Method for sand control of oil wells, segmented and circulating gravel packing equipment
Through segmented and circulating gravel filling equipment, the sand-carrying liquid is squeezed in the oil well to form a strong and permeable filling zone, which solves the problem of sand control in multi-layer wells in long well sections, achieves low-cost, low-risk and efficient filling effects, and ensures Long-term and stable production.
Patent Information
- Application Number
- CN202110553967.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-20
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-05-20
AI Technical Summary
During the sand control process of multi-layer wells in long well sections, there are problems such as difficulty in handling the pipe strings in the later stage and uneven filling of each layer, resulting in poor sand control effect and affecting long-term and stable production.
Use segmented gravel filling equipment and circulating gravel filling equipment to respectively squeeze the sand-carrying liquid with gravel and the sand-carrying liquid that can consolidate sand to fill the oil layer to form a filling zone with a certain strength and permeability to avoid gravel backflow and filling. Uneven.
It achieves low-risk, easy-to-handle and efficient sand control effects, ensuring long-term and stable production of multi-layer wells in long sections.
Smart Images

Figure CN115370327B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of oil production engineering in the petroleum industry, and in particular to a method for sand prevention of oil wells, segmented and circulating gravel filling equipment. Background Art
[0002] Loose sandstone reservoirs face different degrees of sand production problems. The difficulty and poor effect of sand control in long well sections with interlayer spans greater than 50m seriously affect the development efficiency of the oil field. At present, the main sand control technology for long well sections and multilayer wells at home and abroad is mechanical or chemical cage integrated sand control. For foreign mechanical multi-stage segmented filling sand control, the sand control effect is good, but there are problems such as high cost, complex pipe string, high construction risk, and difficult post-processing. With chemical cage integrated sand control, although the construction process is simple, it is difficult to control the gravel filling of the main sand-producing layer, the integrity of the artificial well wall is poor, and there is a problem of short validity period.
[0003] At present, the mechanical sand control countermeasures for long well sections and multi-layer wells in China mainly adopt a comprehensive sand control technology, but all of them have certain shortcomings. The difficulties in sand control for long well sections and multi-layer sand production wells are mainly reflected in: (1) The well section is long, the mechanical sand control pipe string is long, and the pipe string is difficult to handle after the sand control fails, and a major repair operation is required; (2) The span is large, there are many layers, the physical properties of each layer are very different, and the heterogeneity between layers is serious, resulting in the inability to evenly fill sand in each layer when carrying out sand control measures, affecting the long-term stable production of sand control wells.
[0004] Therefore, in view of the problems of difficult handling of late-stage tubulars and uneven filling of various layers in long-section multi-layer wells, it is necessary to study low-cost, low-risk, easy-to-handle sand control tubulars and efficient filling sand control methods suitable for sand control in long-section multi-layer wells, which is of great significance for ensuring the long-term stable production of long-section multi-layer wells. Summary of the invention
[0005] The embodiments of the present invention provide a method for performing sand control operations on oil wells, a segmented gravel filling device and a circulating gravel filling device, which are suitable for sand control operations in long well sections and multi-layer wells and have the advantages of low risk, easy handling and efficient filling.
[0006] On the one hand, the present invention provides a method for sand prevention operations on oil wells, comprising the following steps: a segmented gravel filling device squeezes a sand-carrying fluid containing gravel and a sand-carrying fluid containing consolidated sand to sequentially fill the oil layers in each layer section until a first filling zone is formed deep in the oil layer in each layer section, and a second filling zone with certain strength and permeability is formed at a position corresponding to the oil layer in each layer section and the wellbore casing; a circulating gravel filling device squeezes the sand-carrying fluid containing gravel in the wellbore casing until a third filling zone is formed between the oil layers in each layer section and the wellbore casing.
[0007] In some optional embodiments, the segmented gravel filling equipment squeezes the sand-carrying fluid with gravel and the sand-carrying fluid with consolidated sand to sequentially fill the oil layers in each layer until a first filling zone is formed deep in the oil layer of each layer, and a second filling zone with a certain strength and permeability is formed at a position of the oil layer in each layer corresponding to the wellbore casing, comprising: placing the segmented gravel filling equipment at a preset depth of the oil well; filling the segmented gravel filling equipment in sequence from the deepest oil layer in the geological layer to the shallowest oil layer in the geological layer, and removing the segmented gravel filling equipment from the oil well.
[0008] In some optional embodiments, the segmented gravel packing device includes a first oil pipe, a first filling component and a first plugging component which are sequentially connected along its length direction, and one end of the first oil pipe away from the first filling component is connected to the wellhead.
[0009] In some optional embodiments, the first filling component includes a filling pipe and a sliding sleeve. In the height direction of the filling pipe, the filling pipe is provided with a first filling port and a second filling port. A first packer and a second packer are provided between the first filling port and the second filling port. The first packer and the second packer are respectively connected to the internal space of the filling pipe. The sliding sleeve is provided inside the filling pipe and connected to the filling pipe by a pin. The outer surface of the sliding sleeve is in contact with the inner surface of the filling pipe for sealing at least one of the first filling port and the second filling port.
[0010] In some optional embodiments, when the segmented gravel filling equipment fills the deepest oil layer in the geological layer, the position where the outer surface of the sleeve fits the inner surface of the filling pipe is located at the first filling port to seal the first filling port.
[0011] In some optional embodiments, when the segmented gravel filling equipment fills the oil layer above the deepest oil layer in the geological layer, the position where the outer surface of the sleeve fits the inner surface of the filling pipe is located at the second filling port to seal the second filling port.
[0012] In some optional embodiments, after the segmented gravel filling equipment fills the deepest oil layer in the geological layer, a ball is released to the port of the first oil pipe, and the ball pushes the sleeve to move toward the position of the second filling port until the sleeve blocks the second filling port.
[0013] In some optional embodiments, the circulating gravel packing device includes a second oil pipe, a second filling component, a filtering component and a second plugging component connected in sequence along its length direction, and one end of the first oil pipe away from the first filling component is connected to the wellhead.
[0014] In some optional embodiments, the circulating gravel packing equipment further includes a third packer and a fourth packer, wherein the third packer and the fourth packer are disposed in the second oil pipe and communicate with the inner space of the second oil pipe.
[0015] In some optional embodiments, the second filling component includes an elastic cylinder, a ball seat and a protrusion, the protrusion is inserted into the interior of the ball seat, the outer surface of the protrusion is screwed to the inner surface of the ball seat, the ball seat is inserted into the interior of the elastic cylinder, the ball seat and the elastic cylinder are connected by shear nails, and the elastic cylinder is provided with a third filling port near the upper end of the ball seat.
[0016] In some optional embodiments, the second filling component and the filter component are connected via a safety joint, and the filter component is a fiberglass screen tube.
[0017] On the other hand, the present application provides a segmented gravel packing device, which is the segmented gravel packing device mentioned in any of the above methods for sand control operations on oil wells.
[0018] On the other hand, the present application provides a circulating gravel filling device, which is the circulating gravel filling device mentioned in any of the above methods for sand control operations on oil wells.
[0019] Compared with the prior art, this application has the following technical effects:
[0020] The present application discloses a method for carrying out sand control operation on an oil well, comprising the following steps: a segmented gravel filling device squeezes a sand-carrying liquid containing gravel and a sand-carrying liquid containing consolidable sand respectively to sequentially fill the oil layers located in each layer section until a first filling zone is formed in the depth of the oil layer in each layer section, and a second filling zone with certain strength and permeability is formed at a position corresponding to the oil layer in each layer section and the wellbore casing, wherein the second filling zone is formed by consolidating the consolidable sand through a chemical reaction to form a sand retaining barrier with certain strength and permeability, thereby preventing the gravel in the first filling zone from moving and flowing back into the wellbore; a circulating gravel filling device squeezes the sand-carrying liquid containing gravel in the wellbore casing until a third filling zone is formed between the oil layers in each layer section and the wellbore casing, thereby respectively filling the oil layers in each layer section, avoiding uneven filling of each oil layer due to differences between the oil layers in each layer section, and improving the sand control effect of the oil well. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0022] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0023] Figure 1 It is a schematic flow chart of a method for performing sand control operations on a petroleum well provided by an embodiment of the present invention;
[0024] Figure 2 is a schematic structural diagram of a segmented gravel filling device provided by an embodiment of the present invention;
[0025] Figure 3 It is a schematic diagram of the state of the segmented gravel filling equipment provided by one embodiment of the present invention squeezing the sand-carrying fluid to fill the lower oil layer;
[0026] Figure 4 It is a schematic diagram of the state of the segmented gravel filling equipment provided by one embodiment of the present invention squeezing the sand-carrying fluid to fill the upper oil layer.
[0027] Figure 5 is a schematic structural diagram of a circulating gravel filling device provided by an embodiment of the present invention;
[0028] Figure 6 It is a schematic cross-sectional structure diagram of a second filling component in a circulating gravel filling device provided in one embodiment of the present invention.
[0029] Figure numerals: 1-segmented gravel packing equipment; 11-first oil pipe; 12-first filling component; 121-filling pipe; 122-sleeve; 123-first filling port; 124-second filling port; 125-first packer; 126-second packer; 13-first plugging component; 2-circulating gravel packing equipment; 21-second oil pipe; 22-second filling component; 221-elastic cylinder; 22-ball seat; 223-bump; 224-shear nail; 225-third filling port; 23-filter component; 24-second plugging component; 25-third packer; 26-fourth packer; 27-safety joint; 3-wellbore casing; A-first filling zone; B-second filling zone; C-third filling zone. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0031] The present application provides a method for sand control of oil wells, comprising the following steps: a segmented gravel filling device 1 squeezes a sand-carrying liquid containing gravel and a sand-carrying liquid containing consolidated sand to sequentially fill the oil layers in each layer section until a first filling zone A is formed deep in the oil layer of each layer section, and a second filling zone with certain strength and permeability is formed at a position corresponding to the oil layer of each layer section and the wellbore casing 3; a circulating gravel filling device squeezes the gravel-carrying liquid in the wellbore casing 3 until a third filling zone C is formed between the oil layer of each layer section and the wellbore casing 3, thereby achieving the filling of the oil layers in each layer section respectively, avoiding uneven filling of each oil layer due to differences between the oil layers in each layer section, and improving the sand control effect of the oil well.
[0032] Specifically, the segmented gravel filling device 1 squeezes the sand-carrying fluid with gravel and the sand-carrying fluid with consolidated sand to fill the oil layers in each layer in turn, until a first filling zone A is formed in the depth of the oil layer in each layer, and a second filling zone with certain strength and permeability is formed at the position of the oil layer in each layer corresponding to the wellbore casing 3, including: placing the segmented gravel filling device 1 at a preset depth of the oil well, and fixing the upper end of the oil pipe at the wellhead, optionally, placing the segmented gravel filling device 1 between two adjacent oil layers, 1 to 3 meters below the upper oil layer close to the wellhead, and 1 to 3 meters above the lower oil layer away from the wellhead; the segmented gravel filling device 1 fills from the deepest oil layer in the geological layer to the shallowest oil layer in the geological layer in turn, and the filling of oil layers in different sections will not affect each other, avoiding mutual contamination between oil layers in different sections; and fishing out the segmented gravel filling device 1 in the oil well.
[0033] Furthermore, the segmented gravel filling equipment 1 includes a first oil pipe 11, a first filling component and a first plugging component 13 which are connected in sequence along its length direction. The first oil pipe 11 is connected to the wellhead at one end away from the first filling component. The first filling component includes a filling pipe 121 and a sleeve 122. In the height direction of the filling pipe 121, the filling pipe 121 is provided with a first filling port 123 and a second filling port 124. A first packer 125 and a second packer 126 are provided between the first filling port 123 and the second filling port 124. The first packer 125 and the second packer 126 are respectively connected to the internal space of the filling pipe 121. The sleeve 122 is provided inside the filling pipe 121 and connected to the filling pipe 121 by a pin. The outer surface of the sleeve 122 fits with the inner surface of the filling pipe 121 to plug at least one of the first filling port 123 and the second filling port 124. When the segmented gravel packing device 1 fills the deepest oil layer in the geological layer, the position where the outer surface of the sliding sleeve 122 fits the inner surface of the filling pipe 121 is located at the first filling port 123 to block the first filling port 123. When the segmented gravel packing device 1 fills the oil layer above the deepest oil layer in the geological layer, the position where the outer surface of the sliding sleeve 122 fits the inner surface of the filling pipe 121 is located at the second filling port 124 to block the second filling port 124.
[0034] Furthermore, the first packer 125 and the second packer 126 are both made of elastic leather material, and the first plugging component 13 is a thread plug.
[0035] Specifically, the segmented gravel filling device 1 is placed at a preset depth of the oil well, and the upper end of the oil pipe is fixed at the wellhead. Optionally, the segmented gravel filling device 1 is placed between two adjacent oil layers, 1 to 3 meters below the upper oil layer close to the wellhead, and 1 to 3 meters above the lower oil layer away from the wellhead. The segmented gravel filling device 1 fills the oil layer from the deepest oil layer in the geological layer to the shallowest oil layer in the geological layer in sequence, that is, the segmented gravel filling device 1 first fills the oil layer located in the deepest geological layer, and then fills the oil layer close to the ground in sequence. When filling the oil layer located in the deepest geological layer, the sleeve 122 seals the first filling port 123. When the segmented gravel filling device 1 is filled with sand-carrying liquid, the sand-carrying liquid cannot flow out of the first filling port 123, and therefore cannot flow into other oil layers. Figure 2As shown, the pump truck is located on the ground, and the pump truck pumps gravel-carrying fluid into the first oil pipe 11, and a throttling difference is generated inside and outside the segmented gravel filling device 1. Under the effect of the throttling difference, the first packer 125 and the second packer 126 radially expand to contact and seal with the wall of the wellbore casing 3, so as to isolate the oil layer close to the wellhead, and continue to pump gravel-carrying fluid into the first oil pipe 11. The gravel-carrying fluid flows out from the second filling port 124, enters the deepest oil layer in the geological layer, and forms a first filling zone A in the oil layer. Continue to pump the sand-carrying fluid containing the consolidating sand into the first oil pipe 11, the sand-carrying fluid for consolidating sand flows out from the second filling port 124, enters the oil layer located in the deepest geological layer, displaces a certain amount of gravel-carrying fluid, and forms a second filling zone with certain strength and permeability near the perforation holes where the oil layer and the wellbore casing 3 are in contact. The second filling zone is formed by the consolidating sand through chemical reaction to form a sand retaining barrier with certain strength and permeability, which prevents the gravel in the first filling zone from moving and flowing back into the wellbore. The second filling zone is equivalent to an artificial well wall of the consolidating sand. The second filling zone forms a sand retaining barrier, which prevents the previously filled gravel from flowing back into the wellbore, thereby completing the extrusion filling operation of the lower oil layer.
[0036] After filling the deepest oil layer in the geological layer, fill the oil layer closer to the ground in sequence, such as Figure 3 As shown, after the segmented gravel filling device 1 fills the deepest oil layer in the geological layer, a ball is released to the port of the first oil pipe 11, and the ball pushes the sliding sleeve 122 to move to the position of the second filling port 124 until the sliding sleeve 122 blocks the second filling port 124. After the sliding sleeve 122 moves to the position of the second filling port 124, the first filling port 123 is exposed, and the pump truck continues to pump gravel-carrying fluid into the first oil pipe 11. Under the action of the throttling difference, the first packer 125 and the second packer 126 radially expand and contact and seal with the wall of the wellbore casing 3, so as to achieve the isolation of the oil layer below the oil layer, thereby preventing the lower oil layer from being disturbed when filling the upper oil layer. The ground pump continues to inject gravel-carrying fluid into the oil pipe, and the gravel-carrying fluid flows out from the first filling port 123 and enters the oil layer, and forms a first filling zone A in the oil layer. Continue to pump the sand-carrying fluid with the consolidable sand into the first oil pipe 11, the sand-carrying fluid with the consolidable sand flows out from the first filling port 123, enters the oil layer, displaces a certain amount of the gravel-carrying fluid, and forms a second filling zone near the perforation holes where the oil layer and the wellbore casing 3 are in contact. The second filling zone is formed by the consolidable sand after chemical reaction consolidation to form a sand retaining barrier with certain strength and permeability, which prevents the gravel in the first filling zone from moving and flowing back into the wellbore. The second filling zone is equivalent to an artificial well wall of the consolidating sand. The second filling zone forms a sand retaining barrier, which prevents the previously filled gravel from flowing back into the wellbore, thereby completing the extrusion filling operation of the upper oil layer.
[0037] Specifically, a perforation hole for connecting the oil layer with the wellbore casing 3 is arranged on the wellbore casing 3 corresponding to the oil layer, and the perforation hole can pass through the formation sand and crude oil.
[0038] Furthermore, after the segmented gravel packing device 1 has completely filled all the oil layers in the geological layer, the segmented gravel packing device 1 is fished out of the oil well, the circulating gravel packing device 2 is placed at a preset depth of the oil well, and the upper end of the oil pipe is fixed to the wellhead.
[0039] In some optional embodiments, the circulating gravel filling device 2 includes a second oil pipe 21, a second filling component 22, a filter component 23 and a second plugging component 24 which are sequentially connected along the length direction of the first oil pipe 11, and one end of the first oil pipe 11 away from the first filling component is connected to the wellhead. The circulating gravel filling device 2 also includes a third packer 25 and a fourth packer 26, which are arranged in the second oil pipe 21 and communicate with the internal space of the second oil pipe 21. The second filling component 22 includes an elastic cylinder 221, a ball seat 222 and a protrusion 223, the protrusion 223 is inserted into the inside of the ball seat 222, the outer surface of the protrusion 223 and the inner surface of the ball seat 222 are screwed, the ball seat 222 is inserted into the inside of the elastic cylinder 221, the ball seat 222 and the elastic cylinder 221 are connected by shear nails 224, and the elastic cylinder 221 is provided with a third filling port 225 near the upper end of the ball seat 222. The second filling component 22 and the filter component 23 are connected via a safety joint 27, and the filter component 23 is a glass fiber reinforced plastic screen tube.
[0040] Optionally, the third packer 25 and the fourth packer 26 are both made of cortical elastic materials. The filter component 23 is a glass fiber reinforced plastic screen tube. The second plugging component 24 is a glass fiber reinforced plastic wire plug.
[0041] Specifically, the circulating gravel filling device 2 is placed at a preset depth of the oil well, and the upper end of the oil pipe is fixed at the wellhead. Optionally, the fourth packer 26 of the circulating gravel filling device 2 is set at 2 to 7 meters above the oil layer closest to the ground, and optionally, it is located at 4 meters or 5 meters above the oil layer closest to the ground. The pump pumps sand-carrying fluid with gravel into the wellbore casing 3, and the sand-carrying fluid flows from the third filling port 225 to the annular space formed by the circulating gravel filling device 2 and the wellbore casing 3 until the gravel sand-carrying fluid forms an extrusion gap between the fourth packer 26 and the wellbore casing 3, forming a third filling zone C between the oil layer and the wellbore casing 3, and completing the sand control operation.
[0042] Further, the gravel in the first filling zone A accounts for 60%-70% of the total amount of the gravel-carrying fluid, and optionally, 64% or 68%. The gravel in the second filling zone B accounts for 15%-25% of the total amount of the gravel-carrying fluid, and optionally, 15% or 20%. The gravel in the second filling zone B accounts for 5%-15% of the total amount of the gravel-carrying fluid, and optionally, 8% or 10%.
[0043] On the other hand, the present application provides a segmented gravel packing device 1, which is the segmented gravel packing device 1 mentioned in any of the above methods for performing sand control operations on oil wells.
[0044] On the other hand, the present application provides a circulating gravel filling device, which is the circulating gravel filling device 2 mentioned in any of the above methods for sand control operations on oil wells.
[0045] In addition, the term "and / or" in this article is only a description of the association relationship between the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0046] It should be understood that in the embodiment of the present invention, "B corresponding to A" means that B is associated with A, and B can be determined according to A. However, it should also be understood that determining B according to A does not mean determining B only according to A, and B can also be determined according to A and / or other information.
[0047] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A method for sand control in a petroleum well, characterized in that: The following steps are involved: placing a segmented gravel packing device (1) at a predetermined depth in a petroleum well; The segmented gravel filling equipment (1) fills the oil layer from the deepest oil layer to the shallowest oil layer in the geological layer; The segmented gravel filling device (1) squeezes the sand-carrying fluid with gravel and the sand-carrying fluid with consolidable sand respectively to sequentially fill the oil layers in each layer section until a first filling zone (A) of the sand-carrying fluid with gravel is formed at the depth of the oil layer in each layer section, and a second filling zone (B) of the sand-carrying fluid with consolidable sand having a certain strength and permeability is formed at the position corresponding to the wellbore casing in the oil layer in each layer section; After the segmented gravel filling device (1) has completely filled all the oil layers in the geological layer, the segmented gravel filling device (1) is fished out of the oil well, the circulating gravel filling device (2) is placed at a preset depth of the oil well, and the upper end of the oil pipe is fixed to the wellhead; The circulating gravel filling device (2) squeezes the sand-carrying fluid containing gravel in the wellbore casing (3) until a third filling zone (C) is formed between the oil layers in each layer and the wellbore casing (3); The segmented gravel filling device (1) comprises a first oil pipe (11), a first filling component (12) and a first plugging component (13) which are connected in sequence along the length direction of the first oil pipe (11), and an end of the first oil pipe (11) away from the first filling component (12) is connected to the wellhead; The first filling component (12) comprises a filling pipe (121) and a sliding sleeve (122); in the height direction of the filling pipe (121), the filling pipe (121) is provided with a first filling port (123) and a second filling port (124); a first packer (125) and a second packer (126) are provided between the first filling port (123) and the second filling port (124); the first packer (125) and the second packer (126) are respectively communicated with the internal space of the filling pipe (121); the sliding sleeve (122) is provided inside the filling pipe (121) and connected to the filling pipe (121) by a pin; the outer surface of the sliding sleeve (122) is in contact with the inner surface of the filling pipe (121) and is used to block at least one of the first filling port (123) and the second filling port (124); After the segmented gravel filling device (1) fills the deepest oil layer in the geological layer, a ball is released to the port of the first oil pipe (11), and the ball pushes the sliding sleeve (122) to move toward the position of the second filling port (124) until the sliding sleeve (122) blocks the second filling port (124).
2. The method for sand control of a petroleum well according to claim 1, characterized in that: When the segmented gravel filling device (1) fills the deepest oil layer in the geological layer, the position where the outer surface of the sliding sleeve (122) fits the inner surface of the filling pipe (121) is located at the first filling port (123) to block the first filling port (123).
3. The method for sand control of a petroleum well according to claim 2, characterized in that: When the segmented gravel filling device (1) fills the oil layer above the deepest oil layer in the geological layer, the position where the outer surface of the sliding sleeve (122) fits the inner surface of the filling pipe (121) is located at the second filling port (124) to block the second filling port (124).
4. The method for sand control of a petroleum well according to claim 3, characterized in that: The circulating gravel filling device (2) comprises a second oil pipe (21), a second filling component (22), a filtering component (23) and a second plugging component (24) which are connected in sequence along its length direction; one end of the second oil pipe (21) away from the second filling component (22) is connected to a wellhead.
5. The method for sand control in a petroleum well according to claim 4, characterized in that: The circulating gravel packing device (2) further comprises a third packer (25) and a fourth packer (26), wherein the third packer (25) and the fourth packer (26) are arranged on the second oil pipe (21) and communicate with the internal space of the second oil pipe (21).
6. The method for sand control in a petroleum well according to claim 5, characterized in that: The second filling component (22) comprises an elastic cylinder (221), a ball seat (222) and a protrusion (223); the protrusion (223) is inserted into the interior of the ball seat (222); the outer surface of the protrusion (223) and the inner surface of the ball seat (222) are screwed together; the ball seat (222) is inserted into the interior of the elastic cylinder (221); the ball seat (222) and the elastic cylinder (221) are connected via shear nails (224); and a third filling port (225) is provided on the elastic cylinder (221) near the upper end of the ball seat (222).
7. The method for sand control in a petroleum well according to claim 6, characterized in that: The second filling component (22) and the filtering component (23) are connected via a safety joint (27); the filtering component (23) is a glass fiber reinforced plastic screen tube.
8. A segmented gravel packing device, characterized in that: The segmented gravel filling device (1) mentioned in the method for sand control operation for oil wells as described in any one of claims 1 to 7.
Citation Information
Patent Citations
Sand-prevention well completion pipe column and method
CN108301785A
High-water-cut oil well sand prevention and precipitation method
CN112696178A
Layered sand prevention pipe column for well
CN204140034U
