Energy-saving fabricated laboratory structure

A laboratory and prefabricated technology, applied in the field of laboratory structure, can solve the problems of long time, high cost, and the transformation effect cannot meet the requirements.

CN110159003APending Publication Date: 2019-08-23浙江大东吴集团建设有限公司
0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
Publication Date
2019-08-23

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention provides an energy-saving fabricated laboratory structure, and belongs to the technical field of laboratory structures. The energy-saving fabricated laboratory structure comprises a supporting part, a first plug connector, a second plug connector, a third plug connector, a fourth plug connector, a first fence part, a second fence part, a third fence part, a fourth fence part, a firstsealing part, a second sealing part, a third sealing part, a fourth sealing part, a top cover and a movable door. The energy-saving fabricated laboratory structure is easy and convenient to mount, convenient to detach and simple in structure.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the technical field of laboratory structures and relates to an energy-saving assembled laboratory structure. Background technique

[0002] The level of a national laboratory reflects the top level of science and technology of a country to a certain extent. Usually, the lifespan of a laboratory building is 50-70 years, and the research direction of a scientific research is generally 5-10 years, but it is shorter than the lifespan of a building for a scientific research project. In order to meet the relevant standards of the laboratory environment, the laboratory site has to be expanded, moved, and restructured, which is costly, time-consuming, and interferes with the surrounding environment, greatly increasing the time and economic cost of scientific research; in addition, the current my country's laboratory transformation lacks mature standards, resulting in long transformation cycles, high costs, and insufficient transformatio...

Examples

Embodiment Construction

[0030] The following are specific embodiments of the present invention and in conjunction with the accompanying drawings, the technical solutions of the present invention are further described, but the present invention is not limited to these embodiments.

[0031] see figure 1 , figure 2 , image 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 , Figure 9 , Figure 10 , Figure 11 , Figure 12 and Figure 13, the energy-saving prefabricated laboratory structure in this embodiment includes a support member 1 that can be lifted, a first plug-in member 2 that is disposed at the first end of the support member 1 and is hollow inside, and is disposed at the second end of the support member 1 and that the interior The second hollow connector 3, the third connector 4 arranged at the third end of the support member 1 and hollow inside, the fourth connector 5 arranged at the fourth end of the support member 1 and hollow inside, one end plugged in In the firs...