A semiconductor processing technology control method
Through real-time data collection and analysis, remote monitoring and manual adjustment, combined with multi-process models and modular design, the problems of process deviation and process variation in semiconductor processing are solved, and processing efficiency and production quality are improved.
Patent Information
- Application Number
- CN202410072677.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-18
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-01-18
AI Technical Summary
Existing semiconductor processing process control methods cannot effectively avoid process deviation and process variation, resulting in reduced efficiency.
Real-time data collection, analysis and preprocessing are used to generate and adjust process parameters, and manual adjustments are made through remote monitoring and human-computer interaction interfaces. Multi-process models and modular designs are established, combined with employee training, to improve process stability and adaptability.
It effectively avoids process deviation and process variation, improves the qualification rate and efficiency of semiconductor processing, and enhances production quality and system adaptability.
Smart Images

Figure CN118133054B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of semiconductor processing technology, and more specifically, to a semiconductor processing technology control method. Background Art
[0002] Semiconductor processing technology refers to a technology for processing semiconductor materials. Semiconductor materials are a type of material between conductors and insulators. Their conductivity is not as good as that of metal materials, but they can realize the conductive behavior of electrons under certain conditions. Semiconductor materials are widely used in electronic components, integrated circuits, optoelectronic devices and other fields.
[0003] Moreover, the current semiconductor processing technology control method adopts an adaptive control system to control the semiconductor processing process. Although this increases the automation of semiconductor processing, the control system cannot ensure that the parameters adjusted each time are suitable for the semiconductor processing process, which will cause process deviation and process variation problems, thereby reducing the efficiency of semiconductor processing. Summary of the invention
[0004] The object of the present invention is to provide a semiconductor processing technology control method to solve the problems raised in the above background technology.
[0005] A semiconductor processing technology control method, the semiconductor processing technology control method comprising the following steps;
[0006] S1. Data collection: First, use sensors and monitoring equipment to collect key parameters in the semiconductor production process in real time, and then pre-process the collected data;
[0007] S2. Data analysis: After the collected data has been preprocessed, the processed data is analyzed to identify potential process deviations and process variations.
[0008] S3. Generate process parameters: After the data is analyzed, the adaptive control system will make real-time decisions based on the results of real-time data analysis and generate process parameters that need to be adjusted;
[0009] S4, Remote Monitoring: After the process parameters that need to be adjusted are generated, the adjusted process parameters are transmitted to the process node, and then the remote monitoring system is used to monitor the temperature and humidity in the semiconductor production process;
[0010] S5. Manual adjustment: Before the remote monitoring system monitors the temperature and humidity in the semiconductor production process in real time, it is necessary to set the temperature threshold range and humidity threshold range. When the temperature exceeds the set temperature threshold range during the monitoring process, the data collected by the sensor and monitoring equipment in real time will be fed back to the operator and engineer, and then the engineer will manually adjust the process parameters in the human-computer interaction interface;
[0011] S6, process node: When the current semiconductor process needs to introduce another semiconductor process, it is necessary to establish a multi-process model, and then divide the process control system into independent functional modules, and let each module be responsible for different tasks, and then let engineers use the human-machine interface to manually intervene in the system;
[0012] S7. Employee training: Provide training for operators and cultivate their problem identification and problem solving abilities.
[0013] Preferably, the S1 further comprises the following steps:
[0014] S1-1, data collection: by connecting sensors and monitoring equipment to data collection equipment, and the data collection equipment is a data collection server, and then configuring a real-time data collection system, and data collection includes setting the collection frequency, sampling time interval and data transmission protocol parameters, at this time, the key parameters of the semiconductor production process are collected in real time through sensors and monitoring equipment, and the key parameters include temperature, pressure, flow and humidity;
[0015] S1-2. Data processing: Check the data set of the collected data, and process the missing values, outliers and error values in the data. Then standardize or normalize the checked data to eliminate the dimensional influence between different features. This can ensure that the influence of different features on the model is equal. Then perform feature extraction on the processed data, and review the data after processing to ensure the correctness of the processing steps and verify the effect of data preprocessing to ensure that the preprocessed data set is suitable for modeling.
[0016] Preferably, the S2 further comprises the following steps:
[0017] S2-1, Data Analysis: After the data has been processed, the processed data is analyzed and an accurate representation of the current system status is obtained;
[0018] S2-2, System Identification: After the processed data has been subjected to data analysis, an in-depth quantitative analysis is conducted on the analyzed data, and the quantitative analysis uses statistical methods to analyze whether the data has potential process deviations and process variation problems. If there are problems, data mining technology is used to conduct a systematic root cause analysis and find out the root problems that cause the variation;
[0019] Steps of statistical method:
[0020] 1.ANOVA analysis:
[0021] Used to compare whether there are significant differences between multiple sample means;
[0022] Formula: F = MS between / MS within
[0023] Among them, MS between is the between-group mean square, MS within is the within-group mean square;
[0024] 2. Linear Regression:
[0025] Used to establish a linear relationship between two variables;
[0026] Formula: Y=β o +β1X+ε
[0027] Among them, Y is the dependent variable, X is the independent variable, and β o and β1 are regression coefficients, and ε is the error term;
[0028] Specific steps of data mining technology:
[0029] 1. Clustering algorithm (K-means clustering):
[0030] Divide data into groups with similar characteristics;
[0031] The goal of K-means clustering is to minimize the within-cluster sum of squares;
[0032] Formula: J = ∑ K i=1 ∑ ni j=1 ,=1||xj-μi|| 2
[0033] Where J is the intra-cluster sum of squares, k is the number of clusters, ni is the number of data points in the i-th cluster, and μi is the center point of the i-th cluster;
[0034] 2. Regression analysis:
[0035] Used to establish relationships between variables and make predictions;
[0036] The formula for linear regression is: y = β o +β1x1+β2x2+...+β n x n +ε
[0037] Among them, y is the dependent variable, x1,x2,...,x nis the independent variable, β o ,β1,...,β n is the regression coefficient, ε is the error term;
[0038] 3. Support Vector Machine:
[0039] Used for classification and regression, by finding the optimal hyperplane to separate different classes;
[0040] The decision function of the SVM classifier is: f(x) = sign(∑ n i=1 a i Y i K(x,x i )+b)
[0041] 4. Neural Networks:
[0042] Used to simulate the connections between neurons in the human brain and perform complex pattern recognition;
[0043] Forward propagation of neural network: zj = ∑ n i=1 W ji x i +b j a j =σ(z j )
[0044] Among them, z j is the weighted input of the neuron, a j is the output of the activation function, W ji is the connection weight, x i is the input, b j is the bias and σ is the activation function.
[0045] Preferably, the S2 further comprises the following steps:
[0046] S2-3. Problem solving: When potential process drift and process variation problems are identified in the data, the process stability can be improved and the process drift and process variation problems can be solved by optimizing process parameters and adjusting equipment settings.
[0047] Preferably, the S3 further comprises the following steps:
[0048] S3-1. Process parameters: When the identified potential problems are solved, an adaptive controller is designed to generate the process parameters that need to be adjusted based on the real-time system status and performance feedback.
[0049] Preferably, the S4 further comprises the following steps:
[0050] S4-1, Real-time monitoring: When the process parameters that need to be adjusted are generated, the parameters that need to be adjusted are transmitted to the process nodes in the process, and then the key parameters in the semiconductor production process are monitored in real time using the remote monitoring system;
[0051] S4-2. Alarm mechanism: Before the remote monitoring system performs monitoring operations, it is necessary to set the temperature threshold range and the humidity threshold range. During the monitoring process, if the remote monitoring system detects that the temperature and humidity of the semiconductor during the production process are not within the set temperature threshold range and humidity threshold range, an alarm will be triggered.
[0052] Preferably, the S5 further comprises the following steps:
[0053] S5-1. Feedback data: When the temperature and humidity of the semiconductor during the production process are not within the set temperature threshold range and humidity threshold range, an alarm will be triggered. When the alarm sounds, the data collected by the sensors and monitoring equipment in real time will be fed back to the operators and engineers;
[0054] S5-2. Manual intervention: After receiving the feedback data, the engineer performs manual intervention operations in the human-computer interaction interface, adjusts the process parameters according to the data provided by the sensors and monitoring equipment, and then transmits the manually adjusted parameters to the process nodes.
[0055] Preferably, the S6 further comprises the following steps:
[0056] S6-1. Establishment of multi-process model: When a semiconductor process needs to introduce another semiconductor process, a multi-process model needs to be established, and then an online learning system is introduced to enable the process control system to continuously learn and adapt during operation. Online learning can automatically adjust control parameters by monitoring actual process performance to optimize system performance.
[0057] S6-2. Modular design: The process control system adopts modular design and is divided into independent functional modules. Each module is responsible for different tasks, such as temperature control and pressure regulation. This makes the system easier to adapt to new process nodes. Only relevant modules need to be replaced or adjusted, and the control system can receive data formats generated by different process nodes.
[0058] Preferably, the S6 further comprises the following steps:
[0059] S6-3. Manual intervention: When adding another semiconductor process, parameter adjustments are required. At this time, through the human-computer interaction interface, engineers can manually intervene on the interface and adjust the process node parameters. Then, the system performance and adaptability of the new process node are regularly evaluated. Such evaluations can help discover potential problems in the system and make timely corrections.
[0060] Preferably, the S7 further comprises the following steps:
[0061] S7-1. Training implementation: Carry out training according to the training plan, and impart knowledge and skills to employees through theoretical teaching, practical operation and case analysis, and then provide actual cases to allow employees to combine theoretical knowledge with actual work scenarios;
[0062] S7-2, Training evaluation: After the operators have received training, conduct a training effectiveness evaluation to ensure that the training has achieved the expected goals. Then collect employee feedback and understand the quality and practicality of the training. Provide post-training support, such as providing relevant documents, online resources, professional guidance, continuously track employee performance, identify and solve existing problems, and finally regularly evaluate employee training needs and conduct targeted retraining and advanced training.
[0063] Compared with the prior art, the advantages of the present invention are:
[0064] (1) In the present invention, the parameters to be adjusted are transmitted to the process nodes in the process, and then the key parameters in the semiconductor production process are monitored in real time by using a remote monitoring system. When it is monitored that the temperature and humidity of the semiconductor in the production process are not within the set temperature threshold range or humidity threshold range, an alarm will be triggered, so that the real-time collected data is fed back to the operator and engineer, and the engineer is allowed to perform manual intervention operations in the human-computer interaction interface. In this way, when the parameters adjusted by the system do not conform to the semiconductor processing process, manual intervention can be performed in time, thereby avoiding the problems of process deviation and process variation, and further improving the pass rate in the semiconductor processing process and improving the processing efficiency of semiconductors.
[0065] (2) In the present invention, by establishing a multi-process model, the semiconductor processing can be upgraded and other semiconductor processing processes can be added during the use of the semiconductor processing technology. Then, the process control system adopts a modular design and divides the process control system into independent functional modules. Each module is responsible for different tasks, which makes the system easier to adapt to new process nodes. Finally, by allowing engineers to manually intervene on the interface, engineers and the system can play a synergistic role, thereby improving the processing efficiency of semiconductors and further improving the production quality of semiconductors.
[0066] (3) In the present invention, knowledge and skills are imparted to employees through theoretical teaching, practical operation and case analysis. Actual cases are then provided to allow employees to combine theoretical knowledge with actual work scenarios. Feedback from employees is then collected to understand the quality and practicality of the training. Post-training support is then provided, and employee performance is continuously tracked to identify and resolve existing problems. Finally, employee training needs are regularly assessed, and targeted retraining and advanced training are conducted. This allows operators to quickly understand the system and use the operating system quickly, and also improves the work efficiency of semiconductor processing to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0067] Figure 1 It is a schematic diagram of the overall process of the present invention. DETAILED DESCRIPTION
[0068] Example: See Figure 1 , A semiconductor processing technology control method, a semiconductor processing technology control method comprises the following steps;
[0069] S1. Data collection: First, use sensors and monitoring equipment to collect key parameters in the semiconductor production process in real time, and then pre-process the collected data;
[0070] S2. Data analysis: After the collected data has been preprocessed, the processed data is analyzed to identify potential process deviations and process variations.
[0071] S3. Generate process parameters: After the data is analyzed, the adaptive control system will make real-time decisions based on the results of real-time data analysis and generate process parameters that need to be adjusted;
[0072] S4, Remote Monitoring: After the process parameters that need to be adjusted are generated, the adjusted process parameters are transmitted to the process node, and then the remote monitoring system is used to monitor the temperature and humidity in the semiconductor production process;
[0073] S5. Manual adjustment: Before the remote monitoring system monitors the temperature and humidity in the semiconductor production process in real time, it is necessary to set the temperature threshold range and humidity threshold range. When the temperature exceeds the set temperature threshold range during the monitoring process, the data collected by the sensor and monitoring equipment in real time will be fed back to the operator and engineer, and then the engineer will manually adjust the process parameters in the human-computer interaction interface;
[0074] S6, process node: When the current semiconductor process needs to introduce another semiconductor process, it is necessary to establish a multi-process model, and then divide the process control system into independent functional modules, and let each module be responsible for different tasks, and then let engineers use the human-machine interface to manually intervene in the system;
[0075] S7. Employee training: Provide training for operators and cultivate their problem identification and problem solving abilities.
[0076] S1 also includes the following steps:
[0077] S1-1, data collection: by connecting sensors and monitoring equipment to data collection equipment, and the data collection equipment is a data collection server, and then configuring a real-time data collection system, and data collection includes setting the collection frequency, sampling time interval and data transmission protocol parameters, at this time, the key parameters of the semiconductor production process are collected in real time through sensors and monitoring equipment, and the key parameters include temperature, pressure, flow and humidity;
[0078] S1-2. Data processing: Check the data set of the collected data, and process the missing values, outliers and error values in the data. Then standardize or normalize the checked data to eliminate the dimensional influence between different features. This can ensure that the influence of different features on the model is equal. Then perform feature extraction on the processed data, and review the data after processing to ensure the correctness of the processing steps and verify the effect of data preprocessing to ensure that the preprocessed data set is suitable for modeling.
[0079] S2 also includes the following steps:
[0080] S2-1, Data Analysis: After the data has been processed, the processed data is analyzed and an accurate representation of the current system status is obtained;
[0081] S2-2. System Identification: After the processed data has been analyzed, an in-depth quantitative analysis is conducted on the analyzed data. The quantitative analysis uses statistical methods to analyze whether there are potential process deviations and process variation problems in the data. If there are problems, data mining technology is used to conduct a systematic root cause analysis and find out the root problems that cause the variation.
[0082] S2 also includes the following steps:
[0083] S2-3. Problem solving: When potential process drift and process variation problems are identified in the data, the process stability can be improved and the process drift and process variation problems can be solved by optimizing process parameters and adjusting equipment settings.
[0084] S3 also includes the following steps:
[0085] S3-1. Process parameters: When the identified potential problems are solved, an adaptive controller is designed to generate the process parameters that need to be adjusted based on the real-time system status and performance feedback.
[0086] S4 also includes the following steps:
[0087] S4-1, Real-time monitoring: When the process parameters that need to be adjusted are generated, the parameters that need to be adjusted are transmitted to the process nodes in the process, and then the key parameters in the semiconductor production process are monitored in real time using the remote monitoring system;
[0088] S4-2. Alarm mechanism: Before the remote monitoring system performs monitoring operations, it is necessary to set the temperature threshold range and the humidity threshold range. During the monitoring process, if the remote monitoring system detects that the temperature and humidity of the semiconductor during the production process are not within the set temperature threshold range and humidity threshold range, an alarm will be triggered.
[0089] S5 also includes the following steps:
[0090] S5-1. Feedback data: When the temperature and humidity of the semiconductor during the production process are not within the set temperature threshold range and humidity threshold range, an alarm will be triggered. When the alarm sounds, the data collected by the sensors and monitoring equipment in real time will be fed back to the operators and engineers;
[0091] S5-2. Manual intervention: After receiving the feedback data, the engineer performs manual intervention operations in the human-computer interaction interface, adjusts the process parameters according to the data provided by the sensors and monitoring equipment, and then transmits the manually adjusted parameters to the process nodes.
[0092] Specifically, the parameters that need to be adjusted are transmitted to the process nodes in the process, and then the remote monitoring system is used to monitor the key parameters in the semiconductor production process in real time. During the monitoring process, if the remote monitoring system detects that the temperature and humidity of the semiconductor in the production process are not within the set temperature threshold range and humidity threshold range, an alarm will be triggered. When the alarm sounds, the data collected by the sensors and monitoring equipment in real time will be fed back to the operators and engineers, and the engineers will be allowed to perform manual intervention operations in the human-computer interaction interface, and adjust the process parameters according to the data provided by the sensors and monitoring equipment. In this way, if the parameters adjusted by the system do not conform to the semiconductor processing process, manual intervention can be carried out in time, thereby improving the pass rate in the semiconductor processing process, and then improving the processing efficiency of semiconductors.
[0093] S6 further includes the following steps:
[0094] S6-1. Establishment of multi-process model: When a semiconductor process needs to introduce another semiconductor process, a multi-process model needs to be established, and then an online learning system is introduced to enable the process control system to continuously learn and adapt during operation. Online learning can automatically adjust control parameters by monitoring actual process performance to optimize system performance.
[0095] S6-2. Modular design: The process control system adopts modular design and is divided into independent functional modules. Each module is responsible for different tasks, such as temperature control and pressure regulation. This makes the system easier to adapt to new process nodes. Only relevant modules need to be replaced or adjusted, and the control system can receive data formats generated by different process nodes.
[0096] S6 further includes the following steps:
[0097] S6-3. Manual intervention: When adding another semiconductor process, parameter adjustments are required. At this time, through the human-computer interaction interface, engineers can manually intervene on the interface and adjust the process node parameters. Then, the system performance and adaptability of the new process node are regularly evaluated. Such evaluations can help discover potential problems in the system and make timely corrections.
[0098] Specifically, by establishing a multi-process model and then introducing an online learning system, the process control system can continuously learn and adapt during operation. This allows the semiconductor processing to be upgraded and other semiconductor processing processes to be added during use. The process control system then adopts a modular design and divides the process control system into independent functional modules, with each module responsible for different tasks. This makes the system easier to adapt to new process nodes by simply replacing or adjusting the relevant modules. Finally, by allowing engineers to manually intervene on the interface and adjust the process node parameters, and then regularly evaluate the system performance and adaptability to new process nodes, engineers and the system can work together to improve semiconductor processing efficiency and, in turn, improve semiconductor production quality.
[0099] S7 also includes the following steps:
[0100] S7-1. Training implementation: Carry out training according to the training plan, and impart knowledge and skills to employees through theoretical teaching, practical operation and case analysis, and then provide actual cases to allow employees to combine theoretical knowledge with actual work scenarios;
[0101] S7-2, Training evaluation: After the operators have received training, conduct a training effectiveness evaluation to ensure that the training has achieved the expected goals. Then collect employee feedback and understand the quality and practicality of the training. Provide post-training support, such as providing relevant documents, online resources, professional guidance, continuously track employee performance, identify and solve existing problems, and finally regularly evaluate employee training needs and conduct targeted retraining and advanced training.
[0102] Specifically, training is carried out according to the training plan, and knowledge and skills are imparted to employees through theoretical teaching, practical operation and case analysis. Actual cases are then provided to allow employees to combine theoretical knowledge with actual work scenarios. After the operators have been trained, a training effectiveness evaluation is conducted to ensure that the training achieves the expected goals. Employee feedback is then collected, and the quality and practicality of the training are understood. Post-training support is then provided, such as providing relevant documents, online resources and professional guidance, continuously tracking employee performance, discovering and solving existing problems, and finally regularly evaluating employee training needs, conducting targeted retraining and advanced training. This allows operators to quickly understand the system and use the operating system quickly, and also improves the work efficiency of semiconductor processing on a certain basis.
[0103] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A semiconductor processing technology control method, characterized in that: The semiconductor processing technology control method comprises the following steps: S1. Data collection: First, use sensors and monitoring equipment to collect key parameters in the semiconductor production process in real time, and then pre-process the collected data; S2. Data analysis: After the collected data has been preprocessed, the processed data is analyzed to identify potential process deviations and process variations. S3. Generate process parameters: After the data is analyzed, the adaptive control system will make real-time decisions based on the results of real-time data analysis and generate process parameters that need to be adjusted; S4, Remote Monitoring: After the process parameters that need to be adjusted are generated, the adjusted process parameters are transmitted to the process node, and then the remote monitoring system is used to monitor the temperature and humidity in the semiconductor production process; S5. Manual adjustment: Before the remote monitoring system monitors the temperature and humidity in the semiconductor production process in real time, it is necessary to set the temperature threshold range and humidity threshold range. When the temperature exceeds the set temperature threshold range during the monitoring process, the data collected by the sensor and monitoring equipment in real time will be fed back to the operator and engineer, and then the engineer will manually adjust the process parameters in the human-computer interaction interface; S6, process node: When the current semiconductor process needs to introduce another semiconductor process, it is necessary to establish a multi-process model, and then divide the process control system into independent functional modules, and let each module be responsible for different tasks, and then let engineers use the human-machine interface to manually intervene in the system; S7. Staff training: Provide training for operators and develop their problem identification and problem solving abilities; The S5 further comprises the following steps: S5-1. Feedback data: When the temperature and humidity of the semiconductor during the production process are not within the set temperature threshold range and humidity threshold range, an alarm will be triggered. When the alarm sounds, the data collected by the sensors and monitoring equipment in real time will be fed back to the operators and engineers; S5-2, Manual intervention: After receiving the feedback data, the engineer performs manual intervention operations on the human-computer interaction interface, adjusts the process parameters according to the data provided by the sensors and monitoring equipment, and then transmits the manually adjusted parameters to the process nodes; The S6 further comprises the following steps: S6-1. Multi-process model establishment: When a semiconductor process needs to introduce another semiconductor process, a multi-process model needs to be established, and then an online learning system is introduced to enable the process control system to continuously learn and adapt during operation; S6-2, Modular design: At the same time, the process control system adopts modular design and divides the process control system into independent functional modules, so that each module is responsible for different tasks, and the control system receives data formats generated by different process nodes; The S6 further comprises the following steps: S6-3, Manual intervention: When adding another semiconductor process, parameter adjustment is required. At this time, through the human-computer interaction interface, engineers can manually intervene on the interface and adjust the process node parameters, and then regularly evaluate the system performance and adaptability of the new process node.
2. A semiconductor processing control method according to claim 1, characterized in that: The S1 further comprises the following steps: S1-1, data collection: by connecting sensors and monitoring equipment to data acquisition equipment, and then configuring a real-time data acquisition system, the key parameters of the semiconductor production process are collected in real time through sensors and monitoring equipment, and the key parameters include temperature, pressure, flow and humidity; S1-2. Data processing: Check the data set operation on the collected data, and process the missing values, outliers and error values in the data. Then standardize or normalize the checked data, perform feature extraction operation on the processed data, and perform review operation after data processing.
3. A semiconductor processing control method according to claim 1, characterized in that: The S2 further comprises the following steps: S2-1, Data Analysis: After the data has been processed, the processed data is analyzed and an accurate representation of the current system status is obtained; S2-2. System Identification: After the processed data has been analyzed, an in-depth quantitative analysis is performed on the analyzed data to determine whether there are potential process deviations and process variation issues. If there are any problems, data mining technology is used to conduct a systematic root cause analysis to identify the root problems that cause the variation.
4. A semiconductor processing control method according to claim 1, characterized in that: The S2 further comprises the following steps: S2-3. Problem Solving: When potential process drift and process variation problems exist in the identification data, the process drift and process variation problems are solved by optimizing process parameters and adjusting equipment settings.
5. The semiconductor processing control method according to claim 1, characterized in that: The S3 further comprises the following steps: S3-1. Process parameters: When the identified potential problems are solved, an adaptive controller is designed to generate the process parameters that need to be adjusted based on the real-time system status and performance feedback.
6. The semiconductor processing control method according to claim 1, characterized in that: The S4 further comprises the following steps: S4-1, Real-time monitoring: When the process parameters that need to be adjusted are generated, the parameters that need to be adjusted are transmitted to the process nodes in the process, and then the key parameters in the semiconductor production process are monitored in real time using the remote monitoring system; S4-2. Alarm mechanism: Before the remote monitoring system performs monitoring operations, it is necessary to set the temperature threshold range and the humidity threshold range. During the monitoring process, if the remote monitoring system detects that the temperature and humidity of the semiconductor during the production process are not within the set temperature threshold range and humidity threshold range, an alarm will be triggered.
7. The semiconductor processing control method according to claim 1, characterized in that: The S7 further comprises the following steps: S7-1. Training implementation: Carry out training according to the training plan, and impart knowledge and skills to employees through theoretical teaching, practical operation and case analysis, and then provide actual cases to allow employees to combine theoretical knowledge with actual work scenarios; S7-2, Training evaluation: After the operators have received training, conduct a training effectiveness evaluation, then collect employee feedback, and understand the quality and practicality of the training. Provide post-training support, continue to track employee performance, identify and resolve existing problems, and finally regularly evaluate employee training needs and conduct targeted retraining and advanced training.
Citation Information
Patent Citations
Real-time monitoring and early warning system and method for reservoir pump station
CN116859815A
Device and method for stripping semiconductor material through multi-wavelength laser coupling
CN116913809A
