connecting a side wall 15 of the basement 11 of a building 10 in the ground G to a soil cement continuous column wall 20 constructed around the building 10. For example, a soil cement continuous column wall 20 having a rectangular frame shape in plan view is constructed around the side wall 15 of the basement 11 of the building 10, which is rectangular in plan view, and the two are connected at multiple points. The building 10 has a variety of planar shapes, and the soil cement continuous column wall 20 is constructed in a frame shape corresponding to the planar shape of the building 10. Also, in FIG. 1, only a portion of the side wall 15 and base 17 of the building 10 is illustrated.
[0028] The building 10 may be made of reinforced concrete, steel, SRC (Steel Reinforced Concrete), or a hybrid of these structures, and includes a variety of types of buildings, such as office buildings, apartment buildings, gymnasiums, shopping malls, and various public buildings. In the illustrated example below, at least the side walls 15 and base 17 of the basement 11 are described as being made of reinforced concrete.
[0029] On the other hand, the soil cement column-type continuous wall 20 is constructed by overlapping parts of the soil cement 30, which is circular in plan view, with a core material 40 made of H-shaped steel embedded inside each of the soil cement 30, which is circular in plan view. Here, in addition to the H-shaped steel, steel sheet piles, secondary concrete products, etc. may be used as the core material.
[0030] The soil cement 30 is produced by mixing and stirring the earth and sand generated by excavating the ground G with cement milk discharged from the tip of a multi-shaft mixing auger or the like (not shown), and is constructed by inserting a core material 40 into the soil cement before it hardens.
[0031] The soil cement column-type continuous wall 20 in the illustrated example not only serves as a retaining wall when constructing the building 10, but also functions as the foundation of the building 10 after the building 10 is constructed by being connected to the underground portion 11 of the building 10.
[0032] The soil cement column-type continuous wall 20 may be designed so that its tip reaches hard ground where sufficient tip bearing capacity can be obtained, or it may be designed so that its tip does not reach hard ground but can support vertical loads by the peripheral friction force between the peripheral surface of the soil cement column-type continuous wall 20 and the ground G.
[0033] The H-shaped steel 40 embedded in the soil cement 30 has a first flange 42 on the building side, a second flange 43 on the side opposite the building 10, and a web 41.
[0034] As shown in detail in Figure 2, multiple first through holes 45 (in the illustrated example, a total of four, spaced vertically and horizontally) are opened in the first flange 42 on the building side, and second through holes 16 are opened in the side wall 15 at positions corresponding to the first through holes 45.
[0035] A tension steel 51 constituting the tension member 50 is inserted through the first through hole 45 and the second through hole 16 which are connected to each other. A first anchor 52 and a second anchor 53 which constitute the tension member 50 together with the tension steel 51 are provided at both ends of the tension steel 51, the first anchor 52 being fixed to the rear surface (the surface opposite the building) of the first flange 42, and the second anchor 53 being fixed to the indoor surface of the side wall 15. The tension steel 51 is formed of PC steel such as PC (Prestressed Concrete) steel strands, PC steel wires, and PC steel bars, and is configured such that, for example, after the side wall 15 of the underground portion 11 is constructed, a predetermined tension force is introduced thereto by a post-tensioning method.
[0036] By applying a predetermined tension to the tension steel 51, the side wall 15 of the underground portion 11 and the core material 40 of the soil cement diaphragm wall 20 are mutually fastened via the tension steel 50. Then, at the contact surface 18 between the first flange 42 of the core material 40 and the RC side wall 15, a load transfer mechanism 60 is formed by the frictional force between the first flange 42 and the side wall 15.
[0037] The load transfer mechanism 60 using frictional force forms a strong connection structure between the side wall 15 of the underground portion 11 of the building 10 and the core material 40 of the soil cement column-type continuous wall 20, thereby forming a building 100 based on the soil cement column-type continuous wall 20.
[0038] As shown in Fig. 1, a vertical load N due to the weight of the building 10 or the like is transmitted to the core material 40 via a frictional load transmission mechanism 60, and is then transmitted to the ground G via the soil cement column-type continuous wall 20. Note that compressive loads during earthquakes and strong winds are also transmitted in the same manner.
[0039] Returning to Fig. 2, the contact surface 18 of the first flange 42 is provided with surface irregularities 19. The surface irregularities 19 are a surface that has been processed to a desired roughness by various methods including blasting.
[0040] The concrete forming the side wall 15 penetrates into the surface irregularities 19 of the first flange 42 and engages with the surface irregularities 19 .
[0041] With this configuration, the frictional force at the contact surface 18 between the first flange 42 and the side wall 15 is further increased, and the load transmission performance (capacity) of the load transmission mechanism 60 using frictional force is improved.
[0042] According to the load transfer mechanism 60 using frictional force, the soil cement column-type continuous wall 20 and the entire side wall 15 of the building 10 (the entire thickness of the side wall) can be fastened together by the tension material 50, thereby forming a building 100 with a significantly stronger connection strength than a connection structure using stud dowels, etc., which are only buried up to a portion of the thickness of the side wall.
[0043] Furthermore, since there is no need to weld a large number of stud dowels or the like to the core material on-site in order to obtain a certain level of connection strength, there is no problem with the amount of processing effort required on-site.
[0044] Furthermore, as shown in Figures 1 and 3, the web 41 constituting the core material 40 has multiple (three in the illustrated example) third through holes 47 opened therein, and soil cement enters the third through holes 47 to form a load transmission mechanism 70 due to the supporting pressure of the soil cement.
[0045] Here, the diameter and number of the third through holes 47 are set so as to obtain a desired bearing pressure of the soil cement. In the illustrated example, the third through holes 47 are concentrated under the web 41, but they may be evenly distributed over the entire area of the web 41, or may be provided in the first flange 42 or the second flange 43.
[0046] The load transfer mechanism 70 using the support pressure of the soil cement can effectively transfer the vertical load N transferred to the core material 40 via the load transfer mechanism 60 using frictional force to the soil cement 30, and the vertical load N can be transferred via the soil cement 30 to the surrounding ground G or the hard ground at the tip, etc.
[0047] According to the load transfer mechanism 70 using the supporting pressure of soil cement, the only configuration required is to process the third through hole 47 at an appropriate location in the core material 40, and the soil cement automatically enters the third through hole 47 and hardens to form the mechanism, thereby making it possible to form a mechanism with excellent load transfer performance with simple processing and configuration.
[0048] Although not shown in the figures, a stud dowel may be attached to the core material, and a load transfer mechanism may be formed by the shear force and / or bearing pressure of the stud dowel embedded inside the soil cement. Also, a configuration may be provided that includes both the load transfer mechanism 70 by the bearing pressure of the soil cement as shown in the figures, and a load transfer mechanism by the shear force and / or bearing pressure of the stud dowel.
[0049] [Construction method of a building according to the embodiment] Next, an example of a construction method for a building according to the embodiment will be described with reference to Fig. 4, Fig. 5, and Fig. 1. Here, Fig. 4 and Fig. 5 are diagrams for explaining steps A and B of an example of a construction method for a building according to the embodiment, respectively. As already described, Fig. 1 is a vertical cross-sectional view showing an example of a building according to the embodiment, and is also a diagram for explaining step C of an example of a construction method for a building according to the embodiment.
[0050] In a construction method for a building, first, prior to the construction of the building, a soil cement column-type continuous wall 20 having a rectangular frame shape in plan view, for example, is constructed around the periphery of the construction area of the building as a retaining wall, as shown in FIG.
[0051] The construction method of the soil cement column-type continuous wall 20 can be a known SMW (Soil Mixing Wall) method, etc., which begins with removing underground obstacles, then installing a guide wall (not shown), mixing the soil cement, and discharging the designed mix of cement slurry from the tip of an auger head of a multi-shaft auger machine or the like while drilling and mixing, and after reaching a specified depth, repeatedly mixing while raising the auger head, thereby creating the soil cement 30. Then, a core material 40 is inserted into the soil cement 30 before it hardens. In addition, the wall construction procedure can include a continuous method, in which a first element is constructed, then a second element is constructed at a distance, and then the holes at both ends of the third element are overlapped with the holes at one end of both the first and second elements, or a combined pre-drilling method, in which multiple holes are pre-drilled at intervals at positions where the holes of each element will follow, and then each element is constructed so that the holes of each element are overlapped with the pre-drilled holes (all of this is Process A).
[0052] Next, as shown in FIG. 5, the soil cement 30 at the upper end of the soil cement pilaster-type continuous wall 20 on the building side is cut away to expose a part of the first flange 42.
[0053] Next, a first through hole 45 is opened at a predetermined position in the exposed first flange 42, one end of the tension steel 51 is passed through the first through hole 45, and one end of the tension steel 51 is connected to a first fixing body 52 installed on the back surface of the first flange 42, thereby fixing one end of the tension steel 51 to the first flange 42. Here, the first through hole 45 may be opened in advance at a predetermined position in the first flange 42 (this is step B).
[0054] Next, as shown in Figure 1, the side wall 15 of the underground portion 11 of the building 10 which abuts at least the first flange 42 is constructed, and the other end of the tensioning steel 51 is passed through the second through hole 16 of the side wall 15, and the other end of the tensioning steel 51 is connected to the second anchor 53 installed on the indoor side of the side wall 15.
[0055] Next, a predetermined tension is introduced into the tension member 50 (post-tensioning method) to tightly connect the side wall 15 of the underground portion 11 and the soil cement pilaster-type continuous wall 20 to each other, and a load transfer mechanism 60 is formed by friction at the contact surface 18 between the side wall 15 and the core material 40 of the soil cement pilaster-type continuous wall 20, thereby constructing the building 100 (this is process C).
[0056] According to the construction method of the illustrated example, in step B, one end of the tendon 50 is fixed to the soil cement column-type continuous wall 20, and in step C, the side wall 15 is constructed and the other end of the tendon 50 is fixed, and tension is introduced into the tendon 50 to construct a load transfer mechanism 60 using frictional force, thereby making it possible to efficiently construct a building 100 in which the side wall 15 of the underground portion 11 of the building 10 and the core material 40 of the soil cement column-type continuous wall 20 are firmly connected.
[0057] The present invention is not limited to the configurations shown here, and may be implemented in other embodiments in which other components are combined with the configurations and the like set forth in the above embodiments. In this regard, the present invention may be modified without departing from the spirit of the present invention, and may be appropriately determined according to the application form. [Explanation of symbols]
[0058] 10: Building 11: Underground 15: Side wall 16: Second through hole 17: Bottom board 18: Contact surface 19: Surface unevenness 20: Soil-cement diaphragm wall 30: Soil cement 40: Core material (H-shaped steel) 41: Web 42: First flange 43: Second flange 45: First through hole 47: 3rd through hole 50: Tensile material 51: Tensioned steel material 52: First fixing body 53: Second fixing body 60: Friction-based load transfer mechanism 70: Load transfer mechanism due to bearing pressure of soil cement 100: Building G: Ground N: Vertical load
Claims
1. A building in which a side wall of an underground part of a building in the ground is connected to a soil cement column-type continuous wall provided around the building, The side wall of the underground portion and the soil cement diaphragm wall are connected to each other by a tendon through which tension is introduced, The tension member includes a tension steel member and a first anchor member and a second anchor member at both ends of the tension steel member, The soil cement pier-type continuous wall includes a core material embedded in the soil cement, The core member is formed of an H-shaped steel having a first flange on the building side, a second flange on the opposite side to the building, and a web; A first through hole and a second through hole through which the tension steel passes are formed at corresponding positions of the first flange and the side wall, respectively; One end of the tension steel passing through the corresponding first through hole and the corresponding second through hole is fixed to the first flange via the first fixing body, and the other end of the tension steel is fixed to the side wall via the second fixing body, A building, characterized in that a load transfer mechanism based on frictional force is formed at the contact surface between the side wall and the soil cement diaphragm wall.
2. The core material has a third through hole formed therein, 2. The building according to claim 1, wherein soil cement is inserted into the third through hole, forming a load transfer mechanism by the bearing pressure of the soil cement.
3. A stud dowel is attached to the core material, 3. The building according to claim 1 or 2, characterized in that a load transfer mechanism is formed by the shear force and / or bearing pressure of the stud dowel embedded inside the soil cement.
4. The contact surface of the first flange is provided with a surface irregularity, 4. The building according to claim 1, wherein the side walls are made of reinforced concrete, the concrete interlocking with the surface irregularities.
5. A construction method for a building, in which a side wall of an underground portion of a building located in the ground and a soil cement diaphragm wall provided around the building are connected by a tension member having a tension steel member and a first anchor member and a second anchor member at both ends of the tension steel member, A process for constructing a soil cement column-type continuous wall, the process comprising: soil cement; and a core material embedded in the soil cement, the core material being formed of an H-shaped steel having a first flange on the building side, a second flange on the opposite side to the building, and a web; The soil cement at the upper end of the soil cement diaphragm wall is cut to expose a portion of the first flange; A step B includes inserting one end of the tension steel into a first through hole formed in the first flange and fixing the one end of the tension steel to the first fixing body installed on the rear surface of the first flange; and C process of constructing at least the side wall of the building that abuts against the first flange, penetrating the other end of the tensioning steel into the side wall, fixing the other end of the tensioning steel to the second anchor installed on the indoor side of the side wall, and introducing tension into the tensioning steel to tightly connect the side wall of the underground portion and the soil cement pilaster-type continuous wall to each other, thereby forming a load transfer mechanism by friction force at the contact surface between the side wall and the soil cement pilaster-type continuous wall.
Citation Information
Patent Citations
Consolidated structure of half PC wall with hardened body of post-placed concrete
JP1991172434A
Underground outer wall of structure and its construction method
JP2002061170A
Wall body, construction method for wall body, and residual form
JP2016188491A
Construction method of earth retainer wall and earth retainer wall
JP2017115503A
Soil-cement wall piles, soil-cement structure
JP4466418B2