By adopting a multi-functional bracket mount method in the construction of steel pipe concrete arch bridges, integrating arch rib mount, beam splicing and beam storage and installation, the problems of poor accuracy and high cost of conventional brackets are solved, and more efficient construction accuracy and cost savings are achieved .

CN114232498BActive Publication Date: 2024-11-151ST ENG OF CHINA ZHONGTIE MAJORBRIDGE GROUP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202210014025.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-07
Publication Date
2024-11-15
Estimated Expiration
2042-01-07

AI Technical Summary

Technical Problem

The conventional arch rib bracket has a single function, resulting in poor installation accuracy of arch rib installation and cross beams during the construction of steel pipe concrete arch bridge, long construction cycle and high cost.

Method used

The multi-function bracket mount method is adopted to integrate arch rib mount, beam splicing and beam storage and installation. By setting up the lower and upper arch rib assembly bracket and beam splicing support platform, the main stress-bearing structure of the bridge deck is formed by using track suspenders and booms. Shorten the construction period and improve accuracy.

Benefits of technology

The construction accuracy and quality of arch rib installation and beam installation are improved, materials and time are saved, and construction costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114232498B_ABST
    Figure CN114232498B_ABST
Patent Text Reader

Abstract

The invention discloses a multifunctional support erection method for the construction of a mid-span steel tube concrete arch bridge, which is carried out according to the following steps: (1) erecting a lower arch rib assembly support, which also serves as a beam storage and installation platform; (2) welding and extending the beam segments into a whole on the beam splicing support platform; hoisting the spliced ​​beam to the beam storage and installation platform for storage; (3) continuing to erect the upper arch rib assembly support to the designed position, and after the support is erected, the arch rib is erected, and the arch rib concrete is poured; (4) after the concrete age and strength meet the requirements, the upper arch rib assembly support is removed; (5) continuing to install the suspension rod, and using the crawler crane to install the beam placed in advance at the corresponding position on the beam storage and installation platform; (6) after all the construction is completed, the remaining supports are removed. The invention has the advantages of safe and reliable support force, can improve the construction accuracy and quality of arch rib erection and beam installation, save costs, shorten the construction period, etc.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of arch bridge construction, and in particular to a multifunctional bracket erection method for construction of a mid-span steel tube concrete arch bridge. Background Art

[0002] During the construction of steel tube concrete arch bridges, the erection of arch ribs is a key process for the entire bridge construction, and the quality of its construction will directly affect the safety and stability of the bridge. Conventional arch rib brackets have a single function and can only complete the erection of arch ribs. The assembly and installation of cross beams require the erection of cross beam brackets again. Not only is the construction period long and the cost high, but the accuracy of arch rib erection and cross beam installation is poor. Summary of the invention

[0003] In view of the defects existing in the prior art, the present invention provides a method for erecting a multifunctional support for the construction of a half-span steel tube concrete arch bridge, forming a multifunctional support that integrates arch rib erection, beam splicing, and beam storage and installation. The support has the advantages of safe and reliable force bearing, and can improve the construction accuracy and quality of arch rib erection and beam installation, saving costs, shortening construction period, etc.

[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0005] A multifunctional support erection method for the construction of a mid-span steel tube concrete arch bridge is carried out according to the following steps:

[0006] (1) Set up the lower arch rib assembly bracket, which also serves as a beam storage and installation platform;

[0007] (2) Set up a beam splicing support platform, weld the beam segments to make a whole beam on the beam splicing support platform; hoist the spliced ​​beam to the corresponding position on the beam storage and installation platform under the arch rib;

[0008] (3) Continue to erect the upper arch rib assembly bracket to the designed position. After the upper arch rib assembly bracket is erected, the arch ribs are erected, and the arch rib concrete is poured using the top operating platform of the upper arch rib assembly bracket;

[0009] (4) After the concrete age and strength meet the requirements, remove the upper arch rib assembly bracket;

[0010] (5) Continue to install the hanger rods, and use the crawler crane to install the beams that have been placed in advance at the corresponding positions on the beam storage and installation platform. After connecting the beams to the hanger rods, construct the longitudinal beams between the beams to form the main load-bearing structure of the bridge deck system;

[0011] (6) After all construction is completed, remove the remaining supports.

[0012] Furthermore, in the step (1), the lower structure of the lower arch rib assembly bracket uses steel pipe columns, which are arranged in groups of four, and longitudinal and transverse connection systems are arranged between the steel pipe columns to form columns;

[0013] The columns are arranged in at least two rows, and the columns in each row are connected by a lower connecting system. The lower connecting system serves as a beam storage and installation platform for beams and other rods; the beams are erected between the beam storage and installation platforms.

[0014] Furthermore, when on the cap, the steel pipe column is connected to the cap embedded parts by bolts, and when in water, the steel pipe column is driven into the pile foundation.

[0015] Furthermore, the lower layer connection system is connected to the steel pipe column through a corbel.

[0016] Furthermore, a platform panel is arranged on the lower connecting system, and the platform panel is a structure of industrial steel and patterned steel plate, and the industrial steel and the upper chord of the lower connecting system are firmly welded through a stiffening plate.

[0017] Furthermore, in step (2), the method for setting up the beam splicing support platform is as follows:

[0018] Cross beam splicing brackets are respectively arranged on the river bank at both ends of the main arch rib assembly bracket, and the cross beam splicing brackets are distributed at the cross beam splicing positions; the lower structure of the cross beam splicing bracket adopts steel pipe columns, and pile foundations are driven into them; the steel pipe columns are grouped in four, and longitudinal and transverse connection systems are arranged between the steel pipe columns to form columns; top-mounted distribution beams and platform panels are installed above the columns to form a cross beam splicing bracket platform, wherein the platform panel is a structure of industrial steel and patterned steel plates.

[0019] Furthermore, in the step (2), the method of welding and extending the beam segments into a whole beam on the beam splicing support platform is as follows: the beam is divided into three sections, and the beam segments are sequentially hoisted to the beam splicing support platform by a crawler crane, and the beam segments are welded and extended into a whole beam on the beam splicing support platform.

[0020] Furthermore, a horizontal diagonal rod is arranged between the group of four steel pipe columns, and a parallel connection is arranged between the horizontal and vertical connection systems to form a spatial truss structure.

[0021] Furthermore, in the step (3), the upper arch rib assembly bracket is continuously erected to the designed position, and the top elevation of the steel pipe column is arranged linearly according to the elevation of the arch rib axis; an upper connection system is arranged at the upper end of the column, and the operating platform is supported on the top of the upper connection system;

[0022] A distribution beam is set at the top of the column, and a saddle and arch rib adjustment facilities are arranged on the top of the distribution beam. After the bracket is erected, the arch rib is erected. The order of arch rib erection and hoisting is to install from the arch feet at both ends to the middle, and finally close it in the middle of the span.

[0023] The beneficial effects of the present invention are:

[0024] 1. It integrates arch rib erection, beam splicing, beam storage and installation, and the structure is safe, reliable and highly functional.

[0025] 2. It can improve the construction accuracy and quality of arch rib erection and beam installation.

[0026] 3. Save materials and time for erecting beam supports, shorten construction period and save costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a schematic diagram of the erection of the lower arch rib assembly bracket;

[0028] Figure 2 This is a schematic diagram of the erection of the upper arch rib assembly bracket;

[0029] Figure 3 This is a schematic diagram of the arch rib construction;

[0030] Figure 4 This is a schematic diagram of dismantling the upper arch ribs to assemble the brackets;

[0031] Figure 5 This is a schematic diagram of the installation of the boom beam and the removal of the bracket;

[0032] Figure 6 It is the plan layout of the bracket;

[0033] Figure 7 This is the layout drawing of the beam storage and installation platform.

[0034] In the figure: 1 is a steel pipe column, 21 is a lower connecting system, 22 is an upper connecting system, 31 and 32 are distribution beams, 4 is a lower arch rib assembly bracket, 5 is a cross beam splicing bracket platform, 6 is a cross beam storage and installation platform, 7 is an upper arch rib assembly bracket, 8 is an operating platform, 9 is a saddle, 10 is a hanger, and 11 is a longitudinal beam.

[0035] The drawings are only used for illustrative purposes and should not be construed as limitations on this patent. In order to better illustrate this embodiment, some parts of the drawings may be omitted, enlarged, or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted. DETAILED DESCRIPTION

[0036] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.

[0037] like Figures 1 to 7 As shown, a multifunctional bracket erection method for construction of a mid-through steel tube concrete arch bridge of this embodiment is carried out according to the following steps:

[0038] (1) Set up the lower arch rib assembly bracket 4, which also serves as the beam storage and installation platform 6 (see Figure 1 ).

[0039] Specifically, the lower structure of the lower arch rib assembly bracket 4 adopts steel pipe columns 1, and the steel pipe columns 1 are grouped into four, and longitudinal and transverse connection systems are set between the steel pipe columns 1 to form columns. When on the cap, the steel pipe columns 1 are connected to the cap embedded parts by bolts, and when in water, the steel pipe columns 1 are driven into the pile foundation.

[0040] In this embodiment, the columns are arranged in two rows, and the columns in each row are connected by a lower connection system 21, and the lower connection system 21 is connected to the steel pipe column 1 through a corbel. The lower connection system 21 serves as a beam storage and installation platform 6 for beams and other rods, and the beams are installed between the beam storage and installation platforms 6 of the two rows of columns.

[0041] In this embodiment, a platform panel is arranged on the lower layer connection system 21, and the platform panel is a structure of industrial steel 14 and patterned steel plate 15. The industrial steel and the upper chord of the lower layer connection system 21 are welded firmly through a stiffening plate (see Figure 7 ).

[0042] (2) Set up a beam splicing support platform 5, and weld the beam segments to form a whole beam on the beam splicing support platform 5; hoist the spliced ​​beam to the corresponding position on the beam storage and installation platform 6 under the arch rib for storage.

[0043] The method for setting up the beam splicing support platform 5 is as follows:

[0044] Crossbeam splicing brackets are respectively arranged on the river bank at both ends of the main arch rib assembly bracket, and the crossbeam splicing brackets are distributed at the crossbeam splicing positions; the lower structure of the crossbeam splicing bracket adopts steel pipe columns 1, which are driven into pile foundations; the steel pipe columns 1 are grouped into four, and longitudinal and transverse connection systems are arranged between the steel pipe columns to form columns; the top-mounted distribution beam 31 and the platform panel are installed above the columns to form a crossbeam splicing bracket platform 5, wherein the platform panel is a structure of industrial steel and patterned steel plate.

[0045] In this embodiment, the total length of the beam 13 is 37.5 m. Considering the on-site transportation conditions, the beam is divided into three sections, each 12.5 m long. A 150t crawler crane is used to sequentially hoist the beam segments to the beam splicing support platform 5, and the beam segments are welded and extended into a whole beam on the beam splicing support platform 5.

[0046] (3) Continue to erect the upper arch rib assembly bracket 7 to the designed position (see Figure 2 ), the top elevation of the steel pipe column 1 is arranged linearly according to the elevation of the arch rib axis; an upper connection system 22 is arranged at the upper end of the column, and the operating platform 8 is supported on the top of the upper connection system 22.

[0047] A distribution beam 32 is arranged at the top of the column, and a saddle 9 and an arch rib adjustment facility are arranged on the top of the distribution beam 32. After the bracket is erected, the arch rib is erected (see Figure 3 ), the sequence of arch rib erection and hoisting is to install from the arch feet at both ends to the middle, and finally close them in the middle of the span, and use the top-level operating platform of the bracket to carry out arch rib concrete injection construction.

[0048] (4) After the concrete age and strength meet the requirements, remove the upper arch rib assembly bracket 7 (see Figure 4 );

[0049] (5) Continue to install the hanger rods, and use two crawler cranes to lift the beams that have been placed in advance at the corresponding positions on the beam storage and installation platform. After connecting the beams to the hanger rods 10, construct the longitudinal beams 11 between the beams to form the main load-bearing structure of the bridge deck system;

[0050] (6) After all construction is completed, remove the remaining supports (see Figure 5 ).

[0051] A horizontal diagonal rod is arranged between a group of four steel pipe columns in the span of the above-mentioned support, and a flat connection is arranged between the horizontal and vertical connection systems to form a spatial truss structure to enhance the overall stability.

[0052] The present invention forms a multifunctional bracket which integrates arch rib erection, beam splicing, and beam storage and installation through the above-mentioned multifunctional bracket erection method for the construction of a mid-span steel tube concrete arch bridge. The bracket structure is safe, reliable, and highly functional. The construction accuracy and quality of arch rib erection and beam installation can be improved. The materials and time for erecting the beam bracket can be saved, the construction period can be shortened, and the cost can be saved.

[0053] The above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention is described in detail with reference to the above embodiments, those skilled in the art should understand that the present invention can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.

[0054] If the words "first", "second", etc. are used in this document to limit components, those skilled in the art should know that the use of "first" and "second" is only to facilitate the description of the present invention and simplify the description. Unless otherwise stated, the above words have no special meaning.

[0055] In the description of the present invention, it is necessary to understand that the directions or positional relationships indicated by the terms "upper", "lower", "front", "back", "left", "right", "inside", "outside", etc. are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the protection content of the present invention.

Claims

1. A multifunctional support erection method for the construction of a mid-span steel tube concrete arch bridge, characterized in that Follow these steps: (1) Set up the lower arch rib assembly bracket, which also serves as a beam storage and installation platform; (2) Set up a beam splicing support platform, weld the beam segments to make a whole beam on the beam splicing support platform; hoist the spliced ​​beam to the corresponding position on the beam storage and installation platform under the arch rib; (3) Continue to erect the upper arch rib assembly bracket to the designed position. After the upper arch rib assembly bracket is erected, the arch ribs are erected, and the arch rib concrete is poured using the top operating platform of the upper arch rib assembly bracket; (4) After the concrete age and strength meet the requirements, remove the upper arch rib assembly bracket; (5) Continue to install the hangers and the beams placed in advance at the corresponding positions on the beam storage and installation platform. After connecting the beams to the hangers, construct the longitudinal beams between the beams to form the main load-bearing structure of the bridge deck; (6) After all construction is completed, remove the remaining supports; In the step (1), the lower structure of the lower arch rib assembly bracket adopts steel pipe columns, and the steel pipe columns are grouped into four, and longitudinal and transverse connection systems are arranged between the steel pipe columns to form columns; The columns are arranged in at least two rows, and the columns in each row are connected by a lower connecting system, and the lower connecting system serves as a beam storage and installation platform; the beam is erected between the beam storage and installation platforms; In step (2), the method for setting up the beam splicing support platform is as follows: Beam splicing brackets are respectively arranged on the river bank at both ends of the main arch rib assembly bracket, and the beam splicing brackets are distributed at the beam splicing positions; the lower structure of the beam splicing bracket adopts steel pipe columns, and pile foundations are driven into the steel pipe columns; four steel pipe columns are arranged in a group, and longitudinal and transverse connection systems are arranged between the steel pipe columns to form columns; top-mounted distribution beams and platform panels are installed above the columns to form a beam splicing bracket platform, wherein the platform panel is a structure of industrial steel and patterned steel plates; In the step (2), the method of welding and extending the cross beam segments into a whole beam on the cross beam splicing support platform is as follows: the cross beam is divided into three sections, and the cross beam segments are sequentially hoisted to the cross beam splicing support platform by a crawler crane, and the cross beam segments are welded and extended into a whole beam on the cross beam splicing support platform; In the step (3), the upper arch rib assembly bracket is continuously erected to the designed position, and the top elevation of the steel pipe column is arranged linearly according to the elevation of the arch rib axis; an upper connection system is arranged at the upper end of the column, and the operating platform is supported on the top of the upper connection system; A distribution beam is set at the top of the column, and a saddle and arch rib adjustment facilities are arranged on the top of the distribution beam. After the bracket is erected, the arch rib is erected. The order of arch rib erection and hoisting is to install from the arch feet at both ends to the middle, and finally close it in the middle of the span.

2. The multifunctional support erection method for construction of a mid-through steel tube concrete arch bridge according to claim 1 is characterized by: When on the cap, the steel pipe column is connected to the cap embedded parts by bolts, and when in water, the steel pipe column is driven into the pile foundation.

3. The multifunctional support erection method for construction of a mid-through steel tube concrete arch bridge according to claim 1 is characterized by: The lower layer connection system is connected to the steel pipe column through the corbel.

4. The multifunctional support erection method for construction of a mid-through steel tube concrete arch bridge according to claim 1 is characterized by: A platform panel is arranged on the lower connecting system, and the platform panel is a structure of industrial steel and patterned steel plate. The industrial steel and the upper chord of the lower connecting system are firmly welded through a stiffening plate.

5. The multifunctional support erection method for construction of a mid-through steel tube concrete arch bridge according to claim 1 is characterized by: Horizontal diagonal rods are arranged between the four steel pipe columns, and parallel connections are arranged between the horizontal and vertical connection systems to form a spatial truss structure.

Citation Information

Patent Citations

  • Construction method for continuous tie bar steel tube arch bridge

    CN104562936A

  • Installation construction method for continuous-beam arch-bridge steel-tube arch ribs

    CN109989349A

  • Mounting method of steel pipe arch of through beam-arch combination bridge

    CN110205938A

  • Steel truss arch bridge and construction method

    CN111593673A

  • Construction method for arch bridge

    JP2016023523A