Flexible preliminary bracing structure suitable for high-energy geological environment tunnel and construction method
By employing a flexible initial support structure with radial pressure-relief layers and circumferential toughening layers in the tunnel, the problem of low energy absorption limit of the support structure in high-energy geological environments was solved, thereby improving the stability and construction progress of the tunnel in high-energy geological environments.
Patent Information
- Application Number
- CN202411037561.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-12
AI Technical Summary
Existing initial support structures have low energy absorption limits and poor resistance to faulting and deformation in high-energy geological environments, leading to tunnel cracking, twisting and other phenomena, which affect construction progress and costs.
A flexible initial support structure is adopted, consisting of a radial pressure relief layer and a circumferential toughening layer. The radial pressure relief layer includes pressure relief anchors, compressible concrete, and steel mesh, while the circumferential toughening layer includes an H-shaped steel frame, steel fiber high-performance concrete, and a flexible mesh. Specific construction steps are used to improve the flexibility and toughness of the support structure.
It improves the radial pressure relief capacity of the tunnel, enhances the resistance to faulting and crumbling of the initial support structure, ensures that the tunnel does not break or fall under high-energy geological conditions, maintains its service performance, and improves the resistance to faulting and cracking of shotcrete.
Smart Images

Figure CN118933935A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel engineering, in particular to the field of initial support, and specifically relates to a flexible initial support structure suitable for tunnels in high-energy geological environments. Background Art
[0002] With the rapid development of the economy, railway construction is crossing mountainous areas and tunnel excavation is becoming more and more common. How to reduce the disturbance of tunnel excavation to the surrounding rock and ensure the smooth progress of the project construction is a major challenge in railway construction.
[0003] The existing initial support is generally composed of structures such as anchor rods, steel frame mesh and shotcrete. In high-energy geological environments, the support structure has a low energy absorption limit and poor resistance to dislocation and deformation. It is easy to cause cracking and distortion of the initial support of the tunnel in high-energy geological environments, which has caused great trouble to the construction progress and project cost of the tunnel project. Summary of the invention
[0004] The purpose of the present invention is to provide a flexible initial support structure for a tunnel in a high-energy geological environment, so as to solve the problems of low energy absorption limit, poor anti-fracture and deformation capacity of the existing initial support structure.
[0005] To achieve the above purpose, the technical solution adopted by the present invention is as follows:
[0006] A flexible initial support structure suitable for tunnels in high-energy geological environments, comprising a radial yield layer and an annular toughening layer, wherein the radial yield layer is close to the surrounding rock area, and the annular toughening layer is close to the tunnel area;
[0007] The radial yield layer includes yield anchor rods, compressible concrete and steel mesh, the compressible concrete is sprayed inside and on both sides of the steel mesh, and the yield anchor rods are anchored between the surrounding rock and the steel mesh;
[0008] The annular toughening layer includes an H-shaped steel frame, steel fiber high-performance concrete and a flexible net. A flange plate on one side of the H-shaped steel frame is in contact with compressible concrete, and a flexible net is arranged outside the flange plate on the other side. The steel fiber high-performance concrete is sprayed into the H-shaped steel frame and its thickness exceeds the H-shaped steel frame.
[0009] Furthermore, the spraying thickness of the compressible concrete is 8-20 cm.
[0010] Furthermore, the spraying thickness of the steel fiber high performance concrete exceeds that of the H-shaped steel frame by 3 cm.
[0011] Furthermore, the flexible mesh may be replaced by a facing steel mesh or an energy dissipation mesh.
[0012] A construction method of a flexible initial support structure suitable for a tunnel in a high-energy geological environment, for a section with good face stability, comprises the following steps:
[0013] S1: First spray a certain thickness of compressible concrete until the surrounding rock surface is flat;
[0014] S2: Then lay the steel mesh, drill holes to install the compression anchor rods, and then spray the compressible concrete to the designed thickness;
[0015] S3: Set up H-shaped steel frame and flexible net, and finally spray steel fiber high performance concrete to the designed thickness.
[0016] A construction method of a flexible initial support structure suitable for a tunnel in a high-energy geological environment, for sections with poor face stability, comprises the following steps:
[0017] S1: First spray a certain thickness of compressible concrete until the surrounding rock surface is flat;
[0018] S2: Set the frame bars and weld them together, and set up the steel mesh, H-shaped steel frame and flexible mesh;
[0019] S3: Construct compression anchor rods, spray compressible concrete, and then spray steel fiber high performance concrete to the designed thickness.
[0020] The beneficial technical effects of the present invention are as follows:
[0021] 1. The flexible initial support structure of the high-energy geological environment tunnel provided by the present invention enables it to have a certain radial pressure-yielding capacity of the tunnel, and improves the toughness of the initial support structure, and improves the resistance of the initial support structure to dislocation and wrinkling, so that the initial support of the tunnel in the high-energy geological environment cooperates with the surrounding rock to yield pressure and deform without dislocation or falling, and maintains its service performance under certain cracking conditions.
[0022] 2. The present invention places the radial yield layer on the side closest to the surrounding rock, which can maximize the radial yield of the tunnel. In order to improve the toughness of the shotcrete inside the tunnel, fiber is added, flexible nets or energy dissipation nets or surface reinforcements are added to improve the anti-slip and anti-cracking performance of the shotcrete. The support system is not damaged under cracking conditions and can still function.
[0023] 3. The present invention adopts a steel frame to ensure the initial strength, and a flexible net / energy dissipation net / surface reinforcement can be constructed based on the steel frame to improve the ease of construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a cross-sectional schematic diagram of the flexible initial support structure of the present invention.
[0025] Figure numerals, 1-yield anchor, 2-compressible concrete, 3-steel mesh, 4-H-shaped steel frame, 5-steel fiber high performance concrete, 6-flexible mesh, 7-tunnel area, 8-surrounding rock area. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present invention will be described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0027] The present invention provides a flexible initial support structure suitable for tunnels in high-energy geological environments, comprising a radial yield layer and an annular toughening layer, wherein the radial yield layer is arranged on a side close to a surrounding rock area 8, and the annular toughening layer is arranged on a side close to a tunnel area 7.
[0028] refer to Figure 1 As shown, the radial yield layer includes a yield anchor rod 1, compressible concrete 2 and a steel mesh 3. The compressible concrete 2 is sprayed inside and on both sides of the steel mesh 3, and the yield anchor rod 1 is anchored between the surrounding rock and the steel mesh 3.
[0029] The annular toughening layer includes an H-shaped steel frame 4, steel fiber high-performance concrete 5 and a flexible net 6. A flange plate on one side of the H-shaped steel frame 4 is in contact with the compressible concrete 2, and a flexible net 6 is arranged outside the flange plate on the other side. The steel fiber high-performance concrete 5 is sprayed into the structure of the H-shaped steel frame 4 and its thickness exceeds the H-shaped steel frame 4.
[0030] Embodiment:
[0031] During the specific implementation, first spray 5cm of compressible concrete 2 until the surrounding rock surface is flat, lay the steel mesh 3, construct the pressure anchor 1, and then spray compressible shotcrete 2 to the designed thickness; erect the steel frame and flexible net / energy dissipation net / surface steel bars, spray fiber high-performance concrete 5 to the designed thickness, and complete the construction.
[0032] This construction sequence is for sections with better stability of the face. If the stability of the face is poor, vertical reinforcement can be added to the outside of the steel frame, and the vertical reinforcement can be welded together with the steel mesh 3. After the initial spraying of 5 cm of compressible concrete, the steel frame (steel mesh + steel frame + flexible mesh / energy dissipation mesh / surface reinforcement) is erected, and then the compression anchor rod 1 is constructed, the compressible concrete 2 is sprayed again, and then the steel fiber high-performance concrete 5 is sprayed.
[0033] Please note that all concrete is shotcrete, so the minimum grid spacing of the flexible net / energy dissipation net / surface steel bars on the outside cannot be too small to meet the requirements of shotcrete construction.
[0034] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. A flexible initial support structure suitable for tunnels in high-energy geological environments, characterized by: It includes a radial yield layer and an annular toughening layer, wherein the radial yield layer is close to the surrounding rock area (8), and the annular toughening layer is close to the tunnel area (7); The radial yield layer comprises a yield anchor rod (1), compressible concrete (2) and a steel mesh (3); the compressible concrete (2) is sprayed inside and on both sides of the steel mesh (3); and the yield anchor rod (1) is anchored between the surrounding rock and the steel mesh (3); The annular toughening layer comprises an H-shaped steel frame (4), steel fiber high performance concrete (5) and a flexible net (6); a flange plate on one side of the H-shaped steel frame (4) is in contact with the compressible concrete (2), and a flexible net (6) is arranged outside the flange plate on the other side; the steel fiber high performance concrete (5) is sprayed into the structure of the H-shaped steel frame (4) and has a thickness exceeding the H-shaped steel frame (4).
2. The flexible initial support structure suitable for tunnels in high-energy geological environments according to claim 1 is characterized in that: The spraying thickness of the compressible concrete (2) is 8-20 cm.
3. The flexible initial support structure suitable for tunnels in high-energy geological environments according to claim 1 is characterized in that: The sprayed thickness of the steel fiber high performance concrete (5) exceeds that of the H-shaped steel frame (4) by 3 cm.
4. The flexible initial support structure suitable for tunnels in high-energy geological environments according to claim 1 is characterized in that: The flexible net (6) can be replaced by a surface reinforcement net or an energy dissipation net.
5. A construction method for a flexible initial support structure suitable for a tunnel in a high-energy geological environment as claimed in claim 1, characterized in that: For sections with good face stability, the following steps are included: S1: First spray a certain thickness of compressible concrete (2) until the surrounding rock surface is flat; S2: Then, the steel mesh (3) is laid, holes are drilled and the compression anchor rods (1) are installed, and then the compressible concrete (2) is sprayed to the designed thickness; S3: erecting an H-shaped steel frame (4) and a flexible net (6), and finally spraying steel fiber high performance concrete (5) to the designed thickness.
6. The construction method of the flexible initial support structure suitable for tunnels in high-energy geological environments according to claim 1 is characterized by: For sections with poor face stability, the following steps are included: S1: First spray a certain thickness of compressible concrete (2) until the surrounding rock surface is flat; S2: setting the frame bars and welding them together with the steel mesh (3), and setting up the steel mesh (3), the H-shaped steel frame (4) and the flexible mesh (6); S3: construct the yield anchor rod (1), spray the compressible concrete (2), and then spray the steel fiber high performance concrete (5) to the designed thickness.
Citation Information
Cited By
Mutually-embedded type tunnel yielding supporting structure and construction method
CN119145893A
Interlocking tunnel pressure-yielding support structure and construction method
CN119145893B
Rapid energy dissipation protection system and method for TBM tunnel rockburst under high ground stress
CN121611458A
A rapid energy dissipation and protection system and method for rock burst of TBM tunnel under high ground stress
CN121611458B
Construction device and method for reducing rebound rate of tunnel sprayed concrete
CN121701232A