High-support underground stormwater storage construction with beam-column structure integrally formed by pouring

By designing a highly supportive beam-column integrated pour-molded groundwater filling structure, the problem of traditional permeable bricks and water filling structures being unable to withstand heavy pressure has been solved, and underground water storage equipment with high support strength has been realized, reducing the risk of floods and providing groundwater resources. storage and reuse capabilities.

WO2024212979A1PCT designated stage expired Publication Date: 2024-10-17CHEN JUI WEN
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/086917
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-04-11
Filing Date
2024-04-10
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

Traditional permeable bricks and water-filled structures cannot withstand heavy pressure and are easily damaged by earthquakes or heavy vehicles. They cannot be used as heavy-duty underground water storage equipment.

Method used

A highly supportive beam-column integrated pour-molded underground water filling structure is designed. Through the overlapping of bricks and side panels, a concrete mortar poured-molded beam and column structure is formed to enhance the support strength and store water underground, making it able to withstand The weight of heavy vehicles.

Benefits of technology

It realizes underground water storage equipment with high support strength, avoids damage to roads caused by heavy vehicles, reduces surface runoff, prevents floods, and provides storage and reuse functions of groundwater resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024086917_17102024_PF_FP_ABST
    Figure CN2024086917_17102024_PF_FP_ABST
Patent Text Reader

Abstract

A high-support underground stormwater storage construction with a beam-column structure integrally formed by pouring. The stormwater storage unit is formed by bricks and side plates, wherein the brick is provided with a groove in an upper flat face, a concrete-mortar pouring flow pipe is provided in and is in communication with the groove, and the brick is also provided with a through hole in the upper flat face, and is provided with a protruding hollow tubular column on a bottom side, such that the flow pipe and the hollow tubular column can be connected when two bricks are aligned with each other; and then, the brick is provided with a retaining slot at a side edge thereof to enable the side plate to be snap-fitted to an outer side of the brick to form a stormwater storage structure. In this way, after the bricks are laid on the ground and combined with the side plate, concrete mortar is poured over the assembled stormwater storage unit, so as to build a solid underground stormwater storage construction comprising a beam-column structure.
Need to check novelty before this filing date? Find Prior Art

Description

Highly supportive beam-column integrally cast underground water piggy bank structure Technical Field

[0001] The present invention relates to a high-support beam-column integrally cast underground water bank structure, particularly a water bank constructed underground as a water storage space and having a beam and column structure by pouring concrete mortar, which is suitable for use as a heavy-load-bearing underground water storage device. Background Art

[0002] In recent years, extreme weather conditions have become increasingly severe, with frequent torrential rains and urban flooding occurring worldwide. To combat global warming and reduce the environmental burden and its negative impacts, experts from various countries have proposed corresponding adaptation measures and sustainable development policies at the World Climate Conference in recent years. These include promoting sponge cities and energy transition policies. Sponge cities are a new type of urban planning design that incorporates flood control and waterlogging prevention measures within cities while also providing ecological and environmental protection features. For example, permeable pavement is constructed to replace impermeable pavement. These pavements absorb, store, infiltrate, and purify water during rain. In dry and hot weather, they release moisture to mitigate the heat island effect and prevent the spread of global warming.

[0003] To combat global warming and mitigate the environmental burden and its negative impacts, countries like Germany and the United States are promoting Low Impact Development (LID) technologies, aiming to protect, restore, and maintain the environmental integrity of water resources. However, the maintenance costs associated with LID equipment are relatively high, necessitating the construction of sustainable structures or equipment. LID aims to maintain and restore the hydrological regime of developing watersheds by creating a landscape that mimics natural hydrological functions (infiltration, runoff, and evapotranspiration). This is achieved through a series of LID site planning practices and stormwater treatment technologies that manage runoff volume and quality. The more effectively LID integrates with the environment, the greater the site's ability to replicate the land's natural water storage capacity, capturing water and capturing and recycling pollutants. The dispersed and discontinuous distribution of small LIDs throughout a site mitigates surface runoff, allowing for infiltration and reducing site discharge.

[0004] Conventional low-impact development technologies typically include permeable bricks for permeability and water banks for water storage. However, these bricks and banks cannot withstand heavy pressure, and their structures are not permanently stable and reliable. They are easily damaged by earthquakes or heavy vehicles running over them. Therefore, these bricks and banks are only suitable for use on surfaces that are not accessible to heavy vehicles, such as sidewalks, parks, and squares, to prevent them from collapsing due to heavy vehicles, which could lead to public safety concerns.

[0005] To this end, in order to coordinate with the construction of various permeable paving surfaces on the ground so that the rainwater introduced into the ground can be effectively stored and reused, a high-support underground water bank structure that can better withstand the pressure of heavy-duty vehicles and withstand the crushing of multi-ton trucks is designed underground. This is the main motivation of the present invention.

[0006] In view of this, the present inventor has actively conducted research and designed a system to meet the above needs, hoping to improve and develop a water bank structure design with higher pressure resistance, thus resulting in the present invention.

[0007] Summary of the Invention

[0008] The primary purpose of the present invention is to provide a highly supportive underground water bank structure with integrally cast beams and columns, achieving a compressive strength capable of withstanding the heavy pressure that may be caused by vehicles passing through the ground. The water bank of the present invention comprises a beam and column structure integrally formed by pouring concrete mortar, thereby enhancing the support strength and providing the strength to withstand heavy pressure. The water bank can not only be buried underground to store water, but also become an artificial underground reservoir. After storing water, it can effectively provide water resources for convenient extraction and utilization, and has a wide range of applications.

[0009] To achieve the above-mentioned purpose, the present invention provides a high-support beam-column integrally cast underground water bank structure, which is formed by overlapping bricks and side panels, and is characterized by:

[0010] The brick is provided with a groove on the upper surface, and a concrete mortar pouring flow pipe is provided in the groove;

[0011] The side panels are provided with through holes and snap-fit ​​structures at the side edges. The side panels are mounted on the outside of the bricks using the snap-fit ​​structures to form a water storage structure.

[0012] In this way, when the bricks are laid on the floor and combined with the side panels, the upper and lower bricks are docked and combined with each other, and the two flow pipes are combined to form a grouting channel. Concrete mortar is poured on the top of the constructed water tank to construct a stable underground water tank building structure including a beam and column structure.

[0013] A high-support beam-column integrally cast underground water bank structure, which is formed by overlapping brick flat plates, hollow pipe columns, through pipes and side plates, and is characterized by:

[0014] The brick stacking plate is provided with a groove, a pipe column fastening hole, and a through-tube fastening hole, and a through-tube fastening hole is provided in the groove;

[0015] The hollow pipe column is provided with a buckle ring groove at the periphery of the buckle end, and is assembled and buckled on the buckle ring groove on the pipe column buckle hole of the brick flat plate;

[0016] The through pipe is provided with a buckle ring groove at the periphery of the buckle end, and is assembled and buckled on the buckle ring groove to the through pipe buckle hole of the brick stacking plate;

[0017] The side panels are provided with through holes and snap-fit ​​structures at the side edges. The side panels are mounted on the outside of the bricks using the snap-fit ​​structures to form a water storage structure.

[0018] In this way, when the bricks are laid on the floor and combined with the side panels, the upper and lower bricks are connected to each other, and the upper and lower flow pipes are combined to form a grouting channel. Concrete mortar is poured on the top of the constructed water tank to construct a stable underground water tank structure including a beam and column structure.

[0019] The effective benefit of this new model is that grooves are provided on the upper surface of the bricks, so that the grooves are combined with the flow pipes. When concrete mortar is poured, an integrated underground solid building with beams and columns is formed, which can be supported underground, thereby forming an underground water storage device with high supporting strength.

[0020] This can be used to enhance the road's ability to withstand high loads and prevent damage to the road caused by heavy vehicles.

[0021] At the same time, when there is heavy rainfall on the road surface, rainwater can be collected through various pavements and introduced into the ground, and then further stored in the underground water-bank structure. This can not only effectively prevent the chance of surface flooding, but also replenish groundwater resources. At the same time, it can also form water storage space and underground pipeline channels in the water-bank structure, and store and recycle rainwater for subsequent reuse.

[0022] Other features and specific embodiments of the present invention can be further understood from the following detailed description with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] FIG1 is an exploded schematic diagram of the structure of the first embodiment of the present invention.

[0024] FIG2 is a schematic diagram of the arrangement of steel bars after assembly according to the first embodiment of the present invention.

[0025] FIG3 is a schematic diagram of the overlap of two adjacent water piggy banks according to the first embodiment of the present invention.

[0026] FIG4 is a schematic diagram of a first embodiment of the present invention, in which a plurality of water buckets are combined and steel bars are tied on top.

[0027] FIG5 is a schematic diagram of pouring concrete mortar above a water pump according to the first embodiment of the present invention.

[0028] FIG6 is a schematic diagram of a first embodiment of the present invention in which a water-permeable material road surface is paved on top of a beam-column integrated structure after concrete mortar is poured into the water-filled column.

[0029] FIG7 is a schematic cross-sectional view of the partial structure of FIG6 of the present invention.

[0030] FIG8 is an exploded schematic diagram of the brick stacking structure according to the second embodiment of the present invention.

[0031] FIG9 is an external view of the second embodiment of the present invention after the brick stacking plate and the hollow pipe column are snap-fitted together.

[0032] FIG9A is a cross-sectional view of the partial structure of FIG9 of the present invention.

[0033] FIG10 is an appearance diagram of a brick stack according to a second embodiment of the present invention. DETAILED DESCRIPTION

[0034] Referring to Figures 1 and 2 , the first embodiment of the present invention features a water bank structure primarily comprised of a porous hollow body that can be buried underground to create an underground water storage space. Multiple hollow bodies can be assembled to create a larger underground area and water storage space. The water bank structure comprises two stacking bricks 10 and four side panels 20. When assembled, two identical stacking bricks 10 are stacked, facing each other from top to bottom. The four side panels 20 are interlocked around the four sides of the stacking bricks 10 to form a hollow body.

[0035] The brick 10 has an upper surface at its top, a groove 11 formed in the upper surface, and a flow passage 12 for pouring concrete mortar in the groove 11. In this embodiment, two grooves 11 are provided, and the grooves 11 are staggered at the center of the upper surface of the brick 10. The flow passage 12 is also located at this staggered position and extends downward. The upper surface of the brick 10 is also provided with a through hole 13 and a hollow tube column 14, allowing water to penetrate the upper surface through the through hole 13. The brick 10 is also provided with a snap-fit ​​structure around the four sides of the upper surface frame, such as a relatively interlocking tongue 15 and a tongue 16. Two adjacent water bank bricks can be mortised and spliced ​​together using the tongue 15 and tongue 16. The upper surface frame is also provided with a snap-fit ​​groove 17, and the bottom end of each hollow tube column 14 is provided with a symmetrical positioning protrusion 18 and a positioning groove 19.

[0036] As shown in Figures 3 to 5, when the upper and lower bricks 10 are butted together, the two flow tubes 12 form a grouting channel, and the hollow pipe columns 14 are connected to each other to provide support. The side panels 20 are placed around the bricks 10 to form a hollow body for water storage. When two adjacent water buckets are joined, they are connected by a locking tongue 15 and groove 16 provided around the bricks.

[0037] The side panels 20 are provided with through holes 21 for providing water inlet from the sides of the water pump, and elastic buckle rods 22 are provided at the side edges. The positions of the elastic buckle rods correspond to the buckling grooves 17 of the stacking bricks 10, so that the side panels 20 can be snapped onto the outside of the stacking bricks 10 to form a water pump structure.

[0038] Therefore, after the ground is prepared, the water-saving bricks 10 are stacked together to form a larger area and connected in series. At the same time, the steel bars 30 are placed in the grooves 11. The through pipes 12 can also be inserted with steel bars as needed. Then, concrete mortar 40 can be poured on top of the bricks 10. The concrete mortar 40 will flow through the grooves 11 and the through pipes 12 into the grooves 11 and the through pipes 12 of the water-saving bricks 10 in the lower layer, thereby forming an underground water-saving structure with an integrated beam body and a column body, which is an underground water storage building with extremely high pressure resistance and load-bearing capacity.

[0039] Referring to Figures 6 and 7 , after constructing a solid underground water bank with integrated beams and columns, the present invention can then pave the water bank with a permeable material 50, such as permeable asphalt or concrete pavement, to withstand earthquakes and heavy vehicle traffic without damage. Conventional technology often uses a non-woven fabric covering on the water bank, a method that depends on the application and functionality and is not specifically addressed within the technical approach of this invention. The present invention forms a solid underground water reservoir that can be pumped to the surface at any time to recycle rainwater for reuse.

[0040] As shown in Figures 8 to 10, in another embodiment of the water bank brick 10 of the present invention, the brick is configured as a brick flat plate 60, and the flow pipe 12 and hollow tube column 14 are of a separate design. In addition to the groove 11, the brick flat plate 60 is also provided with a tube column fastening hole 61 and a tube fastening hole 62. The tube column fastening hole 61 and the tube fastening hole 62 are both provided with a step edge 63 (as shown in Figure 9A). The flow pipe 12 and the hollow tube column 14 are provided with snap ring grooves 121 and 141 around the fastening ends with larger diameters. The snap ring grooves can be used to easily assemble and fasten them to the brick flat plate 60, forming a brick 10 integrally molded as in the first embodiment. The advantages of adopting a split design of the brick stacking plate 60 are that it not only takes up less volume when storing materials, but also is easy to transport and carry. Relatively speaking, when the brick stacking plate must be cut due to floor size restrictions, the plate-shaped brick stacking plate 60 is relatively easy to cut into a suitable size, so that a good finishing effect can be achieved in a limited construction area.

[0041] As can be seen from the above, the present invention has the following practical advantages:

[0042] 1. Through the design of the groove above the water bucket, combined with steel bars, a stable underground water bucket structure including beams and columns is constructed. It has the characteristics of high supporting strength. When buried underground, it can withstand the pressure of heavy vehicles on the road without causing the road surface to collapse, making it easy to maintain a flat and safe road surface.

[0043] 2. It can reduce surface runoff, lower the chance of floods, and replenish groundwater resources to achieve the purpose of water conservation on the base. It supports Low Impact Development (LID) technology. The purpose of meeting the LID standard is to protect, restore and maintain the environmental integrity of water resources, which is more in line with the construction of an excellent condition for sustainable use of equipment.

[0044] 3. It can provide a large underground space for rainwater storage for subsequent use, so as to fully reserve water resources and recycle and reuse them.

[0045] 4. It can provide space and safety for laying underground pipelines.

[0046] In summary, the present invention designs a water bank with a grooved top surface, and provides a flow pipe for concrete mortar pouring within the groove. After pouring concrete mortar above the water bank, a stable underground water bank structure with beams and columns is constructed. This structure can withstand the load and pressure of heavy vehicles above the water bank without damage, and has industrial application value. A patent application is filed in accordance with the law. However, the above description is merely a preferred embodiment of the present invention and should not be used to limit the scope of the present invention. Therefore, any simple equivalent changes and modifications made within the scope of the patent application and the content of the invention specification shall still fall within the scope of the present patent.

Claims

1. A high-support beam-column integrally cast underground water piggy bank structure, formed by overlapping bricks and side panels, characterized by: The brick is provided with a groove on the upper plane, and a concrete mortar pouring flow pipe is provided in the groove to communicate with the groove; The side plate is provided with a through hole and a buckle structure is provided at the side edge. The side plate is set up on the outside of the bricks by using the buckle structure to form a water storage structure; In this way, after the bricks are laid on the floor and combined with the side panels, the upper and lower bricks are connected to each other, and the two flow pipes are combined to form a grouting channel. Concrete mortar is poured on the top of the constructed water bucket to form a stable underground water bucket building structure including a beam and column structure.

2. The high-support beam-column integrally cast underground water piggy bank structure as claimed in claim 1, characterized in that: The upper plane of the bricks is provided with through holes and the bottom side is provided with protruding hollow pipe columns.

3. The high-support beam-column integrally cast underground water piggy bank structure as claimed in claim 1, characterized in that: The upper plane frame plate of the stacked bricks is provided with buckling grooves around it.

4. The high-support beam-column integrally cast underground water piggy bank structure as claimed in claim 2, characterized in that: A positioning convex point and a positioning groove are arranged at the bottom end of the hollow pipe column.

5. The high-support beam-column integrally cast underground water piggy bank structure as claimed in claim 1, characterized in that: The side plate is provided with a buckle structure at the side edge which is an elastic buckle rod.

6. A high-support beam-column integrally cast underground water bank structure, which is formed by overlapping brick flat plates, hollow pipe columns, through pipes and side plates, and is characterized by: The brick stacking plate is provided with a groove, a pipe column buckling hole and a through pipe buckling hole, and a through pipe buckling hole is provided in the groove; The hollow pipe column is provided with a buckle ring groove at the periphery of the buckle end, and is assembled and buckled on the buckle ring groove of the pipe column of the brick stacking plate; The through pipe is provided with a buckle ring groove at the periphery of the buckle end, and is assembled and buckled on the buckle ring groove of the through pipe of the brick stacking plate; The side plate is provided with a through hole and a buckle structure is provided at the side edge. The side plate is set up on the outside of the piled bricks by using the buckle structure to form a water storage structure of a water piggy bank. In this way, after the bricks are laid on the floor and combined with the side panels, the upper and lower bricks are connected to each other, and the upper and lower flow pipes are connected to form a grouting channel, and concrete mortar is poured on the top of the constructed water bucket to construct a stable underground water bucket building structure including a beam and column structure.

Citation Information

Patent Citations

  • Drainage template and construction method of permeable pavement

    CN109295829A

  • Interlocking -type ecological brick

    CN206034226U

  • Pavement structure

    CN206266974U

  • Pavement paving structure

    CN211368270U

  • Strengthening type underground water full water storage equipment structure

    CN215670013U