Construction equipment placement system based on digital twin

The digital twin-based construction equipment placement system addresses inefficiencies by optimizing equipment arrangement through real-time data processing and obstacle-aware planning, ensuring accurate and conflict-free deployment.

JP7575765B1Active Publication Date: 2024-10-30GUANGZHOU PEARL RIVER CONSTR DEV CO LTD +1

Patent Information

Application Number
JP2024075141
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2024-03-28
Filing Date
2024-05-07
Publication Date
2024-10-30
Estimated Expiration
2044-05-07

AI Technical Summary

Technical Problem

Conventional construction equipment arrangement relies on experience and is prone to subjective influences, leading to inefficiencies and conflicts due to dynamic uncertainties and inaccuracies in placement planning.

Method used

A construction equipment placement system utilizing a digital twin technology with data acquisition, transmission, and management modules to optimize equipment placement by real-time data collection, model construction, and dynamic adjustment based on obstacle detection and time windows.

Benefits of technology

Enhances the accuracy and efficiency of construction equipment placement by identifying obstacle correlations and adjusting placement plans to minimize conflicts and optimize time utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007575765000001_ABST
    Figure 0007575765000001_ABST
Patent Text Reader

Abstract

Provides a construction equipment placement system based on a digital twin. [Solution] The construction equipment deployment system based on digital twin includes a data collection module, a data transmission module, and a digital twin management module. The data collection module is used to deploy sensors on construction equipment to collect equipment deployment information in real time, the data transmission module is used to transmit the deployment information to the digital twin management module in real time, and the digital twin management module is used to combine the deployment information to build a digital twin model of the construction site and perform equipment deployment planning, so as to perform equipment deployment planning according to obstacle road conditions and adjust the preset deployment plan of the equipment, thereby improving the accuracy and efficiency of construction equipment deployment.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to the field of digital twins, and in particular to a construction device placement system based on digital twins. [Background technology]

[0002] The dynamic layout of construction equipment is an important part of the construction process, and the rational layout of construction equipment is an important guarantee for ensuring the smooth progress of the entire construction and shortening the construction period, and it is necessary to rationally plan the dynamic management of all construction equipment both before and during construction. However, the traditional layout of construction equipment relies on experience and artificial design, and is easily influenced by subjective factors and restrictive conditions, which makes the layout plan restrictive and inefficient.

[0003] Digital twin is a simulation technology that realizes interaction, feedback and optimization process by associating a digital image of the real world with its digital model. During the construction process of a project, digital twin technology can accurately provide a three-dimensional construction site environment and display the interrelationships between elements such as different buildings, machinery and equipment, and working areas, which makes it very convenient to plan and optimize the layout of machinery and equipment during construction. However, in the actual construction environment, multiple machinery and equipment participate in the layout at the same time, and the layout environment has dynamic uncertainty, which is likely to lead to collisions in the equipment layout plan, and in addition, there is a lack of judgment on obstacle sections during the planning and layout process, which results in a certain lack of precision in the equipment layout. Summary of the Invention [Means for solving the problem]

[0004] In view of the above deficiencies of the prior art, the present invention proposes a construction equipment arrangement system based on digital twin, and the technical solution designed in the present invention is: Including a data collection module, a data transmission module and a digital twin management module; The data collection module is used to collect device placement information in real time by placing a sensor at a construction site, The data transmission module is used for transmitting configuration information to the digital twin management module in real time; The digital twin management module is used to build a digital twin model of the construction site by combining the configuration information and to perform equipment configuration planning; The device layout plan includes: Step S10 of arranging all the devices at the construction site based on a preset arrangement plan; Step S20: determining whether the obstacle road situation is correlated with the preset arrangement plan of the current device, and if so, executing S30; otherwise, executing S40; Step S30 of updating the digital twin model and adjusting the preset deployment plan of the current device; and step S40 of continuing the placement until all the devices at the work site have been placed.

[0005] Preferably, the device location information includes device position information and time information.

[0006] Preferably, the data transmission module includes a 5G network and / or an optical fiber network.

[0007] Preferably, S10 includes: Constructing a three-dimensional construction site scenario by the digital twin model, presetting a plurality of nodes in the three-dimensional construction site scenario as a pre-set arrangement plan, and moving all the devices in sequence through the respective pre-set nodes to complete the arrangement; and setting corresponding time windows for the predefined nodes to represent the time at which a corresponding device arrives at the node and the three-dimensional position of the node.

[0008] Preferably, the time window formula is as follows:

number

[0009] Preferably, step S20 includes: The method includes inputting obstacle road condition information into a digital twin model and identifying it in node form in a three-dimensional construction site scene, outputting obstacle nodes and corresponding time windows, and determining that the obstacle road condition is correlated with the preset deployment plan of the current device if the preset node time window and the obstacle node time window overlap, and executing S30; otherwise, executing S40.

[0010] Preferably, step S30 includes: The current device position is the start node p1, and the end node p M remains unchanged and there are multiple new path nodes p m A step S3001 of reconstructing a step S3002 of removing new path nodes whose time windows overlap with obstacle node time windows; It is determined whether the new route node time window overlaps with all the node time windows of the other devices. If they overlap, it is determined that a node collision has occurred. The device waits a time Δt m Step S3003, which requires waiting; A step S3004 of setting an objective function for fastest placement time based on nodes and latency; and step S3005 of solving the objective function, determining the positional relationship of each node, and adjusting the placement plan of the current device.

[0011] Preferably, the objective function formula is as follows:

number

[0012] The beneficial effects are as follows: In the present invention, when arranging a construction site based on the digital twin, judge whether the obstacle road situation and the preset arrangement plan of the current device are correlated, update the digital twin model and adjust the preset arrangement plan of the current device, set a corresponding time window for the preset node to represent the time when the corresponding device arrives at the node and the three-dimensional position of the node, so as to more efficiently identify the obstacle road situation, and when the obstacle road situation appears, all the devices on the construction site can be efficiently arranged. [Brief description of the drawings]

[0013] [Figure 1] FIG. 1 is a structural schematic diagram of one preferred embodiment of the present invention. [Diagram 2] 1 is a flowchart of an equipment layout plan according to one preferred embodiment of the present invention. [Diagram 3] 1 is a plan adjustment flowchart of one preferred embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] The following examples are described in detail. The following examples are implemented on the basis of the technical solution of the present invention, and provide detailed embodiments and specific operation procedures, but the scope of protection of the present invention is not limited to the following examples.

[0015] The present invention designs a construction equipment placement system based on digital twin. As shown in Figure 1, the technical solution is as follows: Including a data collection module, a data transmission module and a digital twin management module; The data collection module is used to collect device placement information in real time by placing sensors at the construction site. The data transmission module is used to transmit the configuration information to the digital twin management module in real time; The digital twin management module is used to build a digital twin model of the construction site by combining the layout information and to plan the equipment layout. As shown in FIG. 2, the device layout plan includes: Step S10 of arranging all the devices at the construction site based on a preset arrangement plan; Step S20: determining whether the obstacle road situation is correlated with the preset arrangement plan of the current device, and if so, executing S30; otherwise, executing S40; Step S30 of updating the digital twin model and adjusting the preset deployment plan of the current device; and step S40 of continuing the placement until all the devices at the work site have been placed.

[0016] Preferably, the device location information includes device position information and time information.

[0017] Preferably, the data transmission module includes a 5G network and / or an optical fiber network.

[0018] Preferably, S10 comprises: Constructing a three-dimensional construction site scenario by the digital twin model, presetting a plurality of nodes in the three-dimensional construction site scenario as a pre-set arrangement plan, and moving all the devices in sequence through the respective pre-set nodes to complete the arrangement; and setting corresponding time windows for the predefined nodes to represent the time at which a corresponding device arrives at the node and the three-dimensional position of the node.

[0019] Preferably, the time window formula is as follows:

number

[0020] Preferably, step S20 comprises: The method includes inputting obstacle road condition information into a digital twin model and identifying it in node form in a three-dimensional construction site scene, outputting obstacle nodes and corresponding time windows, and determining that the obstacle road condition is correlated with the preset deployment plan of the current device if the preset node time window and the obstacle node time window overlap, and executing S30; otherwise, executing S40.

[0021] Specifically, the preset deployment plan is to move the current device along the preset node, and when it arrives at the deployment point, to complete the deployment process of the current device. To represent the deployment situation of the current device, the node time window in the preset plan of the current device is obtained according to the mapping relationship of the digital twin model, and the obstacle road condition node represents the position of the obstacle road condition that may occur during construction. Each obstacle road condition node has one time window to represent the time range and three-dimensional position of the obstacle. The newly constructed path node is a node that is reconstructed with the position of the current device as the new starting point when updating the digital twin model. These new nodes also have time windows to represent the time range in which the device arrives at these nodes. The overlapping nodes to be removed are nodes whose time windows overlap with the obstacle road condition time window to be removed. These nodes may affect the movement of the device, so they need to be processed during deployment. The node collision node between devices is a node that determines whether there is a node collision between the devices. By comparing the time windows between the devices, it is determined whether the nodes overlap, and if there is an overlap, it needs to be processed, for example, the device needs to wait for a while before entering the overlapping node. These time windows cover node-related information, such as pre-set deployment plan, obstacle road conditions, newly constructed path nodes, overlapping nodes to be removed, and node collisions between devices, and are used to guide the movement and adjustment of the device during the deployment of the construction device, thereby improving the accuracy and efficiency of the construction device deployment.

[0022] Also, step S10 further includes performing node optimization for a preset plan, n1 From the end point p nM The five adjacent nodes are set as local device placement routes, and the preset placement plan is divided into multiple local device placement routes.

number

number

number

[0023] Preferably, as shown in FIG. 3, step S30 includes: The current device position is the start node p1, and the end node p M remains unchanged and there are multiple new path nodes p m A step S3001 of reconstructing a step S3002 of removing new path nodes whose time windows overlap with obstacle node time windows; It is determined whether the new route node time window overlaps with all the node time windows of the other devices. If they overlap, it is determined that a node collision has occurred. The device waits a time Δt m Step S3003, which requires waiting; A step S3004 of setting an objective function for fastest placement time based on nodes and latency; and step S3005 of solving the objective function, determining the positional relationship of each node, and adjusting the placement plan of the current device.

[0024] Preferably, the objective function formula is as follows:

number

[0025] Specifically, the conventional arrangement path adjustment only changes and optimizes the nodes, but often ignores the obstacle time, for example, when an obstacle exists for a short time, it can wait on the spot before entering the obstacle node, reducing the time to rearrange the node. It includes setting a waiting time for each node, giving a value to the waiting time by determining whether it is a node collision, and when it is determined to be a non-node collision, the waiting time is 0, and when it is determined to be a node collision, determining the magnitude of the waiting time based on the obstacle time window, minimizing the arrangement time of the device according to the constraints of the node and time, and improving the arrangement efficiency.

[0026] The above is a detailed description of the preferred specific embodiments of the present invention. It should be understood that those skilled in the art can make many modifications and changes based on the concept of the present invention without creative labor. Therefore, all technical solutions that those skilled in the art can obtain based on the concept of the present invention through logical analysis, reasoning, or limited testing based on the prior art should fall within the scope of protection determined by the claims.

Claims

1. A construction equipment placement system based on a digital twin, Including a data collection module, a data transmission module and a digital twin management module; The data collection module is used to collect device placement information in real time by placing a sensor at a construction site, The data transmission module is used for transmitting configuration information to the digital twin management module in real time; The digital twin management module is used to build a digital twin model of the construction site by combining the configuration information and to perform equipment configuration planning; The device layout plan includes: Step S10 of arranging all the devices at the construction site based on a preset arrangement plan; Step S20: determining whether the obstacle road situation is correlated with the preset arrangement plan of the current device, and if so, executing S30; otherwise, executing S40; Step S30 of updating the digital twin model and adjusting the preset deployment plan of the current device; and a step S40 of continuing the arrangement until all the devices at the construction site have been arranged; The step S10 is A step of constructing a three-dimensional construction site scenario by the digital twin model, presetting a plurality of nodes in the three-dimensional construction site scenario as a pre-set arrangement plan, and moving all the devices in sequence through the respective pre-set nodes to complete the arrangement; and setting corresponding time windows for the predetermined nodes to represent the time at which the corresponding equipment arrives at the node and the three-dimensional position of the node.

2. The construction equipment placement system based on a digital twin according to claim 1 , wherein the placement information includes equipment position information and time information.

3. The construction device placement system based on a digital twin according to claim 1, characterized in that the data transmission module includes a 5G network and / or an optical fiber network.

4. The formula for the time window is: [0080] In the formula, f(p m ) is the node p m time window, T(p m ) is the device that corresponds to p m The time to arrive at the node, Coord(p m ) is the p of the corresponding device m The construction device placement system based on a digital twin as described in claim 1, characterized in that the node is a three-dimensional position.

5. A construction equipment placement system based on a digital twin, comprising: Including a data collection module, a data transmission module and a digital twin management module; The data collection module is used to collect device placement information in real time by placing a sensor at a construction site, The data transmission module is used for transmitting configuration information to the digital twin management module in real time; The digital twin management module is used to build a digital twin model of the construction site by combining the configuration information and to perform equipment configuration planning; The device layout plan includes: Step S10 of arranging all the devices at the construction site based on a preset arrangement plan; Step S20: determining whether the obstacle road situation is correlated with the preset arrangement plan of the current device, and if so, executing S30; otherwise, executing S40; Step S30 of updating the digital twin model and adjusting the preset deployment plan of the current device; and a step S40 of continuing the arrangement until all the devices at the construction site have been arranged; The step S20 is A construction equipment placement system based on a digital twin, comprising the steps of: inputting obstacle road condition information into a digital twin model, and identifying it in node form in a three-dimensional construction site scene; outputting obstacle nodes and corresponding time windows; determining that the obstacle road condition is correlated with the preset placement plan of the current equipment when the preset node time window and the obstacle node time window overlap, and executing S30; and executing S40 if not.

6. A construction equipment placement system based on a digital twin, comprising: Including a data collection module, a data transmission module and a digital twin management module; The data collection module is used to collect device placement information in real time by placing a sensor at a construction site, The data transmission module is used for transmitting configuration information to the digital twin management module in real time; The digital twin management module is used to build a digital twin model of the construction site by combining the configuration information and to perform equipment configuration planning; The device layout plan includes: Step S10 of arranging all the devices at the construction site based on a preset arrangement plan; Step S20: determining whether the obstacle road situation is correlated with the preset arrangement plan of the current device, and if so, executing S30; otherwise, executing S40; Step S30 of updating the digital twin model and adjusting the preset deployment plan of the current device; and a step S40 of continuing the arrangement until all the devices at the construction site have been arranged; The step S30 is The current device position is the start node p 1 Then, the end node p M remains unchanged, and there are multiple new path nodes p m Step S3001 of reconstructing A step S3002 of removing new path nodes whose time windows overlap with obstacle node time windows; It is determined whether the new route node time window overlaps with all the node time windows of the other devices. If they overlap, it is determined that a node collision has occurred. m Step S3003, which requires waiting; A step S3004 of setting an objective function for fastest placement time based on nodes and latency; A construction equipment placement system based on a digital twin, comprising: a step S3005 of solving an objective function, determining the positional relationship of each node, and adjusting the placement plan of the current equipment.

7. The formula for the objective function is: [0097] In the formula, T(p) is the actual deployment time of the current device, T(p M ) is the estimated deployment time of the current device, Δt m The construction device placement system based on the digital twin according to claim 6, characterized in that: m is the waiting time for entering node m.

Citation Information

Patent Citations

  • Method for assisting earth excavation construction based on oblique photography of unmanned aerial vehicle

    CN116448080A

  • Intelligent installation method and system for fabricated structure system

    CN116484459A

  • Industrial automation using 5G and beyond

    JP2022522630A

  • A platform for accelerating the development of intelligence in industrial Internet of Things systems

    JP2022531919A

  • Information processing system, information processing method, and information processing program

    JP2023146532A

Cited By

  • BIM (Building Information Modeling)-based intelligent optimization method and system for installation precision of prefabricated part

    CN120181327A