By obtaining and calculating the tunnel size parameters, establishing the cutting coordinate system, generating paths, and controlling the excavation equipment for cutting, the over-excavation and under-excavation problems of automatic cutting of the flat-top three-center arched tunnel is solved, and the accurate forming of the tunnel is achieved .

WO2024234761A1PCT designated stage expired Publication Date: 2024-11-21SANY HEAVY EQUIP CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/077690
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-16
Filing Date
2024-02-20
Publication Date
2024-11-21

AI Technical Summary

Technical Problem

The prior art cannot accurately determine the automatic cutting of the three-center arched tunnel in flat top, resulting in over-excavation or under-excavation, affecting the tunnel forming effect and unable to meet the automatic cutting needs.

Method used

By obtaining the dimension parameters of the tunnel, determining the cutting area, establishing the cutting coordinate system, calculating the vertical and horizontal boundary coordinate values, generating the cutting path, and controlling the excavation equipment to cut according to the path to ensure accuracy and completeness.

Benefits of technology

Automatic cutting of flat-top three-center arched tunnels is realized to avoid over-excavation and under-excavation, ensure the forming effect and meet the needs of automatic cutting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024077690_21112024_PF_FP_ABST
    Figure CN2024077690_21112024_PF_FP_ABST
Patent Text Reader

Abstract

The present application relates to the field of operation machinery control. Particularly provided are a cutting control method, apparatus and assembly, a tunneling device, and a readable storage medium. The cutting control method is used for controlling a tunneling device to perform a cutting operation on a flat-top three-centered arch-shaped tunnel. The cutting control method comprises: acquiring dimension parameters of a flat-top three-centered arch-shaped tunnel; according to the dimension parameters, determining a plurality of cutting areas which are included in the flat-top three-centered arch-shaped tunnel; establishing a cutting coordinate system according to the dimension parameters; determining a plurality of longitudinal cutting coordinate values according to the cutting coordinate system; determining a cutting area where the plurality of longitudinal cutting coordinate values are located, and according to the cutting area where the plurality of longitudinal cutting coordinate values are located and the dimension parameters, determining a transverse cutting boundary coordinate value corresponding to each longitudinal cutting coordinate value; generating a cutting path according to the plurality of longitudinal cutting coordinate values and a plurality of transverse cutting boundary coordinate values; and controlling a cutting head of a tunneling device to perform cutting according to the cutting path.
Need to check novelty before this filing date? Find Prior Art

Description

Cutting control method, device, component, tunneling equipment and readable storage medium

[0001] This application claims priority to the Chinese patent application filed with the State Intellectual Property Office of China on May 16, 2023, with application number "202310547997.1" and application name "Cutting control method, device, component, tunneling equipment and readable storage medium", all contents of which are incorporated by reference into this application. Technical Field

[0002] The present application relates to the field of operating machinery control, and in particular, to a cutting control method, device, component, tunneling equipment and readable storage medium. Background Art

[0003] In the related technology, for flat-top three-center arch tunnels, the automatic cutting method of the flat-top three-center arch tunnel cannot accurately locate the coordinate value of the tunnel boundary, which easily causes over-excavation or under-excavation, affects the tunnel forming effect, and cannot meet the automatic cutting needs of the flat-top three-center arch tunnel.

[0004] Summary of the Invention

[0005] In order to solve the above-mentioned technical problem that automatic cutting of flat-top three-center arch tunnels easily causes over-excavation and under-excavation, affects the tunnel forming effect, and cannot meet the automatic cutting requirements of flat-top three-center arch tunnels, the first purpose of this application proposes a cutting control method.

[0006] The second purpose of this application is to provide a cutting control device.

[0007] The third purpose of this application is to propose a cutting control component.

[0008] The fourth object of this application is to provide a tunneling device.

[0009] The fifth objective of this application is to provide a readable storage medium.

[0010] According to the first purpose of the present application, the present application provides a cutting control method for controlling tunneling equipment to perform cutting operations on a flat-top three-center arch tunnel. The cutting control method includes: obtaining the size parameters of the flat-top three-center arch tunnel; determining multiple cutting areas contained in the flat-top three-center arch tunnel according to the size parameters; establishing a cutting coordinate system according to the size parameters; determining multiple cutting longitudinal coordinate values ​​according to the cutting coordinate system; determining the cutting areas where the multiple cutting longitudinal coordinate values ​​are located, and determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting areas and size parameters where the cutting longitudinal coordinate values ​​are located; generating a cutting path according to the multiple cutting longitudinal coordinate values ​​and the multiple cutting transverse boundary coordinate values; and controlling the cutting head of the tunneling equipment to cut according to the cutting path.

[0011] The cutting control method proposed in the present application is used to control the excavation equipment to perform cutting operations on a flat-top three-center arch tunnel. Specifically, the flat-top three-center arch tunnel is an arch-section tunnel composed of three circular arcs.

[0012] It should be noted that the executor of the cutting control method proposed in this application can be the cutting control device of the tunneling equipment or the cutting control component of the tunneling equipment. In order to more clearly illustrate the cutting control method proposed in this application, the following technical scheme uses the executor of the cutting control method as the cutting control component of the tunneling equipment for illustrative explanation.

[0013] During the control of the tunneling equipment's cutting operation, the dimensional parameters of the flat-top three-center arched roadway are first obtained. After obtaining the dimensional parameters, the cutting area encompassed by the flat-top three-center arched roadway is determined based on the dimensional parameters of the flat-top three-center arched roadway. Those skilled in the art will appreciate that there are two types of flat-top three-center arched roadways: one in which the flat top of the roadway is cut on a large circle, and the other in which the flat top of the roadway is cut on a small circle. The fact that the flat top is cut on different circles indicates that the flat-top three-center arched roadway has different cutting areas.

[0014] After obtaining the size parameters of the flat-top three-center arched tunnel, the present application will also establish a cutting coordinate system based on the size parameters of the flat-top three-center arched tunnel. Specifically, the above-mentioned cutting coordinate system can be determined by the tunnel height and tunnel width in the size parameters.

[0015] After determining the cutting coordinate system, multiple cutting longitudinal coordinate values ​​are determined based on the cutting coordinate system. For this cutting longitudinal coordinate value, it can be understood that during the cutting process, the cutting head of the engineering machinery needs to continuously cut and move the height position, so that the entire flat-top three-center arch tunnel can be cut and the cutting operation can be completed completely. These height values ​​are converted using the cutting coordinate system to obtain the cutting longitudinal coordinate value.

[0016] After obtaining the plurality of cutting longitudinal coordinate values, the cutting regions in which the plurality of cutting longitudinal coordinate values ​​are located are determined. After determining the cutting regions in which the plurality of cutting longitudinal coordinate values ​​are located, the cutting transverse boundary coordinate values ​​corresponding to each cutting longitudinal coordinate value are calculated based on the cutting regions and the size parameters. Specifically, two cutting transverse boundary coordinate values ​​corresponding to each cutting longitudinal coordinate value are calculated. These two cutting transverse boundary coordinate values ​​are the transverse coordinates of the cutting left boundary position and the transverse coordinates of the cutting right boundary position under the height condition. The absolute values ​​of these two cutting transverse boundary coordinate values ​​are equal, but are expressed as opposite signs in the cutting coordinate system.

[0017] This application determines the cutting area where the cutting longitudinal coordinate value is located, and then obtains the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the size parameters of different cutting areas and flat-top three-center arch tunnels. Finally, the transverse cutting boundary corresponding to different cutting areas with different cutting height positions and flat-top three-center arch tunnels can be obtained, thereby providing boundary limitations for the cutting of the tunneling equipment to avoid over-excavation and under-excavation.

[0018] After determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value, a cutting path is generated according to multiple cutting longitudinal coordinate values ​​and multiple cutting transverse boundary coordinate values, and the cutting head of the tunneling equipment is controlled to cut according to the cutting path, so that the tunneling equipment can automatically cut the flat-top three-center arch tunnel, meet the forming requirements of the flat-top three-center arch tunnel, and ensure the forming effect of the tunnel.

[0019] In summary, the cutting control method proposed in this application uses the dimensional parameters of the flat-top three-center arch tunnel to determine the cutting area contained in the flat-top three-center arch tunnel, and obtains the corresponding horizontal cutting boundary coordinate value in the cutting area at this height according to the cutting longitudinal coordinate value, that is, the height position of the cutting head to be cut, and then obtains the cutting boundary point. The line connecting the cutting boundary points is used as the cutting path to control the excavation equipment to perform cutting, so as to correspond to the characteristics of the flat-top three-center arch tunnel and meet the forming requirements of the flat-top three-center arch tunnel. There will be no over-excavation or under-excavation during cutting. After cutting, a complete and standardized flat-top three-center arch tunnel can be obtained, realizing the automatic cutting and forming of the flat-top three-center arch tunnel.

[0020] In addition, the cutting control method in the above technical solution provided by this application may also have the following additional technical features:

[0021] In the above technical solution, preferably, the size parameters include: tunnel height, rectangle height, height from the intersection point of the first circle of the tunnel and the second circle of the tunnel to the vertex of the rectangle, and the process of determining the multiple cutting areas contained in the flat-top three-center arch tunnel according to the size parameters specifically includes: when the value of the tunnel height is greater than or equal to the sum of the rectangle height and the height from the intersection point of the first circle of the tunnel and the second circle of the tunnel to the vertex of the rectangle, determining that the flat-top three-center arch tunnel includes the first flat-top arch cutting area, the second flat-top arch cutting area and the rectangular cutting area; when the value of the tunnel height is less than the sum of the rectangle height and the height from the intersection point of the first circle of the tunnel and the second circle of the tunnel to the vertex of the rectangle, determining that the flat-top three-center arch tunnel includes the third flat-top arch cutting area and the rectangular cutting area.

[0022] In this technical solution, the present application uses dimensional parameters to determine the cutting area contained in the flat-top three-center arch tunnel, thereby improving the accuracy of determining the cutting horizontal boundary coordinate value corresponding to the cutting longitudinal coordinate value, and realizing the determination of different cutting boundary points according to different cutting areas, thereby meeting the cutting requirements of the flat-top three-center arch tunnel.

[0023] In any of the above technical solutions, preferably, the size parameters also include: the radius of the first circle of the lane, the center angle of the first circle of the lane, and the center distance between the first circle of the lane and the second circle of the lane. The process of determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting area and the size parameters of the cutting longitudinal coordinate value specifically includes: determining that the cutting longitudinal coordinate value is in the first flat-top arch cutting area, and obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the rectangle height, the radius of the first circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value.

[0024] In this technical solution, the size parameters also include the radius of the first circle of the lane, which is the radius of the large circle of the lane. The size parameters also include the center angle of the first circle of the lane and the center distance between the first circle of the lane and the second circle of the lane.

[0025] In the cutting control method proposed in the present application, the process of determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting area and size parameters of the cutting longitudinal coordinate value specifically includes: determining that the cutting longitudinal coordinate value is in the first flat-top arch cutting area, and obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the rectangle height, the radius of the first circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value.

[0026] By using the above-mentioned size parameters to determine the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the first flat-top arch cutting area, it can be ensured that the cutting transverse boundary coordinate value corresponds to the first flat-top arch cutting area, so as to ensure the cutting and forming effect of the first flat-top arch cutting area and avoid over-excavation and under-excavation.

[0027] In any of the above technical solutions, preferably, when it is determined that the cutting longitudinal coordinate value is in the first flat-top arch cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is:

[0028] Among them, x1 is the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the first flat-top arch cutting area, R is the radius of the first circle of the tunnel, ɑ is the center distance between the first circle of the tunnel and the second circle of the tunnel, α is the central angle of the first circle of the tunnel, y is the cutting longitudinal coordinate value, and h is the height of the rectangle.

[0029] In this technical solution, preferably, it is defined that when the cutting longitudinal coordinate value is determined to be in the first flat-top arch cutting area, a calculation formula is used to calculate the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value. Through the above calculation formula, the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value can be obtained according to the rectangle height, the radius of the first circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value. Since the specific cutting transverse boundary coordinate value is obtained using the cutting longitudinal coordinate value, the cutting coordinate system is also used for parameter conversion, and the number of cutting transverse boundary coordinate values ​​obtained is two. These two cutting transverse boundary coordinate values ​​are the transverse coordinate of the left boundary position of the cutting and the transverse coordinate of the right boundary position of the cutting under this cutting longitudinal coordinate value. The absolute values ​​of these two cutting transverse boundary coordinate values ​​are equal, but the positive and negative are opposite in the cutting coordinate system.

[0030] By using the above-mentioned dimensional parameters and calculation formula to obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the first flat-top arch cutting area, it can be ensured that the cutting transverse boundary coordinate value corresponds to the first flat-top arch cutting area to ensure the cutting forming effect and avoid over-excavation and under-excavation.

[0031] In any of the above technical solutions, preferably, the size parameters also include: the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the radius of the second circle of the lane. The process of determining the cutting horizontal boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting area and the size parameters of the cutting longitudinal coordinate value specifically includes: determining that the cutting longitudinal coordinate value is in the second flat-top arch cutting area or the third flat-top arch cutting area, and obtaining the cutting horizontal boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the rectangle height, the radius of the second circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value.

[0032] In this technical solution, the above-mentioned dimensional parameters are used to determine the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the second flat-top arch cutting area or the third flat-top arch cutting area, so as to ensure that the cutting transverse boundary coordinate value corresponds to the shape of the second flat-top arch cutting area or the third flat-top arch cutting area, so as to ensure the cutting forming effect when cutting using the cutting path generated by the cutting transverse boundary coordinate value and the cutting longitudinal coordinate value, and avoid over-excavation and under-excavation.

[0033] In any of the above technical solutions, preferably, when it is determined that the cutting longitudinal coordinate value is in the second flat-top arch cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is:

[0034] Among them, x2 is the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the second flat-top arch cutting area, r is the radius of the second circle of the roadway, ɑ is the distance between the centers of the first circle and the second circle of the roadway, α is the central angle of the first circle of the roadway, y is the cutting longitudinal coordinate value, and h is the height of the rectangle; or when the cutting longitudinal coordinate value is determined to be in the third flat-top arch cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is:

[0035] Among them, x3 is the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the third flat-top arch cutting area, r is the radius of the second circle of the tunnel, ɑ is the center distance between the first circle of the tunnel and the second circle of the tunnel, α is the central angle of the first circle of the tunnel, y is the cutting longitudinal coordinate value, and h is the height of the rectangle.

[0036] In this technical solution, it is defined that when the cutting longitudinal coordinate value is determined to be in the second flat-top arch cutting area or the third flat-top arch cutting area, a calculation formula is used to calculate the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value. Through the above calculation formula, the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value can be obtained according to the rectangle height, the radius of the second circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value. The specific cutting transverse boundary coordinate value is obtained by using the cutting longitudinal coordinate value, so it is also presented according to the cutting coordinate system. The number of cutting transverse boundary coordinate values ​​obtained is two. These two cutting transverse boundary coordinate values ​​are the transverse coordinate of the left boundary position of the cutting and the transverse coordinate of the right boundary position of the cutting under this cutting longitudinal coordinate value. The absolute values ​​of these two cutting transverse boundary coordinate values ​​are equal, but the positive and negative are opposite in the cutting coordinate system.

[0037] By using the above-mentioned dimensional parameters and calculation formula to determine the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the second flat-top arch cutting area or the third flat-top arch cutting area, it can be ensured that the cutting transverse boundary coordinate value corresponds to different cutting areas, so as to ensure the cutting forming effect when cutting using the cutting path generated by the cutting transverse boundary coordinate value and the cutting longitudinal coordinate value, and avoid over-excavation and under-excavation.

[0038] In any of the above technical solutions, preferably, the size parameter also includes the lane width, and the process of determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value based on the cutting area in which the cutting longitudinal coordinate value is located and the size parameter further includes: determining that the cutting longitudinal coordinate value is in a rectangular cutting area, and obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value based on the lane width; wherein, when the cutting longitudinal coordinate value is determined to be in a rectangular cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is:

[0039] Among them, x4 is the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the rectangular cutting area, and L is the tunnel width.

[0040] In this technical solution, the size parameters also include the lane width.

[0041] The cutting control method proposed in this application is a process of determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value based on the cutting area and size parameters of the cutting longitudinal coordinate value, and also includes: determining that the cutting longitudinal coordinate value is in a rectangular cutting area, and obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the lane width.

[0042] By using the above-mentioned size parameters and calculation formula to determine the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value within the rectangular cutting area, it can be ensured that the cutting transverse boundary coordinate value corresponds to the rectangular cutting area, so as to ensure the cutting forming effect when cutting using the cutting path generated by the cutting transverse boundary coordinate value and the cutting longitudinal coordinate value, and avoid over-excavation and under-excavation.

[0043] In any of the above technical solutions, preferably, the process of determining multiple cutting longitudinal coordinate values ​​according to the cutting coordinate system specifically includes: determining the cutting starting point according to the size parameters; connecting the cutting starting point with a point on the plane where the flat-top three-center arch tunnel is located, and dividing the connecting line with a preset single cutting amount as the separation amount to obtain multiple separation points; determining the longitudinal coordinate values ​​of the cutting starting point and multiple separation points according to the cutting coordinate system; and using the longitudinal coordinate values ​​of the cutting starting point and multiple separation points as the cutting longitudinal coordinate values.

[0044] In this technical solution, the cutting control method proposed in this application, the process of determining multiple cutting longitudinal coordinate values ​​according to the cutting coordinate system, specifically includes: first, determining the cutting starting point for cutting the flat-top three-center arched roadway based on the dimensional parameters of the flat-top three-center arched roadway, specifically, the cutting starting point is located at the middle highest point of the entire flat-top three-center arched roadway. After determining the cutting starting point, connecting the cutting starting point with a point on the plane where the flat-top three-center arched roadway is located, specifically, the ground, and the point is a point opposite the ground and the cutting starting point along the height direction of the entire flat-top three-center arched roadway, and the line connecting the two is parallel to the direction of gravity.

[0045] After connecting the cutting starting point with a point on the plane where the flat-top three-center arch tunnel is located to obtain a line segment, the line segment is divided according to the preset single cutting amount to obtain multiple separation points. It can be understood that the above process is to simulate the situation where the cutting head of the tunneling equipment will continuously adjust the height according to the preset single cutting amount during cutting.

[0046] After obtaining the plurality of separation points, the longitudinal coordinate values ​​of the cutting starting point and the plurality of separation points are determined according to the cutting coordinate system, and then the longitudinal coordinate values ​​of the cutting starting point and the plurality of separation points are used as the cutting longitudinal coordinate values.

[0047] Through the above steps, the actual height position of the cutting head of the tunneling equipment when cutting the flat-top three-center arch tunnel can be used to obtain the corresponding cutting longitudinal coordinate value, so as to finally obtain the matching cutting transverse boundary coordinate value. The cutting path can be obtained through the correspondence between the above-mentioned cutting longitudinal coordinate value and the cutting transverse boundary coordinate value to ensure the accuracy of the cutting.

[0048] In any of the above technical solutions, preferably, the cutting path includes a cutting segment, and the process of generating the cutting path according to multiple cutting longitudinal coordinate values ​​and multiple cutting transverse boundary coordinate values ​​specifically includes: sorting the multiple cutting longitudinal coordinate values ​​in descending order; determining the first cutting point according to the first cutting longitudinal coordinate value and the middle transverse coordinate value of the two cutting transverse boundary coordinate values ​​corresponding to the first cutting longitudinal coordinate value; determining the second cutting point according to the first cutting longitudinal coordinate value and the negative cutting transverse boundary coordinate value corresponding to the first cutting longitudinal coordinate value; determining the third cutting point according to the first cutting longitudinal coordinate value and the positive cutting transverse boundary coordinate value corresponding to the first cutting longitudinal coordinate value; connecting the first cutting point with the second cutting point, and connecting the second cutting point with the third cutting point to obtain the cutting segment.

[0049] In this technical solution, in the cutting control method proposed in this application, the cutting path specifically includes a cut-in segment, which refers to the line segment where the cutting head advances to perform the first cut. Specifically, in the cutting control method proposed in this application, the process of generating the cutting path based on multiple cutting longitudinal coordinate values ​​and multiple cutting transverse boundary coordinate values ​​specifically includes: first, sorting the multiple cutting longitudinal coordinate values ​​in descending numerical order. After sorting multiple cutting longitudinal coordinate values, the first cutting point is determined according to the first cutting longitudinal coordinate value and the middle horizontal coordinate value of the two cutting horizontal boundary coordinate values ​​corresponding to the first cutting longitudinal coordinate value; the second cutting point is determined according to the first cutting longitudinal coordinate value and the negative cutting horizontal boundary coordinate value corresponding to the first cutting longitudinal coordinate value; the third cutting point is determined according to the first cutting longitudinal coordinate value and the positive cutting horizontal boundary coordinate value corresponding to the first cutting longitudinal coordinate value; the first cutting point and the second cutting point are connected, and the second cutting point and the third cutting point are connected to obtain the cutting segment. Through the above process of obtaining the cutting segment, the phenomenon of over-excavation or under-excavation in the cutting operation can be avoided.

[0050] In any of the above technical solutions, preferably, the cutting path also includes a cutting segment. After obtaining the cutting segment, the process of generating the cutting path according to multiple cutting longitudinal coordinate values ​​and multiple cutting transverse boundary coordinate values ​​also includes: determining multiple endpoints according to the second cutting longitudinal coordinate value to the Nth cutting longitudinal coordinate value and the positive and negative transverse cutting boundary coordinate values ​​corresponding to the second cutting longitudinal coordinate value to the Nth cutting longitudinal coordinate value; taking the endpoint close to the third cutting point as the starting point of the connection, connecting the multiple endpoints according to an S-shaped line to obtain a cutting segment; connecting the third cutting point with the endpoint as the starting point of the connection to generate a cutting path.

[0051] In this technical solution, the cutting path also includes a cutting section, which refers to the line section where the cutting is mainly performed after the cutting head advances.

[0052] After obtaining the cutting segment, the process of generating a cutting path based on multiple cutting longitudinal coordinate values ​​and multiple cutting transverse boundary coordinate values ​​also includes: determining multiple endpoints based on the second cutting longitudinal coordinate value to the Nth cutting longitudinal coordinate value and the positive and negative cutting transverse boundary coordinate values ​​corresponding to the second cutting longitudinal coordinate value to the Nth cutting longitudinal coordinate value.

[0053] After determining multiple endpoints, the endpoint close to the third cutting point is used as the starting point of the connection, and multiple endpoints are connected in an S-shaped line to obtain a cutting segment. The third cutting point is connected to the endpoint as the starting point of the connection line, and then the cutting segment and the cutting segment are connected together to finally generate a complete cutting path.

[0054] By setting the cutting path generated as described above, on the one hand, the forming effect of the flat-top three-center arch tunnel can be ensured, and on the other hand, the cutting head of the tunneling equipment can cut in an S-shaped path, thereby improving the cutting efficiency.

[0055] According to the second purpose of the present application, the present application also proposes a cutting control device, which is used to implement the steps of the cutting control method in any of the above-mentioned technical solutions, and the cutting control device includes: an acquisition unit for acquiring the size parameters of the flat-top three-center arch tunnel; a first processing unit for determining the multiple cutting areas contained in the flat-top three-center arch tunnel according to the size parameters; a second processing unit for establishing a cutting coordinate system according to the size parameters; a first determination unit for determining multiple cutting longitudinal coordinate values ​​according to the cutting coordinate system; a second determination unit for determining the cutting areas where the multiple cutting longitudinal coordinate values ​​are located, and determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting area and the size parameters where the cutting longitudinal coordinate value is located; a third processing unit for generating a cutting path according to the multiple cutting longitudinal coordinate values ​​and the multiple cutting transverse boundary coordinate values; a control unit for controlling the cutting head of the tunneling equipment to cut according to the cutting path.

[0056] The cutting control device proposed in the second aspect of the present application includes an acquisition unit, a first processing unit, a second processing unit, a third processing unit, a first determination unit, a second determination unit, and a control unit. The acquisition unit is configured to acquire the dimensional parameters of the flat-top three-center arched roadway. After obtaining the dimensional parameters of the flat-top three-center arched roadway, the first processing unit in the cutting control device can determine the cutting area included in the flat-top three-center arched roadway based on the dimensional parameters of the flat-top three-center arched roadway. The second processing unit can establish a cutting coordinate system based on the dimensional parameters of the flat-top three-center arched roadway.

[0057] After establishing the cutting coordinate system, the first determination unit determines multiple cutting longitudinal coordinate values ​​based on the cutting coordinate system. For this cutting longitudinal coordinate value, it can be understood that during the cutting process, the cutting head of the engineering machinery needs to continuously cut and move the height position, so that the entire flat-top three-center arch tunnel can be cut and the cutting operation can be completed completely. These height values ​​are the cutting longitudinal coordinate values ​​obtained by converting the cutting coordinate system.

[0058] After obtaining the plurality of cutting longitudinal coordinate values, the second determining unit determines the cutting regions in which the plurality of cutting longitudinal coordinate values ​​are located. After determining the cutting regions in which the plurality of cutting longitudinal coordinate values ​​are located, the second determining unit calculates a cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value based on the cutting region and the size parameter. Specifically, two cutting transverse boundary coordinate values ​​corresponding to each cutting longitudinal coordinate value are calculated. These two cutting transverse boundary coordinate values ​​are the transverse coordinates of the cutting left boundary position and the transverse coordinates of the cutting right boundary position under the height condition. The absolute values ​​of these two cutting transverse boundary coordinate values ​​are equal, but are expressed as opposite signs in the cutting coordinate system.

[0059] After determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value, the third processing unit generates a cutting path according to multiple cutting longitudinal coordinate values ​​and multiple cutting transverse boundary coordinate values, and the control unit controls the cutting head of the tunneling equipment to cut according to the cutting path, so that the tunneling equipment can automatically cut the flat-top three-center arch tunnel to meet the forming requirements of the flat-top three-center arch tunnel. There will be no over-excavation or under-excavation during the cutting, and a complete and standardized flat-top three-center arch tunnel can be obtained after cutting, realizing the automatic cutting and forming of the flat-top three-center arch tunnel.

[0060] According to the third purpose of this application, this application also proposes a cutting control component, wherein the cutting control component includes a processor and a memory, and the memory stores programs or instructions that can be run on the processor, and when the program or instructions are executed by the processor, the steps of the cutting control method in any of the above technical solutions are implemented.

[0061] The cutting control component proposed for the third purpose of this application includes a processor and a memory, and the memory stores programs or instructions that can be run on the processor. When the programs or instructions are executed by the processor, the steps of the cutting control method in any of the above-mentioned technical solutions are implemented. Therefore, the cutting control component has all the beneficial effects of the cutting control method in any of the above-mentioned technical solutions.

[0062] According to the fourth purpose of the present application, the present application also proposes a tunneling device, including a cutting control device or a cutting control component as in the above technical solution.

[0063] The excavation equipment proposed in the fourth purpose of this application includes the cutting control device or cutting control component in the above technical solution, and therefore has all the beneficial technical effects of the cutting control device or cutting control component in the above technical solution.

[0064] When the processor in the cutting control component executes the program or instructions, the steps of the cutting control method are implemented so that the tunneling equipment can automatically perform cutting operations on the flat-top three-center arch tunnel, meet the cutting requirements of the flat-top three-center arch tunnel, avoid over-excavation and under-excavation, and make the final flat-top three-center arch tunnel complete.

[0065] According to the fifth purpose of the present application, the present application also proposes a readable storage medium, on which a program is stored, and when the program is executed by a processor, the steps of the cutting control method in any of the above technical solutions are implemented.

[0066] A program is stored on the readable storage medium, and when the program is executed by the processor, the steps of the cutting control method in any of the above technical solutions are implemented. Therefore, this readable storage medium includes all the beneficial technical effects of the cutting control method in any of the above technical solutions.

[0067] Additional aspects and advantages of the present application will become apparent in the following description or may be learned through practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0068] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0069] FIG1 shows one of the flow charts of a cutting control method in one embodiment of the present application;

[0070] FIG2 shows a second flow chart of a cutting control method according to an embodiment of the present application;

[0071] FIG3 shows a third flow chart of a cutting control method according to an embodiment of the present application;

[0072] FIG4 shows a fourth flow chart of a cutting control method according to an embodiment of the present application;

[0073] FIG5 shows a schematic structural diagram of a cutting coordinate system in one embodiment of the present application;

[0074] FIG6 shows one of the schematic diagrams of a flat-top three-center arched tunnel in one embodiment of the present application;

[0075] FIG7 shows a second schematic diagram of a flat-top three-center arched tunnel in one embodiment of the present application;

[0076] FIG8 shows a third schematic diagram of a flat-top three-center arched tunnel in one embodiment of the present application;

[0077] FIG9 shows a fourth schematic diagram of a flat-top three-center arched tunnel in one embodiment of the present application;

[0078] FIG10 shows a schematic block diagram of the structure of a cutting control device in one embodiment of the present application;

[0079] FIG11 shows a schematic block diagram of the structure of a cutting control component in one embodiment of the present application. DETAILED DESCRIPTION

[0080] In order to more clearly understand the above-mentioned objects, features and advantages of the present application, the present application is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features therein can be combined with each other in the absence of conflict.

[0081] In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application may also be implemented in other ways different from those described herein. Therefore, the scope of protection of the present application is not limited to the specific embodiments disclosed below.

[0082] The following describes cutting control methods, devices, components, tunneling equipment, and computer-readable storage media in some embodiments of the present application with reference to Figures 1 to 11.

[0083] FIG1 shows one of the flow charts of a cutting control method in one embodiment of the present application, wherein the cutting control method includes:

[0084] S102: Obtaining dimension parameters of the flat-top three-center arched roadway;

[0085] S104: determining a plurality of cutting areas included in the flat-top three-center arched roadway according to size parameters;

[0086] S106: Establishing a cutting coordinate system according to the size parameters;

[0087] S108: Determine multiple cutting longitudinal coordinate values ​​according to the cutting coordinate system;

[0088] S110: determining a cutting area where a plurality of cutting longitudinal coordinate values ​​are located, and determining a cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting area where the cutting longitudinal coordinate value is located and a size parameter;

[0089] S112: generating a cutting path according to a plurality of cutting longitudinal coordinate values ​​and a plurality of cutting transverse boundary coordinate values;

[0090] S114: Control the cutting head of the tunneling equipment to perform cutting according to the cutting path.

[0091] In this embodiment, the cutting control method proposed in the present application is used to control the excavation equipment to perform cutting operations on the flat-top three-center arch tunnel. Specifically, as shown in Figures 6 and 8, the flat-top three-center arch tunnel is an arched cross-section tunnel composed of three circular arcs, which has a large circle and two small circles, wherein the center point of the large circle is point A in the figure, and the center points of the two small circles are points B and C in the figure.

[0092] It should be noted that the executor of the cutting control method proposed in this application can be the cutting control device or cutting control component of the tunneling equipment. In order to more clearly illustrate the cutting control method proposed in this application, the following embodiment uses the executor of the cutting control method as the cutting control component of the tunneling equipment for illustrative explanation.

[0093] During the control of the tunneling equipment's cutting operation, the dimensional parameters of the flat-top three-center arched roadway are first obtained. After obtaining the dimensional parameters, the cutting area encompassed by the flat-top three-center arched roadway is determined based on the dimensional parameters of the flat-top three-center arched roadway. Those skilled in the art will appreciate that there are two types of flat-top three-center arched roadways: one in which the flat top of the roadway is cut on a large circle, and the other in which the flat top of the roadway is cut on a small circle. The fact that the flat top is cut on different circles indicates that the flat-top three-center arched roadway has different cutting areas.

[0094] After obtaining the size parameters of the flat-top three-center arched tunnel, the present application will also establish a cutting coordinate system based on the size parameters of the flat-top three-center arched tunnel. Specifically, the above-mentioned cutting coordinate system can be determined by the tunnel height and tunnel width in the size parameters.

[0095] After the cutting coordinate system is established, multiple cutting longitudinal coordinate values ​​are determined based on the cutting coordinate system. For this cutting longitudinal coordinate value, it can be understood that during the cutting process, the cutting head of the engineering machinery needs to continuously move the height position, and then the entire flat-top three-center arch tunnel can be cut and the cutting operation can be completed completely. These height values ​​are converted through the cutting coordinate system to obtain the cutting longitudinal coordinate value.

[0096] After obtaining the plurality of cutting longitudinal coordinate values, the cutting regions in which the plurality of cutting longitudinal coordinate values ​​are located are determined. After determining the cutting regions in which the plurality of cutting longitudinal coordinate values ​​are located, the cutting transverse boundary coordinate values ​​corresponding to each cutting longitudinal coordinate value are calculated based on the cutting regions and the size parameters. Specifically, two cutting transverse boundary coordinate values ​​corresponding to each cutting longitudinal coordinate value are calculated. These two cutting transverse boundary coordinate values ​​are the transverse coordinates of the cutting left boundary position and the transverse coordinates of the cutting right boundary position under the height condition. The absolute values ​​of these two cutting transverse boundary coordinate values ​​are equal, but they are opposite in sign in the cutting coordinate system.

[0097] This application determines the cutting area where the cutting longitudinal coordinate value is located, and then obtains the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the size parameters of different cutting areas and flat-top three-center arch tunnels. Finally, the transverse cutting boundary corresponding to different cutting areas with different cutting height positions and flat-top three-center arch tunnels can be obtained, thereby providing boundary limitations for the cutting of the tunneling equipment to avoid over-excavation and under-excavation.

[0098] After determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value, a cutting path is generated according to multiple cutting longitudinal coordinate values ​​and multiple cutting transverse boundary coordinate values, and the cutting head of the tunneling equipment is controlled to cut according to the cutting path, so that the tunneling equipment can automatically cut the flat-top three-center arch tunnel, meet the forming requirements of the flat-top three-center arch tunnel, and ensure the forming effect of the tunnel.

[0099] In this embodiment, specifically, the dimensional parameters of the flat-top three-center arched roadway include: roadway height, rectangle height, roadway width, roadway first circle radius, roadway first circle center angle, roadway second circle radius, distance between the center of the first and second roadsides, and height from the point of tangency between the first and second roadsides to the vertex of the rectangle. The first roadway circle is the larger of the three circles in the cross section of the flat-top three-center arched roadway, with the center of the first roadway circle being point A in Figures 6 and 8. The second roadway circle is one of the two smaller circles in the cross section of the flat-top three-center arched roadway, with the two smaller circles having equal radii. Specifically, the center of the second roadway circle is point B in Figures 6 or 8, and the center of the corresponding other smaller circle is point C in Figures 6 or 8.

[0100] Further, as shown in Figures 6 and 8, the above two figures show the representation positions of the dimensional parameters in the structure of the flat-top three-center arch tunnel. Specifically, H in the figure is the tunnel height, h in the figure is the rectangle height, L in the figure is the tunnel width, R in the figure is the radius of the first circle of the tunnel, α in the figure is the center angle of the first circle of the tunnel, ɑ in the figure is the center distance between the first circle of the tunnel and the second circle of the tunnel, r in the figure is the radius of the second circle of the tunnel, point D in the figure is the tangent point of the first circle of the tunnel and the second circle of the tunnel, and h1 in the figure is the height from the tangent point of the first circle of the tunnel and the second circle of the tunnel to the vertex of the rectangle.

[0101] Furthermore, the process of obtaining the size parameters of the flat-top three-center arched roadway specifically includes: receiving the roadway height, rectangle height, roadway width, roadway first circle radius and roadway first circle center angle input from the host computer.

[0102] The center distance between the first circle and the second circle of the lane is calculated based on the lane width, the radius of the first circle of the lane, and the center angle of the first circle of the lane. Specifically, the calculation formula for the center distance between the first circle and the second circle of the lane is:

[0103] Among them, ɑ is the distance between the centers of the first circle and the second circle of the roadway, R is the radius of the first circle of the roadway, L is the width of the roadway, and α is the central angle of the first circle of the roadway.

[0104] Specifically, the above calculation formula can be derived based on the formula for calculating the lane width, where the calculation formula for the lane width is:

[0105] Among them, L is the width of the roadway, ɑ is the distance between the centers of the first circle and the second circle of the roadway, R is the radius of the first circle of the roadway, and α is the central angle of the first circle of the roadway.

[0106] Furthermore, for the radius of the second circle of the lane, the present application provides a method for calculating the radius of the second circle of the lane according to the radius of the first circle of the lane and the center distance between the first circle of the lane and the second circle of the lane. Specifically, the calculation formula of the radius of the second circle of the lane is: r=R-ɑ;

[0107] Among them, r is the radius of the second circle of the roadway, R is the radius of the first circle of the roadway, and ɑ is the distance between the centers of the first circle and the second circle of the roadway.

[0108] For the height from the tangent point of the first and second lane circles to the vertex of the rectangle, the present application provides a method for calculating the height from the tangent point of the first and second lane circles to the vertex of the rectangle based on the radius of the second lane circle and the central angle of the first lane circle. Specifically, the calculation formula for the height from the tangent point of the first and second lane circles to the vertex of the rectangle is:

[0109] Among them, h1 is the height from the tangent point of the first circle of the lane and the second circle of the lane to the vertex of the rectangle, r is the radius of the second circle of the lane, and α is the central angle of the first circle of the lane.

[0110] In this embodiment, the relationship between the cutting coordinate system and the flat-top three-center arched roadway is shown in FIG5 . Specifically, the cutting control method proposed in this application establishes the cutting coordinate system based on the roadway height and roadway width in the dimensions of the flat-top three-center arched roadway. The cutting coordinate system is specifically a plane rectangular coordinate system, and the coordinate origin of the cutting coordinate system is the middle value of the roadway width and the lowest value of the roadway height. The X-axis of the cutting coordinate system is the width direction of the roadway, and the Y-axis of the cutting coordinate system is the height direction of the roadway.

[0111] In this embodiment, the size parameters include: tunnel height, rectangle height, and the height from the intersection of the first circle of the tunnel and the second circle to the vertex of the rectangle. The process of determining the multiple cutting areas contained in the flat-top three-center arch tunnel based on the size parameters specifically includes: when the value of the tunnel height is greater than or equal to the sum of the rectangle height and the height from the intersection of the first circle of the tunnel and the second circle to the vertex of the rectangle, determining that the flat-top three-center arch tunnel includes the first flat-top arch cutting area, the second flat-top arch cutting area, and the rectangular cutting area; when the value of the tunnel height is less than the sum of the rectangle height and the height from the intersection of the first circle of the tunnel and the second circle to the vertex of the rectangle, determining that the flat-top three-center arch tunnel includes the third flat-top arch cutting area and the rectangular cutting area.

[0112] In this embodiment, after obtaining the dimensional parameters of the flat-top three-center arched roadway, including the roadway height, the rectangle height, and the height from the intersection of the first and second roadway circles to the vertex of the rectangle, the process of determining the multiple cutting regions included in the flat-top three-center arched roadway based on the dimensional parameters specifically includes comparing the roadway height with the sum of the heights from the first and second roadway circles to the vertex of the arch and the rectangle height. If the roadway height is greater than or equal to the sum of the rectangle height and the height from the intersection of the first and second roadway circles to the vertex of the rectangle, the flat-top three-center arched roadway is determined to include the first flat-top arched cutting region, the second flat-top arched cutting region, and the rectangle cutting region.

[0113] Specifically, Figures 6 and 7 show the specific positions of the first flat-top arch cutting area, the second flat-top arch cutting area and the rectangular cutting area contained in the flat-top three-center arch tunnel. The longitudinal length of the first flat-top arch cutting area is h2, the longitudinal length of the second flat-top arch cutting area is h1, and the longitudinal length of the rectangular cutting area is h.

[0114] When the roadway height is less than the sum of the rectangle height and the height from the tangent point of the first and second roadway circles to the rectangle vertex, the flat-topped three-center arched roadway is determined to include a third flat-topped arched cutting region and a rectangular cutting region. Specifically, the specific locations of the two cutting regions can be shown in Figures 8 and 9 , where the longitudinal length of the third flat-topped arched cutting region is h3, and the longitudinal length of the rectangular cutting region is h.

[0115] In this embodiment, the present application uses size parameters to determine the cutting area contained in the flat-top three-center arch tunnel, thereby improving the accuracy of determining the cutting horizontal boundary coordinate value corresponding to the cutting longitudinal coordinate value, and realizing the determination of different cutting boundary points according to different cutting areas, thereby meeting the cutting requirements of the flat-top three-center arch tunnel.

[0116] Specifically, when the roadway height is greater than or equal to the sum of the rectangle height and the height from the tangent point of the first and second roadway circles to the rectangle vertex, the flat-top three-center arch roadway can be determined to be a roadway with a flat top cut on a large circle, i.e., the flat-top three-center arch roadway shown in Figure 6. When the roadway height is less than the sum of the rectangle height and the height from the tangent point of the first and second roadway circles to the rectangle vertex, the flat-top three-center arch roadway is determined to be a roadway with a flat top cut on a small circle, i.e., the flat-top three-center arch roadway shown in Figure 8.

[0117] FIG2 shows a second flow chart of a cutting control method in one embodiment of the present application, wherein the cutting control method includes:

[0118] S202: Obtaining dimension parameters of the flat-top three-center arched roadway;

[0119] S204: If the value of the roadway height is greater than or equal to the sum of the height of the rectangle and the height from the tangent point of the first and second circles of the roadway to the vertex of the rectangle, determine that the flat-top three-center arch roadway includes a first flat-top arch cutting area, a second flat-top arch cutting area, and a rectangular cutting area;

[0120] S206: Establishing a cutting coordinate system according to the size parameters;

[0121] S208: Determine multiple cutting longitudinal coordinate values ​​according to the cutting coordinate system;

[0122] S210: Determine a cutting area where a plurality of cutting longitudinal coordinate values ​​are located;

[0123] S212: Determine that the cutting longitudinal coordinate value is in the first flat-top arch cutting area, and obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value based on the rectangle height, the radius of the first circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value;

[0124] S214: Determine that the cutting longitudinal coordinate value is in the second flat-top arch cutting area, and obtain a cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value based on the rectangle height, the radius of the second circle of the lane, the central angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value;

[0125] S216: Determine that the cutting longitudinal coordinate value is within the rectangular cutting area, and obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the lane width;

[0126] S218: Generate a cutting path according to the plurality of cutting longitudinal coordinate values ​​and the plurality of cutting transverse boundary coordinate values;

[0127] S220: Control the cutting head of the tunneling equipment to perform cutting according to the cutting path.

[0128] In this embodiment, the tunnel height is compared with the sum of the heights from the first and second tunnel circles to the arch vertex and the height of the rectangle. If the tunnel height is greater than or equal to the sum of the height of the rectangle and the height from the tangent point of the first and second tunnel circles to the rectangle vertex, it is determined that the flat-topped three-center arched tunnel includes a first flat-topped arched cutting area, a second flat-topped arched cutting area, and a rectangular cutting area.

[0129] Obtain multiple cutting longitudinal coordinate values, determine the cutting areas where the multiple cutting longitudinal coordinate values ​​are located, determine that the cutting longitudinal coordinate value is in the first flat-top arch cutting area, and obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value based on the rectangle height, the radius of the first circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value.

[0130] By using the above-mentioned size parameters to determine the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the first flat-top arch cutting area, it can be ensured that the cutting transverse boundary coordinate value corresponds to the first flat-top arch cutting area, so as to ensure the cutting and forming effect of the first flat-top arch cutting area and avoid over-excavation and under-excavation.

[0131] Specifically, when it is determined that the cutting longitudinal coordinate value is in the first flat-top arch cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is:

[0132] Among them, x1 is the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the first flat-top arch cutting area, R is the radius of the first circle of the tunnel, ɑ is the center distance between the first circle of the tunnel and the second circle of the tunnel, α is the central angle of the first circle of the tunnel, y is the cutting longitudinal coordinate value, and h is the height of the rectangle.

[0133] Through the above calculation formula, the cutting horizontal boundary coordinate value corresponding to the cutting longitudinal coordinate value can be obtained according to the rectangle height, the radius of the first circle of the lane, the central angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value. Since the specific cutting horizontal boundary coordinate value is obtained using the cutting longitudinal coordinate value, the cutting coordinate system is also used, and the number of cutting horizontal boundary coordinate values ​​obtained is two. These two cutting horizontal boundary coordinate values ​​are the horizontal coordinate of the left boundary position of the cutting and the horizontal coordinate of the right boundary position of the cutting at this cutting longitudinal coordinate value. The absolute values ​​of these two cutting horizontal boundary coordinate values ​​are equal, but the positive and negative are opposite in the cutting coordinate system.

[0134] In this embodiment, if it is determined that the cutting longitudinal coordinate value is in the second flat-top arch cutting area, the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is obtained based on the rectangle height, the radius of the second circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value.

[0135] By using the above-mentioned size parameters to determine the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the second flat-top arch cutting area, it can be ensured that the cutting transverse boundary coordinate value corresponds to the second flat-top arch cutting area, so as to ensure the cutting forming effect when cutting using the cutting path generated by the cutting transverse boundary coordinate value and the cutting longitudinal coordinate value, and avoid over-excavation and under-excavation.

[0136] Specifically, when it is determined that the cutting longitudinal coordinate value is in the second flat-top arch cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is:

[0137] Among them, x2 is the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the second flat-top arch cutting area, r is the radius of the second circle of the tunnel, ɑ is the center distance between the first circle of the tunnel and the second circle of the tunnel, α is the central angle of the first circle of the tunnel, y is the cutting longitudinal coordinate value, and h is the height of the rectangle.

[0138] Through the above calculation formula, the cutting horizontal boundary coordinate value corresponding to the cutting longitudinal coordinate value can be obtained according to the rectangle height, the radius of the second circle of the lane, the central angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value. The specific cutting horizontal boundary coordinate value is obtained using the cutting longitudinal coordinate value, so it is also presented according to the cutting coordinate system. The number of cutting horizontal boundary coordinate values ​​obtained is two. These two cutting horizontal boundary coordinate values ​​are the horizontal coordinate of the left boundary position of the cutting and the horizontal coordinate of the right boundary position of the cutting at this cutting longitudinal coordinate value. The absolute values ​​of these two cutting horizontal boundary coordinate values ​​are equal, but the positive and negative are opposite in the cutting coordinate system.

[0139] In this embodiment, if it is determined that the cutting longitudinal coordinate value is in the rectangular cutting area, the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is obtained according to the lane width.

[0140] Specifically, when it is determined that the cutting longitudinal coordinate value is in the rectangular cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is:

[0141] Among them, x4 is the cutting horizontal boundary coordinate value corresponding to the cutting vertical coordinate value in the rectangular cutting area, and L is the lane width.

[0142] It can be seen that in this embodiment, the process of determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value based on the cutting area and size parameters of the cutting longitudinal coordinate value also includes: determining that the cutting coordinate value is in the rectangular cutting area, and then obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the lane width.

[0143] By using the above-mentioned size parameters and calculation formula to determine the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value within the rectangular cutting area, it can be ensured that the cutting transverse boundary coordinate value corresponds to the rectangular cutting area, so as to ensure the cutting forming effect when cutting using the cutting path generated by the cutting transverse boundary coordinate value and the cutting longitudinal coordinate value, and avoid over-excavation and under-excavation.

[0144] In this embodiment, specifically, the process of determining the cutting area in which multiple cutting longitudinal coordinate values ​​are located specifically includes: comparing the cutting longitudinal coordinate value with the tunnel height, the rectangle height, and the height from the intersection point of the first circle of the tunnel and the second circle of the tunnel to the tunnel vertex; when the cutting longitudinal coordinate value is greater than the sum of the rectangle height and the height from the intersection point of the first circle of the tunnel and the second circle of the tunnel to the rectangle vertex, and is less than or equal to the tunnel height, it is determined that the cutting longitudinal coordinate value is within the first flat-top arch cutting area.

[0145] When the cutting longitudinal coordinate value is less than or equal to the sum of the rectangle height and the height from the tangent point of the first circle of the lane and the second circle of the lane to the rectangle vertex, and is greater than the rectangle height, it is determined that the cutting longitudinal coordinate value is within the second flat-top arch cutting area.

[0146] When the cutting longitudinal coordinate value is greater than zero and less than or equal to the value of the rectangle height, it is determined that the cutting longitudinal coordinate value is within the rectangular cutting area.

[0147] FIG3 shows a third flow chart of a cutting control method in one embodiment of the present application, wherein the cutting control method includes:

[0148] S302: Obtaining dimension parameters of the flat-top three-center arched roadway;

[0149] S304: When the value of the roadway height is less than the sum of the height of the rectangle and the height from the tangent point of the first circle and the second circle of the roadway to the vertex of the rectangle, determining that the flat-top three-center arch roadway includes a third flat-top arch cutting area and a rectangular cutting area;

[0150] S306: Establishing a cutting coordinate system according to the size parameters;

[0151] S308: Determine multiple cutting longitudinal coordinate values ​​according to the cutting coordinate system;

[0152] S310: Determine a cutting area where a plurality of cutting longitudinal coordinate values ​​are located;

[0153] S312: Determine that the cutting longitudinal coordinate value is in the third flat-top arch cutting area, and obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value based on the rectangle height, the radius of the second circle of the lane, the central angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value;

[0154] S314: Determine that the cutting longitudinal coordinate value is within the rectangular cutting area, and obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the lane width;

[0155] S316: Generate a cutting path according to the plurality of cutting longitudinal coordinate values ​​and the plurality of cutting transverse boundary coordinate values;

[0156] S318: Control the cutting head of the tunneling equipment to perform cutting according to the cutting path.

[0157] In this embodiment, when the tunnel height is less than the sum of the rectangle height and the height from the tangent point of the first and second tunnel circles to the rectangle vertex, it is determined that the flat-topped three-center arched tunnel includes a third flat-topped arched cutting area and a rectangular cutting area.

[0158] Determine that the cutting longitudinal coordinate value is in the third flat-top arch cutting area, then obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value based on the rectangle height, the radius of the second circle of the lane, the central angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value.

[0159] By using the above-mentioned size parameters to determine the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the third flat-top arch cutting area, it can be ensured that the cutting transverse boundary coordinate value corresponds to the third flat-top arch cutting area, so as to ensure the cutting forming effect when cutting using the cutting path generated by the cutting transverse boundary coordinate value and the cutting longitudinal coordinate value, and avoid over-excavation and under-excavation.

[0160] Specifically, when it is determined that the cutting longitudinal coordinate value is within the third flat-top arch cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is:

[0161] Among them, x3 is the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the third flat-top arch cutting area, r is the radius of the second circle of the tunnel, ɑ is the center distance between the first circle of the tunnel and the second circle of the tunnel, α is the central angle of the first circle of the tunnel, y is the cutting longitudinal coordinate value, and h is the height of the rectangle.

[0162] Through the above calculation formula, the cutting horizontal boundary coordinate value corresponding to the cutting longitudinal coordinate value can be obtained according to the rectangle height, the radius of the second circle of the lane, the central angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value.

[0163] In this embodiment, if it is determined that the cutting longitudinal coordinate value is in the rectangular cutting area, the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is obtained according to the lane width.

[0164] Specifically, when it is determined that the cutting longitudinal coordinate value is in the rectangular cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is:

[0165] Among them, x4 is the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the rectangular cutting area, and L is the lane width.

[0166] FIG4 shows a fourth flow chart of a cutting control method in one embodiment of the present application, wherein the cutting control method includes:

[0167] S402: Obtaining the size parameters of the flat-top three-center arched roadway;

[0168] S404: Determine multiple cutting areas included in the flat-top three-center arched roadway according to size parameters;

[0169] S406: Determine the cutting starting point according to the size parameters;

[0170] S408: Connecting a cutting starting point with a point on the plane where the flat-top three-center arched roadway is located, dividing the connecting line by a preset single cutting amount as a dividing amount, and obtaining a plurality of dividing points;

[0171] S410: Determine the longitudinal coordinate values ​​of the cutting starting point and multiple separation points according to the cutting coordinate system;

[0172] S412: Using the longitudinal coordinate values ​​of the cutting starting point and the plurality of separation points as cutting longitudinal coordinate values;

[0173] S414: Determine a cutting area where a plurality of cutting longitudinal coordinate values ​​are located, and determine a cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting area where the cutting longitudinal coordinate value is located and the size parameter;

[0174] S416: Generate a cutting path according to the plurality of cutting longitudinal coordinate values ​​and the plurality of cutting transverse boundary coordinate values;

[0175] S418: Control the cutting head of the tunneling equipment to perform cutting according to the cutting path.

[0176] In this embodiment, the process of determining multiple longitudinal coordinate values ​​for cutting based on the cutting coordinate system specifically includes: first, determining a cutting starting point for cutting the flat-top three-center arched roadway based on the dimensional parameters of the flat-top three-center arched roadway. Specifically, the cutting starting point is located at the highest point in the middle of the entire flat-top three-center arched roadway. After determining the cutting starting point, a line is drawn between the cutting starting point and a point on the plane on which the flat-top three-center arched roadway lies. Specifically, the plane is the ground. The point is located along the height direction of the entire flat-top three-center arched roadway, opposite the ground and the cutting starting point. The line connecting the two is parallel to the direction of gravity.

[0177] After connecting the cutting starting point with a point on the plane where the flat-top three-center arch tunnel is located to obtain a line segment, the line segment is divided according to the preset single cutting amount to obtain multiple separation points. It can be understood that the above process is to simulate the situation where the cutting head of the tunneling equipment will continuously adjust the height according to the preset single cutting amount during cutting.

[0178] After obtaining the plurality of separation points, the longitudinal coordinate values ​​of the cutting starting point and the plurality of separation points are determined according to the cutting coordinate system, and then the longitudinal coordinate values ​​of the cutting starting point and the plurality of separation points are used as the cutting longitudinal coordinate values.

[0179] Through the above steps, the actual height position of the cutting head of the tunneling equipment when cutting the flat-top three-center arch tunnel can be obtained, and the corresponding cutting longitudinal coordinate value can be obtained to finally obtain the matching cutting transverse boundary coordinate value. The cutting path is obtained through the correspondence between the above-mentioned cutting longitudinal coordinate value and the cutting transverse boundary coordinate value to ensure the accuracy of cutting.

[0180] Specifically, the cutting path includes a cut-in segment, which refers to the line segment where the cutting head advances to perform the first cut. In this embodiment, in the cutting control method proposed in this application, the process of generating a cutting path based on multiple cutting longitudinal coordinate values ​​and multiple cutting transverse boundary coordinate values ​​specifically includes: first, sorting the multiple cutting longitudinal coordinate values ​​in descending order of numerical value. For example, if there are five cutting longitudinal coordinate values, and the five cutting longitudinal coordinate values ​​are 3000, 2800, 2600, 2400, and 2200, respectively, then the cutting longitudinal coordinate value of 3000 is the first cutting longitudinal coordinate value, and the cutting longitudinal coordinate value of 2800 is the second cutting longitudinal coordinate value.

[0181] After sorting multiple cutting longitudinal coordinate values, the first cutting point is determined according to the first cutting longitudinal coordinate value and the middle horizontal coordinate value of the two cutting horizontal boundary coordinate values ​​corresponding to the first cutting longitudinal coordinate value; the second cutting point is determined according to the first cutting longitudinal coordinate value and the negative cutting horizontal boundary coordinate value corresponding to the first cutting longitudinal coordinate value; the third cutting point is determined according to the first cutting longitudinal coordinate value and the positive cutting horizontal boundary coordinate value corresponding to the first cutting longitudinal coordinate value; the first cutting point and the second cutting point are connected, and the second cutting point and the third cutting point are connected to obtain the cutting segment. Through the above process of obtaining the cutting segment, the phenomenon of over-excavation or under-excavation in the cutting operation can be avoided.

[0182] Furthermore, in the cutting control method proposed in the present application, the cutting path also includes a cutting section, which refers to the line section where the cutting is mainly performed after the cutting head advances.

[0183] After obtaining the cutting segment, in this embodiment, the process of generating a cutting path based on multiple cutting longitudinal coordinate values ​​and multiple cutting transverse boundary coordinate values ​​also includes: determining multiple endpoints based on the second cutting longitudinal coordinate value to the Nth cutting longitudinal coordinate value and the positive and negative cutting transverse boundary coordinate values ​​corresponding to the second cutting longitudinal coordinate value to the Nth cutting longitudinal coordinate value.

[0184] After determining multiple endpoints, the endpoint close to the third cutting point is used as the starting point of the connection, and multiple endpoints are connected in an S-shaped line to obtain a cutting segment. The third cutting point is connected to the endpoint as the starting point of the connection line, and then the cutting segment and the cutting segment are connected together to finally generate a complete cutting path.

[0185] By setting the cutting path generated as described above, on the one hand, the forming effect of the flat-top three-center arch tunnel can be ensured, and on the other hand, the cutting head of the tunneling equipment can cut in an S-shaped path, thereby improving the cutting efficiency.

[0186] Specifically, the process of controlling the cutting head of the tunneling equipment to cut according to the cutting path specifically includes: controlling the cutting head to start rotating; controlling the cutting head to move to the first cutting point to start cutting the flat-top three-center arch tunnel; controlling the cutting head to move from the first cutting point to the second cutting point; after moving to the second cutting point, controlling the cutting head to move from the second cutting point to the third cutting point; after moving to the third cutting point, controlling the cutting head to move to the first endpoint, specifically, the cutting horizontal boundary coordinate value of this endpoint is positive; controlling the cutting head to move to the second endpoint, specifically, the cutting longitudinal coordinate value of this endpoint is equal to the cutting longitudinal coordinate value of the first endpoint, and the cutting horizontal boundary coordinate value of this endpoint is equal to the absolute value of the cutting horizontal boundary coordinate value of the first endpoint, but is negative.

[0187] Next, the cutting head is controlled to move to the third endpoint. Specifically, the cutting transverse boundary coordinate value of this endpoint is negative. The cutting head is controlled to move to the fourth endpoint. Specifically, the cutting longitudinal coordinate value of this endpoint is equal to the cutting longitudinal coordinate value of the third endpoint. The cutting transverse boundary coordinate value of this endpoint is equal to the absolute value of the cutting transverse boundary coordinate value of the third endpoint, but is positive.

[0188] Next, the cutting head is controlled to move to the fifth endpoint. Specifically, the cutting transverse boundary coordinate value of this endpoint is a positive number. The cutting head is controlled to move to the sixth endpoint. Specifically, the cutting longitudinal coordinate value of this endpoint is equal to the cutting longitudinal coordinate value of the fifth endpoint. The cutting transverse boundary coordinate value of this endpoint is equal to the absolute value of the cutting transverse boundary coordinate value of the fifth endpoint, but is a negative number.

[0189] According to the above process, the cutting head is controlled to move to different end points until it passes through all the end points to complete the cutting of the flat-top three-center arch tunnel, realizing rapid cutting of the tunnel with an S-shaped trajectory, and quickly completing the automatic cutting operation of the tunneling equipment. At the same time, the forming quality of the flat-top three-center arch tunnel is guaranteed, and over-excavation and under-excavation of the boundaries are avoided.

[0190] As shown in FIG10 , in one embodiment of the present application, a cutting control device 800 is further provided. The cutting control device 800 is configured to implement the steps of the cutting control method described in any of the above embodiments. The cutting control device 800 includes: an acquisition unit 810 for acquiring the size parameters of a flat-top three-center arched tunnel; a first processing unit 820 for determining multiple cutting regions contained in the flat-top three-center arched tunnel based on the size parameters; a second processing unit 830 for establishing a cutting coordinate system based on the size parameters; a first determination unit 840 for determining multiple cutting longitudinal coordinate values ​​based on the cutting coordinate system; a second determination unit 850 for determining the cutting regions in which the multiple cutting longitudinal coordinate values ​​are located, and determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value based on the cutting region in which the cutting longitudinal coordinate value is located and the size parameters; a third processing unit 860 for generating a cutting path based on the multiple cutting longitudinal coordinate values ​​and the multiple cutting transverse boundary coordinate values; and a control unit 870 for controlling the cutting head of the tunneling equipment to cut according to the cutting path.

[0191] In this embodiment, the cutting control device 800 proposed in this application is used to implement the steps of the cutting control method in any of the above embodiments. The cutting control device 800 includes an acquisition unit 810, a first processing unit 820, a second processing unit 830, a third processing unit 860, a first determination unit 840, a second determination unit 850, and a control unit 870. The acquisition unit 810 is used to obtain the dimensional parameters of the flat-top three-center arched roadway. After obtaining the dimensional parameters of the flat-top three-center arched roadway, the first processing unit 820 in the cutting control device 800 can determine the cutting area included in the flat-top three-center arched roadway based on the dimensional parameters of the flat-top three-center arched roadway. The second processing unit 830 can establish a cutting coordinate system based on the dimensional parameters of the flat-top three-center arched roadway.

[0192] After establishing the cutting coordinate system, the first determination unit 840 determines multiple cutting longitudinal coordinate values ​​according to the cutting coordinate system. For this cutting longitudinal coordinate value, it can be understood that during the cutting process, the cutting head of the engineering machinery needs to continuously cut and move the height position, so that the entire flat-top three-center arch tunnel can be cut and the cutting operation can be completed completely. These height values ​​are converted using the cutting coordinate system to obtain the cutting longitudinal coordinate value.

[0193] After obtaining the plurality of cutting longitudinal coordinate values, the second determining unit 850 determines the cutting region in which the plurality of cutting longitudinal coordinate values ​​are located. After determining the cutting region in which the plurality of cutting longitudinal coordinate values ​​are located, the second determining unit 850 calculates the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value based on the cutting region and the size parameter. Specifically, the number of cutting transverse boundary coordinate values ​​calculated corresponding to each cutting longitudinal coordinate value is two. These two cutting transverse boundary coordinate values ​​are the transverse coordinates of the cutting left boundary position and the transverse coordinates of the cutting right boundary position under the height condition. The absolute values ​​of these two cutting transverse boundary coordinate values ​​are equal, but they are opposite in sign in the cutting coordinate system.

[0194] After determining the cutting horizontal boundary coordinate value corresponding to each cutting longitudinal coordinate value, the third processing unit 860 generates a cutting path according to multiple cutting longitudinal coordinate values ​​and multiple cutting horizontal boundary coordinate values, and the control unit 870 controls the cutting head of the tunneling equipment to cut according to the cutting path, so that the tunneling equipment can automatically cut the flat-top three-center arch tunnel to meet the forming requirements of the flat-top three-center arch tunnel. There will be no over-excavation or under-excavation during the cutting, and a complete and standardized flat-top three-center arch tunnel can be obtained after cutting, realizing the automatic cutting and forming of the flat-top three-center arch tunnel.

[0195] Furthermore, the dimensional parameters of the flat-top three-center arched roadway specifically include: roadway height, rectangle height, roadway width, roadway first circle radius, roadway first circle center angle, roadway second circle radius, distance between the center of the roadway first circle and the roadway second circle, and the height from the point of intersection of the roadway first circle and the roadway second circle to the vertex of the rectangle. In the process of obtaining the dimensional parameters of the flat-top three-center arched roadway, the acquisition unit 810 is specifically configured to: receive the roadway height, rectangle height, roadway width, roadway first circle radius, and roadway first circle center angle input from the host computer; calculate the distance between the center of the roadway first circle and the roadway second circle based on the roadway width, roadway first circle radius, and roadway first circle center angle; calculate the roadway second circle radius based on the roadway first circle radius and the distance between the center of the roadway first circle and the roadway second circle; and calculate the height from the point of intersection of the roadway first circle and the roadway second circle to the vertex of the rectangle based on the roadway second circle radius and the roadway first circle center angle.

[0196] In the process of determining the multiple cutting areas contained in the flat-top three-center arched roadway according to the size parameters, the first processing unit 820 is specifically used to: compare the roadway height with the sum of the rectangle height and the height from the intersection point of the first circle of the roadway and the second circle of the roadway to the rectangle vertex; when the roadway height is greater than or equal to the sum of the rectangle height and the height from the intersection point of the first circle of the roadway and the second circle of the roadway to the rectangle vertex, determine that the flat-top three-center arched roadway includes the first flat-top arched cutting area, the second flat-top arched cutting area and the rectangular cutting area; when the roadway height is less than the sum of the rectangle height and the height from the intersection point of the first circle of the roadway and the second circle of the roadway to the rectangle vertex, determine that the flat-top three-center arched roadway includes the third flat-top arched cutting area and the rectangular cutting area.

[0197] In the process of determining multiple cutting longitudinal coordinate values ​​according to the cutting coordinate system, the first determination unit 840 is specifically used to: determine the cutting starting point according to the size parameters; connect the cutting starting point with a point on the plane where the flat-top three-center arch tunnel is located, and separate the connecting line with a preset single cutting amount as the separation amount to obtain multiple separation points; determine the longitudinal coordinate values ​​of the cutting starting point and multiple separation points according to the cutting coordinate system; and use the longitudinal coordinate values ​​of the cutting starting point and multiple separation points as the cutting longitudinal coordinate values.

[0198] In the process of determining the cutting area where multiple cutting longitudinal coordinate values ​​are located, and determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting area and size parameters where the cutting longitudinal coordinate value is located, the second determination unit 850 is specifically used to: determine that the cutting longitudinal coordinate value is in the first flat-top arch cutting area, and obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the height of the rectangle, the radius of the first circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value.

[0199] Determine whether the cutting longitudinal coordinate value is in the second flat-top arch cutting area or the third flat-top arch cutting area, and obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value based on the rectangle height, the radius of the second circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value.

[0200] It is determined that the cutting longitudinal coordinate value is in the rectangular cutting area, and the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is obtained according to the lane width.

[0201] Furthermore, the cutting path includes an entry segment and a cutting segment. In the process of generating a cutting path based on multiple cutting longitudinal coordinate values ​​and multiple cutting transverse boundary coordinate values, the third processing unit 860 is specifically used to: sort the multiple cutting longitudinal coordinate values ​​in descending order; determine the first cutting point based on the first cutting longitudinal coordinate value and the middle transverse coordinate value of the two cutting transverse boundary coordinate values ​​corresponding to the first cutting longitudinal coordinate value; determine the second cutting point based on the first cutting longitudinal coordinate value and the negative cutting transverse boundary coordinate value corresponding to the first cutting longitudinal coordinate value; determine the third cutting point based on the first cutting longitudinal coordinate value and the positive cutting transverse boundary coordinate value corresponding to the first cutting longitudinal coordinate value; connect the first cutting point with the second cutting point, and connect the second cutting point with the third cutting point to obtain the entry segment.

[0202] After obtaining the cutting segment, the third processing unit 860 is also specifically used to determine multiple endpoints based on the second cutting longitudinal coordinate value to the Nth cutting longitudinal coordinate value and the positive and negative cutting transverse boundary coordinate values ​​corresponding to the second cutting longitudinal coordinate value to the Nth cutting longitudinal coordinate value; the endpoint close to the third cutting point is used as the starting point of the connection line, and the multiple endpoints are connected in an S-shaped line to obtain the cutting segment; the third cutting point is connected to the endpoint as the starting point of the connection line to generate a cutting path.

[0203] In one embodiment of the present application, as shown in Figure 11, a cutting control component 900 is also proposed, wherein the cutting control component 900 includes a processor 920 and a memory 910, and the memory 910 stores programs or instructions that can be run on the processor 920. When the program or instruction is executed by the processor 920, the steps of the cutting control method in any of the above embodiments are implemented.

[0204] In this embodiment, the cutting control component 900 includes a processor 920 and a memory 910. The memory 910 stores programs or instructions that can be run on the processor 920. When the program or instructions are executed by the processor 920, the steps of the cutting control method in any of the above embodiments are implemented. Therefore, the cutting control component 900 has all the beneficial effects of the cutting control method in any of the above embodiments.

[0205] In one embodiment of the present application, a tunneling device is provided, comprising the cutting control device 800 or the cutting control assembly 900 as described in the above embodiments.

[0206] In this embodiment, a tunneling device is provided. The tunneling device specifically includes the cutting control device 800 or cutting control assembly 900 described in the above embodiment, thereby achieving all the beneficial technical effects of the cutting control device 800 or cutting control assembly 900 described in the above embodiment. The tunneling device can be controlled to automatically cut a flat-top, three-center arched roadway, meeting the cutting requirements of the flat-top, three-center arched roadway, avoiding overbreak and underbreak, and ultimately resulting in a complete flat-top, three-center arched roadway. Specifically, the tunneling device includes a roadheader, which can be an open-type roadheader or a shield-type roadheader.

[0207] In one embodiment of the present application, a readable storage medium is further provided. The readable storage medium stores a program. When the program is executed by a processor, the steps of the cutting control method in any of the above embodiments are implemented.

[0208] In this embodiment, a program is stored on the readable storage medium, and when the program is executed by the processor, the steps of the cutting control method in any of the above embodiments are implemented. Therefore, this readable storage medium has all the beneficial technical effects of the cutting control method in any of the above embodiments.

[0209] Specifically, a person of ordinary skill in the art can understand that all or part of the steps of implementing the cutting control method in the above embodiment can be completed by controlling the relevant hardware through a program, and the program is stored in a readable storage medium. When executed, the program may include the following steps: obtaining the size parameters of the flat-top three-center arch tunnel; determining the multiple cutting areas contained in the flat-top three-center arch tunnel according to the size parameters; establishing a cutting coordinate system according to the size parameters; determining multiple cutting longitudinal coordinate values ​​according to the cutting coordinate system; determining the cutting areas where the multiple cutting longitudinal coordinate values ​​are located, and determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting areas and size parameters where the cutting longitudinal coordinate values ​​are located; generating a cutting path according to the multiple cutting longitudinal coordinate values ​​and the multiple cutting transverse boundary coordinate values; and controlling the cutting head of the tunneling equipment to cut according to the cutting path.

[0210] Specifically, the readable storage medium may include a magnetic disk, an optical disk, a semiconductor memory, or a memory stick.

[0211] In this application, the term "plurality" refers to two or more, unless otherwise specified. Terms such as "installed," "connected," "connected," and "fixed" should be interpreted broadly. For example, "connected" can mean fixed, removable, or integrally connected; and "connected" can mean directly or indirectly through an intermediary. Those skilled in the art will understand the specific meanings of these terms in this application based on the specific circumstances.

[0212] Throughout this specification, terms such as "one embodiment," "some embodiments," and "specific embodiments" mean that the specific features, structures, materials, or characteristics described in conjunction with that embodiment or example are included in at least one embodiment or example of the present application. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

[0213] The above description is merely a preferred embodiment of the present application and is not intended to limit the present application. Various modifications and variations are possible for those skilled in the art. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of the present application shall be included within the scope of protection of the present application.

Claims

1. A cutting control method, wherein: Used to control the excavation equipment to perform cutting operation on the flat-top three-center arched tunnel, the cutting control method includes: Obtaining the dimension parameters of the flat-top three-center arched tunnel; Determining a plurality of cutting areas included in the flat-top three-center arched tunnel according to the size parameters; Establishing a cutting coordinate system according to the size parameters; According to the cutting coordinate system, determining a plurality of cutting longitudinal coordinate values; Determine a cutting area where a plurality of the cutting longitudinal coordinate values ​​are located, and determine a cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting area where the cutting longitudinal coordinate value is located and the size parameter; Generate a cutting path according to the plurality of cutting longitudinal coordinate values ​​and the plurality of cutting transverse boundary coordinate values; The cutting head of the tunneling equipment is controlled to perform cutting according to the cutting path.

2. The cutting control method according to claim 1, wherein: The size parameters include: tunnel height, rectangle height, and the height from the tangent point of the first circle of the tunnel and the second circle of the tunnel to the vertex of the rectangle. The process of determining the multiple cutting areas included in the flat-top three-center arched tunnel according to the size parameters specifically includes: In the case where the value of the roadway height is greater than or equal to the sum of the height of the rectangle and the height from the tangent point of the first circle of the roadway and the second circle of the roadway to the vertex of the rectangle, it is determined that the flat-top three-center arch roadway includes a first flat-top arch cutting area, a second flat-top arch cutting area and a rectangular cutting area; When the value of the lane height is less than the sum of the rectangle height and the height from the tangent point of the first lane circle and the second lane circle to the rectangle vertex, it is determined that the flat-top three-center arch lane includes a third flat-top arch cutting area and the rectangular cutting area.

3. The cutting control method according to claim 2, wherein: The size parameters also include: the radius of the first circle of the lane, the center angle of the first circle of the lane, and the center distance between the first circle of the lane and the second circle of the lane. The process of determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting area where the cutting longitudinal coordinate value is located and the size parameters specifically includes: Determine that the cutting longitudinal coordinate value is in the first flat-top arch cutting area, according to the The height of the rectangle, the radius of the first circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value are used to obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value.

4. The cutting control method according to claim 3, wherein: When it is determined that the cutting longitudinal coordinate value is in the first flat-top arch cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is: Among them, x1 is the cutting lateral boundary coordinate value corresponding to the cutting longitudinal coordinate value in the first flat-top arch cutting area, R is the radius of the first circle of the lane, ɑ is the center distance between the first circle of the lane and the second circle of the lane, α is the center angle of the first circle of the lane, y is the cutting longitudinal coordinate value, and h is the height of the rectangle.

5. The cutting control method according to claim 2, wherein: The size parameters also include: the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the radius of the second circle of the lane. The process of determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting area where the cutting longitudinal coordinate value is located and the size parameters specifically includes: Determine whether the cutting longitudinal coordinate value is in the second flat-top arch cutting area or the third flat-top arch cutting area, and obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the rectangle height, the radius of the second circle of the lane, the center angle of the first circle of the lane, the center distance between the first circle of the lane and the second circle of the lane, and the cutting longitudinal coordinate value.

6. The cutting control method according to claim 5, wherein: When it is determined that the cutting longitudinal coordinate value is in the second flat-top arch cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is: Wherein, x2 is the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the second flat-top arch cutting area, r is the radius of the second circle of the lane, ɑ is the center distance between the first circle of the lane and the second circle of the lane, α is the center angle of the first circle of the lane, y is the cutting longitudinal coordinate value, and h is the height of the rectangle; or When it is determined that the cutting longitudinal coordinate value is in the third flat-topped arch cutting area, The calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is: Among them, x3 is the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value in the third flat-top arch cutting area, r is the radius of the second circle of the lane, ɑ is the center distance between the first circle of the lane and the second circle of the lane, α is the center angle of the first circle of the lane, y is the cutting longitudinal coordinate value, and h is the height of the rectangle.

7. The cutting control method according to claim 2, wherein: The size parameter also includes the lane width. The process of determining the cutting transverse boundary coordinate value corresponding to each cutting longitudinal coordinate value according to the cutting area where the cutting longitudinal coordinate value is located and the size parameter specifically includes: Determine that the cutting longitudinal coordinate value is in the rectangular cutting area, and obtain the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value according to the lane width; Wherein, when it is determined that the cutting longitudinal coordinate value is in the rectangular cutting area, the calculation formula for obtaining the cutting transverse boundary coordinate value corresponding to the cutting longitudinal coordinate value is: Among them, x4 is the cutting lateral boundary coordinate value corresponding to the cutting longitudinal coordinate value in the rectangular cutting area, and L is the lane width.

8. The cutting control method according to any one of claims 1 to 7, wherein: The process of determining a plurality of cutting longitudinal coordinate values ​​according to the cutting coordinate system specifically includes: According to the size parameters, determining the cutting starting point; Connect the cutting starting point with a point on the plane where the flat-top three-center arched tunnel is located, and separate the connecting line with a preset single cutting amount as a separation amount to obtain multiple separation points; Determine the longitudinal coordinate values ​​of the cutting starting point and the plurality of separation points according to the cutting coordinate system; The longitudinal coordinate values ​​of the cutting starting point and the plurality of separation points are used as the cutting longitudinal coordinate values.

9. The cutting control method according to claim 8, wherein: The cutting path includes a cutting-in segment, and the process of generating the cutting path according to the plurality of cutting longitudinal coordinate values ​​and the plurality of cutting transverse boundary coordinate values ​​specifically includes: Sorting the plurality of cutting longitudinal coordinate values ​​in descending order of value; Determine a first cutting point according to a first cutting longitudinal coordinate value and an intermediate transverse coordinate value of two cutting transverse boundary coordinate values ​​corresponding to the first cutting longitudinal coordinate value; Determine a second cutting point according to the first cutting longitudinal coordinate value and the negative cutting transverse boundary coordinate value corresponding to the first cutting longitudinal coordinate value; Determine a third cutting point according to the first cutting longitudinal coordinate value and the cutting transverse boundary coordinate value which is a positive number and corresponds to the first cutting longitudinal coordinate value; The first cutting point and the second cutting point are connected, and the second cutting point and the third cutting point are connected to obtain the cutting-in segment.

10. The cutting control method according to claim 9, wherein: The cutting path also includes a cutting segment. After obtaining the cut-in segment, the process of generating the cutting path according to the plurality of cutting longitudinal coordinate values ​​and the plurality of cutting transverse boundary coordinate values ​​further includes: Determine a plurality of endpoints according to the second cutting longitudinal coordinate value to the Nth cutting longitudinal coordinate value and the positive and negative transverse cutting boundary coordinate values ​​corresponding to the second cutting longitudinal coordinate value to the Nth cutting longitudinal coordinate value; Taking the endpoint close to the third cutting point as the starting point of the connection, connecting the multiple endpoints in an S-shaped line to obtain the cutting segment; The third cutting point is connected to the endpoint serving as the starting point of the connection line to generate the cutting path.

11. A cutting control device, wherein: Used to implement the cutting control method according to any one of claims 1 to 10, the cutting control device comprises: An acquisition unit, used for acquiring the dimension parameters of the flat-top three-center arched laneway; A first processing unit, configured to determine a plurality of cutting areas included in the flat-top three-center arched tunnel according to the size parameters; A second processing unit, used for establishing a cutting coordinate system according to the size parameters; A first determining unit, configured to determine a plurality of cutting longitudinal coordinate values ​​according to the cutting coordinate system; A second determining unit is used to determine a cutting area where a plurality of the cutting longitudinal coordinate values ​​are located, and determine a cutting transverse boundary coordinate value corresponding to each of the cutting longitudinal coordinate values ​​according to the cutting area where the cutting longitudinal coordinate value is located and the size parameter; A third processing unit, configured to generate a cutting path according to the plurality of cutting longitudinal coordinate values ​​and the plurality of cutting transverse boundary coordinate values; A control unit is used to control the cutting head of the tunneling equipment to cut according to the cutting path.

12. A cutting control assembly, wherein: The method comprises a processor and a memory, wherein the memory stores a program or instruction that can be run on the processor, and when the program or instruction is executed by the processor, the steps of the cutting control method according to any one of claims 1 to 10 are implemented.

13. A tunneling device, wherein: include: The cutting control device according to claim 11; or The cutting control assembly of claim 12.

14. A readable storage medium having a program stored thereon, wherein: When the program is executed by a processor, the steps of the cutting control method according to any one of claims 1 to 10 are implemented.

Citation Information

Patent Citations

  • System and method for controlling exhaust system having selective catalyst reduction component

    CN103362620A

  • Control method of heading machine, heading machine and readable storage medium

    CN112377204A

  • Optimization method for automatically forming cutting motion of section of cantilever longitudinal shaft type heading machine

    CN112983412A

  • Cutting arm control method and device, heading machine and heading machine control system

    CN115163107A

  • Cutting control method, device and assembly, tunneling equipment and readable storage medium

    CN116255160A