Work train for renewing the ballast and sleepers of a track portion
The work train addresses inefficiencies and safety concerns in underground metro network maintenance by using a suction device and articulated arm for centralized ballast and sleeper handling, improving renewal efficiency and safety for both iron and tire tracks.
Patent Information
- Application Number
- PCT/EP2024/065090
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-06-01
- Filing Date
- 2024-05-31
- Publication Date
- 2024-12-05
AI Technical Summary
Current solutions for renewing ballast and sleepers in underground metro networks are inefficient, pose safety risks to operators, and are not adapted for tire tracks, which have different characteristics compared to conventional iron tracks, leading to suboptimal maintenance and rapid network deterioration.
A work train equipped with a suction device for old ballast, a storage system for sleepers, and an articulated arm for handling sleepers and ballast, allowing for centralized and mechanized renewal operations that include vacuuming, sleeper uncoupling and coupling, and ballast distribution, ensuring improved efficiency and safety.
The work train significantly enhances the efficiency of ballast and sleeper renewal, allowing for faster and safer operations on both iron and tire tracks, maintaining network condition and reducing downtime, while ensuring operator safety and adaptability to confined environments.
Smart Images

Figure EP2024065090_05122024_PF_FP_ABST
Abstract
Description
WORK TRAIN FOR THE RENEWAL OF THE BALLAST AND SLEEPERS OF A PORTION OF TRACK Technical field of the invention
[0001] The present invention relates to a work train for renewing the ballast and sleepers of a section of track. The work train is particularly intended for use in an underground environment such as a metro network. The track may in particular be for rolling stock fitted with iron bearings or pneumatic bearings. The invention also relates to the method for renewing the ballast and sleepers implemented by the aforementioned work train. Technological background
[0002] The metro system in large cities is generally a primarily underground network. Different types of metro can coexist on the same network, which can include metro lines with rolling stock equipped with iron bearings and metro lines with rolling stock equipped with pneumatic bearings. This is the case, for example, of the Paris metro in France.
[0003] Conventionally, when the rolling stock is equipped with iron bearings, it rolls on tracks 1A called irons as shown in the figure. These tracks 1A typically comprise sleepers 2, made of wood or concrete, positioned perpendicular to rails 3, which are fixed to the sleepers 2 by lag screws 5, and a ballast 4 which allows the anchoring of track 1A. The metro network being generally electric, a side rail 6 is present to electrically supply the rolling stock.
[0004] When the rolling stock is equipped with pneumatic bearings, it rolls on tracks called 1B tires as shown in the figure. These 1B tracks typically comprise sleepers 2 on which are fixed, by means of lag screws 5, rolling tracks 7 on which the pneumatic wheels roll, and lateral guide bars 8 allowing the guidance of horizontal pneumatic wheels and also ensuring the electrical supply of the rolling stock. The 3-iron rails remain present even on a 1B tire track. The ballast 4, allowing the anchoring of the 1B tire track, is arranged under and between the sleepers 2.
[0005] Due to their configuration, so-called tire tracks are wider than so-called iron tracks and therefore have sleepers that are generally longer than the sleepers of a railway track.
[0006] Faced with the aging and wear of the network and in particular of the various tracks, it is becoming necessary for operators to regenerate their networks. In order to maintain a correct condition of the network, certain components must be renewed. Thus, the sleepers and ballast appear to be those that require massive replacement. Indeed, since metro lines are essentially underground, they suffer from various problems linked in particular to water infiltration which tends to damage the wooden sleepers, which rot and disintegrate, but also linked to the punctual concrete injections intended to reinforce certain vaults which have left solid and massive residues in the track which distort the latter and pose problems of differential settlement. Finally, the attrition of the ballast due to the numerous commercial circulations of rolling stock as well as pollution makes its replacement necessary.
[0007] Ballast and sleeper renewal is carried out industrially on the tracks of so-called "main line" surface trains on the national network. It then uses large, heavily mechanized work trains that achieve outputs of close to 1,000 meters of renewed track for operations lasting 4 to 5 hours.
[0008] However, these work trains are poorly suited to the specific constraints of the metro network. Indeed, underground infrastructure is often built in small gauges, which makes access difficult and directly impacts the dimensions of the work trains that can operate there. The often tight track curves also make maneuvers complicated. In addition, the intensive operation of the network severely limits the time allowed for work, often by a few hours at night.
[0009] It should also be noted that these work trains traditionally used on the surface are not designed to handle tire tracks which, as mentioned above, have different characteristics compared to conventional railway tracks.
[0010] Mechanized solutions have already been developed in the past to deal with the renewal of metro line tracks. They relied on the use of a bucket-type ballast stripper specially designed for ballast replacement and on lorries for handling sleepers. In particular, they allowed the replacement of ballast and sleepers on 60 meters of track over a period of approximately 5 hours, dealing with small 5-meter areas renewed end to end without touching the rails. In other words, the method used relied on a one-off deconsolidation of the track, thereby avoiding having a significant length of track without ballast or difficulties in surrendering, i.e., freeing the track, in the event of a breakdown.
[0011] However, these solutions had drawbacks. When the ballast was removed, the track was wedged using wooden blocks and the operators worked directly into the excavation, i.e. into a free space under the rails formed by the removal of the ballast, to secure the sleepers to the lorries. This created difficult working conditions and compromised the safety of the operators. Another drawback was that these solutions were not designed for the renewal of the tire tracks, as the presence of the tracks and guide bars was a hindrance.
[0012] Another solution implemented to renew the ballast and sleepers of underground metro networks is based on the scheduling of one-off projects during which work teams intervene with light equipment. A work train, generally present on the track adjacent to the one benefiting from the ballast and sleeper renewal, transports the new ballast and sleepers. This work train can also be equipped with a mechanical shovel that moves over the work train's wagons and helps remove the ballast and load it onto the work train.
[0013] This type of solution also has disadvantages, mainly due to the low yield of ballast and sleeper renewal, which is around 5 meters for 3 hours of work, due to the fact that most of the work remains manual and not very mechanized. This level of yield does not allow the network to be maintained in good condition because the latter then wears out faster than it is regenerated.
[0014] Also, an objective of the invention is to propose a work train which does not have at least one of the aforementioned drawbacks.
[0015] Another objective of the invention is to propose a work train making it possible to achieve a significantly improved average efficiency in ballast and sleeper renewal, both on railways and on tyre tracks.
[0016] Another objective of the invention is to propose a work train ensuring improved safety for operators as well as high reliability.
[0017] A work train is therefore proposed for the renewal of ballast and sleepers on a portion of track, this portion of track comprising at least one pair of rails, sleepers, called old, and ballast, called old, this work train comprising: a device for suctioning the old ballast from the track as well as an associated means of storing the old ballast, a means of storing the sleepers, a main wagon equipped with two bogies between which extend two parallel beams, these beams having an overall omega shape and each comprising at each end a lower part linked to a bogie and an upper part, the main wagon comprising: a trolley mounted movable in translation on and along the beams, the trolley comprising an articulated arm equipped with a rotating gripping element so that the articulated arm has access to the track by passing between the two beams to, on the one hand, remove the old sleepers from the track and, on the other hand,laying new sleepers, a station for uncoupling / coupling the sleepers to the rails suspended from the two beams and configured to translate along the two beams, said station for uncoupling / coupling the sleepers being arranged so that the articulated arm has access to the track, a track ballast hopper, a means for storing new ballast as well as a ballast conveyor extending from the means for storing new ballast to the ballast hopper.,
[0018] Thus, thanks to the invention, an improvement in the efficiency of ballast and sleeper renewal operations on a section of track is ensured. Indeed, the centralization on a single wagon of the various tools necessary for renewal allows a rationalization of operations, that is to say an optimization of these operations both in their sequence and in their duration. On the one hand, the sleeper detachment / attachment station facilitates the work of the operators to remove the fasteners from the old sleepers and fix the new ones by having them intervene directly above the rails, and, on the other hand, the trolley with its articulated arm ensures the handling of the sleepers directly above the track, the articulated arm passing between the beams of the main wagon to have access to the track.In addition, the articulated arm allows the old sleepers to be handled directly to the dedicated sleeper storage facility and new sleepers to be retrieved for installation.
[0019] The work train, according to the invention, may comprise one or more of the following features, taken in isolation from each other or in combination with each other: the two beams have a spacing between them taken at the level of the upper part which is less than a spacing between the beams taken at the level of a lower part; the main wagon comprises a control cabin for the trolley and the articulated arm, suspended between the two beams, so that in use an operator has a clear view of the track from the control cabin; the main wagon comprises an articulated support for a suction head of the device for suctioning the old ballast; the station for detaching / attaching the sleepers to the rails comprises two seats, each being suspended from one of the two beams above a rail and configured to translate perpendicularly to the two beams;the main wagon comprises a leveling station comprising at least one leveler mounted under the two beams, the leveler being configured to fold, by means of at least one arm that can be rotated, the old ballast not sucked up by the suction device, located under each end of a sleeper, towards the centre of the track, so as to form a flat and uniform excavation bottom under the track, the leveling station being located upstream of the sleeper detachment / coupling station, the leveler is configured to be movable in axial and lateral translation relative to the beams; the at least one arm of the leveler has a width at most equal to a spacing between two consecutive sleepers; the leveler is arranged to be, in use, supported on the rails of the track;the main wagon comprises a compactor provided with at least one vibrating plate for crushing and distributing the new ballast between at least two new sleepers, said compactor being suspended from the two beams, said compactor being movable in axial and lateral translation relative to the beams; the main wagon comprises a compactor for the new ballast, the compactor being provided with at least one mechanical tamping unit for distributing the new ballast between at least two new sleepers, said compactor being suspended from the two beams, said compactor being movable in lateral translation relative to the beams; the main wagon comprises a track holding device configured to retain the rails when the old ballast is removed, the holding device being suspended from the two beams, the holding device being movable in lateral translation relative to the beams;the work train has batteries for autonomous power supply of the work train.;
[0020] The invention also relates to a method for renewing ballast and sleepers of a portion of track implemented by a work train as described above, the method comprising:A) a priming phase comprising the following steps:A1) sucking up the old ballast between at least the rails of the track by means of the suction device so as to form a free volume under the rails, this free volume having a length, defined according to the orientation of the rails, at least equal to a length of an old or new sleeper;A2) separating a plurality of old sleepers from the rails of the track so as to form an opening defined in the plane of the rails and opening into the free volume and having a length at least equal to the length of an old or new sleeper, said old sleepers falling onto a excavation bottom of the free volume once separated;A3) for each old sleeper that has been detached, grasp and turn the old sleeper that has been detached in the free volume using the articulated arm, then remove the said old sleeper that has been detached through the opening before storing the said old sleeper that has been detached in the sleeper storage means;B) a nominal phase comprising the following steps:B1) using the articulated arm, insert through the opening then, after rotation in the free volume, secure a new sleeper to the track rails in place of a removed old sleeper, the said new sleeper having been recovered from the sleeper storage means;B2) ballast the new ballast through the ballast hopper so as to partially fill the free volume, the said new ballast having been conveyed from the new ballast storage means to the said hopper by a conveyor;B3) sucking up the old ballast between at least the rails and two new old sleepers still secured to the rails;B4) separating a new old sleeper from the rails of the track so that the length of the opening remains substantially equal to that formed in step A2), said new old sleeper falling onto the bottom of the excavation once separated;B5) grasping and turning in the free volume the new old sleeper separated by means of the articulated arm, then removing the new old sleeper separated through the opening before storing the new old sleeper separated in the sleeper storage means; andB6) repeating steps B1) to B5) until the ballast and sleepers of the predefined portion of the track are renewed.;
[0021] The method according to the invention may comprise one or more of the following characteristics, taken in isolation from one another or in combination with one another: the method comprises, after the nominal phase B), a finishing phase C) which comprises the following steps: C1) by means of the articulated arm, inserting through the opening then, after rotation in the free volume, depositing on the bottom of the excavation a plurality of new sleepers, the plurality of new sleepers being equal in number to the plurality of old sleepers from step A2), said new sleepers having been recovered from the sleeper storage means; C2) securing each new sleeper of the plurality of new sleepers to the rails of the track so as to close the opening opening into the free volume;andC3) ballast the new ballast on the track so as to fill the free volume in steps A1) and B3), the old ballast is sucked under the old sleepers to a depth of between 20 cm and 50 cm; prior to steps A1) and B3), the old ballast is moistened by means of a watering device; after or simultaneously with the suction of the old sleepers in step A1), a track-holding device, suspended from the beams of the main wagon, holds the rails in position above the free volume; the method comprises: in the initiation phase A), between step A1) and step A2), a first leveling step consisting of folding back into the free volume, by means of a leveler (341), the unsucked old ballast towards the center of the track and leveling the unsucked ballast under the track to make the bottom of the excavation substantially flat and uniform;andin the nominal phase B), between step B3) and step B4), a second leveling step consisting of folding back the old ballast not sucked up as in the first leveling step;the bottom of the excavation is located under the sleepers at a depth of between 20 cm and 30 cm;each of the rotations of steps A3) and B5) is carried out so that the old sleeper is positioned substantially in the axis of the rails;after ballasting, a step of compacting the new ballast is carried out by a compactor between the new sleepers joined together;each step of the process is supplied with electrical energy by batteries.; Brief description of the figures
[0022] The invention will be better understood with the aid of the following description, given solely by way of example and with reference to the appended drawings in which:
[0023] It represents a schematic sectional view of a track for rolling stock fitted with iron bearings,
[0024] It represents a schematic sectional view of a track for rolling stock fitted with pneumatic bearings,
[0025] It represents a schematic side view of an embodiment according to the invention,
[0026] It represents a schematic profile view of an alternative embodiment according to the invention,
[0027] The figure represents a schematic perspective view of the embodiment of the,
[0028] The figure represents a schematic perspective view of a detail of the embodiment of the, in particular the trolley,
[0029] The figure represents a schematic perspective view of a detail of the embodiment of the, in particular the trolley after rotation and removal of an old sleeper from the track,
[0030] The figure represents a schematic cross-sectional view of the embodiment of the, in particular the sleeper detachment / coupling station,
[0031] This represents another schematic view of the sleeper decoupling / coupling station, when a sleeper is placed on the bottom of the excavation,
[0032] The figure shows another schematic view of the sleeper detachment / coupling station, when a sleeper is caught by the articulated arm to be removed / inserted from / to the track,
[0033] The figure represents a schematic cross-sectional view of the embodiment of the, in particular the suction device,
[0034] The figure represents a schematic cross-sectional view of the embodiment of the, in particular the adjustment station,
[0035] The figure represents a schematic perspective view of a detail of the embodiment of the, in particular the ballast hopper and the compactor,
[0036] The figure represents a schematic cross-sectional view of the, in particular the ballast hopper,
[0037] The represents a schematic cross-sectional view of the, in particular the compactor,
[0038] The figure represents a top view of the main wagon according to the invention, without the trolley being shown, in the case of a curved portion of track,
[0039] The figure represents a block diagram of the process for renewing the ballast and sleepers of a section of track according to the invention,
[0040] The diagram represents a schematic view of the first part of a kinematic breakdown of the method according to the invention applied to a tire track,
[0041] It represents a schematic view of the second part of the kinematic breakdown of the,
[0042] The figure represents a schematic side view of another embodiment according to the invention,
[0043] It represents a schematic from above,
[0044] It represents a schematic perspective view of the compactor of the,
[0045] The represents a schematic front view of the track maintenance device of the, and
[0046] The figure represents a schematic perspective view of the holding device. Detailed description of the invention
[0047] With reference to Figures 1 and 2, already described in the above, there are several types of tracks for rolling stock in a metro network: 1A rail tracks and 1B tire tracks. In the following, reference will be made for convenience to track 1A, 1B since the invention is suitable for use on these two types of tracks as detailed below. Also for convenience, the following will also refer to the “rails 3 and other elements”. By this designation, it is understood that reference is made to the side rails 6, the running tracks 7 and / or the guide bars 8.
[0048] We now turn to Figures 3 to 16 and 19 to 24 which illustrate a work train 100 for the renewal of the ballast 4 and the sleepers 2 of a portion of track 1A, 1B according to the invention and details concerning different aspects of this work train 100.
[0049] In situation, the work train 100 according to the invention is brought onto a portion of track 1A, 1B composed of at least one pair of rails 3, sleepers 2a, called old, and ballast 4a, called old. It is understood that the old sleepers 2a and the old ballast 4a must be renewed and changed respectively by new sleepers 2b and new ballast 4b.
[0050] The work train 100 comprises a suction device 10 for the old ballast of track 1A, 1B as well as an associated storage means 50, a storage means 20 for the sleepers 2a, 2b and a storage means 40 for the new ballast 4b.
[0051] The suction of the suction device 10 can for example be carried out by means of one or more fans or one or more vacuum pumps. A vacuum pump has the advantage of being able to maintain a substantially constant suction. The suction of the old ballast 4a makes it possible to form a free volume 90 under the old sleepers 2a. This free volume 90 comprising a excavation bottom 91 defined as being the bottom of the free volume 90.
[0052] The work train 100 also comprises a main wagon 30 provided with two bogies 31 between which extend two beams 32 parallel to each other. The beams 32 have an overall omega shape. Each beam 32 thus comprises, at each end, a lower part 34, 34', linked to one of the bogies 31, and an upper part 35.
[0053] Advantageously, the two beams 32 have a spacing between them taken at the level of the upper part 35 which is less than a spacing between the beams 32 taken at the level of a lower part 34, 34'. It is understood that this spacing is a lateral spacing. This makes it possible to improve the crossing by the main wagon 30 of the narrowest parts of a tunnel of the metro network on which the work train is intended to be used.
[0054] In a particular embodiment, illustrated for example in figures 3 to 18, the main wagon 30 may comprise a leveling station 340, a trolley 310, a station 320 for separating / securing the sleepers 2a, 2b to the rails 3 and other elements and a hopper 330 for ballast of the track 1A, 1B.
[0055] Advantageously, the different stations 340, 310, 320, 330 are arranged, from front to rear in the direction of travel, in the aforementioned order.
[0056] A ballast conveyor 60 also extends from the storage means 40 for the new ballast 4b to the ballast hopper 330 of the main wagon 30. We are talking here about a conveyor 60 in general which can be composed of a multitude of conveyors placed in series.
[0057] We now take a closer look at main car 30.
[0058] The trolley 310 of the main wagon 30 comprises an articulated arm 311 mounted on and between the two beams 32 so that the articulated arm 311 has access to the track 1A, 1B by passing between the two beams 32 to, on the one hand, remove the old sleepers 2a from the track 1A, 1B and, on the other hand, lay new sleepers 2b. To grip the sleepers 2a, 2b, the articulated arm 311 is provided with a rotatable gripping element 314.
[0059] The carriage 310 is mounted to move in translation on and along the beams 32. It is understood that the carriage 310 is mounted in the upper part 35 of the beams 32. For example, the carriage 310 can be located on rails 33 mounted on and along the beams 32 so that the carriage 310, with the articulated arm 311, can move on these rails 33.
[0060] The articulated arm 311 can further be directly controlled from the carriage 310, as shown in the, where an operator is installed on the carriage 310, therefore on the beams 32.
[0061] However, this configuration is not the most optimal since the operator's field of vision, in particular between the two beams 32, is obstructed by the articulated arm 311. In addition, since the operator is located high up in relation to the track 1A, 1B, precise handling of the sleepers 2a, 2b may prove difficult.
[0062] Also, advantageously, the main wagon 30 comprises a control cabin 312 for the trolley 310 and the articulated arm 311. This control cabin 312 is suspended between the two beams 32 above the track 1A, 1B so that in use an operator has a clear view of the track 1A, 1B from the control cabin 312, as shown in Figures 4 to 7. It is understood that the articulated arm 311 is, in such a case, controlled remotely from the control cabin 312. From this control cabin 312, the operator can also control the movement of the trolley 310 provided with the articulated arm 311 along the beams 32.
[0063] In this example, the control cabin 312 is advantageously located downstream of the adjustment station 340 and upstream of the decoupling / coupling station 320.
[0064] Alternatively, an operator may control the trolley 310 and the articulated arm 311 with a remote control, such as a radio control, while being next to the main wagon 30.
[0065] With reference to the, the station 320 for disconnecting / connecting the sleepers 2a, 2b to the rails 3 and other elements is suspended from the two beams 32, above the rails 3, and is configured to translate along the two beams 32. It is understood that the station 320 for disconnecting / connecting is suspended from the upper part 35 of the beams 32. A sliding connection 321 can, for example, allow the station 320 for disconnecting / connecting to translate along the two beams 32. The station 320 for disconnecting / connecting can also be suspended from one or more rails fixed to the beams 32. It is preferred that the movement of the station 320 for disconnecting / connecting along the beams 32 is limited on one side by the leveling station 340 and on the other by the hopper 330. The movement of the decoupling / coupling station 320 can be limited on one side by the control cabin 312 when the latter is present and on the other side by the hopper 330.The decoupling / coupling station 320 is further designed so that the articulated arm 311 has access to track 1A, 1B.
[0066] Advantageously, the decoupling / coupling station 320 comprises two seats 322, each suspended from one of the two beams 32 above a rail 3. Each seat is configured to translate along this beam 32 as indicated previously.
[0067] Advantageously, each of these seats 322 is configured to be able to translate perpendicularly to the beams 32, for example by means of a slide. In this way, the operator seated on a seat 322 of the uncoupling / coupling station 320 can adjust its position relative to the rails 3, side rails 6, running tracks 7 and / or guide bars 8 of the track 1A, 1B to facilitate the removal or placement of the lag screws 5 of the sleepers 2a, 2b. In addition, this also makes it possible to adjust its lateral position when the track 1A, 1B is curved, as shown in the, where an offset is observed between the beams 32 of the main wagon 30 and the track 1A, 1B.
[0068] With reference to the, the main wagon 30 may comprise, upstream of any station of the main wagon 30, for example the leveling station 340 or the decoupling / coupling station 320, a mobile support 360 for a suction head 12 of the suction device 10 of the old ballast 4a, the suction head 12 then being connected by a flexible pipe 11 to the storage means 50 of the old ballast 4a. This mobile support 360 allows an operator to precisely control the suction head 12 of the suction device 10 of the old ballast 4a under the track 1A, 1B. The mobile support 360 can be controlled by the operator by means of a control unit 13.
[0069] The main wagon 30 may comprise, at the same level as the mobile support, a device 370 for watering the old ballast 4a, as seen in the figure. Watering the old ballast 4a with water makes it possible to dilute the pollution which over time has either clogged the old ballast 4A or made it compact. In other words, watering makes it possible to detach the grains of old ballast 4a from each other, or to decompact the old ballast 4a, which facilitates its suction by the suction device 10. This also makes it possible to facilitate the leveling operation as described below.
[0070] Advantageously, the main wagon 30 may comprise a mechanical decompaction device, not shown, to ultimately improve the suction of the ballast. This device may, for example, be vibrating needles intended to be planted in the ballast 4a.
[0071] The main wagon 30 may comprise, upstream of the decoupling / coupling station 320 but downstream of the mobile support 360, when present, a levelling station 340. This is for example the case on the. Levelling is understood to mean an operation consisting of levelling a ground so as to give it a regular surface. Also, this levelling station 340 comprises a leveller 341 mounted under the two beams 32. It is understood that the leveller is mounted under the upper part 35 of the beams 32.
[0072] The leveler 341 is configured to fold, by means of at least one arm 342 movable in rotation, the old ballast 4a not sucked up by the suction device 10, towards the center of the track 1A, 1B, so as to form under the track 1A, 1B an excavation bottom 91, arranged to be leveled, substantially flat and uniform. Preferably, the old ballast 4a folded down by the leveler 341 is that located under each end of an old sleeper 2a.
[0073] The regulating station 340 may comprise a control cabin 345 of the regulator 341 which is suspended between the two beams 32 above the track 1A, 1B so that in use an operator has a clear view of the track 1A, 1B, and in particular of the free volume 90 under the track 1A, 1B, from the control cabin 345. It is understood that the control cabin 345 is suspended from the upper part 35 of the beams 32.
[0074] Conventionally, the regulator 341 comprises a block 344 positioned transversely to the track 1A, 1B from which the motor block of the arm 342 is suspended, the latter being able to move laterally under the block 344.
[0075] Advantageously, the regulator 341, via the block 344, is, in use, at least supported on the rails 3 of the track 1A, 1B in order to increase its stability and transmit more force to the arm 342.
[0076] Advantageously, the regulator 341 is configured to be movable in axial and lateral translation relative to the beams 32. These translations are permitted by the presence of jacks for example, fixed between the regulator 341 and the beams 32 and / or along the beams 32. An axial translation makes it possible, among other things, to compensate for a variation in spacing, or travel, between the sleepers 2a, while a lateral translation, as described previously, is advantageous for compensating for the offset which is observed between the beams 32 of the main wagon 30 and the track 1A, 1B when this same track 1A, 1B is curved.
[0077] Advantageously, the arm 342 of the regulator has a width which is at most equal to the spacing existing between two consecutive old sleepers 2a.
[0078] Furthermore, the arm 342 can be provided with "fingers" 343 designed to scrape and tear off more easily the old, unvaccinated ballast 4a which, over time, has become compact.
[0079] Alternatively, not shown, the regulator 341 may comprise two arms 342, each located on one side and the other of the regulator 341.
[0080] Alternatively, not shown, the adjustment station 340 may comprise two adjusters 341, placed one behind the other.
[0081] It should be noted that in certain embodiments, the main car 30 does not include a regulating station 340.
[0082] With reference to figures 13 to 15, the main wagon 30 may also comprise, downstream of the hopper 330, a compactor 350 for the new ballast 4b. This compactor 350 may be provided with at least one vibrating plate 351 for crushing and distributing the new ballast 4b, deposited by the hopper 330, between at least two new sleepers 2b. The compactor 350 is suspended from the two beams 32 of the main wagon 30. The compactor 350 may, as a variant, be suspended from a substructure of these same beams 32 which extends under the conveyor 60.
[0083] The compactor 350 can also be configured to be movable in axial and lateral translation relative to the beams 32. The axial translations are enabled by rails or slides 352 fixed to the beams 32 while the lateral translations are enabled by the presence of jacks or slides for example. These translations have the same advantages as described previously for the regulator 341.
[0084] With reference to the, the hopper 330 comprises a bin 333 through which passes the new ballast 4b transported by the conveyor 60 from the storage means 40 of the new ballast 4b. Like the compactor 350, the hopper 330 can be configured to be movable in axial and lateral translation relative to the beams 32. The axial translations are permitted by rails or slides 332 fixed to the beams 32 while the lateral translations are permitted by the presence of jacks or slides for example. These translations have the same advantages as described previously for the regulator 341.
[0085] In a second embodiment, illustrated for example in figures 19 to 23, the main wagon 30 may comprise a station 320 for disconnecting / connecting the sleepers 2a, 2b to the rails 3 and other elements, a trolley 310 and a hopper 330 for ballast of the track 1A, 1B.
[0086] This second embodiment is similar to the first embodiment but differs in some aspects detailed in the following.
[0087] Advantageously, in this second embodiment, the different stations 320, 310 and 330 are arranged, from front to rear in the direction of travel, in the aforementioned order.
[0088] In this second embodiment, illustrated for example in the, the adjustment station 340 as described previously is not present. However, this adjustment station 340 can be provided as a variant.
[0089] In this example, the carriage 310 is similar to that described previously. A control cabin 312 of the carriage 310 may be located downstream of the detaching / coupling station 320 and upstream of the hopper 330. Advantageously, the control cabin 312 is oriented such that the operator faces the detaching / coupling station 320. In this way, the operator has a clear view of the track 1A, 1B to control the articulated arm 311 of the carriage 310 in complete safety.
[0090] In this example, the station 320 for uncoupling / coupling the sleepers 2a, 2b to the rails 3 and other elements may comprise at least one walkway 323, as seen in the figure. The uncoupling / coupling station 320 may comprise a walkway 323 under each beam 32. This walkway 323 is designed to allow an operator to crouch or stand and move around. The operator positioned on the walkway 323 participates in the removal and installation of the lag screws 5 of the sleepers 2a, 2b.
[0091] As before, the decoupling / coupling station 320 is designed so that the articulated arm 311 of the trolley 310 has access to the track 1A, 1B.
[0092] In this example, the hopper 330 may include a hose 334 at the outlet of the bin 333, as illustrated in the figure. This hose 334 allows an operator to precisely control the distribution of the new ballast 4b in the free volume 90. The operator handling the hose 334 of the hopper 330 may be positioned on a platform 335, suspended from the beams 32, to distribute the new ballast 4b. This platform 335 is preferably located between the control cabin 312 and the hopper 330.
[0093] Alternatively, the hopper 330 may be similar to that described in the first embodiment, and not include a hose 334.
[0094] In this example again, the compactor 350 of the new ballast 4b may be provided with at least one mechanical tamping unit 353 for distributing the new ballast between at least two new beams 2b. In such a case, the compactor 350 with mechanical tamping unit 353 is configured to be movable in lateral translation relative to the beams. Alternatively, the compactor 350 may be movable in lateral translation and / or movable in axial translation relative to the beams.
[0095] Each mechanical tamping unit 353 comprises claws 354 designed to be inserted into the new ballast 4b and to vibrate in the ballast in order to improve its distribution and increase the strength of the track under the new sleeper 2b. Another type of compactor can be used, such as a compactor equipped with a vibrating plate for example.
[0096] With reference to figures 22 and 23, the main wagon 30 may comprise a holding device 380 for the track 1A, 1B. This holding device 380 is configured to hold the rails 3 and / or the running tracks 7 in position when the old ballast 4a is removed, so that the rails 3 and / or the running tracks 7 do not collapse. This makes it possible to avoid deformation of the track 1A, 1B.
[0097] The holding device 380 comprises a clamp 381 which may comprise at least two movable arms 382. Each movable arm 382 has a free end provided with a circular rim 383. This rim 383 is designed to cooperate with a lower rim 3a of a rail 3 or with a lower rim 7b of a rolling track 7.
[0098] In practice, in the case of a track 1B, called a tire track, the circular edge 383 cooperates from the inside of the track with the lower edge 3a of a rail 3 as illustrated in the, while the circular edge 383 cooperates from the outside of the track with the lower edge 7b of a running track 7 as illustrated in the. This configuration is due to the small spacing between the rails 3 and the running tracks 7 which may be insufficient for the passage of the circular edge 383 of the arm 382. In the case of a track 1A, called a railway track, the running tracks 7 being absent, the circular edge 383 can cooperate from the inside or from the outside of the track 1A with the lower edge 3a of the rails 3.
[0099] The holding device 380 may be suspended from the beams 32. The holding device 380 may also be configured to be movable in lateral translation relative to the beams 32, the lateral translations being made possible by the presence of jacks or slides. These translations have the same advantages as described previously for the regulator 341.
[0100] The holding device 380 can be located between the control cabin 312 and the hopper 330. Advantageously, this holding device 380 is fixed to the same frame as the control cabin 312, a frame which is suspended from the beams 32.
[0101] Returning to Figures 3 to 5, the storage means 20 for the sleepers 2a, 2b may be a wagon located downstream, in the direction of travel, from the main wagon 30. The storage means 20 may comprise several racks 21 intended to receive the old sleepers 2a or new sleepers 2b, as well as an exchange zone 22 for the old sleepers 2a and new sleepers 2b. This exchange zone 22 is also accessible to the articulated arm 311 of the trolley 310. The articulated arm 311, for example, places a removed old sleeper 2a in the exchange zone 22 before recovering a new sleeper 2b brought by a handling gantry 23 from one of the racks 21. The handling gantry 23 may be movable along the storage means 20 for the sleepers by being mounted on rails specific to the storage means 20, for example by being fixed to uprights of the wagon. In this way, the routing of the crosspieces 2a, 2b from the racks 21 to the exchange zone 23 or vice versa is facilitated.
[0102] Part of the conveyor 60 is also located under the storage means 20 of the sleepers 2a, 2b to allow the transport of the new ballast 4b to the main wagon 30.
[0103] The storage means 40 for the new ballast 4b may be in the form of one or more wagons located downstream, depending on the direction of travel, from the storage means 20 for the sleepers 2a, 2b. The storage means 40 may comprise several hoppers containing new ballast 4b discharging onto the conveyor 60. It is understood that the conveyor 60 thus extends from the storage means 40 for the new ballast 4b to the ballast hopper 330 on the track 1A, 1B, passing through the storage means 20 for the sleepers 2a, 2b.
[0104] The work train 100 may include batteries, not shown, for an autonomous power supply. This makes it possible to avoid the electrical network coming from the side rails 6 or the guide bars 8, the power supply of which is cut off during the work. Furthermore, the use of an autonomous power supply has the advantage of emitting little pollution into the air, which limits the impact on the health of the operators. This is not the case with diesel machines, for example.
[0105] The invention also relates to a method P for renewing the ballast and sleepers of a portion of track 1A, 1B implemented by a works train 100 as described above.
[0106] The method P according to the invention comprises:
[0107] A) a priming phase comprising the following steps: A1) sucking up between at least the rails 3 and two sleepers 2a, 2b of the track 1A, 1B the old ballast 4a by means of the suction device 10 so as to form a free volume 90 under the rails 3, this free volume 90 having a length, defined according to the orientation of the rails 3, at least equal to a length of an old sleeper 2a or new sleeper 2b; A2) separating a plurality of old sleepers 2a from the rails 3 of the track 1A, 1B so as to form an opening 92 defined in the plane of the rails 3 and opening into the free volume 90 and having a length at least equal to the length of an old sleeper 2a or new sleeper 2b, the old sleepers 2a falling onto the excavation bottom 91 of the free volume 90 once separated;andA3) for each old crosspiece 2a detached, grasp and turn in the free volume 90 the old crosspiece 2a detached by means of the articulated arm 311, then remove the old crosspiece 2a detached through the opening 92 before storing the old crosspiece 2a detached in the storage means 20 of the crosspieces 2a, 2b;
[0108] B) a nominal phase comprising the following steps: B1) by means of the articulated arm 311, insert through the opening 92 then, after rotation in the free volume 90, secure to the rails 3 of the track 1A, 1B a new sleeper 2b in place of an old sleeper 2a removed, the new sleeper 2b having been recovered from the storage means 20 of the sleepers 2a, 2b; B2) ballast the new ballast 4b through the ballast hopper 330 so as to partially fill the free volume 90, the new ballast 4b having been conveyed from the storage means 40 of the new ballast 4a to the hopper 330 by a conveyor 60; B3) suck the old ballast 4a between at least the rails 3 and two new old sleepers 2a still secured to the rails 3;B4) detaching a new old sleeper 2a from the rails 3 of the track 1A, 1B so that the length of the opening 92 remains substantially equal to that formed in step A2), the new old sleeper 2a falling onto the excavation bottom 91 once detached; B5) grasping and turning in the free volume 90 the new old sleeper 2a detached by means of the articulated arm 311, then removing the new old sleeper 2a detached through the opening 92 before storing the new old sleeper 2a detached in the storage means 20 for the sleepers 2a, 2b; and B6) repeating steps B1) to B5) until the ballast 4 and the sleepers 2 of the predefined portion of the track 1A, 1B are renewed.
[0109] The steps of the method P are detailed in the following, with reference to the block diagram of the kinematic breakdown of figures 18A and 18B.
[0110] The P process includes a start-up phase A) during which route 1A, 1B is prepared to launch the work.
[0111] At a step P08, prior to step A1) or P10, the old ballast 4a can be moistened by means of a watering device 370 so as to make the old ballast 4a less compact thanks to the percolation of water in the old ballast 4a. This moistening of the old ballast 4a increases the separation of the ballast grains from each other and facilitates the following suction and / or adjustment steps, when implemented.
[0112] At a step P10, or step A1), the old ballast 4a at least located between the rails 3 of the track 1A, 1B is sucked up by means of the suction device 10. In this way, a free volume 90 is formed under the rails 3, as shown by the. This free volume 90 is arranged so as to have a length at least equal to the length of an old sleeper 2a or new sleeper 2b so that these can be maneuvered in the free volume 90. The length of the free volume 90 is understood to mean a dimension defined according to the orientation of the rails 3, that is to say extending substantially parallel to the rails 3.
[0113] In this step P10, the old ballast 4a can be sucked under the old sleepers 2a to a depth of between 20 cm and 60 cm to form the free volume 90.
[0114] Optionally, at a step P11 following step P10, mechanical leveling ensures, by means of the leveler 341, a folding of the old ballast 4a not sucked up in step P10 towards the center of the track 1A, 1B. The leveler 341 is inserted into the free volume 90 under the old sleepers 2a and the arm 342 of the leveler 341 is rotated on one side of the free volume 90, then on the other, to break the old ballast 4a not sucked up which has remained under the ends of the sleepers 2a and fold it towards the center of the track 1A, 1B. In this way, the mechanical leveling ensures a leveling of the old ballast 4a not sucked up under the track 1A, 1B to form a substantially flat and uniform excavation bottom 91, as shown by the. Furthermore, it is ensured that the width of the free volume 90 is at least equal to the length of a crosspiece 2a, 2b.
[0115] In this step P11, the bottom of the excavation 91 is located under the sleepers 2a, 2b at a depth of between 20 cm and 30 cm.
[0116] At this stage, part of the rails 3, and other elements, and of the sleepers 2a of the track portion 1A, 1B are in the air above the free volume 90, that is to say they are not resting on any ballast.
[0117] Advantageously, after or simultaneously with step P10, a device 380 for holding the track 1A, 1B can be deployed to hold the rails 3 and / or the running tracks 7 in position above the free volume 90.
[0118] In a step P12 or step A2), a plurality of old sleepers 2a are separated from the rails 3 and other elements of the track 1A, 1B by the operator(s) of the separation / separation station 320 so as to form an opening 92. This opening 92 is defined in the plane of the rails 3. The opening 92 also opens into the free volume 90. This opening 92 has a length at least equal to the length of an old sleeper 2a or new sleeper 2b, as shown in Figures 6 to 10 and 18. At this step, the lag screws 5 holding the old sleepers 2a to the rails 3 and other elements of the track 1A, 1B are removed. To facilitate the operation, the articulated arm 311 can be used to hold the old sleeper 2a in place, using its rotating gripping element 314 (). The old sleeper 2a, once detached, then falls or is placed in the free volume 90, and preferably on the bottom of the excavation 91 ().In the case where the distance separating two old sleepers 2a is less than the length of a sleeper 2a, 2b, it is necessary to separate several old sleepers 2a to form the opening 92 as described previously.
[0119] At a step P14 or step A3), each of the old sleepers 2a separated in the previous step is removed through the opening 92 formed in step P12. Beforehand, each old sleeper 2a separated will have performed a rotation, on a plane parallel to the plane of the rails 3, in the free volume 90 to find itself substantially in the axis of the rails 3. The rotation, which is generally 90°, is carried out using the articulated arm 311 (and 18A, B). It is understood that, in this configuration, it is necessary that, in order to pass through the opening 92, a sufficient number of old sleepers 2a have been separated in step P12. The articulated arm 311 extracts the old sleeper 2a through the opening 92 and lifts it, without being hindered by the decoupling / coupling station 320, between the two beams 32 of the main wagon 30 (figures 6 and 7) before storing it in the storage means 20 for the sleepers 2a, 2b.
[0120] In the example of Figures 18A, 18B, once the old sleeper 2a has been extracted, the carriage 310 carrying the articulated arm 311 is maneuvered on the rails 33 to move towards the storage means 20 of the sleepers 2a, 2b, represented here by a wagon as described previously. The old sleeper 2a is placed in the exchange zone 22 then stored by means of the handling gantry 23 in one of the dedicated racks 21.
[0121] This step P14 preferably ends when all the old sleepers 2a separated in step P12 are stored in the storage means 20.
[0122] At this stage, the initiation phase A) is completed and the process P implemented by the work train 100 enters a so-called nominal phase B), i.e. the site is in a repeated, quasi-automatic operating mode.
[0123] At a step P16 or step B1), a new sleeper 2b is inserted by means of the articulated arm 311 through the opening 92 into the free volume 90 and then, after rotation in this free volume 90, is secured to the rails 3 and other elements of the track 1A, 1B. In other words, the process of step P16 can be considered as being the reverse of the process of step P14. Indeed, a new sleeper 2b is recovered from the storage means 20, for example in the exchange zone 22, by the articulated arm 311. The carriage 310 carrying the articulated arm 311 is maneuvered to bring the new sleeper 2b above the work zone, to pass the new sleeper 2b between the two beams 32 then into the opening 92. It is understood that the new sleeper 2b is oriented substantially along the axis of the rails 3. A rotation of the new sleeper 2b is carried out in the free volume 90 by the articulated arm 311 so as to place the new sleeper 2b substantially perpendicular to the rails 3.The new sleeper 2b is then secured by means of lag screws 5 by the operator(s) of the decoupling / coupling station 320 to the rails 3 and other elements of the track 1A, 1B in place of an old sleeper 2a removed, preferably the first old sleeper 2a removed. It is understood that once the new sleeper 2b is secured, the opening 92 has a length less than the length of a sleeper 2a, 2b.
[0124] At a step P18 or step B2), the new ballast 4b is spread on the track 1A, 1B through the ballast hopper 330 to partially fill the free volume 90 under the track 1A, 1B (figures 14 and 18B). This filled part can for example be the volume separating the newly laid new sleeper 2b and the previous sleeper. The new ballast 4b is, beforehand, conveyed from the storage means 40 of the new ballast 4a to the hopper 330 by the conveyor 60.
[0125] At a step P19, compaction of the new ballast 4b can be carried out by means of the compactor 350 between the new sleepers 2b. This compaction step can be carried out by means of at least one vibrating plate 351 or by means of at least one tamping unit 353.
[0126] At a step P20 or step B3), the old ballast 4a is sucked between at least the rails 3 and two new old sleepers 2a still secured to the track. It is understood that these two new old sleepers 2a are located after the plurality of old sleepers 2a already detached at step P14. It is also understood that this step makes it possible to enlarge the free volume 90. These new old sleepers 2a are therefore located at one end of the free volume 90.
[0127] Prior to this step P20, a step P08' identical to step P08 can be carried out.
[0128] Optionally, at a step P22 following step P20, the old ballast not sucked up at step P20 is folded back by means of the regulator 341 as at step P11.
[0129] In a step P24 or step B4), a new old sleeper 2a is separated from the rails 3 and the other elements of the track 1A, 1B, in a manner similar to that of step P12. It is understood that the new old sleeper 2a which is separated is the one which is located at one end of the opening 92 and that once separated, it falls or is deposited on the bottom of the excavation 91. In this way, the length of the opening 92 remains substantially equal to that formed in step P12. It is understood that the length of the opening 92 at the end of this step P24 must be greater than the length of the opening 92 at the end of step P16.
[0130] In step P26 or step B5), the new old sleeper 2a is removed through the opening 92 and then stored in the storage means (20) of the sleepers 2a, 2b in a manner similar to that of step P14.
[0131] At step P28 or step B6), the previously described steps P16 to P26 are repeated in the same order until the ballast and sleepers of the predefined portion of track 1A, 1B are renewed.
[0132] With reference to the time indicators from 02:02:00 to 02:23:00 of the, to conclude the work, the method P may comprise, taking place after the nominal phase B), that is to say after the step P28, a finishing phase C) which comprises the following additional steps: C1) by means of the articulated arm 311, insert through the opening 92 then, after rotation in the free volume 90, deposit on the bottom of the excavation 91, a plurality of new sleepers 2b, the plurality of new sleepers 2b being equal in number to the plurality of old sleepers 2a of the step A2), the new sleepers 2b having been recovered in the storage means 20 of the sleepers 2a, 2b; C2) secure each new sleeper 2b of the plurality of new sleepers 2b to the rails 3 of the track 1A, 1B so as to close the opening 92 opening into the free volume 90; andC3) ballast the new ballast 4b on track 1A, 1B so as to fill the free volume 90.
[0133] Thus, in a step P30 or step C1), a plurality of new sleepers 2b are recovered one by one in the storage means 20 of the sleepers 2a, 2b by the articulated arm 311 before being placed on the excavation bottom 91 under the rails 3, each new sleeper 2b being previously turned in the free volume 90 so as to be substantially perpendicular to the rails 3. It is preferred that the plurality of new sleepers 2b comprises a number of new sleepers 2b equal to the number of old sleepers 2a of the plurality of old sleepers 2a described in step P12 or step A3).
[0134] It is understood that at this stage P30, the new sleepers 2b must all necessarily be placed on the bottom of the excavation 91 before being secured because, otherwise, they could no longer be inserted under the rails 3.
[0135] At a step P32 or step C2), the new sleepers 2b placed on the bottom of the excavation 91 are secured one after the other to the rails 3 and other elements of the track 1A, 1B so as to close the opening 92 leading into the free volume 90.
[0136] At a step P34 or step C3), the new ballast 4b is spread on track 1A, 1B through the ballast hopper 330 to fill the free volume 90 under track 1A, 1B. The new ballast 4b can be transported in the same manner as in step P18.
[0137] After step P34, a step P19' identical to step P19 can be carried out.
[0138] At stage P36, the time allowed for carrying out the work is over and track 1A, 1B is returned to commercial metro traffic.
[0139] It should be noted that the means implemented at each stage of the P process are supplied with electrical energy by batteries.
[0140] It should be noted that the process P as described above does not take place entirely statically. Indeed, the work train 100 advances as part of the track portion 1A, 1B is renewed as shown in the kinematic breakdown of the process P in Figures 18A and 18B. The work train 100 only advances when all of the tasks described above have been completed, i.e. the tasks of suction, leveling - when carried out - decoupling, maneuvering of the sleepers, securing and ballasting and when carried out, the compacting task.
[0141] Also, it is important to note that the localized deconsolidation of track 1A, 1B and the sequencing of the steps of process P allow that at no time do the bogies 31 of the main wagon 30, nor any other bogie of the work train 100, roll on the part of track 1A, 1B located in the air above the free volume 90, without support from the ballast.
[0142] Figures 18A and 18B relate more specifically to the kinematic breakdown of method P implemented by a single work train 100 in a given time to carry out the renewal of a predefined portion of a tire track 1B. The time t indicating the time elapsed (in hours, minutes, seconds) since the actual start of the work is given as an expected example of the implementation of method P. Thus, it is expected that by following method P, in less than 2h30, the work train 100 can allow the replacement of at least 21 old sleepers 2a with their associated ballast, i.e. approximately 12.5 linear meters of tire track 1B, in particular when the travellage, i.e. the spacing between the sleepers, is 60 cm.
[0143] The 1B tire tracks have a more complex construction than the classic 1A railway tracks. It is expected that the yield of ballast and sleeper renewal on these 1A tracks, under conditions identical to those described above, will be approximately twice that on 1B tire tracks, which represents approximately 42 old 2a sleepers with their associated ballast, or approximately 25 linear meters.
[0144] It should be noted that efficiency can be further improved by using several work trains 100. For example, the work trains can be placed one after the other on the same track or one can be placed on a first track and another on the adjacent track.
[0145] In light of what has been described in the foregoing, it is clear that the work train 100 according to the invention allows an improvement in the efficiency of the ballast and sleeper renewal operations on a section of track. Indeed, the centralization on a single wagon of the various tools necessary for the renewal allows an optimization of the operations in their sequence and in their duration. On the one hand, the sleeper detachment / attachment station facilitates the work of the operators to remove the fasteners of the old sleepers and fix the new ones by having them intervene directly above the rails, and, on the other hand, the trolley with its articulated arm ensures the handling of the sleepers directly from above the track, the articulated arm passing between the beams of the main wagon to have access to the track.In addition, the articulated arm allows the old sleepers to be stored directly in the storage facility, in particular, when provided, in a volume dedicated to the exchange of sleepers and then to recover new ones to be installed.
[0146] Another advantage is that it ensures that the track elevation is maintained. In fact, during the implementation of the process, the rails are not dismantled and remain in place. A portion of the rail is thus kept in the air, without resting on the ballast, which facilitates work on the track and the removal / installation of sleepers.
[0147] Another advantage, linked to the centralization of the various tools on the main wagon, is the "compact" aspect of the work train which allows it to operate efficiently in confined environments.
[0148] Yet another advantage is that it improves operator safety. Operators no longer have to work directly in the bottom of the excavation to separate / unseal sleepers and remove / install them. Furthermore, since the articulated arm is located directly on the beams of the main wagon and passes between these beams, the risk of a collision with an operator is greatly reduced since the articulated arm has no reason to pivot away from the track axis.
Claims
Work train (100) for renewing ballast and sleepers of a portion of track (1A, 1B), said portion of track comprising at least one pair of rails (3), sleepers (2a), called old, and ballast (4a), called old, said work train comprising:- a suction device (10) for the old ballast (4a) of the track as well as a storage means (50) for the associated old ballast,- a storage means (20) for the sleepers (2a, 2b),- a main wagon (30) provided with two bogies (31) between which extend two beams (32) parallel to each other, said beams (32) having an overall omega shape and each comprising at each end a lower part (34, 34') linked to a bogie (31) and an upper part (35), said main wagon (30) comprising: a carriage (310) mounted movably in translation on and along the beams,the trolley comprising an articulated arm (311) provided with a gripping element (314) rotatable so that the articulated arm has access to the track (1A, 1B) by passing between the two beams to, on the one hand, remove the old sleepers (2a) from the track (1A, 1B) and, on the other hand, lay new sleepers (2b), a station for detaching / attaching the sleepers (2a, 2b) to the rails (3) suspended from the two beams (32) and configured to translate along the two beams, said station for detaching / attaching the sleepers being arranged so that the articulated arm (311) has access to the track, a hopper (330) for ballasting the track, - a storage means (40) for new ballast (4b) as well as a ballast conveyor (60) extending from the storage means of the new ballast to the ballast hopper (330)., A work train (100) according to claim 1, wherein the main wagon (30) comprises a control cabin (312) for the trolley (310) and the articulated arm (311), suspended between the two beams (32), so that in use an operator has a clear view of the track from the control cabin (312). Work train (100) according to any one of claims 1 or 2, wherein the main wagon (30) comprises an articulated support (360) for a suction head (12) of the suction device (10) of the old ballast (4a). Work train (100) according to any one of claims 1 to 3, in which the station (320) for detaching / attaching the sleepers (2a, 2b) to the rails (3) comprises two seats (322), each being suspended from one of the two beams above a rail (3) and configured to translate perpendicular to the two beams (32). Work train (100) according to any one of claims 1 to 4, wherein the main wagon (30) comprises a leveling station (340) comprising at least one leveler (341) mounted under the two beams (32), said leveler (341) being configured to fold, by means of at least one arm (342) movable in rotation, the old ballast (4a) not sucked up by the suction device (10), located under each end of a sleeper (2a), towards the center of the track (1A, 1B), so as to form a flat and uniform excavation bottom (91) under the track, said leveling station being located upstream of the sleeper detachment / coupling station (320). Work train (100) according to claim 5, wherein the regulator (341) is configured to be movable in axial and lateral translation relative to the beams (32). Work train (100) according to any one of claims 5 or 6, wherein said at least one arm (342) of the regulator (341) has a width at most equal to a spacing between two consecutive sleepers (2a). Work train (100) according to any one of claims 5 to 7, in which the regulator (341) is arranged to be, in use, supported on the rails (3) of the track. Work train (100) according to any one of claims 1 to 8, wherein the main wagon (30) comprises a compactor (350) provided with at least one vibrating plate (351) for crushing and distributing the new ballast (4b) between at least two new sleepers (2b), said compactor (350) being suspended from the two beams (32), said compactor being movable in axial and lateral translation relative to the beams. Work train (100) according to any one of claims 1 to 8, wherein the main wagon (30) comprises a compactor (350) of the new ballast (4b), said compactor being provided with at least one mechanical tamping unit (353) for distributing the new ballast (4b) between at least two new sleepers (2b), said compactor (350) being suspended from the two beams (32), said compactor being movable in lateral translation relative to the beams. Work train (100) according to any one of claims 1 to 10, wherein the main wagon (30) comprises a track holding device (380) configured to hold the rails (3) and / or running tracks (7) when the old ballast (4a) is removed, said holding device being suspended from the two beams (32), said holding device being movable in lateral translation relative to the beams. Work train (100) according to any one of claims 1 to 11 comprising batteries for an autonomous electrical supply of the work train. Method (P) for renewing ballast and sleepers of a portion of track (1A, 1B) implemented by a works train (100) according to any one of claims 1 to 12, said method comprising:A) a priming phase comprising the following steps:A1) sucking (P10) between at least the rails (3) of the track (1A, 1B) the old ballast (4a) by means of the suction device (10) so as to form a free volume (90) under the rails (3), said free volume (90) having a length, defined according to the orientation of the rails (3), at least equal to a length of an old (2a) or new (2b) sleeper;A2) detaching (P12) a plurality of old sleepers (2a) from the rails of the track so as to form an opening (92) defined in the plane of the rails (3) and opening into the free volume (90) and having a length at least equal to the length of an old (2a) or new (2b) sleeper, said old sleepers (2a) falling onto a excavation bottom (91) of the free volume (90) once detached; A3) for each detached old sleeper, grasp and turn in the free volume the detached old sleeper by means of the articulated arm (311), then remove (P14) said detached old sleeper through the opening (92) before storing said detached old sleeper in the sleeper storage means (20);B) a nominal phase comprising the following steps: B1) by means of the articulated arm, insert (P16) through the opening (92) then, after rotation in the free volume, secure to the rails of the track a new sleeper (2b) in place of an old sleeper (2a) removed, said new sleeper having been recovered from the sleeper storage means (20); B2) ballast (P18) the new ballast (4b) through the ballast hopper (330) so as to partially fill the free volume (90), said new ballast having been conveyed from the new ballast storage means (40) to said hopper by a conveyor (60); B3) suck (P20) the old ballast between at least the rails (3) and two new old sleepers still secured to the rails;B4) detaching (P24) a new old sleeper (2a) from the rails of the track so that the length of the opening (92) remains substantially equal to that formed in step A2), said new old sleeper (2a) falling onto the excavation bottom (91) once detached; B5) grasping and turning in the free volume the new old sleeper detached by means of the articulated arm, then removing (P26) the new old sleeper detached through the opening before storing the new old sleeper detached in the sleeper storage means; and B6) repeating (P28) steps B1) to B5) until the ballast and sleepers of the predefined portion of the track (1A, 1B) are renewed.; Method (P) according to claim 13 comprising, after the nominal phase B), a finishing phase C) which comprises the following steps: C1) by means of the articulated arm, insert (P30) through the opening (92) then, after rotation in the free volume, place on the bottom of the excavation (91) a plurality of new sleepers (2b), the plurality of new sleepers (2b) being equal in number to the plurality of old sleepers (2a) of step A2), said new sleepers having been recovered from the sleeper storage means (20); C2) securing (P32) each new sleeper (2b) of the plurality of new sleepers to the rails of the track so as to close the opening (92) opening into the free volume (90); and C3) ballasting (P34) the new ballast (4b) on the track so as to fill the free volume (90). Method (P) according to any one of claims 13 or 14, in which, in steps A1) and B3), the old ballast (4a) is sucked under the old sleepers (2a) to a depth of between 20 cm and 50 cm. Method (P) according to any one of claims 13 to 15, in which, prior to steps A1) and B3), the old ballast (4a) is moistened by means of a watering device (370). Method (P) according to any one of claims 13 to 16, in which, after or simultaneously with the suction of the old sleepers (2a) of step A1), a track holding device (380), suspended from the beams of the main wagon (30), holds the rails (3) in position above the free volume (90). Method (P) according to any one of claims 13 to 17, comprising:- in the priming phase A), between step A1) and step A2), a first leveling step (P11) consisting of folding back into the free volume (90), by means of a leveler (341), the old ballast (4a) not sucked up towards the center of the track (1A, 1B) and leveling the old ballast (4a) not sucked up under the track to make the excavation bottom (91) substantially flat and uniform; and- in the nominal phase B), between step B3) and step B4), a second leveling step (P22) consisting of folding back the old ballast not sucked up as in the first leveling step (P11). Method (P) according to any one of claims 13 to 18, in which the excavation bottom (91) is located under the sleepers (2a, 2b) at a depth of between 20 cm and 30 cm. Method (P) according to any one of claims 13 to 19, in which each of the rotations of steps A3) and B5) is carried out so that the old sleeper is positioned substantially in the axis of the rails (3). Method (P) according to any one of claims 13 to 20, in which, after ballasting (P18, P34), a compaction step (P19, P19') of the new ballast (4b) is carried out by a compactor (350) between the new sleepers (2b) joined together. Method (P) according to any one of claims 13 to 21, in which each step of the method (P) is supplied with electrical energy by batteries.
Citation Information
Patent Citations
Track-travelling system and method for picking up, transporting and putting down or exchanging goods, in particular sleepers
AT389337B
Machine for taking up ballast from a ballast bed under suction
EP0608679A1
Method for sectionally replacing old sleepers of a track with new sleepers
EP2663690B1