Cargo handling equipment

The cargo handling and conveying device addresses the complexity of transporting heavy steel shell segments by providing stable movement and positioning, enhancing the efficiency and precision of large cross-section tunnel construction.

JP7582404B2Active Publication Date: 2024-11-13OHBAYASHI GUMI LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023137242
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-08-25
Publication Date
2024-11-13
Estimated Expiration
2039-11-28

Smart Images

  • Figure 0007582404000001
    Figure 0007582404000001
  • Figure 0007582404000002
    Figure 0007582404000002
  • Figure 0007582404000003
    Figure 0007582404000003
Patent Text Reader

Abstract

To provide a cargo handling and conveyance device that can facilitate a work of conveying materials necessary for constructing a tunnel frame and improve work efficiency.SOLUTION: The present invention comprises a traveling body that can move in the tunnel axis direction within a tunnel frame, a pair of hydraulic jacks that are installed so as to be freely retractable from the traveling body via attachment members, protrude in opposite directions perpendicular to the tunnel axis, and fix the traveling body to the tunnel frame, and a main body of a cargo handling device that is installed on the traveling body and performs material handling work either in front of or behind the traveling body. The traveling body comprises a frame having a rectangular cross section when viewed from the tunnel axis direction, and wheels that are provided near each outer corner of the frame extending in the tunnel axis direction and abut against the tunnel frame.SELECTED DRAWING: Figure 6
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a material handling and transporting device for handling and transporting materials. [Background technology]

[0002] Conventionally, various methods have been considered for constructing a large cross-section tunnel in a portion of an existing tunnel located at great depth underground.

[0003] For example, in Patent Document 1, the area where the main line shield tunnel and the branch line shield tunnel branch off and join is set as the planned construction area for the large cross-section tunnel, and multiple small cross-section outer shell tunnels are constructed in parallel to surround this area. Next, a tunnel body is constructed to span these multiple outer shell tunnels. After the tunnel body is constructed in this way, the inside of the tunnel body is excavated to construct the large cross-section tunnel.

[0004] Here, the tunnel body is constructed by connecting multiple body segments in the circumferential direction and the tunnel axis direction, and the body segments are constructed by pouring concrete into steel shell segments which have inner steel shell plates forming the inner surface of the tunnel body, outer steel shell plates forming the outer surface, and shear reinforcement bars. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2018-109329 A Summary of the Invention [Problem to be solved by the invention]

[0006] In Patent Document 1, the steel shell segments that make up the main body segment are heavy, so their handling and transportation in the small-section outer shell tunnel is cumbersome. For this reason, the inner and outer steel shell plates are transported separately into the outer shell tunnel, and each is positioned at a predetermined position in the outer shell tunnel and assembled into the steel shell segments. However, this type of work is cumbersome and prone to positional deviations. If the tunnel main body is constructed with positional deviations, it may affect the finished shape of the large-section tunnel constructed in the internal space of the tunnel main body.

[0007] The present invention has been made in consideration of such problems, and its main object is to provide a loading and transporting device that can facilitate the loading and transporting of materials required when constructing a tunnel body and improve work efficiency. [Means for solving the problem]

[0008] In order to achieve this object, the cargo handling and conveying device of the present invention comprises a traveling body that is movable in the tunnel body in the tunnel axis direction, and a mounting member that is installed so as to be freely in and out of the traveling body and is movable in opposite directions perpendicular to the tunnel axis. elongation a pair of hydraulic jacks for fixing the traveling body to the tunnel body; and a loading device main body that is installed on the traveling body and performs loading and unloading of materials in front or behind the traveling body in the direction of travel, the traveling body comprising a frame having a rectangular cross section as viewed from the tunnel axis direction, and wheels that are provided near each of the outer corners of the frame extending in the tunnel axis direction and come into contact with the tunnel body; The loading / unloading device body includes an axis member parallel to the beam member of the frame and a material gripping mechanism for gripping the material, the axis member being provided in the hollow portion of the frame, and the material gripping mechanism being provided so as to be rotatable around the axis member and movable in the longitudinal direction of the axis member. It is characterized by: The loading and unloading device main body further comprises, in place of the shaft member and the material gripping mechanism, a sending-out mechanism which is installed at the front or rear of the frame and sends out the material toward a predetermined position, and a pushing mechanism which moves within the frame via an equipment moving device and is positioned adjacent to the sending-out mechanism from a state where it is stored within the frame and pushes the sent-out material into a predetermined position, and the direction in which the material is sent by the sending-out mechanism is perpendicular to the extension direction of the hydraulic jack.

[0009] The loading and unloading transport device of the present invention comprises a running body movable within a tunnel body in the direction of the tunnel axis, a pair of hydraulic jacks installed via mounting members so as to be freely retracted from the running body and extend in opposite directions perpendicular to the tunnel axis to fix the running body to the tunnel body, and a loading and unloading device main body installed on the running body and performing loading and unloading of materials in front of or behind the running body in the traveling direction, the running body comprising a frame having a rectangular cross section as viewed from the tunnel axis direction, wheels provided near each of the outer corners of the frame extending in the tunnel axis direction, The wheels move along a long platform that is installed at the four corners of a virtual square or rectangle whose circumscribing circle is approximately the inner circumscribing circle of the tunnel body and extends in the tunnel axial direction.

[0010] According to the above-mentioned material handling and transporting device of the present invention, wheels that abut against the tunnel body are provided near each of the outer corners of the frame constituting the traveling body, and a pair of hydraulic jacks that extend in opposite directions perpendicular to the tunnel axis and fix the traveling body to the tunnel body are provided. This allows the traveling body to travel even when tilted in any direction within a range of 90 degrees to the left or right as viewed from the tunnel axis direction, and the hydraulic jacks can reliably stop and position the traveling body. Therefore, even if the materials are heavy and the material supply position is located at any position on the tunnel body, it is possible to stably handle and transport the materials while keeping the material handling and transporting device in a position that allows the main body of the material handling device to operate toward the material supply position within the tunnel body.

[0011] According to the loading and conveying device of the present invention, when the material discharge direction is approximately horizontal, the load of the loading and conveying device can be transmitted to the outer shell tunnel body via a hydraulic jack whose protruding direction is approximately vertical, making it possible to carry out material discharge work in an approximately horizontal direction while stabilizing the loading and conveying device.

[0012] By constructing a large-diameter tunnel body using the loading and transporting device of the present invention, it is possible to speed up the transportation and loading and unloading of materials, equipment, supports, and other materials required when constructing a large-diameter tunnel body, which can contribute to improving the work efficiency and shortening the construction period of the entire construction work of a large-diameter tunnel body.

[0013] In addition, once work on one outer shell tunnel body is completed, the loading and unloading equipment can be moved to the other outer shell tunnel body and reused.

[0014] Furthermore, a steel shell section can be manufactured in advance by fixing the inner and outer steel shell plates together via a connecting member, and the steel shell section can be transported by a loading and unloading device by holding the connecting member with the loading and unloading device body. This eliminates the need to assemble and install the outer and inner steel shell plates in the narrow outer shell tunnel, and also makes it easier to transport and unload the steel shell section, thereby reducing the labor required for constructing a large cross-section tunnel body.

[0015] In addition, by eliminating the need to assemble and install the outer and inner steel shell plates, there is no risk of misalignment during erection. This allows the large-section tunnel body to be constructed with high precision, and makes it possible to ensure the desired shape of the large-section tunnel.

[0016] Furthermore, regardless of the position of the outer shell tunnel body where the steel shell section is to be sent out or erected, the loading and unloading conveying device can be run in a posture corresponding to this, and the steel shell section can be sent out or erected using the loading and unloading device main body. Effect of the Invention

[0017] According to the present invention, the running body is provided with wheels that abut against the tunnel body near each of the outer corners of the frame constituting the running body, and a pair of hydraulic jacks that fix the running body to the tunnel body. Therefore, even if the materials are heavy and the supply position of the materials is at any position in the tunnel body, it is possible to stably carry out loading and transporting work of the materials while keeping the loading and transporting equipment in a position within the tunnel body that allows the loading and transporting equipment main body to operate toward the supply position of the materials. [Brief description of the drawings]

[0018] [Figure 1] 1 is a diagram showing an outline of a large-section tunnel body in an embodiment of the present invention. FIG. [Diagram 2] A diagram showing details of a large cross-section tunnel body in an embodiment of the present invention. [Diagram 3] FIG. 2 is a diagram showing details of a steel shell section in an embodiment of the present invention. [Figure 4] FIG. 1 is a diagram showing details of a material handling and conveying device according to an embodiment of the present invention (part 1). [Diagram 5] FIG. 2 is a diagram showing details of the material handling and conveying device according to the embodiment of the present invention (part 2). [Figure 6] FIG. 1 is a diagram showing a procedure for constructing a large cross-section tunnel body in an embodiment of the present invention (part 1). [Figure 7] FIG. 2 is a diagram showing the construction procedure for a large cross-section tunnel body in an embodiment of the present invention (part 2). [Figure 8] FIG. 3 is a diagram showing the construction procedure for a large cross-section tunnel body in an embodiment of the present invention (part 3). [Figure 9] FIG. 4 is a diagram showing the construction procedure for a large-section tunnel body in an embodiment of the present invention (part 4). [Figure 10] FIG. 4 is a diagram showing another example of the material handling and conveying device according to the embodiment of the present invention (part 1). [Figure 11] FIG. 2 is a diagram showing another example of the material handling and conveying device according to the embodiment of the present invention (part 2). [Figure 12] FIG. 4 is a diagram showing another example of the material handling and conveying device according to the embodiment of the present invention (part 3). [Figure 13] FIG. 1 is a diagram showing a state in which a material handling and conveying device according to an embodiment of the present invention is used (part 1). [Figure 14] FIG. 2 is a diagram showing a state in which the cargo handling and conveying device according to the embodiment of the present invention is used (part 2). DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] The present invention provides an apparatus and method suitable for constructing multiple small-section outer shell tunnels in parallel to surround the planned construction area of ​​a large-section tunnel, and using these outer shell tunnels to construct the large-section tunnel body.

[0020] The large-section tunnel to be constructed may be used for any purpose, but in this embodiment, an example is given of a large-section tunnel being used as a branching and junction section between an existing main line tunnel and a branch line tunnel, and details of the loading and conveying equipment and the method of constructing the large-section tunnel body are described with reference to Figures 1 to 14.

[0021] As shown in Figure 1, an existing main line tunnel 1 has a planned large cross-section tunnel construction area 3 set in an area that will be a junction with a branch line tunnel 2, and multiple outer shell tunnel bodies 5 have been constructed along this planned large cross-section tunnel construction area 3. A large cross-section tunnel body 9 has been constructed in each of these multiple outer shell tunnel bodies 5, utilizing the outer shell tunnel 4, which is the internal space thereof, to surround the planned large cross-section tunnel construction area 3. The large cross-section tunnel is constructed by excavating the inside of the large cross-section tunnel body 9.

[0022] As shown in Figure 2, the large-diameter tunnel main body 9 is a cylindrical structure constructed by connecting multiple main body sections 6, each of which consists of a steel shell section 7 and concrete 8 poured and filled inside it, in the circumferential direction of the area 3 where the large-diameter tunnel is to be constructed, as well as in the tunnel axis direction of the area 3 where the large-diameter tunnel is to be constructed.

[0023] The steel shell section 7 that constitutes the main body section 6 is composed of an inner steel shell plate 71 that forms the inner surface of the large cross-section tunnel main body 9, an outer steel shell plate 72 that forms the outer surface of the large cross-section tunnel main body 9, and shear reinforcement bars 73 and connecting materials 74 installed between the two.

[0024] 3, the inner steel shell plate 71 includes a skin plate 711 made of a rectangular steel plate formed into an arc shape whose length forms the inner peripheral surface of the large cross-section tunnel body 9, a pair of main girders 712 installed at both ends in the width direction of the skin plate 711, a pair of joint plates 713 installed at both ends in the length direction of the skin plate 711, and a plurality of vertical ribs (not shown) installed on the skin plate 711 so as to connect the main girders 712 to each other. All of the main girders 712, joint plates 713, and vertical ribs are installed on the convex side of the skin plate 711.

[0025] Like the inner steel shell plate 71, the outer steel shell plate 72 also includes a skin plate 721, a pair of main girders 722, a pair of joint plates 723, and a vertical rib (not shown), but the skin plate 721 is formed in an arc shape whose length forms the outer peripheral surface of the large cross-section tunnel body 9. In addition, the main girder 722, the joint plate 723, and the vertical rib are all installed on the concave side of the skin plate 721.

[0026] A plurality of shear reinforcement bars 73 are installed at intervals between the inner steel shell plate 71 and the outer steel shell plate 72, which are arranged at intervals, so as to connect the two. The steel shell section 7 constructed in this manner is further provided with connecting members 74.

[0027] The connecting material 74 connects the inner steel shell plate 71 and the outer steel shell plate 72 together before the concrete 8 is poured, and enables loading and unloading work using the loading and unloading equipment 100 described later, and employs steel materials such as H-shaped steel. In this embodiment, the connecting material 74 is arranged parallel to the shear reinforcement 73 and installed near one end of the steel shell section 7 in the longitudinal direction, but the present invention is not limited to this and may be installed near both ends.

[0028] Materials, equipment, supports, and other supplies required for constructing the large cross-section tunnel body 9, including the steel shell segments 7 having such a structure, are handled and transported by a cargo handling and transporting device 100 that uses the outer shell tunnel body 5 as its travel path. The cargo handling and transporting device 100 will be described in detail below.

[0029] <Loading and Conveying Equipment> As shown in FIG. 4, the cargo handling and conveying device 100 has a configuration that allows it to move freely in the axial direction of the outer shell tunnel body 5, and is equipped with a running body 110, an outrigger 120, and a cargo handling device main body .

[0030] The running body 110 has a frame 111, main wheels 116, and auxiliary wheels 117. The frame 111 is a vehicle body whose outer shape is formed like a rectangular parallelepiped or cube, and is composed of two lower beam members 112, two upper beam members 113, a plurality of column members 114, and a plurality of beam members 115.

[0031] The lower girder member 112 and the upper girder member 113 are each a long member extending in the tunnel axis direction of the outer shell tunnel body 5, and multiple column members 114 are installed to connect the lower girder members 112 and the upper girder members 113, and multiple beam members 115 are installed to connect the lower girder members 112 to each other or the upper girder members 113 to each other.

[0032] As a result, the frame 111 has a rectangular cross section in the tunnel axis direction of the outer shell tunnel body 5 and a hollow portion, and main wheels 116 and auxiliary wheels 117 are installed on the lower girder members 112 and upper girder members 113 that form the outer corners of the frame 111. These main wheels 116 and auxiliary wheels 117 are installed in multiple locations at intervals in the longitudinal direction of the lower girder members 112 and upper girder members 113, respectively.

[0033] 5, the outrigger 120 is composed of a hydraulic jack 121 that expands and contracts in a direction parallel to the pillar member 114, and a mounting member 122 that is installed so as to be rotatable around the pillar member 114, and a piston 121a of the hydraulic jack 121 is fixed to the mounting member 122. This allows the hydraulic jack 121 to rotate around the pillar member 114 and to be able to protrude and retract laterally from the frame 111, as shown in FIGS.

[0034] Two such outriggers 120 make a pair, and a total of four are installed on each side of the frame 111. The pair of outriggers 120 are arranged so that the rods 121b of the hydraulic jacks 121 extend in opposite directions while being perpendicular to the tunnel axis direction of the outer shell tunnel body 5, as shown in FIG.

[0035] The cargo handling device main body 130 is provided on the front side of the frame 111 (in the forward direction of the cargo handling transport device 100), and includes an axis member 131 parallel to the beam member 115, and a material gripping mechanism 132 installed so as to be rotatable relative to the axis member 131. The material gripping mechanism 132 includes a boom 133, an arm 134, and a gripping part 135 provided at the tip of the arm 134 for gripping materials.

[0036] By installing the shaft member 131 in the hollow portion of the frame 111, the loading device main body 130 can store the boom 133 and arm 134 in the frame 111 when folded as shown in Fig. 4, and can raise and lower the gripping part 135 above and below the frame 111 while rotating around the shaft member 131 when unfolded as shown in Fig. 5. The material gripping mechanism 132 can also be moved along the longitudinal direction of the shaft member 131 (direction parallel to the beam member 115), and the position can be adjusted laterally within the frame 111.

[0037] The gripping portion 135 may be of a chuck type or an electromagnet type, or may be of an attachment type, in which a member can be freely replaced according to the shape of the material to be gripped. The loading / unloading device main body 130 may be provided on the rear side of the frame 111 (in the backward direction of the loading / unloading conveying device 100).

[0038] The cargo handling and conveying device 100 configured as described above moves in the tunnel axis direction using as guides four long frames 10 installed on the inner circumferential surface of the outer shell tunnel body 5 and extending in the tunnel axis direction, as shown in Fig. 4. Specifically, the main wheels 116 run on rails 13 installed to extend from two of the four long frames 10. On the other hand, the auxiliary wheels 117 run in contact with each of the other two long frames 10.

[0039] On the other hand, when the traveling is stopped to perform loading and unloading work, the outriggers 120 are deployed as shown in Fig. 5. That is, the hydraulic jack 121 is rotated around the pillar member 114 via the mounting member 122 to protrude laterally from the frame 111, and further, the rod 121b of the hydraulic jack 121 is extended. Then, the hydraulic jack 121 presses the upper and lower long frames 10 in the space formed between the upper and lower long frames 10, and the loading and unloading conveying device 100 is positioned at the stop position.

[0040] The long frame 10 constituting the outer shell tunnel body 5 is a long member formed in a quadrant in cross section, extending in the axial direction of the outer shell tunnel body 5 at the four corners of a virtual square or rectangle whose approximate circumscribing circle is the inner surface of the outer shell tunnel body 5.

[0041] In this way, the cargo handling and conveying device 100 runs with the main wheels 116 or the auxiliary wheels 117 provided at each of the four outer corners of the frame 111 abutting against the inner peripheral surface of the outer shell tunnel body 5 via the long frame 10. As a result, even if the frame 111 is tilted to either side within a range of 90 degrees to the left or right as viewed from the tunnel axis direction of the outer shell tunnel 4 depending on the position of the long frame 10, the cargo handling and conveying device 100 can run and can be reliably stopped and positioned by the outriggers 120.

[0042] Therefore, even if the materials are heavy and the supply position of the materials is at any position on the inner surface of the outer shell tunnel body 5, the loading and transporting device 100 can be positioned within the outer shell tunnel body 5 so that the loading and transporting device main body 130 can operate toward the supply position of the materials, making it possible to load and transport the materials.

[0043] <How to construct a large cross-section tunnel> The procedure for constructing the large cross-section tunnel body 9 using the above-mentioned cargo handling and transporting apparatus 100 will be described with reference to Figs.

[0044] As shown in Fig. 6(a), multiple small-section outer shell tunnel bodies 5 are arranged in parallel in the large-section tunnel construction area 3 so as to surround it, with the tunnel axis direction aligned with the axis direction of the large-section tunnel construction area 3. In this embodiment, as shown in Fig. 1, the large-section tunnel construction area 3 is divided into multiple sections A, B, etc. in the axial direction. Then, for each section, a body division body 6 is constructed so as to straddle adjacent outer shell tunnel bodies 5 as shown in Fig. 2, to construct a ring-shaped structure.

[0045] <Pretreatment process> Prior to the construction of the large-section tunnel body 9, the ground around the multiple outer shell tunnel bodies 5 is subjected to ground improvement work 15 by freezing or chemical injection as shown in Fig. 6(a) to take measures to stop water leakage. In addition, the four long frames 10 described above are installed on the outer shell tunnel body 5.

[0046] <First step> As shown in Fig. 6(b), three supports 11 are installed in the tunnel axis direction using a long frame 10 on one of the adjacent outer shell tunnel bodies 5. As shown in Fig. 7(a), multiple supports 11 are installed at intervals in the axial direction of the outer shell tunnel body 5. By installing the supports 11 via the long frame 10 in this way, the supports 11 can be placed in the desired position without considering the joint positions of the segments 51 of the outer shell tunnel body 5, which greatly improves workability.

[0047] After that, as shown in Figure 6 (b), cutting is performed on the opposing parts of each of the adjacent outer shell tunnel bodies 5, 5' to provide a mutually communicating space 12. This cutting work is performed within the range of section A set in the tunnel axis direction of the outer shell tunnel 4 as shown in Figure 1, and the communicating space 12 is made continuous in the tunnel axis direction. Note that a water stop plate 14 that connects the adjacent outer shell tunnel bodies 5, 5' is provided in the communicating space 12 to prevent water leakage from the ground into the communicating space 12.

[0048] <Second step> As shown in Fig. 6(c), the loading and unloading transport device 100 installed in one of the outer shell tunnel bodies 5 is used to remove the support 11 at the position where the steel shell section 7 will be installed and facing the communication space 12, to secure the steel shell section installation area W. Specifically, the loading and unloading transport device 100 is moved forward in the tunnel axis direction within one of the outer shell tunnel bodies 5, and stopped near the installation start position of the steel shell section 7, and then the outriggers 120 are deployed and positioned.

[0049] Next, the loading / unloading device main body 130 is operated to remove the shoring 11 while gripping it with the gripping part 135, and while still gripping it, the outriggers 120 are stored and the loading / unloading device 100 is moved backward. The removed shoring 11 is transferred to a position where no shoring 11 has been installed yet, within section A in the tunnel axis direction of one of the outer shell tunnels 4, as shown in Fig. 7(a).

[0050] After this, the cargo handling and transportation device 100 is also used to transport the steel shell segment 7 to the steel shell segment installation area W, but the steel shell segment 7 is temporarily placed behind one of the outer shell tunnels 4, as shown in Fig. 7(a). Therefore, the cargo handling and transportation device 100 after replacing the shoring 11 is further moved backward and, as shown in Fig. 7(b), is stopped near the temporary storage area, and the outriggers 120 are deployed to position the cargo handling and transportation device 100.

[0051] As shown in Fig. 7(c), the loading / unloading device main body 130 grasps and raises the steel shell section 7, retracts the outriggers 120, and moves the loading / unloading transport device 100 forward toward the steel shell section installation area W. The gripping parts 135 of the loading / unloading device main body 130 only need to grasp the connecting members 74 provided on the steel shell section 7, so that the steel shell section 7 can be easily transported.

[0052] In addition, as shown in Fig. 8(a), the erection work of the steel shell section 7 is performed by operating the loading and unloading device main body 130 of the loading and unloading transport device 100 positioned near the steel shell section installation area W, and sending out the steel shell section 7 from the steel shell section installation area W of one outer shell tunnel body 5 toward the communication space 12. Then, as shown in Fig. 8(b), the steel shell section 7' ​​is abutted against the steel shell section 7' ​​that has been installed in advance on the other outer shell tunnel body 5', and they are connected.

[0053] The above-mentioned work of sending and erecting the steel shell segments 7 from the steel shell segment installation area W formed at the site where the shoring 11 was removed toward the communicating space 12 is repeated sequentially in the tunnel axis direction of one of the outer shell tunnel bodies 5 within section A, as shown in Figure 8 (c), to connect the steel shell segments 7.

[0054] 6 to 8, the loading and unloading transport device 100 can travel even when tilted from the tunnel axis direction of the outer shell tunnel body according to the position of the long frame 10 arranged corresponding to the communicating space 12, and can be stopped and positioned reliably by the outriggers 120. Therefore, even when sending out the heavy steel shell segments 7 toward the communicating space 12 located diagonally below the outer shell tunnel body 5, it is possible to stably perform loading and unloading work of materials.

[0055] <Third step> After that, as shown in Fig. 9(a), concrete 8 is poured into each of the connected steel shell sections 7, 7' to construct the main body section 6. In this embodiment, as shown in Fig. 8(b), two steel shell sections 7, 7' are connected in the circumferential direction of the large cross-section tunnel construction area 3, and as shown in Fig. 8(c), concrete 8 is poured in every five steel shell sections 7, 7' are connected in the axial direction of the large cross-section tunnel construction area 3 (the tunnel axis direction of the outer shell tunnel main body 5), but the number of connections is not limited in any way.

[0056] <Fourth step> As shown in Figures 9(b) and (c), a loading and unloading device 100 is used to send out and erect a new steel shell section 7'' to a predetermined position in one of the outer shell tunnel bodies 5 in the same manner as described above, and this is connected to the body section 6 constructed in the third process located in the communication space 12. In addition, at an appropriate timing, as shown in Figure 9(b), filling material 16 is filled into the gaps generated between the communication space 12 and the body section 6, and between the outer shell tunnel 4 and the steel shell section 7.

[0057] By repeatedly carrying out these steps for each of the multiple outer shell tunnel bodies 5 surrounding the planned large cross-section tunnel construction area 3 as shown in Figure 1, a tubular structure consisting of multiple body segments 6 is constructed within section A. Furthermore, by repeating the steps in the axial direction of the planned large cross-section tunnel construction area 3 (section A, section B, etc.), a large cross-section tunnel body 9 can be constructed that surrounds the planned construction area of ​​the large cross-section tunnel.

[0058] In addition, once work on one outer shell tunnel body 5 is completed, the cargo handling and transporting device 100 can be moved to another outer shell tunnel body 5 and reused.

[0059] As described above, according to the method for constructing a large-diameter tunnel body using the loading and transporting device 100, it is possible to speed up the loading and transporting of materials such as the steel shell sections 7 and shoring 11 required when constructing the large-diameter tunnel body 9, thereby contributing to improving the overall work efficiency of the construction work of the large-diameter tunnel body 9 and shortening the construction period.

[0060] Furthermore, by manufacturing a steel shell section 7 in which the inner steel shell plate 71 and the outer steel shell plate 72 are fixed together via the connecting members 74, the steel shell section 7 can be transported by the loading and unloading transport device 100 using the connecting members 74. This makes it possible to omit the assembly and installation work of the outer steel shell plate 72 and the inner steel shell plate 71, and also makes it easier to load and transport the steel shell section 7, thereby making it possible to reduce the labor required for the construction of the large cross-section tunnel body 9.

[0061] Furthermore, since the assembly and installation work of the outer steel shell plate 72 and the inner steel shell plate 71 can be omitted, there is no positional misalignment during construction, so the large-section tunnel body 9 can be constructed with high precision, and the desired shape of the large-section tunnel can be ensured.

[0062] The cargo handling and transporting device 100 and the construction method for the large cross-section tunnel body 9 of the present invention are not limited to the above-described embodiment, and various modifications are possible without departing from the spirit of the present invention.

[0063] For example, in this embodiment, in the loading and unloading conveying device 100, a material gripping mechanism 132 equipped with a boom 133 and an arm 134 is adopted in the loading and unloading device main body 130, and the operation direction (material sending direction) is set to a direction parallel to the pillar member 114. In addition, the outrigger 120 is installed on the traveling body 110 so that the hydraulic jack 121 extends in a direction parallel to the operation direction of the loading and unloading device main body 130. This type of structure is suitable for sending out and erecting the steel shell sections 7 in the depth direction of the ground, as shown in Figures 6 to 9.

[0064] However, when the outer shell tunnel bodies 5 are adjacent to each other in a substantially horizontal direction as in the region X shown in Fig. 1, the communication space 12 between the two is horizontal, so the above-mentioned cargo handling and conveying device 100 does not necessarily have a rational structure. Therefore, other examples of the cargo handling and conveying device 100 will be described with reference to Figs. 10 to 14.

[0065] As shown in Figure 10, the loading and unloading conveying equipment 100 comprises a running body 110, an outrigger 120, and a loading and unloading equipment main body 130. However, its structure differs from that of the loading and unloading conveying equipment 100 shown in Figure 4 in that the running body 110 is provided with an equipment moving device 160, the loading and unloading equipment main body 130 is structured to comprise a send-out mechanism 140 and a push-in mechanism 150, and the outrigger 120 is provided on the equipment moving device 160 together with the push-in mechanism 150.

[0066] The running body 110 includes a frame 111, main wheels 116, and auxiliary wheels 117. The frame 111 is a car body that is composed of two lower beam members 112, two upper beam members 113, a plurality of column members 114, and a plurality of beam members 115, and has a cubic or rectangular parallelepiped outer shape with a hollow portion in the tunnel axis direction of the outer shell tunnel body 5. In addition, the main wheels 116 and the auxiliary wheels 117 are installed on the lower beam members 112 and the upper beam members 113 that form the outer corners of the frame 111, respectively.

[0067] The above configuration is similar to that of the running body 110 of the aforementioned cargo handling and conveying equipment 100 shown in Figure 4. However, in Figure 10, an equipment moving device 160 is provided on one side of the hollow portion of the frame 111 constituting the running body 110.

[0068] The facility moving device 160 includes a rail-like guide member 161 extending from the rear to the front of the frame 111 as shown in Fig. 11, and a platform 162 that moves on the guide member 161 as shown in Fig. 12. The platform 162 has a plane parallel to the pillar members 114, and a turntable 163 is rotatably installed on this plane. The outrigger 120 and the push-in mechanism 150 are installed on this turntable 163.

[0069] As shown in Fig. 11, the outrigger 120 and the push-in mechanism 150 are housed in the frame 111 with the platform 162 located at the rear of the frame 111. Also, as shown in Fig. 12, when the platform 162 is moved to the front of the frame 111 on the guide member 161 and then the turntable 163 is rotated, both the outrigger 120 and the push-in mechanism 150 are positioned in front of the frame 111 (in the rearward movement direction of the material handling conveying device 100).

[0070] 10, the outrigger 120 includes two hydraulic jacks 121 and mounting members (also used by the pressing device 151 described later) for installing them on a turntable 163, and when the base 162 is moved to the front of the frame 111 and the turntable 163 is rotated, the two hydraulic jacks 121 are positioned in front of the frame 111 and above the upper girder member 113. In this state, the rods 121b of the two hydraulic jacks 121 extend in mutually opposing directions parallel to the beam member 115 while being perpendicular to the tunnel axis direction of the outer shell tunnel body 5.

[0071] The pressing mechanism 150 includes a columnar, extendable pressing device 151, a pressing section 152 that is provided at the tip of the pressing device 151 and that applies a pressing force by contacting the material, and a mounting member 153 that mounts the pressing device 151 on a turntable 163. When the base 162 is moved to the front of the frame 111 and the turntable 163 is rotated, the pressing device 151 is positioned in front of the frame 111 so as to be parallel to the column member 114. When the pressing device 151 is extended in this state, the pressing section 152 moves in a direction parallel to the column member 114 and reaches a position below the lower beam member 112.

[0072] As shown in FIG. 12, the feed mechanism 140 includes a gripping mechanism 141, a slide mechanism 142, and a guide plate 143, and is installed on the front surface of the frame 111. However, the feed mechanism 140 is positioned so as not to interfere with the outrigger 120 and the push-in mechanism 150 when they are positioned in front of the frame 111, as shown in FIG. 10.

[0073] The gripping mechanism 141 may be of any of the chuck type or electromagnet type, and may also be configured as an attachment type in which the members can be freely replaced according to the shape of the material to be gripped.

[0074] The slide mechanism 142 is composed of a pair of sprockets 142a provided near the lower beam member 112 and the upper beam member 113, and an endless roller chain 142b wound around the sprockets 142a. A gripping mechanism 141 is provided on a portion of the roller chain 142b, and by rotating the sprocket 142a, the gripping mechanism 141 can be moved back and forth between the lower beam member 112 and the upper beam member 113 (in a direction parallel to the pillar member 114) as shown in Figures 11 and 12.

[0075] The guide plate 143 is disposed on the rear surface of the gripping mechanism 141 in parallel with the roller chain 142 b , and assists the gripping mechanism 141 in moving in a direction parallel to the pillar member 114 .

[0076] As shown in Figures 13(a) and (b), when the communicating space 12, which is the push-out direction of the steel shell section 7, is approximately horizontal, the loading and conveying device 100 configured as described above assumes a lying-down position when viewed from the tunnel axis direction within the outer shell tunnel body 5, and orients the operating direction (feeding direction) of the push-in mechanism 140 and the operating direction (pushing direction) of the push-in mechanism 150 in a substantially horizontal direction.

[0077] Even in this position, since main wheels 116 and auxiliary wheels 117 are installed at each of the outer corners of the frame 111, the steel shell segment 7 can be grasped by the gripping mechanism 141 of the sending mechanism 140, and the steel shell segment 7 can be transported within the outer shell tunnel body 5.

[0078] 13(b), when the steel shell segment 7 is sent out toward the communication space 12 between the adjacent outer shell tunnel bodies 5, 5', the slide mechanism 142 of the sending mechanism 140 is operated to drive the sprocket 142a and rotate the roller chain 142b. Then, the steel shell segment 7 is sent out toward the communication space 12. At this time, the gripping mechanism 141 is assisted in moving by the guide plate 143, so that the steel shell segment 7 can be sent out stably in the horizontal direction.

[0079] Thereafter, when erecting the steel shell sections 7, as shown in Fig. 14, the platform 162 is moved to the front of the frame 111 on the guide members 161, and the turntable 163 is rotated to position the outriggers 120 and the pushing mechanism 150 in front of the frame 111. Then, the outriggers 120 are deployed, and the two hydraulic jacks 121 press against the long platform 10, which is positioned in a substantially vertical direction, to fix the cargo handling and transporting device 100 to the inner circumferential surface of the outer shell tunnel 4. This allows the load of the cargo handling and transporting device 100 to be transmitted to the outer shell tunnel body 5 via the outriggers 120, which protrude in a substantially vertical direction.

[0080] In this state, the pressing device 151 is extended to cause the pressing portion 152 to grip the steel shell section 7, while the gripping by the gripping mechanism 141 of the sending-out mechanism 140 is released. Then, the pressing device 151 is further extended to push in the steel shell section 7 and erect it in a predetermined position. This allows the steel shell section 7 to be efficiently erected even if the sending-out direction of the steel shell section 7 is approximately horizontal.

[0081] In addition, although it has already been removed in Figure 13(a), the support 11 that was installed using the long platform 10 in a position opposite the communicating space 12 before the steel shell section 7 was brought in has also been removed using the gripping mechanism 141 of the sending-out mechanism 140.

[0082] Further, the sending mechanism 140 and the pushing mechanism 150 constituting the loading / unloading device main body 130 may be arranged behind the frame 111 constituting the traveling body 110 (in the backward direction of the loading / unloading conveying device 100). [Explanation of symbols]

[0083] 1 Main Line Tunnel 2 Branch tunnel 3. Planned area for constructing large-section tunnel 4. Outer Shell Tunnel 5. Outer shell tunnel structure 51 Segments 6 Frame division body 7 Steel shell segment 71 Inner steel shell plate 72 Outer steel shell plate 73 Shear Reinforcement 74 Connecting material 8. Concrete 9 Large cross-section tunnel structure 10 Long stand 11 Shoring 12 Communication space 13 Rail 14 Waterstop 15 Ground Improvement Department 16 Filling material 100 Cargo handling equipment 110 Vehicle 111 Frame 112 Lower beam member 113 Upper beam member 114 Column members 115 Beam member 116 Main Wheel 117 Secondary wheel 120 Outrigger 121 Hydraulic jack 121a Piston 121b Rod 122 Mounting material 130 Cargo handling equipment body 131 Shaft member 132 Material gripping mechanism 133 Boom 134 Arm 135 Gripping part 140 Delivery mechanism 141 Gripping mechanism 142 Slide mechanism 142a sprocket 142b roller chain 143 Information Board 150 Push mechanism 151 Pressing device 152 Pressing part 153 Mounting parts 160 Equipment moving device 161 Guide member 162 Mount 163 Turntable

Claims

1. A traveling body capable of moving in the tunnel axis direction within the tunnel body; A pair of hydraulic jacks are installed so as to be freely retractable from the running body via mounting members, extend in opposite directions perpendicular to the tunnel axis, and fix the running body to the tunnel body; a loading device main body that is installed on the traveling body and performs loading and unloading of materials in front or rear of the traveling body in the traveling direction, The traveling body is A frame having a rectangular cross section as viewed from the tunnel axis direction; wheels provided near each of the outer corners of the frame extending in the tunnel axial direction and abutting against the tunnel body; The loading device body includes: a shaft member parallel to the beam member of the frame, and a material gripping mechanism for gripping the material, The shaft member is provided in an inner hollow portion of the frame, A cargo handling and transporting device, characterized in that the material gripping mechanism is rotatable around the shaft member and movable in the longitudinal direction of the shaft member.

2. The cargo handling and conveying device according to claim 1, The loading / unloading device body, instead of the shaft member and the material gripping mechanism, a sending mechanism that is installed in front of or behind the frame and sends out the material toward a predetermined position; a pushing mechanism that moves within the frame via an equipment moving device and is disposed adjacent to the sending mechanism from a state in which the material is stored within the frame, and pushes the sent-out material into a predetermined position; A cargo handling and transportation device, characterized in that the direction in which the material is fed by the delivery mechanism is perpendicular to the extension direction of the hydraulic jack.

3. A traveling body capable of moving in the tunnel axis direction within the tunnel body; A pair of hydraulic jacks are installed so as to be freely retractable from the running body via mounting members, extend in opposite directions perpendicular to the tunnel axis, and fix the running body to the tunnel body; a loading device main body that is installed on the traveling body and performs loading and unloading of materials in front or rear of the traveling body in the traveling direction, The traveling body is A frame having a rectangular cross section as viewed from the tunnel axis direction; a wheel provided near each of the outer corners of the frame extending in the tunnel axial direction; Equipped with A loading and transporting device characterized in that the wheels move using a long platform extending in the tunnel axial direction as a guide, the platform being installed at the four corners of an imaginary square or rectangle whose inner surface of the tunnel body is approximately a circumscribing circle.

Citation Information

Patent Citations

  • Device for winding and erecting segment

    JP1983120999A

  • Demounting and lining device for covering concrete form of tunnel

    JP1989187300A

  • Segment carrier device

    JP1995071197A

  • Vibration proofing subway tunnel construction device and construction method thereof

    JP1998082298A

  • Tunnel boring car and construction method of tunnel

    JP1999336473A