Execution system of gas tunnel outburst prevention comprehensive measures
An outburst prevention measure and tunnel technology, applied in the directions of gas discharge, dust prevention, fire prevention, etc., can solve problems such as large outburst risks and achieve the effect of preventing and controlling gas outburst problems.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] Such as figure 1 Shown: a gas tunnel anti-burst comprehensive measures implementation system, the following steps are taken:
[0024] Step 1. Firstly, the coal or rock strata of the tunnel are predicted within 60M along the direction of the tunnel, and the prediction results are divided into non-dangerous areas, threatened areas and dangerous areas;
[0025] Step 2, deal with the danger zone and the threat zone respectively:
[0026] (1) Forecasting the working face in the dangerous area, the prediction result is divided into a non-dangerous face and a dangerous face, and the non-dangerous face is excavated under the premise of taking safety measures;
[0027] (2) Take safety measures for the threat area, advance the excavation 40M on the premise of taking safety measures, and then predict the working face, and divide the prediction results into threat face and dangerous face;
[0028] During the excavation of the entire tunnel, when the predicted result is a threat s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 