A centralized access and coordinated control technology, applied in wind power generation, single-network parallel feed arrangement, etc., can solve the problem of frequent input of reactive power equipment into reactive power circulation, affecting the safety and reliable operation of the power system, and endangering the voltage stability of the power system, etc. problem, to achieve the effect of increasing reactive power range, improving voltage stability, and solving reactive circulating current
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The method is described in detail in conjunction with the accompanying drawings and a specific embodiment as follows:
[0028] figure 2 It is a typical wind farm grid connection diagram. The fans in the wind farm are connected to the 35kV high-voltage bus on the wind farm side after passing through the step-up transformer, and then connected to the 220kV power grid through the 220kV hub substation. Power and voltage control equipment, such as capacitor banks, static var generators, transformer taps, etc. In the 220kV hub substation, there are generally 220 / 35kV double-winding transformers or 220 / 110 / 35kV three-winding transformers or both.
[0029] The method of the present embodiment comprises the following steps: the general setting control period is 5-10 minutes, and the present embodiment setting control period is 5 minutes;
[0030] 1) The control cycle begins, and the wind farm busbar and the 220kV hub substation transformer high-voltage side winding voltage co...