A method for installing a large storage tank using a large storage tank cluster electric hoist synchronous lifting device

By using a synchronous lifting device during the installation of large storage tanks, the force and position of the electric hoist can be monitored and adjusted in real time, solving the overload problem caused by inconsistent speed of the electric hoist and achieving efficient and safe storage tank installation.

CN111874811BActive Publication Date: 2024-11-26CHINA NAT CHEM ENG THIRD CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010894495.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-31
Publication Date
2024-11-26
Estimated Expiration
2040-08-31

AI Technical Summary

Technical Problem

During the installation of existing large storage tanks, inconsistent lifting speeds of electric hoists lead to variations in load, which can easily cause overload damage and overturning accidents. Furthermore, existing preventative measures rely on the experience of operators, reducing efficiency.

Method used

A large-scale cluster of electric hoists is used for synchronous lifting. Through tension sensors and rangefinders, the force and position of each electric hoist are monitored in real time. The control cabinet automatically adjusts the lifting speed of the electric hoists to keep them consistent and ensure balance.

Benefits of technology

It improves operational safety and installation efficiency, avoids damage from overloading of electric hoists, and has a simple structure and high stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111874811B_ABST
    Figure CN111874811B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for installing a large storage tank by adopting a large storage tank cluster electric hoist synchronous lifting device, wherein the synchronous lifting device comprises a control cabinet, a plurality of columns, tie bars connected to the side walls of the columns, an electric hoist suspended on the top of the column, and an expansion ring capable of being tightened on the inner wall of the storage tank, the hook head of the electric hoist lifting chain is hung on the lifting lug of the expansion ring, a tension sensor is provided on the electric hoist lifting chain, and the electric hoist and the tension sensor are both electrically connected to the control cabinet; a rangefinder is provided below each lifting lug of the expansion ring, and the rangefinder is electrically connected to the control cabinet; the large storage tank cluster electric hoist synchronous lifting device effectively avoids the problem of overload damage of the electric hoist, has higher safety and increases the efficiency of installation and lifting.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of installation of vertical cylindrical large storage tanks in petrochemical industry, and particularly relates to a large storage tank cluster electric hoist synchronous lifting device and a lifting installation method. Background Art

[0002] Vertical cylindrical large storage tanks are common non-standard equipment in petroleum and chemical plants. Their production and installation generally adopts manual hoist lifting, hydraulic jacking, gas jack lifting and other processes. The electric hoist inversion method is a new process method developed in the past decade. It has the characteristics of low labor intensity and high efficiency. It is particularly suitable for the installation of 1000~20000m3 storage tanks. However, this method also has some defects. The main manifestation is that the lifting speeds of multiple electric hoists cannot be completely consistent. As the continuous operation time of the lifting increases, the actual load between the electric hoists changes. Some electric hoists lift slowly and the load continues to decrease, or even does not carry any load, while some electric hoists lift quickly and the load continues to increase, which is easy to cause overload damage, and even cause the storage tank to overturn due to uneven loading.

[0003] In view of the above-mentioned process defects, the preventive measures generally taken at present are:

[0004] 1. Set up an electric hoist group control console. Each hoist is equipped with overload protection. When a single hoist is protected, all circuits are locked and stopped.

[0005] 2. Before lifting, adjust each electric hoist to keep the chain tightness consistent;

[0006] 3. After the lifting starts, stop the machine every 500~600mm to check the tightness of the chain;

[0007] 4. During the lifting process, monitor the motor and chain at any time to see if there are any abnormal sounds.

[0008] These measures have avoided the problem of electric hoist overload damage to a certain extent, but they have also reduced efficiency. Adjusting the chain tightness and monitoring abnormal noises during operation require operators to have rich construction experience. Summary of the invention

[0009] The purpose of the present invention is to solve the above-mentioned problems and to provide a large-scale storage tank cluster electric hoist synchronous lifting device and method with high work efficiency and effective improvement of operation safety.

[0010] The present invention achieves the above-mentioned purpose through the following technical solutions:

[0011] A method for installing a large storage tank using a large storage tank cluster electric hoist synchronous lifting device, the synchronous lifting device comprises a control cabinet, a plurality of columns, a tie rod connected to the side wall of the column, an electric hoist suspended on the top of the column, and an expansion ring capable of being tightened on the inner wall of the storage tank, the hook head of the electric hoist lifting chain is hung on the lifting ear of the expansion ring, a tension sensor is provided on the electric hoist lifting chain, and the electric hoist and the tension sensor are both electrically connected to the control cabinet;

[0012] A distance meter is provided below each lifting ear of the expansion ring, and the distance meter is electrically connected to the control cabinet;

[0013] The method comprises the following steps:

[0014] Step S1. Laying the tank bottom plate;

[0015] Step S2. Several prefabricated tank wall panels are hoisted and connected end to end to the tank bottom plate and assembled, and vertical welds are welded to form a cylindrical first-layer tank body. The edge angle steel ring and the tank top are installed on the top of the first-layer tank body in sequence;

[0016] Step S3. Evenly arrange columns in a circular pattern on the bottom plate of the tank near the inner wall of the first tank layer, and set tie bars. The columns, tie bars and the bottom plate of the tank are welded and fixed, and the electric hoist is hung on the top of the column;

[0017] Step S4. Connecting a plurality of prefabricated tank wall panels end to end and surrounding the outside of the first tank body, welding a plurality of prefabricated tank wall panels vertically and leaving a weld as a joint, thereby forming a prototype of the second tank body;

[0018] Step S5. Set the expansion ring on the inside of the first tank body near the lower port, adjust the screw on the expansion ring so that the expansion ring and the first tank body are tightened, and hang the hook of the electric hoist chain on the lifting ear of the expansion ring;

[0019] Step S6. The control cabinet is placed in debugging mode, and a single electric hoist is adjusted by jogging to tighten the electric hoist lifting chain. During adjustment, the tension sensor is used to ensure that the force state of each electric hoist lifting chain is the same;

[0020] Step S7. The control cabinet is placed in interlocking mode. After starting, several electric hoists work simultaneously and lift the first tank. When the lower port height of the first tank is higher than the upper port of the second tank, the lifting stops;

[0021] Step S8. The assembly welds the reserved opening on the second tank body, controls the electric hoist to descend, fits the lower port of the first tank body to the upper port of the second tank body, and welds the first tank body and the second tank body;

[0022] Step S9. According to step S4, the third layer tank body is formed, the screw on the expansion ring is adjusted to separate the expansion ring from the first layer tank body and move the expansion ring to the position of the second layer tank body near the lower port, the screw is adjusted to tighten the expansion ring and the second layer tank body, the hook is hung, and then step SS is repeated to assemble and weld the middle layer tank body except the last layer tank body;

[0023] Step S10. Assemble the last tank body, reserve a prefabricated tank body wall panel to form an evacuation hole during assembly, and surround the other prefabricated tank body wall panels that are not connected to the outside of the second-last tank body and weld the vertical welds between the prefabricated tank body wall panels, install the expansion ring and lift the tank body according to the method of step SS, and weld the annular weld between the upper port of the last tank body and the lower port of the second-last tank body;

[0024] Step S11. Remove the columns, tie bars and electric hoists and evacuate from the evacuation hole reserved on the last layer of the tank, and seal and weld the reserved hole with a reserved prefabricated tank wall panel;

[0025] Step S12: Welding the annular weld between the lower port of the last tank body and the tank bottom plate.

[0026] The beneficial effects of the present invention are:

[0027] The invention monitors the force change of each electric hoist in real time through the tension sensor when lifting the tank body, which can ensure that each electric hoist is in the same working state, and monitors whether the tank body is in a balanced state in the lifting process in real time through the rangefinder, which has high safety.

[0028] The present invention effectively avoids the problem of overload damage to the electric hoist, is safer and increases the efficiency of installation and lifting;

[0029] The invention has the advantages of simple structure, high stability, reasonable design and easy implementation. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0031] In the figure: 1. Tank bottom plate; 2. Second-layer tank body; 3. Expansion ring; 4. Electric hoist lifting chain; 5. Tension sensor; 6. Electric hoist; 7. First-layer tank body; 8. Edge angle steel ring; 9. Tank top; 10. Column; 11. Control cabinet; 12. Tie rod; 13. Distance meter. DETAILED DESCRIPTION

[0032] The present application is further described in detail below in conjunction with the accompanying drawings. It is necessary to point out here that the following specific implementation methods are only used to further illustrate the present application and cannot be understood as limiting the scope of protection of the present application. Technical personnel in this field can make some non-essential improvements and adjustments to the present application based on the above application content.

[0033] Example 1

[0034] like Figure 1 As shown, a method for installing a large storage tank using a large storage tank cluster electric hoist synchronous lifting device comprises the following steps:

[0035] Step S1. Laying the tank bottom plate 1;

[0036] Step S2. Several prefabricated tank wall panels are hoisted end to end onto the tank bottom plate 1 and assembled, and vertical welds are welded to form a cylindrical first-layer tank body 7. The edge angle steel ring 8 and the tank top 9 are successively installed on the top of the first-layer tank body 7;

[0037] Step S3. The columns 10 are evenly arranged in a circular pattern on the tank bottom plate 1 near the inner wall of the first-layer tank body 7, and the tie bars 12 are provided. The columns 10, the tie bars 12 and the tank bottom plate 1 are welded and fixed, and the electric hoist 6 is hung on the top of the column 10;

[0038] The lifting device includes a control cabinet 11, a plurality of columns 10, a tie rod 12 connected to the side wall of the column 10, an electric hoist 6 suspended on the column 10, and an expansion ring 3 that can be tightened on the inner wall of the storage tank. The hook head of the electric hoist lifting chain 4 is hung on the lifting ear of the expansion ring 3. The electric hoist lifting chain 4 is provided with a tension sensor 5. The electric hoist 6 and the tension sensor 5 are electrically connected to the control cabinet 11.

[0039] A distance meter 13 is provided below each lifting ear on the expansion ring 3, which can measure the height of the expansion ring 3 from the tank bottom, and the distance meter 13 is electrically connected to the control cabinet 11;

[0040] The control cabinet 11 is provided with an operation panel, and a calculation unit and an output unit are arranged inside the control cabinet 11, and the control modes are debugging and interlocking. In the debugging mode, each electric hoist 6 can operate independently; in the interlocking mode, the calculation unit collects the tension of each electric hoist lifting chain 4 and the height position of the expansion ring 3 measured by the distance meter 13 through the tension sensor 5 and compares them. For the electric hoist 6 with large tension, the output unit outputs a signal to reduce the speed, and vice versa, it outputs a signal to increase the speed, so that the lifting force of each electric hoist 6 is kept consistent; the function of the distance meter 13 is that when the horizontal tilt deviation of the expansion ring 3 during the lifting process exceeds the set value, the control cabinet 11 can automatically cut off the power supply of the electric hoist 6 and stop lifting;

[0041] The expansion ring 3 is made of channel steel, the radius of curvature is consistent with the inner radius of the tank body, and is divided into several sections in the circumferential direction. Nuts are welded to the two ends of each section, and the distance between two adjacent sections can be adjusted by a screw rod;

[0042] When lifting the tank, the tension sensor 5 monitors the force change state of each electric hoist 6 in real time, which can ensure that each electric hoist 6 is in the same working state. The rangefinder 13 monitors in real time whether the tank is in a balanced state during the lifting process, which is safer.

[0043] Step S4. Connecting a plurality of prefabricated tank wall panels end to end and surrounding the outside of the first tank body 7, welding a plurality of prefabricated tank wall panels vertically and leaving a weld as a live opening to form the prototype of the second tank body 2;

[0044] Step S5. Set the expansion ring 3 at a position close to the lower port on the inner side of the first tank 7, adjust the screw on the expansion ring 3 so that the expansion ring 3 and the first tank 7 are tightened, and hang the hook of the electric hoist chain 4 on the lifting ear of the expansion ring 3;

[0045] Step S6. The control cabinet 11 is placed in debugging mode, and the single electric hoist 6 is adjusted by jogging to drive the electric hoist lifting chain 4 to tighten. During adjustment, the tension sensor 5 ensures that each electric hoist lifting chain 4 is subjected to the same force state;

[0046] Step S7. The control cabinet 11 is placed in interlocking mode, and after starting, several electric hoists 6 work simultaneously and lift the first tank 7. When the lower port height of the first tank 7 is higher than the upper port of the second tank 2, the lifting is stopped;

[0047] Step S8. The reserved opening on the second tank body 2 is welded together, and the electric hoist 6 is controlled to descend so that the lower port of the first tank body 7 is attached to the upper port of the second tank body 2 and the first tank body 7 and the second tank body 2 are welded;

[0048] Step S9. According to step S4, the third layer tank body is formed, the screw on the expansion ring 3 is adjusted to separate the expansion ring 3 from the first layer tank body 7 and the expansion ring 3 is moved to the position of the second layer tank body 2 close to the lower port, the screw is adjusted to tighten the expansion ring 3 and the second layer tank body 2, the hook is hung, and then steps S6-S8 are repeated to assemble and weld the middle layer tank body except the last layer tank body;

[0049] Step S10. Assemble the last tank body, reserve a prefabricated tank body wall panel to form an evacuation hole during assembly, and place the other prefabricated tank body wall panels that are not connected first around the outside of the second-last tank body and weld the vertical welds between the prefabricated tank body wall panels, install the expansion ring 3 according to the method of steps S5-S7, lift the tank body, and weld the annular weld between the upper port of the last tank body and the lower port of the second-last tank body;

[0050] Step S11. The column 10, the tie rod 12 and the electric hoist 6 are removed and evacuated from the reserved evacuation hole on the last layer of the tank, and a reserved prefabricated tank wall is used to seal the reserved hole and weld it;

[0051] Step S12: Welding the annular weld between the lower port of the last tank body and the tank bottom plate 1.

[0052] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. A method for installing a large storage tank using a large storage tank cluster electric hoist synchronous lifting device, the synchronous lifting device comprising a control cabinet (11), a plurality of columns (10), a tie rod (12) connected to the side wall of the column (10), an electric hoist (6) suspended on the top of the column (10), and an expansion ring (3) capable of being tightened on the inner wall of the storage tank, the hook head of the electric hoist lifting chain (4) being hung on the lifting ear of the expansion ring (3), characterized in that: A tension sensor (5) is provided on the electric hoist lifting chain (4), and the electric hoist (6) and the tension sensor (5) are both electrically connected to the control cabinet (11); A distance meter (13) is provided below each lifting ear of the expansion ring (3), and the distance meter (13) is electrically connected to the control cabinet (11); The method comprises the following steps: Step S1. Laying the tank bottom plate (1); Step S2. Several prefabricated tank wall panels are hoisted and connected end to end onto the tank bottom plate (1) and assembled, and vertical welds are welded to form a cylindrical first-layer tank body (7). The edge angle steel ring (8) and the tank top (9) are successively installed on the top of the first-layer tank body (7); Step S3. The columns (10) are evenly arranged in a circular shape on the bottom plate (1) of the storage tank near the inner wall of the first-layer tank body (7), and tie bars (12) are provided. The columns (10), tie bars (12) and the bottom plate (1) of the storage tank are welded and fixed, and the electric hoist (6) is hung on the top of the columns (10); Step S4. Connecting a plurality of prefabricated tank wall panels end to end and surrounding the outer side of the first tank body (7), welding a plurality of prefabricated tank wall panels vertically and leaving a weld as a joint, thereby forming a prototype of the second tank body (2); Step S5. The expansion ring (3) is arranged at a position close to the lower port on the inner side of the first tank body (7), the screw on the expansion ring (3) is adjusted to tighten the expansion ring (3) and the first tank body (7), and the hook of the electric hoist lifting chain (4) is hung on the lifting ear of the expansion ring (3); Step S6. The control cabinet (11) is placed in the debugging mode, and a single electric hoist (6) is adjusted to drive the electric hoist lifting chain (4) to tighten. During the adjustment, the tension sensor (5) is used to ensure that the force state of each electric hoist lifting chain (4) is the same; Step S7. The control cabinet (11) is placed in interlocking mode. After starting, several electric hoists (6) work simultaneously and lift the first tank body (7). When the lower port height of the first tank body (7) is higher than the upper port of the second tank body (2), the lifting stops; Step S8. Assemble and weld the reserved opening on the second tank body (2), control the electric hoist (6) to descend, fit the lower port of the first tank body (7) to the upper port of the second tank body (2), and weld the first tank body (7) and the second tank body (2); Step S9. According to step S4, a third layer tank body prototype is formed, the screw on the expansion ring (3) is adjusted to separate the expansion ring (3) from the first layer tank body (7) and the expansion ring (3) is moved to a position close to the lower port of the second layer tank body (2), the screw is adjusted to tighten the expansion ring (3) and the second layer tank body (2), the hook is hung, and then steps S6-S8 are repeated to assemble and weld the middle layer tank body except the last layer tank body; Step S10. Assemble the last tank body, reserve a prefabricated tank body wall panel to form an evacuation hole during assembly, and place the other prefabricated tank body wall panels that are not connected around the outside of the second-last tank body and weld the vertical welds between the prefabricated tank body wall panels, install the expansion ring (3) according to the method of steps S5-S7, lift the tank body, and weld the annular weld between the upper port of the last tank body and the lower port of the second-last tank body; Step S11. Remove the columns (10), tie bars (12) and electric hoists (6) and withdraw from the evacuation hole reserved on the last layer of the tank, and seal the reserved hole with a reserved prefabricated tank wall and weld it; Step S12: Welding the annular weld between the lower port of the last tank body and the tank bottom plate (1).