A shield tunnel segment wall back grouting construction method

By using multi-layered wrapping bags and expansion bags behind the shield tunnel pipe wall, the expansion and outflow of concrete is controlled, and the slurry leakage problem caused by excessive concrete pouring pressure in the prior art is solved, and the effective effect of small gaps is achieved Filling and slurry leakage control.

CN114607399BActive Publication Date: 2024-11-15CHINA RAILWAY 19TH BUREAU GROUP RAIL TRANSPORTATION ENGINEERING CO LTD +1
View PDF 0 Cites 5 Cited by

Patent Information

Application Number
CN202210386268.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-13
Publication Date
2024-11-15
Estimated Expiration
2042-04-13

AI Technical Summary

Technical Problem

In the existing method of back-grouting of pipe sheets in shield tunnels, concrete pouring can easily lead to excessive pressure on pipe sheets and soil walls, resulting in slurry leakage problems. Once slurry leakage occurs, it will cause large-scale leakage, which is difficult to control.

Method used

Using retractable transmission tubes and multi-layer structure wrapping bags, the expansion and outflow of concrete is controlled through the expansion bags and permeation components in the transmission tubes, ensuring that the concrete first enters the wrapping bags and then fills the gaps outward, reducing the pipe sheets and the pressure of the soil wall, and the design of the tear opening and connecting sheet of the expansion bag, control the leakage of slurry.

Benefits of technology

It effectively reduces the pressure on the pipe sheet and soil walls of concrete, reduces the severity of slurry leakage, ensures that the concrete spreads evenly and fills small gaps, and avoids large-scale leakage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114607399B_ABST
    Figure CN114607399B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of shield construction, and specifically is a method for grouting behind the wall of a shield tunnel segment. The method is specifically as follows: S1: when a shield device is digging a tunnel, the tunnel segment is laid closely following the shield device, and then a retractable transmission pipe is inserted deep into the space between the tunnel segment and the tunnel soil wall, and concrete is injected into the space through the transmission pipe using a supply device; S2: as the transmission pipe is poured, a wrapping bag at the end of the transmission pipe is expanded, allowing the concrete to be shaped and solidified on the inner side of the wrapping bag 2; through this arrangement, the expanded concrete is allowed to enter the wrapping bag first, and all the wrapping bags are allowed to expand first to determine the basic shape. When the wrapping bag is expanded as a whole, the remaining concrete expands and penetrates outward to fill the small gaps, which not only reduces the pressure of the concrete on the segment and the soil wall, but also reduces the problem of tunnel leakage caused by excessive pressure. Even if leakage occurs, the concrete will be blocked by the wrapping bag and will not leak on a large scale.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of shield construction, in particular to a shield tunnel segment wall back grouting construction method. Background Art

[0002] As an advanced construction method, shield construction has been increasingly widely used in underground tunnel construction due to its fast construction speed, high safety, less ground disturbance, and suitability for various complex strata. After the shield machine excavates, there will be a certain gap between the segment and the stratum, and between the segment and the shield tail. In order to control stratum deformation, reduce settlement, and improve the tunnel's impermeability and early stability of the segment lining, it is necessary to fill slurry behind the segment wall.

[0003] A Chinese patent with publication number CN111997653A discloses a shield tunnel segment wall back grouting construction method, including synchronous grouting and secondary reinforcement grouting. The secondary reinforcement grouting starts after the synchronous grouting solidifies and stabilizes. When the grouting pressure value reaches the set value, the grouting is automatically stopped. The manual control method is to manually adjust the grouting flow rate at any time according to the excavation situation. The present invention can effectively solve the problems of stratum loss caused by shield construction, reconsolidation of remolded soil around the shield tunnel, and water infiltration.

[0004] The existing grouting method still has some shortcomings. During the grouting process, concrete is generally poured directly into the gap, which causes excessive pressure on the tunnel segments and soil walls. It is easy to cause leakage, and once it occurs, it will be a large-scale leakage.

[0005] To this end, the present invention provides a shield tunnel segment wall back grouting construction method. Summary of the invention

[0006] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.

[0007] The technical solution adopted by the present invention to solve the technical problem is: a shield tunnel segment wall back grouting construction method described in the present invention, the method specifically comprises:

[0008] S1: When the shield machine excavates the tunnel, the tunnel segments are laid closely following the shield machine, and then the retractable transmission pipe is inserted deep into the space between the tunnel segments and the tunnel wall, and concrete is injected into it through the transmission pipe using a supply device;

[0009] S2: A wrapping bag is arranged at the end of the transmission pipe. As the transmission pipe is poured, the wrapping bag at the end of the transmission pipe will expand, allowing the concrete to be shaped and solidified inside the wrapping bag;

[0010] S3: The wrapping bag is a multi-layer structure. After the wrapping bag is expanded and shaped, the concrete inside it will flow out from the tearing hole outside the wrapping bag;

[0011] Through this arrangement, the expanding concrete enters the wrapping bag first, allowing all the wrapping bags to expand first to determine the basic shape. When the wrapping bag is expanded as a whole, the remaining concrete expands and penetrates outward to fill the tiny gaps. This not only reduces the pressure of concrete on the pipe segments and soil walls, and reduces tunnel leakage caused by excessive pressure, but also, even if leakage occurs, the concrete will be blocked by the wrapping bag, and large-scale leakage will not occur.

[0012] Preferably, a sealing seat is fixedly installed at one end of the transmission tube, and a wrapping bag is arranged on the outside of the sealing seat, and the wrapping bag includes a plurality of expansion bags, and the width of the plurality of expansion bags increases successively from the inside to the outside, and adjacent expansion bags are fixedly connected to each other. A penetration component is arranged on the outside of the expansion bag, and the expansion bag is made of flexible fiber material, and is matched with the multi-layer overlapping arrangement of the wrapping bag, and the arrangement of the penetration component. The penetration component can release the restraint of the wrapping bag after it is filled and expanded to a certain extent, so that the concrete inside can flow out. Through this arrangement, it can be ensured that all the wrapping bags are expanded in place, and the multi-layer design can reduce the large-scale loss caused by the rupture of a single layer. The arrangement of the fiber material allows the wrapping bag with a fiber structure to exist in the concrete after solidification, and its toughness is stronger than that of the overall concrete structure.

[0013] Preferably, the infiltration component includes a plurality of connecting pieces, and a plurality of groups of tearing openings are provided on the outer side of the expansion bag, the tearing openings are arranged in a wave shape, and the two ends of the connecting piece are fixedly connected to the inner side of the tearing openings. The connecting piece is made of elastic material, and the tearing openings will gradually expand as the expansion bag expands, and the elastic connecting piece is used to connect the two sides of the tearing openings. The tearing openings will only open when the expansion bag is expanded into place, and when tunnel leakage really occurs, it is only necessary to close the output end in time. At this time, the internal pressure stops, and the tearing openings will be closed by the connecting piece, thereby greatly reducing the severity of the leakage event.

[0014] Preferably, the outer side of the outermost expansion bag is fixedly connected to an outer bag, and the outer bag includes a plurality of cross-arranged fiber ropes, and a plurality of elastic extension strips are fixedly installed on the outer side of the fiber ropes. After the last expansion bag is finalized, the leaked concrete will fall into the outer bag, and the loose setting of the outer bag allows the concrete to expand normally to the surroundings and pass through the outer bag normally. The fiber ropes arranged on the outer side of the outer bag can increase friction, allowing the concrete to smoothly expand the outer bag, thereby ensuring uniform diffusion of the concrete. At the same time, the staggered fiber ropes are used to further increase the toughness of the concrete.

[0015] Preferably, a grouting head is fixedly installed on the outer side of the sealing seat, the width of the sealing seat is larger than the transmission pipe, and a docking tube is fixedly installed on the inlet end of the innermost expansion bag, and a flexible connecting tube is fixedly installed on one end of the docking tube, and the grouting head is docked with the hard docking tube, and then the sealing seat is wrapped with a flexible connecting tube and fixed on the outside. After grouting is completed, since the concrete has been initially shaped, the grouting head can be directly pulled out for the next filling work.

[0016] Preferably, a plurality of top blocks are fixedly installed on the inner side of the connecting tube, and the top blocks are arranged in an arc shape. The sealing seat is inclined at one end close to the pouring head. When the wrapping bag and the sealing seat are docked, the shape of the sealing seat is matched and the arc-shaped top block is contacted as it goes deeper. Due to the limitation of the elastic connecting tube, the bottom end of the top block will be buckled inward, so that both ends of the top block are in contact with the outer side of the sealing seat. After that, it only needs to be fixed in the middle to achieve the effect of multi-layer sealing, increase the sealing performance, and ensure that during the grouting process, the concrete can expand the wrapping bag smoothly instead of spraying outward.

[0017] Preferably, a transmission groove is opened on the inner side of the sealing seat, and the transmission groove is set in an "L" shape. Both ends of the transmission groove are connected to the outside world. A fan is fixedly installed on the inner side of the transmission groove. When one end of the top block moves to contact with the sealing seat, the fan is started to generate suction, so that one end of the top block can be firmly adsorbed. When the infusion is completed, the fan is turned off and the infusion head is retracted. Through this arrangement, there is no need to perform complicated fixing and unlocking work, and the sealing and opening effects can be achieved by controlling the opening and closing of the fan.

[0018] Preferably, a sealing block is fixedly installed at one end of the top block, and the sealing block is made of elastic material, and a plurality of groups of fiber strips are arranged on the inner side of the sealing block. With the arrangement of the elastic sealing block, the sealing block will be adsorbed before the top block is adsorbed, and the sealing block can adapt to the shape of the transmission groove, and part of the sealing block will enter the inner side of the transmission groove, thereby ensuring the firmness of the fixing process, and the arrangement of the fiber strips can ensure the toughness of the sealing block and improve its service life.

[0019] Preferably, a magnet is fixedly installed at one end of the top block away from the sealing block, the pouring head is made of metal material, and an elastic shaping strip is fixedly installed between the top block and the docking tube. In conjunction with the arrangement of the magnet, when the transmission tube is withdrawn from the wrapping bag, the top block is adsorbed by the magnet so as to be close to the pouring head, which can not only clean the concrete outside the pouring head, but also after the pouring head is withdrawn, the top blocks can be closed together to seal the connecting tube, thereby reducing the loss of concrete. The shaping strip is used to ensure the elastic force concentrated in the center of the connecting tube and the top block.

[0020] Preferably, a driving motor is fixedly installed at the bottom end of the transmission tube, and a connecting plate is fixedly installed at the transmission end of the driving motor, and a plurality of electric telescopic rods are fixedly installed on the outer side of the connecting plate, and an elastic deformation strip is fixedly installed on one end of the electric telescopic rod, and the deformation strip is arranged in an arc shape, and a grab arm is fixedly installed on one end of the deformation strip, and the wrapping bag is clamped with the grab arm, and a binding rope is wrapped around the outer side of the wrapping bag. When a wrapping bag is filled and shaped, as the transmission tube is withdrawn, the driving motor is started to drive the connecting plate to rotate, so that the grab arm with a new wrapping bag is moved to the front end of the transmission tube. At this time, the arc shape of the elastic deformation strip is cooperated with, so that the wrapping bag is just in the position of the injection head, and the elastic setting allows the deformation strip to pass normally when passing through the rear end of the transmission tube, and then the electric telescopic rod is started to be recovered, so that the end of the wrapping bag is docked with the sealing seat. Through this arrangement, the function of fully automatic replacement of the wrapping bag is effectively realized, and no manual operation is required throughout the process. In order to tighten the volume of the wrapping bag, the binding rope will be broken during grouting.

[0021] The beneficial effects of the present invention are as follows:

[0022] 1. The shield tunnel segment wall back-grouting construction method described in the present invention allows concrete to enter the wrapping bags first through the provision of wrapping bags, allowing all the wrapping bags to expand first to determine the basic shape, and when the wrapping bags are expanded as a whole, the remaining concrete expands and penetrates outward to fill the tiny gaps, which not only reduces the pressure of concrete on the segments and soil walls, and reduces the problem of tunnel leakage caused by excessive pressure, but also, even if leakage occurs, the concrete will be blocked by the wrapping bags, and large-scale leakage will not occur.

[0023] 2. The shield tunnel segment wall back-grouting construction method described in the present invention, through the arrangement of the expansion bag, the tearing hole and the connecting piece, the tearing hole will only be opened when the expansion bag is expanded to the right position. When the tunnel leakage really occurs, it is only necessary to close the output end in time. At this time, the internal pressure stops and the tearing hole will be closed by the connecting piece, thereby greatly reducing the severity of the leakage event. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The present invention will be further described below in conjunction with the accompanying drawings.

[0025] Figure 1 is a method block diagram of the present invention;

[0026] Figure 2 is a stereogram of the present invention;

[0027] Figure 3 is a cross-sectional view of the wrapping capsule of the present invention;

[0028] Figure 4 yes Figure 3 A partial enlarged view of the middle part;

[0029] Figure 5 is a top view of the connection between the transmission tube and the deformation strip of the present invention;

[0030] In the figure: 1. transmission tube; 2. wrapping bag; 3. binding rope; 4. expansion bag; 5. outer bag; 6. tearing mouth; 7. connecting piece; 8. injection head; 9. docking tube; 10. connecting cylinder; 11. shaping strip; 12. top block; 13. sealing block; 14. sealing seat; 15. fan; 16. transmission trough; 17. deformation strip; 18. electric telescopic rod; 19. grab arm; 20. drive motor. DETAILED DESCRIPTION

[0031] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0032] Embodiment 1

[0033] like Figure 1 As shown, a shield tunnel segment wall back grouting construction method according to an embodiment of the present invention is specifically as follows:

[0034] S1: When the shield machine excavates the tunnel, the tunnel segments are laid closely following the shield machine, and then the retractable transmission pipe 1 is inserted deep into the space between the tunnel segments and the tunnel soil wall, and concrete is injected into the space through the transmission pipe 1 using a supply device;

[0035] S2: a wrapping bag 2 is arranged at the end of the transmission pipe 1. As the transmission pipe 1 is poured, the wrapping bag 2 at the end of the transmission pipe 1 expands, allowing the concrete to be shaped and solidified inside the wrapping bag 2.

[0036] S3: The wrapping bag 2 is a multi-layer structure. After the wrapping bag 2 is expanded and shaped, the concrete inside it will flow out from the tearing hole 6 on the outside of the wrapping bag 2;

[0037] With this arrangement, the expanding concrete enters the wrapping bag 2 first, allowing all the wrapping bags 2 to expand first to determine the basic shape. After the wrapping bag 2 expands as a whole, the remaining concrete expands and penetrates outward to fill the tiny gaps. This not only reduces the pressure of the concrete on the pipe segments and soil walls, and reduces the problem of tunnel leakage caused by excessive pressure, but also, even if leakage occurs, the concrete will be blocked by the wrapping bag 2, and large-scale leakage will not occur.

[0038] like Figures 2 to 3As shown, a sealing seat 14 is fixedly installed at one end of the transmission pipe 1, and a wrapping bag 2 is arranged on the outside of the sealing seat 14. The wrapping bag 2 includes a plurality of expansion bags 4, and the width of the plurality of expansion bags 4 increases successively from the inside to the outside, and the adjacent expansion bags 4 are fixedly connected to each other. A penetration component is arranged on the outside of the expansion bag 4, and the expansion bag 4 is a flexible fiber material. When working, the multi-layer overlapping setting of the wrapping bag 2 and the setting of the penetration component are combined. The penetration component can release the restraint of the wrapping bag 2 after it is filled and expanded to a certain extent, so that the concrete inside can flow out. Through this setting, it can be ensured that all the wrapping bags 2 are expanded in place, and the multi-layer design can reduce the large-scale loss caused by the rupture of a single layer. The setting of the fiber material allows the wrapping bag 2 with a fiber structure to exist in the concrete after solidification, and its toughness is stronger than that of the overall concrete structure.

[0039] like Figure 3 As shown, the penetration component includes a plurality of connecting pieces 7, and a plurality of groups of tearing openings 6 are opened on the outer side of the expansion bag 4. The tearing openings 6 are arranged in a wave shape, and the two ends of the connecting piece 7 are fixedly connected to the inner side of the tearing openings 6. The connecting piece 7 is made of elastic material. During operation, as the expansion bag 4 expands, the tearing openings 6 will gradually expand, and the elastic connecting piece 7 is used to connect the two sides of the tearing opening 6. The tearing opening 6 will only be opened when the expansion bag 4 is expanded to the right position. When tunnel leakage really occurs, it is only necessary to close the output end in time. At this time, the internal pressure stops, and the tearing opening 6 will be closed by the connecting piece 7, thereby greatly reducing the severity of the leakage event.

[0040] like Figures 2 to 3 As shown, the outer side of the outermost expansion bag 4 is fixedly connected with an outer bag 5, and the outer bag 5 includes a plurality of cross-arranged fiber ropes, and a plurality of elastic extension strips are fixedly installed on the outer side of the fiber ropes. During operation, after the last expansion bag 4 is formed, the leaked concrete will fall into the outer bag 5. With the loose setting of the outer bag 5, the concrete can expand normally to the surroundings and pass through the outer bag 5 normally. With the fiber ropes arranged on the outer side of the outer bag 5, the friction force can be increased, so that the concrete can smoothly expand the outer bag 5, thereby ensuring the uniform diffusion of the concrete. At the same time, the staggered fiber ropes are used to further increase the toughness of the concrete.

[0041] like Figure 4As shown, a grouting head 8 is fixedly installed on the outer side of the sealing seat 14, the width of the sealing seat 14 is larger than the transmission pipe 1, and a docking tube 9 is fixedly installed on the inlet end of the innermost expansion bag 4, and a flexible connecting tube 10 is fixedly installed on one end of the docking tube 9. When working, the grouting head 8 is docked with the hard docking tube 9, and then the sealing seat 14 is wrapped with the flexible connecting tube 10 and fixed on the outside. After the grouting is completed, since the concrete has been initially shaped, the grouting head 8 can be directly pulled out for the next filling work.

[0042] like Figure 4 As shown, a plurality of top blocks 12 are fixedly installed on the inner side of the connecting tube 10, and the top block 12 is arranged in an arc shape. The sealing seat 14 is inclined at one end close to the pouring head 8. During operation, when the wrapping bag 2 and the sealing seat 14 are docked, the shape of the sealing seat 14 is matched, and the arc-shaped top block 12 will be contacted as it goes deeper. Due to the limitation of the elastic connecting tube 10, the bottom end of the top block 12 will be buckled inward, so that both ends of the top block 12 are in contact with the outer side of the sealing seat 14. After that, it only needs to be fixed in the middle to achieve the effect of multi-layer sealing, increase the sealing performance, and ensure that during the grouting process, the concrete can expand smoothly to wrap the bag 2 instead of spraying outward.

[0043] like Figure 4 As shown, a transmission groove 16 is opened on the inner side of the sealing seat 14, and the transmission groove 16 is set in an "L" shape. Both ends of the transmission groove 16 are connected to the outside world. A fan 15 is fixedly installed on the inner side of the transmission groove 16. During operation, when one end of the top block 12 moves to contact the sealing seat 14, the fan 15 is started to generate suction, so that one end of the top block 12 can be firmly adsorbed. When the infusion is completed, the fan 15 is turned off and the infusion head 8 is retracted. Through this arrangement, there is no need to perform complicated fixing and unlocking work, and the sealing and opening effects can be achieved by controlling the opening and closing of the fan 15.

[0044] like Figure 4 As shown, a sealing block 13 is fixedly installed at one end of the top block 12. The sealing block 13 is made of elastic material, and a plurality of fiber strips are arranged on the inner side of the sealing block 13. When working, the elastic sealing block 13 is arranged so that the sealing block 13 is adsorbed before the top block 12 is adsorbed. The sealing block 13 can adapt to the shape of the transmission groove 16, and part of the sealing block 13 will enter the inner side of the transmission groove 16, thereby ensuring the firmness of the fixing process. The arrangement of the fiber strips can ensure the toughness of the sealing block 13 and improve its service life.

[0045] like Figure 4As shown, a magnet is fixedly installed at one end of the top block 12 away from the sealing block 13, the pouring head 8 is made of metal material, and an elastic shaping strip 11 is fixedly installed between the top block 12 and the docking tube 9. During operation, in conjunction with the setting of the magnet, when the transmission tube 1 is withdrawn from the wrapping bag 2, the top block 12 is adsorbed by the magnet so as to be close to the pouring head 8, which can not only clean the concrete on the outside of the pouring head 8, but also after the pouring head 8 is withdrawn, the top blocks 12 can be closed together to seal the connecting tube 10, thereby reducing the loss of concrete. The shaping strip 11 is used to ensure the elastic force concentrated in the center of the connecting tube 10 and the top block 12.

[0046] Embodiment 2

[0047] like Figure 5 As shown, in contrast to Example 1, another embodiment of the present invention is as follows: a driving motor 20 is fixedly installed at the bottom end of the transmission tube 1, a connecting plate is fixedly installed at the transmission end of the driving motor 20, a plurality of electric telescopic rods 18 are fixedly installed on the outside of the connecting plate, an elastic deformation bar 17 is fixedly installed at one end of the electric telescopic rod 18, the deformation bar 17 is arranged in an arc shape, a grab arm 19 is fixedly installed at one end of the deformation bar 17, the wrapping bag 2 is clamped with the grab arm 19, a binding rope 3 is wound around the outside of the wrapping bag 2, and when working, after a wrapping bag 2 is filled and shaped, as the transmission tube 2 is moved, the wrapping bag 2 is wrapped and ... 1 is withdrawn, and the driving motor 20 is started to drive the connecting disk to rotate, so that the grab arm 19 with the new wrapping bag 2 is moved to the front end of the transmission tube 1. At this time, the arc setting of the elastic deformation strip 17 is cooperated to make the wrapping bag 2 just in the position of the injection head 8, and the elastic setting is to allow the deformation strip 17 to pass normally when passing through the rear end of the transmission tube 1. Then the electric telescopic rod 18 is started to be recovered, so that the end of the wrapping bag 2 is docked with the sealing seat 14. Through this setting, the function of fully automatic replacement of the wrapping bag 2 is effectively realized, and no manual operation is required throughout the process. In order to tighten the volume of the wrapping bag 2, the binding rope 3 will be broken during grouting.

[0048] During operation, with the multi-layer overlapping arrangement of the wrapping bag 2 and the arrangement of the penetration component, the penetration component can release the restraint of the wrapping bag 2 after it is filled and expanded to a certain extent, so that the concrete inside can flow out. Through this arrangement, it can be ensured that all the wrapping bags 2 are expanded to the right position, and the multi-layer design can reduce the large amount of loss caused by the rupture of a single layer. The arrangement of the fiber material allows the wrapping bag 2 with a fiber structure to exist in the concrete after solidification, and its toughness is stronger than that of the overall concrete structure. During operation, as the expansion bag 4 expands, the tearing hole 6 will gradually unfold, and the elastic connecting piece 7 is used to connect the two sides of the tearing hole 6. Only when the expansion bag 4 is expanded to the right position will the tearing hole 6 be opened, and the real When the tunnel leaks, it is only necessary to close the output end in time. At this time, the internal pressure stops and the tearing hole 6 will be closed by the connecting piece 7, thereby greatly reducing the severity of the leakage event; during operation, as the last expansion bag 4 is finalized, the leaked concrete will fall into the outer bag 5. With the loose setting of the outer bag 5, the concrete can expand normally to the surroundings and pass through the outer bag 5 normally. With the fiber rope set on the outside of the outer bag 5, the friction force can be increased, so that the concrete can smoothly open the outer bag 5, ensuring the uniform diffusion of the concrete. At the same time, the interlaced fiber ropes are used to further increase the toughness of the concrete; during operation, the pouring head 8 is docked with the hard docking pipe 9, and then the flexible The connecting tube 10 wraps the sealing seat 14 and fixes it on the outside. When the grouting is completed, since the concrete has been initially shaped, the grouting head 8 can be directly pulled out to carry out the next filling work; when working, when the wrapping bag 2 and the sealing seat 14 are docked, the shape setting of the sealing seat 14 is matched, and as it goes deeper, it will contact the arc-shaped top block 12. Due to the limitation of the elastic connecting tube 10, the bottom end of the top block 12 will be buckled inward, so that both ends of the top block 12 are in contact with the outside of the sealing seat 14. After that, it only needs to be fixed in the middle to achieve the effect of multi-layer sealing, increase the sealing performance, and ensure that during the grouting process, the concrete can smoothly expand and wrap the bag 2 instead of spraying outward; when working, when the top After one end of the block 12 moves to contact with the sealing seat 14, the fan 15 is started to generate suction, so that one end of the top block 12 can be firmly adsorbed. When the infusion is completed, the fan 15 is turned off and the infusion head 8 is retracted. Through this arrangement, there is no need to perform complicated fixing and unlocking work, and the sealing and opening effects can be achieved by controlling the opening and closing of the fan 15; when working, the elastic sealing block 13 is set, so that the sealing block 13 will be adsorbed before the top block 12 is adsorbed, and the sealing block 13 can adapt to the shape of the transmission groove 16, and part of the sealing block 13 will enter the inner side of the transmission groove 16, thereby ensuring the firmness of the fixing process, and the setting of the fiber strip can ensure the toughness of the sealing block 13 and improve the service life;During operation, with the setting of the magnet, when the transmission tube 1 is withdrawn from the wrapping bag 2, with the adsorption of the magnet, the top block 12 is closely attached to the pouring head 8, which can not only clean the concrete outside the pouring head 8, but also after the pouring head 8 is withdrawn, the top blocks 12 can close together to seal the connecting tube 10, which can reduce the loss of concrete, and the shaping strip 11 is to ensure the elastic force concentrated in the center of the connecting tube 10 and the top block 12; during operation, after a wrapping bag 2 is filled and shaped, as the transmission tube 1 is withdrawn, the drive motor 20 is started to drive the connecting disk to rotate, so that The gripping arm 19 with the new wrapping bag 2 moves to the front end of the transmission tube 1. At this time, the arc setting of the elastic deformation strip 17 is used to make the wrapping bag 2 just in the position of the injection head 8. The elastic setting allows the deformation strip 17 to pass normally when passing through the rear end of the transmission tube 1. Then the electric telescopic rod 18 is started to retract, so that the end of the wrapping bag 2 is docked with the sealing seat 14. Through this setting, the function of fully automatic replacement of the wrapping bag 2 is effectively realized, and no manual operation is required throughout the process. In order to tighten the volume of the wrapping bag 2, the binding rope 3 will be broken during grouting. ;

[0049] The above-mentioned front, back, left, right, top and bottom are all based on the figures in the specification. Figure 1 As a benchmark, according to the person's observation perspective, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.

[0050] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present invention.

[0051] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A shield tunnel segment wall back grouting construction method, characterized in that: The method is as follows: S1: When the shield machine excavates the tunnel, the tunnel segments are laid closely following the shield machine, and then the retractable transmission pipe (1) is inserted deep into the space between the tunnel segments and the tunnel wall, and concrete is injected into the space through the transmission pipe (1) using a supply device; S2: a wrapping bag (2) is arranged at the end of the transmission pipe (1). As the transmission pipe (1) is poured, the wrapping bag (2) at the end of the transmission pipe (1) expands, allowing the concrete to be shaped and solidified inside the wrapping bag (2); S3: The wrapping bag (2) is a multi-layer structure. After the wrapping bag (2) is expanded and shaped, the concrete inside the wrapping bag (2) will flow outward from the tearing hole (6) outside the wrapping bag (2); A sealing seat (14) is fixedly mounted on one end of the transmission pipe (1), a wrapping bag (2) is arranged on the outside of the sealing seat (14), the wrapping bag (2) comprises a plurality of expansion bags (4), the widths of the plurality of expansion bags (4) increase from the inside to the outside, and adjacent expansion bags (4) are fixedly connected to each other, a permeation component is arranged on the outside of the expansion bag (4), and the expansion bag (4) is made of a flexible fiber material; The infiltration assembly comprises a plurality of connecting pieces (7), the outer side of the expansion bag (4) is provided with a plurality of tearing openings (6), the tearing openings (6) are arranged in a wave shape, the two ends of the connecting piece (7) are fixedly connected to the inner side of the tearing openings (6), and the connecting piece (7) is made of elastic material; The outer side of the outermost expansion bag (4) is fixedly connected to an outer bag (5), the outer bag (5) comprising a plurality of cross-arranged fiber ropes, and a plurality of elastic extension strips are fixedly installed on the outer side of the fiber ropes; A filling head (8) is fixedly mounted on the outside of the sealing seat (14); the width of the sealing seat (14) is greater than that of the transmission pipe (1); a butt joint pipe (9) is fixedly mounted on the inlet end of the innermost expansion bag (4); a flexible connecting tube (10) is fixedly mounted on one end of the butt joint pipe (9); A plurality of top blocks (12) are fixedly mounted on the inner side of the connecting tube (10), the top blocks (12) are arranged in an arc shape, and the sealing seat (14) is arranged at an angle at one end close to the injection head (8); A transmission groove (16) is provided on the inner side of the sealing seat (14), the transmission groove (16) is arranged in an "L" shape, both ends of the transmission groove (16) are connected to the outside, and a fan (15) is fixedly installed on the inner side of the transmission groove (16).

2. A shield tunnel segment wall back grouting construction method according to claim 1, characterized in that: A sealing block (13) is fixedly mounted on one end of the top block (12); the sealing block (13) is made of elastic material, and a plurality of groups of fiber strips are arranged on the inner side of the sealing block (13).

3. A shield tunnel segment wall back grouting construction method according to claim 2, characterized in that: A magnet is fixedly mounted on one end of the top block (12) away from the sealing block (13); the pouring head (8) is made of a metal material; and an elastic shaping strip (11) is fixedly mounted between the top block (12) and the butt joint pipe (9).

4. A shield tunnel segment wall back grouting construction method according to claim 3, characterized in that: A driving motor (20) is fixedly mounted on the bottom end of the transmission tube (1), a connecting plate is fixedly mounted on the transmission end of the driving motor (20), a plurality of electric telescopic rods (18) are fixedly mounted on the outside of the connecting plate, an elastic deformation bar (17) is fixedly mounted on one end of the electric telescopic rod (18), the deformation bar (17) is arranged in an arc shape, a grab arm (19) is fixedly mounted on one end of the deformation bar (17), the wrapping bag (2) is clamped with the grab arm (19), and a binding rope (3) is wound around the outside of the wrapping bag (2).

Citation Information

Cited By

  • Micro-disturbance shield tunnel segment structure rounding method and grouting support

    CN115199295A

  • Micro-perturbation method for the rounding of shield tunnel segment structures

    CN115199295B

  • Indoor experimental device and experimental method for micro-disturbance grouting technology of operating metro

    CN115201456A

  • Indoor experimental device and experimental method of micro-disturbance grouting technology for operating subway

    CN115201456B