Concrete-embeddable formwork-anchor bracket

Internal anchor devices integrated into poured concrete structures address the issue of surface damage from external anchor blocks, enhancing construction efficiency by eliminating repair needs.

US20260357589A1Pending Publication Date: 2026-11-12GREMORE COREY R
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
US19/460343
Authority / Receiving Office
US · United States
Patent Type
Applications(United States)
Current Assignee / Owner
Priority Date
2025-05-06
Filing Date
2026-01-27
Publication Date
2026-11-12

AI Technical Summary

Technical Problem

Existing construction methods cause damage to existing concrete surfaces when securing formwork with external anchor blocks, necessitating additional repair steps.

Method used

The use of internal, embeddable anchor devices that are permanently integrated into the poured concrete structure, eliminating the need for post-construction repairs by being embedded within the concrete.

Benefits of technology

Accelerates construction by eliminating the need for post-construction repairs and maintaining the integrity of the existing concrete surface.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure US20260357589A1-D00000_ABST
    Figure US20260357589A1-D00000_ABST
Patent Text Reader

Abstract

An anchor device is configured to couple wooden formwork onto a concrete surface for pouring a subsequent concrete structure into the wooden formwork, whereby the anchor device is configured to be permanently embedded within the poured concrete structure to prevent exterior damage to the existing concrete surface. In some examples, the anchor device includes an L-shaped body with a plurality of spacing pegs extending outward therefrom.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present technology is generally related to construction, and in particular, the use of poured concrete.BACKGROUND

[0002] Most modern structures feature some form of concrete foundation. During construction, liquid concrete is poured into a temporary wooden frame (or “formwork”) and allowed to dry (or “cure”) over a period of time.SUMMARY OF THE DISCLOSURE

[0003] The present disclosure is directed to devices and related methods for “anchoring” a wooden formwork in place over an existing concrete surface while an additional concrete structure is poured into the form. In some examples, an anchor device is configured to be permanently embedded within the poured concrete structure to prevent exterior damage to the existing concrete surface. In some such examples, the anchor device includes an L-shaped body with a plurality of spacing pegs extending therefrom.

[0004] The details of one or more aspects of the disclosure are set forth in the accompanying drawings and the description below. Other features, objects, and advantages of the techniques described in this disclosure will be apparent from the description and the drawings, and from the claims.BRIEF DESCRIPTION OF THE DRAWINGS

[0005] The disclosure can be more completely understood in consideration of the following detailed description of various embodiments of the disclosure, in connection with the accompanying drawings, in which:

[0006] FIG. 1A is a perspective view of an example prior-art system for pouring a concrete structure onto an existing concrete surface.

[0007] FIG. 1B is a cross-sectional side-profile view of the prior-art system of FIG. 1A.

[0008] FIG. 2 is a cross-sectional side-profile view of an improved system for pouring a concrete structure onto an existing concrete surface, including a concrete-embedded formwork-anchoring device.

[0009] FIG. 3A is a perspective view of a first example of the anchoring device of FIG. 2.

[0010] FIG. 3B is a side-profile view of the anchoring device of FIG. 3A.

[0011] FIG. 3C is a front view of the anchoring device of FIGS. 3A & 3B.

[0012] FIG. 3D is a back view or rear view of the anchoring device of FIGS. 3A-3C.

[0013] FIG. 3E is a top view or overhead view of the anchoring device of FIGS. 3A-3D.

[0014] FIG. 3F is a bottom view or underside view of the anchoring device of FIGS. 3A-3E.

[0015] FIG. 4A is a perspective view of another example of the anchoring device of FIG. 2.

[0016] FIG. 4B is a side-profile view of the anchoring device of FIG. 4A.

[0017] FIG. 4C is a front view of the anchoring device of FIGS. 4A & 4B.

[0018] FIG. 4D is a back view or rear view of the anchoring device of FIGS. 4A-4C.

[0019] FIG. 4E is a top view or overhead view of the anchoring device of FIGS. 4A-4D.

[0020] FIG. 4F is a bottom view or underside view of the anchoring device of FIGS. 4A-4E.

[0021] FIG. 5A is a perspective view of another example of the anchoring device of FIG. 2.

[0022] FIG. 5B is a cross-sectional side-profile view of the anchoring device of FIG. 5A.

[0023] FIG. 5C is a front view of the anchoring device of FIGS. 5A & 5B.

[0024] FIG. 5D is a back view or rear view of the anchoring device of FIGS. 5A-5C.

[0025] FIG. 5E is a top view or overhead view of the anchoring device of FIGS. 5A-5D.

[0026] FIG. 5F is a bottom view or underside view of the anchoring device of FIGS. 5A-5E.

[0027] FIG. 6 is a cross-sectional side-profile view of another example of the system of FIG. 2, including another example of the concrete-embedded formwork-anchoring device.

[0028] FIG. 7A is a perspective view of another example of the anchoring device of FIG. 6.

[0029] FIG. 7B is a cross-sectional side-profile view of the anchoring device of FIG. 7A.

[0030] FIG. 7C is a front view of the anchoring device of FIGS. 7A & 7B.

[0031] FIG. 7D is a back view or rear view of the anchoring device of FIGS. 7A-7C.

[0032] FIG. 7E is a top view or overhead view of the anchoring device of FIGS. 7A-7D.

[0033] FIG. 7F is a bottom view or underside view of the anchoring device of FIGS. 7A-7E.

[0034] FIG. 8A is a perspective view of another example of the anchoring device of FIG. 6.

[0035] FIG. 8B is a cross-sectional side-profile view of the anchoring device of FIG. 8A.

[0036] FIG. 8C is a front view of the anchoring device of FIGS. 8A & 8B.

[0037] FIG. 8D is a back view or rear view of the anchoring device of FIGS. 8A-8C.

[0038] FIG. 8E is a top view or overhead view of the anchoring device of FIGS. 8A-8D.

[0039] FIG. 8F is a bottom view or underside view of the anchoring device of FIGS. 8A-8E.

[0040] FIG. 9 is a flowchart illustrating a method of using a novel anchoring device to form a concrete structure.

[0041] While examples of this disclosure are amenable to various modifications and alternative forms, specifics thereof shown by way of example in the drawings will be described in detail. It should be understood, however, that the intention is not to limit the disclosure to the particular examples described.DETAILED DESCRIPTION

[0042] FIGS. 1A and 1B depict a high-level example of a typical system 100 for constructing a poured-concrete structure 102 (e.g., a concrete curb or ledge) on top of an existing concrete surface 104, in accordance with current industry-standard practices. In general, the concrete system 100 includes a temporary formwork 106—here, a parallel pair of elongated wooden boards 106A / 106B defining opposite lateral sidewalls of the poured-concrete structure 102. Additionally, a plurality of curved rebar hooks 108A-108D are spaced longitudinally along the interior of the wooden formwork 106 to structurally reinforce the concrete structure 102 after it cures.

[0043] Finally, the concrete system 100 includes a plurality of wooden “anchor” blocks 110 configured to temporarily secure the formwork 106 (specifically, wooden board 106A) in place while the poured concrete 102 cures. The anchor blocks 110 are typically bolted or nailed into the existing concrete surface 104, along the exterior side(s) of the formwork 106. As illustrated in the cross-sectional side-profile view of FIG. 1B, the nails or bolts 112 securing the anchor blocks 110 necessarily cause at least some degree of damage (114) to the concrete surface 104. The damage 114 is exposed after the newly poured concrete structure 102 cures and the wooden formwork 106 and its anchor blocks 110 are removed from the site. Accordingly, construction projects of this nature typically require an additional stage to repair and / or conceal the damage 114 to the concrete surface 104, whether for cosmetic reasons, structural reasons, or both.

[0044] Thus, the present disclosure is directed to novel systems, devices, and associated techniques for anchoring the wooden formwork 106 in place overtop the existing concrete surface 104 while liquid concrete is poured into the formwork 106 to build an additional concrete structure 102, without requiring repairs to the surface 104 afterward. For an illustrative example, FIG. 2 is a cross-sectional side-profile view of a poured-concrete system 200 featuring one or more improvements over the system 100 shown in FIGS. 1A and 1B.

[0045] For instance, in substitution of the wooden anchor blocks 110 of the “typical” system 100, the improved system 200 includes at least one novel formwork-anchoring device 210 (hereinafter, “anchor device 210” or “anchor bracket 210”) as detailed and described herein. That is, unlike the “external” anchor blocks 110 arranged along the exterior of the formwork 106, the anchor bracket 210 is an “internal” (or “integral” or “interior”) device configured to be permanently embedded within the poured-concrete structure 102. As shown in FIG. 2, under this “internal” or “embedded” configuration, the underlying “damage” from the anchor bolt 112 to the existing concrete surface 104 from the anchor bolt 112 becomes a “feature” rather than a “bug,” as the bolt 112 is never removed from the site. In this way, the construction process is greatly accelerated by eliminating the “repair and / or conceal” step at the end of the process.

[0046] The anchor device 210, including the various example implementations thereof as shown and described throughout this disclosure, can be formed from any suitably rigid material. Examples include: plastics, such as acrylonitrile butadiene styrene (ABS) plastic, polylactic acid (PLA) plastic, polyethylene terephthalate glycol-modified (PETG) plastic, polycarbonate, etc. ; carbon-fiber; metal; wood; ceramics; and / or a combination thereof.

[0047] FIG. 3A-3F illustrate a first non-limiting example implementation 310 of the formwork-anchor device 210 of FIG. 2. The anchor device 310 includes a main body 316 that, when viewed from a side-profile perspective (e.g., FIGS. 2 and 3B) generally conforms to an “L” shape. More specifically, the main body 316 includes both a “vertical” or “upright” portion 318A and a “horizontal” or “lower” portion 318B arranged perpendicular to one another, with a curved or sloped rear surface 318C extending therebetween. The vertical portion 318A defines a “front” or “forward” surface 320 configured to be oriented facing an interior surface of the wooden formwork 106 (FIG. 2).

[0048] A plurality of spacing pegs 322 (or “offset pins 322”) extend outward from the front surface 320. In the present example, the anchor device 310 includes three spacing pegs 322A-322C mutually arranged in a generally triangular configuration—it is to be understood that other examples of the anchor device 310 can include more, fewer, and / or differently arranged spacing pegs 322 without departing from the scope of the present disclosure. A front-most surface 324 of each peg 322 is configured to contact the interior surface of the wooden formwork 106.

[0049] In some examples, the anchor device 310 includes a designated fastening region 326, e.g., located on (or defined by) the front surface 320 of the main body 316 between the pegs 322. During use, an anchor pin 212 (FIG. 2), such as a nail, screw, or bolt, is punched through from the exterior surface of the wooden formwork 106 into the fastening region 326 in order to temporarily secure the formwork 106 in place while the poured-concrete structure 102 cures. That is, the anchor device 310 is bolted (112) to the concrete surface 104, and then the wooden formwork 106 is temporarily nailed or screwed (212) to the front surface 320 of the anchor device 310. When the liquid concrete is poured into the formwork 106, the concrete fills the gaps and spaces in between the pegs 322, and overtop of the main body 316 in order to permanently retain the anchor device 310 within the interior of the resulting concrete structure 102. After the concrete structure 102 cures, the formwork 106 can be decoupled (e.g., unscrewed) from the fastening region 326 and discarded. The fastening region 326 can be a perforated, pre-drilled (e.g., threaded), cross-hatched, and / or “thinner” region of the front surface 320 that facilitates nailing or screwing into the vertical portion 318A of the main body 316.

[0050] In some examples (but not all examples), the horizontal lower portion 318B of the main body 316 defines one or more tap holes (or “anchor holes”) 328 for permanently coupling (e.g., nailing, screwing, or bolting) the bottom-most surface 330 of the anchor device 310 onto the existing concrete surface 104.

[0051] FIG. 4A-4F illustrate another example implementation 410 of the anchor device 210 of FIG. 2. The anchor device 410 still includes a substantially “L” shaped main body 416 featuring a “vertical” or “upright” portion 418A and a “horizontal” lower portion 418B. But unlike the example device 310 shown in FIG. 3A-3F, the anchor device 410 does not have a unitary curved rear surface 318C. Instead, two curved sidewalls 432A, 432B are positioned on opposite sides of the L-shaped main body 416. The open central region between the two sidewalls 432 facilitates the inclusion of additional tap hole(s) 328, i.e., two or more tap holes 328 rather than just one.

[0052] Similar to the anchor device 310 described above, the vertical upright portion 418A of the main body 416 defines a “front” or “forward” surface 420, whereby a plurality of spacing pegs 422 extend perpendicularly outward from the front surface 420. In this example, the anchor device 410 includes just two spacing pegs 422A, 422B, positioned along a common vertical plane—other examples of the anchor device 410 can include more, fewer, and / or differently arranged spacing pegs 422 without departing from the scope of this disclosure.

[0053] In some examples of the anchor device 410, the user is able to adjust or customize the “spacing” distance between the front surface 420 of the anchor device 410 and the interior surface of the wooden formwork 106A (FIG. 2). For instance, the spacing pegs 422 may be, or may include, threaded screws that can be screwed deeper or shallower into the vertical portion 418A of the main body 416 to adjust the spacing distance as needed. As a non-limiting example, the spacing pegs 422 can be, or can include, set screws and / or torque-style screws with a T-25-type screwhead.

[0054] FIG. 5A-5F illustrate another example implementation 510 of the anchor device 210 of FIG. 2. In this example, the anchor device 510 includes a simple “L” shaped main body 516 featuring a “vertical” or “upright” portion 518A and a “horizontal” lower portion 518B. As a non-limiting illustrative example, the L-shaped main body 516 can include an approximately 3-inch vertical portion 518A and an approximately 3-inch horizontal portion 518B oriented at a 90° angle to one another. Each portion 518 can have a thickness between about ⅛-inch and about 3 / 16-inch, in some examples.

[0055] Consistent with the prior examples, the vertical portion 518A defines a “front” or “forward” surface 520, whereby a plurality of spacing pegs 522 extend perpendicularly outward from the front surface 520. In this example, the anchor device 510 includes two pegs 522A, 522B arranged along a common vertical plane.

[0056] Similar to the example device 410 described above, in some examples, the user is able to adjust or customize the spacing distance between the front surface 520 of the anchor device 510 and the interior surface of the wooden formwork 106A (FIG. 2). For instance, the spacing pegs 522 may be or may include threaded screws that can be screwed deeper or shallower into the upright portion 518A of the main body 516 to adjust the offset distance. As an example, the spacing pegs 522 can be, or can include, 1.5-inch-long set screws and / or torque-style screws with a T-25-type screwhead.

[0057] FIG. 6 is a cross-sectional side-profile view of another example 600 of the improved concrete system 200 of FIG. 2, including another example 610 of the concrete-embedded formwork-anchoring device 210. In this example, the anchor device 610 is configured to attach to a section of reinforcement rebar—such as the rebar hooks 108 shown in FIG. 1A—either instead of, or in addition to, being bolted directly to the concrete surface 104.

[0058] FIG. 7A-7F illustrate an example implementation 710 of the anchor devices 210, 610, configured for such an application. As shown in FIG. 7A-7F, the anchor device 710 includes a semi-cylindrical rebar clip 736 supported by a generally triangular central structure 718C extending between the upright portion 718A and the horizontal lower portion 718B of the main body 716. The rebar clip 736 is configured to firmly retain a length of rebar 108 (FIGS. 1B and 6) extending horizontally therethrough. In some examples, but not all examples, the horizontal lower portion 718B may additionally include one or more tap holes 328 (as in FIG. 7A) to further secure the device 710 to the concrete surface 104.

[0059] FIG. 8A-8F illustrate another example implementation 810 of the anchor devices 210 and 610 of FIGS. 2 and 6, respectively. In this example, each of the spacing pegs 822A, 822B, of the anchor device 810 includes a retainer washer 838 aligned coaxially with the respective peg. Simply put, the retainer washers 838 provide the device 810 with additional surface area in order to increase the amount of mutual contact between the poured-concrete structure 102 (FIGS. 2 and 6) and the anchor device 810 embedded therein, thereby improving the retention of the device 810 within the concrete 102.

[0060] In some applications, the user might prefer to finish (e.g., polish, sand, coat, paint, etc.) the exterior of the completed concrete structure 102, i.e., after removal of the wooden formwork 106 from the cured concrete. For such cases, the front ends 824 of the spacing pegs 822 can be formed into a concave (or inverted) cone shape rather than the flat surface shown in the previous examples. In such configurations, the pegs'front ends 824 function as detents to guide the end of a drill bit (e.g., a ¼th-inch drill bit) to bore out some of the surrounding material. The resulting bore can then be plugged, and then painted-over or otherwise coated as needed.

[0061] It is to be generally understood that the anchor devices shown and described throughout this disclosure may be scaled without significantly departing from the scope of the claimed subject matter. For instance, the example devices 810 of FIG. 8A-8F are generally shown to be about 3 inches (e.g., between about 2.5 inches and about 3.5 inches) in height, in order to accommodate a standard wooden “2×4” making up the formwork 106. In other cases, the wooden formwork 106 may use boards that extend even higher, for instance, around 8 inches or more. In such cases, the anchor device(s) 810 may be scaled up to a comparable height, while maintaining its overall structure and functionality.

[0062] FIG. 9 is a flowchart illustrating a method 900 of using a novel embeddable formwork-anchoring device to form a concrete structure overtop an existing concrete surface. At Step 902, the method 900 includes assembling a wooden formwork 106 so as to define the exterior boundaries (i.e., sidewalls) of the concrete structure 102 to be formed.

[0063] At Step 904, the method 900 further includes securing a set of novel concrete-embeddable formwork-anchor devices 210 to the existing concrete surface 104, e.g., by bolting the devices directly to the surface 104 and / or indirectly by clipping the devices to reinforcing rebar 108 embedded therein.

[0064] At Step 906, the method 900 further includes securing the anchor devices 210 to the formwork 106, e.g., by placing an interior surface of the formwork 106 against the devices'spacing pegs, and then temporarily screwing through the formwork and into the main bodies of the anchor devices.

[0065] At Step 908, the method 900 further includes pouring liquid concrete into the wooden formwork 106, i.e., directly overtop the anchor devices 210 such that the devices become permanently embedded therein. At Step 910, the method 900 further includes allowing the poured concrete to cure for a predetermined amount of time.

[0066] After sufficiently curing, at Step 912, the method 900 further includes removing and discarding the wooden formwork 106 from the newly formed concrete structure 102, e.g., by unscrewing the formwork 106 from the embedded anchor devices 210.

[0067] The example embodiments referenced above have been chosen, described, and illustrated so that persons skilled in the art will be able to understand the invention and the manner and process of making and using it. The descriptions and the accompanying drawings should be interpreted in the “illustrative” sense, and not the “exhaustive” or “limited” sense. That is, the invention is not intended to be limited to the exact forms disclosed. While the application attempts to disclose all of the embodiments of the invention that are reasonably foreseeable, there may be unforeseeable insubstantial modifications that remain as equivalents. It should be understood by persons skilled in the art that there may be other embodiments than those disclosed which fall within the scope of the invention as defined by the claims. Where a claim, if any, is expressed as a means or step for performing a specified function it is intended that such claim be construed to cover the corresponding structure, material, or acts described in the specification and equivalents thereof, including both structural equivalents and equivalent structures, material-based equivalents and equivalent materials, and act-based equivalents and equivalent acts.

Claims

1. A device configured to couple between a concrete surface and wooden formwork, the device comprising:an L-shaped main body having:a vertical portion defining a front surface; anda horizontal portion defining a bottom surface configured to contact the concrete surface; anda plurality of spacing pegs extending perpendicularly outward from the front surface of the vertical portion, wherein front ends of the spacing pegs are configured to contact an interior surface of the wooden formwork such that, when concrete is poured into the wooden formwork, the device becomes permanently embedded within the concrete as the concrete cures.

2. The device of claim 1, wherein the plurality of spacing pegs comprises three spacing pegs mutually arranged in a non-linear triangular configuration.

3. The device of claim 1, wherein the plurality of spacing pegs comprises two spacing pegs mutually arranged along a common vertical plane.

4. The device of claim 1, wherein each of the plurality of spacing pegs comprises a retainer washer aligned coaxially around an outer circumference of the respective spacing peg.

5. The device of claim 1, further comprising a semi-cylindrical rebar clip configured to removably couple to reinforcing rebar embedded within the concrete surface.

6. The device of claim 5, further comprising a generally right-triangle-shaped structure extending between the vertical portion, the horizontal portion, and the rebar clip.

7. The device of claim 1, wherein the horizontal portion of the main body defines one or more tap holes configured to receive a bolt for securing the device to the concrete surface.

8. The device of claim 1, wherein the front surface of the vertical portion further defines a fastening region for securing the device to the wooden formwork.

9. The device of claim 8, wherein the fastening region is perforated, threaded, cross-hatched, or thinned relative to the rest of the front surface of the vertical portion.

10. The device of claim 1, further comprising a curved rear surface extending between the vertical portion and the horizontal portion.

11. The device of claim 1, wherein the front ends of the spacing pegs define inverted cones for guiding a drill bit into the respective spacing peg.

12. A system comprising:wooden formwork; andan anchor device comprising:an L-shaped main body having:a vertical portion defining a front surface; anda horizontal portion defining a bottom surface configured to contact a concrete surface; anda plurality of spacing pegs extending perpendicularly outward from the front surface of the vertical portion, wherein front ends of the spacing pegs are configured to contact an interior surface of the wooden formwork such that, when concrete is poured into the wooden formwork, the anchor device becomes permanently embedded within the concrete as the concrete cures.

13. The system of claim 12, wherein the plurality of spacing pegs comprises three spacing pegs mutually arranged in a non-linear triangular configuration.

14. The system of claim 12, wherein the plurality of spacing pegs comprises two spacing pegs mutually arranged along a common vertical plane.

15. The system of claim 12, wherein each of the plurality of spacing pegs comprises a retainer washer aligned coaxially around an outer circumference of the respective spacing peg.

16. The system of claim 12, wherein the anchor device further comprises a semi-cylindrical rebar clip configured to removably couple to reinforcing rebar embedded within the concrete surface.

17. The system of claim 16, wherein the device further comprises a generally right-triangle-shaped structure extending between the vertical portion, the horizontal portion, and the rebar clip.

18. The system of claim 1, wherein the horizontal portion of the main body defines one or more tap holes configured to receive a bolt for securing the anchor device to the concrete surface.

19. A method comprising:assembling wooden formwork;coupling an anchor device to an interior surface of the wooden formwork, wherein the anchor device comprises:an L-shaped main body having:a vertical portion defining a front surface; anda horizontal portion defining a bottom surface configured to contact a concrete surface; anda plurality of spacing pegs extending perpendicularly outward from the front surface of the vertical portion, wherein front ends of the spacing pegs are configured to contact the interior surface of the wooden formwork;securing the anchor device to the concrete surface;pouring liquid concrete into the wooden formwork overtop of the anchor device such that the device is embedded within the liquid concrete;allowing the liquid concrete to cure; anddecoupling the wooden formwork from the embedded anchor device.

20. The method of claim 19, wherein securing the anchor device to the concrete surface comprises:bolting the anchor device to the concrete surface; orclipping the anchor device to reinforcing rebar embedded within the concrete surface.