Standard bridge structure completed
LAP279AUndetermined Publication Date: 2018-12-31KUROSAWA CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- LAP279
- Authority / Receiving Office
- LA · LA
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2013-09-11
- Publication Date
- 2018-12-31
Smart Images

Figure 00000000_0000_ABST
Abstract
In a standard prefabricated bridge structure, the main girder is constructed with the main girders extending out as precast concrete from one girder to another between the bridge legs by the method of extending the girders. The steel and concrete structures are prepared by joining them together and are constructed in a continuous horizontal section. First, the precast steel is prepared continuously at the top of the main girder except for the middle girder so that the closing section and the second precast steel are prepared to pass through the bottom of the middle girder and connect to the adjacent girders at the bending point. The first precast steel is prepared at the top of the main girder and the second precast steel is prepared at the bottom of the main girder of the middle girder and is secured with tension to form a compressive force for the concrete of the main girder.
Need to check novelty before this filing date? Find Prior Art
