Segmented free precast concrete column having a hollow portion
The segmentless precast concrete column with a hollow section addresses self-weight and construction inefficiencies by using a metal lath and deck plate for visual confirmation and structural reinforcement, ensuring stable and efficient construction.
Patent Information
- Application Number
- KR1020260109306
- Authority / Receiving Office
- KR · KR
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2026-06-16
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2046-06-16
AI Technical Summary
The construction of large cross-section precast concrete columns is hindered by excessive self-weight, leading to inefficiencies and safety risks in segmented construction methods, and hollow formation methods face challenges with internal formwork deformation and uneven concrete filling.
A segmentless precast concrete column with a hollow section is manufactured using a metal lath and deck plate to visually confirm concrete solidity, distribute lifting loads, and prevent deformation, featuring a T-shaped bend for structural reinforcement and a lifting hole for stable lifting.
This approach reduces self-weight, ensures structural integrity, and enables safe, efficient, and cost-effective construction of large cross-section columns with reduced on-site operations and improved resistance to lateral forces.
Smart Images

Figure 112026072872176-PAT00001_ABST
Abstract
Description
Technology Field
[0001] The disclosed content relates to a precast concrete column that is manufactured in advance in a factory to increase construction efficiency in architectural and civil engineering structures, and has a longitudinal hollow section formed inside to reduce self-weight and ensure functionality. Background Technology
[0003] Unless otherwise indicated in this specification, the contents described in this section are not prior art for the claims of this application, and are not to be recognized as prior art simply because they are included in this section.
[0005] Precast concrete (hereinafter referred to as 'PC') is a method in which major structural members of buildings and civil engineering structures are pre-fabricated in a factory according to standardized processes and assembled on-site. Compared to the cast-in-place method, it offers advantages such as reduced construction time, uniform quality, and reduced on-site waste. With the recent surge in demand for logistics centers, super-large data centers, and high-rise buildings, the cross-sections of column members designed to support the self-weight of structures and resist lateral forces are becoming increasingly larger. Consequently, the adoption of large PC columns equipped with high-strength concrete and high-density reinforcement is becoming commonplace.
[0006] Meanwhile, general PC columns are designed as solid structures with the entire cross-section filled with concrete. However, large solid columns with high floor heights and large cross-sections inevitably cause problems with excessive self-weight. Currently, the equipment capacity of domestic and international PC manufacturing plants, the loading capacity of transport trailers, and the allowable lifting load of tower cranes and hydro cranes operated on-site are typically limited to around 20 tons. Therefore, if a column member with a large cross-sectional area and high floor height exceeds this weight limit, 'segmented construction,' which involves cutting a single column vertically, is required.
[0007] This segmented construction method exposes several critical flaws in terms of constructability, stability, and economics. First, it leads to a decline in construction efficiency and safety. As the number of segments increases, the number of lifting operations increases proportionally, and repetitive connection work in high-altitude environments poses a risk of worker falls and causes project delays. Second, it results in increased economic costs. The segmented method incurs costs for connecting fittings and additional lifting expenses. While the steel-concrete composite column method, which allows for segmentless construction, is sometimes used as an alternative to avoid these costs, it undermines overall construction economics due to higher material unit costs compared to the PC method.
[0008] To overcome this, hollow PC column technology has been proposed to drastically reduce self-weight by hollowing out the core of the column. The hollow structure can reduce weight by more than 40–50% while efficiently maintaining the column's rotational moment of inertia, enabling segmentless construction for a single lifting operation. However, conventional hollow formation methods present serious challenges in terms of internal mold control and quality management.
[0009] The most persistent problem is the fluidity of the internal formwork during concrete pouring. If the internal formwork shifts out of place or deforms due to the high pouring pressure and buoyancy of the concrete, the concrete cover thickness on the outer perimeter becomes uneven, leading to structural defects. In particular, when using closed internal formwork, there is absolutely no way to visually verify whether the concrete has been densely filled (filling rate) up to the lowest parts and corners of the column body. This leads to the "honeycomb" phenomenon, which is discovered only after demolding, causing the discarding of structural members or incurring massive repair costs.
[0010] In addition, when the outer concrete thickness is minimized (e.g., around 150 mm) to reduce self-weight, the existing embedded lifting anchor method poses a high risk of causing splitting failure or cone failure of the concrete due to the localized concentration of tensile loads. Therefore, for the commercialization of large, segmentless PC columns, there is an urgent need for advanced technical solutions, such as preventing deformation of the internal formwork, real-time visual verification of the casting completion rate, and a penetrating lifting system that can guarantee structural safety even in thin sections. Prior art literature
[0012] Republic of Korea Patent Registration No. 10-1178381 (Registered August 23, 2012) Republic of Korea Patent Registration No. 10-2586712 (Registered October 4, 2023) Republic of Korea Patent Registration No. 10-0999020 (Registered December 1, 2010) The problem to be solved
[0013] The present invention provides a segmentless precast concrete column having a hollow section that enables the manufacturing and construction of a large cross-section precast concrete column in a segmentless state by forming a hollow section partitioned by metal lath and a deck plate inside the main body of the column to reduce self-weight for segmentless construction, and by placing metal lath on the bottom side during concrete pouring so that the solidity of the pouring can be visually confirmed, and by providing angle steel on the edge side of the deck plate to prevent deformation due to lateral pressure of pouring, and at the same time forming a bonding structure with the deep concrete through the T-shaped bend and reinforcing steel formed in the deck plate, and by forming a lifting hole through the top of the column so that lifting is performed by inserting a shaft.
[0014] Furthermore, it is evident that the technical challenges described above are not limited to those mentioned above, and that other technical challenges may be derived from the following description. means of solving the problem
[0016] As one embodiment, a segmentless precast concrete column having a hollow section is presented as an embodiment, characterized by comprising: a column body manufactured by a precast method, having a hollow section formed longitudinally through the interior with open top and bottom ends; a main reinforcing bar embedded longitudinally in the column body; a metal lath positioned in one direction inside the column body to form a boundary surface between the column body and the hollow section, installed in a position facing the floor surface during concrete pouring according to the precast method so as to visually confirm the solidity of the concrete; and a deck plate positioned in the remaining direction inside the column body where the metal lath is not positioned to complete the boundary surface between the column body and the hollow section.
[0017] According to a preferred feature of the disclosed content, the column body is formed with a thickness of 150 mm, and the upper and lower parts of the column body, into which a sleeve for connecting the main reinforcing bar is embedded, may be formed with a thickness of 200 mm.
[0018] According to a preferred feature of the disclosed content, lifting holes penetrating along the same horizontal line are formed on both upper sides of the column body to distribute the load and maintain the horizontal level of the column body during lifting, and lifting shafts can be inserted into the lifting holes on both sides.
[0019] According to a preferred feature of the disclosed content, a plurality of transverse reinforcing bars are stacked at regular intervals in the hollow portion, and the ends of the transverse reinforcing bars are connected to the main reinforcing bars while extending to the outside of the deck plate through a through hole formed in the deck plate, and the through hole through which the transverse reinforcing bars are positioned can be sealed by a sealing member to prevent leakage of concrete when pouring concrete according to the precast method.
[0020] According to a preferred feature of the disclosed content, the metal lath can be replaced with an inspection-type deck plate in which inspection holes are formed through at regular intervals.
[0021] According to a preferred feature of the disclosed content, the deck plate comprises a plurality of unit plates formed with both longitudinal ends bent, arranged along the circumferential direction inside the column body, wherein the bent ends of adjacent unit plates are overlapped and protrude toward the hollow portion to form a T-shaped bent portion.
[0022] According to a preferred feature of the disclosed content, a plurality of angle steel members may be provided on the horizontal and vertical edge sides of the deck plate to provide structural reinforcement against lateral pressure during concrete pouring according to the precast method.
[0023] According to a preferred feature of the disclosed content, reinforcing bars may be connected to the plurality of T-shaped bends to generate resistance against the lateral load of the column body. Effects of the invention
[0025] According to one embodiment of the disclosed content, a segmentless precast concrete column having a hollow section is formed inside the column body by a metal lath and a deck plate, thereby enabling a significant reduction in self-weight for segmentless construction. As a result, even though the column has a large cross-section, on-site installation is possible with only one lifting operation, which shortens the construction period and minimizes the cost of renting large equipment.
[0026] Secondly, by placing metal lath on the bottom surface side during concrete pouring so that the pouring condition can be visually checked, manufacturing defects such as underfilling or material separation that chronically occurred when using conventional closed formwork can be completely prevented in advance, thereby ensuring the structural integrity of the member.
[0027] Thirdly, angle steel is provided on the edge side of the deck plate to prevent deformation of the internal formwork due to lateral pressure from pouring, thereby accurately maintaining the design dimensions of the column and increasing the joint strength of the corner section, thereby maintaining stability during the manufacturing and transportation process.
[0028] Fourth, by forming a strong shear connection structure with the deep concrete to be poured on-site later through the T-shaped bends and reinforcing bars formed in the deck plate, the precast body and the internal filler behave as a single structure, which can significantly improve resistance performance against upper loads and lateral forces, thereby enabling perfect integral behavior with the cast-in-site concrete.
[0029] Fifth, a lifting hole is formed through the upper part of the column body, and lifting is performed by a shaft inserted horizontally into this lifting hole, thereby evenly distributing the load even on thin outer concrete sections to prevent local failure, and the erection and installation of large columns can be performed more safely and precisely.
[0030] Therefore, the disclosed content has an excellent effect of simultaneously solving the safety problems of existing segmented construction methods and the economic problems of expensive composite column construction methods by enabling large-section precast concrete columns to be manufactured and constructed in a non-segmented state. Brief explanation of the drawing
[0032] FIG. 1 is a perspective view of a segmentless precast concrete column having a hollow portion according to one embodiment of the disclosed content. FIG. 2 is a perspective view showing the assembled state of the internal formwork before concrete pouring of the column body in a segmentless precast concrete column having a hollow section according to one embodiment of the disclosed content. FIG. 3 is a partially cutaway perspective view of a segmentless precast concrete column having a hollow section according to one embodiment of the disclosed content. FIG. 4 is a partial enlarged view of FIG. 3 of a segmentless precast concrete column having a hollow portion according to one embodiment of the disclosed content. FIG. 5 is a plan view of FIG. 2 of a segmentless precast concrete column having a hollow portion according to one embodiment of the disclosed content. FIG. 6 is a construction structure diagram of a segmentless precast concrete column having a hollow section according to one embodiment of the disclosed content. FIG. 7 is a perspective view of an inspection port-type deck plate that can be replaced with metal lath in a segmentless precast concrete column having a hollow portion according to one embodiment of the disclosed content. Specific details for implementing the invention
[0033] The advantages and features of the disclosed content and the methods for achieving them are described in detail below together with the accompanying drawings. Hereinafter, the configuration, operation, and effects of a preferred embodiment will be examined with reference to the accompanying drawings. For reference, in the drawings below, each component is omitted or schematically illustrated for convenience and clarity, and the size of each component does not reflect its actual size. Furthermore, throughout the specification, the same reference numerals refer to the same components, and reference numerals for the same configuration in individual drawings will be omitted.
[0035] A segmentless precast concrete column having a hollow section according to one embodiment of the disclosed content is designed to reduce self-weight for segmentless construction by forming a hollow section partitioned by a metal lath and a deck plate inside the column body. It may include a column body manufactured by a precast method, having a hollow section formed longitudinally through the interior with open top and bottom ends, a main reinforcing bar embedded longitudinally in the column body, a metal lath positioned in one direction inside the column body to form a boundary surface between the column body and the hollow section, and installed in a position facing the floor surface during concrete pouring according to the precast method so as to visually confirm the solidity of the concrete, and a deck plate positioned in the remaining direction inside the column body where the metal lath is not positioned to complete the boundary surface between the column body and the hollow section.
[0037] First, referring to FIG. 1, a column body (10) is provided. This column body (10) forms the overall shape of a segmentless precast concrete column (1) having a hollow section according to the disclosed content, and at the same time serves to provide the constituent members to be described later. This column body (10) is manufactured by a precast method, and a hollow section (11) with an open top and bottom is formed through the interior in the longitudinal direction.
[0038] As a result of forming a hollow portion (11) inside the column body (10) in this manner, the self-weight can be reduced compared to a solid precast column of the same cross-section. Accordingly, the column body (10) can be manufactured and delivered to the site without being segmented, and the high-altitude connection work performed at the site can be performed relatively less.
[0039] Furthermore, the column body (10) is formed by pre-casting at a precast factory, and then concrete is poured into the hollow section (11) after the on-site installation is completed. That is, the column body (10), which is shaped like a square column with a hollow interior, is installed at the site in a pre-fabricated state at the factory, and after the installation is completed, concrete is filled into the hollow section (11), thereby finally forming an internally filled integral concrete column structure. Accordingly, construction efficiency is secured due to the reduction of self-weight during the manufacturing and transportation stages, and structural integrity can be secured by the concrete inside the hollow section (11) after construction is completed.
[0040] Meanwhile, the column body (10) is formed with a thickness of 150 mm, but the upper and lower parts of the column body (10), into which a sleeve for connecting the main reinforcing bar (20) is embedded, may be formed with a thickness of 200 mm. This is to ensure that space is secured for embedding the sleeve, thereby ensuring stable coverage thickness and anchoring performance of the concrete around the sleeve. In addition, since the upper and lower parts are areas that act as column connection parts, relatively large stress may be concentrated therein, so the local structural rigidity can be improved by increasing the thickness. At this time, the 200 mm thickness area may be formed on both the upper and lower parts of the column body (10), or selectively formed on either the upper or lower part, depending on the installation location, the shape of the structure to be connected, and construction conditions.
[0041] Additionally, lifting holes (12) are formed on both upper sides of the column body (10). These lifting holes (12) serve to distribute the load and maintain a horizontal state during the lifting of the column body (10). These lifting holes (12) are formed through on the same horizontal line, and lifting shafts (80) are inserted into the lifting holes (12) on both sides.
[0042] In particular, the lifting shaft (80) is connected to the lifting belt while being fixed through the column body (10) via the lifting holes (12) on both sides, so that the lifting load is not concentrated in a specific buried section but can be effectively distributed across the entire cross-section of the column body (10). That is, in the case of a general conventional buried lifting head structure, the lifting load is concentrated in the concrete of a part of the area where the lifting head is buried, so local tensile and shear stresses are likely to be concentrated in the concrete around the buried section, and especially during the process of lifting a precast concrete column with a large cross-section, there was a risk of concrete cracking, peeling of the covering, or local damage occurring.
[0043] On the other hand, the lifting shaft (80) according to the disclosed content supports the load while penetrating the column body (10), so that the lifting load can be distributed and transmitted to the entire cross-section of the column body (10), and accordingly, the phenomenon of tensile and shear stress being concentrated in the concrete around some embedded parts can be mitigated. In addition, the risk of local concrete cracking, damage, and spalling of cover concrete that may occur during the lifting process can be reduced. Furthermore, it is formed to enable more stable load support even when lifting a column body (10) with a large cross-section. Also, although not shown, a separate sealing means (not shown) may be provided in the lifting hole (12) to prevent the leakage of concrete through the lifting hole (12) when concrete is poured into the hollow part (11) after the column body (10) is installed.
[0045] Next, referring to FIG. 2, main reinforcing bars (20) are embedded in the aforementioned column body (10). These main reinforcing bars (20) serve to resist axial compressive force and bending load of the column body (10). These main reinforcing bars (20) are arranged along the longitudinal direction of the column body (10) and are formed to be embedded along the outer edge of the column body (10).
[0046] In particular, the main reinforcing bar (20) is formed to improve cross-sectional efficiency by being placed in the outer concrete area of the hollow section (11). Additionally, the ends of the main reinforcing bar (20) are formed to protrude to the upper and lower parts of the column body (10) so that reinforcing bar connections with adjacent structures are possible.
[0047] Meanwhile, a plurality of transverse reinforcing bars (70) are arranged in the aforementioned hollow section (11). These transverse reinforcing bars (70) serve to suppress the buckling of the main reinforcing bars (20) and, at the same time, improve the transverse structural stability of the column body (10). These transverse reinforcing bars (70) are stacked at regular intervals along the longitudinal direction of the hollow section (11).
[0048] Both ends of these transverse reinforcing bars (70) are connected to the main reinforcing bars (20) while extending outward from the deck plate (40) through a through hole (43) formed in the deck plate (40), which will be described later, before pre-casting at the precasting plant. Accordingly, the structural bonding strength between the transverse reinforcing bars (70) and the main reinforcing bars (20) is improved, and the structural integrity between the hollow portion (11) filled with post-cast concrete and the column body (10) is also improved.
[0050] Next, referring to FIGS. 2 and 3, a metal lath (30) is placed in one direction inside the aforementioned column body (10). This metal lath (30) serves to form a boundary surface between the column body (10) and the hollow part (11), and at the same time allows the solidity of the concrete to be visually checked during concrete pouring according to the precast method. This metal lath (30) has a mesh structure formed by weaving multiple wires to intersect, and is installed in a position facing the floor surface during concrete pouring.
[0051] That is, in the process of arranging the internal formwork for concrete pouring in the precast factory, the metal lath (30) is arranged so that the surface on which it is formed faces the floor. Accordingly, the worker can visually check through the metal lath (30) whether the concrete is fully filled into the lower area of the hollow section (11). In addition, since the presence of unfilled concrete or voids can be easily checked, the reliability of the quality of the column body (10) can be ensured.
[0052] Meanwhile, as shown in FIG. 7, the metal lath (30) can be replaced with an inspection-type deck plate (90) when pouring concrete according to the precast method. This is to prepare for cases where excessive leakage is a concern due to the high fluidity of the concrete, and while preventing excessive leakage of concrete, it is possible to visually check whether the concrete is fully filled through the inspection holes (91) formed at regular intervals. This inspection-type deck plate (90) is formed in the same shape as the deck plate (40) to be described later, which is composed of a plurality of unit plates (41), but instead of a through hole (43), an inspection hole (91) is formed.
[0053] In addition, the entire metal lath (30) may be replaced with an inspection-type deck plate (90), but depending on the conditions, the metal lath (30) and the inspection-type deck plate (90) may be installed together. When installed together, the metal lath (30) and the inspection-type deck plate (90) may be arranged alternately, divided into two sides by a predetermined reference line, or overlapped with each other.
[0054] Alternate placement can be applied when the fluidity of the concrete is uneven in sections or when the shape around the internal formwork for forming the hollow section is complex, resulting in different risks of concrete leakage depending on the area. That is, an inspection-type deck plate (90) with a low opening ratio is placed in sections with a relatively high risk of leakage, and a metal lath (30) is placed in sections with a low risk of leakage, thereby optimizing the filling performance and leakage suppression performance of the concrete for each section.
[0055] The arrangement, which is divided by a predetermined reference line, can be applied when the concrete pouring pressure or flow characteristics are clearly distinguished based on the upper and lower parts of the column or a specific horizontal cross-section. For example, if the lateral pressure acting on the lower part is high during the initial pouring stage or if the concrete fluidity in the lower part is particularly high due to the mixing conditions, the inspection-type deck plate (90) can be placed in the corresponding section and the metal lath (30) can be placed in the remaining section, allowing for reasonable differentiation according to construction conditions.
[0056] The case where they are arranged in an overlapping manner can be applied when the concrete slump is very high or a large amount of fluidizing agent is added, and it is determined that a single material alone is insufficient to suppress outflow. In this case, a metal lath (30) with a relatively large opening ratio is placed on the inside, and an inspection-type deck plate (90) with a small opening ratio is placed on the outside. Thus, the metal lath (30) on the inside ensures adhesion performance with the concrete and uniform filling, while the inspection-type deck plate (90) on the outside can ultimately block excessive outflow of the concrete. In this way, the openings of the two materials overlap, resulting in a significantly lower actual opening ratio, and stable construction becomes possible even in environments where high-fluidity concrete is used.
[0058] Next, referring to FIG. 3, a deck plate (40) is placed in the remaining direction where the metal lath (30) is not placed inside the aforementioned column body (10). This deck plate (40) completes the boundary surface between the column body (10) and the hollow section (11), and at the same time serves as a formwork that does not need to be removed when concrete is poured into the hollow section (11). That is, the aforementioned hollow section (11), which has a virtual rectangular column shape, forms four boundary surfaces with the inner surface of the column body (10). Among them, one boundary surface in the shape of a straight line is formed by the aforementioned metal lath (30), and the remaining boundary surface in the shape of a square is formed by the deck plate (40), thereby completing the entire boundary surface in the shape of a square.
[0059] Meanwhile, the aforementioned deck plate (40) is composed of a plurality of unit plates (41). These unit plates (41) are formed with a shape in which both ends in the longitudinal direction are bent, and a plurality of them are arranged in a └┘ shape along the perimeter in the direction other than the direction in which the metal lath (30) is placed inside the column body (10). In particular, the bent ends of adjacent unit plates (41) are formed to protrude toward the hollow portion (11) while overlapping each other, thereby forming a plurality of T-shaped bent portions (42). As these T-shaped bent portions (42) are positioned within the hollow portion (11) where concrete is to be poured, the resistance performance of the column body (10) is improved, and the adhesion performance between the column body (10) and the concrete to be filled within the hollow portion (11) is improved. The shape and size of such T-shaped bent portions (42) can be varied.
[0060] Additionally, as described above, a through hole (43) is formed in the deck plate (40) to allow a transverse reinforcing bar (70) to pass through, which is connected to the main reinforcing bar (20), and a sealing member (44) is provided in the through hole (43). This sealing member (44) serves to prevent the leakage of concrete through the through hole (43) when concrete is poured according to the precast method. This sealing member (44) is formed of PVC or synthetic resin material, and by sealing the area around the through hole (43) even when the transverse reinforcing bar (70) is passed through, concrete leakage is prevented, thereby ensuring stable quality of the column body (10).
[0062] Next, referring to FIG. 4, angle steel members (50) are installed on the horizontal and vertical edges of the aforementioned deck plate (40). These angle steel members (50) reinforce the structural rigidity of the deck plate (40) and serve to resist lateral pressure generated when concrete is poured into the hollow section (11). These angle steel members (50) are arranged at regular intervals along the corner or edge area of the deck plate (40).
[0063] Such an angle steel member (50) is installed by welding or bolting the deck plate (40), and accordingly, the deck plate (40) can be prevented from bending or spreading during the concrete pouring process in the hollow section (11), and the shape of the hollow section (11) can be maintained stably.
[0065] Next, referring to FIG. 5, a reinforcing bar (60) is connected to the aforementioned T-shaped bend (42). This reinforcing bar (60) serves to improve the resistance performance against lateral loads of the column body (10), and a plurality of them are installed at regular intervals within the hollow section (11) while connected to a plurality of T-shaped bends (42). At this time, the deck plate (40) is arranged in a └┘ shape by the arrangement of the unit plate (41), and as the reinforcing bar (60) is connected to the T-shaped bend (42), the reinforcing bar (60) is also arranged in a corresponding └┘ shape.
[0066] These reinforcing bars (60) are embedded together within the concrete poured into the hollow section (11), thereby improving the local stiffness around the T-shaped bend (42). In addition, the structural stability of the cross-section is maintained even when a lateral load or a repetitive load is applied to the column body (10).
[0067] Both such reinforcing steel bars (60) and the aforementioned angle steel bars (50) serve to reinforce the rigidity of the column body (10). Only one of the angle steel bars (50) and reinforcing steel bars (60) may be selectively installed, but it is of course possible to install both as needed.
[0070] Finally, the overall construction method using a segmentless precast concrete column (1) having a hollow section according to the disclosed content with reference to FIG. 6 is described as follows.
[0072] First, a segmentless precast concrete column (1) having a hollow section, manufactured in a precast factory, is installed on a foundation or substructure. At this time, a lifting shaft (80) is inserted into lifting holes (12) formed on both upper sides of the column body (10), and the lifting shaft (80) is connected to lifting equipment. Accordingly, the column body (10) can be stably lifted and installed while standing upright.
[0073] After the installation of the column body (10) is completed, a precast concrete beam is placed on top of the column body (10). During this process, the main reinforcing bar (20) protruding from the upper part of the column body (10) is connected to the reinforcing bar of the precast concrete beam, and reinforcing bar connection through a sleeve can be performed as needed.
[0074] After the installation of the precast concrete beam is completed, multiple half-slabs are placed and assembled on top of the precast concrete beam. Accordingly, the formwork function for forming the floor structure is secured, and a workspace for cast-in-place concrete is provided.
[0075] Next, concrete is poured into the hollow portion (11) of the column body (10). At this time, the concrete fills between the transverse reinforcing bars (70) placed inside the hollow portion (11) and is combined with the T-shaped bent portion (42) of the deck plate (40), thereby more effectively securing structural integrity with the column body (10).
[0076] In addition, along with the pouring of concrete inside the hollow section (11), additional on-site concrete is poured on the upper part of the half slab. Accordingly, the column body (10), precast concrete beam, and floor structure are integrated, and the structural stability of the entire frame structure is improved.
[0077] A non-segmental precast concrete column (1) having a hollow section according to the disclosed content is formed in a structure that is self-supporting even before concrete is poured inside the hollow section (11), thereby enabling the construction of precast concrete beams and half slabs to proceed immediately after the installation of the column body (10). Accordingly, compared to conventional segmental precast concrete columns, the number of lifting operations and connection tasks are reduced, and the overall construction process can be simplified and the construction period shortened.
[0080] Although preferred embodiments of the present invention have been described above with reference to the attached drawings, the embodiments described in this specification and the configurations illustrated in the drawings are merely the most preferred embodiments of the present invention and do not represent all technical concepts of the present invention. Therefore, it should be understood that various equivalents and modifications that can replace them may exist at the time of filing this application. Accordingly, the embodiments described above should be understood as illustrative in all respects and not restrictive, and the scope of the present invention is defined by the claims set forth below rather than by the detailed description. Furthermore, all modifications or variations derived from the meaning and scope of the claims and equivalent concepts should be interpreted as being included within the scope of the present invention. Explanation of the symbols
[0082] 1: Segmentless precast concrete column with a hollow section 10: Pillar body 11 : Chinese government 12 : Lifting hole 20 : Main reinforcement 30 : Metalass 40 : Deck plate 41 : Unit plate 42 : T-shaped bend 43 : Through hole 44 : Sealing member 50 : Angle steel 60 : Reinforcing steel 70 : Transverse reinforcement 80: Lifting shaft 90 : Inspection hatch type deck plate 91 : Inspection port
Claims
Claim 1 A non-segmental precast concrete column having a hollow section, comprising: a column body manufactured by a precast method, wherein a hollow section with open top and bottom ends is formed penetrating longitudinally within the column body; main reinforcing bars embedded longitudinally in the column body; metal lath disposed in one direction inside the column body to form a boundary surface between the column body and the hollow section, and installed in a position facing the floor surface during concrete pouring according to the precast method so as to visually confirm the solidity of the concrete; and a deck plate disposed in the remaining direction inside the column body where the metal lath is not disposed to complete the boundary surface between the column body and the hollow section; wherein the column body is formed with a thickness of 150 mm, and the top and bottom portions of the column body, into which sleeves for connecting the main reinforcing bars are embedded, are formed with a thickness of 200 mm. Claim 2 A segmentless precast concrete column having a hollow section, comprising: a column body manufactured by a precast method, having a hollow section formed longitudinally through the interior with open top and bottom ends; main reinforcing bars embedded longitudinally in the column body; metal lath disposed in one direction inside the column body to form a boundary surface between the column body and the hollow section, installed in a position facing the floor surface during concrete pouring according to the precast method so as to visually check the solidity of the concrete; and a deck plate disposed in the remaining direction inside the column body where the metal lath is not disposed to complete the boundary surface between the column body and the hollow section; wherein the metal lath can be replaced with an inspection-hole type deck plate having inspection holes formed through it at regular intervals. Claim 3 A segmentless precast concrete column having a hollow portion according to claim 1 or claim 2, wherein lifting holes penetrating along the same horizontal line are formed on both upper sides of the column body to distribute the load and maintain the horizontal level of the column body during lifting, and lifting shafts are inserted into the lifting holes on both sides. Claim 4 A non-segmental precast concrete column having a hollow portion according to claim 1 or claim 2, wherein a plurality of transverse reinforcing bars are stacked at regular intervals in the hollow portion, the ends of the transverse reinforcing bars are connected to the main reinforcing bars while extending to the outside of the deck plate through a through hole formed in the deck plate, and the through hole into which the transverse reinforcing bars are penetrated is sealed by a sealing member to prevent leakage of concrete during concrete pouring according to the precast method. Claim 5 delete Claim 6 A segmentless precast concrete column having a hollow portion according to claim 1 or claim 2, wherein the deck plate comprises a plurality of unit plates formed with both longitudinal ends bent, arranged along the circumferential direction inside the column body, and wherein the bent ends of adjacent unit plates protrude toward the hollow portion in a state where they overlap each other to form a T-shaped bent portion. Claim 7 A segmentless precast concrete column having a hollow portion, characterized in that, in claim 1 or claim 2, a plurality of angle steel members are provided on the horizontal and vertical edge sides of the deck plate for structural reinforcement against lateral pressure during concrete pouring according to the precast method. Claim 8 A segmentless precast concrete column having a hollow section according to claim 6, characterized in that reinforcing bars are connected to the plurality of T-shaped bending sections to generate resistance against the lateral load of the column body.
Citation Information
Patent Citations
Radiation pipe disposing structure for refrigerator
JP1995103636A
Column structural form
KR1020120121628A
Combination structure of permanent concrete form and prefabricated reinforced concrete column assembly
KR1020180079748A
Concrete pile lifting structure
KR1020200113941A
Precast hollow column structure using compression-type sleeve and the construction method thereof
KR1020220101353A