Air building machine and building method

By using auxiliary lifting rods and stable hydraulic rods in the air building machine, the problem of uneven pressure points during the lifting process is solved, the stability and safety of the construction platform are achieved, and the construction efficiency is improved.

CN119041718APending Publication Date: 2024-11-29CHINA CONSTR THIRD ENG BUREAU GRP SOUTH CHINA CO LTD

Patent Information

Application Number
CN202411428646.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing aerial building machine has unevenly distributed pressure points during the lifting process, resulting in unstable construction platform and affecting construction safety.

Method used

Use auxiliary lifting rods and stabilized hydraulic rods to make the upper and lower platform plates and truss bodies more stable through the hydraulic rods on the accompanying truss body to avoid shaking, and use external lifting equipment to lift the foundation section to appropriate positions, and use stable hydraulic rods to stabilize Elevate the outer wall of the building.

Benefits of technology

Reduce the pressure during lifting, ensure the stable improvement and stability of the construction platform, avoid shaking, and improve construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041718A_ABST
    Figure CN119041718A_ABST
Patent Text Reader

Abstract

The invention discloses an aerial building machine and a building method, and belongs to the technical field of special building equipment, the aerial building machine is characterized in that a foundation seat is fixed on the ground, a foundation section body is arranged on the foundation seat, the foundation section body is repeatedly and fixedly mounted through high-strength bolts, the repeatedly mounted foundation section body forms a supporting truss body, and a lifting device is arranged at the top end of the supporting truss body; a lifting device is installed on the base, an accompanying truss body is installed on the lifting device, a lower platform plate and an upper platform plate are installed on the accompanying truss body, protective shell formworks are assembled on the lower platform plate and outside the upper platform plate, the protective shell formworks are mutually enclosed to form a closed frame shape, and a transverse supporting frame is fixed to the side wall of the top end of the accompanying truss body. The lifting pressure of the lifting devices on the periphery of the floor building can be relieved, the pressure during lifting is relieved through the auxiliary lifting rods, the upper platform plate, the lower platform plate and the accompanying truss body are more stable through the stabilizing hydraulic rods arranged on the accompanying truss body, and shaking is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention specifically relates to an aerial building construction machine and a building construction method, and belongs to the technical field of special construction equipment. Background Art

[0002] In traditional floor construction, workers are required to process building materials on the ground and then transport them to the top floor for use. As the number of floors increases, building becomes more and more difficult. A large number of on-site construction workers are required during the construction process. Aerial building machines can form an independent space and are not affected by the weather. They are safer and can better protect the safety of construction workers, greatly improving construction efficiency. At the same time, the improvement of the implementation inside the aerial building machine can also reduce environmental pollution and interference with the external environment.

[0003] For example, the Chinese invention patent application document, with publication number CN108265991A, relates to an aerial building machine for industrialized buildings and its construction method, which belongs to the field of special equipment for construction. The bolt sleeve at the bottom of the standard section is connected with the high-strength bolts embedded in the foundation; the workshop column and the standard section are connected by high-strength bolts; the hydraulic lifting mechanism is connected and fixed to the workshop column by bolts; the construction external frame platform and the workshop column are connected as a whole by bolts; the beams I and II are connected and fixed to the workshop column by high-strength bolts; the driving track is fixed on the beam II; the end lifting crane and the middle installation crane are installed on the driving track and fixed by the crane locking mechanism; the standard section lifting equipment is installed at the bottom of the overhanging beam of the workshop column. It can not only meet the requirements of rapid lifting, precise positioning, and multi-station synchronous construction, but also realize the integration of the construction external frame and synchronous lifting with the floor, improve the construction accuracy and speed, and the installation and removal of the overall equipment are all computer-automated, with safe and efficient construction.

[0004] As shown in the Chinese invention patent application document, the publication number is CN112627479A, which provides an aerial building construction machine, including a lifting platform, a working platform installed thereon, and a plurality of hydraulic lifting devices, wherein a plurality of trusses are fixedly connected to the lower surface of the lifting platform, and a support plate is fixedly connected between each two adjacent trusses, and a plurality of hydraulic lifting devices are evenly and equidistantly distributed around the lifting platform and are respectively fixedly connected to the support plates. The present invention can increase the safety of high-altitude construction of the working platform by setting a guardrail on the working platform, and a gap is left on one side of the guardrail for people to enter and exit, which increases the convenience of use. At the same time, a plurality of hydraulic telescopic devices are set, and are evenly and equidistantly fixed around the lifting platform, thereby increasing the carrying capacity of the lifting platform and speeding up the progress of construction.

[0005] However, in the above documents, the increase in floors is accommodated by continuously raising the height, and the height is raised by hydraulic lifting, and then a standard section of fixed height is installed. Although this method is simple and practical, the lifting points are distributed all around, and the pressure on the lifting equipment is huge during operation. In addition, the construction platform may shake during the lifting process, making the construction platform unstable, which greatly affects the safety of the construction workers. Summary of the invention

[0006] The purpose of the present invention is to address the shortcomings of the prior art and provide an aerial building construction machine and a building construction method, which can reduce the lifting pressure of the lifting devices around the floor building, use auxiliary lifting rods to reduce the lifting pressure, and make the upper platform plate, the lower platform plate and the accompanying truss body more stable by stabilizing hydraulic rods arranged on the accompanying truss body to avoid shaking.

[0007] An aerial building construction machine comprises a base fixed on the ground, wherein the base is provided with a base node, the base node is repeatedly fixed and installed by high-strength bolts, and the repeatedly installed base node forms a supporting truss body, and a lifting device is provided at the top of the supporting truss body, and a traveling truss body is installed on the lifting device. The lifting device can facilitate the installation of the base node onto the supporting truss body, and its structure is the same as the jacking of the tower crane, and no further description is made here. The traveling truss body is smoothly lifted together by the lifting devices on each supporting truss, and external lifting equipment is required to lift the base node to a suitable position during the lifting, and a lower platform plate and an upper platform plate are installed on the traveling truss body, and the upper platform plate and the lower platform plate are used to form a working platform outside the building for construction workers to walk and construct, and cooperate with the external shell template to form a relatively closed The environment is avoided to prevent falling from high altitude. The lower platform plate and the upper platform plate are both equipped with shell formwork. The shell formwork is a detachable formwork, which can be designed according to the shape of the building and can also be easily reused after disassembly. The shell formworks are mutually enclosed to form a closed frame. A transverse support frame is fixed on the top side wall of the accompanying truss body, one end of the transverse support frame converges toward the center of the shell formwork, and a connecting platform is fixed at one end of the transverse support frame. The connecting platform fixed with the transverse support frame can obtain better supporting performance. A retaining wall is extended downward at the bottom of the connecting platform, an ear plate is fixed at the bottom edge of the retaining wall, and an auxiliary lifting rod extending downward is fixed to the bottom of the ear plate. The bottom end of the composite lifting rod is used to contact the building below, and then the accompanying truss body is assisted in lifting by pushing the transverse support frame upward.

[0008] A control compartment is provided on one side of the foundation node located on the ground of the building, and a communication control module is provided in the control compartment. Power supply cables, water supply pipes and concrete delivery pipes for supplying the building are provided along one side of the supporting truss body. This makes it easy to transport construction materials to the roof of the building, avoids manual transportation, and saves labor.

[0009] The supporting truss bodies are fixed around the target building, and there are at least four of them evenly distributed. An opening is opened in the center of the lower platform plate and the upper platform plate. The internal shape of the opening is the shape of the outer wall of the target building. In actual use, the position of the supporting truss body is set according to the shape of the building.

[0010] A transport truss body is fixed between the bottom of the lower platform plate and the building ground. The transport truss body is also formed by fixing a number of single nodes installed by stacking. The transport truss bodies are arranged in pairs, and a transport elevator that can travel back and forth between the ground and the bottom of the lower platform plate is slidably installed between the transport truss bodies. An entrance is opened at the bottom of the lower platform plate corresponding to the top of the transport elevator, and an internal end frame is fixed on the lower platform plate corresponding to the top of the transport truss body. This can facilitate the replenishment and transportation of some materials, and also facilitate the entry and exit of personnel.

[0011] The corner connections of the shell formwork are fixed with turning plates by high-strength bolts, reinforcing strips are fixed on the inner walls of the shell formwork, a mounting plate is fixed between the top edge of the shell formwork and the connecting platform, an automatic retractable rain shelter is provided on the mounting plate, a construction equipment fixing platform is fixed on the transverse support frame, a short-distance material transport elevator is provided between the retaining walls under the connecting platform, and the transportation of materials and the movement of personnel between floors can be completed using the short-distance material transport elevator, and the transportation and transfer of materials can be more convenient after the construction platform plate for personnel is added.

[0012] The transverse support frame includes a first cross beam whose top is flush with the top of the connecting platform, a second cross beam is fixed between the retaining wall and the accompanying truss body, a diagonal brace beam is provided between the second cross beam and the first cross beam, and a diagonal brace is fixedly connected between the bottom of the second cross beam and the side wall of the accompanying truss body, so as to provide better support.

[0013] A stabilizing assembly is installed on the side wall of the accompanying truss body, and the stabilizing assembly includes a stabilizing hydraulic rod fixed on the accompanying truss body, the stabilizing hydraulic rod is located below the upper platform plate, a limiting block is fixed to the bottom of the upper platform plate, one end of the stabilizing hydraulic rod passes through the limiting block, and a plug-in block is fixed to one end of the stabilizing hydraulic rod, and a plug-in notch is provided on the side of the plug-in block close to the target building. When the wind force in the external environment is too strong, and in some high-rise buildings, the stability requirements of the structure become more and more important due to the high floors. The stabilizing assembly is used to fix the position between the accompanying truss body and the building.

[0014] A building construction method, based on the use of an aerial building construction machine, S1: First, plan the land area required to complete the building and the maximum building outer contour range at the construction site, perform normal construction operations on the foundation part at the construction site, and when the construction reaches the first floor above the ground, cast the foundation seat for fixing the foundation node at a fixed point, and then fix the foundation node on the foundation seat, and embed the fixing components in the foundation body, and then connect and fix it with the foundation node through high-strength bolts;

[0015] S2: Install a lifting device on the foundation section, then hoist the accompanying truss body to the supporting truss body formed by the foundation section by a crane, connect the bottom of the accompanying truss body to the lifting device, and then fix the lower platform plate in place. The water tank and the spray device required for the construction operation can be set on the lower platform plate. The spray device is used to spray water for maintenance of the exterior wall of the building. At the same time, part of the water source can be temporarily stored in the water tank for workers to use during construction. At the same time, various equipment required for construction can be placed on the lower platform plate;

[0016] S3: After the installation of the lower platform plate, the construction of the floor is carried out normally. At the same time, the upper platform plate is installed on the accompanying truss body, and the shell template around the lower platform plate is fixed and installed. When the construction progress is two floors above ground, the horizontal support frame and the connecting platform need to be installed, as well as the corresponding auxiliary lifting rods, and a short-distance material transport elevator is installed under the connecting platform. An automatic retractable rain shelter is installed on the horizontal support frame, and the automatic retractable rain shelter is opened when it rains;

[0017] S4: After the construction progress of two floors is completed, the shell template above the upper platform plate is enclosed and installed. At this time, the upper platform plate and the lower platform plate can be constructed following the construction of the floor. When it is necessary to carry out follow-up lifting, the lifting device will synchronously lift the accompanying truss body upward based on the supporting truss body. During the lifting, the construction personnel can carry out construction and maintenance on the exterior wall on the lower platform plate;

[0018] S5: A transport truss is installed between the lower platform plate and the ground, and the entry of personnel and some materials can be completed using a transport elevator installed between the transport trusses.

[0019] During the construction process, water supply and necessary cables are needed to transmit electricity. The connection can be segmented, that is, the cables or pipes are connected and installed in sections of 9-15 meters. A reserved part is provided on the lower platform plate. When the reserved part is insufficient, a supplementary section is connected in parallel, and then the reserved end is installed at the top again as the reserved section for the next cycle. The added pipes or cables are fixed to the outer wall of the supporting truss through fixings.

[0020] The technical effects and advantages of the present invention are as follows: the building crane can utilize the auxiliary lifting rod to reduce the pressure during lifting, and through the stabilizing hydraulic rod arranged on the accompanying truss body, the upper platform plate, the lower platform plate and the accompanying truss body are made more stable to avoid shaking. When in use, when it is necessary to lift the accompanying truss body, the lifting devices on each supporting truss are used to jointly lift the accompanying truss body smoothly. When lifting, it is necessary to utilize external lifting equipment to lift the basic node to a suitable position, and then install and fix the basic node. When lifting, a part of the stabilizing hydraulic rod is retracted. After lifting to a suitable position, the stabilizing hydraulic rod is extended to make the plug-in block contact the outer wall of the building, thereby achieving the stability of the accompanying truss body. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention;

[0022] Figure 2 It is a bottom view structural schematic diagram of the present invention;

[0023] Figure 3 It is a schematic diagram of the bottom structure of the lower platform plate of the present invention;

[0024] Figure 4 for Figure 3 A schematic diagram of the enlarged structure at A in the middle;

[0025] Figure 5 It is a schematic diagram of the structure of the upper platform plate of the present invention;

[0026] Figure 6 It is a schematic diagram of the top structure of the present invention;

[0027] Figure 7 It is a schematic diagram of the top cross-sectional structure of the present invention;

[0028] Figure 8 It is a structural schematic diagram of the shell template of the present invention;

[0029] Fig. 9 It is a schematic flow chart of building construction of the present invention.

[0030] In the figure: 1. supporting truss body; 101. lifting device; 2. accompanying truss body; 3. lower platform plate; 4. upper platform plate; 5. shell template; 501. turning plate; 502. reinforcing strip plate; 6. transverse support frame; 601. first crossbeam; 602. second crossbeam; 603. diagonal bracing beam; 604. diagonal bracing rod; 7. auxiliary lifting rod; 8. transport truss body; 801. transport elevator; 802. internal end frame; 9. connecting platform; 10. retaining wall; 11. automatic retractable rain shelter; 12. fixed platform; 13. stabilizing component; 131. stabilizing hydraulic rod; 132. limit block; 133. plug-in block. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] See also Figure 1-Figure 9As shown, an aerial building construction machine and a building construction method include a base fixed on the ground, a base node is provided on the base, the base node is repeatedly fixed and installed by high-strength bolts, and the repeatedly installed base node forms a supporting truss body 1, and a lifting device 101 is provided on the top of the supporting truss body 1, and an accompanying truss body 2 is installed on the lifting device 101. The lifting device 101 can facilitate the installation of the basic node on the supporting truss body 1. Its structure is the same as the jacking of the tower crane, and no further description is given here. The accompanying truss body 2 is lifted steadily by the lifting devices 101 on each supporting truss, and then the lifting is performed. When lifting, it is necessary to use external lifting equipment to lift the foundation node to a suitable position. The accompanying truss body 2 is equipped with a lower platform plate 3 and an upper platform plate 4. The upper platform plate 4 and the lower platform plate 3 are used to form a working platform outside the building for construction workers to walk and construct. The external shell template 5 forms a relatively closed environment to avoid falling from a high altitude. The lower platform plate 3 and the upper platform plate 4 are both equipped with shell templates 5. The shell template 5 is a detachable template that can be designed according to the shape of the building and can also be reused after disassembly. The shell templates 5 are mutually enclosed to form a The accompanying truss body 2 is formed into a closed frame shape, and a transverse support frame 6 is fixed on the top side wall of the accompanying truss body 2, one end of the transverse support frame 6 converges to the center of the shell template 5, and a connecting platform 9 is fixed at one end of the transverse support frame 6, and the connecting platform 9 fixed to the transverse support frame 6 can obtain better support, and a retaining wall 10 extends downward from the bottom of the connecting platform 9, and an ear plate is fixed to the bottom edge of the retaining wall 10, and an auxiliary lifting rod 7 extending downward is fixed to the bottom of the ear plate, and the bottom end of the composite lifting rod is used to contact the building below, and then the accompanying truss body 2 is assisted in lifting by pushing the transverse support frame 6 upward, which is located at the building A control compartment is provided on one side of the ground foundation node, and a communication control module is provided in the control compartment. Power supply cables, water supply pipes and concrete delivery pipes for supplying construction are provided on one side of the supporting truss body 1. This makes it easy to transport construction materials to the roof of the building, avoids manual transportation, and saves labor. The supporting truss body 1 is fixed around the target building, and there are at least four evenly distributed. An open opening is provided in the center of the lower platform plate 3 and the upper platform plate 4. The internal shape of the open opening is the shape of the outer wall of the target building. In actual use, the position of the supporting truss body 1 is set according to the shape of the building.

[0033] A transport truss body 8 is fixed between the bottom of the lower platform plate 3 and the building ground. The transport truss body 8 is also formed by fixing a number of single nodes that are stacked and installed. The transport truss bodies 8 are arranged in pairs, and a transport elevator 801 that can travel back and forth between the ground and the bottom of the lower platform plate 3 is slidably installed between the transport truss bodies 8. An entrance is opened at the bottom of the lower platform plate 3 corresponding to the top of the transport elevator 801, and an internal end frame body 802 is fixed on the lower platform plate 3 corresponding to the top of the transport truss body 8. This can facilitate the replenishment and transportation of some materials, and also facilitate the entry and exit of personnel.

[0034] The corner connection of the shell formwork 5 is fixed with a turning plate 501 by high-strength bolts, a reinforcing strip 502 is fixed on the inner wall of the shell formwork 5, a mounting plate is fixed between the top edge of the shell formwork 5 and the connecting platform 9, an automatic retractable rain shelter 11 is provided on the mounting plate, a construction equipment fixing platform 12 is fixed on the transverse support frame 6, and a short-distance material transport elevator is provided between the retaining walls 10 under the connecting platform 9. The transportation of materials and the movement of personnel between floors can be completed using the short-distance material transport elevator, and the transportation and transfer of materials can be more convenient after the construction platform plate for personnel is added.

[0035] The transverse support frame 6 includes a first cross beam 601 whose top is flush with the top of the connecting platform 9, a second cross beam 602 is fixed between the retaining wall 10 and the accompanying truss body 2, a diagonal brace beam 603 is provided between the second cross beam 602 and the first cross beam 601, and a diagonal brace rod 604 is fixedly connected between the bottom of the second cross beam 602 and the side wall of the accompanying truss body 2, so as to provide better support.

[0036] A stabilizing assembly 13 is installed on the side wall of the accompanying truss body 2, and the stabilizing assembly 13 includes a stabilizing hydraulic rod 131 fixed on the accompanying truss body 2, and the stabilizing hydraulic rod 131 is located below the upper platform plate 4, and a limiting block 132 is fixed to the bottom of the upper platform plate 4. One end of the stabilizing hydraulic rod 131 passes through the limiting block 132, and a plug-in block 133 is fixed to one end of the stabilizing hydraulic rod 131. A plug-in notch is provided on the side of the plug-in block 133 close to the target building. When the wind force in the external environment is too strong, and in some high-rise buildings, the stability requirements of the structure become more and more important due to the high floors. The stabilizing assembly 13 is used to fix the position between the accompanying truss body 2 and the building.

[0037] The building machine can use the auxiliary lifting rod 7 to reduce the pressure during lifting, and through the stabilizing hydraulic rod 131 set on the accompanying truss body 2, the upper platform plate 4, the lower platform plate 3 and the accompanying truss body 2 are made more stable to avoid shaking. When in use, when it is necessary to lift the accompanying truss body 2, the lifting devices 101 on each supporting truss are used to jointly lift the accompanying truss body 2 smoothly. When lifting, it is necessary to use external lifting equipment to lift the basic node to a suitable position, and then install and fix the basic node. When lifting, the stabilizing hydraulic rod 131 is partially retracted. After lifting to a suitable position, the stabilizing hydraulic rod 131 is extended to make the plug-in block 133 contact the outer wall of the building, thereby achieving the stability of the accompanying truss body 2.

[0038] A building construction method, S1: firstly plan the land area required for the completion of the building and the maximum outer contour range of the building at the construction site, perform normal construction operations on the foundation part at the construction site, and when the construction reaches the first floor above the ground, cast the foundation seat for fixing the foundation node at a fixed point, and then fix the foundation node on the foundation seat, and embed the fixing parts in the foundation body, and then connect and fix the foundation node with the foundation body through high-strength bolts;

[0039] S2: Install the lifting device 101 on the foundation node, then hoist the accompanying truss body 2 to the supporting truss body 1 formed by the foundation node by a crane, connect the bottom of the accompanying truss body 2 to the lifting device 101, and then fix the lower platform plate 3 in place. The water tank and the spraying device required for the construction operation can be set on the lower platform plate 3. The spraying device is used to spray water on the exterior wall of the building for maintenance. At the same time, part of the water source can be temporarily stored in the water tank for workers to use during construction. At the same time, various equipment required for construction can be placed on the lower platform plate 3;

[0040] S3: After the lower platform plate 3 is installed, the construction of the floor is carried out normally. At the same time, the upper platform plate 4 is installed on the accompanying truss body 2, and the shell template 5 around the lower platform plate 3 is fixed and installed. When the construction progress is two floors above ground, the transverse support frame 6 and the connecting platform 9 need to be installed, as well as the corresponding auxiliary lifting rod 7, and a short-distance material transport elevator is installed under the connecting platform 9. An automatic retractable rain shelter 11 is set on the transverse support frame 6, and the automatic retractable rain shelter is opened when it rains;

[0041] S4: After the construction progress of two floors is completed, the shell formwork 5 above the upper platform plate 4 is enclosed and installed. At this time, the upper platform plate 4 and the lower platform plate 3 can be constructed following the construction of the floor. When it is necessary to carry out follow-up lifting, the lifting device 101 synchronously lifts the accompanying truss body 2 upward based on the supporting truss body 1. During the lifting, the construction personnel can carry out construction and maintenance on the exterior wall on the lower platform plate 3;

[0042] S5: A transport truss body 8 is installed between the lower platform plate 3 and the ground. The entry of personnel and some materials can be completed using a transport elevator 801 installed between the transport truss bodies 8.

[0043] During the construction process, water supply and necessary cables are needed to transmit electricity. The connection can be segmented, that is, the cables or pipes are connected and installed in sections of 9-15 meters. A reserved part is provided on the lower platform plate 3. When the reserved part is insufficient, a supplementary section is connected in parallel, and then the reserved end is installed at the top again as the reserved section for the next cycle. The added pipe belt or cable is fixed to the outer wall of the supporting truss body 1 through fixings.

[0044] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0045] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. An aerial building machine, comprising a base fixed on the ground, a base section provided on the base, and the base section repeatedly fixed and installed by high-strength bolts, characterized in that: After repeated installation, the basic nodes form a supporting truss body (1), the top of the supporting truss body (1) is provided with a lifting device (101), a traveling truss body (2) is installed on the lifting device (101), a lower platform plate (3) and an upper platform plate (4) are installed on the traveling truss body (2), a shell template (5) is installed on the lower platform plate (3) and the outer side of the upper platform plate (4), and the shell templates (5) are mutually enclosed to form a closed frame shape, a transverse support frame (6) is fixed on the top side wall of the traveling truss body (2), one end of the transverse support frame (6) converges toward the center of the shell template (5), and a connecting platform (9) is fixed at one end of the transverse support frame (6), a retaining wall (10) extends downward from the bottom of the connecting platform (9), an ear plate is fixed to the bottom edge of the retaining wall (10), and an auxiliary lifting rod (7) extending downward is fixed to the bottom of the ear plate.

2. The aerial building machine according to claim 1, characterized in that: A control compartment is provided on one side of the base node located on the ground of the building, a communication control module is provided in the control compartment, and power supply cables, water supply pipes and concrete delivery pipes for supplying the building are provided along one side of the support truss body (1).

3. The aerial building machine according to claim 1, characterized in that: The supporting truss bodies (1) are fixed around the target building and are at least four evenly distributed. The lower platform plate (3) and the upper platform plate (4) are provided with openings in the center, and the internal shape of the openings is the shape of the outer wall of the target building.

4. The aerial building construction machine as claimed in claim 3, characterized in that: A transport truss body (8) is fixed between the bottom of the lower platform plate (3) and the building ground. The transport truss body (8) is also formed by fixing a plurality of single nodes installed in a stacked manner. The transport truss bodies (8) are arranged in pairs, and a transport elevator (801) capable of traveling back and forth between the ground and the bottom of the lower platform plate (3) is slidably installed between the transport truss bodies (8). An entrance is provided at the bottom of the lower platform plate (3) corresponding to the top of the transport elevator (801), and an internal end frame body (802) is fixed on the lower platform plate (3) corresponding to the top of the transport truss body (8).

5. The aerial building construction machine as claimed in claim 1, characterized in that: The corner connection of the shell formwork (5) is fixedly connected with a turning plate (501) by high-strength bolts, and a reinforcing strip (502) is fixed on the inner wall of the shell formwork (5). A mounting plate is fixed between the top edge of the shell formwork (5) and the connecting platform (9), and an automatic retractable rain shelter (11) is arranged on the mounting plate. A construction equipment fixing platform (12) is fixed on the transverse support frame (6), and a short-distance material transport elevator is arranged between the retaining wall (10) below the connecting platform (9).

6. The aerial building construction machine as claimed in claim 1, characterized in that: The transverse support frame (6) comprises a first crossbeam (601) whose top is flush with the top of the connecting platform (9); a second crossbeam (602) is fixed between the retaining wall (10) and the accompanying truss body (2); an oblique bracing beam (603) is provided between the second crossbeam (602) and the first crossbeam (601); and an oblique bracing rod (604) is fixedly connected between the bottom of the second crossbeam (602) and the side wall of the accompanying truss body (2).

7. The aerial building construction machine as claimed in claim 1, characterized in that: A stabilizing assembly (13) is installed on the side wall of the accompanying truss body (2), and the stabilizing assembly (13) comprises a stabilizing hydraulic rod (131) fixed on the accompanying truss body (2), and the stabilizing hydraulic rod (131) is located below the upper platform plate (4), and a limiting block (132) is fixed at the bottom of the upper platform plate (4), and one end of the stabilizing hydraulic rod (131) passes through the limiting block (132), and a plug-in block (133) is fixed to one end of the stabilizing hydraulic rod (131), and a plug-in notch is provided on a side of the plug-in block (133) close to the target building.

8. A building construction method, based on the method for using the aerial building construction machine according to any one of claims 1 to 7, characterized in that: S1: First, plan the land area required for the construction and the maximum outer contour of the building at the construction site. Perform normal construction operations on the foundation at the construction site. When the construction reaches the first floor above the ground, the foundation seat for fixing the foundation node can be cast at a fixed point. Then, the foundation node can be fixed on the foundation seat. Fixed components can be buried in the foundation body and then connected and fixed with the foundation node through high-strength bolts. S2: Install a lifting device (101) on the foundation node, then hoist the accompanying truss body (2) to the supporting truss body (1) formed by the foundation node by a crane, connect the bottom of the accompanying truss body (2) to the lifting device (101), and then fix the lower platform plate (3) in place. A water tank and a spraying device required for construction operations can be set on the lower platform plate (3). The spraying device is used to spray water on the exterior wall of the building for maintenance. At the same time, part of the water source can be temporarily stored in the water tank for workers to use during construction. At the same time, various equipment required for construction can be placed on the lower platform plate (3); S3: After the lower platform plate (3) is installed, the construction of the floor is carried out normally. At the same time, the upper platform plate (4) is installed on the accompanying truss body (2), and the shell template (5) around the lower platform plate (3) is fixedly installed. When the construction progress is two floors above the ground, it is necessary to complete the installation of the transverse support frame (6) and the connecting platform (9), as well as the corresponding auxiliary lifting rod (7), and set up a short-distance material transport elevator under the connecting platform (9). An automatic retractable rain shelter (11) is set on the transverse support frame (6), and the automatic retractable rain shelter is opened when it rains; S4: After the construction progress of two floors is completed, the shell template (5) above the upper platform plate (4) is enclosed and installed. At this time, the upper platform plate (4) and the lower platform plate (3) can be constructed following the construction of the floors. When it is necessary to carry out follow-up lifting, the lifting device (101) uses the supporting truss body (1) as a basis to synchronously lift the accompanying truss body (2) upwards. During the lifting, the construction personnel can carry out construction and maintenance on the exterior wall on the lower platform plate (3); S5: A transport truss body (8) is installed between the lower platform plate (3) and the ground, and the entry of personnel and some materials can be completed using a transport elevator (801) installed between the transport truss bodies (8).

9. The building construction method according to claim 8, characterized in that: During the construction process, water supply and necessary cables are required to transmit electricity. The connection can be segmented, that is, the cables or pipes are connected and installed in sections of 9-15 meters. A reserved part is provided on the lower platform plate (3). When the reserved part is insufficient, a supplementary section is connected in parallel, and then the reserved end is installed at the top again as the reserved section for the next cycle. The added pipe belt or cable is fixed to the outer wall of the supporting truss body (1) through a fixing piece.

Citation Information

Patent Citations

  • Aerial building machine for industrial buildings and construction method of aerial building machine

    CN108265991A

  • Aerial building machine

    CN112627479A

Cited By

  • Building building machine with intelligent scabbling robot

    CN119795396A

  • A building machine with an intelligent underpinning robot

    CN119795396B

  • Building building machine with external facade construction hanging basket

    CN119825139A

  • Construction operation platform of building machine

    CN120520397A