A smart building fire safety early warning system based on smart fire protection
Through the smart fire safety warning system, the wires and pipelines in the building are analyzed, detected and regional risk assessment are carried out, safety warning signals are generated, and fire intelligent control is carried out, which solves the problem of the inability to analyze fire hazards simultaneously in the existing technology and improves the fire safety of the building Performance and early warning efficiency.
Patent Information
- Application Number
- CN202410606425.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-16
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-05-16
AI Technical Summary
The existing technology cannot synchronously analyze building pipeline wiring and wire wiring, resulting in the inability to detect fire hazards in time, affecting fire safety, and being unable to analyze safety channels in real time, reducing the safety performance of buildings.
Design a smart building fire safety warning system based on smart fire protection, including building wiring analysis and detection unit, area risk assessment unit, safety analysis and warning unit and fire intelligent control unit. By analyzing and detecting the internal wires and pipelines of the building, the area risks will be evaluated. , generate safety warning signals and carry out intelligent fire control.
It effectively avoids fire hazards in buildings, improves fire safety control, ensures that early warning and control can be carried out in a timely manner when a fire occurs, reduces the impact of fire on buildings, and improves the efficiency and safety performance of fire warnings.
Smart Images

Figure CN118537988B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building fire safety early warning, and in particular to a smart building fire safety early warning system based on smart fire protection. Background Art
[0002] With the rapid development of economy, the utilization rate of urban building land is getting higher and higher. Along with it, the number of high-rise office buildings is also increasing. The biggest advantage of high-rise office buildings is that they can accommodate more objects and people. The improvement of building space utilization rate and the continuous improvement of supporting equipment of high-rise office buildings have made high-rise office buildings show a trend of diversified functions. However, while bringing benefits and convenience to people, they also hide great fire safety hazards. Once a fire safety hazard occurs, the consequences will be extremely serious.
[0003] However, in the existing technology, it is impossible to synchronously analyze the building pipeline wiring and wire wiring, so as to timely monitor fire hazards. At the same time, it is impossible to perform real-time analysis of the safety passages in the building, so that it is impossible to plan the use of the safety passages when a fire occurs, resulting in reduced building safety performance and inability to use them accurately.
[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0005] The purpose of the present invention is to solve the above-mentioned problems and to propose a smart building fire safety early warning system based on smart fire protection.
[0006] The purpose of the present invention can be achieved through the following technical solutions:
[0007] A smart building fire safety early warning system based on smart fire protection, comprising an early warning center, wherein the early warning center is communicatively connected to a building wiring analysis and detection unit, a building area risk assessment unit, a safety analysis and early warning unit, and a fire intelligent management and control unit;
[0008] The building wiring analysis and detection unit analyzes and detects the wiring of wires and pipelines inside the building. After completing the analysis and detection, the building area risk assessment unit conducts a regional risk assessment on the building to determine whether there are risks in the corresponding safety exits in each area of the building area, divide the building area into i sub-areas, i is a natural number greater than 1, and mark the safety exits set in each sub-area as equipped exits;
[0009] The safety analysis and early warning unit conducts safety analysis and early warning on the building area, obtains the safety analysis and early warning coefficient in the building area, generates a building safety early warning signal or a building safety normal signal based on the comparison of the safety analysis and early warning coefficient, and sends it to the early warning center; the fire intelligent control unit conducts fire intelligent control on the building area.
[0010] As a preferred embodiment of the present invention, the operation process of the building wiring analysis and detection unit is as follows:
[0011] Analyze the wire wiring area and pipeline wiring area in the building, obtain the area ratio of the wire overlapping area in the building wire wiring area and the wire overlapping density in the charging overlapping area in the wire wiring area, and compare the area ratio of the wire overlapping area in the building wire wiring area and the wire overlapping density in the charging overlapping area in the wire wiring area with the area ratio threshold and the wire overlapping density threshold respectively;
[0012] If the area ratio of the wire overlap area in the building wire wiring area exceeds the area ratio threshold, or the wire overlap density in the charging overlap area in the wire wiring area exceeds the wire overlap density threshold, a wire wiring high risk signal is generated and sent to the early warning center; after receiving the wire wiring high risk signal, the early warning center re-plans the building wire wiring;
[0013] If the area ratio of the wire overlapping area in the building wiring area does not exceed the area ratio threshold, and the wire overlapping density in the charging overlapping area in the wiring area does not exceed the wire overlapping density threshold, a low risk signal for the wiring is generated and sent to the early warning center.
[0014] As a preferred embodiment of the present invention, when water seepage is detected at any part of the pipeline at the intersection of the pipeline and the wire in the building pipeline wiring area, the spatial spacing value between the water seepage part and the wire wiring position is obtained; the maximum deviation value of the water pressure at the same moment of each outlet after pipeline planning in the building pipeline wiring area is obtained, and the spatial spacing value between the water seepage part and the wire wiring position is analyzed with the maximum deviation value of the water pressure at the same moment of each outlet after pipeline planning in the building pipeline wiring area:
[0015] If the spatial spacing value between the water seepage part and the wire wiring position does not exceed the spatial spacing value threshold, or the maximum water pressure deviation value at the same time of each outlet after pipeline planning in the building pipeline wiring area exceeds the maximum water pressure deviation value threshold, the building pipeline wiring analysis is judged to be unqualified, a pipeline wiring high risk signal is generated and sent to the early warning center;
[0016] If the spatial spacing value between the water seepage site and the wire wiring location exceeds the spatial spacing value threshold, and the maximum water pressure deviation value at the same time of each outlet after pipeline planning in the building pipeline wiring area does not exceed the maximum water pressure deviation value threshold, then the building pipeline wiring analysis is judged to be qualified, and a pipeline wiring low risk signal is generated and sent to the early warning center.
[0017] As a preferred embodiment of the present invention, the operation process of the building area risk assessment unit is as follows:
[0018] The instantaneous floating amount of the airflow velocity at the location of the equipped outlet corresponding to the open period and the non-open period when the sub-area is in any air circulation route is obtained, and the maximum cumulative number of airflow circulation routes inside the equipped outlet of the sub-area is obtained at the same time, and the instantaneous floating amount of the airflow velocity at the location of the equipped outlet corresponding to the open period and the non-open period when the sub-area is in any air circulation route and the maximum cumulative number of airflow circulation routes inside the equipped outlet of the sub-area are compared with the instantaneous floating amount threshold of the airflow velocity and the maximum cumulative number threshold of routes respectively.
[0019] As a preferred embodiment of the present invention, if the instantaneous floating amount of the airflow velocity at the location of the equipped outlet corresponding to the open period and the non-open period when the sub-area is in any air circulation route exceeds the instantaneous floating amount threshold of the airflow velocity, or the maximum cumulative number of airflow circulation routes inside the equipped outlet of the sub-area exceeds the maximum cumulative number threshold, then the equipped outlet of the sub-area is determined to be a non-continuous outlet, and the exhaust outlet of the non-continuous outlet is set, and the airflow circulation route and circulation speed of the non-continuous outlet are controlled. If a fire occurs before it is controlled, an evacuation time threshold is set, and the display light sign of the non-continuous outlet within the evacuation time threshold is green, and the display light sign of the non-continuous outlet exceeding the evacuation time threshold is yellow;
[0020] If the instantaneous fluctuation of the airflow velocity at the location of the equipped outlet corresponding to the open period and the non-open period does not exceed the instantaneous fluctuation threshold of the airflow velocity when the equipped outlet is in any air circulation route in the sub-area, and the maximum cumulative number of airflow circulation routes inside the equipped outlet of the sub-area does not exceed the maximum cumulative number threshold of routes, then the equipped outlet of the sub-area is determined to be a continuous exit, and the display light of the continuous exit will always be green in the event of a fire.
[0021] As a preferred embodiment of the present invention, the operation process of the security analysis and early warning unit is as follows:
[0022] The duration of the synchronous increase of smoke concentration and ambient temperature in the air circulation route of the sub-area in the building area and the synchronous floating span of the temperature growth rate of the adjacent sub-area when the ambient temperature in the sub-area rises instantaneously are obtained, and the duration of the synchronous increase of smoke concentration and ambient temperature in the air circulation route of the sub-area in the building area and the synchronous floating span of the temperature growth rate of the adjacent sub-area when the ambient temperature in the sub-area rises instantaneously are marked as CXS and FDK respectively; the control amount of the sub-area ambient temperature rising speed after the sprinkler branch pipe is started in the sub-area in the building area and the reduction span of the control amount of the sub-area ambient temperature rising speed during the water pressure increase after the sprinkler branch pipe is started are obtained, and the control amount of the sub-area ambient temperature rising speed after the sprinkler branch pipe is started in the sub-area in the building area and the reduction span of the control amount of the sub-area ambient temperature rising speed during the water pressure increase after the sprinkler branch pipe is started are marked as KZL and JDK respectively;
[0023] By formula The safety analysis warning coefficient G in the building area is obtained, where f1>f2>f3>f4>1, and β is the error correction factor, which is 1.25;
[0024] Compare the safety analysis warning coefficient G in the building area with the safety analysis warning coefficient threshold:
[0025] If the safety analysis warning coefficient G in the building area exceeds the safety analysis warning coefficient threshold, a building safety warning signal is generated and sent to the fire intelligent management and control unit; if the safety analysis warning coefficient G in the building area does not exceed the safety analysis warning coefficient threshold, a building safety normal signal is generated and sent to the warning center.
[0026] As a preferred embodiment of the present invention, the operation process of the fire intelligent management and control unit is as follows:
[0027] The sustainable increase in the fire water supply pressure of the current sub-area when a fire occurs in any sub-area in the building area and the rate of increase in the smoke concentration in the exit channel of the current sub-area when a fire occurs in any sub-area in the building area are obtained, and the sustainable increase in the fire water supply pressure of the current sub-area when a fire occurs in any sub-area in the building area and the rate of increase in the smoke concentration in the exit channel of the current sub-area when a fire occurs in any sub-area in the building area are compared with the sustainable increase threshold and the concentration increase rate threshold respectively:
[0028] If the sustainable increase in the fire water supply pressure of the current sub-area exceeds the sustainable increase threshold when a fire occurs in any sub-area in the building area, or if the increase rate of the smoke concentration in the exit channel of the current sub-area exceeds the concentration increase rate threshold when a fire occurs in any sub-area in the building area, it is determined that the fire risk in the building area is high, and a fire intelligent control signal is generated and sent to the early warning center. After receiving the fire intelligent control signal, the early warning center stops the pipe water supply in the adjacent sub-area with the fire sub-area as the center to ensure the water supply pressure value in the fire sub-area, and at the same time, controls the air flow direction in the channel equipped with the exit, and sets the air flow direction opposite to the channel direction;
[0029] If the sustainable increase in the fire water supply pressure of the current sub-area does not exceed the sustainable increase threshold when a fire occurs in any sub-area in the building area, and the increase rate of the smoke concentration in the exit channel of the current sub-area does not exceed the concentration increase rate threshold when a fire occurs in any sub-area in the building area, then a controllable signal of the fire hazard in the building area is determined, and the fire sub-area is continuously monitored.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] 1. In the present invention, the wiring and pipeline wiring inside the building are analyzed and detected to determine whether there are any abnormalities in the distribution of wires and pipelines in the building, so as to avoid the increase of fire hazards in the building and the abnormal distribution of wires and pipelines, which will cause inefficient fire safety control and the failure to avoid the impact of building fires in time; regional risk assessment is performed on the building to determine whether there are risks corresponding to the safety exits in each area of the building, so as to perform risk analysis on the safety exits in the area, so as to avoid the safety exits being unsuitable as the optimal evacuation exits when a fire occurs, so as to prevent the impact of the fire in the building from being minimized.
[0032] 2. In the present invention, a safety analysis and early warning are performed on the building area, a fire safety analysis and early warning are performed on each sub-area in the building area, and a safety early warning is performed on each sub-area, so that a warning can be given in time when a fire occurs. At the same time, sub-area management and control can be performed in time to reduce the impact of the fire on the building area, and the efficiency of the building fire early warning can be improved; intelligent fire management and control is performed on the building area to improve the building safety early warning performance, so that intelligent management and control can be performed when a fire occurs in the building area, and the safety performance of the building fire early warning is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0034] Figure 1 It is a principle block diagram of the present invention. DETAILED DESCRIPTION
[0035] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0037] See also Figure 1 As shown, a smart building fire safety early warning system based on smart fire protection includes an early warning center, wherein the early warning center is communicatively connected to a building wiring analysis and detection unit, a building area risk assessment unit, a safety analysis and early warning unit, and a fire intelligent management and control unit;
[0038] The early warning center generates a building wiring analysis detection signal and sends the building wiring analysis detection signal to the building wiring analysis detection unit. After receiving the building wiring analysis detection signal, the building wiring analysis detection unit analyzes and detects the wiring of wires and pipelines inside the building to determine whether there are abnormalities in the distribution of wires and pipelines in the building, thereby avoiding the increase of building fire hazards and abnormal distribution of wires and pipelines, resulting in inefficient fire safety control and the inability to avoid the impact of building fires in a timely manner;
[0039] Analyze the wire wiring area and pipeline wiring area in the building, obtain the area ratio of the wire overlapping area in the building wire wiring area and the wire overlapping density in the charging overlapping area in the wire wiring area, and compare the area ratio of the wire overlapping area in the building wire wiring area and the wire overlapping density in the charging overlapping area in the wire wiring area with the area ratio threshold and the wire overlapping density threshold, respectively, where the wire overlapping density is represented by the cumulative total length of wires in the same area;
[0040] If the area ratio of the wire overlap area in the building wire wiring area exceeds the area ratio threshold, or the wire overlap density in the charging overlap area in the wire wiring area exceeds the wire overlap density threshold, a wire wiring high risk signal is generated and sent to the early warning center; after receiving the wire wiring high risk signal, the early warning center re-plans the building wire wiring;
[0041] If the area ratio of the wire overlap area in the building wire wiring area does not exceed the area ratio threshold, and the wire overlap density in the charging overlap area in the wire wiring area does not exceed the wire overlap density threshold, a wire wiring low risk signal is generated and sent to the early warning center;
[0042] When water seepage is found at any part of the pipeline at the intersection of the pipeline and the wire in the building pipeline wiring area, the spatial spacing value between the water seepage part and the wire wiring position is obtained, wherein the spatial spacing value is expressed as the spatial straight-line interval between the two positions, and in this application, the data is collected when the pipeline is higher than the wire and is in the same area. If the wire is far away from the pipeline or the water droplets do not drip onto the wire under the action of gravity, no data is collected; the maximum deviation value of the water pressure at the same time of each outlet after the pipeline planning in the building pipeline wiring area is obtained, and the spatial spacing value between the water seepage part and the wire wiring position is analyzed with the maximum deviation value of the water pressure at the same time of each outlet after the pipeline planning in the building pipeline wiring area:
[0043] If the spatial spacing value between the water seepage site and the wire wiring location does not exceed the spatial spacing value threshold, or the maximum water pressure deviation value at the same time of each outlet after pipeline planning in the building pipeline wiring area exceeds the maximum water pressure deviation value threshold, the building pipeline wiring analysis is judged to be unqualified, and a pipeline wiring high-risk signal is generated and sent to the early warning center; after receiving the pipeline wiring high-risk signal, the early warning center regulates the pipeline planning and conducts real-time operation supervision of the pipeline when regulation is impossible;
[0044] If the spatial spacing value between the water seepage part and the wire wiring position exceeds the spatial spacing value threshold, and the maximum water pressure deviation value at the same time of each outlet after pipeline planning in the building pipeline wiring area does not exceed the maximum water pressure deviation value threshold, then the building pipeline wiring analysis is determined to be qualified, and a pipeline wiring low risk signal is generated and sent to the early warning center; and a building area risk assessment signal is generated and sent to the building area risk assessment unit;
[0045] After receiving the building area risk assessment signal, the building area risk assessment unit conducts a regional risk assessment on the building to determine whether there are risks at the corresponding safety exits in each area of the building area, thereby conducting a risk analysis on the safety exits in the area to avoid the safety exits being unsuitable as the optimal evacuation exits when a fire occurs, which causes the fire impact in the building to be unable to be minimized;
[0046] The building area is divided into i sub-areas, where i is a natural number greater than 1, and the safety exits set in each sub-area are marked as equipped exits, and the instantaneous floating amount of the airflow velocity at the equipped exit corresponding to the opening period and non-open period when the sub-area is in any air circulation route is obtained, and the maximum cumulative number of airflow routes inside the equipped exit of the sub-area is obtained at the same time, and the instantaneous floating amount of the airflow velocity at the equipped exit corresponding to the opening period and non-open period when the sub-area is in any air circulation route and the maximum cumulative number of airflow routes inside the equipped exit of the sub-area are compared with the instantaneous floating amount threshold of the airflow velocity and the maximum cumulative number threshold of routes respectively:
[0047] If the instantaneous fluctuation of the airflow velocity at the corresponding equipped outlet during the open period and the non-open period exceeds the threshold of the instantaneous fluctuation of the airflow velocity when the equipped outlet is in any air circulation route in the sub-area, or the maximum cumulative number of airflow routes inside the equipped outlet of the sub-area exceeds the threshold of the maximum cumulative number of routes, then the equipped outlet of the sub-area is determined to be a non-continuous outlet, and the exhaust vent of the non-continuous outlet is set, and the airflow route and flow velocity of the non-continuous outlet are controlled. If a fire occurs before it is controlled, an evacuation time threshold is set, and the display light of the non-continuous outlet is green within the evacuation time threshold, and the display light of the non-continuous outlet is yellow when the evacuation time threshold is exceeded;
[0048] If the instantaneous fluctuation of the airflow velocity at the corresponding equipped outlet during the opening period and the non-opening period when the equipped outlet is in any air circulation route in the sub-area does not exceed the instantaneous fluctuation threshold of the airflow velocity, and the maximum cumulative number of airflow routes inside the equipped outlet of the sub-area does not exceed the maximum cumulative number threshold of routes, then the equipped outlet of the sub-area is determined to be a continuous exit, and the display light of the continuous exit is always green when a fire occurs;
[0049] The early warning center generates a safety analysis early warning signal and sends it to the safety analysis early warning unit. After receiving the safety analysis early warning signal, the safety analysis early warning unit conducts a safety analysis early warning on the building area, and conducts a fire safety analysis early warning on each sub-area in the building area, and conducts a safety early warning on each sub-area, so as to provide a timely early warning when a fire occurs, and at the same time, timely control of the sub-area can be carried out to reduce the impact of the fire on the building area, and also improve the efficiency of the building fire early warning;
[0050] The duration of the synchronous increase of smoke concentration and ambient temperature in the air circulation route of the sub-area in the building area and the synchronous floating span of the temperature growth rate of the adjacent sub-area when the ambient temperature in the sub-area rises instantaneously are obtained, and the duration of the synchronous increase of smoke concentration and ambient temperature in the air circulation route of the sub-area in the building area and the synchronous floating span of the temperature growth rate of the adjacent sub-area when the ambient temperature in the sub-area rises instantaneously are marked as CXS and FDK respectively; the control amount of the sub-area ambient temperature rising speed after the sprinkler branch pipe is started in the sub-area in the building area and the reduction span of the control amount of the sub-area ambient temperature rising speed during the water pressure increase after the sprinkler branch pipe is started are obtained, and the control amount of the sub-area ambient temperature rising speed after the sprinkler branch pipe is started in the sub-area in the building area and the reduction span of the control amount of the sub-area ambient temperature rising speed during the water pressure increase after the sprinkler branch pipe is started are marked as KZL and JDK respectively;
[0051] By formula The safety analysis warning coefficient G in the building area is obtained, where f1>f2>f3>f4>1, and β is the error correction factor, which is 1.25;
[0052] Compare the safety analysis warning coefficient G in the building area with the safety analysis warning coefficient threshold:
[0053] If the safety analysis warning coefficient G in the building area exceeds the safety analysis warning coefficient threshold, a building safety warning signal is generated and sent to the fire intelligent management and control unit;
[0054] If the safety analysis warning coefficient G in the building area does not exceed the safety analysis warning coefficient threshold, a building safety normal signal is generated and sent to the warning center;
[0055] After receiving the building safety warning signal, the fire intelligent control unit performs intelligent fire control on the building area, improves the building safety warning performance, facilitates intelligent control when a fire occurs in the building area, and improves the safety performance of building fire warning;
[0056] The sustainable increase in the fire water supply pressure of the current sub-area when a fire occurs in any sub-area in the building area and the rate of increase in the smoke concentration in the exit channel of the current sub-area when a fire occurs in any sub-area in the building area are obtained, and the sustainable increase in the fire water supply pressure of the current sub-area when a fire occurs in any sub-area in the building area and the rate of increase in the smoke concentration in the exit channel of the current sub-area when a fire occurs in any sub-area in the building area are compared with the sustainable increase threshold and the concentration increase rate threshold respectively:
[0057] If the sustainable increase in the fire water supply pressure of the current sub-area exceeds the sustainable increase threshold when a fire occurs in any sub-area in the building area, or if the increase rate of the smoke concentration in the exit channel of the current sub-area exceeds the concentration increase rate threshold when a fire occurs in any sub-area in the building area, it is determined that the fire risk in the building area is high, and a fire intelligent control signal is generated and sent to the early warning center. After receiving the fire intelligent control signal, the early warning center stops the pipe water supply in the adjacent sub-area with the fire sub-area as the center to ensure the water supply pressure value in the fire sub-area, and at the same time, controls the air flow direction in the channel equipped with the exit, and sets the air flow direction opposite to the channel direction;
[0058] If the sustainable increase in the fire water supply pressure of the current sub-area does not exceed the sustainable increase threshold when a fire occurs in any sub-area in the building area, and the increase rate of the smoke concentration in the exit channel of the current sub-area does not exceed the concentration increase rate threshold when a fire occurs in any sub-area in the building area, then the fire hazard controllable signal in the building area is determined, and the fire sub-area is continuously monitored;
[0059] The above formulas are obtained by collecting a large amount of data and performing software simulation, and a formula close to the actual value is selected. The coefficients in the formula are set by technicians in this field according to actual conditions;
[0060] When the present invention is in use, the building wiring analysis and detection unit analyzes and detects the wiring of wires and pipelines inside the building. After completing the analysis and detection, the building area risk assessment unit performs an area risk assessment on the building to determine whether there are risks corresponding to the safety exits in each area of the building area, divide the building area into i sub-areas, i is a natural number greater than 1, and mark the safety exits set in each sub-area as equipped exits; the safety analysis and early warning unit performs safety analysis and early warning on the building area, obtains the safety analysis and early warning coefficient in the building area, generates a building safety early warning signal or a building safety normal signal based on the comparison of the safety analysis and early warning coefficient, and sends it to the early warning center; the fire intelligent management and control unit performs fire intelligent management and control on the building area.
[0061] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A smart building fire safety early warning system based on smart fire protection, characterized in that: It includes an early warning center, wherein the early warning center is connected to a building wiring analysis and detection unit, a building area risk assessment unit, a safety analysis and early warning unit, and a fire intelligent management and control unit; The building wiring analysis and detection unit analyzes and detects the wire wiring and pipeline wiring inside the building, obtains the area ratio of the wire overlapping area in the building wire wiring area and the wire overlapping density in the charging overlapping area in the wire wiring area, and compares the area ratio of the wire overlapping area in the building wire wiring area and the wire overlapping density in the charging overlapping area in the wire wiring area with the area ratio threshold and the wire overlapping density threshold respectively; If the area ratio of the wire overlap area in the building wiring area exceeds the area ratio threshold, or the wire overlap density in the charging overlap area in the wiring area exceeds the wire overlap density threshold, a high-risk signal for wiring is generated and sent to the early warning center. After receiving the high-risk signal for wiring, the early warning center replans the building wiring; If the area ratio of the wire overlap area in the building wire wiring area does not exceed the area ratio threshold, and the wire overlap density in the charging overlap area in the wire wiring area does not exceed the wire overlap density threshold, a wire wiring low risk signal is generated and sent to the early warning center; When water seeps from any part of the pipeline at the intersection of the pipeline and the wire in the building pipeline wiring area, the spatial distance value between the water seepage part and the wire wiring position is obtained; Get the maximum deviation of water pressure at each outlet in the building pipeline wiring area after pipeline planning, and analyze the spatial spacing between the water seepage site and the wire wiring position and the maximum deviation of water pressure at each outlet in the building pipeline wiring area after pipeline planning: If the spatial spacing value between the water seepage part and the wire wiring position does not exceed the spatial spacing value threshold, or the maximum water pressure deviation value at the same time of each outlet after pipeline planning in the building pipeline wiring area exceeds the maximum water pressure deviation value threshold, the building pipeline wiring analysis is judged to be unqualified, a pipeline wiring high risk signal is generated and sent to the early warning center; If the spatial spacing value between the water seepage part and the wire wiring position exceeds the spatial spacing value threshold, and the maximum water pressure deviation value of each outlet in the building pipeline wiring area after pipeline planning does not exceed the maximum water pressure deviation value threshold, the building pipeline wiring analysis is determined to be qualified, and a pipeline wiring low risk signal is generated and sent to the early warning center; After completing the analysis and detection, the building area risk assessment unit conducts a regional risk assessment on the building to determine whether there are risks at the corresponding safety exits in each area of the building area, divide the building area into i sub-areas, where i is a natural number greater than 1, and mark the safety exits set in each sub-area as equipped exits; The safety analysis and early warning unit performs safety analysis and early warning on the building area, obtains the safety analysis and early warning coefficient in the building area, generates a building safety early warning signal or a building safety normal signal according to the comparison of the safety analysis and early warning coefficient, and sends it to the early warning center; Intelligent fire control is carried out in building areas through the fire intelligent management and control unit.
2. According to claim 1, a smart building fire safety early warning system based on smart fire protection is characterized in that: The operation process of the building area risk assessment unit is as follows: The instantaneous floating amount of the airflow velocity at the location of the equipped outlet corresponding to the open period and the non-open period when the sub-area is in any air circulation route is obtained, and the maximum cumulative number of airflow circulation routes inside the equipped outlet of the sub-area is obtained at the same time, and the instantaneous floating amount of the airflow velocity at the location of the equipped outlet corresponding to the open period and the non-open period when the sub-area is in any air circulation route and the maximum cumulative number of airflow circulation routes inside the equipped outlet of the sub-area are compared with the instantaneous floating amount threshold of the airflow velocity and the maximum cumulative number threshold of routes respectively.
3. According to claim 2, a smart building fire safety early warning system based on smart fire protection is characterized in that: If the instantaneous fluctuation of the airflow velocity at the corresponding equipped outlet during the open period and the non-open period exceeds the threshold of the instantaneous fluctuation of the airflow velocity when the equipped outlet is in any air circulation route in the sub-area, or the maximum cumulative number of airflow routes inside the equipped outlet of the sub-area exceeds the threshold of the maximum cumulative number of routes, then the equipped outlet of the sub-area is determined to be a non-continuous outlet, and the exhaust vent of the non-continuous outlet is set, and the airflow route and flow velocity of the non-continuous outlet are controlled. If a fire occurs before it is controlled, an evacuation time threshold is set, and the display light of the non-continuous outlet is green within the evacuation time threshold, and the display light of the non-continuous outlet is yellow when the evacuation time threshold is exceeded; If the instantaneous fluctuation of the airflow velocity at the location of the equipped outlet corresponding to the open period and the non-open period does not exceed the instantaneous fluctuation threshold of the airflow velocity when the equipped outlet is in any air circulation route in the sub-area, and the maximum cumulative number of airflow circulation routes inside the equipped outlet of the sub-area does not exceed the maximum cumulative number threshold of routes, then the equipped outlet of the sub-area is determined to be a continuous exit, and the display light of the continuous exit will always be green in the event of a fire.
4. According to claim 1, a smart building fire safety early warning system based on smart fire protection is characterized in that: The operation process of the safety analysis and early warning unit is as follows: The duration of the synchronous increase of smoke concentration and ambient temperature in the air circulation route of the sub-area in the building area and the synchronous floating span of the temperature growth rate of the adjacent sub-area when the ambient temperature in the sub-area rises instantaneously are obtained, and the duration of the synchronous increase of smoke concentration and ambient temperature in the air circulation route of the sub-area in the building area and the synchronous floating span of the temperature growth rate of the adjacent sub-area when the ambient temperature in the sub-area rises instantaneously are marked as CXS and FDK respectively; the control amount of the sub-area ambient temperature rising speed after the sprinkler branch pipe is started in the sub-area in the building area and the reduction span of the control amount of the sub-area ambient temperature rising speed during the water pressure increase after the sprinkler branch pipe is started are obtained, and the control amount of the sub-area ambient temperature rising speed after the sprinkler branch pipe is started in the sub-area in the building area and the reduction span of the control amount of the sub-area ambient temperature rising speed during the water pressure increase after the sprinkler branch pipe is started are marked as KZL and JDK respectively; By formula The safety analysis warning coefficient G in the building area is obtained, where f1>f2>f3>f4>1, and β is the error correction factor, which is 1.25; Compare the safety analysis warning coefficient G in the building area with the safety analysis warning coefficient threshold: If the safety analysis warning coefficient G in the building area exceeds the safety analysis warning coefficient threshold, a building safety warning signal is generated and sent to the fire intelligent management and control unit; if the safety analysis warning coefficient G in the building area does not exceed the safety analysis warning coefficient threshold, a building safety normal signal is generated and sent to the warning center.
5. According to claim 1, a smart building fire safety early warning system based on smart fire protection is characterized in that: The operation process of the fire intelligent control unit is as follows: The sustainable increase in the fire water supply pressure of the current sub-area when a fire occurs in any sub-area in the building area and the rate of increase in the smoke concentration in the exit channel of the current sub-area when a fire occurs in any sub-area in the building area are obtained, and the sustainable increase in the fire water supply pressure of the current sub-area when a fire occurs in any sub-area in the building area and the rate of increase in the smoke concentration in the exit channel of the current sub-area when a fire occurs in any sub-area in the building area are compared with the sustainable increase threshold and the concentration increase rate threshold respectively: If the sustainable increase in the fire water supply pressure of the current sub-area exceeds the sustainable increase threshold when a fire occurs in any sub-area in the building area, or if the increase rate of the smoke concentration in the exit channel of the current sub-area exceeds the concentration increase rate threshold when a fire occurs in any sub-area in the building area, it is determined that the fire risk in the building area is high, and a fire intelligent control signal is generated and sent to the early warning center. After receiving the fire intelligent control signal, the early warning center stops the pipe water supply in the adjacent sub-area with the fire sub-area as the center to ensure the water supply pressure value in the fire sub-area, and at the same time, controls the air flow direction in the channel equipped with the exit, and sets the air flow direction opposite to the channel direction; If the sustainable increase in the fire water supply pressure of the current sub-area does not exceed the sustainable increase threshold when a fire occurs in any sub-area in the building area, and the increase rate of the smoke concentration in the exit channel of the current sub-area does not exceed the concentration increase rate threshold when a fire occurs in any sub-area in the building area, then a controllable signal of the fire hazard in the building area is determined, and the fire sub-area is continuously monitored.