Analysis device and analysis program

The analysis device and program enhance tunnel construction predictions by using a neural network and Kalman filter to learn from excavated data, accurately predicting unexcavated groundwater behavior despite modeling errors and multiple strata.

JP7576491B2Active Publication Date: 2024-10-31TAKENAKA CIVIL ENG & CONSTR CO LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2021037734
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-09
Publication Date
2024-10-31
Estimated Expiration
2041-03-09

AI Technical Summary

Technical Problem

Existing methods for predicting groundwater behavior during tunnel construction, such as the SDA-SWING method, struggle with inaccuracies due to difficulties in grasping physical quantities of unexcavated areas, leading to deviations in prediction results.

Method used

An analysis device and program that uses a neural network model to learn an estimation model from explanatory and objective variables of excavated slices, updating these variables using a Kalman filter, and predicting unexcavated slice values through machine learning, incorporating geological stratum divisions and observed values.

Benefits of technology

Accurately predicts observed values of unexcavated tunnel sections by improving prediction accuracy through machine learning and Kalman filter updates, addressing modeling errors and multiple strata classifications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007576491000001
    Figure 0007576491000001
  • Figure 0007576491000002
    Figure 0007576491000002
  • Figure 0007576491000003
    Figure 0007576491000003
Patent Text Reader

Abstract

To accurately predict an observation value of a slice corresponding to a non-excavation part of a natural ground.SOLUTION: A setting part 22 sets an explanation variable for each slice of a natural ground model. A target variable prediction part 24 predicts a target variable of a slice of an excavation target part on the basis of a target variable of a slice of an excavated part. A learning part 26 learns an estimation model by using an explanation variable and the target variable of the slice of the excavated part as learning data. An observation part 30 excavates the excavation target part, and then acquires an observation value. An identification part 32 identifies the target valuable of the slice of the excavation target part from the observation value by using an observation equation. An observation value prediction part 34 predicts a target variable of a slice of a non-excavation part by using the identified target variable of the slice of the excavation target part, an explanation variable of a slice of the non-excavation part, and an estimation model, and predicts an observation value of the slice of the non-excavation part by using the observation equation.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an analysis device and an analysis program. [Background technology]

[0002] Groundwater problems associated with tunnel construction include the collapse of tunnel faces due to large amounts of groundwater seeping out and the impact on the surrounding environment. To address these issues, a method is needed to quickly and accurately predict the amount of groundwater seeping out.

[0003] Therefore, as an information-based construction method that reflects observed values ​​during construction in a model to quickly predict groundwater behavior and reflects the results in the selection of excavation methods and the consideration of groundwater countermeasures (drainage methods, water-stopping methods), the SDA-SWING (groundwater information-based construction) method, which predicts the amount of spring water by introducing a sequential data assimilation (SDA) method, is known (for example, non-patent documents 1 and 2). [Prior art documents] [Non-patent literature]

[0004] [Non-Patent Document 1] Kenji Takahashi, Yuzo Onishi, Toru Yasuda, and Shun Kuma: Development of a simplified system for groundwater information construction (SWING) for mountain tunnels, Proceedings of the Symposium on Underground Space, Japan Society of Civil Engineers, Vol. 13, pp. 147-150, 2008. [Non-Patent Document 2] Junya Ogiso, Tomofumi Koyama, Kenji Takahashi, Toru Yasuda, Yuzo Onishi: Development of a simplified groundwater information construction system (SWING) using sequential data assimilation, Journal of Japan Society of Civil Engineers, Special Issue on F1 (Tunnel Engineering), Vol.66, No.1, pp.9-15, 2012. Summary of the Invention [Problem to be solved by the invention]

[0005] A prediction method using one-dimensional hydraulic formulas has been developed that can predict the amount of spring water using the observational values ​​of the amount of spring water obtained at the mine mouth and reflect them in the construction stage, but there have been reported cases where the predicted results differ from the observed values. One of the reasons for this is thought to be the difficulty of grasping the physical quantities of the ground required for prediction in advance in unexcavated parts.

[0006] In consideration of the above, an object of the present invention is to be able to accurately predict the observed values ​​of a slice corresponding to an unexcavated portion of the natural ground. [Means for solving the problem]

[0007] The analysis device according to the present invention includes a setting unit that sets explanatory variables, which are physical quantities including a stratum division of a slice obtained in advance, for each slice obtained by dividing a natural ground model that models a natural ground to be excavated in an excavation direction, a response variable prediction unit that predicts the response variable of the slice corresponding to the portion to be excavated based on a response variable, which is a physical quantity correlated with the explanatory variable, of the slice corresponding to an excavated portion that is on the front side of the portion to be excavated in the excavation direction, a learning unit that uses the explanatory variables and the response variable of the slice corresponding to the excavated portion as learning data to learn an estimation model for estimating the response variable from the explanatory variables, and after excavating the portion to be excavated, a prediction unit that predicts the response variable of the slice corresponding to the portion to be excavated based on a response variable, which is a physical quantity correlated with the explanatory variable. the slice corresponding to the portion to be excavated using the objective variable of the slice corresponding to the portion to be excavated, which is an unexcavated portion that is further from the portion to be excavated in the excavation direction in the excavation direction than the portion to be excavated in the excavation direction, and the estimation model, and an observation value prediction unit that predicts the objective variable of the slice corresponding to the unexcavated portion using the objective variable of the slice corresponding to the identified portion to be excavated, the explanatory variables of the slice corresponding to the unexcavated portion that is further from the portion to be excavated in the excavation direction, and the estimation model, and predicts the observation value of the slice corresponding to the unexcavated portion using the objective variable of the slice corresponding to the unexcavated portion and the observation equation.

[0008] According to the analysis device of the present invention, the setting unit sets explanatory variables, which are physical quantities including the stratum classification of the slice obtained in advance, for each slice obtained by dividing a natural ground model, which models the natural ground to be excavated, in the excavation direction. The objective variable prediction unit predicts the objective variable of the slice corresponding to the portion to be excavated based on the objective variables, which are physical quantities correlated with the explanatory variables, of the slice corresponding to the excavated portion that is on the front side of the portion to be excavated in the excavation direction.

[0009] A learning unit learns an estimation model for estimating the dependent variable from the explanatory variables using the explanatory variables and the dependent variable of the slice corresponding to the excavated portion as learning data. An observation unit obtains an observed value, which is a physical quantity related to the dependent variable of the slice corresponding to the excavated portion, after the portion to be excavated is excavated.

[0010] Then, an identification unit identifies the objective variable of the slice corresponding to the portion to be excavated from the observation value of the slice corresponding to the portion to be excavated by using an observation equation expressing a relationship between the observation value and the objective variable. An observation value prediction unit predicts the objective variable of the slice corresponding to the unexcavated portion by using the objective variable of the slice corresponding to the identified portion to be excavated, the explanatory variables of the slice corresponding to the unexcavated portion that is further in the excavation direction than the portion to be excavated, and the estimation model, and predicts the observation value of the slice corresponding to the unexcavated portion by using the objective variable of the slice corresponding to the unexcavated portion and the observation equation.

[0011] In this way, the explanatory variables and the objective variables of the slice corresponding to the excavated portion are used as learning data, and an estimation model for estimating the objective variables from the explanatory variables is learned. The objective variables of the slice corresponding to the identified portion to be excavated, the explanatory variables of the slice corresponding to the unexcavated portion, and the estimation model are used to predict the objective variables of the slice corresponding to the unexcavated portion. The observation equation is used to predict the observed values ​​of the slice corresponding to the unexcavated portion, thereby making it possible to accurately predict the observed values ​​of the slice corresponding to the unexcavated portion of the natural ground.

[0012] The estimation model according to the present invention is a neural network model that receives the explanatory variables as input and outputs the objective variables.

[0013] The learning unit of the present invention uses the learned estimation model to determine the ratio of the objective variables between the stratum divisions, and the observation value prediction unit predicts the objective variable of the slice corresponding to the identified portion to be excavated, the explanatory variables of the slice corresponding to the unexcavated portion that is further back in the excavation direction than the portion to be excavated, and the ratio of the objective variables between the stratum divisions.

[0014] The objective variable prediction unit of the present invention predicts the objective variable of the slice corresponding to the portion to be excavated based on the objective variable of the slice corresponding to the excavated portion, by time updating of the Kalman filter, with the objective variable of each slice being the state quantity of the Kalman filter at each time, and the identification unit identifies the objective variable of the slice corresponding to the portion to be excavated based on the objective variable estimated by the objective variable prediction unit, the observation value of the slice corresponding to the portion to be excavated, and an observation equation representing the relationship between the observation value and the objective variable, by observation updating of the Kalman filter.

[0015] The analysis device according to the present invention further includes an explanatory variable update unit that updates the explanatory variables of the slice corresponding to an unexcavated portion after the portion to be excavated is excavated.

[0016] The analysis program according to the present invention includes a computer, which includes a setting unit that sets explanatory variables, which are physical quantities including a stratum division of the slice obtained in advance, for each slice obtained by dividing a natural ground model that models a natural ground to be excavated in the excavation direction, a response variable prediction unit that predicts the response variable of the slice corresponding to the portion to be excavated based on a response variable, which is a physical quantity correlated with the explanatory variable, of the slice corresponding to an excavated portion that is on the front side of the portion to be excavated in the excavation direction, a learning unit that learns an estimation model for estimating the response variable from the explanatory variables using the explanatory variables and the response variable of the slice corresponding to the excavated portion as learning data, and a learning unit that learns an estimation model for estimating the response variable from the explanatory variables after excavating the portion to be excavated, and a target value for the slice corresponding to the portion to be excavated that is correlated with the response variable. the analysis program to function as an observation unit that acquires observed values, which are physical quantities corresponding to the depth of the excavation target, an identification unit that identifies the dependent variable of the slice corresponding to the portion to be excavated from the observed values ​​of the slice corresponding to the portion to be excavated, using an observation equation that represents the relationship between the observed values ​​and the dependent variable, and an observation value prediction unit that predicts the dependent variable of the slice corresponding to the unexcavated portion using the dependent variable of the slice corresponding to the identified portion to be excavated, the explanatory variables of the slice corresponding to an unexcavated portion that is further back in the excavation direction than the portion to be excavated, and the estimation model, and predicts the observed value of the slice corresponding to the unexcavated portion using the dependent variable of the slice corresponding to the unexcavated portion and the observation equation. Effect of the Invention

[0017] As described above, the analysis device and analysis program of the present invention have the effect of making it possible to accurately predict the observed values ​​of a slice corresponding to an unexcavated portion of the natural ground. [Brief description of the drawings]

[0018] [Figure 1] 1 is a block diagram showing an analysis device according to an embodiment of the present invention; [Diagram 2] 1 is a functional block diagram illustrating an analysis device according to an embodiment of the present invention. [Diagram 3] FIG. 13 is a diagram showing an example of slices obtained by dividing a natural ground model in the excavation direction. [Figure 4] FIG. 1 is a diagram illustrating an example of a neural network model. [Diagram 5] FIG. 13 is a diagram showing an example of a well formula that is an observation equation in which the amount of spring water is an observation value. [Figure 6] 4 is a flowchart showing the contents of an analysis processing routine of the analysis device according to the embodiment of the present invention. [Figure 7] 1 is a graph showing examples of explanatory variables and response variables in an embodiment. [Figure 8] FIG. 2 is a diagram showing a configuration of a neural network model in an embodiment. [Figure 9] 1 is a graph showing prediction results of a response variable in an example. [Figure 10] FIG. 1 illustrates operations in inverse calculation in the prior art. [Figure 11] FIG. 1 illustrates operations in data assimilation in the prior art. [Figure 12] FIG. 1 is a diagram illustrating filtering taking into account the observation space and the state space in the prior art. [Figure 13] FIG. 1 is a diagram showing an example of the data assimilation range in spring water volume prediction. [Figure 14] FIG. 13 is a diagram showing an example of adding observed values ​​in spring water volume prediction. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.

[0020] <Principle of the embodiment of the present invention> (Prior art and its problems)

[0021] In recent years, in order to improve the prediction accuracy of tunnel excavation simulations, efforts have been made in various places to incorporate methods such as inverse calculation (data assimilation, etc.) and deep learning. Here, we will discuss the problems associated with each method.

[0022] (Inverse calculation / forward calculation (data assimilation)) In a general simulation problem, the relationship between the observed value y and the state quantity x is replaced by the formula y=h(x). The state quantity x is the main parameter that constitutes the simulation model, but it is difficult to observe directly, so it is generally estimated from the observed value y. For example, the state quantity x is a soil constant, and the observed value y is the amount of ground deformation and water level drop caused by excavation.

[0023] In an inverse calculation problem, the state quantity x that matches the observed value y is calculated. The solution is determined deterministically, and there is only one state quantity x for one observed value y.

[0024] Now, the state before the observation is obtained is x t-1 , the state quantity obtained is x t , the observations are y t , x t The time change of f t (x), the formula is h t If (x), the operations in inverse analysis can be expressed as shown in Figure 10.

[0025] In data assimilation, the state quantity x t and the observed value y t We assume that each has a known Gaussian noise due to its characteristics, and the noise in each distribution is expressed as υ t and ω t In this case, the observed values ​​in the inverse analysis are displayed as a probability distribution as shown in Figure 11.

[0026] Now, the formula y=h(x) is invariant, and only the state variable x is updated over time. Both f(x) and h(x) are linear, and both υ and ω are Gaussian noise.t The probability distribution of can be calculated using a formula.

[0027] x t =F x t-1 +υ υ~N(0,Q): This state space model is represented by a normal distribution with variance Q.

[0028] y t =H x t +ω ω~N(0,R): This observation model is represented by a normal distribution with variance R.

[0029] Distribution x at time t-1 t-1 is the average value x as shown below. t-1 , variance value V t-1 It is assumed that the distribution follows a normal distribution.

[0030] x t-1 ~N(x t-1 ,V t-1 )

[0031] Observed value y t is given, the state x t can be calculated as follows. This operation is called filtering (see Figure 12).

[0032] K t =V t-1 H' / (H V t-1 H'+R t ) x t =x t-1 +K t (y t -H x t-1 ) V t =V t-1 ·(1-K t H)

[0033] y t and x t The relationship between is a linear mapping of coefficient H (observation equation), and by using this, the posterior distribution x t Dispersion value V t and the prior distribution x t-1 ·V t-1The update coefficient K t The calculation is as follows: K t is V t-1 and R t This is the ratio of the prior distribution x t-1 and the observed distribution y t The variance value V in t-1 ,R t The ratio K t The mean of the posterior distribution is x t and the variance value V t This is just a calculation of K t is called the Kalman gain.

[0034] posterior distribution x t Once calculated, we can use the state equation and observation equation to predict the state one period ahead and beyond. The equation for one period ahead prediction is as follows:

[0035] x t =F x t-1 V t = F V t-1 F'+Q t

[0036] V t In the calculation of, it is assumed that the equation of state F is linear.

[0037] After this, this process is repeated each time observational data is obtained, thereby improving the accuracy of the posterior distribution.

[0038] The biggest problem with applying inverse calculation to tunnel excavation simulation is that this method only identifies the objective variables in areas that affect the observed values. Particularly in tunnel excavation with a long construction length, it is not possible to identify the objective variables for unconstructed sections outside the affected area, and the results of forward calculation (future prediction) are not updated (see Figure 13).

[0039] Furthermore, if there are multiple stratum divisions within the affected area (see Figure 3), there will also be multiple objective variables, so the inverse calculation requires the same number of observations as the number of objective variables, but in most cases only one observation can be obtained at the tunnel face position, so a separate observation must be obtained ahead of the face (see Figure 14). For example, to solve the equation y=ax1+bx2, two values ​​of y are required.

[0040] Furthermore, in normal inverse / forward calculation processing, the value of the objective variable x is identified using only the observed value y, and the explanatory variable z is not currently mentioned. For example, a clear correlation exists between the explanatory variable z and the objective variable x, such as the relationship between the density of fractures and the coefficient of permeability, but it is difficult to demonstrate this relationship with an equation, and when the dimensions of the explanatory variables increase, such as elastic wave velocity and uniaxial compressive strength in addition to the fractures, it becomes even more difficult to derive a relational equation.

[0041] Therefore, it has become common to use an observation equation whose relationship is clearly shown, and to back-calculate the dependent variable using only the observed values.

[0042] (Correlation between hydraulic conductivity and soil cover in the SWING method (well formula)) In the SWING method, the tunnel spring water volume at the slice section is calculated by Bear's formula, which combines Dupuit's quasi-uniform flow with rainfall infiltration. This formula is a type of well formula, and assumes that the water level directly above the tunnel drops to the tunnel excavation depth immediately after excavation, and then gradually expands to the steady-state water level drop range over time. Since the target is a mountain tunnel, the groundwater level before excavation is assumed to be around GL or GL-5m.

[0043] In this formula, the amount of spring water q t and the permeability coefficient k is q t =α√k, which is a proportional relationship with respect to the logarithmic hydraulic conductivity.

[0044] When considering the water flow according to the seepage theory, the water level directly above the tunnel does not change immediately after excavation, but gradually decreases over time. Therefore, the flow rate q calculated by the SWING method t is a value that includes an error due to this modeling. When the soil overburden is small, the steady-state water level is expected to drop to the tunnel position, so this error will be small. At this time, the spring water volume (= permeability coefficient identified by the SWING method) is proportional to the square of the soil overburden. However, when the soil overburden is large, the groundwater level does not drop to the tunnel position even in the steady state, and the error will be large. At this time, the effect of the soil overburden on the spring water volume is expected to be small.

[0045] Therefore, if future predictions are made assuming that the hydraulic conductivity of the natural ground is constant, the spring water volume calculated by the SWING method increases in proportion to the square of the soil cover. However, in reality, once the soil cover exceeds a certain level, the spring water volume hardly changes, so the correlation between the soil cover and the spring water volume approaches logarithmic proportion. If assimilation is performed using the SWING method for such a spring water volume, the hydraulic conductivity will be small due to modeling errors. Therefore, to improve the prediction accuracy of the SWING method for natural ground with a uniform hydraulic conductivity, the set hydraulic conductivity must be corrected according to the soil cover.

[0046] In this embodiment, the correlation is calculated internally by including soil cover in the explanatory variables in machine learning, and the hydraulic conductivity is automatically corrected. This makes it possible to make highly accurate predictions by incorporating machine learning, even if there is an error in the observation equation.

[0047] (Machine Learning) As mentioned above, there is a clear correlation between explanatory variable z and objective variable x, but it is difficult to prove that relationship with an equation. However, if there are multiple combinations of objective variable x corresponding to explanatory variable z, it is possible to estimate an equation from them using techniques such as regression analysis.

[0048] When the explanatory variable z is high-dimensional, it is difficult to perform regression analysis, etc., but with the recent improvement in computer performance, it has become possible to calculate this correlation relatively easily by using machine learning without performing complex formulation work.

[0049] In this embodiment, by incorporating this machine learning process into the flow of reverse calculation and forward calculation, when not only the observed value y but also the explanatory variable z is updated, it is possible to predict the objective variable x of the unconstructed section from the results.

[0050] In addition, the explanatory variable z is unrelated to the range of influence of the observation equation, making it possible to update the objective variable in unconstructed sections outside that range. Furthermore, since it is carried out independently of the inverse calculation, objective variables are calculated for multiple rock types, and by assuming that their ratios are constant, the objective variable x has a single dimension, making it possible to identify a single observed value y.

[0051] It is possible to directly associate the observed value y with the explanatory variable z using machine learning alone, without using inverse calculation, but it is generally possible to associate multiple observed items (e.g. deformation amount, component stress, spring water volume, affected area, etc.) with the objective variable through a single observation equation, enabling efficient calculations.

[0052] <Configuration of the analysis device according to the embodiment of the present invention> As shown in FIG. 1, analysis device 100 according to an embodiment of the present invention includes a CPU 12, a graphics card 13, a GPU 14, a RAM 16, a HDD 18, a communication interface 21, and a bus 23 for interconnecting these components.

[0053] The CPU 12 and the GPU 14 execute various programs. The RAM 16 is used as a work area or the like when the CPU 12 executes the various programs. The HDD 18, which serves as a recording medium, stores various programs including a program for executing an analysis processing routine, which will be described later, and various data.

[0054] Analysis device 100 in this embodiment is represented by functional blocks along with a program for executing an analysis processing routine, as shown in Fig. 2. Analysis device 100 includes an input unit 10, a calculation unit 20, and an output unit 50.

[0055] The input unit 10 receives as input data representing each slice obtained by dividing a rock mass model, which is a model of the rock mass to be excavated, in the excavation direction, and explanatory variables, which are physical quantities including stratum divisions determined in advance for each slice (see Figure 3).

[0056] The explanatory variable z can be obtained from design conditions, preliminary surveys (forward exploration, etc.), past performance, etc. before the tunnel excavation reaches the relevant slice, and is a value that is expected to be related to the objective variable but is difficult to formulate.

[0057] Examples of explanatory variables include rock type, which is a geological layer classification, as well as soil overburden, tunnel cross-sectional dimensions, crack density, natural rock elastic wave velocity, uniaxial compressive strength, and rainfall intensity.

[0058] Furthermore, the input unit 10 receives as input data indicating the correlation between explanatory variables and objective variables obtained from other excavation work results.

[0059] Here, the objective variables are values ​​that can be converted into various observed values ​​through the observation equation. These values ​​are determined as explanatory variables z that correspond to each stratum division. For example, objective variables include the rock mass deformation coefficient, hydraulic conductivity, rainfall infiltration rate, etc.

[0060] Furthermore, after the excavation target portion is excavated, the input unit 10 receives as input an observation value, which is a physical quantity related to the objective variable, of a slice corresponding to the excavation target portion.

[0061] Here, the various observed values ​​y are values ​​obtained from various behaviors that occur in the tunnel when the tunnel progress reaches each slice, and cannot be measured in advance. For example, the observed values ​​include support displacement, face extrusion amount, appropriate charge amount, face image (feature amount), or well water amount.

[0062] Furthermore, after the excavation target portion is excavated, if there are explanatory variables to be updated for a slice corresponding to an unexcavated portion, the input unit 10 receives as input the explanatory variables of the slice corresponding to the unexcavated portion.

[0063] The calculation unit 20 includes a setting unit 22, a response variable prediction unit 24, a learning unit 26, an explanatory variable update unit 28, an observation unit 30, an identification unit 32, and an observed value prediction unit .

[0064] The setting unit 22 sets explanatory variables for each slice of a natural ground model that models the natural ground to be excavated.

[0065] In addition, the setting unit 22 sets an initial objective variable x corresponding to the stratum classification included in the explanatory variables for each slice, based on the correlation between the stratum classification and the objective variable obtained from the results of other excavation works.

[0066] The objective variable prediction unit 24 predicts the objective variables of a slice corresponding to the portion to be excavated, based on the objective variables of a slice corresponding to an excavated portion which is located on the front side in the excavation direction of the portion to be excavated.

[0067] Specifically, the objective variable prediction unit 24 predicts the objective variable of the slice corresponding to the portion to be excavated based on the objective variable of the slice corresponding to the excavated portion by time updating the Kalman filter, with the objective variable of each slice being the state quantity of the Kalman filter at each time. Here, the Kalman filter is time updated with each slice in the excavation direction of the natural ground model corresponding to each time step of the Kalman filter. In other words, the time change of the objective variable is not predicted.

[0068] The learning unit 26 generates explanatory variables and objective variables of each slice corresponding to the excavated portion as learning data, and learns a neural network model for estimating the objective variables from the explanatory variables based on the learning data (see FIG. 4).

[0069] In this way, as tunnel excavation progresses, the identified objective variable x and its corresponding explanatory variable z are obtained for each slice in the already constructed section, and the explanatory variables and identified objective variables of each slice are generated as learning data, and this learning data is subjected to machine learning to train the neural network model.

[0070] The learning unit 26 also uses the trained neural network model to determine the ratio of the objective variables between the stratum divisions. Specifically, the trained neural network model is used to determine objective variables x1', x2' corresponding to each stratum division, and a ratio α2 is determined such that x2'=α2×x1' from the objective variable x1' corresponding to the stratum division in the excavation target portion and the objective variable x2' corresponding to another stratum division. This ratio is determined for all stratum divisions.

[0071] After the excavation target portion is excavated, if there are explanatory variables to be updated for a slice corresponding to an unexcavated portion by performing forward exploration, the explanatory variable update unit 28 updates the explanatory variables of the slice.

[0072] After excavating the portion to be excavated, the observation unit 30 obtains the observation values ​​of the slice corresponding to the input portion to be excavated.

[0073] The identification unit 32 identifies the objective variable of the slice corresponding to the excavation target portion by inverse calculation x=f'(y) using an observation equation f that represents the relationship between the observation value y of the slice corresponding to the excavation target portion and the objective variable x.

[0074] Specifically, the identification unit 32 identifies the dependent variable of the slice corresponding to the portion to be excavated based on the dependent variable estimated by the dependent variable prediction unit 24 through observation updates of the Kalman filter, the observation values ​​of the slice corresponding to the portion to be excavated, and the observation equation.

[0075] Here, the observation equation f is a simulation model equivalent to y = f(x) or y = f(x,z) that explains the relationship between the objective variable x, some of the explanatory variables z, and various observed values ​​y, and contains errors associated with modeling.

[0076] For example, the observation equation f is a 3D FEM model in which the deformation amount and the spring water amount are the observed values, a 2D FEM model in which the deformation amount and the spring water amount are the observed values, an elastic support beam model in which the deformation amount is the observed value, or a well formula in which the spring water amount shown in Figure 5 is the observed value.

[0077] The observation value prediction unit 34 predicts the objective variables of the slice corresponding to the identified excavation target portion, the explanatory variables of the slice corresponding to the unexcavated portion that is further back in the excavation direction than the excavation target portion, and the learning results of the neural network model, and predicts the observation value of the slice corresponding to the unexcavated portion using the objective variables of the slice corresponding to the unexcavated portion and the observation equation.

[0078] Specifically, the observation value prediction unit 34 predicts the dependent variable of the slice corresponding to the undrilled portion using the dependent variable of the slice corresponding to the identified portion to be excavated, the explanatory variables of the slice corresponding to the undrilled portion that is further back in the excavation direction than the portion to be excavated, and the ratio of dependent variables between the stratum divisions.

[0079] For example, the objective variable x1 for stratum division 1 of the slice in the area to be excavated and its corresponding rock type is set as the reference value, and the objective variables x2, x3, x4... for the other stratum divisions 2, 3, 4... are set as multiples of x1 as x2 = α2 × x1, x3 = α3 × x1, x4 = α4 × x1, ..., and the objective variable x for each slice in the unconstructed section is determined.

[0080] Then, the observed value prediction unit 34 predicts the observed value y of each slice present in the unconstructed section by forward calculation applying the observation equation y=f(x), and outputs it from the output unit 50.

[0081] <Operation of the analysis device> Next, the operation of analysis device 100 according to the embodiment of the present invention will be described.

[0082] When performing excavation work on the ground to be excavated, the input unit 10 receives as input data representing each slice obtained by dividing a ground model that models the ground to be excavated in the excavation direction, explanatory variables which are physical quantities including stratum divisions determined in advance for each slice, and data representing the correlation between the explanatory variables and the objective variables obtained from other excavation work results, and the analysis device 100 executes the analysis processing routine shown in Figure 6.

[0083] First, in step S100, the setting unit 22 sets the input explanatory variables for each slice of a natural ground model that models the natural ground to be excavated.

[0084] Then, in step S102, the setting unit 22 sets an initial response variable x corresponding to the stratum classification of the explanatory variable for each slice, based on the correlation between the stratum classification and the response variable obtained from the results of other excavation works.

[0085] In step S104, the objective variable prediction unit 24 predicts the objective variables of a slice corresponding to the portion to be excavated, based on the objective variables of a slice corresponding to the excavated portion which is located on the front side in the excavation direction of the portion to be excavated.

[0086] In step S106, the learning unit 26 generates explanatory variables and response variables of each slice corresponding to the excavated portion as learning data, and learns a neural network model for estimating the response variable from the explanatory variables based on the learning data.

[0087] In step S108, the learning unit 26 uses the trained neural network model to obtain the ratio of the objective variables between the stratum sections.

[0088] In step S110, after the excavation target portion is excavated, if explanatory variables to be updated for a slice corresponding to an unexcavated portion are input by performing forward exploration, the explanatory variable update unit 28 updates the explanatory variables of that slice.

[0089] In step S112, the observation unit 30 excavates the excavation target portion and then obtains the observation values ​​of the slice corresponding to the excavation target portion.

[0090] In step S114, the identification unit 32 identifies the objective variable of the slice corresponding to the excavation target portion by inverse calculation x=f'(y) using an observation equation f that represents the relationship between the observation value y of the slice corresponding to the excavation target portion and the objective variable x.

[0091] In step S116, the observation value prediction unit 34 predicts the objective variables of the slices corresponding to the identified excavation target portion, the explanatory variables of the slices corresponding to the unexcavated portion that is further in the excavation direction than the excavation target portion, and the learning result of the neural network model, and predicts the observation value of the slice corresponding to the unexcavated portion using the objective variables of the slices corresponding to the unexcavated portion and the observation equation.Then, the prediction result is output by the output unit 50.

[0092] In step S118, it is determined whether the excavation work has been completed. If the excavation work has not been completed, the slice of the excavation target portion is changed to one further in the excavation direction, and the process returns to step S104. On the other hand, if the excavation work has been completed, the analysis process routine is terminated.

[0093] <Example> In this embodiment, in addition to rock type, which is a geological stratum classification, the explanatory variables are earth covering, porosity, elastic wave velocity, and drilling energy used when drilling holes for charging the tunnel face, as shown in Figure 7, and the permeability coefficient is the objective variable. The explanatory variables are determined based on design conditions and various surveys, and the objective variable is determined by inverse calculation using an observation equation from observed values ​​during excavation work.

[0094] The neural network model used for training uses a seven-layer perceptron structure with 100 nodes each, as shown in Figure 8.

[0095] Figure 9(A) shows a comparison of the measurement results using the SWING method with the predicted permeability coefficient of the unconstructed section after 300m of excavation work has been performed. Figure 9(B) shows a comparison of the measurement results using the SWING method with the predicted permeability coefficient of the unconstructed section after 700m of excavation work has been performed. Figure 9(C) shows a comparison of the measurement results using the SWING method with the predicted permeability coefficient of the unconstructed section after 1000m of excavation work has been performed.

[0096] In this way, it was confirmed that as the excavation work progressed, the neural network model's learning progressed and the prediction accuracy of the permeability coefficient in unconstructed sections improved.

[0097] As described above, according to the analysis device of an embodiment of the present invention, the explanatory variables and dependent variables of a slice corresponding to an excavated portion are used as learning data to learn a neural network model for estimating the dependent variables from the explanatory variables, and the dependent variables of the slice corresponding to the identified portion to be excavated, the explanatory variables of the slice corresponding to the unexcavated portion, and the ratio of the dependent variables between the stratum divisions obtained from the neural network model are used to predict the dependent variables of the slice corresponding to the unexcavated portion, and an observation equation is used to predict the observed values ​​of the slice corresponding to the unexcavated portion, thereby making it possible to accurately predict the observed values ​​of the slice corresponding to the unexcavated portion of the ground.

[0098] In addition, it is possible to identify the objective variable x outside the range of influence of the observation equation, which is not possible with normal inverse / forward calculations.

[0099] Furthermore, even if multiple geological layers exist within the range of influence of the observation equation, it is possible to identify the objective variable by inverse analysis using a single observed value.

[0100] Furthermore, even if the observation equation contains modeling errors, it is possible to identify a dependent variable that takes those errors into account, and the observed values ​​of slices corresponding to unexcavated parts of the ground can be predicted with high accuracy.

[0101] In addition, the prediction accuracy of the objective variable improves as the excavation progresses, but it is also expected that the prediction accuracy of the objective variable will improve by using past performance in advance predictions before excavation.

[0102] The present invention is not limited to the above-described embodiment, and various modifications and applications are possible without departing from the spirit and scope of the present invention.

[0103] For example, in the above analysis processing routine, setting of the initial objective variable x based on the correlation between the stratum classification and the objective variable obtained from the results of other excavation works in step S102 and updating of the explanatory variables of the slice in step S110 may be omitted. In this case, input of data indicating the correlation between the explanatory variables and the objective variable obtained from the results of other excavation works by the input unit 10 and input of the explanatory variables to be updated for the slice corresponding to the unexcavated portion can be omitted.

[0104] Furthermore, in the above embodiment, a horizontally excavated tunnel is assumed, but the present invention may also be applied to vertical excavation work such as a shaft or retaining wall excavation.

[0105] Furthermore, the program of the present invention may be provided in a form stored on a storage medium. [Explanation of symbols]

[0106] 10 Input section 20 Arithmetic section 22 Setting section 24. Objective variable prediction section 26 Learning Department 28 Explanatory variable update section 30 Observation Section 32 Identification section 34 Observation value prediction section 50 Output section 100 Analysis Device

Claims

1. a setting unit that sets explanatory variables, which are physical quantities including a stratum classification of a slice obtained in advance, for each slice obtained by dividing a rock mass model that is a model of a rock mass to be excavated in the excavation direction; A response variable prediction unit that predicts the response variable of the slice corresponding to the excavation target portion based on a response variable that is a physical quantity correlated with the explanatory variable of the slice corresponding to the excavated portion that is on the front side of the excavation target portion in the excavation direction; a learning unit that learns an estimation model for estimating the objective variable from the explanatory variables by using the explanatory variables and the objective variable of the slice corresponding to the excavated portion as learning data; an observation unit that acquires an observation value of the slice corresponding to the excavation target portion, the observation value being a physical quantity associated with the objective variable, after the excavation target portion is excavated; an identification unit that identifies the objective variable of the slice corresponding to the excavation target portion from the observation value of the slice corresponding to the excavation target portion by using an observation equation that represents a relationship between the observation value and the objective variable; an observation value prediction unit that predicts the objective variable of the slice corresponding to the identified excavation target portion, the explanatory variables of the slice corresponding to an unexcavated portion that is further in the excavation direction than the excavation target portion, and the estimation model, and predicts the observation value of the slice corresponding to the unexcavated portion using the objective variable of the slice corresponding to the unexcavated portion and the observation equation; An analysis device comprising:

2. 2. The analysis device according to claim 1, wherein the estimation model is a neural network model that receives the explanatory variables as input and outputs the objective variables.

3. The learning unit calculates a ratio of the objective variable between the stratum divisions using the learned estimation model, The analysis device described in claim 1 or 2, wherein the observation value prediction unit predicts the dependent variable of the slice corresponding to the identified portion to be excavated, the explanatory variables of the slice corresponding to the unexcavated portion that is further in the excavation direction than the portion to be excavated, and the ratio of the dependent variables between the stratum divisions.

4. The objective variable prediction unit predicts the objective variable of the slice corresponding to the portion to be excavated based on the objective variable of the slice corresponding to the already excavated portion by updating the objective variable of each slice as a state quantity of the Kalman filter at each time point, by time updating the Kalman filter; The analysis device according to any one of claims 1 to 3, wherein the identification unit identifies the dependent variable of the slice corresponding to the portion to be excavated based on the dependent variable estimated by the dependent variable prediction unit through observation updates of the Kalman filter, the observed values ​​of the slice corresponding to the portion to be excavated, and an observation equation representing the relationship between the observed values ​​and the dependent variable.

5. The analysis device according to any one of claims 1 to 4, further comprising an explanatory variable update unit that updates the explanatory variables of the slice corresponding to an unexcavated portion after the portion to be excavated has been excavated.

6. Computer, a setting unit for setting explanatory variables, which are physical quantities including a stratum classification of a slice obtained in advance, for each slice obtained by dividing a rock mass model, which is a model of a rock mass to be excavated, in an excavation direction; an objective variable prediction unit for predicting the objective variable of the slice corresponding to the excavation target portion based on an objective variable which is a physical quantity correlated with the explanatory variable of the slice corresponding to the excavated portion which is on the front side of the excavation target portion in the excavation direction; a learning unit that learns an estimation model for estimating the dependent variable from the explanatory variables by using the explanatory variables and the dependent variable of the slice corresponding to the excavated portion as learning data; an observation unit that acquires an observation value, which is a physical quantity associated with the objective variable, of the slice corresponding to the excavation target portion after the excavation target portion is excavated; an identification unit that identifies the objective variable of the slice corresponding to the portion to be excavated from the observation value of the slice corresponding to the portion to be excavated by using an observation equation that represents a relationship between the observation value and the objective variable; and an observation value prediction unit that predicts the objective variable of the slice corresponding to the identified excavation target portion, the explanatory variables of the slice corresponding to an unexcavated portion that is further in the excavation direction than the excavation target portion, and the estimation model, and predicts the observation value of the slice corresponding to the unexcavated portion using the objective variable of the slice corresponding to the unexcavated portion and the observation equation. An analysis program to function as a.

Citation Information

Patent Citations

  • Method for estimating coefficient of permeability and method for evaluating soundness in ground and bedrock

    JP2002236122A

  • Estimation method of n value and fine-grain fraction content, as well as ground improvement body and information processing device

    JP2020100949A

  • Construction management method for shield excavation machine

    JP2021014727A