Construction method of complex-structure blocky geologic model based on geologic rule constraint
A geological model and construction method technology, applied in the field of geological three-dimensional modeling, can solve problems such as horizon intersection calculations that cannot be interpreted by users
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0061] 1. Layer tracking
[0062] In the process of horizon interpretation, the interpreter’s interpretation of horizons can be simply expressed as figure 1 In the horizon model shown, the lines marked with Arabic numerals are horizon lines, the lines marked with letters indicate faults, the serial numbers on horizon lines or faults indicate their serial numbers, T3x1, P2, and P1 are horizon line names, Each layer line is composed of different line segments, and the line segment is composed of pick-up points and lines, for example: layer T3x1 is composed of 3 line segments 7, 8, and 9, and line segment 7 is composed of 5 pick-up points and 4 lines, and the line segment 8 consists of 4 pick points and 3 lines, segment 9 also consists of 4 pick points and 3 lines.
[0063] But in the actual layer line picking process, figure 1 The theoretical model shown is difficult to achieve, because of human subjective factors and visual errors, it is difficult to ensure the strict interse...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com