A method for ecological restoration of coal mining subsidence in loess hilly areas

By dividing terraced fields in the coal mining subsidence area in the loess hilly area and setting up water storage ditches, drainage ditches and irrigation systems, combined with plant hedges to control collapse cracks, the soil erosion problem of coal mining subsidence area is solved, and the efficient utilization of water resources is achieved. Ecological restoration has improved the ecological restoration effect and disaster response capabilities.

CN116267443BActive Publication Date: 2024-11-29SHAANXI COAL & CHEM IND GRP CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310232233.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-10
Publication Date
2024-11-29
Estimated Expiration
2043-03-10

AI Technical Summary

Technical Problem

The problem of soil erosion in coal mining subsidence in the loess hilly areas has not been effectively solved, and the existing governance methods have failed to achieve efficient utilization of water resources and ecological restoration.

Method used

The method of controlling coal mining subsidence cracks is adopted by sponge-type terraces and plant hedges. By dividing terrace units in coal mining subsidence, setting up water storage ditches, drainage ditches and irrigation systems, combining planting forage and crops, sponge-type terraces are formed to control soil erosion. and improve the ecological restoration effect.

Benefits of technology

It has achieved efficient utilization of water resources, controlled soil erosion, improved the ecological restoration effect of coal mining subsidence and its ability to deal with natural disasters, and improved vegetation coverage and soil fertility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116267443B_ABST
    Figure CN116267443B_ABST
Patent Text Reader

Abstract

The present invention discloses an ecological restoration method for coal mining subsidence in loess hilly areas, comprising the following steps: 1. determining an ecological restoration plan for coal mining subsidence in loess hilly areas; 2. determining the depth and width of water storage ditches; 3. determining the height of field ridges; 4. building terraces; 5. setting up a water storage system; 6. setting up a road system; 7. setting up an irrigation system; 8. ecological management. The present invention aims at ecological restoration of subsidence areas and takes soil and water loss control as a starting point. It proposes to use sponge terraces to manage coal mining subsidence and to use plant hedges to manage coal mining collapse cracks. It constructs a new ecological restoration model for coal mining subsidence in loess hilly areas, realizes efficient use of water resources, controls soil and water loss, and improves the ecological restoration effect of subsidence areas and the ability to cope with natural disasters.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of ecological restoration of coal mining subsidence land, and specifically relates to an ecological restoration method for coal mining subsidence land in loess hilly areas. Background Art

[0002] The western loess hilly area has a low vegetation coverage rate, little and concentrated rainfall, and serious soil erosion. It has been listed as a national key supervision area and key prevention and control area for soil erosion. At the same time, the western loess hilly area is rich in coal resources and has simple geological conditions. It is one of the important coal production bases in my country. The development and construction of coalfields have promoted the development of the energy industry and regional economy. However, under the disturbance of coal mining, a series of problems have emerged, such as changes in topography and landforms, destruction of surface vegetation, fragmentation of surface landscapes, intensified soil erosion, and degradation of the ecological environment. How to protect and restore the ecological environment of the loess hilly area while developing coal resources has become an urgent problem that needs to be solved. The current governance methods are mainly simple crack filling and land reclamation, which have failed to fundamentally solve the problems of efficient utilization of water resources and soil erosion in coal mining subsidence areas. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide an ecological restoration method for coal mining subsidence in loess hilly areas in response to the deficiencies in the above-mentioned prior art. The method aims at ecological restoration of subsidence areas and takes soil and water loss control as a starting point. It proposes to use sponge-type terraces to manage coal mining subsidence areas and to use plant hedges to manage coal mining collapse cracks. A new ecological restoration model for coal mining subsidence in loess hilly areas is constructed, which realizes efficient use of water resources, controls soil and water loss, and improves the ecological restoration effect of subsidence areas and the ability to respond to natural disasters.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for ecological restoration of coal mining subsidence in loess hilly areas, characterized in that the method comprises the following steps:

[0005] Step 1: Determine the ecological restoration plan for coal mining subsidence in the loess hilly area: The coal mining subsidence is a coal mining subsidence slope. The coal mining subsidence is divided into multiple terrace units from upstream to downstream. The total width of each terrace unit is L, as follows:

[0006] Step 101: Determine the agricultural planting land coefficient of the terrace unit: According to the formula The coefficient m of agricultural planting land in the terrace unit is calculated, where R is the runoff coefficient, P is the annual rainfall in the coal mining subsidence area, and h1 is the irrigation quota selected in combination with the planting of crops and the irrigation method;

[0007] Step 102: Determine the width of the agricultural planting land in the terrace unit: Based on the original ground slope α of the coal mining subsidence area, and using the formula B = INT (41.612e-0.068α ), calculate the width B of the agricultural planting land in the terrace unit;

[0008] Step 103: Determine the total width of the terrace unit: According to the formula The total width L of the terrace unit is calculated;

[0009] Step 2: Determine the depth and width of the water storage ditch: Set a water storage ditch in the terrace unit, and set the width b of the water storage ditch to no more than 1m. According to the net surface flow generated by the terrace unit corresponding to the maximum rainfall h2 in one hour in the area where the coal mining subsidence is located within ten years, the formula is used Get the depth h of the water storage ditch;

[0010] Step 3: Determine the height of the field ridge: According to the formula The height H of the ridge in the terrace unit is calculated, where β is the side slope of the ridge, 70°≤β≤80°;

[0011] Step 4, building terraces: according to the total width L of the terrace unit, mark the position of each terrace unit on the surface of the coal mining subsidence, and build a slope section and a platform section at the marked position of each terrace unit; according to the height H and the side slope gradient β, build a field ridge between the slope section and the platform section and downstream of the platform section, wherein the width of the platform section is the sum of the width B of the agricultural planting land in the terrace unit and the width b of the water storage ditch;

[0012] Step 5, setting up a water storage system: digging a drainage ditch on each slope section, setting a water storage ditch with a width of b and a depth of h close to the field ridge downstream of each platform section, setting a drainage ditch on one side of each terrace unit, connecting the drainage ditch with the water storage ditch through the drainage ditch, and setting a filtering mechanism at the inlet end of the water storage ditch;

[0013] Step 6: Setting up a road system: setting up a field road on the other side of the terrace unit and one side of the drainage ditch, and setting up a sidewalk on the upper part of the top plate of the water storage ditch;

[0014] Step 7, setting up an irrigation system: the area on the platform section except the water storage ditch is used as an agricultural planting platform section for agricultural planting land, and a drip irrigation belt is laid on each of the agricultural planting platform sections, and the drip irrigation belt is connected to the upstream water storage ditch through a pipeline;

[0015] Step 8: Ecological management: Plant crops on each agricultural planting platform and plant forage grass on each slope;

[0016] Among them, when collapse cracks appear on the slope, the plant hedge method is used to treat the collapse cracks.

[0017] The above-mentioned ecological restoration method for coal mining subsidence in loess hilly areas is characterized in that: in step 101, the agricultural planting land coefficient of the terrace unit is equal to the ratio of the width B of the agricultural planting platform section to the total width L of the terrace unit, that is,

[0018] The water demand W1 of the crops planted on the agricultural planting platform section (2) is equal to the runoff W2 of the terrace unit, where W1 = B × h1, W2 = L × R × P, and then the agricultural planting land coefficient of the terrace unit is calculated.

[0019] The above-mentioned method for ecological restoration of coal mining subsidence in loess hilly areas is characterized in that the field ridge is an anti-deformation field ridge formed by setting a reinforced concrete assembled field ridge on the earth ridge, and the reinforced concrete assembled field ridge includes a plurality of ridge columns anchored on the earth ridge surface by support rods, and a retaining plate is arranged between two adjacent ridge columns, and the support rods and the ridge columns are perpendicular to each other.

[0020] The above-mentioned ecological restoration method for coal mining subsidence in loess hilly areas is characterized in that: a slot for mounting a retaining plate is provided on both sides of the ridge column, one end of the support rod is anchored in the ridge, and the other end of the support rod is connected to the ridge column;

[0021] A T-shaped connecting piece is respectively arranged at both ends of the support rod, and a T-shaped groove for clamping the T-shaped connecting piece is arranged on one side of the ridge column close to the surface of the ridge.

[0022] The above-mentioned method for ecological restoration of coal mining subsidence in loess hilly areas is characterized in that: the water storage ditch adopts a leak-proof prefabricated reinforced concrete structure, and the filtering mechanism includes a trash rack arranged at one end of the water storage ditch close to the drainage ditch, and a sedimentation tank and a gravel filter layer are arranged in sequence at a position close to the trash rack inside the water storage ditch from the direction close to the trash rack to the direction away from the trash rack.

[0023] The above-mentioned method for ecological restoration of coal mining subsidence in loess hilly areas is characterized in that the drainage ditch is arranged close to the downstream of the slope section, and the drainage ditch is constructed in a reverse slope horizontal step mode.

[0024] The above-mentioned method for ecological restoration of coal mining subsidence in loess hilly areas is characterized in that the field road adopts a sandy and gravel road surface, and the road surface of the field road is paved with natural sand and stone, graded crushed stone, graded gravel or gravel improved soil.

[0025] The above-mentioned method for ecological restoration of coal mining subsidence in loess hilly areas is characterized in that the drainage ditch is located between the terrace unit and the field road on one side, and the drainage ditch adopts a prefabricated U-shaped concrete drainage ditch.

[0026] Compared with the prior art, the present invention has the following advantages:

[0027] 1. The present invention forms terraces to carry out ecological restoration of coal mining subsidence land by setting up sloping sections for planting forage grass and agricultural planting platform sections for planting crops. This can effectively weaken the erosion of water, ensure that water and fertilizer are not easy to flow out of the agricultural planting platform sections, and play a role in maintaining water and soil. Therefore, while repairing the coal mining subsidence land, it can also effectively prevent soil erosion. At the same time, building terraces helps to retain the topsoil. After the terraces are built, agricultural farming measures such as deep plowing, additional application of organic fertilizers, and planting of appropriate pioneer crops are used to accelerate soil maturation and improve soil fertility.

[0028] 2. The present invention forms a sponge-type terrace by setting a water storage system and an irrigation system in each terrace unit, that is, a drainage ditch is set on the slope section, and a water storage ditch is set downstream of the agricultural planting platform section, and the drainage ditch is connected with the water storage ditch through the drainage ditch. The runoff of the slope section can be stored in the water storage ditch through the drainage ditch and the drainage ditch. At the same time, the accumulated water in the agricultural planting platform section is introduced into the drainage ditch through the field ridge ditch and then into the water storage ditch, which can effectively realize the functions of water absorption and water storage, and prevent rainwater from flooding the agricultural planting platform section and then damaging crops.

[0029] 3. The present invention uses drip irrigation belts to divert water from the water storage ditch to the roots of crops on the downstream agricultural planting platform section, which can effectively irrigate the crops on the agricultural planting platform section during drought, release and utilize the stored water, improve the ecological restoration effect of coal mining subsidence areas and the ability to respond to natural disasters, and improve the ecological benefits of the management area.

[0030] 4. The present invention treats the collapse cracks on the slope by using the plant hedge method. While treating the collapse cracks, it can also transform the local micro-topography, control soil erosion, and improve the vegetation coverage of the treatment area.

[0031] To sum up, the present invention aims at ecological restoration of subsidence areas and takes soil and water loss control as the starting point. It proposes to use sponge-type terraces to control coal mining subsidence areas. A water storage system and an irrigation system are set in each terrace unit to form a sponge-type terrace. Plant hedges are used to control coal mining collapse cracks. A new ecological restoration model for coal mining subsidence areas in loess hilly areas is constructed, which realizes efficient use of water resources, controls soil and water loss, and improves the ecological restoration effect of subsidence areas and the ability to respond to natural disasters.

[0032] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a flowchart of the method of the present invention.

[0034] Figure 2 It is a cross-sectional view of the sponge-type terrace of the present invention.

[0035] Figure 3 It is a plan view of the sponge-type terrace of the present invention.

[0036] Figure 4 It is a structural schematic diagram of the reinforced concrete assembled field ridge of the present invention.

[0037] Figure 5 The figure is a schematic diagram of the installation structure of the ridge column and the support rod on the ridge of the present invention.

[0038] Figure 6 The present invention is a schematic structural diagram of using a plant hedge method to treat collapse cracks on a slope.

[0039] Description of reference numerals:

[0040] 1—slope section; 2—agricultural planting platform section; 3—drainage ditch;

[0041] 4—field ridge; 5—water storage ditch; 6—drainage ditch;

[0042] 7—gravel filter layer; 8—sand settling tank; 9—bank column;

[0043] 10—support rod; 11—retaining board; 12—T-type connector;

[0044] 13—field road; 14—collapse crack; 15—planting ditch;

[0045] 16—Hedgerow. DETAILED DESCRIPTION

[0046] like Figures 1 to 6 A method for ecological restoration of coal mining subsidence in loess hilly areas is shown, the method comprising the following steps:

[0047] Step 1: Determine the ecological restoration plan for coal mining subsidence in the loess hilly area: The coal mining subsidence is a coal mining subsidence slope. The coal mining subsidence is divided into multiple terrace units from upstream to downstream. The total width of each terrace unit is L, as follows:

[0048] Step 101: Determine the agricultural planting land coefficient of the terrace unit: According to the formula The coefficient m of agricultural planting land in the terrace unit is calculated, where R is the runoff coefficient, P is the annual rainfall in the coal mining subsidence area, and h1 is the irrigation quota selected in combination with the planting of crops and the irrigation method;

[0049] Step 102: Determine the width of the agricultural planting land in the terrace unit: Based on the original ground slope α of the coal mining subsidence area, and using the formula B = INT (41.612e-0.068α ), calculate the width B of the agricultural planting land in the terrace unit; where INT is the rounding function, and for positive numbers, the decimal part is directly removed and rounded.

[0050] Step 103: Determine the total width of the terrace unit: According to the formula The total width L of the terrace unit is calculated;

[0051] Step 2: Determine the depth and width of the water storage ditch: Set a water storage ditch in the terrace unit, and set the width b of the water storage ditch to no more than 1m. According to the net surface flow generated by the terrace unit corresponding to the maximum rainfall h2 in one hour in the area where the coal mining subsidence is located within ten years, the formula is used Get the depth h of the water storage ditch 5;

[0052] Step 3: Determine the height of the field ridge: According to the formula The height H of the ridge in the terrace unit is calculated, where β is the side slope of the ridge, 70°≤β≤80°;

[0053] Step 4: Build terraces: Based on the total width of the terrace unit L, mark the position of each terrace unit on the surface of the coal mining subsidence, and build slope section 1 and platform section at the marked position of each terrace unit. Figure 3 As shown; a field ridge 4 is built between the slope section 1 and the platform section and downstream of the platform section according to the height H and the side slope gradient β, wherein the width of the platform section is the sum of the width B of the agricultural planting land in the terrace unit and the width b of the water storage ditch;

[0054] Step 5, setting up a water storage system: digging a drainage ditch 3 on each slope section 1, setting a water storage ditch 5 with a width b and a depth h on each platform section close to the field ridge 4 downstream thereof, setting a drainage ditch 6 on one side of each terrace unit, connecting the drainage ditch 3 with the water storage ditch 5 through the drainage ditch 6, and setting a filtering mechanism at the inlet end of the water storage ditch 5;

[0055] Step 6: Setting up a road system: setting up a field road 13 on the other side of the terrace unit and on one side of the drainage ditch 6, and setting up a sidewalk on the upper part of the top plate of the water storage ditch 5;

[0056] Step 7, setting up an irrigation system: the area on the platform section except the water storage ditch 5 is used as the agricultural planting platform section 2 for agricultural planting, and a drip irrigation belt is laid on each of the agricultural planting platform sections 2, and the drip irrigation belt is connected to the upstream water storage ditch 5 through a pipeline;

[0057] Step 8: Ecological management: Plant crops on each agricultural planting platform section 2 and plant forage grass on each slope section 1;

[0058] Among them, when collapse cracks appear in slope section 1, the plant hedge method is used to treat the collapse cracks.

[0059] When constructing terraces, when collapse cracks appear in the agricultural planting platform section 2, the collapse cracks are filled and leveled synchronously when the agricultural planting platform section 2 is being constructed.

[0060] In actual use, the ecological restoration of coal mining subsidence is carried out by forming terraces by setting up a slope section 1 for planting forage and an agricultural planting platform section 2 for planting crops. After the terraces are built, the slope of the field is reduced, the erosion of water is weakened, and the ridge is slightly higher than the terrace surface, which can ensure that water and fertilizer are not easy to flow out of the field, thereby playing a role in maintaining water and soil. Therefore, while repairing the coal mining subsidence, it can also effectively prevent soil erosion; the water storage, soil conservation and yield increase effects of the terraces are very significant. The terraces are strip-shaped stepped or wavy sections built along the contour lines on the hilly slopes. Terraces are an effective measure to control soil erosion on sloping farmland; terraces have good ventilation and light conditions, which are conducive to crop growth and the accumulation of nutrients. According to the different slopes of the fields, there are horizontal terraces, sloping terraces, compound terraces, etc. The width of the terraces is determined by the slope of the ground, the thickness of the soil layer, the farming method, the amount of labor and economic conditions, and is planned in a unified manner with the irrigation and drainage system and transportation roads; the topsoil can be retained by building terraces. After the terraces are built, agricultural farming measures such as deep plowing, increased application of organic fertilizers, and planting of appropriate pioneer crops can be used to accelerate soil maturation and improve soil fertility.

[0061] It should be noted that, by setting a drainage ditch 3 on the slope section 1, setting a water storage ditch 5 downstream of the agricultural planting platform section 2, and connecting the drainage ditch 3 with the water storage ditch 5 through the drainage ditch 6, the runoff of the slope section 1 can be stored in the water storage ditch 5 through the drainage ditch 3 and the drainage ditch 6, and filtered through the filtering mechanism. At the same time, the accumulated water in the agricultural planting platform section 2 is introduced into the drainage ditch 6 through the field ridges and then into the water storage ditch 5, which can effectively realize the functions of water absorption and water storage, and prevent rainwater from flooding the agricultural planting platform section 2 and damaging crops.

[0062] It should be noted that by draining the water in the water storage ditch 5 to the roots of the crops on the downstream agricultural planting platform section 2 through the drip irrigation belt, the crops on the agricultural planting platform section 2 can be effectively irrigated during droughts, so that the stored water can be "released" and utilized, thereby improving the ecological restoration effect of coal mining subsidence areas and the ability to respond to natural disasters, and improving the ecological benefits of the management area.

[0063] During the specific implementation, the slope section 1 adopts the original ground of the coal mining subsidence area.

[0064] It should be noted that the design of the water storage ditch 5 needs to be able to bear the maximum rainfall in one hour in the area once every 10 years.

[0065] It should be noted that the sum of the width of the agricultural planting platform section 2, the width of the water storage ditch 5, the width of the slope section 1 and the width of the two ridges 4 is equal to the total width of the terrace unit. The width of the ridge 4 can be calculated based on the height of the ridge 4 and the slope of the side slope.

[0066] In specific implementation, before building the terraces, according to the determined width B of the agricultural planting land in the terrace unit, the total width L of the terrace unit, the width b and depth h of the water storage ditch 5, the height H of the ridge 4 and the slope gradient β of the side slope, the positions of the slope section 1, the drainage ditch 3, the agricultural planting platform section 2, the water storage ditch 5, the drainage ditch 6, the two ridges 4 and the field road 13 are marked on the original soil surface of the terrace unit.

[0067] It should be noted that the top of the field ridge 4 downstream of the slope section 1 is connected to the bottom of the slope section 1. According to the height of the field ridge 4, the original slope surface at the marked positions of the agricultural planting platform section 2 and the water storage ditch 5 is excavated and filled, and the agricultural planting platform section 2 and the water storage ditch 5 are constructed so that the top positions of the agricultural planting platform section 2 and the water storage ditch 5 are on the same horizontal plane. At the same time, a ridge is formed downstream of the slope section 1 and downstream of the water storage ditch 5, and the bottom of the ridge downstream of the water storage ditch 5 is located on the original slope surface; a reinforced concrete assembled field ridge is set on the two ridges to form a field ridge 4 with anti-deformation ability;

[0068] The top of the field ridge 4 downstream of the slope section 1 is connected to the bottom of the slope section 1. The height and side slope of the field ridge 4 are known. A field ridge 4 is excavated downward from the downstream side of the slope section 1. After the field ridge 4 is built, the bottom of the field ridge 4 intersects with the top of the agricultural planting platform section 2. Therefore, the agricultural planting platform section 2 is leveled starting from the bottom of the field ridge 4 downstream of the slope section 1.

[0069] In actual use, a water storage system and an irrigation system are set up in each terrace unit to form a sponge-type terrace. The concept of sponge-type terrace is derived from the sponge-type city, that is, guided by the relevant concepts of sponge and based on the carrying capacity of water resources, the land use structure of coal mining subsidence is reasonably configured, and the terrace structure is scientifically designed. The terrace is built to have good "elasticity" and can absorb, store, infiltrate and purify water when it rains. The stored water can be "released" and utilized when needed, thereby improving the ecological restoration effect of coal mining subsidence and the ability to respond to natural disasters, and improving the ecological benefits of the governance area.

[0070] During specific implementation, the field road 13 is arranged perpendicular to the contour lines, the sidewalk is arranged parallel to the contour lines, the top of the water storage ditch 5 is arranged at the same height as the surface of the agricultural planting platform section 2 and both are horizontal, a cover plate is set on the top of the water storage ditch 5, and the sidewalk is modified using the cover plate on the top of the water storage ditch 5.

[0071] It should be noted that after rainfall, the runoff from the slope section 1 enters the drainage ditch 6 through the drainage ditch 3, and is then filtered through the trash rack, the sedimentation tank 8 and the gravel filter layer 7 before being stored in the water storage ditch 5; the accumulated water in the agricultural planting platform section 2 is introduced into the drainage ditch 6 through the field ridges, and then merged into the water storage ditch 5.

[0072] It should be noted that, during drought, the rainwater stored in the water storage ditch 5 is transported to the roots of crops in the downstream terraced field units by means of drip irrigation belts for local irrigation.

[0073] During specific implementation, the forage planted on the slope section 1 depends on rainfall to survive, and the crops planted on the agricultural planting platform section 2 depend on rainfall and rainwater stored in the water storage ditch 5 for water-saving irrigation to maintain normal production.

[0074] During specific implementation, the drip irrigation belt is laid on the surface of the agricultural planting platform section 2. The drip irrigation belt is connected to the upstream water storage ditch 5 through a water pipe, so as to facilitate the transportation of water in the upstream water storage ditch 5 to the downstream agricultural planting platform section 2. The drip irrigation belt is made of polyethylene plastic pipe, and the water is sent to the roots of crops through a water outlet or dripper with a diameter of about 16 mm for local irrigation, and the water is evenly and slowly dripped into the soil near the roots of the crops.

[0075] It should be noted that for the loess hilly coal mining subsidence area with serious soil erosion, plant hedges can not only disperse surface runoff, reduce flow velocity, increase infiltration, intercept sediment, etc., but also beautify the environment. The ecological and economic benefits are significant.

[0076] like Figure 6 As shown in the figure, when the plant hedge method is used to treat the collapse cracks in the slope section 1, the specific process is as follows:

[0077] a. Land preparation: The top of the collapsed crack 14 of the slope section 1 is rectified into a planting ditch 15 with a width of 30 cm to 50 cm and a depth of 30 cm to 60 cm;

[0078] b. Planting of hedges: Plant hedges 16 are planted in the planting trenches 15 at a spacing of 30 cm to 50 cm. The roots of the hedges 16 extend deep into the collapsed cracks 14 at the bottom of the planting trenches 15. The hedges 16 are made of Amorpha fruticosa with a soil ball and a ground diameter of more than 1 cm.

[0079] Among them, before planting Amorpha fruticosa, root pruning and mud application are carried out, and after planting Amorpha fruticosa, water and fertilizer management, seedling protection and disease and pest control are carried out.

[0080] It should be noted that by using the plant hedge method to treat the collapsed cracks 14 in the slope section 1, while treating the collapsed cracks, it is also possible to transform the local micro-topography, control soil erosion, and improve the vegetation coverage of the treated area.

[0081] In this embodiment, in step 101, the agricultural planting land coefficient of the terrace unit is equal to the ratio of the width B of the agricultural planting platform section 2 to the total width L of the terrace unit, that is,

[0082] The water demand W1 of the crops planted on the agricultural planting platform section 2 is equal to the runoff W2 of the terrace unit, where W1 = B × h1, W2 = L × R × P, and then the agricultural planting land coefficient of the terrace unit is calculated.

[0083] like Figure 4 and Figure 5 As shown, in this embodiment, the field ridge 4 is an anti-deformation field ridge formed by setting a reinforced concrete assembled field ridge on the earth ridge. The reinforced concrete assembled field ridge includes a plurality of ridge columns 9 anchored on the earth ridge surface by support rods 10, and a retaining plate 11 is arranged between two adjacent ridge columns 9, and the support rods 10 and the ridge columns 9 are perpendicular to each other.

[0084] In actual use, since it is located in a coal mining subsidence area, there is a certain amount of residual deformation. Traditional earthen ridges and terraces have weak deformation resistance and are easily damaged. Therefore, anti-deformation reinforced concrete prefabricated components are used to construct ridges to resist deformation, while reducing the area occupied by ridges and increasing the area of ​​arable land.

[0085] During the specific implementation, the sill column 9 adopts a prefabricated reinforced concrete structure of 30cm*50cm, and the spacing between the sill columns 9 is 1.5m; the retaining plate 11 is generally not less than 15cm thick, and adopts a prefabricated reinforced concrete plate with a length of 1.3m and a width of 30cm; the support rod 10 adopts a prefabricated reinforced concrete structure with a cross-section of 20cm*20cm.

[0086] It should be noted that reinforced concrete prefabricated field ridges are prefabricated reinforced concrete components, which are produced through intensive factory processing, making them easy to transport, install, repair and replace, thereby reducing production costs.

[0087] In this embodiment, a slot for mounting the earth retaining plate 11 is provided on both sides of the ridge column 9, one end of the support rod 10 is anchored in the earth ridge, and the other end of the support rod 10 is connected to the ridge column 9;

[0088] A T-shaped connector 12 is respectively disposed at both ends of the support rod 10 , and a T-shaped slot for the T-shaped connector 12 to be clamped is disposed on one side of the ridge column 9 that is close to the surface of the ridge.

[0089] In this embodiment, the water storage ditch 5 adopts a leak-proof prefabricated reinforced concrete structure, and the filtering mechanism includes a trash rack arranged at one end of the water storage ditch 5 close to the drainage ditch 6, and a sedimentation tank 8 and a gravel filter layer 7 arranged in sequence at a position close to the trash rack inside the water storage ditch 5 from the direction close to the trash rack to the direction away from the trash rack.

[0090] In actual use, the laying length of the gravel filter layer 7 in the water storage ditch 5 is 2m, and the trash rack is woven with lead wire into a 0.01m square grid and is laid at the entrance of the water storage ditch 5.

[0091] In this embodiment, the drainage ditch 3 is arranged close to the downstream of the slope section 1, and the drainage ditch 3 is constructed in a reverse slope horizontal step mode.

[0092] In actual use, the drainage ditch 3 is an earth structure with an upper opening width of 60 cm.

[0093] In this embodiment, the field road 13 adopts a sand and gravel road surface, and the road surface of the field road 13 is paved with natural sand and stone, graded crushed stone, graded gravel or gravel improved soil.

[0094] In actual use, the width of the field road 13 is 3m, and the pavement thickness is 20cm.

[0095] In this embodiment, the drainage ditch 6 is located between the terrace unit and the field road 13 on one side, and the drainage ditch 6 is a prefabricated U-shaped concrete drainage ditch.

[0096] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent structural change made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A method for ecological restoration of coal mining subsidence in loess hilly areas, characterized in that: The method comprises the following steps: Step 1: Determine the ecological restoration plan for coal mining subsidence in the loess hilly area: The coal mining subsidence is a coal mining subsidence slope. The coal mining subsidence is divided into multiple terrace units from upstream to downstream. The total width of each terrace unit is L, as follows: Step 101: Determine the agricultural planting land coefficient of the terrace unit: According to the formula The coefficient m of agricultural planting land in the terrace unit is calculated, where R is the runoff coefficient, P is the annual rainfall in the coal mining subsidence area, and h1 is the irrigation quota selected in combination with the planting of crops and the irrigation method; Step 102: Determine the width of the agricultural planting land in the terrace unit: Based on the original ground slope α of the coal mining subsidence area, and using the formula B = INT (41.612e -0.068α ), calculate the width B of the agricultural planting land in the terrace unit; Step 103: Determine the total width of the terrace unit: According to the formula The total width L of the terrace unit is calculated; Step 2: Determine the depth and width of the water storage ditch: Set a water storage ditch in the terrace unit, and set the width b of the water storage ditch to no more than 1m. According to the net surface flow generated by the terrace unit corresponding to the maximum rainfall h2 in one hour in the area where the coal mining subsidence is located within ten years, the formula is used Obtain the depth h of the water storage ditch (5); Step 3: Determine the height of the field ridge: According to the formula The height H of the ridge in the terrace unit is calculated, where β is the side slope of the ridge, 70°≤β≤80°; Step 4, building terraces: according to the total width L of the terrace unit, the position of each terrace unit is marked on the surface of the coal mining subsidence, and a slope section (1) and a platform section are built at the marked position of each terrace unit; according to the height H and the side slope gradient β, a field ridge (4) is built between the slope section (1) and the platform section and downstream of the platform section, wherein the width of the platform section is the sum of the width B of the agricultural planting land in the terrace unit and the width b of the water storage ditch; Step 5, setting up a water storage system: digging a drainage ditch (3) on each slope section (1), setting a water storage ditch (5) with a width b and a depth h close to the field ridge (4) downstream of each platform section, setting a drainage ditch (6) on one side of each terrace unit, connecting the drainage ditch (3) with the water storage ditch (5) through the drainage ditch (6), and setting a filtering mechanism at the inlet end of the water storage ditch (5); Step 6: Setting up a road system: setting up a field road (13) on the other side of the terrace unit and on one side of the drainage ditch (6), and setting up a sidewalk on the upper part of the top plate of the water storage ditch (5); Step 7, setting up an irrigation system: the area on the platform section except the water storage ditch (5) is used as an agricultural planting platform section (2) for agricultural planting, and a drip irrigation belt is laid on each of the agricultural planting platform sections (2), and the drip irrigation belt is connected to the upstream water storage ditch (5) through a pipeline; Step 8: Ecological management: Plant crops on each agricultural planting platform section (2) and plant forage grass on each slope section (1); When collapse cracks appear in the slope section (1), the collapse cracks are treated by using a plant hedge method; When using the plant hedge method to treat the collapse cracks in the slope section (1), the specific process is as follows: a. Land preparation: the top of the collapsed crack (14) of the slope section (1) is rectified into a planting ditch (15) with a width of 30 cm to 50 cm and a depth of 30 cm to 60 cm; b. Planting of hedges: Plant hedges (16) are planted in the planting trenches (15) at a spacing of 30 cm to 50 cm. The roots of the hedges (16) extend deep into the collapsed cracks (14) at the bottom of the planting trenches (15). The hedges (16) are made of Amorpha fruticosa with a soil ball and a ground diameter of more than 1 cm.

2. The ecological restoration method for coal mining subsidence in loess hilly areas according to claim 1, characterized in that: In step 101, the agricultural planting land coefficient of the terrace unit is equal to the ratio of the width B of the agricultural planting platform section (2) to the total width L of the terrace unit, that is, The water demand W1 of the crops planted on the agricultural planting platform section (2) is equal to the runoff W2 of the terrace unit, where W1 = B × h1, W2 = L × R × P, and then the agricultural planting land coefficient of the terrace unit is calculated.

3. The ecological restoration method for coal mining subsidence in loess hilly areas according to claim 1, characterized in that: The ridge (4) is an anti-deformation ridge formed by arranging a reinforced concrete assembled ridge on an earthen ridge. The reinforced concrete assembled ridge comprises a plurality of ridge columns (9) anchored on the surface of the earthen ridge by support rods (10). A retaining plate (11) is arranged between two adjacent ridge columns (9). The support rods (10) and the ridge columns (9) are perpendicular to each other.

4. A method for ecological restoration of coal mining subsidence in loess hilly areas according to claim 3, characterized in that: A slot for mounting a retaining plate (11) is respectively provided on both sides of the ridge column (9); one end of the support rod (10) is anchored in the ridge, and the other end of the support rod (10) is connected to the ridge column (9); A T-shaped connecting piece (12) is respectively provided at both ends of the support rod (10), and a T-shaped slot for clamping the T-shaped connecting piece (12) is provided on one side of the ridge column (9) that is in close contact with the surface of the ridge.

5. The ecological restoration method for coal mining subsidence in loess hilly areas according to claim 1, characterized in that: The water storage ditch (5) adopts a leakproof prefabricated reinforced concrete structure, and the filtering mechanism comprises a trash rack arranged at one end of the water storage ditch (5) close to the drainage ditch (6), and a sedimentation tank (8) and a crushed stone filtering layer (7) arranged in sequence at a position close to the trash rack inside the water storage ditch (5) from the direction close to the trash rack to the direction away from the trash rack.

6. The ecological restoration method for coal mining subsidence in loess hilly areas according to claim 1, characterized in that: The drainage ditch (3) is arranged close to the downstream of the slope section (1), and the drainage ditch (3) is constructed in a reverse slope horizontal step mode.

7. The ecological restoration method for coal mining subsidence in loess hilly areas according to claim 1, characterized in that: The field road (13) is paved with sand and stone, and the road surface of the field road (13) is paved with natural sand and stone, graded crushed stone, graded gravel or gravel-improved soil.

8. The ecological restoration method for coal mining subsidence in loess hilly areas according to claim 1, characterized in that: The drainage ditch (6) is located between the terrace unit and a field road (13) on one side, and the drainage ditch (6) is a prefabricated U-shaped concrete drainage ditch.

Citation Information

Patent Citations

  • Method for treating coal mining collapse wide cracks in loess hilly area

    CN110889163A

  • Coal mining collapse crack treatment method based on partition slope terrace mode

    CN111837500A