AI Technical Summary

Technical Problem

Existing fixing structures for open excavation structures face challenges in maintaining structural safety due to decreased tensile strength of anchors from vibrations, and maintenance like re-tensioning is hindered by obstructions from upper structures.

Method used

A fixing structure comprising a lower slab, walls, and buoyancy-preventing anchors that allow adjustment of fixing force, with exposed anchors enabling re-tensioning, and includes auxiliary anchors for enhanced stability and maintenance.

Benefits of technology

The structure effectively fixes and maintains open-cut structures by allowing re-tensioning of anchors, improving structural safety and durability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 112024095066534-PAT00001_ABST
    Figure 112024095066534-PAT00001_ABST
Patent Text Reader

Abstract

The present invention relates to a fixing structure for a maintainable open-cut structure and a method for constructing an open-cut structure using the same. More specifically, the invention comprises a lower slab provided on the bottom surface of an excavated installation space, walls installed at each end of the lower slab to support the earth pressure on both sides of the installation space, and a plurality of buoyancy-preventing anchor parts provided to fix the lower slab and the walls to the ground below the installation space, wherein the ground fixing force of the lower slab and the walls can be adjusted by operating the buoyancy-preventing anchor part exposed at the top of the wall. According to the present invention as described above, not only can the open-cut structure be firmly fixed, but maintenance such as re-tensioning can also be performed, thereby improving structural safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technology Field

[0001] The present invention relates to a fixing structure and a construction method, and more specifically, to a maintainable fixing structure for an open excavation structure that can improve structural safety by adjusting the fixing force while fixing the open excavation structure using a buoyancy prevention anchor, and a construction method for an open excavation structure using the same. Background Technology

[0002] Generally, when a building structure is constructed, an axial force causing settlement acts due to the structure's own weight, and in the case of structures such as box culverts, sumps, sewage treatment facilities, and underground parking lots, a buoyant force acting to cause flow by groundwater acts.

[0003] In the parts where buoyancy acts, anchors are used to attenuate the load caused by water pressure from groundwater, etc., by securing the anchors to the ground, such as bedrock, thereby preventing buoyancy of the structure.

[0004] As disclosed in the prior registered patent No. 10-1114821, methods using anchors include forming holes in floor concrete, such as the slabs and foundations of a structure, and inserting anchors into the drilled parts so that their ends are connected to the bedrock for fixation.

[0005] In this conventional method, after the structure has cured, holes are drilled in the slabs and floor concrete of the structure to insert anchors, and cement or similar materials are poured to secure the anchors, or manufactured slabs are installed and then fixed using the anchors.

[0006] Afterward, other structures (walls, etc.) are stacked and installed on top of the slab fixed by anchors.

[0007] Here, even if the basement floor is properly compacted and the slab is firmly fixed using anchors, a problem arises where the tensile strength of the anchors decreases due to vibrations, and maintenance such as re-tensioning is carried out to resolve this.

[0008] However, in the conventional case, there is a problem in that maintenance cannot be performed because the upper part of the anchor is obscured by other structures.

[0009] Accordingly, there is an urgent need for the development of technology that can improve structural safety by not only firmly fixing structures but also enabling maintenance such as re-tensioning. The problem to be solved

[0010] Accordingly, the present invention has been devised to resolve the aforementioned problems, and aims to provide a fixing structure for a maintainable open-cut structure and a method for constructing an open-cut structure using the same, wherein the fixing force of the lower slab and the wall in the ground below the installation space is adjusted by operating the buoyancy-preventing anchor exposed at the top of the wall to firmly fix the open-cut structure and improve structural safety by enabling maintenance such as re-tensioning, by including a lower slab provided on the bottom surface of an excavated installation space, walls installed at each end of the lower slab to support the earth pressure on both sides of the installation space, and a plurality of buoyancy-preventing anchors provided to fix the lower slab and the wall in the ground below the installation space. means of solving the problem

[0011] The present invention for achieving the above objective comprises a lower slab provided on the bottom surface of an excavated installation space, walls installed at each end of the lower slab to support the earth pressure on both sides of the installation space, and a plurality of buoyancy-preventing anchor parts provided to fix the lower slab and walls in the ground below the installation space, wherein the ground fixing force of the lower slab and walls can be adjusted by operating the buoyancy-preventing anchor part exposed at the top of the wall.

[0012] Preferably, the wall comprises a plurality of vertical reinforcement sections arranged to form a frame, horizontal reinforcement sections arranged perpendicularly to the vertical reinforcement sections, and a wall body formed by casting to surround the arranged vertical reinforcement sections and horizontal reinforcement sections to form an outer shape, wherein the outer surface is formed to slope outward so that the cross-sectional area gradually increases from the top to the bottom.

[0013] And the above-mentioned buoyancy prevention anchor part comprises an anchor installation hole formed through the wall in the vertical direction, an anchor fixing hole formed through the lower slab to correspond to the anchor installation hole, a buoyancy prevention anchor installed in the ground by penetrating the anchor installation hole and the anchor fixing hole located in a straight line, and an anchor fixing part that fixes the lower slab and the wall, which are integrally formed, to the ground by fixing the upper end of the buoyancy prevention anchor to the upper end of the anchor installation hole.

[0014] In addition, it further includes a re-tensioning adjustment part for re-tensioning the anti-buoyancy anchor fixed to the upper part of the wall by the anchor fixing part.

[0015] Additionally, it further includes an auxiliary buoyancy prevention anchor member installed by obliquely penetrating the integrally formed wall and lower slab to assist the above buoyancy prevention anchor member, and provided between two adjacent buoyancy prevention anchor members.

[0016] The auxiliary buoyancy prevention anchor portion comprises: an auxiliary anchor installation hole formed through the wall in the vertical direction, wherein the upper portion is formed at the upper portion of the inner side of the wall and the lower portion is formed at the lower side of the wall; an auxiliary anchor fixing hole formed through the lower slab to correspond to the auxiliary anchor installation hole, wherein the upper portion is formed at the upper side of the lower slab and the lower portion is formed at the side of the lower slab; an auxiliary buoyancy prevention anchor installed in the ground by penetrating the auxiliary anchor installation hole and the auxiliary anchor fixing hole located in a straight line; and an auxiliary anchor fixing portion that fixes the lower slab and the wall, which are integrally formed, to the ground by fixing the upper portion of the auxiliary buoyancy prevention anchor to the upper portion of the auxiliary anchor installation hole.

[0017] In addition, the method includes an excavation step for excavating the ground to install the above-mentioned open-cut structure, a lower slab mounting step for mounting a lower slab having a plurality of anchor fixing holes on the bottom surface of the excavated installation space, a wall mounting step for mounting a wall having an anchor installation hole corresponding to the anchor fixing hole along each of the two ends of the lower slab, and an underground fixing step for fixing the lower slab and the wall in the ground by fixing them in the ground through the anchor installation hole and the anchor fixing hole located in a straight line using a buoyancy prevention anchor and a buoyancy fixing part.

[0018] And the above excavation step includes an excavation line setting step for setting an excavation line for installing the underground structure, a ground excavation step for excavating the ground along the excavation line, and an excavation completion step for completing the excavation by compacting the bottom and sides of the excavated installation space.

[0019] In addition, the manufacturing step of the lower slab in the lower slab installation step comprises a slab skeleton arrangement step of arranging the first and second reinforcing bars, which are the skeleton, in the formwork; a slab pipe arrangement step of arranging the slab pipes at the location where the anchor fixing holes are to be formed; and a lower slab pouring step of pouring concrete to cover the arranged first and second reinforcing bars.

[0020] And the wall manufacturing step of the above wall installation step includes a wall skeleton reinforcement step of arranging vertical and horizontal reinforcement sections, which are the skeleton, in the formwork; a wall pipe arrangement step of arranging wall pipes at locations to form the anchor installation holes; and a wall pouring step of pouring concrete to cover the arranged vertical and horizontal reinforcement sections.

[0021] In addition, after the above-mentioned underground fixing step, it further includes a maintenance step for maintaining the above-mentioned buoyancy prevention anchor.

[0022] And the above maintenance step includes an elongation verification step for verifying the elongation of the installed buoyancy prevention anchor, a re-tension verification step for verifying whether re-tension is required by comparing the verified elongation with a preset standard tensile force, and a re-tension step for re-tensioning the buoyancy prevention anchor using a re-tension control unit if re-tension is required. Effects of the invention

[0023] As described above, the fixing structure for a maintainable open-cut structure and the method for constructing an open-cut structure using the same according to the present invention are very useful and effective inventions that not only firmly fix the open-cut structure but also enable maintenance such as re-tensioning, thereby improving structural safety. Brief explanation of the drawing

[0024] FIG. 1 is a drawing illustrating a fixing structure of a maintainable open-cut structure according to the present invention, and FIG. 2 is a drawing illustrating a lower slab, a wall, and a buoyancy prevention anchor part according to the present invention, and FIG. 3 is a drawing illustrating a state in which an auxiliary buoyancy prevention anchor part according to the present invention is further provided, and FIG. 4 is a drawing illustrating a method for constructing an open-cut structure according to the present invention, and FIG. 5 is a drawing illustrating an excavation step according to the present invention, and FIG. 6 is a drawing illustrating the manufacturing steps of a lower slab according to the present invention, and FIG. 7 is a drawing illustrating the manufacturing steps of a wall according to the present invention, and FIG. 8 is a drawing illustrating a state further including a maintenance step according to the present invention. Specific details for implementing the invention

[0025] Hereinafter, preferred embodiments according to the present invention will be described in detail with reference to the accompanying drawings. The detailed description disclosed below, together with the accompanying drawings, is intended to describe exemplary embodiments of the present invention and is not intended to represent the only embodiment in which the present invention may be practiced. The following detailed description includes specific details to provide a complete understanding of the present invention. However, those skilled in the art will know that the present invention may be practiced without such specific details.

[0026] In some cases, to avoid obscuring the concept of the present invention, known structures and devices may be omitted or illustrated in the form of a block diagram focusing on the core functions of each structure and device.

[0027] Throughout the specification, when a part is described as "comprising" or "including" a component, this means that, unless specifically stated otherwise, it does not exclude other components but may include additional components. Furthermore, the term "...part" as used in the specification refers to a unit that performs at least one function or operation. Additionally, "one (a or an)," "one," "the," and similar related terms may be used in the context describing the invention (particularly in the context of the following claims) to include both singular and plural forms, unless otherwise indicated in the specification or clearly contradicted by the context.

[0028] In describing the embodiments of the present invention, specific descriptions of known functions or configurations will be omitted if it is determined that such detailed descriptions could unnecessarily obscure the essence of the invention. Furthermore, the terms described below are defined in consideration of their functions in the embodiments of the present invention, and these definitions may vary depending on the intentions or practices of the user or operator. Therefore, such definitions should be based on the content throughout this specification.

[0029] Hereinafter, preferred embodiments of the present invention will be described with reference to the attached drawings.

[0030] FIG. 1 is a drawing illustrating a fixing structure of a maintainable open-cut structure according to the present invention, FIG. 2 is a drawing illustrating a lower slab, a wall, and a buoyancy prevention anchor part according to the present invention, FIG. 3 is a drawing illustrating a state in which an auxiliary buoyancy prevention anchor part is further provided according to the present invention, FIG. 4 is a drawing illustrating a construction method of an open-cut structure according to the present invention, FIG. 5 is a drawing illustrating an excavation step according to the present invention, FIG. 6 is a drawing illustrating a manufacturing step of a lower slab according to the present invention, FIG. 7 is a drawing illustrating a manufacturing step of a wall according to the present invention, and FIG. 8 is a drawing illustrating a state in which a maintenance step according to the present invention is further included.

[0031] As illustrated in the drawing, the fixed structure of the maintainable open-cut structure includes a lower slab (100), a wall (200), and a buoyancy-preventing anchor part (300).

[0032] The lower slab (100) is provided on the bottom surface of the excavated installation space (10).

[0033] And the walls (200) are installed at each end of the lower slab (100) to support the earth pressure on both sides of the installation space (10).

[0034] A plurality of buoyancy prevention anchors (300) are provided to fix the lower slab (100) and the wall (200) to the ground below the installation space (10).

[0035] According to the fixing structure of such a maintainable open-cut structure, the underground fixing force of the lower slab (100) and the wall (200) can be adjusted by operating the buoyancy prevention anchor part (300) exposed at the top of the wall (200).

[0036] For this purpose, the lower slab (100) includes a first reinforcing bar section (110), a second reinforcing bar section (120), and a slab body (130), as shown in FIG. 2.

[0037] The first reinforcing bar section (110) is arranged in multiple numbers to form a skeleton.

[0038] In addition, the second reinforcing bar (120) is arranged to be orthogonal to the first reinforcing bar (110).

[0039] The slab body (130) is poured to surround the arranged first reinforcing bar section (110) and second reinforcing bar section (120) to form an outer shape.

[0040] The first reinforcing bar section (110) and the second reinforcing bar section (120) are arranged in multiple numbers at the upper and lower portions respectively inside the slab body (130), and further include a lower reinforcing bar maintenance section (150) for maintaining the spacing between the first reinforcing bar section (110) arranged at the upper portion and the first reinforcing bar section (110) arranged at the lower portion.

[0041] This lower reinforcement maintenance part (150) is installed and poured when the first reinforcement part (110) and the second reinforcement part (120) are reinforced.

[0042] On the upper and lower surfaces of the lower reinforcement retaining part (150), a reinforcement retaining seating groove (151) is formed to allow the first reinforcement part (110) to be seated, thereby maintaining the reinforcement state, and a plurality of through holes (153) are formed so that concrete poured inside can be inserted.

[0043] Accordingly, the lower reinforcement maintenance part (150) allows the first reinforcement parts (110) that are reinforced in the upper and lower parts to be easily seated and maintained in position, and concrete can be inserted and poured through a plurality of through holes (153) to improve durability.

[0044] And the wall (200) includes a vertical reinforcement section (210), a horizontal reinforcement section (220), and a wall body (230).

[0045] The vertical reinforcing bars (210) are arranged in multiple numbers to form a skeleton.

[0046] In addition, the horizontal reinforcement (220) is arranged to be orthogonal to the vertical reinforcement (210).

[0047] The wall body (230) is cast to surround the arranged vertical reinforcement section (210) and horizontal reinforcement section (220) to form an outer shape, and the outer surface is formed to slope outward so that the cross-sectional area gradually increases from the top to the bottom.

[0048] Here, the slab body (130) and the wall body (230) are cast together and manufactured as a single unit.

[0049] And the buoyancy prevention anchor part (300) includes an anchor installation hole (310), an anchor fixing hole (320), a buoyancy prevention anchor (330), and an anchor fixing part (340).

[0050] The anchor installation hole (310) is formed through the wall (200) in the vertical direction.

[0051] In addition, the anchor fixing hole (320) is formed through the lower slab (100) to correspond to the anchor installation hole (310).

[0052] The buoyancy prevention anchor (330) is installed in the ground by passing through the anchor installation hole (310) and the anchor fixing hole (320) located in a straight line.

[0053] And the anchor fixing part (340) fixes the upper part of the buoyancy prevention anchor (330) to the upper part of the anchor installation hole (310) to fix the lower slab (100) and wall (200) formed integrally in the ground.

[0054] Here, the anchor installation hole (310) and the anchor fixing hole (320) are formed after the lower slab (100) and the wall (200) are manufactured, or during the manufacturing of the lower slab (100) and the wall (200).

[0055] When the lower slab (100) and wall (200) are formed in this anchor installation hole (310) and anchor fixing hole (320), the lower slab (100) is poured together with the slab pipe (140), and the wall (200) is poured together with the wall pipe (240).

[0056] These buoyancy prevention anchors (330) are installed through the interior of the wall pipe (240) and slab pipe (140) installed in the anchor installation hole (310) and anchor fixing hole (320).

[0057] In particular, the slab pipe (140) is installed through the through hole (153) of the lower reinforcement maintenance part (150).

[0058] Accordingly, the slab pipe (140), the first reinforcing bar section (110), and the second reinforcing bar section (120) can be firmly cast in the lower reinforcing bar maintenance section (150), thereby improving more stable position maintenance and durability.

[0059] And the anti-buoyancy anchor part (300) is re-tensioned by the re-tension control part (500).

[0060] This re-tensioning adjustment part (500) is provided for re-tensioning (re-tensioning) of the anti-buoyancy anchor (330) fixed to the upper part of the wall (200) by the anchor fixing part (340).

[0061] This re-tensioning adjustment unit (500) lifts the anchor fixing unit (340) upward by hydraulic pressure, and then inserts a wedge plate into the lifted space to maintain the re-tensioned state of the anti-buoyancy anchor (330).

[0062] And the fixed structure of the maintainable open-cut structure further includes an auxiliary buoyancy prevention anchor part (400) as shown in FIG. 3.

[0063] This auxiliary buoyancy prevention anchor part (400) is installed by penetrating the wall (200) and the lower slab (100) at an angle to assist the buoyancy prevention anchor part (300), and is provided between two adjacent buoyancy prevention anchor parts (300, 300').

[0064] This auxiliary buoyancy prevention anchor part (400) includes an auxiliary anchor installation hole (410), an auxiliary anchor fixing hole (420), an auxiliary buoyancy prevention anchor (430), and an auxiliary anchor fixing part (440).

[0065] The auxiliary anchor installation hole (410) is formed through the wall (200) in the vertical direction, with the upper part formed at the upper part of the inner surface of the wall and the lower part formed at the lower surface of the wall.

[0066] Additionally, the auxiliary anchor fixing hole (420) is formed through the lower slab (100) to correspond to the auxiliary anchor installation hole (410), with the upper portion formed on the upper side of the lower slab (100) and the lower portion formed on the side of the lower slab (100).

[0067] The auxiliary buoyancy prevention anchor (430) is installed in the ground by penetrating the auxiliary anchor installation hole (410) and the auxiliary anchor fixing hole (420) located in a straight line.

[0068] And the auxiliary anchor fixing part (440) fixes the upper part of the auxiliary buoyancy prevention anchor (430) to the upper part of the auxiliary anchor installation hole (410) to fix the lower slab (100) and wall (200) formed integrally in the ground.

[0069] Accordingly, the lower slab (100) and the wall (200) are fixed vertically by the buoyancy prevention anchor part (300), and at the same time, are fixed vertically by the auxiliary buoyancy prevention anchor part (400).

[0070] In other words, the buoyancy prevention anchor part (300) fixes the lower slab (100) and the wall (200) into the ground at the bottom of the installation space (10), and the auxiliary buoyancy prevention anchor part (400) fixes the lower slab (100) and the wall (200) into the ground at the side of the installation space (10).

[0071] In addition, the auxiliary buoyancy prevention anchor part (400) is re-tensioned by the re-tension control part (500).

[0072] This re-tensioning adjustment part (500) is provided for re-tensioning the anti-buoyancy anchor (330) fixed to the upper part of the wall (200) by the anchor fixing part (340).

[0073] A construction method for an open-cut structure using a fixing structure of such a maintainable open-cut structure includes an excavation step (S100), a lower slab installation step (S200), a wall installation step (S300), and an underground fixing step (S400), as illustrated in FIG. 4.

[0074] The excavation step (S100) excavates the ground for installing an open-cut structure.

[0075] Then, the lower slab mounting step (S200) mounts a lower slab (100) having a plurality of anchor fixing holes (320) on the bottom surface of the excavated installation space.

[0076] The wall mounting step (S300) involves mounting a wall (200) having an anchor installation hole (310) corresponding to an anchor fixing hole (320) along each of the two ends of the lower slab (100).

[0077] Additionally, the underground fixing step (S400) fixes the lower slab (100) and the wall (200) in the ground by using a buoyancy prevention anchor (330) and a buoyancy fixing part (340) to penetrate the anchor installation hole (310) and the anchor fixing hole (320) located in a straight line and fix them in the ground.

[0078] For this purpose, the excavation step (S100) includes an excavation line setting step (S110), a ground excavation step (S120), and an excavation completion step (S130), as illustrated in FIG. 5.

[0079] The excavation line setting step (S110) sets an excavation line for installing an underground structure.

[0080] And the ground excavation step (S120) excavates the ground along the excavation line.

[0081] The excavation completion step (S130) completes the excavation by compacting the bottom and sides of the excavated installation space (10).

[0082] In addition, when looking at the manufacturing step (S210) of the lower slab (100) in the lower slab installation step (S200), as shown in FIG. 6, it includes a slab frame reinforcement step (S211), a slab pipe arrangement step (S212), and a lower slab pouring step (S213).

[0083] The slab frame reinforcement step (S211) involves reinforcing bars (110, 120) that are the frame into the formwork.

[0084] Then, the slab pipe arrangement step (S212) arranges the slab pipes (140) at the location where the anchor fixing hole (320) is to be formed.

[0085] The lower slab pouring step (S213) pours concrete to cover the reinforced bars (110, 120).

[0086] Accordingly, a slab pipe (140) is installed inside the lower slab (100) to form an anchor fixing hole (320).

[0087] Here, when the lower reinforcement maintenance part (150) is installed, the lower reinforcement maintenance part (150) is placed together with the slab frame reinforcement step (S211) to maintain the spacing between the first reinforcement part (110) arranged at the top and the first reinforcement part (110) arranged at the bottom.

[0088] Then, in the slab pipe arrangement step (S212), the slab pipe (140) is arranged so as not to be connected to other components, or is positioned in the through hole (153) of the lower reinforcement retaining part (150).

[0089] In the lower slab pouring step (S213), they are poured together to maintain the correct position of each component, and the durability of the lower slab (100) can be improved.

[0090] In addition, when looking at the manufacturing step (S310) of the wall (200) in the wall installation step (S300), as shown in FIG. 7, it includes a wall frame reinforcement step (S311), a wall pipe arrangement step (S312), and a wall pouring step (S313).

[0091] The wall frame reinforcement step (S311) involves reinforcing bars (210, 220), which are the frame, into the formwork.

[0092] And the wall pipe arrangement step (S312) arranges the wall pipes (240) at the location where the anchor installation hole (310) is to be formed.

[0093] The wall pouring step (S313) pours concrete to cover the reinforced steel (210, 220).

[0094] Accordingly, a wall pipe (240) is installed inside the wall (200) to form an anchor installation hole (320).

[0095] And as illustrated in FIG. 8, the construction method of an open-cut structure using a fixed structure of a maintainable open-cut structure further includes a maintenance step (S500).

[0096] This maintenance step (S500) maintains the anti-buoyancy anchor (330) after the underground fixing step (S400).

[0097] These maintenance steps (S500) include an elongation verification step (S510), a re-tension verification step (S520), and a re-tension step (S530).

[0098] The elongation amount verification step (S510) verifies the elongation amount of the installed buoyancy prevention anchor (330).

[0099] In addition, the re-tension verification step (S520) checks whether to re-tension by comparing the verified elongation amount with a preset standard tensile force.

[0100] In the re-tensioning step (S530), if re-tensioning is required, the buoyancy prevention anchor (330) is re-tensioned using the re-tensioning control unit (500).

[0101] It is natural that the stretch amount verification step (S510), the re-tension verification step (S520), and the re-tension step (S530) are performed repeatedly at regular intervals.

[0102] Accordingly, the problem of being unable to maintain the lower slab (100) by fixing it with a conventional buoyancy prevention anchor and covering the upper part with a wall can be resolved, allowing the lower slab (100) and the wall (200) to be simultaneously fixed and re-tensioned, thereby enabling maintenance.

[0103] Here, the maintenance stage (S500) naturally includes maintenance of the auxiliary buoyancy prevention anchor part (400) as well as the buoyancy prevention anchor part (300). Explanation of the symbols

[0104] 100 : Lower slab 200 : Wall 300 : Anti-buoyancy anchor section 400 : Auxiliary anti-buoyancy anchor section 500 : Re-tension control section

Claims

Claim 1 It comprises: a lower slab (100) provided on the bottom surface of an excavated installation space; walls (200) formed at each end of the lower slab to support the earth pressure on both sides of the installation space; and a plurality of buoyancy prevention anchors (300) provided to fix the lower slab and the walls to the ground below the installation space; wherein the walls are cast together with the lower slab to be manufactured as a single unit, and the upper end of the buoyancy prevention anchors (300) is exposed to the upper end of the walls so as to be operable from the outside, and the lower slab (100) comprises a plurality of first reinforcing bar sections (110) arranged to form a frame; and a second reinforcing bar section (120) arranged perpendicularly to the first reinforcing bar sections (110). The structure includes a slab body (130) formed by pouring concrete to surround the first reinforcing bar section (110) and the second reinforcing bar section (120) arranged therein to form an outer shape; wherein the first reinforcing bar section (110) and the second reinforcing bar section (120) are arranged in multiple numbers at the upper and lower portions respectively inside the slab body (130), and further includes a lower reinforcing bar maintenance section (150) for maintaining the spacing between the first reinforcing bar section arranged at the upper portion and the first reinforcing bar section arranged at the lower portion; wherein a reinforcing bar maintenance seating groove (151) is formed on the upper and lower surfaces of the lower reinforcing bar maintenance section (150) to allow the first reinforcing bar section (110) to be seated thereon to maintain the reinforcing state, and a plurality of through holes (153) are formed to allow concrete poured inside to be inserted, and the buoyancy prevention anchor section (300) is formed by installing a wall pipe (240) inside the wall (200) in the vertical direction An anchor installation hole (310) formed through; an anchor fixing hole (320) formed through by installing a slab pipe (140) inside the lower slab to correspond to the anchor installation hole; a buoyancy prevention anchor (330) installed in the ground by penetrating the anchor installation hole and the anchor fixing hole located in a straight line; and an anchor fixing part (340) that fixes the lower slab and wall, which are integrally formed, to the ground by fixing the upper end of the buoyancy prevention anchor to the upper end of the anchor installation hole.A fixing structure for a maintainable open-cut structure, comprising, wherein the slab pipe (140) is positioned to penetrate the through hole (153) of the lower reinforcement retaining part (150) and is cast together with the lower reinforcement retaining part when the lower slab is cast, thereby being fixed integrally. Claim 2 delete Claim 3 delete Claim 4 delete Claim 5 A method for constructing an open-cut structure using a fixing structure of a maintainable open-cut structure, comprising: an excavation step for excavating the ground to install the open-cut structure of claim 1; a lower slab placement step for placing a lower slab having a plurality of anchor fixing holes on the bottom surface of the excavated installation space; a wall placement step for placing a wall having an anchor installation hole corresponding to the anchor fixing hole along each of the two ends of the lower slab; an underground fixing step for fixing the lower slab and the wall in the ground by penetrating the anchor installation hole and the anchor fixing hole located in a straight line using a buoyancy prevention anchor and a buoyancy fixing part; and a maintenance step for maintaining the buoyancy prevention anchor after the underground fixing step. Claim 6 delete Claim 7 delete Claim 8 delete Claim 9 delete Claim 10 delete

Citation Information

Patent Citations

  • Construction work for anchor for reinforcing bottom slab of underground structure

    JP1987236918A

  • Support pile structure for large-span structural element

    JP1993214724A

  • Underground tank and its constructing method

    JP2000144772A

  • Underground structure

    JP2004060232A