Cutting system
By designing an automated cutting system, the continuous implementation of cutting and weight measurement on one process line is solved, and the problems of redundant equipment and low productivity in the prior art are improved.
Patent Information
- Application Number
- CN202110854942.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2021-07-23
- Filing Date
- 2021-07-28
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2041-07-28
Smart Images

Figure CN113996944B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a cutting system for performing a cutting process for producing a sheet product by cutting a processing object and a measuring process for measuring the weight of the product. Background Art
[0002] Recently, sheet products are used in many industrial fields. Generally, sheet products are produced by cutting a film material or other processing objects using a cutter.
[0003] The sheet products manufactured as described above frequently have uneven weight due to uneven thickness of the object or other reasons. Such uneven weight of the sheet products may lead to quality degradation. Therefore, after manufacturing the sheet products, a weight measurement process is required to measure the weight of the sheet products.
[0004] However, in the past, there has been no device for implementing the cutting process and the weight measuring process on a single process line. Therefore, after the cutting process is implemented by the cutting device, the weight measuring process needs to be implemented by a weight measuring device formed separately from the cutting device. In this regard, in the past, due to the separate installation of the cutting device and the weight measuring device, there are problems such as increased installation area and cost, and the cutting process and the weight measuring process take a long time to implement, resulting in a problem of reduced product productivity. Summary of the invention
[0005] Technical issues
[0006] An object of the present invention is to provide a cutting system with an improved structure so that a cutting process and a weight measuring process can be performed together on a single process line.
[0007] Technical Solution
[0008] The cutting system of a preferred embodiment of the present invention for solving the above-mentioned problem comprises: a supply unit for supplying a pallet; a loading unit for receiving the pallet transferred from the supply unit, on which the processing object is loaded; a processing unit for receiving the pallet transferred from the loading unit, and cutting the processing object loaded on the pallet to form a product; and a recovery unit for receiving the pallet transferred from the processing unit, and recovering the pallet and the product after measuring the weight of the product.
[0009] Preferably, the present invention further comprises a storage unit for receiving the above-mentioned tray transferred from the above-mentioned loading unit, and after temporarily storing the tray loaded with the above-mentioned processing object, transferring it to the above-mentioned processing unit according to the formation progress of the above-mentioned product.
[0010] Preferably, the supply unit comprises: a first pallet stacker for stacking a plurality of pallets in layers and discharging the plurality of pallets in sequence; and a first pallet elevator for lifting and transferring the pallets discharged from the first pallet stacker.
[0011] Preferably, the first pallet lift includes: a first lifting roller for supporting and transferring the pallet; and a first lifting component for lifting and lowering the first lifting roller.
[0012] Preferably, the loading unit includes: a second pallet elevator for lifting and transferring the pallet transferred from the first pallet elevator; a first shuttle for placing the pallet transferred from the second pallet elevator; and a first shuttle transfer component for transferring the first shuttle to the storage unit if the processing object is loaded on the pallet in the loading unit, and transferring the first shuttle to the loading unit if the pallet is transferred to the storage unit in the storage unit.
[0013] Preferably, the second pallet elevator includes: a second lifting roller for supporting and transferring the pallet transferred from the first pallet elevator; and a second lifting component for lifting the second lifting roller, and the first shuttle includes: a through hole formed in a way that allows the second lifting roller to pass through; and a placement groove, when the second lifting roller descends for the purpose of passing through the through hole, the pallet placed on the second lifting roller is separated from the second lifting roller and placed.
[0014] Preferably, the storage unit includes: a third pallet elevator for lifting and transferring the pallet transferred from the first shuttle; and a second pallet stacker, which stacks the plurality of pallets separated from the first shuttle in layers by lifting and lowering the third pallet elevator, or discharges the plurality of pallets in sequence according to the formation progress of the product, and the third pallet elevator transfers the pallet discharged from the second pallet stacker toward the processing unit.
[0015] Preferably, the second pallet elevator includes: a third lifting roller for supporting and transferring the pallet; and a third lifting component for lifting the third lifting roller so that the third lifting roller can pass through the through hole. If the first shuttle reaches the storage unit, the third lifting component lifts the third lifting roller so that the third lifting roller passes through the through hole, and the pallet is placed on the third lifting roller passing through the through hole and separated from the placement groove.
[0016] Preferably, the processing unit includes: a fourth pallet elevator for lifting and transferring the pallet transferred from the storage unit; a second shuttle for placing the pallet transferred from the fourth pallet elevator; and a second shuttle transfer component for transferring the second shuttle to the recycling unit if the pallet is placed on the second shuttle in the processing unit, and transferring the second shuttle to the processing unit if the pallet is transferred to the recycling unit in the recycling unit.
[0017] Preferably, the fourth pallet lift includes: a fourth lifting roller for supporting and transferring the pallet; and a fourth lifting component for lifting the fourth lifting roller, and the second shuttle includes: a through hole formed in a way that allows the fourth lifting roller to pass through; and a placement groove, when the fourth lifting roller descends for the purpose of passing through the through hole, the pallet placed on the fourth lifting roller is separated from the fourth lifting roller and placed.
[0018] Preferably, the processing unit further includes a barcode reader, which is disposed on a transfer path of a second shuttle that is transferred from the processing unit toward the recovery unit, and reads a barcode pre-marked on the processing object to collect information related to the processing object.
[0019] Preferably, the processing unit further includes a laser processor, which is disposed on a transfer path of a second shuttle that transfers from the processing unit toward the recovery unit, and forms the product by dividing the processing object through laser cutting.
[0020] Preferably, the recycling unit includes: a product transfer device, which is arranged on the transfer path of the second shuttle, separates and transfers the product from the fragments of the processed object remaining after the product is formed; and a weight measuring component, which is used to measure the weight of the product transferred from the product transfer device.
[0021] Preferably, the recovery unit further comprises a product container for packaging the products delivered from the weight measuring component.
[0022] Preferably, the recycling unit further comprises: a debris transfer device, which is arranged on the transfer path of the second shuttle and is used to hold and transfer the debris; and a debris container, which is used to pack the debris transferred from the debris transfer device.
[0023] Preferably, the recovery unit further includes a fifth pallet elevator for lifting and transferring the pallet transferred from the second shuttle.
[0024] Preferably, the fifth pallet elevator includes: a fifth lifting roller for supporting and transferring the pallet; and a fifth lifting component for lifting the fifth lifting roller so that the fifth lifting roller can pass through the through hole. If the second shuttle reaches the recovery unit, the fifth lifting component lifts the fifth lifting roller so that the fifth lifting roller passes through the through hole, and the pallet is placed on the fifth lifting roller passing through the through hole and separated from the placement groove.
[0025] Preferably, when the tray separated from the placement groove is placed on the fifth lifting roller, the fifth lifting roller transfers the tray toward the supply unit.
[0026] Effects of the Invention
[0027] The present invention relates to a cutting system, and the present invention has the following effects.
[0028] First, in the present invention, a cutting process and a weight measuring process can be continuously performed on one process line. In the cutting process, a product is formed by laser cutting a processing object, and in the weight measuring process, the weight of the product formed by this can be measured. According to this present invention, compared with the case where a cutting device for the cutting process and a weight measuring device for the weight measuring process are separately formed, the installation area and cost of the system can be reduced, and the time required for the cutting process and the weight measuring process can be reduced, thereby improving the productivity of the product.
[0029] Secondly, in the present invention, after being supplied from the supply unit, the pallet loaded with the processing object is automatically recovered to the supply unit through the product processing and inspection process line, thereby further improving the productivity of the product. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 A diagram showing a simplified structure of a cutting system according to a preferred embodiment of the present invention.
[0031] Figure 2 for Figure 1 Left side view of the cutting system.
[0032] Figure 3 for Figure 1 Right side view of the cutting system.
[0033] Figure 4 This is a diagram schematically showing the transfer paths of the processing object, products, and fragments.
[0034] Figure 5 To show Figure 2 A diagram showing a schematic structure of a supply unit is shown.
[0035] Figure 6It is a diagram for explaining a method of transferring a tray from a supply unit to a loading unit and a method of loading a processing object on the tray transferred to the loading unit.
[0036] Figure 7 To show Figure 2 A diagram showing a schematic structure of a loading unit.
[0037] Figure 8 A diagram for explaining a method of moving a pallet loaded with a processing object to a storage unit.
[0038] Fig. 9 To show Figure 3 A diagram showing a simplified structure of a storage unit.
[0039] Fig.10 and Fig.11 A diagram for explaining a method of transferring a pallet discharged from a storage unit to a processing unit.
[0040] Fig.12 To show Figure 3 The schematic structure of the processing unit is shown in the figure.
[0041] Fig.13 A diagram for explaining a method of forming a product by laser cutting a processing object and a method of measuring the weight of the product.
[0042] Fig.14 To show Figure 2 A diagram showing the schematic structure of a recovery unit.
[0043] Fig.15 A diagram for explaining a method of recycling pallets, products, and scraps.
[0044] Description of Reference Numerals
[0045] 1: Cutting system
[0046] 10: Supply unit
[0047] 12: First Pallet Stacker
[0048] 14: First Pallet Lift
[0049] 20: Loading unit
[0050] 22: Second Pallet Lift
[0051] 24: The First Shuttle
[0052] 26: First shuttle transfer component
[0053] 30: Storage unit
[0054] 32: Third pallet lift
[0055] 34: Second Pallet Stacker
[0056] 40: Processing unit
[0057] 42: Fourth Pallet Lift
[0058] 44: Second Shuttle
[0059] 46: Barcode reader
[0060] 48: Laser Processor
[0061] 49: Second shuttle transfer component
[0062] 50: Recycling unit
[0063] 51: Product transfer device
[0064] 52: Weight measurement components
[0065] 53: Product Recycler
[0066] 54: Product Box
[0067] 55: Debris Transporter
[0068] 56: Debris Container
[0069] 57: Fifth Pallet Lift
[0070] 58: Second product transfer device
[0071] 59: Third product transfer device
[0072] 60: First fixed roller
[0073] 70: Second fixed roller
[0074] 80: The third fixed roller
[0075] T: Tray
[0076] F: Processing object
[0077] P: Product
[0078] S: Fragments DETAILED DESCRIPTION
[0079] Hereinafter, some embodiments of the present invention are described in detail through illustrative drawings. In the process of adding reference numerals to the structural elements in each drawing, the same reference numerals are assigned to the same structural elements as much as possible even if they are shown in different drawings. In addition, in the process of describing the embodiments of the present invention, if it is determined that the specific description of the relevant well-known function or structure hinders the understanding of the embodiments of the present invention, the detailed description thereof will be omitted.
[0080] In the process of describing the structural elements of the embodiments of the present invention, terms such as "first", "second", "A", "B", "(a)", "(b)", etc. may be used. Such terms are only used to distinguish one structural element from another structural element, and the nature, order or sequence of the corresponding structural elements are not limited by the above terms. Furthermore, unless otherwise defined, the meanings of all terms used herein, including technical terms or scientific terms, are the same as those generally understood by ordinary technicians in the technical field to which the present invention belongs. Common terms such as terms defined in commonly used dictionaries should be interpreted as being consistent with the contextual meaning of the relevant technology, and should not be interpreted as idealized or overly formalized meanings unless clearly defined in the present invention.
[0081] Figure 1 FIG. 2 is a diagram showing a simplified structure of a cutting system according to a preferred embodiment of the present invention. Figure 2 for Figure 1 Left side view of the cutting system. Figure 3 for Figure 1 Right side view of the cutting system, Figure 4 This is a diagram schematically showing the transfer paths of the processing object, products, and fragments.
[0082] The cutting system 1 of the preferred embodiment of the present invention is a device for cutting a processing object F to separate the processing object F into products F. Figures 1 to 4 The cutting system 1 may include: a supply unit 10 for sequentially supplying a plurality of pre-loaded trays T; a loading unit 20 for loading a processing object F on the tray T supplied from the supply unit 10; a storage unit 30 for sequentially resupplying the plurality of trays T loaded with the processing objects F according to the formation progress of the product P after stacking and temporarily storing the plurality of trays T loaded with the processing objects F in layers; a processing unit 40 for forming the product P by laser processing the processing objects F transferred from the storage unit 30; and a recovery unit 50 for measuring the weight of the product P formed in the processing unit 40 and recovering the product P and the tray T respectively.
[0083] Figure 5 To show Figure 2 The schematic structure of the supply unit is shown in FIG. Figure 6 It is a diagram for explaining a method of transferring a tray from a supply unit to a loading unit and a method of loading a processing object on the tray transferred to the loading unit.
[0084] The supply unit 10 can store and supply a plurality of trays T. For example, Figure 5As shown, the supply unit 10 may include: a first pallet stacker 12, for stacking a plurality of pallets T in layers or discharging a plurality of pallets T in sequence; and a first pallet elevator 14, for lifting and lowering in the thickness direction or transferring in the horizontal direction (for example, the longitudinal width direction) the pallet T discharged from the first pallet stacker 12.
[0085] like Figure 5 As shown, the tray T has a height difference structure in which a locking portion J is protruded on the side surface in a manner that the lower portion has a narrower cross-sectional area than the upper portion, and a placement groove G having a shape corresponding to the lower portion of the tray T is formed on the upper surface of the tray T. In this regard, as Figure 5 As shown, by placing the lower surface of one tray T located on the upper side in the placement groove G of another tray T located on the lower side, a plurality of trays T can be stacked in layers in the thickness direction.
[0086] And, if Figure 5 As shown, the tray T may also have a guide hole H perforated in the thickness direction so that when the object F is laser processed, the laser beam penetrating the object F can pass through. Such a guide hole H can prevent the tray T from being damaged by the laser beam penetrating the object F.
[0087] like Figure 5 As shown, the first pallet stacker 12 includes: a first fixing clamp 12a, used to fix and support multiple pallets T stacked in layers in the thickness direction; and a first clamp transfer component 12b, which is combined with the first fixing clamp 12a in a manner of reciprocatingly transferring the first fixing clamp 12a in the horizontal direction of the pallet T (for example, the longitudinal width direction of the pallet T).
[0088] Preferably, the first fixing fixture 12 a may support the locking portion J of the tray T in the lower direction, but is not limited thereto.
[0089] Preferably, the first jig transfer member 12b is composed of a cylinder device, but is not limited thereto.
[0090] The number of the first fixing fixture 12a and the first fixture transfer member 12b is not particularly limited. Figure 5 and Figure 6 As shown, a plurality of first fixing clamps 12a and a first clamp transfer member 12b can be arranged at predetermined intervals along the horizontal direction of the pallet T (for example, the lateral width direction of the pallet T), and a pair of first fixing clamps 12a and a first clamp transfer member 12b can be symmetrical on the left and right with a plurality of pallets T between them.
[0091] According to the first fixing fixture 12a and the first fixture transfer member 12b, as shown in FIG. Figure 5As shown, when the first fixing clamp 12a is transferred by the first clamp transfer part 12b in a manner of supporting the locking portion J of the tray T located at the bottom layer among multiple pallets T, the first fixing clamp 12a can fix the bottom layer pallet T and multiple pallets T stacked in layers on the upper side of the bottom layer pallet T in a state of being lifted to a specified height from the ground.
[0092] like Figure 5 As shown, the first pallet lift 14 may include: a plurality of first lift rollers 14a that can support and transfer the pallet T in a horizontal direction (e.g., a longitudinal width direction); and a first lift component 14b that is used to lift the plurality of first lift rollers 14a. Preferably, the plurality of first lift rollers 14a are arranged at predetermined intervals along the longitudinal width direction of the pallet T, but the present invention is not limited thereto. Preferably, the first lift component 14b is composed of a cylinder device, but the present invention is not limited thereto.
[0093] Below, refer to Figure 5 , a method of transferring the pallet T loaded on the first pallet stocker 12 to the plurality of first lifting rollers 14a will be described.
[0094] First, the first elevating member 14 b elevates the plurality of first elevating rollers 14 a so that the plurality of first elevating rollers 14 a support the tray T at the lowermost layer.
[0095] Next, the first jig transfer member 12 b transfers the first fixing jig 12 a so as to be separated from the lowermost tray T, thereby releasing the fixing of the plurality of trays T by the first fixing jig 12 a.
[0096] Then, the first lifting member 14b lowers the first lifting rollers 14a and the trays T supported by the first lifting rollers 14a so that the locking portion J of the tray T above the uppermost tray T is located at a height corresponding to the first fixing fixture 12a.
[0097] Next, the first fixture transfer member 12b transfers the first fixing fixture 12a so that the first fixing fixture 12a supports the locking portion J of the upper tray T among the plurality of trays T. Therefore, the plurality of trays T stacked in layers on the upper tray T and the upper side of the upper tray T are fixed by the first fixing fixture 12a.
[0098] Then, the first lifting member 14b lowers the plurality of first lifting rollers 14a so that the plurality of first lifting rollers 14a are located at the same height as the plurality of first fixing rollers 60 described later. Therefore, the tray T at the bottom layer is lowered by the plurality of first lifting rollers 14a, and can be separated from the remaining plurality of trays T that are still fixed by the plurality of first fixing clamps 12a.
[0099] As described above, when the lowermost tray T is transferred to the plurality of first lifting rollers 14a, the plurality of first lifting rollers 14a can be driven to rotate so as to transfer the tray T received from the first tray stacker 12 in the lateral width direction to the plurality of first fixed rollers 60. Figure 5 As shown, the multiple first fixed rollers 60 are rollers fixedly arranged at predetermined intervals along the horizontal direction (for example, the longitudinal width direction) of the pallet T between the supply unit 10 and the loading unit 20, and can transfer the pallet T transferred from the first lifting roller 14a of the supply unit 10 toward the multiple second lifting rollers 22a of the loading unit 20 described later.
[0100] The plurality of first fixed rollers 60 can transfer the tray T transferred from the plurality of first lifting rollers 14a to the plurality of second lifting rollers 22a in the longitudinal width direction. Figure 6 As shown, the tray T discharged from the supply unit 10 may be supplied to the loading unit 20 through a plurality of first fixing rollers 60 .
[0101] Figure 7 To show Figure 2 The schematic structure of the loading unit is shown in FIG. Figure 8 A diagram for explaining a method of moving a pallet loaded with a processing object to a storage unit.
[0102] The loading unit 20 may load the processing object F on the tray T transferred from the plurality of first fixing rollers 60 .
[0103] For example, Figure 7 and Figure 8 As shown, the loading unit 20 may include: a second pallet elevator 22, which is used to lift and lower the pallet T along the thickness direction or transfer the pallet T along the horizontal direction (for example, the longitudinal width direction); a first shuttle 24, which is used to place the pallet T transferred from the second pallet elevator 22; and a first shuttle transfer component 26, which reciprocates the first shuttle 24 across a predetermined transfer path.
[0104] like Figure 7 As shown, the second pallet lift 22 may include: a plurality of second lift rollers 22a that can support and transfer the pallet T in a horizontal direction (e.g., a longitudinal width direction); and a second lift component 22b that lifts and lowers the plurality of second lift rollers 22a. The plurality of second lift rollers 22a and the second lift component 22b have the same structure as the plurality of first lift rollers 14a and the first lift component 14b, and therefore, a detailed description thereof will be omitted.
[0105] like Figure 7As shown, the first shuttle 24 may include: a through hole 24a, which is formed in a way that multiple second lifting rollers 22a can pass through; a placement groove 24b, which is formed in a way to place the tray T; and a track groove 24c, which is slidably installed on the first track 26a of the first shuttle transfer component 26 described later.
[0106] Below, refer to Figure 7 , describing the process of placing the tray T on the first shuttle 24.
[0107] First, when the tray T transferred from the plurality of first fixed rollers 60 is placed on the plurality of second elevating rollers 22 a , the second elevating member 22 b lowers the plurality of second elevating rollers 22 a .
[0108] Next, the second lifting component 22b lowers the plurality of second lifting rollers 22a and the tray T placed on the plurality of second lifting rollers 22a so that the plurality of second lifting rollers 22 are arranged at a position lower than the first shuttle 24 after passing through the through hole 24a, and at the same time, the tray T is placed in the placement groove 24b and separated from the plurality of second lifting rollers 22a.
[0109] Afterwards, if Figure 7 As shown, the worker W loads the processing object F on a predetermined position of the tray T placed on the first shuttle 24. However, the present invention is not limited to this, and the processing object F may also be automatically loaded on the tray T by an automatic attack device.
[0110] On the other hand, the shape of the processing object F is not limited. Figure 4 As shown, the processing object F may be in a rectangular shape with predetermined horizontal and vertical widths.
[0111] The loading position of the processing object F is not particularly limited. Figure 6 and Figure 7 As shown, the object F to be processed can be loaded on the upper surface of the tray T so that the object F covers the guide hole H and a plurality of predetermined cutting lines E are opposite to the guide hole H. The predetermined cutting lines E are imaginary lines, that is, the object F is irradiated with a laser beam along the predetermined cutting lines E to laser cut the object F, thereby separating the object F into sheet products P having predetermined lateral and longitudinal widths, and are determined in a manner that a closed loop corresponding to the contour of the product P can be formed. Such a plurality of predetermined cutting lines E can be set at predetermined intervals so that a plurality of products P can be separated from the object F.
[0112] The structure of the first shuttle transfer member 26 is not particularly limited. Figure 7 and Figure 8As shown, the first shuttle transfer component 26 may include: a first track 26a, which extends in the loading unit 20 to the storage unit 30 described later, and the track groove 24c of the first shuttle 24 is installed in a slidable manner; and a first driving component 26b, which reciprocates the first shuttle 24 along the first track 26a.
[0113] Furthermore, the structure of the first driving component 26b is not particularly limited. Figure 7 and Figure 8 As shown, the first driving component 26b may include: a driving motor 26c for providing driving force; a first sprocket 26d coupled to the rotating shaft of the driving motor 26c; a second sprocket 26e disposed at a predetermined distance from the first sprocket 26d to the supply unit 10 side; a chain 26f, which rotates according to the first sprocket 26d and causes the second sprocket 26e to rotate, and is fastened to the first sprocket 26d and the second sprocket 26e in a chain track; and a fixing tag 26g, which couples the first shuttle 24 to a predetermined position of the chain 26f. Such a first driving component 26b can move the first shuttle 24 from the loading unit 20 to the storage unit 30 side or from the storage unit 30 to the loading unit 20 side along the rotating direction of the driving motor 26c.
[0114] With the formation of such a first shuttle transfer member 26, as Figure 8 As shown, when the workpiece F is loaded on the tray T placed on the first shuttle 24 , the first driving member 26 b moves the first shuttle 24 and the tray T placed thereon toward the storage unit 30 along the first track 26 a and transfers them to the storage unit 30 .
[0115] Fig. 9 To show Figure 3 A diagram showing a simplified structure of a storage unit is shown. Fig.10 and Fig.11 A diagram for explaining a method of transferring a pallet discharged from a storage unit to a processing unit.
[0116] The storage unit 30 is disposed at a predetermined distance from the loading unit 20 in a horizontal direction (eg, a lateral width direction) of the tray T so as to receive the first shuttle 24 moved along the first rail 26 a by the first driving member 26 b .
[0117] The structure of the storage unit 30 is not particularly limited. Fig. 9 As shown, it may include: a third pallet elevator 32 for lifting and lowering the pallet T in the thickness direction or transferring the pallet T in the horizontal direction; and a second pallet stacker 34 for stacking the multiple pallets T transferred from the third pallet elevator 32 in layers or discharging the multiple pallets T in sequence.
[0118] like Fig. 9As shown, the third pallet elevator 32 may include: a plurality of third lifting rollers 32a that can support and transfer the pallet T in a horizontal direction (e.g., a longitudinal width direction); and a third lifting member 32b that lifts and lowers the plurality of third lifting rollers 32a. The plurality of third lifting rollers 32a and the third lifting member 32b have the same structure as the plurality of first lifting rollers 14a and the first lifting member 14b, and therefore, a detailed description thereof will be omitted.
[0119] And, if Fig. 9 As shown, the second pallet stacker 34 includes: a second fixing clamp 34a for fixing and supporting multiple pallets T; and a second clamp transfer component 34b, which is combined with the second fixing clamp 34a to transfer the second fixing clamp 34a to the horizontal direction of the pallet T (for example, the longitudinal width direction).
[0120] Preferably, the second fixing fixture 34 a may support the locking portion J of the tray T in the lower direction, but is not limited thereto.
[0121] Preferably, the second jig transfer member 34b is composed of a cylinder device, but is not limited thereto.
[0122] The number of the second fixing fixture 34a and the second fixture transfer member 34b is not particularly limited. Fig. 9 and Fig.10 As shown, multiple second fixing clamps 34a and second clamp transfer parts 34b are respectively arranged at predetermined intervals along the horizontal direction (for example, the lateral width direction) of multiple pallets T, and a pair of second fixing clamps 34a and second clamp transfer parts 34b are symmetrical left and right across multiple pallets T.
[0123] Below, refer to Fig. 9 , a method for loading the pallet T on the second pallet stacker 34 is described.
[0124] First, when the first shuttle 24 reaches the setting position of the third tray lifter 32, the third lift member 32b moves the plurality of third lift rollers 32a to the setting height of the second fixing fixture 34a of the ginger juice, so that the plurality of third lift rollers 32a pass through the through hole 24a of the first shuttle 24. Therefore, the tray T loaded with the processing object F is placed on the plurality of third lift rollers 32a, and the tray T is separated from the placement groove 24b of the first shuttle 24 and is lifted and lowered along the plurality of third lift rollers 32a.
[0125] Next, the second clamp transfer member 34b transfers the second fixing clamp 34a in such a manner that the second fixing clamp 34a supports the locking portion J of the pallet T. Therefore, the pallet T can be fixed in a state of being lifted from the ground to a predetermined height by the second fixing clamp 34a. Next, the third lifting member 32b lowers the plurality of third lifting rollers 32a so that the plurality of third lifting rollers 32a are separated from the pallet T and are disposed at a height lower than the first shuttle 24 after passing through the through hole 24a of the first shuttle 24. Thereafter, as Figure 6 As shown, the first shuttle transfer member 26 may transfer the first shuttle 24 of the separated tray T toward the loading unit 20 to return it to the loading unit 20. As described above, the first shuttle 24 returning to the loading unit 20 may place the tray T newly supplied from the supply unit 10.
[0126] Furthermore, when a new pallet T is transferred from the loading unit 20 by the first shuttle 24, the plurality of third lifting rollers 32a can lift the new pallet T so that the new pallet T supports the pallet T previously fixed to the second fixing jig 34a in the lower side direction. As described above, in a state where the pallet T previously fixed to the second fixing jig 34a is supported by the new pallet T, the second fixing jig 34a can operate in a manner of supporting the locking portion J of the new pallet T. Through this process, a plurality of pallets T can be loaded on the second pallet stocker 34.
[0127] On the other hand, Figure 8 As shown, preferably, the process of supplying the pallet T loaded on the first pallet stacker 12 of the above-mentioned supply unit 10 to the loading unit 20, the process of loading the processing object F on the pallet T supplied to the loading unit 20, the process of transferring the pallet T loaded with the processing object F to the storage unit 30, and the process of loading the pallet T transferred to the storage unit 30 on the second pallet stacker 34 of the storage unit 30 are repeatedly performed until the multiple pallets T loaded on the first pallet stacker 12 are loaded on the second pallet stacker 34 with the processing object F.
[0128] Furthermore, the third pallet elevator 32 and the second pallet stacker 34 may sequentially transfer a plurality of pallets T pre-fixed on the second fixing fixture 34a to the plurality of third lifting rollers 32a one at a time by the same principle as the first pallet stacker 12 and the first pallet elevator 14 .
[0129] First, if Fig. 9 As shown, the third lifting member 32b lifts the plurality of third lifting rollers 32a so that the plurality of third lifting rollers 32a support the lowermost tray T among the plurality of trays T fixed by the second fixing jig 34a.
[0130] Next, the second jig transfer member 34 b separates and transfers the second fixing jig 34 a from the lowermost tray T, thereby releasing the fixation of the plurality of trays T by the second fixing jig 34 a.
[0131] Then, the second lifting member 32b lowers the plurality of trays T supported by the third lifting rollers 32a and 34a so that the locking portions J of the trays T above the lowermost tray T are located at a height corresponding to the second fixing fixture 34a.
[0132] Next, the second fixture transfer member 34b transfers the second fixing fixture 34a so that the second fixing fixture 34a supports the locking portion J of the upper tray T among the plurality of trays T. Therefore, the plurality of trays T stacked in layers on the upper tray T and above the upper tray T are fixed by the second fixing fixture 34a.
[0133] Then, the third lifting member 32b lowers the plurality of third lifting rollers 32a so that the plurality of third lifting rollers 32a are located at the same height as the plurality of second fixing rollers 70 described later. Therefore, the lowermost tray T is lowered along the plurality of third lifting rollers 32a, thereby being separated from the remaining plurality of trays T still fixed by the plurality of second fixing clamps 34a.
[0134] As described above, the plurality of third lifting rollers 32a arranged at the same height as the plurality of second fixed rollers 70 with the tray T placed thereon can be driven to rotate and move the tray T in the longitudinal width direction toward the plurality of second fixed rollers 70. Figure 8 As shown, the multiple second fixed rollers 70 are rollers fixedly arranged at predetermined intervals along the horizontal direction (for example, the longitudinal width direction) of the pallet T at a waiting position between the storage unit 30 and the processing unit 40, and can transfer the pallet T transferred from the multiple third lifting rollers 32a of the storage unit 30 toward the multiple fourth lifting rollers 42a of the processing unit 40 described later.
[0135] The plurality of second fixed rollers 70 can transfer the tray T transferred from the plurality of third lifting rollers 32a to the plurality of fourth lifting rollers 42a in the lateral width direction. Fig.10 and Fig.11As shown, the tray T discharged from the storage unit 30 waits for a predetermined time in a state of being placed on the plurality of second fixed rollers 70, and then is transferred to the processing unit 40 through the plurality of second fixed rollers 70. As described above, the process of transferring the tray T loaded on the two-tray stacker 34 to the processing unit 40 can be repeatedly performed according to the trend of forming the product F by laser cutting the processing object F in the processing unit 40. That is, every time the laser cutting process of the processing object F loaded on one tray T is completed in the processing unit 40, the tray T corresponding to the next order of the above-mentioned tray T is additionally supplied to the processing unit 40 from the storage unit 30. As a result, the cutting system 1 can quickly supply the tray T loaded with the processing object F according to the formation progress of the product P, thereby improving the productivity of the product P.
[0136] Fig.12 To show Figure 3 The schematic structure of the processing unit is shown in FIG. Fig.13 A diagram for explaining a method of forming a product by laser cutting an object and measuring the weight of the product.
[0137] The processing unit 40 can manufacture the product P by performing laser cutting processing on the processing object F transferred from the plurality of second fixing rollers 70. For example, Fig.12 and Fig.13 As shown, the processing unit 40 may include: a fourth pallet elevator 42, which is used to transfer the pallet T along the lifting pallet T or along the horizontal direction (for example, the longitudinal width direction); a second shuttle 44, which is used to place the pallet T transferred from the fourth pallet elevator 42; a barcode reader 46, which reads the barcode pre-marked on the processing object F placed on the second shuttle 44 to collect information related to the processing object F; a laser processor 48, which manufactures the product P by laser cutting the processing object F placed on the second shuttle 44; and a second shuttle transfer component 49, which reciprocates the second shuttle 44 across a predetermined transfer path so that the second shuttle 44 can pass through the barcode reader 46 and the laser processor 48.
[0138] In the present invention, the processing unit 40 performs laser cutting processing on the processing object F to form the product P, but the present invention is not limited to this. That is, the processing unit 40 can also use a cutter (not shown) with a cutting blade and other cutting components of various structures to cut the processing object F. For the convenience of description, the present invention is described by taking the case of laser cutting processing on the processing object F as an example.
[0139] like Fig.12 As shown, the fourth pallet elevator 42 may include: a plurality of fourth lifting rollers 42a for supporting and transferring the pallet T in a horizontal direction (eg, a longitudinal width direction); and a fourth lifting component 42b for lifting the plurality of fourth lifting rollers 42a.
[0140] like Fig.12 As shown, the second shuttle 44 may include: a through hole 44a, through which the plurality of fourth lifting rollers 42a can pass; a placement groove 44b for placing the tray T; and a track groove 44c slidably mounted on the second track 49a.
[0141] When the tray T is transferred to the fourth lifting rollers 42a by the second fixed rollers 70, the fourth lifting member 42b lowers the fourth lifting rollers 42a. Therefore, the fourth lifting rollers 42a are arranged at a position lower than the second shuttle 44 after passing through the through hole 44a, and the tray T is separated from the fourth lifting rollers 42a and placed in the placement groove 44b.
[0142] The structure of the second shuttle transfer member 49 is not particularly limited. Fig.12 and Fig.13 As shown, the second shuttle transfer component 49 may include: a second track 49a extending from the processing unit 40 to the recovery unit 50 described later, and the track groove 44c of the second shuttle 44 is slidably installed; and a second driving component 49b, reciprocatingly transferring the second shuttle 44 along the second track 49a.
[0143] Furthermore, the structure of the second driving component 49b is not particularly limited. Fig.12 and Fig.13 As shown, the second driving component 49b may include: a driving motor 49c for providing driving force; a first sprocket 49d coupled to the rotating shaft of the driving motor 49c; a second sprocket 49e disposed at a predetermined distance from the first sprocket 49d to the recycling unit 50 side; a chain 49f, which rotates according to the first sprocket 49d and rotates the second sprocket 49e, and is fastened to the first sprocket 49d and the second sprocket 49e in a chain track; and a fixing tag 49g, which couples the second shuttle 44 to a predetermined position of the chain 49f. In this regard, the second driving component 49b can transfer the second shuttle 44 from the processing unit 40 to the recycling unit 50 side or from the recycling unit 50 to the processing unit 40 along the rotating direction of the driving motor 49c.
[0144] With the formation of such a second shuttle transfer member 49, as Fig.13 As shown, the second driving component 49b moves the second shuttle 44 and the tray T placed thereon toward the recovery unit 50 along the second track 49a, so that the tray T loaded with the processing object F passes through the barcode reader 46 and the laser processor 48 in sequence and then is transferred to the recovery unit 50.
[0145] like Fig.13As shown, the barcode reader 46 is set at a predetermined position on the transfer path of the second shuttle 44 to read the barcode on the processing object F loaded on the tray T transferred to the collection unit 50 to collect the production information and other information of the processing object F.
[0146] And, if Fig.13 As shown, the laser processor 48 is disposed on the transfer path of the second shuttle 44 so as to perform laser cutting processing on the processing object F transferred along the recovery unit 50 according to a plurality of predetermined cutting lines E to form a plurality of products P at predetermined intervals on the processing object F. In particular, it is preferred that the laser processor 48 is disposed between the barcode reader 46 and the recovery unit 50 so as to laser cut the processing object F whose barcode is read by the barcode reader 46. Fig.13 As shown, when the object F to be processed is subjected to laser cutting processing by such a laser processor 48, the object F to be processed is divided into a plurality of products P and fragments S which are the remainders of the object F to be processed after the plurality of products P are formed. In particular, in the fragments S, a plurality of through holes X corresponding to spaces formed as the products P are separated from the object F are formed at the same intervals as the intervals at which the products P are formed.
[0147] Fig.14 To show Figure 2 The schematic structure of the recovery unit is shown in the figure. Fig.15 A diagram for explaining a method of recycling pallets, products, and scraps.
[0148] The recovery unit 50 can perform a process of measuring the weight of the product P and a process of separately recovering the product P, the fragments S and the tray T. The recovery unit 50 is provided at a predetermined distance from the processing unit 40 in the horizontal direction (e.g., the lateral width direction) of the tray T so as to receive the tray T transferred along the second track 49a by the second driving member 49b and the product P and the fragments S placed on the tray T.
[0149] The structure of the recovery unit 50 is not particularly limited. Fig.14 and Fig.15 As shown, the recovery unit 50 may include: a product transferor 51, which separates the product P formed on the processing object F from the fragments S for transfer; a weight measuring component 52, which is used to measure the weight of the product P transferred from the product transferor 51; a product recoverer 53, which is used to recover the product P with measured weight; a product cargo box 54, which is used to load a plurality of products P recovered by the product recoverer 53; a fragment transferor 55, which is used to recover the fragments S of the processing object F; a fragment cargo box 56, which is used to load the fragments S transferred by the fragment transferor 55; and a fifth pallet elevator 57, which is used to lift and lower along the thickness direction or transfer the pallet T along the horizontal direction (for example, the longitudinal width direction).
[0150] The product transfer device 51 is disposed at a predetermined position on the transfer path of the second shuttle 44. The product transfer device 51 may include at least one vacuum adsorption plate capable of vacuum adsorbing the product P. Fig.13 As shown, the product transfer device 51 can hold and transfer the product P passing through a predetermined position on the transfer path of the second shuttle 44 and place it on the weight measuring unit 52.
[0151] The weight measuring unit 52 can measure the weight of the product P transferred from the product transfer device 51. For example, the weight measuring unit 52 can be composed of a load cell capable of measuring the weight of the product P.
[0152] As described above, the product P whose weight is measured by the weight measuring unit 52 is collected by the product collecting device 53 and then loaded into the product container 54. Preferably, the product collecting device 53 is formed by a conveyor belt, but is not limited thereto.
[0153] In order to transfer the product P placed on the weight measuring part 52 to the product box 54 through the product recoverer 53, the recovery unit 50 may further include: a second product transfer 58 for transferring the product P placed on the weight measuring part 52 to the product recoverer 53; and a third product transfer 59 for loading the product box 54 with the product P that has passed through the second product recoverer 53. In this case, the second product transfer 58 and the third product transfer 59 may have at least one vacuum adsorption plate 59a (see Figure 2 ).
[0154] The debris transfer device 55 is disposed at a predetermined position on the transfer path of the second shuttle 44. The debris transfer device 55 may include at least one vacuum adsorption plate 55a (see Figure 2 ).like Fig.15 As shown, such a chip transfer device 55 can hold and transfer the chips S from the tray T of the second shuttle 44 placed at a predetermined position on the transfer path of the second shuttle 44 and place them in the chip container 56 .
[0155] like Fig.14 As shown, the fifth tray elevator 57 may include: a plurality of fifth lifting rollers 57a for supporting and transferring the tray T in a horizontal direction (eg, a longitudinal width direction); and a fifth lifting member 57b for lifting the plurality of fifth lifting rollers 57a.
[0156] like Fig.14As shown, when the second shuttle 44 reaches the setting position of the fifth tray elevator 57, the fifth elevator member 57b raises and lowers the plurality of fifth elevator rollers 57a so that the plurality of fifth elevator rollers 57a pass through the through hole 44a of the second shuttle 44 and are located at the same height as the plurality of third fixed rollers 80 described later. Therefore, the tray T from the second shuttle 44, which is in an empty state due to the collected products P and the fragments S, is placed on the plurality of fifth elevator rollers 57a, and the tray T is separated from the placement groove 44b of the second shuttle 44 and is raised and lowered along the plurality of fifth elevator rollers 57a.
[0157] like Fig.15 As shown, the plurality of fifth lifting rollers 57a that are lifted and lowered to the setting height of the plurality of third fixed rollers 80 in the state where the tray T is placed can be rotatably driven, thereby transferring the tray T received from the processing unit 40 along the longitudinal width direction to the plurality of third fixed rollers 80. Fig.14 As shown, the multiple third fixed rollers 80 are rollers fixedly arranged at predetermined intervals along the horizontal direction (for example, the longitudinal width direction) of the pallet T between the recovery unit 50 and the supply unit 10, and transfer the pallet T transferred from the multiple fifth lifting rollers 57a of the recovery unit 50 toward the multiple first lifting rollers 14a of the supply unit 10.
[0158] The plurality of third fixed rollers 80 can transfer the tray T transferred from the plurality of fifth lifting rollers 57a to the plurality of first lifting rollers 14a in the longitudinal width direction. Fig.15 As shown, the tray T discharged from the supply unit 10 may be collected back to the supply unit 10 by the plurality of third fixed rollers 80. Also, the supply unit 10 may be driven in such a manner that the tray T collected from the collection unit 50 is re-stacked on the first tray stacker 12.
[0159] Furthermore, when the tray T is collected to the supply unit 10 by the fifth lifting rollers 57a, the fifth lifting member 57b lowers the fifth lifting rollers 57a so that the fifth lifting rollers 57a are disposed at a position lower than the second shuttle 24 after passing through the through hole 44a. Fig.15 As shown, the second shuttle transfer member 49 may transfer the second shuttle 44 of the separated tray T toward the processing unit 40 to return it to the processing unit 40. As described above, the second shuttle 44 returning to the processing unit 40 may place the tray T newly transferred from the storage unit 30.
[0160] As described above, the cutting system 1 can continuously perform the cutting process and the weight measuring process on one process line. The cutting process forms a product by cutting the processing object F, and the weight measuring process measures the weight of the product P formed in this way. According to this cutting system 1, compared with the case where a cutting device for the cutting process and a weight measuring device for the weight measuring process are separately formed, the installation area and cost of the system can be reduced, and the time required for the cutting process and the weight measuring process can be reduced, so that the productivity of the product P can be improved.
[0161] Furthermore, in the cutting system 1, the tray T loaded with the processing object F supplied from the supply unit 10 can be automatically recovered to the supply unit 10 after passing through the processing and inspection process lines of the processing object F such as the loading unit 20, the storage unit 30, the processing unit 40 and the recovery unit 50, thereby further improving the productivity of the product P.
[0162] The above description is only intended to illustrate the technical concept of the present invention by way of example. A person skilled in the art in the technical field to which the present invention belongs may make various modifications and variations without departing from the essential characteristics.
[0163] Therefore, the embodiments disclosed in the present invention are used to illustrate the present invention, but not to limit the technical ideas of the present invention, and the scope of the technical ideas of the present invention is not limited to such embodiments. The protection scope of the present invention is explained by the following invention claims, and all technical ideas within the equivalent scope belong to the invention claims of the present invention.
Claims
1. A cutting system for cutting a processing object (F) to separate a product (P) from the processing object (F), characterized in that: include: A supply unit (10) for supplying a tray (T); A loading unit (20) receives the tray (T) transferred from the supply unit (10), and the processing object (F) is loaded on the tray (T); a storage unit (30) receiving the tray (T) transferred from the loading unit (20) and temporarily storing the tray (T) loaded with the processing object (F); a processing unit (40) receiving the tray (T) transferred from the storage unit (30) according to the formation progress of the product (P), and cutting the processing object (F) loaded on the tray (T) to form the product (P); and a recovery unit (50) receiving the tray (T) delivered from the processing unit (40), recovering the tray (T) and the product (P) after measuring the weight of the product (P); The loading unit (20) comprises: A second pallet elevator (22) includes a second lifting roller (22a) for supporting and transferring the pallet (T) supplied from the supply unit (10) and a second lifting member (22b) for lifting the second lifting roller (22a); The first shuttle (24) includes a first through hole (24a) formed so as to allow the second lifting roller (22a) to pass therethrough, and a first placement groove (24b) in which the tray (T) placed on the second lifting roller (22a) is separated from the second lifting roller (22a) and placed when the second lifting roller (22a) is lowered to pass through the first through hole (24a); and The first shuttle transfer component (26) transfers the first shuttle (24) to the storage unit (30) if the processing object (F) is loaded on the tray (T) in the loading unit (20); and transfers the first shuttle (24) to the loading unit (20) if the tray (T) is transferred to the storage unit (30) in the storage unit (30).
2. The cutting system according to claim 1, characterized in that: The supply unit (10) comprises: A first pallet stacking machine (12) stacks the plurality of pallets (T) in layers and discharges the plurality of pallets (T) in sequence; and The first pallet elevator (14) is used to lift and transfer the pallet (T) discharged from the first pallet stacker (12).
3. The cutting system according to claim 2, characterized in that: The first tray elevator (14) comprises: A first lifting roller (14a) for supporting and transferring the tray (T); and The first lifting component (14b) is used to lift and lower the first lifting roller (14a).
4. The cutting system according to claim 2, characterized in that: The storage unit (30) comprises: a third pallet elevator (32) for lifting and transferring the pallet (T) delivered from the first shuttle (24); and The second pallet stacker (34) stacks the plurality of pallets (T) separated from the first shuttle (24) in layers by lifting and lowering the third pallet elevator (32), or discharges the plurality of pallets (T) in sequence according to the formation progress of the product (P). The third pallet elevator (32) transfers the pallet (T) discharged from the second pallet stacker (34) toward the processing unit (40).
5. The cutting system according to claim 4, characterized in that: The third pallet elevator (32) comprises: A third lifting roller (32a) for supporting and transferring the tray (T); and a third lifting component (32b) for lifting the third lifting roller (32a) so that the third lifting roller (32a) can pass through the first through hole (24a); When the first shuttle (24) reaches the storage unit (30), the third lifting component (32b) lifts the third lifting roller (32a) so that the third lifting roller (32a) passes through the first through hole (24a), and the tray (T) is placed on the third lifting roller (32a) passing through the first through hole (24a) and separated from the first placement groove (24b).
6. The cutting system according to claim 1, characterized in that: The processing unit (40) comprises: a fourth pallet elevator (42) for lifting and transferring the pallet (T) transferred from the storage unit (30); a second shuttle (44) for placing the pallet (T) transferred from the fourth pallet elevator (42); and The second shuttle transfer component (49) is configured to transfer the second shuttle (44) to the recovery unit (50) if the pallet (T) is placed on the second shuttle (44) in the processing unit (40); and to transfer the second shuttle (44) to the processing unit (40) if the pallet (T) is transferred to the recovery unit (50) in the recovery unit (50).
7. The cutting system according to claim 6, characterized in that: The fourth pallet elevator (42) comprises: a fourth lifting roller (42a), used for supporting and transferring the tray (T); and The fourth lifting component (42b) is used to lift the fourth lifting roller (42a). The second shuttle (44) comprises: A second through hole (44a) is formed through the fourth lifting roller (42a) so as to allow the fourth lifting roller (42a) to pass therethrough; and The second placement groove (44b) is configured such that when the fourth lifting roller (42a) is lowered to pass through the second through hole (44a) of the second shuttle (44), the tray (T) placed on the fourth lifting roller (42a) is separated from the fourth lifting roller (42a) and placed.
8. The cutting system according to claim 6, characterized in that: The processing unit (40) further includes a barcode reader (46) which is arranged on a transfer path of a second shuttle (44) that is transferred from the processing unit (40) toward the recovery unit (50) and reads a barcode pre-marked on the processing object (F) to collect information related to the processing object (F).
9. The cutting system according to claim 6, characterized in that: The processing unit (40) further includes a laser processor (48), which is arranged on a transfer path of a second shuttle (44) that transfers from the processing unit (40) toward the recovery unit (50), and forms the product (P) by dividing the processing object (F) by laser cutting the processing object (F).
10. The cutting system according to claim 7, characterized in that: The recovery unit (50) comprises: a product transfer device (51) disposed on a transfer path of the second shuttle (44) to separate the product (P) from the fragments (S) of the processing object (F) remaining after the product (P) is formed and to transfer the product (P); and The weight measuring component (52) is used to measure the weight of the product (P) transferred from the product transfer device (51).
11. The cutting system according to claim 10, characterized in that: The recovery unit (50) further includes a product container (54) for packaging the product (P) delivered from the weight measuring unit (52).
12. The cutting system according to claim 10, characterized in that: The recovery unit (50) further comprises: A fragment transfer device (55) is disposed on the transfer path of the second shuttle (44) and is used to hold and transfer the fragments (S); and The debris container (56) is used to pack the debris (S) transferred from the debris transfer device (55).
13. The cutting system according to claim 12, characterized in that: The recovery unit (50) further includes a fifth tray elevator (57) for lifting and transferring the tray (T) transferred from the second shuttle (44).
14. The cutting system according to claim 13, characterized in that: The fifth pallet elevator (57) comprises: a fifth lifting roller (57a), used for supporting and transferring the tray (T); and a fifth lifting member (57b) for lifting the fifth lifting roller (57a) so that the fifth lifting roller (57a) can pass through the second through hole (44a) of the second shuttle (44), If the second shuttle (44) reaches the recovery unit (50), the fifth lifting component (57b) lifts the fifth lifting roller (57a) so that the fifth lifting roller (57a) passes through the second through hole (44a) of the second shuttle (44), and the tray (T) is placed on the fifth lifting roller (57a) passing through the second through hole (44a) of the second shuttle (44) and separated from the second placement groove (44b) of the second shuttle (44).
15. The cutting system according to claim 14, characterized in that: If the tray (T) separated from the second placement groove (44b) of the second shuttle (44) is placed on the fifth lifting roller (57a), the fifth lifting roller (57a) transfers the tray (T) toward the supply unit (10).