A chemical workshop production safety management platform

By designing a safety production management platform in the chemical workshop and analyzing raw materials, reactors and environmental parameters in real time, the problem of insufficient safety and product quality assessment in the production process of the chemical workshop has been solved, the safety and quality management of the chemical workshop has been realized, and improved improve production efficiency and safety.

CN118644186BActive Publication Date: 2024-10-25JINING FUSHUN CHEM CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411123808.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-10-25
Estimated Expiration
2044-08-16

AI Technical Summary

Technical Problem

The existing chemical workshop production process control methods have shortcomings in safety and product quality assessment, and cannot effectively manage the full-chain safety and product quality of the chemical workshop.

Method used

A chemical workshop safety production management platform is designed, including a raw material inventory analysis module, a production environment analysis module, a chemical workshop environment analysis and control module, a quality analysis and evaluation module, and a comprehensive workshop scheduling module. Through real-time acquisition and analysis of the raw material status inside the chemical workshop , reactor parameters and environmental parameters to achieve comprehensive management of the safety and product quality of the chemical workshop.

Benefits of technology

It improves the production quality and safety of the chemical workshop, ensures the quality of raw material inventory, optimizes the efficiency of the reaction process, reduces safety hazards, and achieves comprehensive supervision and control of parameters in all aspects of the chemical workshop.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118644186B_ABST
    Figure CN118644186B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of chemical workshop production workflow analysis and management, in particular to a chemical workshop production safety management platform, comprising a raw material inventory analysis module, a chemical workshop environment analysis and control module, a quality analysis and evaluation module, a workshop comprehensive scheduling module and a control center; the raw material inventory analysis module, the chemical workshop environment analysis and control module, the quality analysis and evaluation module, and the workshop comprehensive scheduling module are all connected to the control center by signals. The chemical workshop production safety management platform can optimize the quality and safety of the entire workshop production management by analyzing and managing the production process of methyl chloroacetate chemical intermediates in the entire chemical workshop and the raw materials, reaction conditions and environment of each workstation, and product quality, and effectively improves the quality of chemical intermediate products.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of chemical workshop production workflow analysis and management, in particular to a chemical workshop production safety management platform. Background Art

[0002] When producing large quantities of chemical intermediates (such as methyl chloroacetate), chemical workshops generally use production workflow control to achieve the purpose of controlling the entire production process management.

[0003] After searching, a patent document with patent publication number CN117350517B discloses a control method, system, equipment and storage medium for a chemical production process, which mainly predicts and evaluates the supply of input materials to obtain the distribution of predicted values ​​of the production process, determines the production process dependency value cluster according to the production process associated value set, performs expected fusion according to the production process dependency value cluster to obtain the expected output value of the production process, feeds back the input material supply through the expected output value of the production process to obtain the feedback input value, and updates the input material supply of the chemical production process according to the feedback input value, so as to achieve the purpose of improving the overall efficiency of the chemical production process.

[0004] Although this control method for chemical production process has improved production efficiency to a certain extent, it still has many shortcomings when used in chemical workshops:

[0005] First of all, since these basic chemical raw materials in chemical workshops are usually toxic or volatile, and the existing technology lacks control over safety factors in the production process during process control, the overall safety control in production is insufficient and it is impossible to control the safety of the entire production chain.

[0006] Secondly, in the prior art, during the production process, interference with the distribution of production process prediction values ​​is eliminated only by controlling the production process balance parameter value set to obtain a production process adjustment value sequence, and then the production process adjustment value sequence is refined, and the input material supply quantity is fed back through the expected output value of the production process, and the input material supply quantity of the chemical production process is updated with the feedback value. It only completes analysis and feedback on the front end of production, but does not analyze and evaluate the output products and by-products of the back end. It can predict or improve production efficiency, but cannot effectively analyze and evaluate the quality of production.

[0007] Based on this, the present invention designs a chemical workshop safety production management platform according to the actual needs of production in a methyl chloroacetate chemical workshop, so as to better solve the problems existing in the prior art. Summary of the invention

[0008] The present invention solves one of the above technical problems, and the technical solution adopted is: a chemical workshop safety production management platform, including a raw material inventory analysis module, a production environment analysis module, a chemical workshop environment analysis and control module, a quality analysis and evaluation module, a workshop comprehensive scheduling module and a control center.

[0009] The raw material inventory analysis module, production environment analysis module, chemical workshop environment analysis and control module, quality analysis and evaluation module, and workshop comprehensive scheduling module are all connected to the control center by signals.

[0010] The raw material inventory analysis module is used to obtain the raw material status and related parameter information inside the raw material warehouse of the target chemical workshop.

[0011] The production environment analysis module is used to obtain the internal parameter information of the target reactor in the chemical workshop.

[0012] The chemical workshop environmental analysis and control module is used to obtain relevant environmental parameter information inside the chemical workshop and complete the current workshop environmental safety analysis.

[0013] The quality analysis and evaluation module is used to obtain sample parameters of chemical intermediate products and complete product quality analysis and evaluation.

[0014] The workshop comprehensive scheduling module is used to obtain the analysis and processing results of the raw material inventory analysis module, the production environment analysis module, the chemical workshop environment analysis and control module, and the quality analysis and evaluation module, and to perform production scheduling after completing the comprehensive evaluation.

[0015] The control center is used to pre-store relevant basic parameter information and obtain all parameter information of each module during the working process for sharing.

[0016] In any of the above schemes, it is preferred that the raw material status and related parameter information inside the raw material warehouse of the target chemical workshop are obtained, mainly including the sealing, color, particle size, viscosity properties of the raw materials, and the purity of each raw material.

[0017] In any of the above schemes, it is preferred that the specific working process of obtaining the raw material status and related parameter information inside the raw material warehouse of the target chemical workshop includes: observing the sealing, color, particle size, viscosity properties of various raw materials inside the current raw material warehouse and ensuring that they meet the requirements, otherwise the raw materials are replaced.

[0018] Then, the quantity of various raw materials in the raw material warehouse is obtained and various raw materials are sampled respectively to obtain multiple groups of raw material analysis samples; the ath group of analysis samples in the current raw material is obtained and the solid impurities are extracted and separated by centrifugal filtration, and then the raw material analysis samples are further purified by solid phase extraction, liquid-liquid extraction or column chromatography to obtain the total mass of impurities. .

[0019] Get the purity of the ath group of analysis samples in the current raw material ; Indicates the total weight of the ath group of analysis samples in the current raw material.

[0020] Obtain the current sampling purity of a raw material through the analytical formula ;in, Indicates the number of the raw material analysis sample in the current raw material. .

[0021] By analyzing the formula Obtain the expected conformity rate of all types of raw materials in the current raw material warehouse; where n represents the number of the raw material type in the current raw material warehouse, They represent the weight proportions of the sampling purity of the raw materials of the corresponding number types. Indicates the correction factor.

[0022] The expected conformity rate of all types of raw materials in the current raw material library is compared with the theoretical conformity rate of raw materials. If it is greater than the theoretical conformity rate of raw materials, the quality of raw materials in the current raw material library is qualified. Otherwise, subsequent quality analysis or replacement is continued for each type of raw material.

[0023] In any of the above schemes, preferably, the specific steps of obtaining the internal parameter information of the target reactor in the chemical workshop include: obtaining the sampling temperature values ​​at different sampling positions below the reaction liquid surface in the reactor of the target reactor; ;in, Indicates the number of the current sampled temperature value.

[0024] By formula Get the average temperature change rate of the points in the kettle ; When the average temperature change rate of the points in the kettle When it is less than the threshold of the average temperature change rate of the points in the reactor, the internal temperature balance of the current target reactor meets the requirements.

[0025] When the average temperature change rate of the points in the kettle When it is greater than or equal to the threshold of the average temperature change rate of the points in the kettle, start the agitator and obtain the viscosity values ​​of the solutions at different depths in the kettle. Judge whether the homogeneity of the current solution meets the requirements based on the change in viscosity values. When the homogeneity of the solution in the kettle does not meet the requirements, keep the agitator stirring and adjust the reaction temperature and pressure in the kettle, and then complete the above analysis again until the homogeneity of the solution in the kettle meets the requirements.

[0026] Scan the outer wall of the target reactor and use an industrial CT device to obtain the actual wall thickness scanning model of the reactor body. Import the actual wall thickness scanning model into the visual modeling software to reconstruct the wall thickness three-dimensional model.

[0027] Compare the three-dimensional wall thickness model with the product wall thickness of the target reactor to obtain the actual wall thickness of each abnormal coordinate point ; The actual wall thickness at the same coordinate point Wall thickness When the difference is If it is within the range of , the current actual wall thickness meets the requirements.

[0028] When the difference It is determined that there is agglomerated material adhering to the wall in the current kettle, and the agitator or scraping equipment is started to scrape the inner wall of the reactor. After the scraping is completed, the maintenance personnel enter the kettle through the manhole to clean and repair it.

[0029] When the difference When the reactor is detected, it is judged that there are dangerous cracks or damaged depressions in the reactor, and a safety alarm is activated and the control center is notified to shut down the reactor for maintenance.

[0030] In any of the above schemes, it is preferred that a gas leakage sensor is provided on the outside of the joints of each component of the target reactor, and the gas leakage situation of the current part is obtained through each gas leakage sensor; if no gas leakage is analyzed by each gas leakage sensor, the internal air tightness of the current target reactor meets the requirements, otherwise a leakage alarm is issued and the ventilation and fire protection systems of the chemical workshop are promptly started by the control center.

[0031] In any of the above schemes, it is preferred that the specific process of obtaining relevant environmental parameter information inside the chemical workshop and completing the current workshop environmental safety analysis is as follows: Obtaining the gas particle concentration in the internal environment of the chemical workshop under production status and the average air exchange rate per unit time of each ventilation system .

[0032] By analyzing the formula Get the current safe ventilation cycle , then combine the formula Get the current safe ventilation reserved gap; where, It indicates the highest safe value of gas particle concentration allowed in the internal environment of the current chemical workshop. Indicates the internal volume of the workshop. Indicates the number of ventilation systems opened inside the chemical workshop. Indicates the maximum value of the safe ventilation time within the allowable range.

[0033] When safe ventilation is reserved When ≤0, the control center increases the average air exchange volume per unit time of each ventilation system.

[0034] When safe ventilation is reserved >0, it is judged that the average air exchange volume per unit time of each ventilation system meets the safety ventilation requirements.

[0035] When safe ventilation is reserved >50%, the average ventilation volume per unit time of each ventilation system is judged to be too large and the ventilation rate is gradually reduced by 5% of the current ventilation volume until 20%> >0.

[0036] By controlling the reserved gap for safe ventilation, the ventilation cycle inside the chemical workshop can be kept within the safe cycle. Similarly, the ventilation volume can be adjusted to avoid resource waste caused by too short a ventilation cycle, thereby effectively reducing the energy loss of the ventilation system while taking safety into consideration.

[0037] On the premise that the average air exchange volume per unit time of each ventilation system meets the safety ventilation requirements, control the elimination of open flames inside the workshop and set up warning signs and buzzer alarms at each workstation.

[0038] In any of the above schemes, it is preferred that the specific steps of obtaining sample parameters of the chemical intermediate product and completing product quality analysis and evaluation thereof include: completing sample parameter sampling of the methyl chloroacetate chemical intermediate product and dividing the product samples into several groups, and the weight of each group of product samples is .

[0039] Complete moisture treatment for each group of product samples one by one and obtain the weight of the product samples .

[0040] By analyzing the formula The purity compliance rate of the chemical intermediate product of methyl chloroacetate was obtained ,in, Indicates the water content percentage threshold allowed for the methyl chloroacetate chemical intermediate product. Represents the impurity safety correction factor.

[0041] When the purity of methyl chloroacetate chemical intermediate product meets the rate If it meets the requirements, it is judged that the purity of the current product sample preliminarily meets the requirements; otherwise, it is judged that the purity of the current methyl chloroacetate chemical intermediate product does not meet the requirements.

[0042] In any of the above schemes, preferably, after the purity of the current product sample initially meets the requirements, the following steps are also included: obtaining a product sample of the methyl chloroacetate chemical intermediate product and placing it in a sealed transparent storage container, and performing intermittent vibration, temperature adjustment and light adjustment on the outside of the transparent storage container.

[0043] Observe the properties of the product sample in the current transparent storage container and the changes in the internal pressure of the container every 2 hours, and determine whether there is decomposition, discoloration, and adverse reactions.

[0044] If the product samples in the transparent storage container all meet the requirements after several observations, the current product sample is qualified, otherwise it is unqualified.

[0045] In any of the above schemes, it is preferred that the specific working process of the workshop comprehensive scheduling module includes: respectively obtaining the analysis and processing results of the raw material inventory analysis module, the production environment analysis module, the chemical workshop environment analysis and control module, and the quality analysis and evaluation module.

[0046] According to the analysis and processing results, the relevant data and specific conditions of abnormal points in the production process inside the chemical workshop are obtained in real time, and the relevant data and specific conditions of the abnormal points are fed back to the control center.

[0047] The control center obtains the control department and maintenance personnel corresponding to each abnormal point and sends an operation and maintenance signal to them.

[0048] Maintenance personnel receive signals from the control center and promptly inspect and maintain abnormal points. After maintenance is completed, they set up maintenance signs, record the maintenance management process and post-maintenance processing.

[0049] Each workstation must retain the maintenance marks of the last three times.

[0050] Compared with the prior art, the present invention has the following beneficial effects:

[0051] 1. This chemical workshop safety production management platform can optimize the quality and safety of the entire workshop production management by analyzing and managing the production process of methyl chloroacetate chemical intermediates within the entire chemical workshop, the raw materials, reaction conditions and environment of each workstation, and the product quality, and effectively improve the quality of chemical intermediate products.

[0052] 2. This chemical workshop safety production management platform can rely on the periodic analysis and management of inventory raw materials during operation to ensure the quality of inventory supervision and indirectly improve the effect of subsequent raw materials after production reaction, avoiding product quality problems caused by raw material quality.

[0053] 3. During the operation within the chemical workshop, this management platform relies on the control of the internal environment of the chemical workshop and the internal parameters of the target reactor to effectively improve the effect and efficiency of the reaction process, while reducing the safety hazards caused by abnormal reactions to the chemical workshop, and effectively achieve the purpose of safe production.

[0054] 4. The chemical workshop production safety management platform of the present invention takes into account various factors when conducting the management and control of the reaction production within the entire workshop, and can effectively and comprehensively realize the supervision and control of the parameters of each important link of production, and can comprehensively and comprehensively achieve the purpose of managing the safety of the chemical workshop and the safety and quality of the production process. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] In order to more clearly illustrate the technical solutions of the specific embodiments of the present invention, the following will briefly introduce the drawings required for the specific embodiments. In all the drawings, similar elements or components are generally identified by similar reference numerals. In the drawings, each element or component is not necessarily drawn according to the actual scale.

[0056] Figure 1 This is a connection diagram of each module in the present invention.

[0057] Figure 2 It is a schematic diagram of the layout distribution of the ventilation system in the chemical workshop of the present invention.

[0058] In the figure, 1. Chemical workshop; 2. Ventilation system; 3. Target reactor; 4. Air duct. DETAILED DESCRIPTION

[0059] The following is a detailed description of the embodiments of the technical solution of the present invention in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present invention. Figure 1-Figure 2 as shown in .

[0060] Embodiment: A chemical workshop production safety management platform includes a raw material inventory analysis module, a production environment analysis module, a chemical workshop environment analysis and control module, a quality analysis and evaluation module, a workshop comprehensive scheduling module and a control center.

[0061] The raw material inventory analysis module, production environment analysis module, chemical workshop environment analysis and control module, quality analysis and evaluation module, and workshop comprehensive scheduling module are all connected to the control center by signals.

[0062] The entire production safety management platform relies on the control center to achieve overall control. The control center can realize data sharing among the raw material inventory analysis module, production environment analysis module, chemical workshop environment analysis and control module, quality analysis and evaluation module, and workshop comprehensive scheduling module, thus ensuring high efficiency and interoperability in production management and control of the entire chemical workshop.

[0063] The raw material inventory analysis module is used to obtain the raw material status and related parameter information inside the raw material warehouse of the target chemical workshop.

[0064] Conducting status and parameter analysis on the inventory of raw materials in the raw material warehouse can complete the supervision and control of the raw materials before they enter the reactor, effectively ensuring the purpose of pre-management and timely replacement, ensuring the normal supply of raw materials, and avoiding inventory shortages or inventory quality problems when production surges.

[0065] The production environment analysis module is used to obtain the internal parameter information of the target reactor in the chemical workshop.

[0066] The target reactor is the core container in the production process. Real-time control of its internal parameter information during the production process can ensure real-time control of the reaction process and equipment safety, effectively ensure safe production and timely warn of safety hazards in the production process.

[0067] The chemical workshop environmental analysis and control module is used to obtain relevant environmental parameter information inside the chemical workshop and complete the current workshop environmental safety analysis.

[0068] When obtaining relevant environmental parameter information inside the chemical workshop, the main consideration is the important influencing factors in the environment, among which the particle concentration is taken as the key factor; considering the safety hazards caused by particulate matter in the air environment of the chemical workshop, the particle concentration in the environment and the efficiency of rapid ventilation and dust reduction are monitored to comprehensively judge the shortest time to reduce the particle concentration in the current workshop to a safe concentration, while ensuring continuous ventilation and energy-saving control during the ventilation process.

[0069] The quality analysis and evaluation module is used to obtain sample parameters of chemical intermediate products and complete product quality analysis and evaluation.

[0070] Sampling of chemical intermediates and analysis of sampling parameters during the production process as well as product quality analysis can effectively evaluate the quality of the current batch of products and effectively ensure strict control of the overall quality of the products after production.

[0071] The workshop comprehensive scheduling module is used to obtain the analysis and processing results of the raw material inventory analysis module, the production environment analysis module, the chemical workshop environment analysis and control module, and the quality analysis and evaluation module, and to perform production scheduling after completing the comprehensive evaluation.

[0072] The raw material inventory analysis module, production environment analysis module, chemical workshop environment analysis and control module, and quality analysis and evaluation module can complete the analysis and judgment of the parameters of each link within the entire chemical workshop. When each module completes the analysis and judgment, the workshop comprehensive scheduling module can judge each abnormal point according to the analysis and processing results. Through management scheduling, the scheduling and adjustment of each workstation in the entire workshop can be quickly completed to ensure safe production within the entire workshop.

[0073] The control center is used to pre-store relevant basic parameter information and obtain all parameter information of each module during the working process for sharing.

[0074] In any of the above schemes, it is preferred that the raw material status and related parameter information inside the raw material warehouse of the target chemical workshop are obtained, mainly including the sealing, color, particle size, viscosity properties of the raw materials, and the purity of each raw material.

[0075] In any of the above schemes, it is preferred that the specific working process of obtaining the raw material status and related parameter information inside the raw material warehouse of the target chemical workshop includes: observing the sealing, color, particle size, viscosity properties of various raw materials inside the current raw material warehouse and ensuring that they meet the requirements, otherwise the raw materials are replaced.

[0076] Obtaining the sealing, color, particle size, viscosity and purity of each raw material during the inventory stage can better grasp the current remaining inventory and the basic characteristics of each remaining raw material, effectively ensure the quality of the raw materials in the entire raw material warehouse, and provide guarantee for subsequent production supply.

[0077] When unqualified raw materials are found, they can be replaced or processed in a timely manner to ensure that they will not affect subsequent production and supply.

[0078] Then, the quantity of various raw materials in the raw material warehouse is obtained and various raw materials are sampled respectively to obtain multiple groups of raw material analysis samples; the ath group of analysis samples in the current raw material is obtained and the solid impurities are extracted and separated by centrifugal filtration, and then the raw material analysis samples are further purified by solid phase extraction, liquid-liquid extraction or column chromatography to obtain the total mass of impurities. .

[0079] After sampling various raw materials separately, obtaining multiple groups of raw material analysis samples can effectively ensure that multiple samples are taken for various raw materials used inside the raw material warehouse, and effectively ensure the rationality of sampling; the method of separating solid impurities first and then separating liquid impurities after sampling can more accurately determine the total mass of impurities.

[0080] Get the purity of the ath group of analysis samples in the current raw material ; Indicates the total weight of the ath group of analysis samples in the current raw material.

[0081] Obtain the current sampling purity of a raw material through the analytical formula ;in, Indicates the number of the raw material analysis sample in the current raw material. .

[0082] By analyzing the formula Obtain the expected conformity rate of all types of raw materials in the current raw material warehouse; where n represents the number of the raw material type in the current raw material warehouse, They represent the weight proportions of the sampling purity of the raw materials of the corresponding number types. Indicates the correction factor.

[0083] By first completing multiple sampling of a single raw material, and then analyzing the current raw material sampling purity to reflect its raw material concentration; then, by assigning weight factors to the concentrations of various different types of raw materials corresponding to their reaction chemical formulas, combined analysis is performed to obtain the expected raw material compliance rate within the current raw material library. At the same time, the reaction rate and reaction conditions in the reaction process are analyzed within the industry to obtain the correction coefficient, so as to better correct the expected raw material compliance rate, so that the result can more objectively reflect the expected compliance effect of all current raw materials in subsequent production and use.

[0084] This multi-factor weight analysis can better match the current production process to complete the weight ratio, can be used more accurately and objectively to evaluate the quality of raw materials before the production reaction, better guarantee and predict subsequent high-quality production, effectively improve the accuracy of the entire front-end batching process and inventory management, and improve the linkage efficiency between chemical workshop inventory and production, providing guarantees for normal production and safe production.

[0085] At the same time, the expected compliance rate of raw materials can be used as an impurity safety correction factor in the subsequent product quality control link The reference basis set ensures that the impurity safety correction factor can be better set, and the relative objectivity and accuracy of the purity compliance analysis results of methyl chloroacetate chemical intermediate products are improved.

[0086] The expected conformity rate of all types of raw materials in the current raw material library is compared with the theoretical conformity rate of raw materials. If it is greater than the theoretical conformity rate of raw materials, the quality of raw materials in the current raw material library is qualified. Otherwise, subsequent quality analysis or replacement is continued for each type of raw material.

[0087] By comparing the expected conformity rate of raw materials with the theoretical conformity rate of raw materials, the purpose of judging the current raw material quality can be achieved. The quality analysis of the raw materials inside the raw material warehouse can be effectively completed, and unqualified raw materials can be replaced in time or subsequent in-depth inspections can be carried out based on the analysis results.

[0088] In any of the above schemes, preferably, the specific steps of obtaining the internal parameter information of the target reactor in the chemical workshop include: obtaining the sampling temperature values ​​at different sampling positions below the reaction liquid surface in the reactor of the target reactor; ;in, Indicates the number of the current sampled temperature value.

[0089] During the reaction process, rapid sampling of different positions of the liquid surface inside the target reactor can ensure the breadth and comprehensiveness of the sampling range. By numbering the sampling points, it can be effectively ensured that the sampling temperature value of each point corresponds to its position.

[0090] By formula Get the average temperature change rate of the points in the kettle ; When the average temperature change rate of the points in the kettle When it is less than the threshold of the average temperature change rate of the points in the reactor, the internal temperature balance of the current target reactor meets the requirements.

[0091] By taking samples at multiple points and taking the temperature change rate between two adjacent points as the analysis object, the temperature balance inside the current target reactor can be better analyzed. According to the temperature balance inside the target reactor, the heating balance of the current internal solution and the internal heat conduction effect of the target reactor can be quickly judged, thereby effectively providing a basis for the subsequent analysis of the internal quality of the reactor and the inner wall bonding condition.

[0092] When the average temperature change rate of the points in the kettle When it is greater than or equal to the threshold of the average temperature change rate of the points in the kettle, start the agitator and obtain the viscosity values ​​of the solutions at different depths in the kettle. Judge whether the homogeneity of the current solution meets the requirements based on the change in viscosity values. When the homogeneity of the solution in the kettle does not meet the requirements, keep the agitator stirring and adjust the reaction temperature and pressure in the kettle, and then complete the above analysis again until the homogeneity of the solution in the kettle meets the requirements.

[0093] When the average temperature change rate of the points in the kettle When the temperature is greater than or equal to the threshold of the average temperature change rate of the points in the kettle, the viscosity value and homogeneity of the solution can be used to determine the reaction degree and uniformity of the solution in the kettle.

[0094] When the homogeneity of the solution in the kettle does not meet the requirements, the reaction is incomplete and is adjusted according to the temperature and pressure, combined with internal stirring to achieve the purpose of improving the reaction efficiency and effect, thereby achieving real-time monitoring and control of the reaction process and improving the reaction efficiency.

[0095] After the reaction is completed, the inside of the target reactor is thoroughly cleaned; then the outer wall of the target reactor is scanned and an industrial CT scanner is used to obtain a scanning model of the actual wall thickness of the reactor body. The actual wall thickness scanning model is imported into a visual modeling software to reconstruct a three-dimensional model of the wall thickness.

[0096] Compare the three-dimensional wall thickness model with the product wall thickness of the target reactor to obtain the actual wall thickness of each abnormal coordinate point ; The actual wall thickness at the same coordinate point Wall thickness When the difference is If it is within the range of , the current actual wall thickness meets the requirements.

[0097] When the difference It is judged that there is stubborn agglomerated material adhering to the wall in the current kettle, and the agitator or scraping equipment is started to scrape the inner wall of the reactor. After the scraping is completed, the maintenance personnel enter the kettle through the manhole to clean and repair it.

[0098] When the difference When the reactor is detected, it is judged that there are dangerous cracks or damaged depressions in the reactor, and a safety alarm is activated and the control center is notified to shut down the reactor for maintenance.

[0099] By judging the homogeneity of the current solution, the influencing factor of the internal reaction in the kettle can be eliminated. By obtaining the actual wall thickness and combining it with the reconstruction of the three-dimensional wall thickness model, the adhesion and damage of the inner wall of the kettle can be effectively judged, and the target reactor can be effectively prevented and maintained in advance to ensure safe production.

[0100] When comparing the wall thickness, using the 10% difference from the standard wall thickness as the critical value point can better achieve the purpose of accurately judging the current wall thickness in the reactor, so that the wall sticking situation can be controlled in time, and even if cracks or dents appear inside, they will not be too large to cause instantaneous damage, effectively improving the safety and reliability of the entire reactor processing link.

[0101] In any of the above schemes, it is preferred that a gas leakage sensor is provided on the outside of the joints of each component of the target reactor, and the gas leakage situation of the current part is obtained through each gas leakage sensor; if no gas leakage is analyzed by each gas leakage sensor, the internal air tightness of the current target reactor meets the requirements, otherwise a leakage alarm is issued and the ventilation and fire protection systems of the chemical workshop are promptly started by the control center.

[0102] By real-time monitoring of gas leakage during the reaction process, the monitoring effect and efficiency can be improved through multi-point detection and timely alarm, and the ventilation and fire protection systems of the chemical workshop can be effectively started to achieve the purpose of safe ventilation and dilution.

[0103] In any of the above schemes, it is preferred that the specific process of obtaining relevant environmental parameter information inside the chemical workshop and completing the current workshop environmental safety analysis is as follows: Obtaining the gas particle concentration in the internal environment of the chemical workshop under production status and the average air exchange rate per unit time of each ventilation system .

[0104] In this module, the concentration of gas particles in the internal environment is used as the key detection factor. At the same time, the average air exchange volume per unit time of all ventilation systems in the workshop is measured as a factor of the treatment method. The combination of the two can more safely and efficiently judge the safety hazards of the entire current environment and the safety cycle of hazard treatment.

[0105] By analyzing the formula Get the current safe ventilation cycle , then combine the formula Get the current safe ventilation reserved gap; where, It indicates the highest safe value of gas particle concentration allowed in the internal environment of the current chemical workshop. Indicates the internal volume of the workshop. Indicates the number of ventilation systems opened inside the chemical workshop. Indicates the maximum value of the safe ventilation time within the allowable range.

[0106] When safe ventilation is reserved When ≤0, the control center increases the average air exchange volume per unit time of each ventilation system.

[0107] When safe ventilation is reserved >0, it is judged that the average air exchange volume per unit time of each ventilation system meets the safety ventilation requirements.

[0108] By controlling the total ventilation volume inside the chemical workshop and ensuring that the reserved gap for safe ventilation is within a safe range after it is turned on, it is possible to effectively control the ventilation energy consumption of the workshop while ensuring safe production and safe ventilation, thus taking into account both safe production and energy saving.

[0109] When safe ventilation is reserved >50%, the average ventilation volume per unit time of each ventilation system is judged to be too large and the ventilation rate is gradually reduced by 5% of the current ventilation volume until 20%> >0.

[0110] By controlling the reserved gap for safe ventilation, the ventilation cycle inside the chemical workshop can be kept within the safe cycle. Similarly, the ventilation volume can be controlled to avoid waste of resources caused by too short a ventilation cycle, thereby effectively reducing the energy loss of the ventilation system while taking safety into account.

[0111] When designing each ventilation system, each ventilation system is distributed at intervals along the circumference of the chemical workshop, and the arrangement density at the location close to each target reactor is greater than the arrangement density at the location far away from the target reactor; each ventilation system can achieve two-way ventilation and air exchange; the direction of the air duct inside the chemical workshop of each ventilation system is adjustable.

[0112] The directions of the air ducts inside the chemical workshops of each ventilation system are adjustable, and adjacent air ducts can be used in coordination. Adjusting the relative angles between adjacent air ducts can achieve the purpose of coordinated ventilation.

[0113] On the premise that the average air exchange volume per unit time of each ventilation system meets the safety ventilation requirements, control the elimination of open flames inside the workshop and set up warning signs and buzzer alarms at each workstation.

[0114] Effectively prohibiting open flames inside and setting up appropriate buzzer alarms can better ensure the standardization and safety of the internal management of the entire chemical workshop.

[0115] In any of the above schemes, it is preferred that the specific steps of obtaining sample parameters of the chemical intermediate product and completing product quality analysis and evaluation thereof include: completing sample parameter sampling of the methyl chloroacetate chemical intermediate product and dividing the product samples into several groups, and the weight of each group of product samples is .

[0116] Complete moisture treatment for each group of product samples one by one and obtain the weight of the product samples .

[0117] By analyzing the formula The purity compliance rate of the chemical intermediate product of methyl chloroacetate was obtained ,in, Indicates the water content percentage threshold allowed for the methyl chloroacetate chemical intermediate product. Represents the impurity safety correction factor.

[0118] The expected compliance rate of raw materials obtained during raw material inventory can be used as the impurity safety correction factor in the product quality control link. Provide a reference basis, combined with the common sense in the field and based on the expected compliance rate of the raw materials and the types of raw materials and reaction ratios during the reaction, the expected content of internal impurities is calculated by comprehensive analysis; the basic content of the remaining impurities can be obtained after the water is treated, so that the current purity compliance rate of the methyl chloroacetate chemical intermediate product can be predicted and calculated under the premise of only treating the water through safety correction. The specific method and setting basis of this part of the calculation are selected and controlled by those skilled in the art according to the production specifications and the degree of reaction, and will not be repeated here.

[0119] When the purity of methyl chloroacetate chemical intermediate product meets the rate If it meets the requirements, it is judged that the purity of the current product sample preliminarily meets the requirements; otherwise, it is judged that the purity of the current methyl chloroacetate chemical intermediate product does not meet the requirements.

[0120] In any of the above schemes, preferably, after the purity of the current product sample initially meets the requirements, the following steps are also included: obtaining a product sample of the methyl chloroacetate chemical intermediate product and placing it in a sealed transparent storage container, and performing intermittent vibration, temperature adjustment and light adjustment on the outside of the transparent storage container.

[0121] Observe the properties of the product sample in the current transparent storage container and the changes in the internal pressure of the container every 2 hours, and determine whether there is decomposition, discoloration, and adverse reactions.

[0122] If the product samples in the transparent storage container all meet the requirements after several observations, the current product sample is qualified, otherwise it is unqualified.

[0123] By simulating harsh environments such as vibration, temperature adjustment, and light adjustment, the performance stability of the current product samples can be analyzed better and faster.

[0124] In any of the above schemes, it is preferred that the specific working process of the workshop comprehensive scheduling module includes: respectively obtaining the analysis and processing results of the raw material inventory analysis module, the production environment analysis module, the chemical workshop environment analysis and control module, and the quality analysis and evaluation module.

[0125] According to the analysis and processing results, the relevant data and specific conditions of abnormal points in the production process inside the chemical workshop are obtained in real time, and the relevant data and specific conditions of the abnormal points are fed back to the control center.

[0126] The control center obtains the control department and maintenance personnel corresponding to each abnormal point and sends an operation and maintenance signal to them.

[0127] Maintenance personnel receive signals from the control center and promptly inspect and maintain abnormal points. After maintenance is completed, they set up maintenance signs, record the maintenance management process and post-maintenance processing.

[0128] Each workstation must retain the maintenance marks of the last three times.

[0129] Through the analysis of each module, abnormal points can be quickly locked. At the same time, feedback and repair of abnormal points can facilitate timely production and operation of the entire chemical workshop, effectively set up maintenance signs, record the maintenance management process and post-maintenance processing, and retain at least 3 maintenance signs to better ensure that subsequent maintenance personnel can understand the maintenance history of the current point through the reserved signs, providing a reference for subsequent maintenance.

[0130] From the above, it can be seen that this chemical workshop safety production management platform can optimize the quality and safety of the entire workshop production management by analyzing and managing the production process of methyl chloroacetate chemical intermediates within the entire chemical workshop, the raw materials, reaction conditions and environment of each workstation, and the product quality, and effectively improve the quality of chemical intermediate products; when working, it can rely on the periodic analysis and management of inventory raw materials to ensure the quality of inventory and indirectly improve the effect of subsequent raw materials after production reaction, avoiding product quality problems caused by raw material quality.

[0131] During the operation within the chemical workshop, this management platform relies on the control of the internal environment of the chemical workshop and the internal parameters of the target reactor to effectively improve the effect and efficiency of the reaction process, while reducing the potential safety hazards caused by abnormal reactions to the chemical workshop, and effectively achieve the purpose of safe production; when conducting the control of the reaction production within the entire workshop, taking into account various factors, it can effectively and comprehensively realize the supervision and control of the parameters of each important link of production, and can comprehensively and comprehensively achieve the purpose of controlling the safety of the chemical workshop and the safety and quality of the production process.

[0132] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the technical solutions described in the above embodiments can still be modified, or some or all of the technical features can be replaced by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention. For those skilled in the art, any replacement improvements or changes made to the implementation methods of the present invention fall within the protection scope of the present invention.

[0133] The matters not described in detail in the present invention are all known technologies to those skilled in the art.

Claims

1. A chemical workshop production safety management platform, characterized in that: include: The raw material inventory analysis module is used to obtain the raw material status and related parameter information inside the raw material warehouse of the target chemical workshop; The production environment analysis module is used to obtain the internal parameter information of the target reactor in the chemical workshop; The chemical workshop environment analysis and control module is used to obtain relevant environmental parameter information inside the chemical workshop and complete the current workshop environment safety analysis; The quality analysis and evaluation module is used to obtain sample parameters of chemical intermediate products and complete product quality analysis and evaluation; The workshop comprehensive scheduling module is used to obtain the analysis and processing results of the raw material inventory analysis module, the production environment analysis module, the chemical workshop environment analysis and control module, and the quality analysis and evaluation module, and perform production scheduling after completing the comprehensive evaluation; The control center is used to pre-store relevant basic parameter information and obtain all parameter information of each module during the working process for sharing; The specific steps of obtaining the internal parameter information of the target reactor in the chemical workshop include: Get the sampling temperature values ​​at different sampling positions below the reaction liquid surface in the target reactor ;in, Indicates the number of the current sampling temperature value; By formula Get the average temperature change rate of the points in the kettle ; When the average temperature change rate of the points in the kettle When it is less than the average temperature change rate threshold of the points in the reactor, the internal temperature balance of the current target reactor meets the requirements; When the average temperature change rate of the points in the kettle When the temperature is greater than or equal to the threshold of the average change rate of the temperature at the points in the kettle, start the agitator and obtain the viscosity values ​​of the solutions at different depths in the kettle. According to the change of the viscosity value, judge whether the homogeneity of the current solution meets the requirements. When the homogeneity of the solution in the kettle does not meet the requirements, keep stirring with the agitator and adjust the reaction temperature and pressure in the kettle, and then complete the above analysis again until the homogeneity of the solution in the kettle meets the requirements. Scan the outer wall of the target reactor and use an industrial CT scanner to obtain a scanning model of the actual wall thickness of the reactor body. Import the scanning model of the actual wall thickness into the visualization modeling software to reconstruct a three-dimensional model of the wall thickness. Compare the three-dimensional wall thickness model with the product wall thickness of the target reactor to obtain the actual wall thickness of each abnormal coordinate point ; The actual wall thickness at the same coordinate point Wall thickness When the difference is If it is within the range of , the current actual wall thickness meets the requirements; When the difference It is determined that there is agglomerated material adhering to the wall in the reactor, and the agitator or scraping equipment is started to scrape the inner wall of the reactor. After the scraping is completed, the maintenance personnel enter the reactor through the manhole to clean and repair it; When the difference When the reactor is detected, it is judged that there are dangerous cracks or damaged depressions in the reactor, and a safety alarm is activated and the control center is notified to shut down the reactor for maintenance.

2. A chemical workshop production safety management platform according to claim 1, characterized in that: The raw material status and related parameter information inside the raw material warehouse of the target chemical workshop are obtained, mainly including the sealing, color, particle size, viscosity properties, and purity of each raw material.

3. A chemical workshop production safety management platform according to claim 2, characterized in that: The specific work process of obtaining the raw material status and related parameter information inside the raw material warehouse of the target chemical workshop includes: Observe the sealing, color, particle size, viscosity of various raw materials in the current raw material warehouse and ensure that they meet the requirements, otherwise replace the raw materials; Then, the quantity of various raw materials in the raw material warehouse is obtained and various raw materials are sampled respectively to obtain multiple groups of raw material analysis samples; Obtain the a group of analytical samples from the current raw material and extract and separate the solid impurities by centrifugal filtration, and then further purify the raw material analytical samples by solid phase extraction, liquid-liquid extraction or column chromatography to obtain the total mass of impurities. ; Get the purity of the ath group of analysis samples in the current raw material ; Indicates the total weight of the ath group of analysis samples in the current raw material; Obtain the current sampling purity of a raw material through the analytical formula ;in, Indicates the number of the raw material analysis sample in the current raw material. ; By analyzing the formula Obtain the expected conformity rate of all types of raw materials in the current raw material warehouse; where n represents the number of the raw material type in the current raw material warehouse, They represent the weight proportions of the sampling purity of the raw materials of the corresponding number types. represents the correction factor; The expected conformity rate of all types of raw materials in the current raw material library is compared with the theoretical conformity rate of raw materials. If it is greater than the theoretical conformity rate of raw materials, the quality of raw materials in the current raw material library is qualified. Otherwise, subsequent quality analysis or replacement is continued for each type of raw material.

4. A chemical workshop production safety management platform according to claim 3, characterized in that: Gas leakage sensors are installed on the outside of the joints of each component of the target reactor, and the gas leakage situation of the current part is obtained through each gas leakage sensor; if no gas leakage is analyzed by each gas leakage sensor, the internal air tightness of the current target reactor meets the requirements, otherwise a leakage alarm is issued and the ventilation and fire protection systems of the chemical workshop are started by the control center in time.

5. A chemical workshop production safety management platform according to claim 4, characterized in that: The specific process of obtaining relevant environmental parameter information inside the chemical workshop and completing the current workshop environmental safety analysis is as follows: Obtain the gas particle concentration in the internal environment of the chemical workshop under production conditions and the average air exchange rate per unit time of each ventilation system ; By analyzing the formula Get the current safe ventilation cycle , then combine the formula Get the current safe ventilation reserved gap; where, It indicates the highest safe value of gas particle concentration allowed in the internal environment of the current chemical workshop. Indicates the internal volume of the workshop. Indicates the number of ventilation systems opened inside the chemical workshop. Indicates the maximum value of safe ventilation time within the allowable range; When safe ventilation is reserved When ≤0, the control center increases the average air exchange volume per unit time of each ventilation system; When safe ventilation is reserved >0, it is judged that the average ventilation volume per unit time of each ventilation system meets the safety ventilation requirements; When safe ventilation is reserved >50%, the average ventilation volume per unit time of each ventilation system is judged to be too large and the ventilation rate is gradually reduced by 5% of the current ventilation volume until 20%> >0; On the premise that the average air exchange volume per unit time of each ventilation system meets the safety ventilation requirements, control the elimination of open flames inside the workshop and set up warning signs and buzzer alarms at each workstation.

6. A chemical workshop production safety management platform according to claim 5, characterized in that: The specific steps for obtaining sample parameters of chemical intermediate products and completing product quality analysis and evaluation include: Complete the sample parameter sampling of methyl chloroacetate chemical intermediate products and divide the product samples into several groups and the weight of each group of product samples is ; Complete moisture treatment for each group of product samples one by one and obtain the weight of the product samples ; By analyzing the formula The purity compliance rate of the chemical intermediate product of methyl chloroacetate was obtained ,in, Indicates the water content percentage threshold allowed for the methyl chloroacetate chemical intermediate product. Indicates the impurity safety correction factor; When the purity of methyl chloroacetate chemical intermediate product meets the rate If it meets the requirements, it is judged that the purity of the current product sample preliminarily meets the requirements; otherwise, it is judged that the purity of the current methyl chloroacetate chemical intermediate product does not meet the requirements.

7. A chemical workshop production safety management platform according to claim 6, characterized in that: After the purity of the current product sample initially meets the requirements, the following steps are also included: Obtaining a product sample of the methyl chloroacetate chemical intermediate product and placing it in a sealed transparent storage container, and periodically vibrating, adjusting the temperature, and adjusting the light on the outside of the transparent storage container; Observe the properties of the product sample in the current transparent storage container and the changes in the internal pressure of the container every 2 hours, and determine whether there is decomposition, discoloration and adverse reactions; If all product samples in the transparent storage container meet the requirements after observation, the current product sample is qualified, otherwise it is unqualified.

8. A chemical workshop production safety management platform according to claim 7, characterized in that: The specific working process of the workshop comprehensive scheduling module includes: Obtain the analysis and processing results of the raw material inventory analysis module, the production environment analysis module, the chemical workshop environment analysis and control module, and the quality analysis and evaluation module respectively; According to the processing results, the relevant data and specific conditions of abnormal points in the production process of the chemical workshop are obtained in real time, and the relevant data and specific conditions of the abnormal points are fed back to the control center; The control center obtains the control departments and maintenance personnel corresponding to each abnormal point and sends operation and maintenance signals to them; Maintenance personnel receive signals from the control center and promptly inspect and maintain abnormal points. After maintenance is completed, they set up maintenance signs, record the maintenance management process, and post-maintenance processing; Each workstation must retain the maintenance marks of the last three times.

Citation Information

Patent Citations

  • A control method, system, equipment and storage medium for chemical production process

    CN117350517B

  • Chemical reaction platform device and operation method thereof

    CN108355585A

  • Intelligent management and control system for chemical production based on data analysis

    CN116911619A

  • Chemical heat-conducting oil furnace safety supervision system based on multiple variables

    CN116928886A

  • Drug production quality monitoring method and system based on AMES system

    CN117111551A