Shield engineering system

By designing a continuous conveying and processing system, the problem of low material conveying and processing efficiency in tunnel construction is solved, and efficient construction progress and quality improvement is achieved.

WO2024239510A1PCT designated stage expired Publication Date: 2024-11-28CHINA RAILWEY ENG SERVICE CO LTD

Patent Information

Application Number
PCT/CN2023/123257
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-23
Filing Date
2023-10-07
Publication Date
2024-11-28

AI Technical Summary

Technical Problem

There are intermittent problems in material transportation and treatment during tunnel construction, resulting in low construction efficiency, high cost, and long solidification time, which affects the construction progress and quality.

Method used

Design a shield engineering system, including a continuous conveying system of traction rope drive vehicles, a belt conveying system, a material processing system and a material injection auxiliary system, to realize the continuous conveying and processing of materials and shorten the conveying and solidification time.

Benefits of technology

It improves the efficiency and quality of tunnel construction, reduces costs, and ensures the rapid progress of construction progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023123257_28112024_PF_FP_ABST
    Figure CN2023123257_28112024_PF_FP_ABST
Patent Text Reader

Abstract

A shield engineering system, relating to the technical field of tunnel construction. The shield engineering system comprises: a first continuous conveying system (1), a traction rope (11) enabling a first material (9) on carriers (13) to move from the outside of a tunnel (6) to the inside of the tunnel (6); a second continuous conveying system (2), a second material (10) in the form of a fluid on a belt (21) moving into a material pool (8) outside the tunnel (6) from the inside of the tunnel (6); a second material treatment system (4), the second material treatment system (4) being used for separating a solid material and a liquid material in the second material (10); a third continuous conveying system (5), the third continuous conveying system (5) being used for continuously conveying the second material (10) in the material pool (8) to the outside or uninterruptedly conveying same to the second material treatment system (4); and a material injection auxiliary system (3), the material injection auxiliary system (3) being used for injecting a third material (101) in the form of a fluid into gaps between surround rock and segments of the tunnel (6).
Need to check novelty before this filing date? Find Prior Art

Description

A shield engineering system

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This application is based on the Chinese patent application with application number 2023105827876 and application date May 23, 2023, and claims the priority of the Chinese patent application. The entire content of the Chinese patent application is hereby introduced into this application as a reference. Technical Field

[0003] The present disclosure relates to the technical field of tunnel construction, and in particular to a shield engineering system. Background Art

[0004] During tunnel construction, it is necessary to transport materials from outside the tunnel to inside the tunnel, transport materials from inside the tunnel to outside the tunnel, and inject grout into the gaps between the tunnel's surrounding rock and the segments, etc., in order to cooperate with the shield equipment to complete the construction of the tunnel. Among them, the transportation of materials is mostly intermittent.

[0005] Summary of the Invention

[0006] The present disclosure aims to solve one of the technical problems in the related art at least to a certain extent.

[0007] To this end, an object of the present disclosure is to provide a shield engineering system.

[0008] To achieve the above-mentioned purpose, the present disclosure provides a shield engineering system, comprising: a first continuous conveying system, the first continuous conveying system comprising: a traction rope and a plurality of carriers, the traction rope being arranged on the ground of the tunnel, the carrier being connected to the traction rope, the traction rope being used to drive the carrier to circulate between the inside of the tunnel and the outside of the tunnel, so that the first material on the carrier is moved from the outside of the tunnel to the inside of the tunnel; a second continuous conveying system, the second continuous conveying system comprising: a belt, the belt being arranged on the side wall of the tunnel, the belt being used to circulate between the inside of the tunnel and the outside of the tunnel The belt circulates between the two materials so that the second material in fluid form on the belt moves from the inside of the tunnel to the material pool outside the tunnel; a second material processing system, the second material processing system is used to separate the solid material and the liquid material in the second material; a third continuous conveying system, the third continuous conveying system is used to continuously convey the second material in the material pool to the outside or to the second material processing system without interruption; an injection auxiliary system, the injection auxiliary system is used to inject a third material in fluid form into the gap between the surrounding rock and the pipe segment of the tunnel, and inject a fourth material in fluid form into the third material according to a proportion.

[0009] In some embodiments, the traction rope includes: a first feeding section and a first return section, the first feeding section and the first return section are respectively slidably set on the ground of the tunnel, the carrier is movably set on the ground of the tunnel, and the carrier is fixedly connected to the first feeding section or the first return section; the first continuous conveying system also includes: a first driving device, the first driving device is set on the shield equipment in the tunnel, the first driving device is connected to the traction rope transmission, the first driving device is used to drive the first feeding section to move in the direction from the outside of the tunnel to the inside of the tunnel and drive the first return section to move in the direction from the inside of the tunnel to the outside of the tunnel.

[0010] In some embodiments, the first continuous conveying system also includes: a first guide rail, which is arranged on the ground of the tunnel; a plurality of first guide rollers, which are rotatably arranged on the first guide rail, the first feeding section is arranged on the plurality of first guide rollers, and the first feeding section is rollingly connected to the first guide roller; a second guide rail, which is arranged on the ground of the tunnel; a plurality of second guide rollers, which are rotatably arranged on the second guide rail, the first return section is arranged on the plurality of second guide rollers, and the first return section is rollingly connected to the second guide roller.

[0011] In some embodiments, the carrier includes: a disc; a plurality of rollers, wherein the rollers are rotatably arranged on the disc and rollingly arranged on the ground of the tunnel; wherein the disc is located above the first guide rail, the disc is fixedly connected to the first feeding section, and the plurality of rollers are located on both sides of the first guide rail; or the disc is located above the second guide rail, the disc is fixedly connected to the first return section, and the plurality of rollers are located on both sides of the second guide rail.

[0012] In some embodiments, the carrier also includes: a first clamping roller, which is rotatably arranged on the disk body; a second clamping roller, which is rotatably arranged on the disk body; wherein the first clamping roller and the second clamping roller are respectively connected to the two sides of the first guide rail in a rolling manner; or the first clamping roller and the second clamping roller are respectively connected to the two sides of the second guide rail in a rolling manner.

[0013] In some embodiments, the injection auxiliary system includes: a first injection device and a second injection device, the first injection device is arranged on the shield equipment in the tunnel, the discharge end of the first injection device is facing the surrounding rock and the gap between the pipe segments of the tunnel, and the first injection device is used to inject the third material into the gap between the surrounding rock and the pipe segments of the tunnel, the second injection device is arranged on the shield equipment, the discharge end of the second injection device is connected to the feed end of the first injection device, and the second injection device is used to inject the fourth material into the third material according to a proportion.

[0014] In some embodiments, the first injection device includes: a three-way pipe, the three-way pipe includes: a pipe body and a one-way valve, the first feed end of the pipe body is used to input the third material, the discharge end of the pipe body faces the inner wall of the tunnel, the one-way valve is arranged on the pipe body, and the feed end of the one-way valve is connected to the discharge end of the second injection device, and the discharge end of the one-way valve is connected to the second feed end of the pipe body.

[0015] In some embodiments, the one-way valve includes: a valve body, the valve body is arranged on the tube body, a valve cavity is arranged in the valve body, and the valve cavity is connected to the second feed end of the tube body; a valve column, the valve column is arranged on the valve body, and the valve column includes: a first part and a second part, the first part is connected to the second part, the first part is located outside the valve cavity, and the second part is located in the valve cavity; a feed channel, the feed channel is arranged in the valve column, the feed end of the feed channel is arranged on the first part, and the feed end of the feed channel is connected to the second injection device The discharge end of the feed channel is connected to the discharge end of the feed channel, and the discharge end of the feed channel is arranged on the second part; an elastic sleeve, the elastic sleeve is arranged on the second part, and the elastic sleeve covers the discharge end of the feed channel; wherein, based on the pressure in the feed channel being greater than the pressure in the valve cavity, a gap is generated between the elastic sleeve and the second part, and the discharge end of the feed channel and the valve cavity are connected through the gap; based on the pressure in the feed channel being less than or equal to the pressure in the valve cavity, the elastic sleeve is sealed and fitted with the second part, and the discharge end of the feed channel is cut off from the valve cavity.

[0016] In some embodiments, the second material processing system includes: a screening device, a flocculation collection device and a solid-liquid separation device, the feed end of the screening device is connected to the discharge end of the material pool, the feed end of the flocculation collection device is connected to the second discharge end of the screening device, and the feed end of the solid-liquid separation device is connected to the second discharge end of the flocculation collection device.

[0017] In some embodiments, the third continuous conveying system includes: a base, a third driving device, a collecting device and a lifting device. The base is slidingly arranged in the material pool along the horizontal direction. The third driving device is transmission-connected to the base. The third driving device is used to drive the base to reciprocate in the material pool. The collecting device is arranged on the base, and the feeding end of the collecting device is arranged below the material surface of the material pool. The lifting device is arranged on the base, and the feeding end of the lifting device is connected to the discharging end of the collecting device. The discharging end of the lifting device is arranged outside the material pool or the discharging end of the lifting device is connected to the feeding end of the screening device.

[0018] The traction rope drives the carrier to move cyclically between the inside and outside of the tunnel to achieve continuous transportation of the first material from the outside of the tunnel to the inside of the tunnel. The belt moves cyclically between the inside and outside of the tunnel to achieve continuous transportation of the second material from the inside of the tunnel to the material pool outside the tunnel. The third continuous conveying system continuously transports the second material in the material pool outward or uninterruptedly transports it to the second material processing system to achieve continuous transportation or processing of the second material. The injection auxiliary system injects a mixture of the third and fourth materials into the gaps between the surrounding rock and the segments of the tunnel to accelerate the solidification of the third material in the gaps between the surrounding rock and the segments. This effectively shortens the time for conveying the first and second materials, the time for processing the second material, and the time for solidification of the third material, thereby greatly shortening the construction period of shield construction in the tunnel, improving the efficiency of shield construction in the tunnel, and reducing the cost of shield construction in the tunnel.

[0019] Additional aspects and advantages of the present disclosure will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The above and / or additional aspects and advantages of the present disclosure will become apparent and readily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0021] FIG1 is a schematic structural diagram of a first continuous conveying system in a shield engineering system according to an embodiment of the present disclosure;

[0022] FIG2 is a cross-sectional schematic diagram of the first feeding section of the shield engineering system proposed in one embodiment of the present disclosure;

[0023] FIG3 is a cross-sectional schematic diagram of the first return section of the shield engineering system proposed in one embodiment of the present disclosure;

[0024] FIG4 is a schematic structural diagram of a shield engineering system when a traction rope turns in an embodiment of the present disclosure;

[0025] FIG5 is a schematic structural diagram of a carrier in a shield engineering system according to an embodiment of the present disclosure;

[0026] FIG6 is a schematic structural diagram of a rope storage device in a shield engineering system according to an embodiment of the present disclosure;

[0027] FIG7 is a schematic structural diagram of a first driving device in a shield engineering system according to an embodiment of the present disclosure;

[0028] FIG8 is a schematic structural diagram of a second continuous conveying system in a shield engineering system according to an embodiment of the present disclosure;

[0029] FIG9 is a schematic structural diagram of a belt storage device in a shield engineering system according to an embodiment of the present disclosure;

[0030] FIG10 is a schematic structural diagram of a material injection auxiliary system in a shield engineering system according to an embodiment of the present disclosure;

[0031] FIG11 is a schematic structural diagram of a second storage tank in a shield engineering system according to an embodiment of the present disclosure;

[0032] FIG12 is a schematic structural diagram of a tee pipe in a shield engineering system according to an embodiment of the present disclosure;

[0033] FIG13 is a cross-sectional schematic diagram of a one-way valve in a shield engineering system according to an embodiment of the present disclosure (in a non-working state);

[0034] FIG14 is a cross-sectional schematic diagram of a one-way valve in a shield engineering system according to an embodiment of the present disclosure (in working state);

[0035] FIG15 is a cross-sectional schematic diagram of a tee pipe in a shield engineering system according to an embodiment of the present disclosure;

[0036] FIG16 is a schematic structural diagram of a second material handling system in a shield engineering system according to an embodiment of the present disclosure;

[0037] FIG17 is a cross-sectional schematic diagram of a third continuous conveying system in a shield engineering system according to an embodiment of the present disclosure;

[0038] FIG18 is a schematic structural diagram of a baffle in a shield engineering system according to an embodiment of the present disclosure;

[0039] FIG19 is a schematic structural diagram of a lifting device in a shield engineering system according to an embodiment of the present disclosure;

[0040] FIG20 is a schematic structural diagram of a hoisting device in a shield engineering system according to an embodiment of the present disclosure;

[0041] FIG21 is a schematic top view of a material pool in a shield engineering system according to an embodiment of the present disclosure;

[0042] FIG22 is a schematic top view of a material pool in a shield engineering system according to an embodiment of the present disclosure (the movement direction of the base is opposite to that of FIG21 );

[0043] As shown in the figure: 1. The first continuous conveying system;

[0044] 11. Traction rope, 1101. First feeding section, 1102. First return section;

[0045] 12. First driving device, 1201. First driving frame, 1202. First driving wheel, 1203. First driving member;

[0046] 13. Carrier, 1301, plate, 1302, roller, 1303, first clamping roller, 1304, second clamping roller, 1305, first fixed rope, 1306, first rope gripper, 1307, second fixed rope, 1308, second rope gripper, 1309, third bracket, 1310, fifth guide roller, 1311, fourth bracket, 1312, sixth guide roller;

[0047] 14. First guide rail, 1401. First bracket;

[0048] 15. First guide roller;

[0049] 16. Second guide rail, 1601. Second bracket;

[0050] 17. Second guide roller, 18. Third guide roller, 19. Fourth guide roller;

[0051] 110. Rope storage device, 11001. First tensioning fixed frame, 11002. First tensioning sliding frame, 11003. Rope storage wheel;

[0052] 111. First tensioning device, 11101. First tensioning frame, 11102. First tensioning pulley, 11103. Second tensioning pulley, 11104. First tensioning rope, 11105. First winch;

[0053] 112. First detaching device, 113. Second detaching device;

[0054] 2. Second continuous conveying system;

[0055] 21. Belt, 2101. Second feeding section, 2102. Second return section;

[0056] 22. Second driving device, 2201. Second driving frame, 2202. Second driving wheel, 2203. Second driving member, 2204. First steering wheel;

[0057] 23. Belt storage device, 2301. Second tensioning fixed frame, 2302. Second tensioning sliding frame, 2303. Belt storage wheel;

[0058] 24. Second tensioning device, 2401. Second tensioning frame, 2402. Third tensioning pulley, 2403. Fourth tensioning pulley, 2404. Second tensioning rope, 2405. Second winch;

[0059] 25. Support device, 2501. Fifth bracket, 2502. Sixth bracket, 2503. First roller, 2504. Second roller;

[0060] 3. Injection auxiliary system;

[0061] 31. First injection device, 3101. First storage tank, 3102. First delivery pump, 3103. First injection pipe, 3104. Second flow meter;

[0062] 32. Second injection device, 3201. Second storage tank, 3202. Second delivery pump, 3203. Second injection pipe;

[0063] 3204, proportional adjustment component, 32041, proportional valve, 32042, first flow meter;

[0064] 3205, third storage tank, 3206, fourth storage tank, 3207, first feeder, 3208, second feeder, 3209, stirring device, 3210, water storage tank, 3211, third delivery pump, 3212, water injection pipe, 3213, tee pipe;

[0065] 32131, pipe body, 32132, one-way valve;

[0066] 321321, valve body, 321322, valve chamber;

[0067] 321323, valve stem, 3213231, first part, 3213232, second part;

[0068] 321324, feed channel, 321325, elastic sleeve, 321326, gap, 321327, first cover plate, 321328, sealing sleeve, 321329, opening, 3213210, flange, 3213211, fixing sleeve, 3213212, nut, 3213213, quick connector, 3213214, first baffle;

[0069] 4. Second material handling system;

[0070] 41. Screening device, 4101. Hopper, 4102. Coarse vibrating screen, 4103. Fine vibrating screen, 4104. Coarse screening cone tank, 4105. First cyclone, 4106. Second cyclone, 4107. Settling tank, 4108. Sand washer;

[0071] 42. Flocculation collection device, 4201. First flocculation tank, 4202. Second flocculation tank, 4203. Dosing device;

[0072] 43. Solid-liquid separation device, 4301. Filter press;

[0073] 44. First mud pool, 45. Second mud pool, 46. First clear water pool, 47. Second clear water pool;

[0074] 5. The third continuous conveying system;

[0075] 51. Base;

[0076] 52. Aggregate device;

[0077] 5201, aggregate seat;

[0078] 5202, screw conveying device, 52021, first spiral blade, 52022, second spiral blade, 52023, third driving member;

[0079] 5203, aggregate bin, 5204, second baffle, 5205, first chute, 5206, second chute;

[0080] 5207, lifting device, 52071, hanger, 52072, telescopic arm, 52073, chain hoist;

[0081] 53. Lifting device, 5301. Lifting frame, 5302. Driving sprocket, 5303. Driven sprocket, 5304. Chain, 5305. Scraper, 5306. Partition, 5307. Fourth driving member, 5308. First side plate, 5309. Second side plate, 5310. Second cover plate, 5311. Elastic member;

[0082] 54. Third driving device, 5401. Driving seat, 5402. Roller, 5403. Fifth driving member, 5404. Second steering wheel, 5405. Transmission rope;

[0083] 55. Plank road, 56. Third guide rail, 57. Rotating wheel, 58. Gap;

[0084] 6. Tunnel, 7. Shield equipment, 8. Material pool, 9. First material, 10. Second material, 101. Third material, 102. Fourth material. DETAILED DESCRIPTION

[0085] The following describes in detail embodiments of the present disclosure, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended only to explain the present disclosure and are not to be construed as limiting the present disclosure. On the contrary, the embodiments of the present disclosure include all variations, modifications, and equivalents that fall within the spirit and scope of the appended claims.

[0086] As shown in Figures 1 and 8, the embodiment of the present disclosure proposes a shield engineering system, including a first continuous conveying system 1, a second continuous conveying system 2, a second material handling system 4, a third continuous conveying system 5 and a material injection auxiliary system 3. The first continuous conveying system 1 includes a traction rope 11 and a plurality of carriers 13. The traction rope 11 is set on the ground of the tunnel 6. The carrier 13 is connected to the traction rope 11. The traction rope 11 is used to drive the carrier 13 to circulate between the inside and outside of the tunnel 6, so that the first material 9 on the carrier 13 moves from the outside of the tunnel 6 to the inside of the tunnel 6. The second continuous conveying system 2 includes a belt 21. The belt 21 is set On the side wall of the tunnel 6, the belt 21 is used to circulate between the inside and outside of the tunnel 6, so that the fluid second material 10 on the belt 21 moves from the inside of the tunnel 6 to the material pool 8 outside the tunnel 6. The second material processing system 4 is used to separate the solid material and liquid material in the second material 10. The third continuous conveying system 5 is used to continuously convey the second material 10 in the material pool 8 to the outside or uninterruptedly convey it to the second material processing system 4. The injection auxiliary system 3 is used to inject the fluid third material 101 into the inner wall of the tunnel 6, and inject the fluid fourth material 102 into the third material 101 according to the proportion.

[0087] It is understood that the traction rope 11 drives the carrier 13 to circulate between the interior and exterior of the tunnel 6 to achieve continuous conveyance of the first material 9 from the exterior of the tunnel 6 to the interior of the tunnel 6. The belt 21 circulates between the interior and exterior of the tunnel 6 to achieve continuous conveyance of the second material 10 from the interior of the tunnel 6 to the material pool 8 outside the tunnel 6. The third continuous conveying system 5 continuously conveys the second material 10 in the material pool 8 outward or uninterruptedly to the second material processing system 4 to achieve continuous transportation or processing of the second material 10. The injection auxiliary system 3 injects a mixture of the third material 101 and the fourth material 102 into the surrounding rock and the gaps between the segments of the tunnel 6 to accelerate the solidification of the third material 101 in the gaps between the surrounding rock and the segments of the tunnel 6. As a result, the time for conveying the first material 9 and the second material 10, the time for processing the second material 10, and the time for solidification of the third material 101 are effectively shortened, thereby significantly shortening the construction period of the shield tunnel 6, improving the efficiency of the shield tunnel 6, and reducing the cost of the shield tunnel 6.

[0088] It should be noted that tunnel 6 is a passage excavated using shield equipment 7. Tunnel 6 includes an inner diameter surface of the segment and an outer diameter surface of the segment, wherein the inner diameter surface is used for vehicles and personnel to pass through, and the outer diameter surface bears the external pressure of the surrounding rock on the segment. Among them, since the diameter of the shield cutter head is larger than the outer diameter of the segment, the diameter of the surrounding rock of tunnel 6 is larger than the outer diameter of the segment. Therefore, there is a gap of a certain volume space between the surrounding rock and the segment of tunnel 6, and mortar needs to be injected to form a new stable structure of the segment, mortar and surrounding rock. During the shield excavation process, as the shield equipment 7 advances, the first material 9 needs to be continuously moved from the outside of tunnel 6 to the inside of tunnel 6, and at the same time, the second material 10 needs to be continuously moved from the inside of tunnel 6 to the outside of tunnel 6 to complete the construction of tunnel 6.

[0089] The specific types of the first material 9, the second material 10, the third material 101 and the fourth material 102 can be set according to actual needs and are not limited to this. For example, the first material 9 can be prefabricated pipe segments, grease cylinders, foam, walkway boards and other equipment, the second material 10 can be shield slag, mud, other waste, etc., and the third material 101 can be mortar. The mortar is injected into the gap between the surrounding rock and the pipe segments of the tunnel 6 to form a concrete layer to facilitate the fitting installation of the pipe segments on the inner wall of the tunnel 6. Correspondingly, the fourth material 102 can be an auxiliary liquid of the mortar. After the auxiliary liquid is mixed with the mortar in a set proportion, the cost of subsequent pipe segment repair, secondary grouting, plugging, etc. caused by the long solidification time of the original mortar is reduced, thereby reducing the time of shield synchronous grouting, improving the molding quality of the shield pipe segments, and improving the efficiency of tunnel 6 construction.

[0090] Therefore, in the shield engineering system of the embodiment of the present disclosure, the first materials 9 such as prefabricated segments, grease cylinders, foam, walkway plates, etc. required for shield excavation can be quickly transported from the outside of the tunnel 6 to the inside of the tunnel 6, and the second materials 10 such as shield debris, mud, and other waste can be quickly transported from the inside of the tunnel 6 to the material pool 8 outside the tunnel 6. At the same time, the second materials 10 such as shield debris, mud, and other waste in the material pool 8 can be quickly processed or transported out, and the material pool 8 can be quickly emptied, so that the shield engineering will not have the problem of shield shutdown due to the full material pool 8. Moreover, the fourth material 102 such as auxiliary liquid can be mixed into the third material 101 such as mortar, thereby reducing the subsequent segment repair, secondary grouting, plugging and other costs increased due to the long solidification time of the third material 101, thereby reducing the time of shield synchronous grouting and improving the forming quality of the shield segments. Therefore, the shield engineering system of the embodiment of the present disclosure can significantly shorten the construction period of the shield construction in the tunnel 6, improve the efficiency of the shield construction in the tunnel 6, and reduce the cost of the shield construction in the tunnel 6.

[0091] The specific type of shield equipment 7 can be set according to actual needs and is not limited to this. For example, the shield equipment 7 can be a shield machine, TBM (Tunnel-Boring-Machine), etc. A temporary storage area is provided at the tail of the shield equipment 7 for temporarily storing materials.

[0092] The traction rope 11 is used to drive the vehicle 13 to move. The specific type of the traction rope 11 can be set according to actual needs and is not limited to this. For example, the traction rope 11 can be a rope with tensile strength such as a wire rope, or a chain 5304 with tensile strength.

[0093] The carrier 13 is a vehicle for carrying the first material 9 . The specific type of the carrier 13 can be set according to actual needs and is not limited thereto.

[0094] The first material 9 on the carrier 13 can be loaded and unloaded by a lifting device on the shield equipment 7, or by an external lifting device, without limitation.

[0095] The continuous conveying structure in which the traction rope 11 and the carrier 13 are matched as a whole can also improve the adaptability of the whole to the turning of the tunnel 6, so that the whole has a wider application field.

[0096] The belt 21 is used to transport the second material 10. The specific type of the belt 21 can be set according to actual needs and is not limited thereto.

[0097] As shown in Figure 1, in some embodiments, the traction rope 11 includes a first feeding section 1101 and a first return section 1102, and the first feeding section 1101 and the first return section 1102 are respectively slidably set on the ground of the tunnel 6, and the carrier 13 is movably set on the ground of the tunnel 6, and the carrier 13 is fixedly connected to the first feeding section 1101 or the first return section 1102. The first continuous conveying system 1 also includes a first driving device 12, and the first driving device 12 is set on the shield equipment 7 in the tunnel 6. The first driving device 12 is connected to the traction rope 11 for transmission. The first driving device 12 is used to drive the first feeding section 1101 to move in the direction from the outside of the tunnel 6 to the inside of the tunnel 6 and drive the first return section 1102 to move in the direction from the inside of the tunnel 6 to the outside of the tunnel 6.

[0098] It can be understood that the first driving device 12 drives the traction rope 11 to move, so that the first feeding section 1101 of the traction rope 11 moves in the direction from the outside of the tunnel 6 to the inside of the tunnel 6, and the first return section 1102 of the traction rope 11 moves in the direction from the inside of the tunnel 6 to the outside of the tunnel 6, thereby realizing the circular rotation of the traction rope 11 between the inside of the tunnel 6 and the outside of the tunnel 6, and because the carrier 13 is fixedly connected to the first feeding section 1101 or the first return section 1102, the carrier 13 can move in a circular motion between the inside of the tunnel 6 and the outside of the tunnel 6 with the circular rotation of the traction rope 11, thereby realizing the continuous transportation of the first material 9 by the carrier 13, thereby effectively shortening the transportation time of the first material 9, improving the transportation efficiency of the first material 9, and then improving the efficiency of shield construction in the tunnel 6, and reducing the cost of shield construction in the tunnel 6.

[0099] Among them, since the first feeding section 1101 and the first return section 1102 are respectively slidably set on the ground of the tunnel 6, the weight of the traction rope 11 can be dispersed on the ground of the tunnel 6, thereby improving the transportation stability of the carrier 13 for the first material 9 and avoiding safety problems caused by the suspension of the traction rope 11.

[0100] At the same time, since the first drive device 12 is arranged on the shield equipment 7 in the tunnel 6, the first drive device 12 can directly drag the first feeding segment 1101 of the traction rope 11, and at the same time indirectly drag the first return segment 1102 of the traction rope 11, so that the first feeding segment 1101 is in a tensioned state, and the first return segment 1102 is in a relatively relaxed state. Therefore, compared with the manner in which the first drive device 12 indirectly drags the first feeding segment 1101 through the first return segment 1102, the manner in which the first drive device 12 directly drags the first feeding segment 1101 can reduce the dragging force of the first drive device 12 on the traction rope 11, which can not only reduce the power output of the first drive device 12 and reduce the overall cost, but also reduce the force on the traction rope 11, thereby reducing the use specifications of the traction rope 11, reducing the wear of the traction rope 11, and thus extending the service life of the traction rope 11.

[0101] Moreover, since the carrier 13 is fixedly connected to the first feeding section 1101 or the first return section 1102, the carrier 13 and the traction rope 11 can move synchronously, thereby avoiding the overall loss of control such as the carrier 13 moving back and forth due to inertia and other reasons during the climbing or descending process, which not only effectively improves the overall transportation stability of the first material 9, but also improves the overall safety.

[0102] It should be noted that the first feed segment 1101 and the second return segment 2102 of the traction rope 11 are dynamic. That is, during the cyclic rotation of the traction rope 11, the portion of the traction rope 11 that moves from the outside of the tunnel 6 to the inside of the tunnel 6 is called the first feed segment 1101, and the portion of the traction rope 11 that moves from the inside of the tunnel 6 to the outside of the tunnel 6 is called the second return segment 2102. The relative positions of the first feed segment 1101 and the second return segment 2102 of the traction rope 11 within the tunnel 6 can be set according to actual needs and are not limited to this. For example, the first feed segment 1101 can be located at the center of the tunnel 6 floor, and the second return segment 2102 can be located to one side of the tunnel 6 floor.

[0103] The first drive device 12 is used to drive the circular movement of the traction rope 11. The specific type of the first drive device 12 can be set according to actual needs and is not limited to this. For example, as shown in Figure 7, the first drive device 12 includes a first drive frame 1201, at least one first drive wheel 1202 and at least one first drive member 1203. The first drive frame 1201 is set at the tail of the shield equipment 7, and the first drive wheel 1202 is rotatably set on the first drive frame 1201. The traction rope 11 is wrapped around the first drive wheel 1202 for at least one circle. The first drive member 1203 is set on the first drive frame 1201, and the first drive member 1203 is connected to the first drive wheel 1202 through transmission. It can be understood that the first driving member 1203 drives the first driving wheel 1202 to rotate, and the first driving wheel 1202 drives the traction rope 11 to move through the friction between it and the traction rope 11, thereby realizing the circular movement of the traction rope 11. At the same time, by winding the traction rope 11 around the first driving wheel 1202 at least once, it is ensured that there is a high friction between the first driving wheel 1202 and the traction rope 11, thereby ensuring the stable drive of the traction rope 11 by the first driving wheel 1202.

[0104] Moreover, by setting the first drive frame 1201 on the shield equipment 7, the first drive device 12 can move forward synchronously with the shield equipment 7, so that the whole can use the shield equipment 7 to overcome the tension at the storage point of the traction rope 11 to adjust the length of the traction rope 11, thereby making the use of the whole more convenient.

[0105] Among them, the number of turns that the traction rope 11 wraps around the first driving wheel 1202 can be set according to actual needs and is not limited to this. For example, the number of turns that the traction rope 11 wraps around the first driving wheel 1202 can be one, two, three, etc.

[0106] The first driving wheel 1202 corresponds to the first driving member 1203 one by one. The number of the first driving wheel 1202 and the first driving member 1203 can be set according to actual needs and is not limited to this. For example, the first driving wheel 1202 and the first driving member 1203 can be one, two, three, etc.

[0107] The first driving member 1203 is used to drive the first driving wheel 1202 to rotate. The specific type of the first driving member 1203 can be set according to actual needs and is not limited to this. For example, the first driving member 1203 may include a first driving motor and a first reducer. The first driving motor and the first reducer are both arranged on the first driving frame 1201. The first driving motor is connected to the first reducer in a transmission manner, and the first reducer is connected to the first driving wheel 1202 in a transmission manner, so that the first driving motor drives the first reducer to rotate, and the first reducer drives the first driving wheel 1202 to rotate.

[0108] As shown in Figures 2 and 3, in some embodiments, the first continuous conveying system 1 also includes a first guide rail 14, multiple first guide rollers 15, a second guide rail 16 and multiple second guide rollers 17, the first guide rail 14 is set on the ground of the tunnel 6, the first guide roller 15 is rotatably set on the first guide rail 14, the first feeding section 1101 is set on the multiple first guide rollers 15, and the first feeding section 1101 is rollingly connected to the first guide roller 15, the second guide rail 16 is set on the ground of the tunnel 6, the second guide roller 17 is rotatably set on the second guide rail 16, the first return section 1102 is set on the multiple second guide rollers 17, and the first return section 1102 is rollingly connected to the second guide roller 17.

[0109] It can be understood that since the first feeding section 1101 is set on multiple first guide rollers 15, and the first feeding section 1101 is rollingly connected to the first guide rollers 15, the first feeding section 1101 can be slidably set on the ground of the tunnel 6. At the same time, through the rolling setting between the first feeding section 1101 and the multiple first guide rollers 15, the friction loss of the first feeding section 1101 can be reduced, thereby extending the service life of the traction rope 11. Moreover, through the setting of the first guide rail 14, the stable bearing of the multiple first guide rollers 15 on the first feeding section 1101 can be guaranteed, so that the carrier 13 can move according to the set route under the stable movement of the first feeding section 1101, avoiding problems such as overturning of the carrier 13 due to deviation of the motion trajectory.

[0110] Since the first return section 1102 is arranged on multiple second guide rollers 17, and the first return section 1102 is rollingly connected to the second guide rollers 17, the first return section 1102 can be slidably set on the ground of the tunnel 6. At the same time, through the rolling setting between the first return section 1102 and the multiple second guide rollers 17, the friction loss of the first return section 1102 can be reduced, thereby extending the service life of the traction rope 11. Moreover, through the setting of the second guide rail 16, the stable bearing of the multiple second guide rollers 17 on the first return section 1102 can be guaranteed, so that the vehicle 13 can move according to the set route under the stable movement of the first return section 1102, avoiding problems such as overturning of the vehicle 13 due to deviation of the motion trajectory.

[0111] Among them, the first guide rail 14 and the second guide rail 16 and the first guide roller 15 on the first guide rail 14 and the second guide roller 17 on the second guide rail 16 are used to carry the traction rope 11, making the overall erection and installation more convenient. Compared with installing support parts such as brackets in the tunnel 6, the overall cost and construction period are lower, and the safety hazards of high-altitude transportation are avoided.

[0112] It should be noted that the first guide rail 14 and the second guide rail 16 are used to carry the first guide roller 15 and the second guide roller 17, and then carry the traction rope 11. The specific types of the first guide rail 14 and the second guide rail 16 can be set according to actual needs and are not limited to this. For example, the first guide rail 14 and the second guide rail 16 can both be I-beams, and the first guide rail 14 and the second guide rail 16 are set on the ground of the tunnel 6 along the depth direction of the tunnel 6, wherein the depth direction of the tunnel 6 includes the direction from the inside of the tunnel 6 to the outside of the tunnel 6 and the direction from the outside of the tunnel 6 to the inside of the tunnel 6.

[0113] The installation method of the first guide roller 15 on the first guide rail 14 and the installation method of the second guide roller 17 on the second guide rail 16 can be set according to actual needs and there is no limitation on this. For example, as shown in Figure 2, a plurality of first brackets 1401 are provided on the first guide rail 14 along the length direction of the first guide rail 14, and both ends of the first guide roller 15 are connected to the first brackets 1401 through bearings, thereby realizing the rotation setting of the first guide roller 15 on the first guide rail 14. As shown in Figure 3, a plurality of second brackets 1601 are provided on the second guide rail 16 along the length direction of the second guide rail 16, and both ends of the second guide roller 17 are connected to the second brackets 1601 through bearings, thereby realizing the rotation setting of the second guide roller 17 on the second guide rail 16.

[0114] The number of the first guide rollers 15 and the second guide rollers 17 as well as the spacing between adjacent first guide rollers 15 and the spacing between adjacent second guide rollers 17 can be set according to actual needs and are not limited thereto.

[0115] As shown in Figure 4, in some embodiments, the first continuous conveying system 1 also includes a plurality of third guide rollers 18 and a plurality of fourth guide rollers 19, the third guide roller 18 is rotatably set on the first guide rail 14, the first feeding section 1101 is set on the plurality of third guide rollers 18, and the first feeding section 1101 is rollingly connected to the third guide roller 18, the fourth guide roller 19 is rotatably set on the second guide rail 16, the first return section 1102 is set on the plurality of fourth guide rollers 19, and the first return section 1102 is rollingly connected to the fourth guide roller 19, wherein the center axis of the first guide roller 15 and the center axis of the second guide roller 17 are set in the horizontal direction, and the center axis of the third guide roller 18 and the center axis of the fourth guide roller 19 are set in the vertical direction.

[0116] It can be understood that the first feeding section 1101 of the traction rope 11 is simultaneously arranged on the first guide roller 15 and the third guide roller 18, so that the first guide roller 15 and the third guide roller 18 can both play a bearing and guiding role for the first feeding section 1101, and since the center axis of the first guide roller 15 is arranged in the horizontal direction and the center axis of the third guide roller 18 is arranged in the vertical direction, the first guide roller 15 can bear the force of the first feeding section 1101 in the vertical direction, and the third guide roller 18 can bear the force of the first feeding section 1101 in the horizontal direction, thereby enabling the first feeding section 1101 to utilize the first guide roller 15 for stable linear movement and to utilize the third guide roller 18 for stable steering movement.

[0117] The first return section 1102 of the traction rope 11 is simultaneously arranged on the second guide roller 17 and the fourth guide roller 19, so that the second guide roller 17 and the fourth guide roller 19 can both play a bearing and guiding role for the first return section 1102, and since the center axis of the second guide roller 17 is arranged in the horizontal direction and the center axis of the fourth guide roller 19 is arranged in the vertical direction, the second guide roller 17 can bear the force of the first return section 1102 in the vertical direction, and the fourth guide roller 19 can bear the force of the first return section 1102 in the horizontal direction, thereby enabling the first return section 1102 to use the second guide roller 17 for stable linear movement and to use the fourth guide roller 19 for stable steering movement.

[0118] Therefore, through the cooperation of multiple first guide rollers 15, multiple second guide rollers 17, multiple third guide rollers 18 and multiple fourth guide rollers 19, the traction rope 11 can move stably both in straight line movement and turning, thereby further improving the overall adaptability to the tunnel 6 and making the overall application field wider.

[0119] It should be noted that the installation method of the third guide roller 18 on the first guide rail 14 and the installation method of the fourth guide roller 19 on the second guide rail 16 can be set according to actual needs and are not limited to this. For example, the installation method of the third guide roller 18 on the first guide rail 14 can be the same as the installation method of the first guide roller 15 on the first guide rail 14, and the installation method of the fourth guide roller 19 on the second guide rail 16 can be the same as the installation method of the second guide roller 17 on the second guide rail 16.

[0120] The number of the third guide rollers 18 and the fourth guide rollers 19 can be set according to actual needs and is not limited thereto.

[0121] In some embodiments, a first groove is provided on the first guide roller 15 along the circumference of the first guide roller 15, a third groove is provided on the third guide roller 18 along the circumference of the third guide roller 18, the first feeding section 1101 is provided in the first groove and the third groove, and / or a second groove is provided on the second guide roller 17 along the circumference of the second guide roller 17, a fourth groove is provided on the fourth guide roller 19 along the circumference of the fourth guide roller 19, and the first return section 1102 is provided in the second groove and the fourth groove.

[0122] It can be understood that, by setting the first groove and the third groove, the first feeding section 1101 can be limited on the first guide roller 15 and the third guide roller 18, thereby preventing the first feeding section 1101 from falling off the first guide roller 15 and the third guide roller 18, thereby ensuring the stable bearing and guiding of the first feeding section 1101 by the first guide roller 15 and the third guide roller 18, thereby improving the overall stability of material conveying.

[0123] By setting the second groove and the fourth groove, the first return section 1102 can be limited on the second guide roller 17 and the fourth guide roller 19, thereby preventing the first return section 1102 from escaping from the second guide roller 17 and the fourth guide roller 19, thereby ensuring the stable support and guidance of the first return section 1102 by the second guide roller 17 and the fourth guide roller 19, thereby improving the stability of the overall material conveying.

[0124] By setting the first groove, the second groove, the third groove and the fourth groove, the traction rope 11 can also move stably during linear movement and turning, thereby further improving the overall adaptability to the tunnel 6 and making the overall application field wider.

[0125] It should be noted that the first groove can be provided on the first guide roller 15 and the third groove can be provided on the third guide roller 18, while the second groove can be not provided on the second guide roller 17 and the fourth groove can be not provided on the fourth guide roller 19. Alternatively, the first groove can be not provided on the first guide roller 15 and the third groove can be not provided on the third guide roller 18, while the second groove can be provided on the second guide roller 17 and the fourth groove can be provided on the fourth guide roller 19. At the same time, the first groove can be provided on the first guide roller 15, the third groove can be provided on the third guide roller 18, the second groove can be provided on the second guide roller 17 and the fourth groove can be provided on the fourth guide roller 19. There is no limitation to this.

[0126] The first groove, the second groove, the third groove and the fourth groove are used to limit the traction rope 11. The specific types of the first groove, the second groove, the third groove and the fourth groove can be set according to actual needs and are not limited to this. For example, the first groove, the second groove, the third groove and the fourth groove can be annular grooves respectively opened on the first guide roller 15, the second guide roller 17, the third guide roller 18 and the fourth guide roller 19, or the first guide roller 15, the second guide roller 17, the third guide roller 18 and the fourth guide roller 19 can be set to a structure with a small diameter in the middle and a large diameter at both ends, so that the first groove, the second groove, the third groove and the fourth groove are respectively formed on the first guide roller 15, the second guide roller 17, the third guide roller 18 and the fourth guide roller 19.

[0127] As shown in Figures 2, 3 and 5, in some embodiments, the carrier 13 includes a disc 1301 and multiple rollers 1302, the rollers 1302 are rotatably set on the disc 1301, and the rollers 1302 are rollingly set on the ground of the tunnel 6, wherein the disc 1301 is located above the first guide rail 14, the disc 1301 is fixedly connected to the first feeding section 1101, and the multiple rollers 1302 are located on both sides of the first guide rail 14, or the disc 1301 is located above the second guide rail 16, the disc 1301 is fixedly connected to the first return section 1102, and the multiple rollers 1302 are located on both sides of the second guide rail 16.

[0128] It can be understood that since the roller 1302 is rotatably set on the disc 1301, and the roller 1302 is rollingly set on the ground of the tunnel 6, the disc 1301 can move on the ground of the tunnel 6, and since the disc 1301 is fixedly connected to the first feeding section 1101 or the first return section 1102, the traction rope 11 can drive the disc 1301 to move on the ground of the tunnel 6, thereby realizing continuous transportation of the first material 9. At the same time, since multiple rollers 1302 are located on both sides of the first guide rail 14 or the second guide rail 16, the disc 1301 can be evenly stressed when driven by the first feeding section 1101 or the first return section 1102, thereby ensuring stable transportation of the first material 9 by the disc 1301.

[0129] It should be noted that when the carrier 13 is located in the first feeding section 1101, the disk 1301 is located above the first guide rail 14, the disk 1301 is fixedly connected to the first feeding section 1101, and multiple rollers 1302 are located on both sides of the first guide rail 14; when the carrier 13 is located in the first return section 1102, the disk 1301 is located above the second guide rail 16, the disk 1301 is fixedly connected to the first return section 1102, and multiple rollers 1302 are located on both sides of the second guide rail 16.

[0130] The tray 1301 is used to load the first material 9. The specific type of the tray 1301 can be set according to actual needs and is not limited to this.

[0131] The roller 1302 is used to support the tray 1301 and realize the movement of the tray 1301. The specific type of the roller 1302 can be set according to actual needs and is not limited to this.

[0132] The number of rollers 1302 can be set according to actual needs and is not limited thereto. For example, there can be four rollers 1302 , which are respectively located on both sides of the first guide rail 14 or the second guide rail 16 .

[0133] As shown in Figures 2 and 3, in some embodiments, the carrier 13 also includes a first clamping roller 1303 and a second clamping roller 1304, the first clamping roller 1303 is rotatably set on the disk body 1301, and the second clamping roller 1304 is rotatably set on the disk body 1301, wherein the first clamping roller 1303 and the second clamping roller 1304 are respectively rollingly connected to both sides of the first guide rail 14, or the first clamping roller 1303 and the second clamping roller 1304 are respectively rollingly connected to both sides of the second guide rail 16.

[0134] It can be understood that since the first clamping roller 1303 and the second clamping roller 1304 are respectively connected to the two sides of the first guide rail 14 in a rolling manner, or the first clamping roller 1303 and the second clamping roller 1304 are respectively connected to the two sides of the second guide rail 16 in a rolling manner, the first clamping roller 1303 and the second clamping roller 1304 can limit the carrier 13 at the first guide rail 14 or the second guide rail 16, thereby avoiding the problem of tilting, shaking, and detachment of the carrier 13 when the traction rope 11 drives the carrier 13 to move, thereby ensuring that the carrier 13 can move according to the set route and realize stable transportation of the first material 9.

[0135] It should be noted that when the carrier 13 is located in the first feeding section 1101, the first clamping roller 1303 and the second clamping roller 1304 are respectively connected to the two sides of the first guide rail 14 in a rolling manner; when the carrier 13 is located in the first return section 1102, the first clamping roller 1303 and the second clamping roller 1304 are respectively connected to the two sides of the second guide rail 16 in a rolling manner.

[0136] The arrangement of the first clamping roller 1303 and the second clamping roller 1304 on the disk body 1301 can be set according to actual needs and is not limited to this. For example, as shown in Figures 2 and 3, a third bracket 1309 and a fourth bracket 1311 are provided on both sides of the first guide rail 14 or the second guide rail 16 on the disk body 1301, and the two ends of the first clamping roller 1303 are connected to the third bracket 1309 through bearings, and the two ends of the second clamping roller 1304 are connected to the fourth bracket 1311 through bearings.

[0137] As shown in Figures 2 and 3, taking the first guide rail 14 as an example, a fifth guide roller 1310 can be provided on the side of the third bracket 1309 close to the first guide roller 15, and the rotation center axis of the fifth guide roller 1310 is perpendicular to the rotation center axis of the first clamping roller 1303. A sixth guide roller 1312 can be provided on the side of the fourth bracket 1311 close to the first guide roller 15, and the rotation center axis of the sixth guide roller 1312 is perpendicular to the rotation center axis of the second clamping roller 1304. Therefore, when the carrier 13 tilts and causes the third bracket 1309 and the fourth bracket 1311 to deviate in the direction close to the first guide roller 15, direct contact between the third bracket 1309 and the fourth bracket 1311 and the first guide rail 14 can be avoided, thereby avoiding wear between the third bracket 1309 and the fourth bracket 1311 and the first guide rail 14, and making the movement of the carrier 13 smoother.

[0138] The first clamping roller 1303 and the second clamping roller 1304 are used to be connected to the side of the first guide rail 14 or the second guide rail 16 in a rolling manner to cooperate in clamping the first guide rail 14 or the second guide rail 16. The specific types of the first clamping roller 1303 and the second clamping roller 1304 can be set according to actual needs and are not limited to this.

[0139] As shown in Figure 5, in some embodiments, the carrier 13 further includes a first fixing rope 1305, a first gripper 1306, a second fixing rope 1307 and a second gripper 1308, the first fixing rope 1305 is arranged at one end of the disk body 1301, the first gripper 1306 is arranged at the end of the first fixing rope 1305 away from the disk body 1301, the second fixing rope 1307 is arranged at the end of the disk body 1301 away from the first fixing rope 1305, and the second gripper 1308 is arranged at the end of the second fixing rope 1307 away from the disk body 1301, wherein the first gripper 1306 and the second gripper 1308 are respectively detachably connected to the first feeding section 1101, or the first gripper 1306 and the second gripper 1308 are respectively detachably connected to the first return section 1102.

[0140] It can be understood that, since the first fixed rope 1305 is arranged at one end of the disc body 1301, the first rope gripper 1306 is arranged at the end of the first fixed rope 1305 away from the disc body 1301, and the first rope gripper 1306 is detachably connected to the first feeding section 1101 or the first return section 1102, so that one end of the disc body 1301 can be fixedly connected to the first feeding section 1101 or the first return section 1102. At the same time, since the second fixed rope 1307 is arranged at one end of the disc body 1301, the second rope gripper 1308 is arranged at the end of the second fixed rope 1307 away from the disc body 1301, and the second rope gripper 1308 is detachably connected to the first feeding section 1101 or the first return section 1102. The unloading is connected so that the other end of the disc 1301 can be fixedly connected to the first feeding section 1101 or the first return section 1102. Thus, by the arrangement of the first gripper 1306 and the second gripper 1308, the carrier 13 is fixedly connected to the traction rope 11, ensuring the continuous transportation of the first material 9 by the carrier 13, and by the arrangement of the first fixed rope 1305 and the second fixed rope 1307, the carrier 13 and the traction rope 11 can move synchronously, thereby avoiding the overall loss of control such as the forward and backward movement of the carrier 13 due to inertia and other reasons during the climbing or descending process, which not only effectively improves the overall transportation stability of the first material 9, but also improves the overall safety.

[0141] Moreover, since the first gripper 1306 and the second gripper 1308 are detachably connected to the first feeding section 1101 or the first return section 1102 respectively, it is convenient to separate the carrier 13 from the traction rope 11 while ensuring that the carrier 13 is stably connected to the traction rope 11, thereby making the carrier 13 more flexible and convenient in transporting the first material 9.

[0142] It should be noted that when the carrier 13 is located in the first feeding section 1101, the first gripper 1306 and the second gripper 1308 are connected to the first feeding section 1101; when the carrier 13 is located in the first return section 1102, the first gripper 1306 and the second gripper 1308 are connected to the first return section 1102.

[0143] The first fixing rope 1305 and the second fixing rope 1307 are used to fix the carrier 13 and the traction rope 11. The specific types of the first fixing rope 1305 and the second fixing rope 1307 can be set according to actual needs and are not limited to this. For example, the first fixing rope 1305 and the second fixing rope 1307 can be ropes with tensile strength such as steel wire ropes, or chains 5304 with tensile strength, etc.

[0144] The first rope gripper 1306 and the second rope gripper 1308 are used to be connected to the traction rope 11. The first rope gripper 1306 and the second rope gripper 1308 are both rope grippers. The specific types of the first rope gripper 1306 and the second rope gripper 1308 can be set according to actual needs and are not limited to this. For example, the first rope gripper 1306 and the second rope gripper 1308 each include a first clamping rod and a second clamping rod. The middle part of the first clamping rod is hinged to the middle part of the second clamping rod. A spring is provided between one end of the first clamping rod and one end of the second clamping rod. A clamping opening is formed between the other end of the first clamping rod and the other end of the second clamping rod. The clamping opening is stably clamped on the traction rope 11 under the action of the spring.

[0145] The disassembly and assembly method of the first and second rope grips 1306 and 1308 on the traction rope 11 can be set according to actual needs and is not limited to this. For example, the disassembly and assembly of the first and second rope grips 1306 and 1308 can be completed manually or automatically using mechanical equipment.

[0146] As shown in Figure 1, in some embodiments, the first continuous conveying system 1 also includes a first unhooking device 112 and / or a second unhooking device 113. The first unhooking device 112 is arranged on the ground of the tunnel 6 near the tail of the shield equipment 7. The first feeding section 1101 passes through the first unhooking device 112 at one end close to the shield equipment 7. The second unhooking device 113 is arranged on the ground of the tunnel 6 away from the shield equipment 7. The first return section 1102 passes through the second unhooking device 113 at one end away from the shield equipment 7.

[0147] It can be understood that, by setting up the first detaching device 112, the first detaching device 112 can be used to automatically separate the first gripper 1306 and the second gripper 1308 from the first feeding section 1101, thereby simplifying the separation operation between the carrier 13 and the traction rope 11 and making the overall use more convenient.

[0148] By setting the second detaching device 113, the first rope gripper 1306 and the second rope gripper 1308 can be automatically separated from the first return section 1102 using the second detaching device 113, thereby simplifying the separation operation between the carrier 13 and the traction rope 11 and making the overall use more convenient.

[0149] It should be noted that the first continuous conveying system 1 may include only the first dehanging device 112 , or only the second dehanging device 113 , or may include both the first dehanging device 112 and the second dehanging device 113 , and there is no limitation to this.

[0150] The arrangement of the first unhooking device 112 and the second unhooking device 113 on the ground of the tunnel 6 can be set according to actual needs and is not limited to this. For example, the first unhooking device 112 can be set on the shield equipment 7, and the second unhooking device 113 can be directly set on the ground of the tunnel 6.

[0151] The first detaching device 112 and the second detaching device 113 are used for automatically separating the first gripping device 1306 and the second gripping device 1308 from the traction rope 11. The specific types of the first detaching device 112 and the second detaching device 113 can be set according to actual needs and are not limited to this. For example, the first detaching device 112 and the second detaching device 113 both include a first limiting plate, a second limiting plate, a third limiting plate and a fourth limiting plate. The first limiting plate and the second limiting plate are arranged on one side of the traction rope 11, and the third limiting plate and the fourth limiting plate are arranged on the other side of the traction rope 11. The distance between the first limiting plate and the second limiting plate decreases linearly along the forward direction of the traction rope 11, and the distance between the third limiting plate and the fourth limiting plate decreases linearly along the forward direction of the traction rope 11. When the first clamping rod and the second clamping rod of a rope grabber 1306 pass between the first limit plate and the second limit plate, the end of the first clamping rod away from the clamping opening and the end of the second clamping rod away from the clamping opening in the first rope grabber 1306 approach each other, so that the clamping opening of the first rope grabber 1306 gradually becomes larger and eventually separates from the traction rope 11, thereby realizing the separation of the first rope grabber 1306 from the traction rope 11. When the first clamping rod and the second clamping rod of the second rope grabber 1308 pass between the third limit plate and the fourth limit plate, the end of the first clamping rod away from the clamping opening and the end of the second clamping rod away from the clamping opening in the second rope grabber 1308 approach each other, thereby causing the clamping opening of the second rope grabber 1308 to gradually become larger and eventually separates from the traction rope 11, thereby realizing the separation of the second rope grabber 1308 from the traction rope 11.

[0152] Wherein, guide wheels may be provided at one end of the first clamping rod away from the clamping opening and at one end of the second clamping rod away from the clamping opening to reduce wear of the first clamping rod and the second clamping rod.

[0153] As shown in Figures 1 and 6, in some embodiments, the first continuous conveying system 1 also includes a rope storage device 110, which includes a first tensioning fixed frame 11001, a first tensioning sliding frame 11002 and a plurality of rope storage wheels 11003. The first tensioning fixed frame 11001 is set on the ground of the tunnel 6, and the first tensioning sliding frame 11002 is slidably set relative to the first tensioning fixed frame 11001. The plurality of rope storage wheels 11003 are respectively rotatably set on the first tensioning fixed frame 11001 and the first tensioning sliding frame 11002, and the plurality of rope storage wheels 11003 are staggered. The end of the first feeding section 1101 away from the shield equipment 7 and the end of the first return section 1102 away from the shield equipment 7 are connected after bypassing the plurality of rope storage wheels 11003.

[0154] It can be understood that since the end of the first feeding section 1101 away from the shield equipment 7 and the end of the first return section 1102 away from the shield equipment 7 are respectively connected after passing through multiple rope storage wheels 11003, part of the traction rope 11 can be stored between the first tensioning fixed frame 11001 and the first tensioning sliding frame 11002, and since the first tensioning sliding frame 11002 is slidably arranged relative to the first tensioning fixed frame 11001, the relative position of the first tensioning sliding frame 11002 and the first tensioning fixed frame 11001 can be adjusted, so that the release and storage of the traction rope 11 can be achieved through the movement of the first tensioning sliding frame 11002, and the length of the traction rope 11 can adapt to the continuous advancement of the shield equipment 7, thereby ensuring the stable transportation of the first material 9 in the tunnel 6.

[0155] It should be noted that the sliding mode of the first tensioning sliding frame 11002 relative to the first tensioning fixed frame 11001 can be set according to actual needs and is not limited to this. For example, the bottom of the first tensioning sliding frame 11002 is provided with walking wheels, and a wheel track is provided on the ground near the first tensioning fixed frame 11001, and the walking wheels are arranged to roll in the wheel track, thereby realizing the sliding setting of the first tensioning sliding frame 11002 relative to the first tensioning fixed frame 11001.

[0156] The first tensioning sliding frame 11002 and the first tensioning fixing frame 11001 are used to adjust the length of the traction rope 11. The specific types of the first tensioning sliding frame 11002 and the first tensioning fixing frame 11001 can be set according to actual needs and are not limited thereto.

[0157] The arrangement of the rope storage wheel 11003 on the first tensioning frame 11001 and the first tensioning sliding frame 11002 can be configured according to actual needs and is not limited thereto. For example, the rope storage wheel 11003 includes a wheel frame, a wheel axle, and a wheel body. The wheel frame is fixedly mounted on the first tensioning frame 11001, the wheel axle is fixedly mounted on the wheel frame, and the wheel body is rotatably mounted on the wheel axle via a bearing. An annular groove can be provided on the outer circumference of the wheel body to facilitate winding of the traction rope 11 and ensure stable placement of the traction rope 11 on the rope storage wheel 11003.

[0158] The more rope storage wheels 11003 there are, the greater the storage capacity of the traction rope 11 is, and the longer the adjustable length of the traction rope 11 is. The number of rope storage wheels 11003 can be set according to actual needs and there is no restriction on this.

[0159] A plurality of guide wheels may be provided between the devices to satisfy the steering requirements of the traction rope 11 during its circular movement.

[0160] As shown in Figures 1 and 6, in some embodiments, the first continuous conveying system 1 also includes a first tensioning device 111, the first tensioning device 111 includes a first tensioning frame 11101, multiple first tensioning wheels 11102, multiple second tensioning wheels 11103, a first tensioning rope 11104 and a first winch 11105, the first tensioning frame 11101 is set on the ground of the tunnel 6, the first tensioning wheel 11102 is rotatably set on the first tensioning sliding frame 11002, the second tensioning wheel 11103 is rotatably set on the first tensioning frame 11101, the first winch 11105 is set on the ground of the tunnel 6, one end of the first tensioning rope 11104 is connected to the reel of the first winch 11105, and the other end of the first tensioning rope 11104 is connected to the first tensioning frame 11101 after passing through multiple first tensioning wheels 11102 and multiple second tensioning wheels 11103.

[0161] It can be understood that the first winch 11105 drives the reel thereon to wind the first tensioning rope 11104, so that the first tensioning rope 11104 applies a constant force on the first tensioning slide 11002 in a direction away from the first tensioning fixed frame 11001, thereby ensuring the tensioning of the traction rope 11, and when the tension of the shield equipment 7 applied to the traction rope 11 is greater than the constant force output by the first winch 11105, it can overcome the driving force of the first winch 11105 and move the first tensioning slide 11002 in a direction close to the first tensioning fixed frame 11001, thereby extending the length of the traction rope 11. Therefore, through the setting of the first tensioning device 111, not only the stable adjustment of the length of the traction rope 11 can be guaranteed, but also the stable driving of the traction rope 11 to the carrier 13 can be guaranteed.

[0162] It should be noted that the first winch 11105 is used to apply tension to the first tensioning slide 11002. The specific type of the first winch 11105 can be set according to actual needs and is not limited to this. For example, the first winch 11105 may include a first winding frame, a first reel, a first variable frequency motor and a second reducer. The first winding frame is fixedly set on the ground of the tunnel 6, the first reel is rotatably set on the first winding frame, the first variable frequency motor and the second reducer are fixedly set on the first winding frame, the first variable frequency motor is connected to the second reducer for transmission, and the second reducer is connected to the first reel for transmission. The first variable frequency motor is driven by the first frequency converter, and the first frequency converter enables the first variable frequency motor to output constant torque, thereby ensuring that the force applied by the first tensioning rope 11104 on the first tensioning slide 11002 is constant force.

[0163] The first winch 11105 may also include a first brake, and the brake of the first brake is connected to the output shaft of the second reducer. In an emergency or shutdown, the brake of the first brake performs a braking action to lock the second reducer, thereby preventing the first tensioning rope 11104 from rotating in the opposite direction, so that the first tensioning device 111 can maintain a tensioned state.

[0164] The specific type of the first tensioning rope 11104 can be set according to actual needs and is not limited to this. The first tensioning rope 11104 can be a rope with tensile strength such as a wire rope, or a chain 5304 with tensile strength.

[0165] The first tensioning wheel 11102 and the second tensioning wheel 11103 are used to steer the first tensioning rope 11104. The specific types of the first tensioning wheel 11102 and the second tensioning wheel 11103 can be set according to actual needs and are not limited to this. For example, taking the first tensioning wheel 11102 as an example, the first tensioning wheel 11102 includes a wheel frame, a wheel axle, and a wheel body. The wheel frame is fixedly mounted on the first tensioning sliding frame 11002, the wheel axle is fixedly mounted on the wheel frame, and the wheel body is rotatably mounted on the wheel axle via a bearing. An annular groove can be provided on the outer circumference of the wheel body to facilitate the winding of the first tensioning rope 11104 and ensure the stable placement of the first tensioning rope 11104 on the first tensioning wheel 11102.

[0166] A guide wheel can be set between the second tensioning wheel 11103 and the first tensioning wheel 11102 according to actual needs, and the first tensioning rope 11104 passes around the guide wheel to ensure that the first tensioning rope 11104 is stably set between the second tensioning wheel 11103 and the first tensioning wheel 11102.

[0167] The specific position of the first tensioning device 111 can be set according to actual needs and is not limited to this. For example, the first driving device 12, the rope storage device 110 and the first tensioning device 111 are arranged in the direction from the inside of the tunnel 6 to the outside of the tunnel 6.

[0168] As shown in Figure 8, in some embodiments, the belt 21 includes a second feeding section 2101 and a second return section 2102, and the second feeding section 2101 and the second return section 2102 are respectively slidably arranged on the side walls of the tunnel 6. The second continuous conveying system 2 also includes a second driving device 22, and the second driving device 22 is arranged on the ground of the tunnel 6 at one end away from the shield equipment 7. The second driving device 22 is connected to the belt 21 for transmission. The second driving device 22 is used to drive the second feeding section 2101 to move in the direction from the inside of the tunnel 6 to the outside of the tunnel 6 and drive the second return section 2102 to move in the direction from the outside of the tunnel 6 to the inside of the tunnel 6.

[0169] It can be understood that the second driving device 22 drives the belt 21 to move, so that the second feeding section 2101 of the belt 21 moves in the direction from the inside of the tunnel 6 to the outside of the tunnel 6, and the second return section 2102 of the belt 21 moves in the direction from the outside of the tunnel 6 to the inside of the tunnel 6, thereby realizing the circular rotation of the belt 21 between the inside of the tunnel 6 and the outside of the tunnel 6, and then realizing the continuous conveying of the second material 10 by the belt 21, thereby effectively shortening the conveying time of the second material 10, improving the conveying efficiency of the second material 10, and then improving the efficiency of the shield construction in the tunnel 6 and reducing the cost of the shield construction in the tunnel 6.

[0170] Among them, since the second feeding section 2101 and the second return section 2102 are respectively slidably set on the side walls of the tunnel 6, the belt 21 can reduce the occupation of the ground space of the tunnel 6, avoid congestion on the ground of the tunnel 6, thereby improving the efficiency of the shield construction in the tunnel 6, and further reducing the cost of the shield construction in the tunnel 6.

[0171] At the same time, since the second drive device 22 is arranged on the ground of the tunnel 6 at one end away from the shield equipment 7, the second drive device 22 can directly drag the second feeding segment 2101 of the belt 21, and at the same time indirectly drag the second return segment 2102 of the belt 21, so that the second feeding segment 2101 is in a tensioned state, and the second return segment 2102 is in a relatively relaxed state. Therefore, compared with the manner in which the second drive device 22 indirectly drags the second feeding segment 2101 through the second return segment 2102, the manner in which the second drive device 22 directly drags the second feeding segment 2101 can reduce the dragging force of the second drive device 22 on the belt 21, which can not only reduce the power output of the second drive device 22 and reduce the overall cost, but also reduce the force on the belt 21, thereby reducing the use specifications of the belt 21, reducing the wear of the belt 21, and thus extending the service life of the belt 21.

[0172] It should be noted that the second feeding section 2101 and the second return section 2102 of the belt 21 are dynamic. That is, during the circular rotation of the belt 21, the portion of the belt 21 that moves from the outside of the tunnel 6 to the inside of the tunnel 6 is called the second return section 2102, and the portion of the belt 21 that moves from the inside of the tunnel 6 to the outside of the tunnel 6 is called the second feeding section 2101. The relative positions of the second feeding section 2101 and the second return section 2102 of the belt 21 within the tunnel 6 can be set according to actual needs and are not limited to this. For example, the second feeding section 2101 can be located above the second return section 2102.

[0173] The second driving device 22 is used to drive the circular movement of the belt 21. The specific type of the second driving device 22 can be set according to actual needs and is not limited to this. For example, as shown in Figure 8, the second driving device 22 includes a second driving frame 2201, multiple second driving wheels 2202, multiple second driving members 2203 and a first steering wheel 2204. The second driving frame 2201 is set at the end of the tunnel 6 away from the shield equipment 7. The second driving wheel 2202 is rotatably set on the second driving frame 2201. The belt 21 passes around the multiple second driving wheels 2202 in sequence. The second driving member 2203 is set on the second driving frame 2201. The second driving member 2203 is transmission-connected to the second driving wheel 2202. The first steering wheel 2204 is rotatably set on the shield equipment 7. The second feeding section 2101 is close to the end of the shield equipment 7 and the second return section 2102 is close to the end of the shield equipment 7 and then passes around the first steering wheel 2204 and is connected. It can be understood that the second driving member 2203 drives the second driving wheel 2202 to rotate, and the second driving wheel 2202 drives the belt 21 to move through the friction between the second driving wheel 2203 and the belt 21, thereby realizing the circular movement of the belt 21. At the same time, by winding the belt 21 on multiple second driving wheels 2202 at the same time, the stable driving of the belt 21 by multiple second driving wheels 2202 is guaranteed.

[0174] Moreover, by arranging the first steering wheel 2204 on the shield equipment 7, the first steering wheel 2204 can move forward synchronously with the shield equipment 7, so that the entire body can use the shield equipment 7 to overcome the tension at the storage point of the belt 21 to adjust the length of the belt 21, thereby making the overall use more convenient.

[0175] The manner in which the belt 21 is wound around the plurality of second drive wheels 2202 can be set according to actual needs and is not limited thereto. For example, the belt 21 can be in a serpentine structure after being wound around the plurality of second drive wheels 2202 .

[0176] The second driving wheel 2202 corresponds to the second driving member 2203 one by one. The number of the second driving wheel 2202 and the second driving member 2203 can be set according to actual needs and is not limited to this. For example, the second driving wheel 2202 and the second driving member 2203 can be two, three, four, etc.

[0177] The second driving member 2203 is used to drive the second driving wheel 2202 to rotate. The specific type of the second driving member 2203 can be set according to actual needs and is not limited to this. For example, the second driving member 2203 may include a second driving motor and a third reducer. The second driving motor and the third reducer are both arranged on the second driving frame 2201. The second driving motor is connected to the third reducer in a transmission manner, and the third reducer is connected to the second driving wheel 2202 in a transmission manner, so that the second driving motor drives the third reducer to rotate, and the third reducer drives the second driving wheel 2202 to rotate.

[0178] As shown in Figure 9, in some embodiments, the second continuous conveying system 2 also includes a belt storage device 23, which includes a second tensioning fixed frame 2301, a second tensioning sliding frame 2302 and a plurality of belt storage rollers 2303. The second tensioning fixed frame 2301 is set on the ground of the tunnel 6, and the second tensioning sliding frame 2302 is slidably set relative to the second tensioning fixed frame 2301. The plurality of belt storage rollers 2303 are respectively rotatably set on the second tensioning fixed frame 2301 and the second tensioning sliding frame 2302, and the plurality of belt storage rollers 2303 are staggered. The end of the second feeding section 2101 away from the shield equipment 7 and the end of the second return section 2102 away from the shield equipment 7 are connected after bypassing the plurality of belt storage rollers 2303.

[0179] It can be understood that since the end of the second feeding section 2101 away from the shield equipment 7 and the end of the second return section 2102 away from the shield equipment 7 are connected after bypassing multiple belt storage wheels 2303, part of the belt 21 can be stored between the second tensioning fixed frame 2301 and the second tensioning slide frame 2302, and since the second tensioning slide frame 2302 is slidably arranged relative to the second tensioning fixed frame 2301, the relative position of the second tensioning slide frame 2302 and the second tensioning fixed frame 2301 can be adjusted, so that the release and storage of the belt 21 can be achieved through the movement of the second tensioning slide frame 2302, and the length of the belt 21 can adapt to the continuous advancement of the shield equipment 7, thereby ensuring the stable transportation of the second material 10 in the tunnel 6.

[0180] It should be noted that the sliding mode of the second tensioning sliding frame 2302 relative to the second tensioning fixed frame 2301 can be set according to actual needs and is not limited to this. For example, the bottom of the second tensioning sliding frame 2302 is provided with walking wheels, and a wheel track is provided on the ground near the second tensioning fixed frame 2301, and the walking wheels are arranged to roll in the wheel track, thereby realizing the sliding setting of the second tensioning sliding frame 2302 relative to the second tensioning fixed frame 2301.

[0181] The second tensioning sliding frame 2302 and the second tensioning fixing frame 2301 are used to adjust the length of the belt 21. The specific types of the second tensioning sliding frame 2302 and the second tensioning fixing frame 2301 can be set according to actual needs and are not limited thereto.

[0182] The arrangement of the storage roller 2303 on the second tensioning frame 2301 and the second tensioning slide frame 2302 can be configured according to actual needs and is not limited thereto. For example, the storage roller 2303 includes a wheel frame, a wheel axle, and a wheel body. The wheel frame is fixedly mounted on the second tensioning frame 2301, the wheel axle is fixedly mounted on the wheel frame, and the wheel body is rotatably mounted on the wheel axle via a bearing. An annular groove may be provided on the outer circumference of the wheel body to facilitate winding of the belt 21 and ensure stable placement of the belt 21 on the storage roller 2303.

[0183] The more storage wheels 2303 there are, the greater the storage capacity of the belt 21 is, and the longer the adjustable length of the belt 21 is. The number of storage wheels 2303 can be set according to actual needs and is not limited thereto.

[0184] A plurality of guide wheels may be provided between the devices to ensure the steering of the belt 21 during its circular movement.

[0185] As shown in Figure 9, in some embodiments, the second continuous conveying system 2 also includes a second tensioning device 24, which includes a second tensioning frame 2401, multiple third tensioning wheels 2402, multiple fourth tensioning wheels 2403, a second tensioning rope 2404 and a second winch 2405. The second tensioning frame 2401 is set on the ground of the tunnel 6, the third tensioning wheel 2402 is rotatably set on the second tensioning sliding frame 2302, the fourth tensioning wheel 2403 is rotatably set on the second tensioning frame 2401, and the second winch 2405 is set on the ground of the tunnel 6. One end of the second tensioning rope 2404 is connected to the reel of the second winch 2405, and the other end of the second tensioning rope 2404 is connected to the second tensioning frame 2401 after passing through multiple third tensioning wheels 2402 and multiple fourth tensioning wheels 2403.

[0186] It can be understood that the second winch 2405 drives the reel thereon to wind the second tensioning rope 2404, so that the second tensioning rope 2404 applies a constant force on the second tensioning slide 2302 in a direction away from the second tensioning fixed frame 2301, thereby ensuring the tensioning of the belt 21, and when the pulling force of the shield equipment 7 on the belt 21 is greater than the constant force output by the second winch 2405, it can overcome the driving force of the second winch 2405 and move the second tensioning slide 2302 in a direction close to the second tensioning fixed frame 2301, thereby extending the length of the belt 21. Therefore, through the setting of the second tensioning device 24, not only the stable adjustment of the length of the belt 21 can be guaranteed, but also the stable driving of the belt 21 to the second material 10 can be guaranteed.

[0187] It should be noted that the second winch 2405 is used to apply tension to the second tensioning slide 2302. The specific type of the second winch 2405 can be set according to actual needs and is not limited to this. For example, the second winch 2405 may include a second winding frame, a second reel, a second variable frequency motor and a fourth reducer. The second winding frame is fixedly set on the ground of the tunnel 6, and the second reel is rotatably set on the second winding frame. The second variable frequency motor and the fourth reducer are fixedly set on the second winding frame. The second variable frequency motor is connected to the fourth reducer in a transmission manner, and the fourth reducer is connected to the second reel in a transmission manner. The second variable frequency motor is driven by the second frequency converter, and the second frequency converter enables the second variable frequency motor to output a constant torque, thereby ensuring that the force applied by the second tensioning rope 2404 on the second tensioning slide 2302 is a constant force.

[0188] The second winch 2405 can also include a second brake, and the brake of the second brake is connected to the output shaft of the fourth reducer. In an emergency or shutdown, the brake of the second brake performs a braking action to lock the fourth reducer, thereby preventing the second tensioning rope 2404 from rotating in the opposite direction, so that the second tensioning device 24 can maintain a tensioned state.

[0189] The specific type of the second tensioning rope 2404 can be set according to actual needs and is not limited to this. The second tensioning rope 2404 can be a rope with tensile strength such as a wire rope, or a chain 5304 with tensile strength.

[0190] The third tensioning wheel 2402 and the fourth tensioning wheel 2403 are used to steer the second tensioning rope 2404. The specific types of the third tensioning wheel 2402 and the fourth tensioning wheel 2403 can be configured according to actual needs and are not limited thereto. For example, taking the third tensioning wheel 2402 as an example, the third tensioning wheel 2402 includes a wheel frame, an axle, and a wheel body. The wheel frame is fixedly mounted on the second tensioning sliding frame 2302, the axle is fixedly mounted on the wheel frame, and the wheel body is rotatably mounted on the axle via a bearing. An annular groove can be provided on the outer circumference of the wheel body to facilitate the winding of the second tensioning rope 2404 and ensure the stable placement of the second tensioning rope 2404 on the third tensioning wheel 2402.

[0191] A guide wheel can be set between the third tensioning wheel 2402 and the fourth tensioning wheel 2403 according to actual needs, and the second tensioning rope 2404 passes around the guide wheel to ensure that the second tensioning rope 2404 is stably set between the third tensioning wheel 2402 and the fourth tensioning wheel 2403.

[0192] The specific position of the second tensioning device 24 can be set according to actual needs and is not limited to this. For example, the second driving device 22, the belt storage device 23 and the second tensioning device 24 are arranged in the direction from the inside of the tunnel 6 to the outside of the tunnel 6.

[0193] The first driving device 12 is located on the shield equipment 7 , and the rope storage device 110 , the first tensioning device 111 , the second driving device 22 , the belt storage device 23 and the second tensioning device 24 are all located outside the tunnel 6 .

[0194] As shown in Figure 8, in some embodiments, the second continuous conveying system 2 also includes a plurality of supporting devices 25, which are arranged on the inner wall of the tunnel 6 at intervals along the direction from the outside of the tunnel 6 to the inside of the tunnel 6, and the supporting devices 25 include a fifth bracket 2501, a sixth bracket 2502, a plurality of first rollers 2503 and a plurality of second rollers 2504. The fifth bracket 2501 is arranged on the inner wall of the tunnel 6, the sixth bracket 2502 is arranged on the fifth bracket 2501, and the plurality of first rollers 2503 are respectively rotatably arranged on the fifth bracket 2501. The second return section 2102 is arranged on the plurality of first rollers 2503, and the first rollers 2503 are rollingly connected to the second return section 2102. The plurality of second rollers 2504 are respectively rotatably arranged on the sixth bracket 2502. The second feeding section 2101 is arranged on the plurality of second rollers 2504, and the second rollers 2504 are rollingly connected to the second feeding section 2101.

[0195] It can be understood that since the second feeding section 2101 is set on multiple second rollers 2504, and the second rollers 2504 are rollingly connected to the second feeding section 2101, the second feeding section 2101 can be slidably set on the inner wall of the tunnel 6. At the same time, through the rolling setting between the second feeding section 2101 and the multiple second rollers 2504, the friction loss of the second feeding section 2101 can be reduced, thereby extending the service life of the belt 21. Moreover, through the setting of the sixth bracket 2502, the stable bearing of the multiple second rollers 2504 on the second feeding section 2101 can be guaranteed, so that the second material 10 can move along the set route under the stable movement of the second feeding section 2101, avoiding problems such as overturning.

[0196] Since the second return section 2102 is arranged on multiple first rollers 2503, and the first rollers 2503 are rollingly connected to the second return section 2102, the second return section 2102 can be slidably arranged on the inner wall of the tunnel 6. At the same time, through the rolling arrangement between the second return section 2102 and the multiple first rollers 2503, the friction loss of the second return section 2102 can be reduced, thereby extending the service life of the belt 21. Moreover, through the arrangement of the fifth bracket 2501, the stable bearing of the multiple first rollers 2503 on the second return section 2102 can be guaranteed, thereby ensuring the stable circulation movement of the belt 21 and avoiding problems such as overturning.

[0197] Among them, the fifth bracket 2501 and the sixth bracket 2502 and the first roller 2503 on the fifth bracket 2501 and the second roller 2504 on the sixth bracket 2502 are used as a whole to carry the belt 21, making the overall installation on the side wall of the tunnel 6 more convenient.

[0198] It should be noted that the fifth bracket 2501 and the sixth bracket 2502 are used to carry the first roller 2503 and the second roller 2504, and then carry the belt 21. The specific types of the fifth bracket 2501 and the sixth bracket 2502 can be set according to actual needs and are not limited to this. For example, the fifth bracket 2501 can be an arc-shaped bracket fixed on the tunnel 6 segment, and the sixth bracket 2502 can be a U-shaped bracket fixed on the fifth bracket 2501.

[0199] The installation method of the first roller 2503 on the fifth bracket 2501 and the installation method of the second roller 2504 on the sixth bracket 2502 can be set according to actual needs and are not limited to this. For example, a plurality of first support plates are arranged on the fifth bracket 2501 along the width direction of the tunnel 6, and the first roller 2503 is arranged between adjacent first support plates through bearings, thereby realizing the rotation setting of the plurality of first rollers 2503 on the fifth bracket 2501, and a plurality of second support plates are arranged on the sixth bracket 2502 along the width direction of the tunnel 6, and the second roller 2504 is arranged between adjacent second support plates through bearings, thereby realizing the rotation setting of the plurality of second rollers 2504 on the sixth bracket 2502.

[0200] The number of the first rollers 2503 and the second rollers 2504 can be set according to actual needs and there is no limitation on this. For example, there can be two first rollers 2503, and the two first rollers 2503 are distributed in a V shape, and there can be three second rollers 2504, and the three second rollers 2504 are distributed in a U shape.

[0201] The distance between adjacent supporting devices 25 can be set according to actual needs and is not limited thereto.

[0202] As shown in Figure 10, in some embodiments, the injection auxiliary system 3 includes a first injection device 31 and a second injection device 32. The first injection device 31 is arranged on the shield equipment 7 in the tunnel 6, and the discharge end of the first injection device 31 is facing the gap between the surrounding rock and the pipe segment of the tunnel 6. The first injection device 31 is used to inject the third material 101 into the gap between the surrounding rock and the pipe segment of the tunnel 6. The second injection device 32 is arranged on the shield equipment 7, and the discharge end of the second injection device 32 is connected to the feed end of the first injection device 31. The second injection device 32 is used to inject the fourth material 102 into the third material 101 according to the proportion.

[0203] It can be understood that since the discharge end of the first injection device 31 is facing the gap between the surrounding rock and the pipe segment of the tunnel 6, the first injection device 31 can inject the third material 101 into the gap between the surrounding rock and the pipe segment of the tunnel 6. Since the discharge end of the second injection device 32 is connected to the feed end of the first injection device 31, the second injection device 32 can inject the fourth material 102 into the third material 101 according to the proportion. As a result, the injection auxiliary system 3 can inject the third material 101 into the gap between the surrounding rock and the pipe segment of the tunnel 6 while mixing the third material 101 and the fourth material 102, thereby making the injection auxiliary system 3 more flexible and more convenient to use.

[0204] It should be noted that the mixing ratio of the third material 101 and the fourth material 102 can be set according to actual needs and is not limited thereto.

[0205] The specific types of the first injection device 31 and the second injection device 32 can be set according to actual needs and are not limited thereto.

[0206] As shown in Figure 10, in some embodiments, the first injection device 31 may include a first storage tank 3101, a first conveying pump 3102 and multiple first injection pipes 3103. The first storage tank 3101 and the first conveying pump 3102 are respectively arranged on the shield equipment 7. The third material 101 is stored in the first storage tank 3101, the feed end of the first conveying pump 3102 is connected to the discharge end of the first storage tank 3101, and the discharge end of the first conveying pump 3102 is connected to the first feed end of the multiple first injection pipes 3103.

[0207] It can be understood that, under the delivery of the first delivery pump 3102 , the third material 101 in the first storage tank 3101 is injected into the gaps between the surrounding rock and the pipe segments of the tunnel 6 from the discharge ends of the multiple first injection pipes 3103 .

[0208] It should be noted that the specific type of the first delivery pump 3102 can be set according to actual needs and is not limited to this. For example, the first delivery pump 3102 can be a mortar pump.

[0209] The discharge end of the first delivery pump 3102 can also be connected to the return end of the first storage tank 3101, and an overflow valve is provided between the discharge end of the first delivery pump 3102 and the return end of the first storage tank 3101 to ensure stable operation of the first injection device 31.

[0210] Switch valves may also be provided at the feed end and the discharge end of the first delivery pump 3102 to make the use of the first injection device 31 more flexible and convenient.

[0211] As shown in Figure 10, in some embodiments, the second injection device 32 includes a second storage tank 3201, a second delivery pump 3202 and multiple second injection pipes 3203, the second storage tank 3201 and the second delivery pump 3202 are respectively arranged on the shield equipment 7, the second storage tank 3201 stores the fourth material 102, the feed end of the second delivery pump 3202 is connected to the discharge end of the second storage tank 3201, the discharge end of the second delivery pump 3202 is connected to the feed ends of the multiple second injection pipes 3203, and the discharge ends of the multiple second injection pipes 3203 are respectively connected to the second feed ends of the multiple first injection pipes 3103.

[0212] It can be understood that, under the delivery of the second delivery pump 3202 , the fourth material 102 in the second storage tank 3201 is injected into the multiple first injection pipes 3103 from the discharge ends of the multiple second injection pipes 3203 and mixed with the third material 101 .

[0213] As shown in Figure 10, in some embodiments, the second injection device 32 also includes multiple proportional adjustment components 3204, and the multiple proportional adjustment components 3204 are respectively arranged on multiple second injection tubes 3203. The proportional adjustment components 3204 include a proportional valve 32041 and a first flow meter 32042. The proportional valve 32041 and the first flow meter 32042 are respectively arranged on the second injection tube 3203, and the first flow meter 32042 is located between the proportional valve 32041 and the first injection tube 3103.

[0214] It can be understood that through the setting of the first flowmeter 32042, the flow of the fourth material 102 in the second injection pipe 3203 can be detected, and through the setting of the proportional valve 32041, the flow of the fourth material 102 in the second injection pipe 3203 can be controlled. Therefore, through the cooperation of the proportional valve 32041 and the first flowmeter 32042, the flow of the fourth material 102 in the second injection pipe 3203 can be adjusted, and then the proportional mixing of the third material 101 and the fourth material 102 can be achieved.

[0215] It should be noted that the proportional valve 32041 controls the flow of the fourth material 102 by adjusting its own opening size. The specific type of the proportional valve 32041 can be set according to actual needs and is not limited to this.

[0216] The first flow meter 32042 is used to detect the flow of the fourth material 102 in the second injection pipe 3203. The specific type of the first flow meter 32042 can be set according to actual needs and is not limited to this.

[0217] Among them, the overall closed-loop control can be performed using the PID control program of the PLC controller.

[0218] As shown in FIG10 , in some embodiments, the first injection device 31 further includes a plurality of second flowmeters 3104, which are respectively disposed on the plurality of first injection tubes 3103. It is understood that the second flowmeters 3104 can detect the flow rate of the third material 101 in the first injection tubes 3103, thereby enabling the proportional valve 32041 to adjust the flow rate of the fourth material 102 based on the flow rate of the fourth material 102 detected by the first flowmeter 32042 and the flow rate of the third material 101 detected by the second flowmeter 3104, to ensure that the mixing ratio of the third material 101 and the fourth material 102 is maintained within a set range.

[0219] It should be noted that the second flow meter 3104 is used to detect the flow of the third material 101 in the first injection pipe 3103. The specific type of the second flow meter 3104 can be set according to actual needs and is not limited to this.

[0220] The first flow meter 32042 , the second flow meter 3104 and the proportional valve 32041 can be closed-loop controlled by a controller, and there is no limitation on this.

[0221] As shown in Figure 11, in some embodiments, the fourth material 102 includes a fifth material in liquid form and a sixth material in solid form, and the second injection device 32 also includes a third storage tank 3205, a fourth storage tank 3206, a first feeder 3207 and a second feeder 3208. The fifth material is stored in the third storage tank 3205, and the sixth material is stored in the fourth storage tank 3206. The feed end of the first feeder 3207 is set in the third storage tank 3205, and the discharge end of the first feeder 3207 is connected to the feed end of the second storage tank 3201. The feed end of the second feeder 3208 is set in the fourth storage tank 3206, and the discharge end of the second feeder 3208 is connected to the feed end of the second storage tank 3201.

[0222] It can be understood that since the feed end of the first feeder 3207 is set in the third storage tank 3205, the discharge end of the first feeder 3207 is connected to the feed end of the second storage tank 3201, so that the first feeder 3207 can transport the fifth material in the third storage tank 3205 to the second storage tank 3201, and since the feed end of the second feeder 3208 is set in the fourth storage tank 3206, the discharge end of the second feeder 3208 is connected to the feed end of the second storage tank 3201, so that the second feeder 3208 can transport the sixth material in the fourth storage tank 3206 to the second storage tank 3201, thereby realizing the mixing of the fifth material and the sixth material in the second storage tank 3201, and then realizing the formation and storage of the fourth material 102 in the second storage tank 3201, ensuring the stable mixing of the fourth material 102 and the third material 101.

[0223] It should be noted that the specific types of the fifth material and the sixth material can be set according to actual needs and are not limited to this. For example, the fifth material can be water, and the sixth material can be an auxiliary powder of mortar, which forms an auxiliary liquid after being mixed with water.

[0224] The specific types of the first feeder 3207 and the second feeder 3208 can be set according to actual needs and are not limited to this.

[0225] As shown in Figure 11, a stirring device 3209 can also be set in the second storage tank 3201 to achieve sufficient mixing of the fifth material and the sixth material, wherein the specific type of the stirring device 3209 can be set according to actual needs and is not limited to this. For example, the stirring device 3209 may include a stirring shaft, a stirring motor and multiple stirring blades. The stirring shaft is rotatably set in the second storage tank 3201, the stirring motor is set on the second storage tank 3201, and the output shaft of the stirring motor is transmission-connected to the stirring shaft, and multiple stirring blades are set on the stirring shaft.

[0226] A weighing device can also be set at the bottom of the third storage tank 3205 and the fourth storage tank 3206 to enable the fifth material and the sixth material to be mixed according to a weight ratio. The specific type of the weighing device can be set according to actual needs and is not limited to this. For example, the weighing device can be a weighing sensor.

[0227] As shown in Figure 10, in some embodiments, the second injection device 32 also includes a water tank 3210, a third delivery pump 3211 and multiple water injection pipes 3212. The water tank 3210 and the third delivery pump 3211 are respectively arranged on the shield equipment 7. Clean water is stored in the water tank 3210. The water inlet end of the third delivery pump 3211 is connected to the water outlet end of the water tank 3210. The water outlet end of the third delivery pump 3211 is connected to the water inlet ends of multiple water injection pipes 3212. The water outlet ends of the multiple water injection pipes 3212 are respectively connected to the second feed ends of multiple first injection pipes 3103.

[0228] It can be understood that under the delivery of the third delivery pump 3211, the clean water in the water storage tank 3210 is injected into the first injection pipe 3103 from the water outlet ends of multiple water injection pipes 3212, thereby achieving the cleaning of the first injection pipe 3103, avoiding problems such as blockage of the first injection pipe 3103 after injection, and ensuring the stable operation of the injection auxiliary system 3.

[0229] It should be noted that the first injection pipe 3103, the second injection pipe 3203, the water injection pipe 3212, the first flow meter 32042, the second flow meter 3104 and the proportional valve 32041 correspond to each other one by one. The number of the first injection pipe 3103, the second injection pipe 3203, the water injection pipe 3212, the first flow meter 32042, the second flow meter 3104 and the proportional valve 32041 can be set according to actual needs and there is no restriction on this. For example, the first injection pipe 3103, the second injection pipe 3203, the water injection pipe 3212, the first flow meter 32042, the second flow meter 3104 and the proportional valve 32041 can be three, four, five, etc.

[0230] A switch valve can also be provided at the water outlet end of the water injection pipe 3212 to facilitate the control of the clean water.

[0231] As shown in Figure 12, in some embodiments, the first injection device 31 includes a three-way pipe 3213, the three-way pipe 3213 includes a pipe body 32131 and a one-way valve 32132, the first feed end of the pipe body 32131 is used to input the third material 101, and the discharge end of the pipe body 32131 is facing the surrounding rock and pipe segment gap of the tunnel 6, the one-way valve 32132 is arranged on the pipe body 32131, and the feed end of the one-way valve 32132 is connected to the discharge end of the second injection device 32, and the discharge end of the one-way valve 32132 is connected to the second feed end of the pipe body 32131.

[0232] It can be understood that since the third material 101 is input into the first feed end of the tube body 32131, the second feed end of the tube body 32131 is connected to the discharge end of the second injection device 32, and the discharge end of the tube body 32131 is facing the surrounding rock and the gap between the pipe segments of the tunnel 6, the third material 101 and the fourth material 102 can be mixed in the tube body 32131 and can be injected into the surrounding rock and the gap between the pipe segments of the tunnel 6 after mixing, thereby realizing flexible injection of the injection auxiliary system 3 and making the use of the injection auxiliary system 3 more convenient. At the same time, since a one-way valve 32132 is provided between the second feed end of the tube body 32131 and the discharge end of the second injection device 32, the mixed material in the tube body 32131 cannot enter the second injection device 32, thereby avoiding the problem of damage to the second injection device 32 caused by the backflow of the mixed material, and ensuring the stable operation of the injection auxiliary system 3.

[0233] It should be noted that the tee 3213 includes a first feed end, a second feed end, and a discharge end. The first feed end of the tee 3213 and the discharge end of the tee 3213 are arranged opposite each other, and the second feed end of the tee 3213 is arranged between the first feed end and the discharge end of the tee 3213. The specific installation direction of the tee 3213 can be set according to actual needs. For example, the first feed end of the tee 3213 can be located at the bottom, and the discharge end of the tee 3213 can be located at the top.

[0234] The specific type of the three-way pipe 3213 can be set according to actual needs and is not limited to this. For example, the three-way pipe 3213 can be the first injection pipe 3103.

[0235] The specific type of the one-way valve 32132 can be set according to actual needs and is not limited to this.

[0236] As shown in Figures 13, 14 and 15, in some embodiments, the one-way valve 32132 includes a valve body 321321, a valve column 321323, a feed channel 321324 and an elastic sleeve 321325. The valve body 321321 is arranged on the tube body 32131, and a valve cavity 321322 is arranged in the valve body 321321. The valve cavity 321322 is connected to the second feed end of the tube body 32131. The valve column 321323 is arranged on the valve body 321321, and the valve column 321323 includes a first The first part 3213231 and the second part 3213232 are connected, the first part 3213231 is located outside the valve cavity 321322, the second part 3213232 is located inside the valve cavity 321322, the feed channel 321324 is arranged in the valve column 321323, the feed end of the feed channel 321324 is arranged on the first part 3213231, and the feed end of the feed channel 321324 is connected to the second injection device 3213231. The discharge end of the feed channel 321324 is connected, the discharge end of the feed channel 321324 is arranged on the second part 3213232, the elastic sleeve 321325 is sleeved on the second part 3213232, and the elastic sleeve 321325 covers the discharge end of the feed channel 321324, wherein, as shown in FIG14, based on the pressure in the feed channel 321324 being greater than the pressure in the valve chamber 321322, the elastic sleeve 321325 and the second part 32 13232, a gap 321326 is generated between the feed channel 321324 and the valve cavity 321322, and the discharge end of the feed channel 321324 is connected to the valve cavity 321322 through the gap 321326. As shown in FIG13, based on the fact that the pressure in the feed channel 321324 is less than or equal to the pressure in the valve cavity 321322, the elastic sleeve 321325 is sealed and fitted with the second part 3213232, and the discharge end of the feed channel 321324 is cut off from the valve cavity 321322.

[0237] It can be understood that the fourth material 102 enters the feed channel 321324 from the feed end and fills the feed channel 321324. When the pressure of the fourth material 102 in the feed channel 321324 is greater than the pressure of the third material 101 in the valve cavity 321322, the elastic sleeve 321325 is deformed under the action of the pressure difference and a gap 321326 is generated between the elastic sleeve 321325 and the second part 3213232, so that the fourth material 102 in the feed channel 321324 is discharged from the discharge end of the feed channel 321324 through the gap 321326 into the valve cavity 321322. When the pressure of the fourth material 102 in the feed channel 321324 is equal to that of the third material 101 in the valve cavity 321322, the elastic sleeve 321325 is deformed under the action of the pressure difference and a gap 321326 is generated between the elastic sleeve 321325 and the second part 3213232. When the pressure of the fourth material 102 in the feed channel 321324 is lower than the pressure of the third material 101 in the valve cavity 321322, the elastic sleeve 321325 is sealed and fitted on the second part 3213232 under the action of its own elastic force, so that the fourth material 102 in the feed channel 321324 cannot flow out from the discharge end of the feed channel 321324; when the pressure of the fourth material 102 in the feed channel 321324 is lower than the pressure of the third material 101 in the valve cavity 321322, the elastic sleeve 321325 is sealed and fitted on the second part 3213232 under the action of its own elastic force and the pressure of the third material 101 in the valve cavity 321322, so that the fourth material 102 in the feed channel 321324 cannot flow out from the discharge end of the feed channel 321324.

[0238] Therefore, by utilizing the elastic force of the elastic sleeve 321325 and the pressure difference in the one-way valve 32132, the one-way conduction of the fourth material 102 is achieved without involving mechanical movement, which not only makes the one-way valve 32132 more sealed, effectively improving the performance of the one-way valve 32132, but also reduces the wear in the one-way valve 32132, effectively extending the service life of the one-way valve 32132.

[0239] It should be noted that the elastic sleeve 321325 is elastic and can be mounted on the second portion 3213232 by its own elastic force. The specific material of the elastic sleeve 321325 can be set according to actual needs. For example, the elastic sleeve 321325 can be made of rubber material.

[0240] Among them, the specific size of the gap 321326 is determined according to the elastic force of the elastic sleeve 321325, the pressure of the fourth material 102 in the feed channel 321324 and the pressure of the third material 101 in the valve chamber 321322. The greater the pressure of the fourth material 102 in the feed channel 321324, the smaller the elastic force of the elastic sleeve 321325 and the pressure of the third material 101 in the valve chamber 321322, the larger the size of the gap 321326 and the greater the flow rate of the fourth material 102.

[0241] The specific type of the valve body 321321 can be set according to actual needs. For example, the valve body 321321 can be a cylindrical structure, and the valve cavity 321322 is the chamber inside the cylindrical structure.

[0242] The specific types of the first part 3213231 and the second part 3213232 can be set according to actual needs. For example, the first part 3213231 is a cylindrical structure, and the second part 3213232 is a combination structure of a cylindrical structure and a truncated cone structure. The diameter of the cylindrical structure of the second part 3213232 is larger than that of the cylindrical structure of the first part 3213231. The truncated cone structure of the second part 3213232 is used for the connection between the cylindrical structure of the second part 3213232 and the cylindrical structure of the first part 3213231. The valve column 321323 can be an integrally molded part.

[0243] As shown in Figures 13, 14 and 15, in some embodiments, the discharge end of the feed channel 321324 is arranged on the outer circumferential surface of the second part 3213232, the elastic sleeve 321325 is sleeved on the outer circumferential surface of the second part 3213232, and the end of the elastic sleeve 321325 close to the first part 3213231 is sealed and connected to the second part 3213232. The one-way valve 32132 also includes a first cover plate 321327, which is arranged at an end of the second part 3213232 away from the first part 3213231, and the first cover plate 321327 is abutted against the end of the elastic sleeve 321325 away from the first part 3213231.

[0244] It can be understood that the fourth material 102 enters from the feed end of the feed channel 321324 and fills the interior of the feed channel 321324. When the pressure of the fourth material 102 in the feed channel 321324 is greater than the pressure of the third material 101 in the valve chamber 321322, the elastic sleeve 321325 is deformed under the action of the pressure difference and a gap 321326 is generated between the elastic sleeve 321325 and the outer circumferential surface of the second part 3213232. Moreover, since the end of the elastic sleeve 321325 close to the first part 3213231 is sealed and connected to the second part 3213232, the fourth material 102 in the feed channel 321324 is discharged from the discharge end of the feed channel 321324 along the direction from the first part 3213231 to the second part 3213232 through the gap 321326 and into the valve chamber 321322 to mix with the third material 101.

[0245] As a result, not only is the elastic sleeve 321325 more stable on the second part 3213232, but there are also fewer bending points on the flow path of the fourth material 102, so that the fourth material 102 can be discharged more smoothly from the transfer channel 321324 into the valve cavity 321322, effectively improving the performance of the one-way valve 32132; moreover, through the provision of the first cover plate 321327, when the elastic sleeve 321325 is tightly fitted with the second part 3213232, a sealing shield can be formed on the end of the elastic sleeve 321325 away from the first part 3213231, thereby avoiding the backflow problem of the one-way valve 32132, and further improving the performance of the one-way valve 32132.

[0246] It should be noted that the specific type of the first cover plate 321327 can be set according to actual needs. For example, the shape of the first cover plate 321327 can be the same as the cross-sectional shape of the elastic sleeve 321325, the size of the first cover plate 321327 can be larger than the cross-sectional size of the elastic sleeve 321325, and the first cover plate 321327 can be set at the end of the second part 3213232 away from the first part 3213231 by welding, bolting, etc.

[0247] The arrangement of the transfer channel 321324 in the valve column 321323 can be determined according to the shape of the valve column 321323. For example, the main part of the transfer channel 321324 can be a cylindrical structure, and the central axis of the transfer channel 321324 can coincide with the central axis of the valve column 321323.

[0248] The specific size of the elastic sleeve 321325 can be set according to actual needs. For example, the inner diameter of the elastic sleeve 321325 is smaller than the outer diameter of the second part 3213232.

[0249] As shown in FIG. 13 , FIG. 14 and FIG. 15 , in some embodiments, the feed channel 321324 is provided with a plurality of discharge ends, and the discharge ends of the feed channel 321324 extend obliquely in a direction from the first portion 3213231 to the second portion 3213232 .

[0250] It can be understood that by tilting and extending the discharge end of the transfer channel 321324 in the direction from the first part 3213231 to the second part 3213232, the bending angle of the bending point on the flow path of the fourth material 102 is made larger, which not only effectively reduces the impact force of the fourth material 102 on the elastic sleeve 321325 and reduces the wear of the elastic sleeve 321325, but also further improves the smoothness of the fourth material 102 discharged from the transfer channel 321324 into the valve chamber 321322, thereby effectively improving the performance of the one-way valve 32132.

[0251] It should be noted that the distribution of the multiple discharge ends of the feed channel 321324 can be set according to actual needs. For example, the multiple discharge ends of the feed channel 321324 are divided into multiple groups, and the multiple groups of discharge ends of the feed channel 321324 are evenly distributed along the direction from the first part 3213231 to the second part 3213232, and the discharge ends in each group are evenly distributed along the circumference of the second part 3213232.

[0252] The specific number and inclination angle of the feed channels 321324 can be set according to actual needs and are not limited thereto.

[0253] As shown in Figures 13, 14 and 15, in some embodiments, the one-way valve 32132 also includes a sealing sleeve 321328, which is sleeved on one end of the second part 3213232 close to the first part 3213231, and the elastic sleeve 321325 is arranged between the sealing sleeve 321328 and the second part 3213232 at one end close to the first part 3213231.

[0254] It can be understood that, through the provision of the sealing sleeve 321328, the end of the elastic sleeve 321325 close to the first part 3213231 can be sealed on the second part 3213232, which not only realizes the sealing between the end of the elastic sleeve 321325 close to the first part 3213231 and the second part 3213232, ensuring that the fourth material 102 in the transfer channel 321324 can flow in the gap 321326 from the first part 3213231 to the second part 3213232, but also cooperates with the first cover plate 321327 to avoid the backflow problem of the one-way valve 32132, thereby further improving the performance of the one-way valve 32132.

[0255] It should be noted that the arrangement of the elastic sleeve 321325 between the sealing sleeve 321328 and the second part 3213232 can be arranged according to actual needs. For example, the elastic sleeve 321325 is connected to the sealing sleeve 321328 by gluing, and the elastic sleeve 321325 is connected to the second part 3213232 by abutting, and the distance between the sealing sleeve 321328 and the second part 3213232 is smaller than the thickness of the elastic sleeve 321325. It can be understood that, by abutting the elastic sleeve 321325 against the second part 3213232, the elastic sleeve 321325 is connected to the second part 3213232 and the disassembly and maintenance between the elastic sleeve 321325 and the second part 3213232 is facilitated. At the same time, the distance between the sealing sleeve 321328 and the second part 3213232 is set to be smaller than the thickness of the elastic sleeve 321325, so that the sealing sleeve 321328 can press the elastic sleeve 321325 onto the second part 3213232, thereby effectively improving the sealing between the elastic sleeve 321325 and the second part 3213232.

[0256] The specific type of the sealing sleeve 321328 can be set according to actual needs and is not limited to this.

[0257] As shown in Figures 13, 14 and 15, in some embodiments, an opening 321329 is provided on the valve body 321321, and the end of the second part 3213232 close to the first part 3213231 passes through the opening 321329. The one-way valve 32132 also includes a flange 3213210, which is sealed on the valve body 321321 and covers the opening 321329. The flange 3213210 is sleeved on the end of the first part 3213231 close to the second part 3213232.

[0258] It can be understood that the provision of the opening 321329 and the flange 3213210 not only facilitates the disassembly and assembly of the valve column 321323, the sealing sleeve 321328 and other components in the valve body 321321, making the inspection and maintenance of the one-way valve 32132 more convenient, but also ensures the sealing of the valve cavity 321322 to avoid leakage problems.

[0259] It should be noted that the specific size of the opening 321329 can be set according to actual needs so that components such as the valve column 321323 and the sealing sleeve 321328 can pass through smoothly, and there is no limitation on this.

[0260] The specific type of flange 3213210 can be determined according to opening 321329 and is not limited thereto.

[0261] The arrangement of the flange 3213210 on the valve body 321321 can be set according to actual needs. For example, the flange 3213210 can be set on the valve body 321321 by bolt fixation, snap fixation, etc.

[0262] A seal may be provided between the flange 3213210 and the valve body 321321 according to actual needs. For example, a sealing ring is provided between the flange 3213210 and the valve body 321321 to further improve the sealing performance of the valve cavity 321322 .

[0263] As shown in Figures 13, 14 and 15, in some embodiments, the one-way valve 32132 further includes a fixing sleeve 3213211 and a nut 3213212. The fixing sleeve 3213211 is threadedly sleeved on an end of the second part 3213232 close to the first part 3213231, the fixing sleeve 3213211 is located in the opening 321329, the end of the fixing sleeve 3213211 away from the first part 3213231 is connected to the sealing sleeve 321328, the end of the fixing sleeve 3213211 close to the first part 3213231 abuts against the flange 3213210, the nut 3213212 is threadedly sleeved on an end of the first part 3213231 close to the second part 3213232, and the end of the nut 3213212 close to the second part 3213232 abuts against the flange 3213210.

[0264] It can be understood that, by providing the fixing sleeve 3213211 and the nut 3213212, the relative fixation among the flange 3213210, the valve column 321323 and the sealing sleeve 321328 is achieved while the sealing between the valve column 321323 and the flange 3213210 is ensured, thereby further improving the sealing performance of the valve cavity 321322 and facilitating the disassembly, assembly and maintenance of the one-way valve 32132 while avoiding leakage problems.

[0265] It should be noted that the specific types of the fixing sleeve 3213211 and the nut 3213212 can be set according to actual needs and are not limited to this.

[0266] A seal may be provided between the fixing sleeve 3213211 and the flange 3213210 according to actual needs. For example, a sealing ring is provided between the fixing sleeve 3213211 and the flange 3213210 to further improve the sealing performance of the valve cavity 321322 .

[0267] When installing the one-way valve 32132, first place the elastic sleeve 321325, the sealing sleeve 321328, the first cover plate 321327 and other components on the valve post 321323. Then, connect the valve post 321323 to the flange 3213210 through the fixing sleeve 3213211 and the nut 3213212. Finally, place the flange 3213210 on the valve body 321321. When dismantling the one-way valve 32132 for inspection and maintenance, perform the operations in the reverse order.

[0268] The feed end of the feed channel 321324 is disposed at an end of the first portion 3213231 away from the second portion 3213232, as shown in Figures 12 and 15. A quick connector 3213213 is provided at the feed end of the feed channel 321324. The one-way valve 32132 is connected to the discharge end of the second injection device 32 via the quick connector 3213213. The specific type of the quick connector 3213213 can be set according to actual needs and is not limited thereto.

[0269] As shown in FIG. 12 , FIG. 13 , FIG. 14 and FIG. 15 , in some embodiments, the valve post 321323 extends obliquely along a direction from the discharge end of the tube body 32131 to the first feed end of the tube body 32131 .

[0270] It can be understood that by obliquely extending the valve column 321323 of the one-way valve 32132 in the direction from the discharge end of the tube body 32131 to the first feed end of the tube body 32131, the impact force of the third material 101 in the tube body 32131 on the valve column 321323, the elastic sleeve 321325 and other components is effectively reduced, thereby reducing the wear of the one-way valve 32132 and effectively extending the service life of the three-way pipe 3213.

[0271] It should be noted that the inclination angle of the valve column 321323 can be set according to actual needs and is not limited thereto.

[0272] As shown in Figure 15, in some embodiments, the three-way pipe 3213 also includes a first baffle 3213214, which is arranged on the side wall of the tube body 32131 opposite to the valve column 321323, and the first baffle 3213214 is located between the valve column 321323 and the second feed end of the tube body 32131.

[0273] It can be understood that through the setting of the first baffle 3213214, part of the third material 101 between the one-way valve 32132 and the second feed end of the tube body 32131 can be effectively blocked, thereby reducing the impact force of the third material 101 in the tube body 32131 on the valve column 321323, the elastic sleeve 321325 and other components, thereby reducing the wear of the one-way valve 32132 and effectively extending the service life of the three-way pipe 3213.

[0274] It should be noted that, while ensuring that the first baffle 3213214 effectively blocks the valve column 321323, the elastic sleeve 321325 and other components, the impact on the flow of the third material 101 in the tube body 32131 should be minimized. The specific size of the first baffle 3213214 can be determined according to the size of the tube body 32131 and the size of the valve column 321323, and there is no restriction on this.

[0275] The arrangement of the first baffle 3213214 in the tube body 32131 can be set according to actual needs. For example, the first baffle 3213214 can be set on the side wall of the tube body 32131 by welding, bolting, etc.

[0276] The first baffle 3213214 can be installed at the second feed end of the tube body 32131 before the one-way valve 32132 is installed. When the first baffle 3213214 is removed for maintenance, the operation can be performed in the reverse order.

[0277] As shown in Figure 15, in some embodiments, the first baffle 3213214 extends obliquely along the direction from the discharge end of the tube body 32131 to the first feed end of the tube body 32131, and the first baffle 3213214 bends from the center line of the first baffle 3213214 to both sides of the first baffle 3213214 along the direction from the discharge end of the tube body 32131 to the first feed end of the tube body 32131.

[0278] It can be understood that, through the inclined setting of the first baffle 3213214 in the tube body 32131 and the curved structure of the first baffle 3213214 itself, the mixture of the third material 101 and the fourth material 102 flows more smoothly from the discharge end of the tube body 32131 to the first feed end of the tube body 32131, thereby avoiding the accumulation of the mixture at the one-way valve 32132 due to the presence of the first baffle 3213214 when cleaning the three-way pipe 3213, thereby forming protection for the one-way valve 32132 in some embodiments, effectively extending the service life of the three-way pipe 3213.

[0279] The second material processing system 4 can be used to achieve graded dehydration, separation and drying of the second material 10 such as shield slag, mud, and other wastes, and reuse of inorganic raw materials and water resources, thereby achieving reduced transportation, environmentally friendly treatment and resource utilization of the second material 10. The specific type of the second material processing system 4 can be set according to actual needs and is not limited to this.

[0280] As shown in Figures 16 and 17, in some embodiments, the second material processing system 4 includes a screening device 41, a flocculation collection device 42 and a solid-liquid separation device 43. The feed end of the screening device 41 is connected to the discharge end of the material pool 8, the feed end of the flocculation collection device 42 is connected to the second discharge end of the screening device 41, and the feed end of the solid-liquid separation device 43 is connected to the second discharge end of the flocculation collection device 42.

[0281] It can be understood that by setting the screening device 41, the second material 10 can be screened, by setting the flocculation collection device 42, the flocculation collection of the screened second material 10 can be achieved, and by setting the solid-liquid separation device 43, the solid-liquid separation of the second material 10 after flocculation collection can be achieved. As a result, the various components in the second material 10 can be separated, which not only realizes the processing of the second material 10, thereby effectively improving the efficiency of the shield construction of tunnel 6, but also enables the components separated from the second material 10 to be recycled, thereby reducing the cost of the shield construction of tunnel 6.

[0282] Among them, the separated excess components can also be sold to the outside, turning waste into treasure and creating economic benefits; at the same time, the second material 10 can be quickly processed or transported, and the construction site material pool 8 can be emptied in time to create conditions for construction.

[0283] It should be noted that the component types in the second material 10 can be set according to actual needs and are not limited to this. For example, the components in the second material 10 can be soil, water, stones, etc., wherein the stones can be screened out by the screening device 41. After the stones are screened out, the soil and water in the second material 10 can be separated by the flocculation collection device 42 and the solid-liquid separation device 43.

[0284] The specific types of the screening device 41 , the flocculation collection device 42 and the solid-liquid separation device 43 can be set according to actual needs and are not limited thereto.

[0285] For example, as shown in FIG16 , the screening device 41 may include a hopper 4101, a coarse vibrating screen 4102, a fine vibrating screen 4103, a coarse screen cone tank 4104, a first cyclone 4105, a second cyclone 4106, a sedimentation tank 4107, a sand washer 4108, etc., wherein the feed end of the hopper 4101 is used to place the second material 10, and the discharge end of the hopper 4101 is connected to the feed end of the coarse vibrating screen 4102. The hopper 4101 is used to transport the second material 10 to the coarse vibrating screen 4102. The coarse vibrating screen 4102 is used to separate large-particle sand and gravel with a low mud content and mud with a high sand content in the second material 10. The first discharge end of the coarse vibrating screen 4102 is used to discharge large-particle sand and gravel with a low mud content. The second discharge end of 4102 is used to discharge mud with a high sand content. The second discharge end of the coarse vibrating screen 4102 is connected to the feed end of the coarse screen cone tank 4104. The coarse screen cone tank 4104 is used to separate the mud with a low sand content and the small-grained sand and gravel with a high mud content in the second material 10. The first discharge end of the coarse screen cone tank 4104 is used to discharge the mud with a low sand content in the second material 10. The first discharge end of the coarse screen cone tank 4104 is connected to the feed end of the first mud pool 44. The second discharge end of the coarse screen cone tank 4104 is used to discharge the small-grained sand and gravel with a high mud content in the second material 10. The second discharge end of the coarse screen cone tank 4104 is connected to the feed end of the first cyclone 4105. The first cyclone 4105 is used to separate the second material 1 0, the small-grained sand and gravel with low mud content and the mud with low sand content, the first discharge end of the first cyclone 4105 is used to discharge the mud with low sand content, the first discharge end of the first cyclone 4105 is connected to the feed end of the settling tank 4107, the settling tank 4107 is used to separate the mud with low sand content and the small-grained sand and gravel with low mud content in the second material 10, the first discharge end of the settling tank 4107 is used to discharge the small-grained sand and gravel with low mud content, the first discharge end of the settling tank 4107 is connected to the feed end of the coarse screen cone tank 4104, the second discharge end of the settling tank 4107 is used to discharge the mud with low sand content, the second discharge end of the settling tank 4107 is connected to the feed end of the first mud pool 44, the first discharge end of the first cyclone 4105 The second discharge end is used to discharge small-sized sand and gravel with a low mud content. The second discharge end of the first cyclone 4105 is connected to the feed end of the sand washing machine 4108. The sand washing machine 4108 is used to separate small-sized sand and gravel with a low mud content and mud with a low sand content in the second material 10. The first discharge end of the sand washing machine 4108 is used to discharge small-sized sand and gravel with a low mud content. The first discharge end of the sand washing machine 4108 is connected to the feed end of the fine vibrating screen 4103. The fine vibrating screen 4103 is used to separate small-sized sand and gravel with a low mud content and mud with a low sand content in the second material 10. The first discharge end of the fine vibrating screen 4103 is used to discharge small-sized sand and gravel with a low mud content. The second discharge end of the fine vibrating screen 4103 is used to discharge mud with a low sand content.The second discharge end of the fine vibrating screen 4103 is connected to the feed end of the first mud pool 44. The second discharge end of the sand washer 4108 is used to discharge mud with a low sand content. The second discharge end of the sand washer 4108 is connected to the feed end of the second cyclone 4106. The second cyclone 4106 is used to separate small-sized sand and gravel with a lower mud content from the second material 10. The first discharge end of the second cyclone 4106 is used to discharge mud with a lower sand content. The first discharge end of the second cyclone 4106 is connected to the feed end of the first mud pool 44. The second discharge end of the second cyclone 4106 is used to discharge small-sized sand and gravel with a lower mud content. The second discharge end of the second cyclone 4106 is connected to the feed end of the fine vibrating screen 4103.

[0286] Among them, the coarse vibrating screen 4102 is provided with a first high-pressure spray device. The coarse vibrating screen 4102 uses the high-pressure water of the first high-pressure spray device to flush out the mud in the large-particle sand and gravel, so that the first discharging end of the coarse vibrating screen 4102 can discharge large-particle sand and gravel with a lower mud content.

[0287] The sand washing machine 4108 is provided with a second high-pressure spray device. The sand washing machine 4108 uses the high-pressure water of the second high-pressure spray device to flush away the mud in the small-grained sand and gravel, so that the first discharging end of the sand washing machine 4108 can discharge small-grained sand and gravel with a lower mud content.

[0288] As shown in FIG16 , the overflow end of the first mud pool 44 is connected to the feed end of the second mud pool 45 , so that the mud with a lower sand content in the first mud pool 44 overflows into the second mud pool 45 after sedimentation.

[0289] The coarse vibrating screen 4102 and the fine vibrating screen 4103 both include a vibrating motor, a screen frame, a screen plate, a vibration isolation spring, a spray device, etc. The coarse vibrating screen 4102 can be a double-layer linear vibrating screen, and the fine vibrating screen 4103 can be a single-layer linear vibrating screen.

[0290] For example, as shown in FIG16 , the flocculation collection device 42 may include a first flocculation tank 4201, a second flocculation tank 4202, a dosing device 4203, etc. The feed end of the first flocculation tank 4201 is connected to the discharge end of the second mud pool 45 and the discharge end of the dosing device 4203, respectively. The first flocculation tank 4201 is used to separate the water with a low mud content and the mud with a low water content in the mud. The first discharge end of the first flocculation tank 4201 is used to discharge the water with a low mud content. The first discharge end is connected to the feed end of the second flocculation tank 4202, the second discharge end of the first flocculation tank 4201 is used to discharge mud with lower water content, the second flocculation tank 4202 is used to separate water with lower mud content and mud with lower water content in the mud, the first discharge end of the second flocculation tank 4202 is used to discharge water with lower mud content, the first discharge end of the second flocculation tank 4202 is connected to the feed end of the first clear water tank 46, and the second discharge end of the second flocculation tank 4202 is used to discharge mud with lower water content.

[0291] As shown in FIG16 , the overflow end of the first clear water tank 46 is connected to the feed end of the second clear water tank 47 so that the water with a lower mud content in the first clear water tank 46 overflows into the second clear water tank 47 after settling.

[0292] The discharge end of the second clear water tank 47 can be connected to the feed end of the first high-pressure spray device and the feed end of the second high-pressure spray device to achieve water recycling, thereby reducing overall costs.

[0293] For example, as shown in Figure 16, the solid-liquid separation device 43 may include a filter press 4301, etc. The feed end of the filter press 4301 is connected to the second discharge end of the first flocculation tank 4201 and the second discharge end of the second flocculation tank 4202, respectively. The filter press 4301 is used to separate the mud into mud with lower water content and water with lower mud content. The first discharge end of the filter press 4301 is used to discharge mud with lower water content, and the second discharge end of the filter press 4301 is used to discharge water with lower mud content. The second discharge end of the filter press 4301 is connected to the feed end of the second clear water tank 47.

[0294] Among them, the large-particle sand and gravel discharged from the first discharge end of the coarse vibrating screen 4102 can be used as construction aggregate for the construction of tunnel 6 or used in other fields, the small-particle sand and gravel discharged from the first discharge end of the fine vibrating screen 4103 can be used as casting raw materials for the construction of tunnel 6 or used in other fields, the mud discharged from the first discharge end of the filter press 4301 can be used for the construction of tunnel 6 or used in other fields, and the water in the second clear water tank 47 can not only be supplied to the first high-pressure spray device and the second high-pressure spray device, but also can be used for the construction of tunnel 6 or used in other fields.

[0295] As shown in Figures 17, 20, 21 and 22, in some embodiments, the third continuous conveying system 5 includes a base 51, a third driving device 54, a collecting device 52 and a lifting device 53. The base 51 is slidingly arranged in the material pool 8 in the horizontal direction. The third driving device 54 is transmission-connected to the base 51. The third driving device 54 is used to drive the base 51 to move back and forth in the material pool 8. The collecting device 52 is arranged on the base 51, and the feeding end of the collecting device 52 is arranged below the material surface of the material pool 8. The lifting device 53 is arranged on the base 51, and the feeding end of the lifting device 53 is connected to the discharging end of the collecting device 52. The discharging end of the lifting device 53 is arranged outside the material pool 8 or the discharging end of the lifting device 53 is connected to the feeding end of the screening device 41.

[0296] It can be understood that the collecting device 52 collects the second material 10 in the material pool 8 and transports it to the lifting device 53, and the lifting device 53 lifts the second material 10 to the outside of the material pool 8, thereby realizing the continuous outward transportation of the second material 10 in the material pool 8, and the collecting device 52 and the lifting device 53 move back and forth in the material pool 8 with the base 51, so that the feed of the collecting device 52 can cover the entire area in the material pool 8, thereby effectively improving the transportation efficiency of the second material 10 and reducing the transportation cost of the second material 10.

[0297] It should be noted that the material pool 8 is used to temporarily store the second material 10. The specific shape of the material pool 8 can be set according to actual needs and is not limited to this. For example, the material pool 8 can be a rectangular structure, and the moving direction of the base 51 is located in the length direction of the material pool 8 or the width direction of the material pool 8.

[0298] When the third continuous conveying system 5 conveys the second material 10 from the material pool 8 to the outside, the carriage of the transport vehicle can be placed under the discharge end of the lifting device 53. After the carriage of the transport vehicle is filled, the action of the lifting device 53 can be temporarily stopped to facilitate the replacement of the transport vehicle.

[0299] When the third continuous conveying system 5 conveys the second material 10 from the material pool 8 to the screening device 41, an inclined chute can be set on the moving path of the discharge end of the lifting device 53, and the lower end of the chute is located above the feed end of the screening device 41, so that the second material 10 in the material pool 8 can be continuously fed to the screening device 41.

[0300] Among them, the third continuous conveying system 5 and the second material handling system 4 can be used simultaneously or separately. When used separately, the third continuous conveying system 5 can convey the second material 10 outward to transport the second material 10, while the feeding of the second material handling system 4 can be completed using equipment such as excavators.

[0301] The specific type of the base 51 can be set according to actual needs and is not limited thereto. For example, the base 51 can be a flat plate structure with a certain strength.

[0302] As shown in Figure 17, in some embodiments, the material collection device 52 includes a material collection seat 5201, a spiral conveying device 5202 and a material collection bin 5203. The material collection seat 5201 is set on the base 51, the spiral conveying device 5202 is set on the material collection seat 5201, and the feeding end of the spiral conveying device 5202 is set below the material surface of the material pool 8. The material collection bin 5203 is set on the material collection seat 5201, the feeding end of the material collection bin 5203 is connected to the discharging end of the spiral conveying device 5202, and the discharging end of the material collection bin 5203 is connected to the feeding end of the lifting device 53.

[0303] It can be understood that the spiral conveying device 5202 collects the second material 10 in the material pool 8 into the collection bin 5203 by spiral conveying, and the collection bin 5203 guides the collected second material 10 to the lifting device 53 to ensure that the lifting device 53 can efficiently convey the second material 10. At the same time, through the setting of the spiral conveying device 5202, the continuous collection of the second material 10 in the material pool 8 is realized, which effectively improves the conveying efficiency of the second material 10 and reduces the conveying cost of the second material 10.

[0304] It should be noted that the specific type of the aggregate seat 5201 can be set according to actual needs and is not limited to this. For example, the aggregate seat 5201 can be a flat plate structure with a certain strength, and the aggregate seat 5201 can be set on the base 51 by bolt fixation, welding fixation, etc.

[0305] The specific type of the aggregate bin 5203 can be set according to actual needs and is not limited to this. For example, the aggregate bin 5203 is a hollow tubular structure. The aggregate bin 5203 can be set on the aggregate seat 5201 by bolt fixation, welding fixation, etc. The feed end of the aggregate bin 5203 can be a bucket-shaped structure.

[0306] As shown in Figures 17, 21 and 22, in some embodiments, the spiral conveying device 5202 includes a first spiral blade 52021, a second spiral blade 52022 and a third driving member 52023, the first spiral blade 52021 is rotatably set on the material collection seat 5201, the rotation center axis of the first spiral blade 52021 is perpendicular to the moving direction of the base 51, the first spiral blade 52021 is located below the material surface of the material pool 8, the second spiral blade 52022 is rotatably set on the material collection seat 5201, the rotation center axis of the second spiral blade 52022 is perpendicular to the moving direction of the base 51, and the second spiral blade 52021 is located below the material surface of the material pool 8. The spiral blade 52022 is located below the material surface of the material pool 8, and the feed end of the collection bin 5203 is located between the first spiral blade 52021 and the second spiral blade 52022. The third driving member 52023 is arranged on the collection seat 5201, and the third driving member 52023 is transmission-connected to the first spiral blade 52021 and the second spiral blade 52022. The third driving member 52023 is used to drive the first spiral blade 52021 and the second spiral blade 52022 to rotate so that the first spiral blade 52021 and the second spiral blade 52022 spirally move forward in a direction close to the feed end of the collection bin 5203.

[0307] It can be understood that, driven by the third driving member 52023, the first spiral blade 52021 and the second spiral blade 52022 rotate and transport the second material 10 on both sides of the base 51 to the feed end of the collecting bin 5203, thereby realizing the collection of the second material 10 in the material pool 8, and then ensuring the efficient transportation of the second material 10 by the lifting device 53, and because the first spiral blade 52021 and the second spiral blade 52022 continuously transport the second material 10 on both sides of the base 51 to the feed end of the collecting bin 5203 under the drive of the third driving member 52023, and at the same time, the first spiral blade 52021 and the second spiral blade 52022 move back and forth with the base 51 in the material pool 8, thereby achieving full area coverage of the material pool 8, effectively improving the collection quality and collection efficiency of the second material 10 by the collecting device 52, thereby improving the transportation efficiency of the second material 10 and reducing the transportation cost of the second material 10.

[0308] It should be noted that the arrangement of the first spiral blade 52021 and the second spiral blade 52022 on the aggregate seat 5201 can be arranged according to actual needs and is not limited to this. For example, a first support plate is provided at one end of the aggregate seat 5201, a second support plate is provided at the other end of the aggregate seat 5201, and a support seat is provided in the middle of the aggregate seat 5201. The first spiral blade 52021 is rotatably arranged between the first support plate and the support seat through a sealed bearing, and the second spiral blade 52022 is rotatably arranged between the second support plate and the support seat through a sealed bearing, and the first spiral blade 52021 and the second spiral blade 52022 are coaxially connected in the support seat, and the spiral directions of the first spiral blade 52021 and the second spiral blade 52022 are opposite.

[0309] The specific types of the first spiral blade 52021 and the second spiral blade 52022 can be set according to actual needs and are not limited to this. For example, the first spiral blade 52021 and the second spiral blade 52022 can both be an integrated structure; the first spiral blade 52021 and the second spiral blade 52022 can both be a multi-section combination structure, and the multi-section combination structure can adapt to material pools 8 of different sizes.

[0310] The specific type of the third driving member 52023 can be set according to actual needs and is not limited to this. For example, the third driving member 52023 includes a hydraulic motor, a first gear and a second gear. The hydraulic motor is arranged on a support seat, the first gear is mounted on the output shaft of the hydraulic motor, and the second gear is mounted on the rotating shaft of the first spiral blade 52021 or the second spiral blade 52022. The first gear is engaged with the second gear. Thus, under the drive of the hydraulic motor, the first spiral blade 52021 and the second spiral blade 52022 are synchronously rotated.

[0311] The arrangement of the collection bin 5203 on the collection seat 5201 can be set according to actual needs and is not limited to this. For example, the collection bin 5203 is set in the middle of the collection seat 5201, the feed end of the collection bin 5203 is facing between the first spiral blade 52021 and the second spiral blade 52022, and the discharge end of the collection bin 5203 is facing the feed end of the lifting device 53.

[0312] When the spiral conveying device 5202 is performing spiral conveying on the second material 10, the spiral conveying device 5202 also moves back and forth in the material pool 8 along with the base 51. This enables the second material 10 located on the side of the spiral conveying device 5202 facing away from the moving direction of the base 51 to be effectively conveyed by adhering to the spiral conveying device 5202 under the action of resistance. However, due to the movement of the base 51 and the centrifugal force of the spiral conveying, the second material 10 located on the side of the spiral conveying device 5202 facing the moving direction of the base 51 is more difficult to be attached to the spiral conveying device 5202, resulting in the overall conveying efficiency of the spiral conveying device 5202 for the second material 10 being low.

[0313] As shown in Figures 17, 18, 19, 21 and 22, in some embodiments, the material collection device 52 also includes a second baffle 5204, which is detachably arranged on the material collection seat 5201, and the second baffle 5204 is located on the side of the spiral conveying device 5202 facing the moving direction of the base 51.

[0314] It can be understood that, by setting the second baffle 5204, an effective limit can be formed for the second material 10 located on the side of the screw conveying device 5202 facing the moving direction of the base 51, so that the second material 10 located on the side of the screw conveying device 5202 facing the moving direction of the base 51 can be attached to the screw conveying device 5202 and effectively conveyed, thereby effectively improving the overall conveying efficiency of the screw conveying device 5202 for the second material 10, thereby improving the conveying efficiency of the second material 10 and reducing the conveying cost of the second material 10.

[0315] It should be noted that the side of the spiral conveying device 5202 facing the moving direction of the base 51 and the side facing away from the moving direction of the base 51 are in opposite positions on the spiral conveying device 5202. This can be further explained by the spiral conveying device 5202 passing through a certain position. When the spiral conveying device 5202 moves with the base 51, the side of the spiral conveying device 5202 facing away from the moving direction of the base 51 passes through the position first, and then the side of the spiral conveying device 5202 facing the moving direction of the base 51 passes through the position again. Therefore, the side of the spiral conveying device 5202 facing the moving direction of the base 51 and the side facing away from the moving direction of the base 51 can be determined by the order of passing through the positions.

[0316] The specific type of the second baffle 5204 can be set according to actual needs and is not limited thereto. For example, the second baffle 5204 can be a flat plate structure with a certain strength. In particular, due to the presence of the material collection bin 5203, the second baffle 5204 can be provided with an avoidance gap near the material collection bin 5203 to prevent collision between the second baffle 5204 and the material collection bin 5203.

[0317] As shown in Figures 18 and 19, in some embodiments, the material collection device 52 also includes a first chute 5205, a second chute 5206 and a lifting device 5207. The first chute 5205 is arranged on the material collection seat 5201, and the first chute 5205 is located on one side of the spiral conveying device 5202. The second chute 5206 is arranged on the material collection seat 5201, and the second chute 5206 is located on the other side of the spiral conveying device 5202. The lifting device 5207 is arranged on the base 51, and the lifting end of the lifting device 5207 is detachably connected to the second baffle 5204. The lifting device 5207 is used to set the second baffle 5204 in the first chute 5205 or the second chute 5206.

[0318] It can be understood that due to the reciprocating movement of the base 51 in the material pool 8, the moving direction of the base 51 is constantly changing. Therefore, the second baffle 5204 is set in the first slide 5205 or the second slide 5206 through the lifting of the lifting device 5207, so that the second baffle 5204 can always be located on the side of the screw conveying device 5202 facing the moving direction of the base 51, ensuring that the second baffle 5204 effectively improves the conveying efficiency of the screw conveying device 5202.

[0319] Among them, the setting of the first slide groove 5205 and the second slide groove 5206 facilitates the stable setting and position adjustment of the second baffle 5204 on the collection seat 5201, and the setting of the lifting device 5207 facilitates the disassembly and assembly of the second baffle 5204, making the use of the second baffle 5204 more convenient.

[0320] It should be noted that the arrangement of the first chute 5205 and the second chute 5206 can be configured according to actual needs and is not limited thereto. For example, the first chute 5205 and the second chute 5206 are both provided on opposite sides of the first support plate and the second support plate. The upper ends of the first chute 5205 and the second chute 5206 can both be configured as bucket-shaped structures to facilitate rapid alignment of the second baffle 5204 with the first chute 5205 and the second chute 5206.

[0321] The specific type of the lifting device 5207 can be set according to actual needs and is not limited to this. For example, the lifting device 5207 includes a hanger 52071, a telescopic arm 52072 and a chain hoist 52073. The hanger 52071 is set on the base 51, the telescopic arm 52072 is set on the top of the hanger 52071, the chain hoist 52073 is set on the telescopic end of the telescopic arm 52072, and a hanging ring is set in the middle of the second baffle 5204.

[0322] Among them, when the second baffle 5204 is set in the first slide 5205, the hook of the chain hoist 52073 is moved to the top of the hanging ring by controlling the extension and contraction of the telescopic arm 52072, and then the hook of the chain hoist 52073 is controlled to move up and down to move the hook to the hanging ring, and then the hook is hooked on the hanging ring, and then the hook of the chain hoist 52073 is controlled to move up and down to move the second baffle 5204 out of the first slide 5205, and then the extension and contraction of the telescopic arm 52072 is controlled to move the second baffle 5204 to the top of the second slide 5206, and finally the hook of the chain hoist 52073 is controlled to move up and down to move the second baffle 5204 into the second slide 5206, thereby realizing the position adjustment of the second baffle 5204.

[0323] The specific type of the telescopic arm 52072 can be set according to actual needs and is not limited to this. For example, the telescopic arm 52072 can be a sliding telescopic arm 52072; the telescopic arm 52072 can be a sleeve-type telescopic arm 52072.

[0324] The chain hoist 52073 is a light and small lifting equipment. The chain hoist 52073 usually includes a motor, a sprocket, etc. Among them, the specific type of the chain hoist 52073 can be set according to actual needs and there is no restriction on this.

[0325] In order to reduce the erosion of the second material 10 on the telescopic arm 52072 and the chain hoist 52073 , for example, the telescopic arm 52072 and the chain hoist 52073 are both arranged above the material surface of the material pool 8 .

[0326] As shown in Figures 17, 20, 21 and 22, in some embodiments, the lifting device 53 includes a lifting frame 5301, a driving sprocket 5302, a driven sprocket 5303, a transmission chain 5304, a plurality of scrapers 5305, a partition 5306 and a fourth driving member 5307. The lifting frame 5301 is set on the base 51, the driving sprocket 5302 is rotatably set at one end of the lifting frame 5301, the driven sprocket 5303 is rotatably set at one end of the lifting frame 5301 away from the driving sprocket 5302, the transmission chain 5304 is wound around the driving sprocket 5302 and the driven sprocket 5303, and one end of the transmission chain 5304 is set near the collecting device 5 2, the other end of the transmission chain 5304 is arranged outside the material pool 8, the transmission chain 5304 includes an upper chain and a lower chain, a plurality of scrapers 5305 are arranged on the transmission chain 5304 in sequence, the partition 5306 is arranged on the lifting frame 5301, and the partition 5306 is located between the upper chain and the lower chain, the scraper 5305 located on the upper chain is slidingly connected to the partition 5306, the fourth driving member 5307 is arranged on the lifting frame 5301, the fourth driving member 5307 is transmission-connected to the active sprocket 5302, and the fourth driving member 5307 is used to drive the active sprocket 5302 to rotate, so that the upper chain moves along the discharge end of the collecting device 52 toward the outside of the material pool 8.

[0327] It can be understood that the fourth driving member 5307 drives the active sprocket 5302 to rotate, and with the cooperation of the driven sprocket 5303, the active sprocket 5302 can drive the transmission chain 5304 to rotate, so that the multiple scrapers 5305 and the transmission chain 5304 move synchronously, and due to the setting of the partition 5306, the second material 10 can be limited on the scraper 5305, so that the scraper 5305 can effectively lift and convey the second material 10. Therefore, with the cooperation of the fourth driving member 5307, the partition 5306, the multiple scrapers 5305 and other components, the continuous lifting and conveying of the second material 10 is realized, which effectively improves the conveying efficiency of the second material 10 and reduces the cost of conveying the second material 10.

[0328] It should be noted that the specific type of the lifting frame 5301 can be set according to actual needs and is not limited to this. For example, the lifting frame 5301 can be a frame structure that is approximately triangular. The manner in which the lifting frame 5301 is arranged on the base 51 can be set according to actual needs and is not limited to this. For example, the lifting frame 5301 can be fixed to the base 51 by bolts, welding, etc.

[0329] The arrangement of the driving sprocket 5302 and the driven sprocket 5303 on the lifting frame 5301 can be arranged according to actual needs and is not limited to this. For example, the driving sprocket 5302 is rotatably arranged at the upper end of the lifting frame 5301 through a sealed bearing, and the driven sprocket 5303 is rotatably arranged at the lower end of the lifting frame 5301 through a sealed bearing. Correspondingly, the fourth driving member 5307 is also arranged at the upper end of the lifting frame 5301, so that the driving sprocket 5302 and the fourth driving member 5307 are both arranged above the material surface of the material pool 8, thereby reducing the erosion of the second material 10 on the driving sprocket 5302 and the fourth driving member 5307.

[0330] The arrangement of the scraper 5305 on the transmission chain 5304 can be customized based on actual needs and is not limited thereto. For example, the transmission chain 5304 includes a plurality of chain links, which are sequentially hinged. The scraper 5305 includes a first portion 3213231 and a second portion 3213232, which are respectively fixed on either side of the chain link by welding, bolting, or other methods. The chain link and the connection between the chain link, the first portion 3213231, and the second portion 3213232 can be configured as a sealing structure, so that the chain link, the first portion 3213231, and the second portion 3213232 form a sealed integral structure, thereby preventing leakage of the scraper 5305 when conveying the second material 10.

[0331] The specific type of the fourth driving member 5307 can be set according to actual needs and is not limited to this. For example, the fourth driving member 5307 includes a motor and a reducer, and the motor and the reducer are arranged on the lifting frame 5301. The output shaft of the motor is connected to the input shaft of the reducer, and the output shaft of the reducer is coaxially connected to the rotating shaft of the driving sprocket 5302, thereby realizing the rotation of the driving sprocket 5302 under the drive of the motor.

[0332] As shown in Figure 20, in some embodiments, the lifting device 53 also includes a first side plate 5308, a second side plate 5309 and a second cover plate 5310, the first side plate 5308 is arranged on one side of the partition 5306, the second side plate 5309 is arranged on the side of the partition 5306 away from the first side plate 5308, and the second cover plate 5310 is arranged on the side of the first side plate 5308 and the second side plate 5309 away from the partition 5306, wherein the partition 5306, the first side plate 5308, the second side plate 5309 and the second cover plate 5310 together form a material lifting channel, the scraper 5305 located on the upper chain is located in the material lifting channel, and the scraper 5305 located on the upper chain is slidingly sealed to the inner wall of the material lifting channel.

[0333] It can be understood that, by setting the first side plate 5308, the second side plate 5309 and the second cover plate 5310, the scraper 5305 located on the upper chain is in a closed material lifting channel, and since the scraper 5305 located on the upper chain is slidingly sealed with the inner wall of the material lifting channel, a sealed space is formed on the scraper 5305 that moves with the scraper 5305, so that when the scraper 5305 conveys the second material 10, the leakage of the second material 10 can be effectively avoided, and the effective conveying of the second material 10 by the scraper 5305 is ensured, the conveying efficiency of the second material 10 is effectively improved, and the conveying cost of the second material 10 is reduced.

[0334] It should be noted that the arrangement of the partition 5306, the first side plate 5308, the second side plate 5309 and the second cover plate 5310 can be arranged according to actual needs and is not limited to this. For example, the partition 5306, the first side plate 5308, the second side plate 5309 and the second cover plate 5310 are connected by bolt fixation, welding fixation, etc., and the partition 5306 is arranged parallel to the second cover plate 5310, the first side plate 5308 is arranged parallel to the second side plate 5309, and the first side plate 5308 and the second side plate 5309 are both perpendicular to the partition 5306 and the second cover plate 5310.

[0335] As shown in FIG. 20 , in some embodiments, the lifting device 53 further includes an elastic member 5311 . The elastic member 5311 is provided on the circumference of the scraper 5305 , and the elastic member 5311 abuts against the inner wall of the material lifting channel.

[0336] It can be understood that, by setting the elastic member 5311, the scraper 5305 is able to move in the material lifting channel while achieving sealing between the scraper 5305 and the material lifting channel, thereby avoiding leakage of the second material 10 and ensuring the effective transportation of the second material 10 by the scraper 5305, effectively improving the transportation efficiency of the second material 10 and reducing the transportation cost of the second material 10.

[0337] It should be noted that the specific type of the elastic member 5311 can be set according to actual needs and is not limited to this. For example, the elastic member 5311 can be made of a polymer material such as rubber or polyurethane resin.

[0338] The elastic member 5311 abuts against the inner wall of the material lifting channel, which means that the elastic member 5311 abuts against the partition plate 5306, the first side plate 5308, the second side plate 5309 and the second cover plate 5310 respectively.

[0339] The arrangement of the elastic member 5311 on the scraper 5305 can be arranged according to actual needs and is not limited to this. For example, the elastic member 5311 can be arranged on the circumference of the scraper 5305 by gluing, clamping, spring-adjustable crimping, etc.

[0340] As shown in Figures 21 and 22, in some embodiments, the third driving device 54 includes a driving seat 5401, a roller 5402, a fifth driving member 5403, a second steering wheel 5404 and a transmission rope 5405. The driving seat 5401 is set at one end of the material pool 8, and the roller 5402 is rotatably set on the driving seat 5401. The rotation center axis of the roller 5402 is perpendicular to the moving direction of the base 51. The fifth driving member 5403 is set on the driving seat 5401, and the fifth driving member 5403 is transmission-connected to the roller 5402. The second steering wheel 5404 is rotatably set at one end of the material pool 8 away from the driving seat 5401. One end of the transmission rope 5405 is wound around the roller 5402, and the other end of the transmission rope 5405 is wound around the roller 5402 after passing around the second steering wheel 5404, and the two ends of the transmission rope 5405 are wound on the roller 5402 in opposite directions, and the base 51 is connected to the transmission rope 5405.

[0341] It can be understood that the fifth driving member 5403 drives the roller 5402 to rotate, so that the roller 5402 winds one end of the transmission rope 5405 and releases the other end of the transmission rope 5405, so that the transmission rope 5405 drives the base 51 to move, thereby realizing the reciprocating movement of the base 51 in the material pool 8.

[0342] Among them, the driving mode of dragging the base 51 to move by the transmission rope 5405 is formed by the cooperation of the roller 5402, the second steering wheel 5404 and other components. While realizing the reciprocating movement of the base 51, it can adapt to the large weight of the base 51 and its components such as the collecting device 52 and the lifting device 53, thereby ensuring the stable movement of the base 51.

[0343] It should be noted that the arrangement of the drive seat 5401 on the material pool 8 can be set according to actual needs and is not limited to this. For example, the drive seat 5401 is set on the ground at one end of the material pool 8 by bolt fixation.

[0344] The specific type of the roller 5402 can be set according to actual needs and is not limited to this. For example, the roller 5402 may include a first roller body and a second roller body. The first roller body and the second roller body are coaxially connected and are rotatably arranged on the drive seat 5401 through a bearing. One end of the transmission rope 5405 is wound around the first roller body, and the other end of the transmission rope 5405 is wound around the second roller body.

[0345] The specific type of the fifth driving member 5403 can be set according to actual needs and is not limited to this. For example, the fifth driving member 5403 includes a motor and a reducer, and the motor and the reducer are arranged on the driving seat 5401. The output shaft of the motor is connected to the input shaft of the reducer, and the output shaft of the reducer is coaxially connected to the rotating shaft of the roller 5402, thereby realizing the rotation of the roller 5402 under the drive of the motor.

[0346] The second steering wheel 5404 is used for steering the transmission rope 5405. The specific type of the second steering wheel 5404 can be set according to actual needs and is not limited to this. For example, the second steering wheel 5404 can be set to multiple. The second steering wheel 5404 is rotatably arranged at one end of the material pool 8 away from the driving seat 5401 through a bearing. The rotation center axis of the second steering wheel 5404 is perpendicular to the moving direction of the base 51.

[0347] The specific type of the transmission rope 5405 can be set according to actual needs and is not limited to this. For example, the transmission rope 5405 can be a rope with tensile strength such as a wire rope, or a chain 5304 with tensile strength.

[0348] In order to reduce the erosion of the second material 10 on the third driving device 54 , for example, the driving seat 5401 , the roller 5402 , the fifth driving member 5403 , the second steering wheel 5404 and the transmission rope 5405 are all arranged above the material surface of the material pool 8 .

[0349] As shown in Figures 17, 21 and 22, in some embodiments, the third continuous conveying system 5 also includes a plank road 55, a third guide rail 56 and a wheel 57. The plank road 55 is arranged on the material pool 8, and the discharge end of the lifting device 53 is located above the plank road 55. The third guide rail 56 is arranged at the bottom of the plank road 55. The wheel 57 is rotatably arranged on the base 51, and a gap 58 is provided between the wheel 57 and the base 51. The third guide rail 56 passes through the gap 58 and is rollingly connected to the wheel 57.

[0350] It can be understood that the third guide rail 56 is set on the material pool 8 through the plank road 55, and the third guide rail 56 and the rotating wheel 57 are in rolling cooperation to realize the sliding setting of the base 51 in the material pool 8, ensuring that the base 51 can move back and forth in the material pool 8, and then the feeding of the collecting device 52 can cover the entire area in the material pool 8, effectively improving the conveying efficiency of the second material 10 and reducing the cost of conveying the second material 10.

[0351] Among them, the setting of the plank road 55 provides a driving channel for the transport vehicle, and since the discharge end of the lifting device 53 is set above the plank road 55, the transport vehicle can receive the second material 10 discharged by the lifting device 53 while driving on the plank road 55, thereby realizing the transport vehicle's reception and transportation of the second material 10, ensuring the efficient outward transportation of the second material 10.

[0352] It should be noted that the specific type of the plank road 55 can be set according to actual needs and is not limited to this. For example, the plank road 55 may include multiple longitudinal beams, multiple cross beams and load-bearing plates. The ends of the longitudinal beams are set on the ground at the ends of the material pool 8, and the multiple cross beams are respectively set between the multiple longitudinal beams. The load-bearing plates are set on the multiple longitudinal beams and the multiple cross beams, and the transport vehicles travel on the load-bearing plates.

[0353] In addition, according to actual needs, a third guide rail 56 can be separately set above the material pool 8, and the plank road 55 can be set on the ground on the side of the material pool 8, or the plank road 55 can be not used, and the transport vehicle can directly travel on the ground on the side of the material pool 8.

[0354] The specific number of the third guide rails 56 and the rotating wheels 57 can be set according to actual needs and is not limited thereto. For example, the number of the third guide rails 56 and the rotating wheels 57 can be two, three, four, etc.

[0355] In order to reduce the erosion of the second material 10 on components such as the stacking path 55 , the third guide rail 56 , and the rotating wheel 57 , for example, the stacking path 55 , the third guide rail 56 , and the rotating wheel 57 can all be arranged above the material surface of the material pool 8 .

[0356] In the description of the present disclosure, the terms "second", "second", etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance. In addition, in the description of the present disclosure, unless otherwise specified, the meaning of "plurality" is two or more.

[0357] Throughout this specification, references to terms such as "some embodiments" and "examples" indicate that a specific feature, structure, material, or characteristic described in conjunction with that embodiment or example is included in at least one embodiment or example of the present disclosure. In this specification, schematic representations of these terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.

[0358] Although the embodiments of the present disclosure have been shown and described above, it is understood that the above embodiments are illustrative and are not to be construed as limitations on the present disclosure. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present disclosure.

Claims

1. A shield engineering system, wherein: include: A first continuous conveying system, the first continuous conveying system comprising: a traction rope and a plurality of carriers, the traction rope being arranged on the ground of the tunnel, the carriers being connected to the traction rope, the traction rope being used to drive the carriers to cyclically move between the inside of the tunnel and the outside of the tunnel, so that the first material on the carriers moves from the outside of the tunnel to the inside of the tunnel; A second continuous conveying system, the second continuous conveying system comprising: a belt, the belt being arranged on the side wall of the tunnel, the belt being used to circulate between the inside of the tunnel and the outside of the tunnel, so that the second material in a fluid state on the belt moves from the inside of the tunnel to a material pool outside the tunnel; a second material processing system, wherein the second material processing system is used to separate solid material and liquid material in the second material; A third continuous conveying system, the third continuous conveying system is used to continuously convey the second material in the material pool to the outside or uninterruptedly convey it to the second material processing system; The material injection auxiliary system is used to inject a third material in a fluid state into the gap between the surrounding rock and the segments of the tunnel, and inject a fourth material in a fluid state into the third material according to a proportion.

2. The shield engineering system according to claim 1, wherein: The traction rope comprises: a first feeding section and a first return section, the first feeding section and the first return section are respectively slidably arranged on the ground of the tunnel, the carrier is movably arranged on the ground of the tunnel, and the carrier is fixedly connected to the first feeding section or the first return section; The first continuous conveying system also includes: a first driving device, which is arranged on the shield equipment in the tunnel, and is connected to the traction rope transmission. The first driving device is used to drive the first feeding section to move from the outside of the tunnel to the inside of the tunnel and drive the first return section to move from the inside of the tunnel to the outside of the tunnel.

3. The shield engineering system according to claim 2, wherein: The first continuous conveying system also includes: a first guide rail, the first guide rail being arranged on the ground of the tunnel; A plurality of first guide rollers, wherein the first guide rollers are rotatably arranged on the first guide rail, the first feeding section is arranged on the plurality of the first guide rollers, and the first feeding section is rollingly connected with the first guide rollers; a second guide rail, the second guide rail being arranged on the ground of the tunnel; A plurality of second guide rollers, wherein the second guide rollers are rotatably arranged on the second guide rail, the first return section is arranged on the plurality of second guide rollers, and the first return section is rollingly connected with the second guide rollers.

4. The shield engineering system according to claim 3, wherein: The vehicle comprises: Plate body; A plurality of rollers, wherein the rollers are rotatably arranged on the disc body and rollably arranged on the ground of the tunnel; Wherein, the disc is located above the first guide rail, the disc is fixedly connected to the first feeding section, and a plurality of rollers are located on both sides of the first guide rail; or The disc body is located above the second guide rail, the disc body is fixedly connected to the first return section, and a plurality of rollers are located on both sides of the second guide rail.

5. The shield engineering system according to claim 4, wherein: The vehicle also includes: a first clamping roller, the first clamping roller being rotatably disposed on the disc body; a second clamping roller, the second clamping roller being rotatably disposed on the disc body; Wherein, the first clamping roller and the second clamping roller are respectively connected to two sides of the first guide rail in a rolling manner; or The first clamping roller and the second clamping roller are respectively connected to two sides of the second guide rail in a rolling manner.

6. The shield engineering system according to claim 1, wherein: The injection auxiliary system comprises: The first injection device is arranged on the shield equipment in the tunnel, the discharge end of the first injection device faces the gap between the surrounding rock and the segment of the tunnel, and the first injection device is used to inject the third material into the gap between the surrounding rock and the segment of the tunnel. material; The second injection device is arranged on the shield equipment, the discharge end of the second injection device is connected to the feed end of the first injection device, and the second injection device is used to inject the fourth material into the third material according to a proportion.

7. The shield engineering system according to claim 6, wherein: The first injection device comprises: A three-way pipe, the three-way pipe comprises: a pipe body and a one-way valve, the first feed end of the pipe body is used to input the third material, the discharge end of the pipe body faces the inner wall of the tunnel, the one-way valve is arranged on the pipe body, and the feed end of the one-way valve is connected to the discharge end of the second injection device, and the discharge end of the one-way valve is connected to the second feed end of the pipe body.

8. The shield engineering system according to claim 7, wherein: The one-way valve comprises: A valve body, wherein the valve body is arranged on the tube body, a valve cavity is arranged in the valve body, and the valve cavity is connected to the second feed end of the tube body; A valve column, the valve column is arranged on the valve body, and the valve column comprises: a first part and a second part, the first part is connected to the second part, the first part is located outside the valve cavity, and the second part is located inside the valve cavity; A material transfer channel, wherein the material transfer channel is arranged in the valve column, a feed end of the material transfer channel is arranged on the first part, the feed end of the material transfer channel is connected to a discharge end of the second injection device, and the discharge end of the material transfer channel is arranged on the second part; An elastic sleeve, wherein the elastic sleeve is arranged on the second part and covers the discharge end of the material transfer channel; Wherein, based on the fact that the pressure in the material transfer channel is greater than the pressure in the valve cavity, a gap is generated between the elastic sleeve and the second part, and the discharge end of the material transfer channel and the valve cavity are connected through the gap; Based on the fact that the pressure in the material transfer channel is less than or equal to the pressure in the valve cavity, the elastic sleeve is sealed and fitted with the second part, and the discharge end of the material transfer channel is cut off from the valve cavity.

9. The shield engineering system according to claim 1, wherein: The second material processing system comprises: A screening device, wherein the feeding end of the screening device is connected to the discharging end of the material pool; A flocculation collection device, wherein a feed end of the flocculation collection device is connected to a second discharge end of the screening device; A solid-liquid separation device, wherein the feed end of the solid-liquid separation device is connected to the second discharge end of the flocculation collection device.

10. The shield engineering system according to claim 9, wherein: The third continuous conveying system comprises: A base, the base being slidably disposed in the material pool along a horizontal direction; A third driving device, the third driving device is connected to the base by transmission, and the third driving device is used to drive the base to reciprocate in the material pool; A material collecting device, wherein the material collecting device is arranged on the base, and a feeding end of the material collecting device is arranged below the material surface of the material pool; A lifting device, wherein the lifting device is arranged on the base, the feed end of the lifting device is connected to the discharge end of the collecting device, the discharge end of the lifting device is arranged outside the material pool or the discharge end of the lifting device is connected to the feed end of the screening device.

Citation Information

Patent Citations

  • Shield construction muck treatment system and method

    CN110303033A

  • Novel AB material grouting auxiliary device

    CN111927475A

  • Solid-liquid mixture conveying system

    CN116062492A

  • Tunnel suspension type continuous conveying system

    CN116104563A

  • Shield engineering system

    CN116480360A

Cited By

  • Separable cover plate pouring device for shield segment mold

    CN119610351A

  • TBM tunnel surrounding rock dynamic grading method and system based on cutterhead scratches

    CN121582240A

  • A method and system for dynamic classification of surrounding rock in TBM tunnels based on cutterhead scratches

    CN121582240B