Tension rod holding structure and crane vehicle
The tension rod holding structure with temporary placement parts on the jib and boom link addresses the issue of interference by securely holding or temporarily placing the tension rod, ensuring smooth jib operations.
Patent Information
- Application Number
- JP2021091284
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-05-31
- Publication Date
- 2024-10-30
- Estimated Expiration
- 2041-05-31
AI Technical Summary
The existing tension rod holding structures in jib cranes can hinder the swinging of the jib if not properly released during operations, leading to potential operational issues.
A tension rod holding structure with temporary placement parts on the jib and boom link, allowing the tension rod to be securely held or temporarily placed during storage and connection, preventing interference with the jib's movement.
Ensures reliable avoidance of tension rod interference with the jib's swinging motion, simplifying operations and reducing the risk of operational failures.
Smart Images

Figure 0007576000000001 
Figure 0007576000000002 
Figure 0007576000000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a structure for temporarily holding a tension rod, which is a member that provides auxiliary support for the jib attached to the end of the boom in a jib crane, during operations such as swinging out the jib, and to a crane truck equipped with the same. [Background technology]
[0002] In a jib crane, which swings out a jib attached to the end of a boom and transports a load using a hook hanging from the end of the jib, a part called a tension rod is attached as a mechanism for supporting part of the load on the jib. The base end of the jib is rotatably connected to the end of the boom by a pin that serves as a pivot, and is raised and lowered by a lifting mechanism such as a hydraulic cylinder, but if the jib is supported only by these pins and the lifting mechanism, the load applied to the pin by the load may become excessive. Therefore, a tension rod is further connected between the boom and the jib, and this tension rod shares part of the load and provides auxiliary support for the jib.
[0003] Prior art documents related to tension rods for supporting such jibs include, for example, Patent Document 1 below. In the crane truck described in Patent Document 1, one end of the tension rod is rotatably attached to the tip of the boom via a boom link, and a slide bracket is attached to the other end, and the slide bracket slides appropriately along the jib, allowing the tension rod to rotate in response to the rise and fall of the jib. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2020-111415 A [Patent Document 2] JP 2020-179956 A Summary of the Invention [Problem to be solved by the invention]
[0005] In a crane truck equipped with a jib crane as described above, the jib is detached from the boom when necessary, such as when storing or traveling, and at this time, the tension rod is also removed along with the jib. The detached jib is held, for example, below the lowered boom together with the tension rod (in the case of a bottom-hugging type).
[0006] When raising the boom and swinging out the jib from this stored state, it is necessary to first connect the base end of the jib to the tip of the boom and attach one end of the tension rod to the tip of the boom. This work can be performed, for example, by the procedure described in Patent Document 2.
[0007] Furthermore, Patent Document 2 also describes a mechanism (tension rod holding device) that holds the tension rod against the jib when the jib is stored and when it is connected to the boom. The tension rod holding device described in Patent Document 2 includes a movement limiting member and a lower support mechanism. The lower support mechanism supports the tension rod from below when the jib and tension rod are stored, and is configured to allow the tension rod to move forward and backward relative to the vehicle body by using a roller-type receiving member. When attaching the tension rod to the boom, the tension rod is supported by the lower support mechanism against the jib, and the tension rod can be slid in the longitudinal direction relative to the lower support mechanism.
[0008] Here, after attaching the jib and tension rod to the boom, when raising the boom and swinging out the jib, it is necessary to reliably release the tension rod from its hold on the jib. That is, in the case of the crane truck described in Patent Document 2, the swinging part of the lower support mechanism constituting the tension rod holding device is swung upward and outward to release the tension rod so that it can move downward relative to the boom. If an operator forgets to do this and attempts to swing out the jib without releasing the tension rod, the movement of the jib may be hindered by the tension rod, and the jib may not be swung out normally.
[0009] In view of the above-mentioned circumstances, the present invention aims to provide a tension rod holding structure and a crane vehicle that can more reliably avoid interference with the extension of the jib by the tension rod. [Means for solving the problem]
[0010] The present invention relates to a tension rod holding structure comprising a boom that is capable of being raised and lowered on the body of a crane vehicle, a jib that is connected to the tip of the boom and configured to be swung out from the boom, a tension rod that has its base end rotatably connected to the tip of the boom via a boom link and is attached to the jib via a slide bracket that is configured to be able to slide its tip along the jib, and temporary placement portions that are provided on the jib and the tension rod and are configured to engage with each other to allow the tension rod to be temporarily placed on the jib.
[0011] In the tension rod holding structure of the present invention, the tension rod has a holding portion at its base end for being held by the jib, and the temporary placement portion provided on the tension rod can be provided at the base end of the tension rod.
[0012] The tension rod holding structure of the present invention may further include a second temporary placement portion provided on each of the boom link and the tension rod, and configured to engage with each other to temporarily place the tension rod on the boom link.
[0013] In the tension rod holding structure of the present invention, the tension rod has a connecting portion at its base end for connecting to the boom link, and the second temporary placement portion provided on the tension rod can be provided at the base end of the tension rod.
[0014] The present invention also relates to a crane vehicle to which the above-mentioned tension rod holding structure is applied. Effect of the Invention
[0015] The tension rod holding structure and crane vehicle of the present invention can provide the excellent effect of more reliably avoiding interference with the extension of the jib by the tension rod. [Brief description of the drawings]
[0016] [Figure 1] 1 is an overall side view showing an example of a crane vehicle according to an embodiment of the present invention, showing the state in which the boom is retracted and lowered. FIG. [Diagram 2] FIG. 2 is an overall side view showing the state in which the boom of the crane vehicle in FIG. 1 is raised and the jib is swung out. [Diagram 3] FIG. 2 is a perspective view showing the configuration of the jib and tension rods when stored. [Figure 4] FIG. 2 is an enlarged perspective view showing the state of the periphery of the tip of the boom in FIG. 1. [Diagram 5] FIG. 2 is an enlarged perspective view showing a main part of the tension rod holding structure in the present embodiment. [Figure 6] 6 is a perspective view of the protruding portion of the jib in FIG. 5 as viewed from another angle (as viewed from an arrow VI in FIG. 5), illustrating the form of the temporary placement portion. [Figure 7]FIG. 2 is a side view showing the arrangement of the jib, tension rods and boom links in the stored state. [Figure 8] FIG. 1 is a side view showing the arrangement of the jib, tension rods and boom links in a connected state. [Figure 9] FIG. 2 is an enlarged side view showing the base end of the tension rod held by the jib. [Figure 10] FIG. 2 is an enlarged side view showing the base end of the tension rod temporarily placed on the jib. [Figure 11] FIG. 4 is an enlarged side view showing a state in which a base end of a tension rod is temporarily placed on a boom link. [Figure 12] FIG. 4 is an enlarged side view showing a state in which a base end of the tension rod is connected to a boom link. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings.
[0018] 1 to 4 show an example of a tension rod holding structure according to the present invention, and a crane vehicle equipped with the same.
[0019] As shown in Figures 1 and 2, a crane vehicle 1 is equipped with a boom 4 on top of a vehicle body 2 via a swivel base 3. The boom 4 is supported at its base so as to be rotatable about a horizontal axis relative to the swivel base 3, and is adapted to perform a hoisting operation relative to the swivel base 3 by extension and contraction of a hydraulic hoisting cylinder (not shown).
[0020] The boom 4 has a structure in which a plurality of cylinders 5 are connected in a telescopic manner, and is configured to be extendable and retractable by a hydraulic mechanism (not shown). The base end of a telescopic jib 6 is rotatably connected to the tip of the boom 4 via a rotary shaft 6a. When the crane vehicle 1 is in operation, the jib 6 is swung out from the tip of the boom 4 as shown in FIG. 2 and used. When the crane vehicle 1 is stored, the jib 6 can be removed from the boom 4 as necessary. In this embodiment, a main hook 7 and an auxiliary hook 8 are provided as hooks for suspending a load. As shown in FIG. 2, the main hook 7 is suspended from the tip of the boom 4, and the auxiliary hook 8 is suspended from the tip of the jib 6. FIG. 2 shows the jib 6 swung out at different angles on a single sheet of paper.
[0021] The jib 6 is connected to the boom 4 so as to be rotatable around a pivot shaft 6a, but the crane truck 1 is also provided with a mechanism (tension rod 9) for auxiliary support of the jib 6 relative to the boom 4, and the load applied to the jib 6 is supported by this tension rod 9 in addition to the pivot shaft 6a. One end (tip) of the tension rod 9 is attached to the jib 6 via a slide bracket 10, and when the jib 6 is swung out (see Figure 2), the other end (base end) is connected to the tip of the boom 4 via a boom link 11.
[0022] The slide bracket 10 is an annular part provided to surround the periphery of the jib 6, and is capable of sliding along the longitudinal direction of the surface of the jib 6. The tip of a tension rod 9 is rotatably attached to a part of the outer circumferential surface of the slide bracket 10. The slide bracket 10 can be configured as an article equivalent to the slide brackets described in the above-mentioned Patent Documents 1 and 2.
[0023] The configurations of the jib 6 and tension rod 9 are shown in Fig. 3. The jib 6 is a Y-shaped part with a base side (lower left part in Fig. 3) split into two, and as shown in Fig. 4, the two base ends are attached to both ends of the rotating shaft 6a and connected to the boom 4. The tension rod 9 is a pair of rod-shaped parts attached along the jib 6, each of which is configured with a rod-shaped main body 9a and a cylindrical adjustment part (extension) 9b. The tip side of the main body 9a is inserted into the extension 9b from the base end side, and the overall length of the tension rod 9 can be adjusted by changing the fixed position of the main body 9a relative to the extension 9b.
[0024] The tip end of each extension 9b constituting a pair of tension rods 9 is rotatably attached to the outer peripheral surface of the slide bracket 10 as described above, and the base end of the main body 9a is rotatably connected to the tip end of the boom link 11 as shown in Figure 4.
[0025] The boom link 11 is a pair of rod-shaped members that connect each tension rod 9 to the boom 4. As shown in Figures 1, 2 and 4, the base end of the boom link 11 is rotatably connected to the tip end of the boom 4, and the tip end is connected to the base end of the main body 9a of the tension rod 9 as described above.
[0026] At the tip of the boom 4, the pivot shaft 6a to which the base end of the jib 6 is connected is located below the boom 4, and the part to which the base end of the boom link 11 is connected is located above the boom 4 (Note that, for ease of explanation, when directions such as up / down and front / rear are indicated below, the description will be based on the positional relationship in the state in which the boom 4 is lowered and the jib 6 is supported from below as shown in FIG. 1, as necessary. In the state in which the boom 4 is upright (see FIG. 2), "up" corresponds to the rear of the vehicle, "down" corresponds to the front of the vehicle, "front" corresponds to the top, and "rear" corresponds to the bottom). When the boom 4 is swung out as shown in FIG. 2, the tension rod 9 and the boom link 11 apply tension to the jib 6 from the rear side, and share part of the load applied to the jib 6. At this time, the slide bracket 10 connected to the tip of the tension rod 9 slides along the longitudinal direction of the boom 4, and the tension rod 9 rotates appropriately relative to the boom link 11, or rotates together with the boom link 11 relative to the boom 4, allowing the tension rod 9 to rotate in response to the rotation of the jib 6 and support the jib 6.
[0027] Here, Fig. 3 shows a state in which the jib 6 has been removed from the boom 4, and when the mobile crane 1 is stored, the tension rod 9 is removed from the boom 4 and the boom link 11 together with the jib 6 and held under the jib 6, as shown here. Figs. 1 and 4 show a state in which the jib 6 and the tension rod 9 are connected to the boom 4, and Fig. 2 shows a state in which the boom 4 is raised from that state. The mobile crane 1 of this embodiment holds the tension rod 9 on the jib 6 as shown in Fig. 3, and also has a holding structure suitable for performing the work of connecting the tension rod 9 to the boom 4 side from that state as shown in Figs. 1 and 4. The holding structure for the tension rod 9 will be described below with reference to Figs. 5 to 8.
[0028] In the connected state shown in Fig. 8 (Fig. 8 shows a state in which the tension rod 9 is connected to the boom 4, similar to Figs. 1 and 4), the tension rod 9 has a tip end supported by the jib 6 via a slide bracket 10, and a base end supported by the boom 4 by being connected to the tip side of a boom link 11 connected to the boom 4. As shown in Fig. 5, a connecting hole 9c is provided at the base end of the main body 9a of the tension rod 9 as a connecting part for connecting to the boom link 11, while a connecting hole 11a is provided at the tip end of the boom link 11 as a connecting part for connecting to the tension rod 9, and as shown in Fig. 8, the tension rod 9 and the boom link 11 are connected by aligning the positions of the connecting holes 9c, 11a and passing a connecting pin 12 through them.
[0029] In contrast, in the stored state shown in Fig. 7, the jib 6 is removed from the pivot shaft 6a (see Fig. 4) provided on the boom 4 and is supported by the boom 4, and the tension rod 9 is also removed from the boom link 11 on the boom 4 side. In this state, the tip end of the tension rod 9 is supported by the jib 6 by the slide bracket 10, but the base end is released from connection with the boom link 11, so a separate mechanism is required to hold the tension rod 9 in place of the boom link 11. In addition, to move from the stored state shown in Fig. 7 to the connected state shown in Fig. 8, the jib 6 and tension rod 9 must be moved and connected to the pivot shaft 6a and boom link 11 provided at the tip of the boom 4, and it would be convenient if there was a mechanism to temporarily hold the tension rod 9 at this time as well.
[0030] Therefore, in this embodiment, as a holding structure for the tension rod 9, the tension rod 9, the jib 6 and the boom link 11 are provided with various mechanisms described below (see Figs. 5 and 6).
[0031] As shown in Figure 5, the tension rod 9 has at its base end a retaining hole 9d as a retaining portion (a mechanism for holding the tension rod 9 against the jib 6 during storage), a hook 9e as a temporary placement portion for the jib 6 (a mechanism for temporarily placing the tension rod 9 when removing it from the jib 6 or connecting it to the jib 6), and a hook 9f as a second temporary placement portion for the boom link 11 (a mechanism for temporarily placing the tension rod 9 when connecting it to the boom link or removing it from the boom link 11).
[0032] A retaining bracket 9g is provided at the base end of the main body 9a of the tension rod 9. The retaining bracket 9g is a small plate-like member extending along a plane approximately perpendicular to the axial direction of the connecting hole 11a on the boom link 11 side, and is provided with a connecting hole 9c, which is a mechanism for connecting to the boom link 11, as well as retaining holes 9d and hooks 9e and 9f.
[0033] The retaining hole 9d and the hook 9e are formed in a protrusion 9h provided on the retaining bracket 9g. The protrusion 9h is a portion that protrudes upward (toward the jib 6) from the retaining bracket 9g. The retaining hole 9d is provided as a hole penetrating the center of the protrusion 9h, and the hook 9e is provided as a hook-shaped protrusion that protrudes rearward from the rear end of the protrusion 9h. The hook 9f is provided as a hook-shaped protrusion that protrudes forward from the frontmost end (base end) of the retaining bracket 9g.
[0034] As shown in Figures 5 and 6, the jib 6 has a retaining hole 6b as a retaining portion (a mechanism for retaining the tension rod 9 during storage) and a temporary placement portion 6c as a mechanism for temporarily placing the tension rod 9 when removing it from the jib 6 or connecting it to the jib 6.
[0035] The holding hole 6b and the temporary placement portion 6c are formed in a protruding portion 6d provided on the jib 6. The protruding portion 6d is a portion provided so as to protrude downward from the lower surface of the base end portion of the jib 6. The holding hole 6b is provided as a hole penetrating the center portion of the protruding portion 6d, and the periphery of the portion of the protruding portion 6d where the holding hole 6b is provided is formed as two plate-like members that are perpendicular to the axis of the holding hole 6b and parallel to each other. In other words, the holding hole 6b is formed as a hole penetrating the two plate-like members that constitute the protruding portion 6d. The temporary placement portion 6c is a plate-like member provided so as to bridge between the two plate-like members that constitute the protruding portion 6d (see FIG. 6), and is provided behind the holding hole 6b.
[0036] In the stored state shown in Figure 7, the protrusion 9h provided on the retaining bracket 9g of the tension rod 9 is inserted between the two plate-shaped members that constitute the protrusion 6d on the jib 6 side, the position of the retaining hole 9d on the tension rod 9 side is aligned with the position of the retaining hole 6b on the jib 6 side, and the retaining pin 13 is inserted here, thereby retaining the base end of the tension rod 9 on the jib 6 side.
[0037] As shown in FIG. 5, the boom link 11 is provided with a second temporary placement portion 11b as a mechanism for temporarily placing the tension rod 9 when connecting the tension rod 9 to the boom link 11 or when removing the tension rod 9 from the boom link 11.
[0038] The tip of the boom link 11 is provided with the connecting hole 11a as described above. The portion with the connecting hole 11a is formed as two plate-like members that sandwich the holding bracket 9g provided at the base end of the tension rod 9 when the tension rod 9 is connected as shown in Figs. 4 and 8. In this embodiment, the components of the tip of the boom link 11 extend further toward the tip side than the position of the connecting hole 11a, and the temporary placement part 11b is provided between the two plate-like members at a position closer to the tip than the connecting hole 11a. That is, as shown in Figs. 4 and 5, the temporary placement part 11b is provided so as to bridge between the two plate-like members that constitute the tip of the boom link 11, and is a part that is parallel to the longitudinal direction of the boom link 11 and forms a surface that intersects with the two plate-like members. In the stored state shown in Fig. 7, the boom link 11 is in a position where the tip is facing downward, so the temporary placement part 11b is located below the connecting hole 11a. In addition, the temporary rest section 11b is provided in a position forward of the connecting hole 11a in the stored state (see FIG. 7) (in the state where the boom 4 is raised as shown in FIG. 2, the temporary rest section 11b is provided in a position behind the connecting hole 11a) so as not to impede the movement of the tension rod 9 when the jib 6 is swung out as shown in FIG. 2. Furthermore, the temporary rest section 11b is located behind the connecting hole 11a when the jib 6 is swung out as shown in FIG. 2, thereby fulfilling the function of guarding the tension rod 9 from rotating to the rear side with respect to the boom link 11. Note that the protrusion 9h provided to protrude upward from the holding bracket 9g of the tension rod 9 in the state shown in FIG. 7 and FIG. 8 is located in front of the tension rod 9 when the jib 6 is swung out as shown in FIG. 2, and this position is on the opposite side of the temporary rest section 11b with respect to the tension rod 9, so there is no concern that the protrusion 9h will interfere with the temporary rest section 11b when the jib 6 is swung out. In addition, the hook 9f, which is arranged to extend toward the base from the retaining bracket 9g of the tension rod 9, is hidden between the two plate-shaped members that form the tip of the boom link 11 when the jib 6 is extended, so there is no risk of it interfering with the rope (not shown) or the like.
[0039] A series of operations from the stored state shown in FIG. 7 to the connected state shown in FIG. 8 will be described with reference to FIGS.
[0040] In the stored state of the jib 6 (see FIG. 7; corresponding to FIG. 9), the jib 6 is located rearward relative to the boom 4 compared to the state connected to the boom 4 (see FIG. 8; corresponding to FIG. 12), and the tension rod 9 is located rearward relative to the jib 6 compared to the state connected to the boom 4. The boom link 11, the base end of which is connected to the tip of the boom 4 (see FIG. 4), is in a state in which the tip is facing downward, and the base end of the jib 6 and the base end of the tension rod 9 are located rearward relative to the tip of the boom link 11. A holding pin 13 is inserted into a holding hole 6b provided in the protruding portion 6d of the jib 6, and the same holding pin 13 is also inserted into a holding hole 9d provided in a holding bracket 9g of the tension rod 9. In this state, the base end of the tension rod 9 is held by the jib 6. In this state, the hook 9e of the tension rod 9 is located above the temporary placement portion 6c, which is a temporary placement portion for the jib 6. Furthermore, the tip of the tension rod 9 is held to the jib 6 by a slide bracket 10.
[0041] From this state (the state in Figs. 7 and 9), the jib 6 is moved forward relative to the boom 4 (see Figs. 1 and 4), and the base end of the jib 6 is connected to the rotating shaft 6a (see Figs. 1 and 4). At this time, the tension rod 9, whose tip end is supported by the jib 6 via the slide bracket 10 and whose base end is held by the holding hole 6b, moves forward together with the jib 6.
[0042] Next, when the retaining pin 13 connecting the jib 6 and the tension rod 9 is removed from the retaining holes 6b, 9d, the retention of the base end of the tension rod 9 on the jib 6 is released. When the retention is released, the base end of the tension rod 9 attempts to fall due to its own weight, but since the hook 9e of the tension rod 9 was located above the temporary placement part 6c of the jib 6 in the previous retained state (see Figures 7 and 9), the hook 9e engages with the temporary placement part 6c as shown in Figure 10, stopping the downward movement of the base end of the tension rod 9. In this way, even if the retained state is released, the base end of the tension rod 9 can be temporarily placed on the jib 6 as it is.
[0043] Next, the tension rod 9 is moved forward relative to the jib 6, and the work of connecting the tension rod 9 to the boom link 11 is performed. The hook 9e is removed from the temporary placement portion 6c, and while an operator holds the base end of the tension rod 9, the tension rod 9 is slid forward, and first, as shown in Figure 11, the hook 9f provided at the base end of the holding bracket 9g engages with the temporary placement portion 11b provided at the tip of the boom link 11. In this way, the base end of the tension rod 9 can be temporarily placed on the boom link 11 side.
[0044] 12 and 8, the base end of the tension rod 9 is lifted to align the position of the connection hole 9c with the connection hole 11a of the boom link 11, and the connection pin 12 is passed through both. In this way, the connection of the jib 6 and the tension rod 9 to the boom 4 is completed.
[0045] Thereafter, as shown in FIG. 2, the jib 6 is swung out, the boom 4 is extended or retracted, and the main hook 7 and auxiliary hook 8 are appropriately reeled out to carry out the transport work.
[0046] After work, when the crane truck 1 is to be travelled or stored, the tension rod 9 is removed from the boom link 11 by reversing the procedure described above, and the base end of the tension rod 9 is temporarily placed on the temporary placement portion 11b of the boom link 11 or the hook 9f of the jib 6 as appropriate while operating the tension rod 9 and its surrounding equipment, and finally the base end of the tension rod 9 is held by the holding hole 6b of the jib 6.
[0047] According to the tension rod holding structure of this embodiment as described above, the base end of the tension rod 9, which is connected to the boom link 11 in the connected state, is connected to and held by the jib 6 through the holding holes 6b, 9d as holding parts in the stored state, so that the entire tension rod 9 can be held by the jib 6. On the other hand, when the base end of the tension rod 9 is not connected to the boom link 11 or the jib 6 (when the tension rod 9 is to be connected to the boom link 11 or when the tension rod 9 is removed from the boom link 11), the base end of the tension rod 9 can be temporarily placed on the jib 6 using the temporary placement part 6c on the jib 6 side and the hook 9e which is the temporary placement part on the tension rod 9 side, or can be temporarily placed on the boom link 11 using the second temporary placement part 11b on the boom link 11 side and the hook 9f which is the second temporary placement part on the tension rod 9 side. That is, the temporary placement parts 6c, 9e and the second temporary placement parts 11b, 9f perform the function performed by the tension rod holding device in the above-mentioned Patent Document 2.
[0048] In such a structure for holding the tension rod by temporary placement, there is no risk of forgetting to release the temporary placement state when swinging out the jib 6. The temporary placement parts 6c, 9e for temporarily placing the tension rod 9 on the jib 6 side have a hook 9e, which is one of the temporary placement parts, provided at the base end of the tension rod 9, so that when the tension rod 9 is to be connected to the boom link 11, the engagement between the temporary placement parts 6c, 9e is always released. Similarly, the second temporary placement parts 11b, 9f for temporarily placing the tension rod 9 on the boom link 11 side have a hook 9f, which is one of the temporary placement parts, provided at the base end of the tension rod 9, so that when the tension rod 9 is to be connected to the boom link 11, the engagement between the temporary placement parts 11b, 9f is always released. Therefore, at the stage of connecting the tension rod 9 to the boom link 11 and swinging out the jib 6, the temporary placement parts 6c, 9e or the second temporary placement parts 11b, 9f remain engaged with each other, and this does not occur in a situation where this hinders the swinging out of the jib 6.
[0049] In addition, the temporary placement parts 9e, 9f on the tension rod 9 side are provided close to the connecting hole 9c and the holding hole 9d provided at the base end, so that the operation for temporarily placing the tension rod 9 is simple. In other words, when attaching or detaching the base end of the tension rod 9 to or from the jib 6, it is sufficient to attach or detach the holding pin 13 and temporarily place the tension rod 9 only at or near the base end of the tension rod 9, and there is no need to take the time to, for example, temporarily place the tension rod 9 on the jib 6 at a location other than the base end of the tension rod 9, and then move to the vicinity of the base end of the tension rod 9 to release the holding state. Similarly, when attaching or detaching the base end of the tension rod 9 to or from the boom link 11, it is sufficient to attach or detach the connecting pin 12 and temporarily place the tension rod 9 only at or near the base end of the tension rod 9, and there is no need to take the time to, for example, temporarily place the tension rod 9 on the boom link 11 at a location other than the base end of the tension rod 9, and then move to the vicinity of the base end of the tension rod 9 to release the connection state. For example, in the case of the tension rod holding device described in Patent Document 2 above, it is necessary to rotate the lower support mechanism to a holding position near the middle of the tension rod, then move it to near the base end to release the connection between the jib and the base end of the tension rod, connect the tension rod to the boom link, and then move it again to near the middle of the tension rod to release the holding state by the lower support mechanism, which is a complicated procedure.
[0050] Furthermore, the holding structure for these tension rods is composed of components with very simple shapes, and there is no need to install a tension rod holding device with a complex mechanism as described in Patent Document 2, which reduces the costs of manufacturing the holding structure for the tension rods and the crane truck 1.
[0051] In addition, in the tension rod holding device as described in Patent Document 2, various mechanisms such as the movement limiting member and the lower support mechanism are provided to protrude from various parts of the jib, and these mechanisms have a relatively complex structure and a corresponding volume and shape, so there is a risk of interference with other equipment installed on the crane vehicle. In particular, when the crane vehicle is small, the volume of the tension rod holding device and the possibility of it interfering with other equipment become relatively large. With the tension rod holding structure of this embodiment, it is only necessary to provide the minimum number of simple components on the tension rod 9, jib 6, and boom link 11, so the possibility of interference with other equipment can be greatly reduced.
[0052] In addition, when carrying out the present invention, the specific shape of the tension rod holding structure described above may be changed as appropriate. For example, a ring-shaped member may be provided as a temporary placement part instead of a hook, and the temporary placement part on the jib or boom link side may be shaped like a hook. Also, depending on the actual configuration of the tension rod or jib, it is theoretically possible to combine the functions of the holding hole and the connecting hole. That is, when connecting the jib to the boom, the connecting hole on the tension rod side is connected with a pin to the connecting hole on the boom link side, and when storing, the holding hole on the jib side is connected with the connecting hole on the tension rod side with a pin to hold the tension rod. In addition, various configurations and shapes other than those described as examples here can be adopted as the tension rod holding structure, as long as the tension rod can be appropriately held, connected, and temporarily placed.
[0053] As described above, the tension rod holding structure of the present embodiment includes the boom 4 that is hoistable on the vehicle body 2 of the crane vehicle 1, the jib 6 that is connected to the tip of the boom 4 and configured to be swung out from the boom 4, the tension rod 9 that is rotatably connected at its base end to the tip of the boom 4 via the boom link 11 and that is attached to the jib 6 via the slide bracket 10 that is configured to be slidable along the jib 6, and temporary placement parts (temporary placement part 6c, hook 9e) that are provided on the jib 6 and the tension rod 9 and that engage with each other to temporarily place the tension rod 9 on the jib 6. In this way, when the base end of the tension rod 9 is not connected to the jib 6, the base end of the tension rod 9 can be temporarily placed on the jib 6 using the temporary placement parts 6c, 9e, and the temporary placement state can be reliably released when the jib 6 is swung out.
[0054] Furthermore, in the tension rod holding structure of this embodiment, the tension rod 9 has a holding portion (holding hole) 9d at its base end for being held by the jib 6, and the temporary placement portion 9e provided on the tension rod 9 is provided at its base end. In this way, by providing the temporary placement portion 9e adjacent to the holding portion 9d, the operation of temporarily placing the tension rod 9 on the jib 6 can be easily performed.
[0055] The tension rod holding structure of this embodiment further includes second temporary placement parts (temporary placement part 11b, hook 9f) which are provided on the boom link 11 and the tension rod 9 and configured to engage with each other to temporarily place the tension rod 9 on the boom link 11. In this way, when the base end of the tension rod 9 is not connected to the jib 6, the base end of the tension rod 9 can also be temporarily placed on the boom link 11 side.
[0056] Furthermore, in the tension rod holding structure of this embodiment, the tension rod 9 has a connecting portion 9c at its base end for connecting to the boom link 11, and the second temporary placement portion 9f provided on the tension rod 9 is provided at the base end of the tension rod 9. In this way, by providing the second temporary placement portion 9f adjacent to the connecting portion 9c, the operation of temporarily placing the tension rod 9 on the boom link 11 can be easily performed.
[0057] Furthermore, in this embodiment, the above-mentioned tension rod holding structure is applied to the crane truck 1, so that the same operational effects as those described above can be achieved in the crane truck 1.
[0058] Therefore, according to the above embodiment, it is possible to more reliably avoid interference with the extension of the jib by the tension rod.
[0059] Incidentally, the tension rod holding structure and crane vehicle of the present invention are not limited to the above-described embodiments, and it goes without saying that various modifications can be made without departing from the spirit and scope of the present invention. [Explanation of symbols]
[0060] 1 Crane truck 2. Body 4. Boom 6. Jib 6c Temporary storage area 9 Tension Rod 9c Connecting part (connecting hole) 9d Holding part (holding hole) 9e Temporary placement section (hook) 9f Temporary storage area (hook, second temporary storage area) 10 Slide bracket 11 Boom Link 11b Temporary storage area (second temporary storage area)
Claims
1. A boom is provided on a body of the crane vehicle so as to be capable of being raised and lowered; A jib connected to a tip of the boom and configured to be swung out from the boom; A tension rod whose base end is rotatably connected to the tip end of the boom via a boom link and whose tip end is attached to the jib via a slide bracket configured to be slidable along the jib; a temporary placement portion provided on each of the jib and the tension rod, the temporary placement portion being configured to be able to temporarily place the tension rod on the jib by engaging with each other; A tension rod holding structure comprising:
2. The tension rod has a holding portion at a base end for being held by the jib, The temporary placement portion provided on the tension rod is provided at a base end portion of the tension rod. The tension rod holding structure according to claim 1 .
3. The tension rod is further provided with a second temporary placement portion that is provided on each of the boom link and the tension rod and that is configured to be able to temporarily place the tension rod on the boom link by engaging with each other.
3. The tension rod holding structure according to claim 1 or 2.
4. The tension rod has a connecting portion at a base end thereof for connecting to the boom link, The second temporary placement portion provided on the tension rod is provided at a base end portion of the tension rod.
4. The tension rod holding structure according to claim 3.
5. A crane vehicle comprising the tension rod holding structure according to any one of claims 1 to 4.
Citation Information
Patent Citations
Jib extending device of crane with auxiliary jib
JP1993116888A
Jib derricking mechanism and crane vehicle with jib derricking mechanism
JP2020111415A
Jib overhanging device
JP2020179956A
