Construction pattern verification device and construction pattern verification method
The construction pattern verification device addresses the need for automated sand pile construction by simulating and verifying material discharge patterns using a Markov chain Monte Carlo method, ensuring consistent ground compaction quality without relying on skilled operators.
Patent Information
- Application Number
- JP2024051983
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-11-21
- Estimated Expiration
- 2044-03-27
AI Technical Summary
Existing methods for constructing sand piles underground to compact the ground rely heavily on skilled operators to adjust casing pressure and air jets for appropriate sand discharge, lacking a device that can generate and verify an appropriate construction pattern without human intervention.
A construction pattern verification device that includes a construction information acquisition unit, pattern information generation unit, simulation execution unit, and calculation result display unit to simulate and verify the quality of material discharge for columnar objects, using a Markov chain Monte Carlo method to predict construction outcomes.
Enables the generation and verification of appropriate construction patterns for sand pile construction, allowing for accurate and automated adjustment of sand discharge, independent of operator skill, thereby ensuring consistent ground compaction quality.
Smart Images

Figure 0007588261000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a construction pattern verification device and a construction pattern verification method. [Background technology]
[0002] In a conventional method of compacting the surrounding ground by constructing sand piles in the ground, a technique has been proposed for penetrating a casing filled with granular material such as sand or crushed stone to a specified depth and discharging the material in the casing appropriately into the ground. Patent Document 1 discloses a method for discharging sand in a driving-back type compressed sand pile construction method. The sand discharging method disclosed in Patent Document 1 discharges sand by applying air pressure to the sand in the casing, and also discharges the sand efficiently by ejecting an air jet from the side of the tip of the casing. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2008-308839 A Summary of the Invention [Problem to be solved by the invention]
[0004] In a method of constructing sand piles underground to compact the ground, the amount of sand discharged from the casing needs to be adjusted appropriately depending on the material sand used and the ground conditions. Meanwhile, in the past, a skilled operator controlled the pressure of the casing to raise it and the air jet to adjust the construction pattern related to the amount of sand to be discharged. Therefore, in order to carry out this method without relying on the skills of a skilled operator, a device is needed that can generate an appropriate construction pattern for the method and verify whether the appropriate construction can be performed with the verification pattern.
[0005] The present invention has been made in consideration of the problems inherent in the conventional techniques, and an object of the present invention is to provide a construction pattern verification device capable of generating and verifying an appropriate construction pattern for a construction method in which sand piles are constructed in the ground and the ground is compacted. [Means for solving the problem]
[0006] A construction pattern verification device according to an embodiment of the present invention is a construction pattern verification device that verifies a construction pattern used in a compaction pile construction device that compacts the ground by constructing pillar-shaped objects underground, and includes a construction information acquisition unit that acquires construction information constructed by the compaction pile construction device, a pattern information generation unit that generates a construction pattern based on the construction information, a simulation execution unit that executes a simulation of the occurrence probability regarding the quality of the loss of material that forms the pillar-shaped objects for the construction pattern, and a calculation result display unit that displays the results of the simulation.
[0007] A construction pattern verification method according to another aspect of the present invention is a verification method executed by a computer to verify a construction pattern used in a compaction pile construction device that compacts the ground by constructing pillar-shaped objects underground, the method acquiring construction information of construction performed by the compaction pile construction device, generating a construction pattern based on the construction information, performing a simulation of the occurrence probability of the material forming the pillar-shaped objects being loose for the construction pattern, and displaying the results of the simulation. Effect of the Invention
[0008] According to the present invention, it is possible to provide a construction pattern verification device capable of generating and verifying an appropriate construction pattern for a construction method in which sand piles are constructed in the ground and the ground is compacted. [Brief description of the drawings]
[0009] [Figure 1] FIG. 13 is a diagram for explaining a compaction method by driving sand piles, which is the subject of verification in the construction pattern verification device according to the present embodiment. [Diagram 2]FIG. 1 is a diagram for explaining a compaction method using sand pile driving. [Diagram 3] 1 is a block diagram showing a configuration of a construction pattern verification device according to an embodiment of the present invention; [Figure 4] 1 is a block diagram showing a functional configuration of a construction pattern verification device according to an embodiment of the present invention; [Diagram 5] 1 is a diagram for explaining construction information applied to the construction pattern verification device according to the present embodiment. FIG. [Figure 6A] 1 is a diagram for explaining an example of a construction pattern applied to the construction pattern verification device according to the present embodiment. FIG. [Figure 6B] 1 is a diagram for explaining an example of a construction pattern applied to the construction pattern verification device according to the present embodiment. FIG. [Figure 7A] 10 is a diagram for explaining an example of the occurrence probability of an operation applied to the construction pattern verification device according to the present embodiment. FIG. [Figure 7B] 10 is a diagram for explaining an example of the occurrence probability of an operation applied to the construction pattern verification device according to the present embodiment. FIG. [Figure 7C] 10 is a diagram for explaining an example of the occurrence probability of an operation applied to the construction pattern verification device according to the present embodiment. FIG. [Figure 8] 4 is a flowchart illustrating an example of a process of the construction pattern verification device according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] The construction pattern verification device 100 according to the present embodiment will be described in detail below with reference to the drawings. Note that the dimensional ratios in the drawings are exaggerated for the convenience of explanation and may differ from the actual ratios.
[0011] (Sand pile compaction method) 1 is a diagram for explaining a construction method to be verified by the construction pattern verification device 100 according to this embodiment. The construction method to which the construction pattern verification device 100 is applied in this embodiment is a construction method in which the ground is compacted by constructing pillar-shaped objects in the ground using a compaction pile construction device 20.
[0012] The method of compacting the ground by constructing pillars in the ground corresponds to, for example, the sand compaction pile method, sand drain method, or static compaction method, which drives back granular material discharged into the ground using a casing to expand the diameter of the pile and compact the surrounding ground. The method may also be a press-in static compaction method or compaction grouting method, in which a mixture of granular material with a fluidizing agent and cement is pressed into the ground.
[0013] The compaction pile construction device 20 according to this embodiment includes a hopper 30, a lifting device 31, a rotation drive device 32, and a casing pipe 33. The hopper 30 is provided on the upper end side of the casing pipe 33, and is a portion for introducing granular material into the casing pipe 33. In this embodiment, the granular material is, for example, sand.
[0014] The lifting device 31 has a lifting motor and a power transmission means for transmitting the rotational force of the lifting motor to the casing pipe 33, and raises and lowers the casing pipe 33 into the ground. The lifting device 31 is also provided with a hydraulic sensor (not shown) for detecting the hydraulic pressure during the lifting and lowering operation of the casing pipe 33. The lifting device 31 is also provided with a depth gauge (not shown) for detecting the depth of the lower end of the casing pipe 33.
[0015] The rotary drive device 32 is a mechanism equipped with a rotary motor and for rotating the casing pipe 33 in any direction. The rotary drive device 32 is also provided with a current sensor (not shown) for detecting the current value of the rotary motor.
[0016] The compaction pile construction device 20 penetrates the casing pipe 33 to a predetermined depth in the ground using the lifting device 31 and the rotary drive device 32. The compaction pile construction device 20 also discharges granular material from the lower end of the casing pipe 33, and compacts the discharged granular material by repeating the process of pulling out the casing pipe 33 and re-penetrating it. The compaction pile construction device 20 may also include a device (speedometer) that measures the penetration speed when the casing pipe 33 is penetrated into the ground.
[0017] In the example shown in Figure 1, the casing pipe 33 attached to the compaction pile construction device 20 is driven into the ground to a specified depth by the rotary drive device 32, and then finely waving is performed to expand the diameter of the pile and increase the N value between the piles. The N value is a numerical value that serves as a reference for determining the compaction and strength of the soil.
[0018] FIG. 2 is a diagram for explaining the construction method. In step A in FIG. 2, the casing pipe 33 is placed at a predetermined position, and a certain amount of sand is poured in through the hopper 30. In step B, the casing pipe 33 is rotated by the rotary drive device 32 while penetrating into the ground. In step C, it is penetrated to a predetermined depth. In step D, the casing pipe 33 is raised to a specified height while discharging the sand inside the casing pipe 33. In step E, the casing pipe 33 is driven back, and the discharged sand and the surrounding ground are compacted. In step F, the construction is performed by wave construction in which steps D and E are repeatedly performed in small steps to expand the diameter.
[0019] That is, in the material discharge operation, compressed air is introduced into the pipe to increase the pressure inside the pipe, and the material is pushed out from the casing pipe 33. In addition, a jet is installed to loosen the material inside the pipe. The material discharge situation varies depending on when and for how long these air supply and jet operations are performed.
[0020] In addition, when constructing one sand pile, the operation method may differ between deep and shallow areas. In areas with a deep depth, the earth pressure and water pressure at the tip of the casing pipe 33 are large, and in order to discharge the material against this, it is necessary to increase the internal pressure in the casing. In areas with a shallow depth, the earth pressure and water pressure at the tip of the casing pipe 33 are not as large as in areas with a deep depth, and it is not necessary to increase the internal pressure in the casing as much as in areas with a deep depth. Therefore, the time required for the air supply operation to inject compressed air into the casing pipe 33 tends to be longer in areas with a deep depth and shorter in areas with a shallow depth. Furthermore, there is a difference between the operation when the casing pipe 33 is pulled out and the operation when the casing pipe 33 is driven back.
[0021] The construction pattern verification device 100 according to the present embodiment is a device for acquiring construction information and verifying the quality of the sand-escape degree (material discharge state) according to the construction pattern in the above-mentioned ground compaction method. Next, the details of the construction pattern verification device 100 will be described.
[0022] (Configuration of the construction pattern verification device 100) FIG. 3 is a block diagram showing the configuration of the construction pattern verification device 100 according to this embodiment. As shown in FIG. 3, the construction pattern verification device 100 may be configured as a system including a general-purpose microcomputer including a control unit 110 (CPU), a storage unit 120 (memory), an input / output IF 130 (Interface), and a communication IF 140. In this case, a computer program for functioning as the construction pattern verification device 100 may be installed in the microcomputer. By executing the computer program, the microcomputer functions as a plurality of information processing circuits included in the construction pattern verification device 100.
[0023] In this embodiment, an example is shown in which a plurality of information processing functions of the construction pattern verification device 100 are realized by software. The construction pattern verification device 100 functions as a plurality of information processing circuits of the construction pattern verification device 100 by executing a computer program.
[0024] In addition, as another configuration, the construction pattern verification device 100 can prepare dedicated hardware for executing each information processing function, and configure the information processing function by a system LSI (Large Scale Integration) etc. In addition, the construction pattern verification device 100 may configure a system with multiple information processing functions by individual hardware.
[0025] The control unit 110 operates based on a program (not shown) stored in the storage unit 120, and executes each function of the construction pattern verification device 100. The program is not limited to being stored in the storage unit 120, and may be stored in, for example, a ROM (not shown) in the construction pattern verification device 100.
[0026] As shown in FIG. 4, the storage unit 120 stores information stored in a construction information database (DB) 121, a pattern information DB 122, and a calculation result information DB 123 in the storage unit 120 as data.
[0027] Furthermore, as described above, the storage unit 120 may store a program for each function executed by the control unit 110. The information and programs stored in the storage unit 120 may be configured as areas that are physically or logically separated within one storage device. Alternatively, the storage units 120 for each data may be configured to be provided in multiple physically different storage devices.
[0028] The input / output IF 130 is an interface for transmitting and receiving data between the construction pattern verification device 100 and the outside. The input / output IF 130 may also be an interface for transmitting and receiving information to be exchanged between the construction pattern verification device 100 and a user (construction manager). The input / output IF 130 includes, for example, an input IF and an output IF (not shown).
[0029] Moreover, the input IF in the input / output IF 130 has an interface function for inputting various information by a user (construction manager), and information may be input from outside the construction pattern verification device 100. Information is input to the input IF by a user through, for example, a keyboard, a mouse, a touch panel, a trackball, and a voice recognition device connected to the construction pattern verification device 100. Moreover, the input IF can input information as a data input terminal for inputting data from an external storage device (not shown) or the like.
[0030] Furthermore, the output IF in the input / output IF 130 can display construction information, pattern information, calculation result information, etc., which will be described later, on a display device (not shown) such as a monitor connected to the construction pattern verification device 100. The display device is, for example, a display device, a projector device, etc.
[0031] The communication IF 140 is, for example, an interface for enabling mutual communication between the construction pattern verification device 100 and an external device.
[0032] (Functional configuration of the construction pattern verification device 100) Fig. 4 is a block diagram showing the functional configuration of the construction pattern verification device 100 according to this embodiment. As shown in Fig. 4, the control unit 110 of the construction pattern verification device 100 includes a construction information acquisition unit 111, a pattern information generation unit 112, a simulation execution unit 113, a calculation result display unit 114, and an operation information selection unit 115 as functions.
[0033] The construction information acquisition unit 111 acquires construction information of the construction performed by the compaction pile construction device 20. In addition, the construction information acquisition unit 111 stores the acquired construction information in the construction information DB 121. Fig. 5 is a diagram for explaining the construction information applied to the construction pattern verification device 100 according to this embodiment.
[0034] As mentioned above, in the case of the compaction method using sand pile driving, when verifying the construction patterns, it is necessary to classify the construction patterns by depth and work content and specify the operations for each.
[0035] For example, when constructing a 15m sand pile, operations of pulling out and driving back the casing pipe 33 in a deep area of 15m to 10m can be considered. In addition, operations of pulling out and driving back the casing pipe 33 in a medium depth area of 10m to 5m and operations of pulling out and driving back the casing pipe 33 in a shallow area of 5m to the ground surface can be considered. In addition, operations during penetration of the casing pipe 33 and operations during material supply can be added as necessary.
[0036] For example, when constructing a 15m sand pile, in the deepest section from 15m to 10m, the operations of pulling out and driving back the casing pipe 33 are each divided into four. In the pulling out work, the air supply operation is ON, the jet operation is OFF, and the exhaust operation is OFF in the first 1 and 2 sections. In the following 3 and 4 sections, all are OFF. In the driving back work, all sections 1 to 3 are OFF, and only the jet operation is ON in the final 4 sections. These operations can be summarized as shown in Figure 5, which shows the relationship between the work content, depth section, section, and jet, air supply, and exhaust.
[0037] In the example shown in FIG. 5, an example of a depth division of 10 m to 15 m is shown, but the settings of each operation are also performed for other depth divisions.
[0038] The construction information acquisition unit 111 also acquires sand level gauge data before and after the target operation as data items. Furthermore, the construction information acquisition unit 111 also acquires information such as the tip depth of the casing pipe 33 as necessary.
[0039] The pattern information generating unit 112 generates a construction pattern (pattern information) based on the construction information. The pattern information generating unit 112 also stores the generated pattern information in the pattern information DB 122.
[0040] Specifically, the pattern information generating unit 112 compares a predetermined threshold value for determining whether sand has escaped or not with the sand level gauge data, and classifies the result as over-extraction, normal, or insufficient.
[0041] This judgment is made based on the total value of the movement of the sand level gauge for one set of operations of pulling out and driving back. Alternatively, evaluation may be made based on the ratio of the casing pulling length to the movement of the sand level gauge for one set of operations of pulling out and driving back. In addition, the evaluation category of the previous set is also used for the extracted set. This makes it possible to obtain the transition status of the sand removal status before and after the specified operation. Note that the previous set does not need to match the specified construction pattern.
[0042] There are a total of nine transition patterns: three patterns from shortage to shortage-normal-overdischarge, three patterns from normal to shortage-normal-overdischarge, and three patterns from overdischarge to shortage-normal-overdischarge. The pattern information generating unit 112 calculates the occurrence probability of each pattern.
[0043] For example, if there are 100 pairs whose evaluation category before the operation is insufficient, of these, 5 pairs whose evaluation category after the operation remains insufficient, 91 pairs whose evaluation category transitions to normal, and 4 pairs whose evaluation category transitions to over-discharge, then the occurrence probabilities are 5%, 91%, and 4%, respectively. These occurrence probabilities represent the probability of transitioning to each evaluation category by performing an operation when the evaluation category before the operation is insufficient, and the sum of each occurrence probability is 100%. The occurrence probabilities are calculated in the same way for evaluation categories before the operation that are normal and over-discharge.
[0044] FIG. 6A shows the occurrence probability of each transition pattern when an operation of a certain pattern A is performed. For example, in the example shown in FIG. 6A, if the evaluation category after performing a specified operation at the deepest part is insufficient, the next operation will result in a 91% probability of becoming normal, and the next operation will result in a 95% probability of becoming normal. FIG. 6B shows the occurrence probability of each transition pattern when an operation of a certain pattern B is performed. For example, pattern B shown in FIG. 6B shows that the transition probability from normal to normal is higher than that of pattern A shown in FIG. 6A.
[0045] The simulation execution unit 113 executes a simulation of the occurrence probability of the good or bad state of the missing material forming the columnar object for the construction pattern. The simulation execution unit 113 also stores the simulation result in the calculation result information DB 123. Specifically, the simulation execution unit 113 executes a simulation of the occurrence probability of insufficient, normal, and overdischarge as the state of the missing material forming the columnar object, and stores the result in the calculation result information DB 123.
[0046] The simulation execution unit 113 also executes a simulation of the occurrence probability by a general Markov chain Monte Carlo method. The Markov chain Monte Carlo method is a method in which a Markov chain, which is a probability model in which the current state depends only on the immediately preceding state, is applied to the Monte Carlo method, which estimates parameters by repeatedly generating random numbers. In other words, the Markov chain Monte Carlo method is a simulation method in which a large number of random numbers corresponding to the Markov chain are generated to find the probability.
[0047] Here, the details of the simulation executed by the simulation execution unit 113 will be described.
[0048] For example, in sand pile construction, a problem arises as to which of Pattern A and Pattern B shown in Figures 6A and 6B should be adopted. A possible method for determining which should be adopted is to calculate the probability of occurrence of insufficient, normal, and excessive discharge after each operation when each operation is performed consecutively, and adopt the one with the higher probability of normal occurrence. For example, the Markov chain Monte Carlo method can be applied to solve this problem.
[0049] Specifically, if the operations of Pattern A and Pattern B are repeated 1,000 times each, and if the initial state is a shortage, the next operation will result in a transition to either a shortage, normal, or over-discharge; this is simulated by generating random numbers.
[0050] For example, three types of random numbers, 0, 1, and 2, are generated on a computer, with 0 representing a shortage, 1 representing normal, and 2 representing over-discharge. After 1,000 repetitions, the probability of transitioning from a shortage to each evaluation category is set to 5%, 91%, and 4%, respectively, in pattern A.
[0051] The simulation execution unit 113 generates random numbers so that the transition probability from normal / overdischarge to each evaluation category is as shown in the table, and obtains the occurrence probability of each evaluation category after repeating 1000 times. In this way, it is possible to know the occurrence probability of normal after repeating pattern A and pattern B 1000 times each.
[0052] 7A and 7B show the results of the probability of each operation calculated by the simulation execution unit 113. The results shown in Fig. 7A and 7B were obtained by the calculation in the simulation execution unit 113, and it can be seen that pattern B shown in Fig. 7B has a higher probability of normal occurrence.
[0053] In this way, by using the Markov chain Monte Carlo method in the simulation execution unit 113, a simulator capable of predicting in advance the construction results according to a construction pattern can be configured.
[0054] For example, when an operator operates the machine manually, the operator can flexibly perform the optimal operation depending on the situation and based on the operator's experience. However, when operating autonomously, the construction pattern must be input into the construction machine in advance, and selecting the construction pattern in advance is important.
[0055] However, by calculating the probability using the construction pattern verification device 100 according to this embodiment, it becomes possible to directly obtain the probability of each evaluation section without using complicated means by the operator.
[0056] In addition, the probability of selectively using pattern A and pattern B cannot be calculated directly if the operator performs complicated procedures without the corresponding construction data. On the other hand, the construction pattern verification device 100 according to this embodiment can also handle cases where, for example, the operation of pattern B is adopted when the situation before the operation is insufficient, and pattern A is adopted otherwise. FIG. 7C shows the calculation result by the simulation execution unit 113 when the operation of pattern B is adopted when the situation before the operation is insufficient, and pattern A is adopted otherwise. In this way, the construction pattern verification device 100 according to this embodiment can calculate the transition probability according to the operation situation shown by multiple patterns.
[0057] The calculation result display unit 114 displays the calculation result in the simulation execution unit 113. For example, the calculation result may be displayed on a display device (not shown) such as a monitor via the input / output IF 130 of the construction pattern verification device 100.
[0058] The operation information selection unit 115 selects operation information based on the results of the simulation displayed on the calculation result display unit 114. Specifically, for example, a user may select operation information to be operated in sand pile construction via the input / output IF 130 based on the calculation results displayed on the calculation result display unit 114. Alternatively, the operation information selection unit 115 may be configured to automatically select appropriate operation information from the calculation results displayed on the calculation result display unit 114 based on a predetermined threshold value set in advance.
[0059] In this way, the construction pattern verification device 100 verifies an appropriate construction pattern for the construction method of constructing sand piles in the ground and compacting the ground. Then, the user can carry out appropriate construction based on the verification result.
[0060] (Outline of processing flow of the construction pattern verification device 100) Next, the flow of processing in the construction pattern verification device 100 will be shown using the flowchart shown in Figure 8. The series of operations of the construction pattern verification device 100 shown in the flowchart in Figure 8 starts when the construction pattern verification device 100 is started, and ends when the work is completed. In addition, the processing in the flowchart shown in Figure 8 also ends when the power is turned off or an interrupt is issued to end the processing. In addition, in the following explanation of the flowchart, the same contents as those described in the explanation of the construction pattern verification device 100 above will be omitted or simplified.
[0061] In step S801, the construction information acquisition unit 111 acquires construction information of the construction performed by the compaction pile construction device 20. In addition, the construction information acquisition unit 111 stores the acquired construction information in the construction information DB 121. After that, the process proceeds to step S802.
[0062] In step S802, the pattern information generating unit 112 generates a construction pattern (pattern information) based on the construction information. The pattern information generating unit 112 also stores the generated pattern information in the pattern information DB 122. After that, the process proceeds to step S803.
[0063] In step S803, the simulation execution unit 113 executes a simulation of the occurrence probability regarding the quality of the missing material forming the columnar object for the construction pattern. The simulation execution unit 113 also stores the simulation result in the calculation result information DB 123. The simulation execution unit 113 executes the simulation a predetermined number of times. The simulation executed by the simulation execution unit 113 is, for example, a simulation using the Markov chain Monte Carlo method. The predetermined number of times corresponds to, for example, 1000 times. After that, the process proceeds to step S804.
[0064] In step S804, the simulation execution unit 113 determines whether the simulation has been executed a predetermined number of times. The predetermined number of times is, for example, 1000 times. In step S804, if the simulation execution unit 113 determines that the execution has been completed a predetermined number of times (step S804: YES), the process proceeds to step S805. On the other hand, in step S804, if the simulation execution unit 113 determines that the execution has not been completed a predetermined number of times (step S804: NO), the process returns to step S803, and the process from step S803 is repeatedly performed.
[0065] In step S805, the calculation result display unit 114 displays the calculation result in the simulation execution unit 113. For example, the calculation result may be displayed on a display device (not shown) such as a monitor via the input / output IF 130 of the construction pattern verification device 100. After that, the process proceeds to step S806.
[0066] In step S806, the control unit 110 judges whether the verification process has been completed. For example, the control unit 110 may judge the completion of the verification process based on a predetermined verification schedule. Alternatively, when the user judges whether to end the process based on the result displayed on the calculation result display unit 114, the control unit 110 may input information regarding whether the user continues the process via the input / output IF 130, and the control unit 110 may judge the end based on the information. Note that the judgment process of the verification process in step S806 is not limited to these processes, and may be judged to be ended based on the end of the process in the construction pattern verification device 100 (control of power off), etc.
[0067] In step S806, if the control unit 110 determines that the verification process has been completed (step S806: YES), the process ends. On the other hand, in step S806, if the control unit 110 determines that the verification process has not been completed (step S806: NO), the process proceeds to step S807.
[0068] In step S807, the operation information selection unit 115 selects operation information based on the results of the simulation displayed on the calculation result display unit 114. Specifically, for example, a user may select operation information to be operated in sand pile construction via the input / output IF 130 based on the calculation results displayed on the calculation result display unit 114. Alternatively, the operation information selection unit 115 may be configured to automatically select appropriate operation information from the calculation results displayed on the calculation result display unit 114 based on a predetermined threshold value set in advance. Thereafter, the process returns to step S803, and the process from step S803 is repeatedly performed.
[0069] As described above, the construction pattern verification device 100 according to this embodiment is a construction pattern verification device 100 that verifies a construction pattern used in the compaction pile construction device 20 that compacts the ground by constructing pillars in the ground. The construction pattern verification device 100 includes a construction information acquisition unit 111 that acquires construction information constructed by the compaction pile construction device 20. The construction pattern verification device 100 also includes a pattern information generation unit 112 that generates a construction pattern based on the construction information. The construction pattern verification device 100 also includes a simulation execution unit 113 that executes a simulation of the occurrence probability regarding the quality of the missing material that forms the pillars for the construction pattern. Furthermore, the construction pattern verification device 100 includes a calculation result display unit 114 that displays the results of the simulation.
[0070] This allows the construction pattern verification device 100 to generate and verify an appropriate construction pattern for a construction method in which sand piles are constructed in the ground and the ground is compacted. Therefore, the user can carry out appropriate construction based on the verification results.
[0071] Furthermore, the simulation execution unit 113 of the construction pattern verification device 100 according to this embodiment may execute a simulation of the occurrence probability of insufficiency, normality, and overdischarge as the state of the missing degree of the material forming the columnar object.
[0072] As a result, the construction pattern verification device 100 can apply each state corresponding to the result of the sand loss amount in the compaction pile construction device 20 to the simulation, thereby making it possible to perform a more accurate simulation of the occurrence probability.
[0073] Moreover, the simulation execution unit 113 of the construction pattern verification device 100 according to this embodiment may execute a simulation of the occurrence probability by the Markov chain Monte Carlo method.
[0074] As a result, the construction pattern verification device 100 can apply the Markov chain Monte Carlo method to the simulation in the simulation execution unit 113, thereby making it possible to carry out more appropriate verification of the construction pattern.
[0075] (Other embodiments) Although the embodiments have been described in detail with reference to the drawings, the present embodiments are not limited to the contents described in the above embodiments. The components described above include those that a person skilled in the art can easily imagine and those that are substantially the same. Furthermore, the configurations described above can be appropriately combined. Various omissions, substitutions, or modifications of the configurations can be made without departing from the spirit of the embodiments.
[0076] In addition, a computer program (construction pattern verification program) that causes a computer to execute the processing in the construction pattern verification device 100 described above, and a computer-readable recording medium on which the program is recorded, are included in the scope of this embodiment. Here, the type of computer-readable recording medium is arbitrary. In addition, the above-mentioned computer program is not limited to one recorded on the above-mentioned recording medium, and may be one transmitted via a network such as an electric communication line, a wireless or wired communication line, or the Internet.
[0077] (Actions, Effects, etc.) The effects of this embodiment will be described below.
[0078] (1) The construction pattern verification device 100 according to the first aspect of the present embodiment is a construction pattern verification device 100 that verifies a construction pattern used in a compaction pile construction device 20 that compacts the ground by constructing pillar-shaped objects in the ground. The construction pattern verification device 100 includes a construction information acquisition unit 111 that acquires construction information constructed by the compaction pile construction device 20. The construction pattern verification device 100 also includes a pattern information generation unit 112 that generates a construction pattern based on the construction information. The construction pattern verification device 100 also includes a simulation execution unit 113 that executes a simulation of the occurrence probability regarding the quality of the missing condition of the material forming the pillar-shaped object for the construction pattern. Furthermore, the construction pattern verification device 100 includes a calculation result display unit 114 that displays the results of the simulation.
[0079] With this configuration, the construction pattern verification device 100 can generate and verify an appropriate construction pattern for a construction method in which sand piles are constructed in the ground and the ground is compacted. This enables the user to carry out appropriate construction based on the verification results.
[0080] (2) The simulation execution unit 113 of the construction pattern verification device 100 according to the second aspect of this embodiment may execute a simulation of the occurrence probability of insufficiency, normality, and overdischarge as the state of the missing degree of the material forming the columnar object.
[0081] With this configuration, the construction pattern verification device 100 can perform a more accurate simulation of occurrence probability by applying each state corresponding to the result of the sand loss amount in the compaction pile construction device 20 to the simulation.
[0082] (3) The simulation execution unit 113 of the construction pattern verification device 100 according to the third aspect of this embodiment may execute a simulation of the occurrence probability by the Markov chain Monte Carlo method.
[0083] With this configuration, the construction pattern verification device 100 can apply the Markov chain Monte Carlo method to the simulation in the simulation execution unit 113, thereby enabling more appropriate verification of the construction pattern.
[0084] (4) A construction pattern verification method according to a fourth aspect of this embodiment is a verification method executed by a computer to verify a construction pattern used in a compaction pile construction device 20 that compacts the ground by constructing pillar-shaped objects in the ground. The construction pattern verification method acquires construction information of construction performed by the compaction pile construction device 20. The construction pattern verification method also generates a construction pattern based on the construction information. The construction pattern verification method also executes a simulation of the occurrence probability of the quality of the missing material forming the pillar-shaped object for the construction pattern. Furthermore, the construction pattern verification method displays the results of the simulation.
[0085] With this configuration, the construction pattern verification method can generate and verify an appropriate construction pattern for a construction method in which sand piles are constructed in the ground and the ground is compacted. This enables a user to carry out appropriate construction based on the verification results. [Explanation of symbols]
[0086] 10. Verification System 20 Compaction pile construction device 30 Hopper 31 Lifting device 32 Rotational drive unit 33 Casing pipe 100 Construction pattern verification device 110 Control section 111 Construction Information Acquisition Department 112 Pattern information generation unit 113 Simulation Execution Department 114 Calculation result display section 115 Operation information selection section 120 Storage section 121 Construction information DB 122 Pattern Information DB 123 Calculation result information DB 130 Input / Output Interface 140 Communication Interface
Claims
1. A construction pattern verification device that verifies a construction pattern used in a compaction pile construction device that compacts the ground by constructing pillar-shaped objects in the ground, A construction information acquisition unit that acquires construction information of the construction performed by the compaction pile construction device; a pattern information generating unit that generates an evaluation category that classifies the discharge status of the material forming the pillar into overdischarge, normal, and insufficient based on the construction information and a predetermined threshold value, and generates the construction pattern including the occurrence probability of the evaluation category before and after the operation of the compaction pile construction device; A simulation execution unit that executes a simulation of the occurrence probability of the evaluation category when the compaction pile construction device is continuously operated for the construction pattern; a calculation result display unit that displays the results of the simulation; A construction pattern verification device comprising:
2. The construction pattern verification device according to claim 1 , wherein the simulation execution unit executes the simulation of the occurrence probability by a Markov chain Monte Carlo method.
3. A verification method for verifying a construction pattern used in a compaction pile construction device that compacts ground by constructing pillars in the ground, the method comprising: Acquire construction information of the construction performed by the compaction pile construction device, Based on the construction information and a predetermined threshold value, an evaluation category is generated in which the discharge status of the material forming the pillar is classified into over-discharge, normal, and insufficient, and the construction pattern is generated including the occurrence probability of the evaluation category before and after the operation of the compaction pile construction device; A simulation is performed on the occurrence probability of the evaluation category when the compaction pile construction device is operated continuously for the construction pattern, A verification method that displays the results of the simulation.
Citation Information
Patent Citations
Soil improving working method
JP2004143708A
Sand discharge method for drive-back type sand compaction pile diving method
JP2008308839A
