River water ecological compensation method under influence of water engineering
By assessing the impact of water projects on river sections and adopting a variety of compensation measures such as fish conservation and dam scheduling, the problem of the dam's impact on fish diversity and insufficient compensation funds has been solved, and comprehensive and accurate compensation of the river ecosystem has been achieved. compensate.
Patent Information
- Application Number
- CN202410908751.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-09-27
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing technologies fail to comprehensively and carefully assess the impact of dams on fish diversity during the construction of river water projects. Moreover, there are few sources of compensation funds for river water ecological protection, a single method, and imperfect assessment indicators, making it difficult to effectively carry out water ecological compensation.
By determining the degree of impact of river water engineering facilities on river sections, collecting water ecological parameters, and using methods such as fish conservation, proliferation and release, dam scheduling, fish passing facilities, artificial spawning grounds, and river channel restoration, compensation for different river sections is determined. Determine the form and amount of compensation based on differences to achieve targeted water ecological compensation.
It has achieved comprehensive ecological compensation for river ecosystems affected by water projects, improved the accuracy and effectiveness of compensation, ensured ecological environment compensation in different river basin areas, and avoided resource excess.
Smart Images

Figure CN118710128A
Abstract
Description
Technical Field
[0001] The invention relates to a method for compensating river water ecology under the influence of a water project, in particular to a method for compensating water ecology through fish conservation, and belongs to the field of water ecological protection. Background Art
[0003] There are many studies on river ecological compensation in China, mainly including compensation based on ecological services and compensation based on water consumption. In addition, in the past, environmental impact assessments of dam-built river sections mainly discussed their impacts and restoration measures by roughly dividing water projects into medium, large or small projects, without comprehensively and carefully considering the impact of various dam attributes on fish diversity, such as dam height, reservoir area and longitudinal position in the river. Water projects change the composition of fish communities, and this effect varies greatly between different water projects. In addition, the ecological effects of different attributes of water projects (such as dam height, regulation performance, water storage operation time, construction location, etc.) may vary depending on the fish population and the location of the river section, and these effects may be manifested in the river ecosystem in a separate or cumulative form. Therefore, it is necessary to comprehensively evaluate the potential environmental impacts of various water projects, deeply explore the attributes of water projects and their impact on ecological effects, so as to formulate targeted restoration strategies.
[0004] At present, there are deficiencies such as few channels for source of funds for river water ecological protection compensation, a single compensation method, and an imperfect assessment index system. It is necessary to further broaden the channels for source of funds for water ecological protection compensation, start from the integrity of the river rather than isolated analysis of a single river section, further optimize the water ecological protection compensation method, and establish an assessment index system that combines classification and diversity. Summary of the invention
[0005] In order to solve the problems existing in the above-mentioned prior art, the present invention provides a method for compensating river water ecology under the influence of water projects. The present invention can determine the compensation method and compensation form by region, and the present invention can enable many river ecosystems currently affected by the construction of river water projects to obtain sufficient ecological compensation.
[0006] To achieve the above purpose, the technical solution provided by the present invention is a method for compensating river water ecology under the influence of water projects, which includes:
[0007] S1. Based on the river section where the water project is located, determine the river section that is mainly affected by the water project facilities;
[0008] S2. Determine the degree to which the river is affected by the nth water project facility;
[0009] S3. Determine the water ecological compensation period for the nth water project facility;
[0010] S4. Collect water ecological parameters according to the river section that is mainly affected by the water project facilities, including the species diversity of flowing fish and migratory fish P1, the biomass of flowing fish and migratory fish P2, the early fish resource P3, the river connectivity P4, the spawning ground area P5 and the floodplain area P6. The historical water ecological parameter values collected are P11, P21, P31, P41, P51 and P61; determine the current water ecological parameter values of P12, P22, P32, P42, P52 and P62 through field monitoring of the status of fish and habitats, and determine the water ecological compensation method according to A, B, C, D, E and / or F below; when the difference between the current parameter values of fish and habitats based on field monitoring and the historical parameter values is greater than or equal to 0, the form of ecological compensation is that no compensation is made in the area affected by the water project; when the difference between the current results based on field monitoring and the historical benchmark values is less than 0, the form of ecological compensation is that ecological compensation is made in the area affected by the water project;
[0011] A. When P12-P11 < 0, implement the construction of fish conservation centers to carry out artificial breeding, conservation, rescue and monitoring of fish within the river section, provide comprehensive protection for fish within the river section, improve the diversity of fish at each cascade of the river, and achieve water ecological management;
[0012] B. When P22-P21 < 0, implement fish enhancement and release, artificially breed and release fish that need protection, reduce the impact of water-related projects on aquatic biological resources, replenish and restore rare and unique biological resources, and promote the sustainable development of river ecosystems;
[0013] C. When P32-P31 < 0, the dam group is ecologically dispatched from the perspectives of water ecology and water environment quality. In terms of water ecology, in order to maintain the health of the river, the amount of water discharged during the dry season is guaranteed according to the ecological water demand of the downstream during the dam dispatching. For rivers with multiple dams, the upstream and downstream dams are jointly dispatched to replenish the river water volume between the dams and maintain the ecological water use in the river. In terms of water environment, on the basis of jointly dispatching the water quality and quantity of the dams and ensuring the discharge of small flows, the water environment capacity of the river section is increased according to the water storage conditions between the dams and some dam areas.
[0014] D. When P42-P41<0, build fish-passing facilities; after the sluice dam cuts off the river channel, it blocks the natural migration channel of fish. Build fish-passing facilities to facilitate fish to pass through the dam while overcoming the water drop. According to the migratory characteristics of fish, set up upstream migration fish-passing facilities and / or downstream migration fish-passing facilities;
[0015] When assisting fish to go upstream, if the fish completely rely on their motivation, swimming ability and swimming behavior to pass through obstacles, then autonomous upstream fish passing facilities should be established; otherwise, non-autonomous upstream fish passing facilities should be established;
[0016] When assisting fish to move downward, build fish-friendly turbines and physical interceptors, and set up sensory and behavioral barriers to prevent fish from entering threatening areas;
[0017] Establish natural-style fishways, including natural-style fish ladders, fish ramps and fish bypasses, to help fish swim up and down;
[0018] E. When P52-P51 < 0, artificial spawning grounds are used to compensate for the adverse effects of water projects on the ecological environment and aquatic biological species resources. In suitable river sections, artificial flowing fish spawning grounds are constructed based on the spawning characteristics of fish in the natural environment to create a suitable breeding place for flowing fish and continue the survival of some fish populations within the river section.
[0019] F. When P62-P61<0, adopt the protection measures of river morphology diversification restoration, ecological bank protection and internal habitat improvement to build artificial wetlands;
[0020] S5. Determine whether water ecological compensation can be implemented independently. If the water project is within the river section under the jurisdiction of the cascade, independent compensation will be carried out. If the water project is within other affected river sections outside the river section under the jurisdiction of the cascade, joint compensation will be carried out.
[0021] S6. Determine the annual independent compensation amount and annual joint compensation amount for water ecology that the rivers affected by the water project should receive based on the unit price of the water ecology compensation method and the usage of the river compensation method;
[0022] S7. Determine the compensation allocation method based on the compensation form and the total compensation amount. The compensation amount for independent compensation shall be borne by each cascade, and the joint compensation amount shall be determined based on the relationship between the installed capacity ratio of each cascade and the joint compensation amount. The annual operating expenses of the conservation center and the annual joint compensation expenses of the river cascade joint ecological dispatch shall be shared according to the installed capacity of each cascade power station to ensure the normal operation of the conservation center and the normal joint implementation of the river cascade joint ecological dispatch.
[0023] S8. Carry out water ecological compensation for rivers according to the water ecological compensation method, compensation form and compensation amount;
[0024] S9. Check the water ecological compensation effect of the nth water project facility and increase the compensation period based on the effect.
[0025] The further improvement to the above technical solution is as follows:
[0026] In step S1, the river section range mainly affected by the water engineering facility is: the river section range governed by the water engineering facility and other river sections from the river section to the estuary where the migratory fish historically distributed in the river section have reached the farthest, except for the river section range governed by the water engineering facility; wherein, the river section range governed by the water engineering facility includes the reservoir area, the upstream of the reservoir area and the downstream of the reservoir area under its jurisdiction; if the river section governed by the water engineering facility has not historically been distributed with migratory fish, only the scope of the governed river section will be affected.
[0027] The specific formula for determining the degree of influence of the river by the nth water project facility in step S2 is as follows: n =Q1 n *0.2+Q2 n *0.2+Q3 n *0.2+Q4 n *0.2+Q5 n *0.2;
[0028] Among them, R n Indicates the total score of the impact of the nth water project facility on the river, Q1 n It represents the impact score of the dam height of the nth water project facility on the river, Q2 n Indicates the impact score of the regulation performance of the nth water engineering facility in the river, Q3 n Indicates the impact score of the location of the nth water project facility on the river, Q4 n Indicates the impact score of the reservoir area of the nth water project facility in the river, Q5 n It represents the water storage operation time score of the nth water engineering facility in the river.
[0029] In step S3, the water ecological compensation period for the nth water project facility is determined as follows:
[0030] If R n ≥8.5, the compensation period is 15 years; 6≤R n <8.5, the compensation period is 10 years; R n <6, the compensation period is 5 years.
[0031] In step S4, fish conservation is implemented, and the system carries out fish breeding, conservation, rescue and monitoring in the basin, specifically:
[0032] Reproduction: In view of the ecological impact of water projects on fish resources, fish parent collection, domestication, full artificial reproduction, large-scale seedling cultivation, feed nutrition regulation, disease prevention and control, breeding condition control and reproduction and release are carried out;
[0033] Conservation: In view of the ecological impact of river water projects on fish resources, fish parents within the river range are collected, and a fish germplasm resource bank is built based on the germplasm resources of genes, cells, fertilized eggs, embryos, individuals, and populations;
[0034] Rescue: Select rescue methods based on the ecological impact characteristics and methods of river water projects on fish resources and the biological characteristics of the fish that need to be rescued;
[0035] Monitoring: In view of the ecological impact of river water projects on fish, a river biodiversity and biological integrity monitoring network will be established to carry out aquatic biodiversity monitoring and assessment, investigation and restoration of important fish habitats, and monitoring of the impact of cascade water project operations on fish and the effectiveness of water ecological protection measures.
[0036] The autonomous upstream fish passage facilities in step S4 include pond-type fishways, ice port-type fishways, vertical slot-type fishways and Daniel-type fishways; the non-autonomous upstream fish passage facilities include fish lifts, fish locks and transport fishing vessels.
[0037] The annual independent compensation amount and annual joint compensation amount in step S6 are specifically:
[0038] The total annual compensation amount for all tiers ∑X = annual compensation amount for fish conservation center + annual compensation amount for ecological dispatch;
[0039] Total annual independent compensation amount for a single level V m =Annual compensation amount for stocking and releasing + annual compensation amount for ecological scheduling + annual compensation amount for fish passing facilities + annual compensation amount for artificial spawning grounds + annual compensation amount for fish passing facilities.
[0040] The specific calculation formula for the common compensation fund sharing of each echelon in step S7 is:
[0041] The calculation formula for sharing the annual common compensation amount for a single tier is: m =∑X*(Y m / ∑Y); the annual compensation amount for water ecology of a single cascade is calculated as follows: Z m =M m +V m ;
[0042] Among them, M m represents the annual contribution funds in the annual joint compensation funds of the mth echelon, ∑X is the sum of the annual joint compensation amounts of all echelons, and Y m represents the installed capacity of the mth cascade, ∑Y represents the installed capacity of all cascades of the river, and Z m V represents the total annual compensation amount of water ecology in the mth cascade. m Represents the sum of annual independent compensation funds for the mth level.
[0043] Step S9 specifically includes:
[0044] After water ecological compensation is carried out on the river cascade, water ecological parameters are collected every year within the river section determined to be mainly affected by the water engineering facilities, including the species diversity of flowing fish and migratory fish P1, the biomass of flowing fish and migratory fish P2, the early fish resource quantity P3, the river connectivity P4, the spawning ground area P5 and the floodplain area P6. The historical water ecological parameter values are P11, P21, P31, P41, P51 and P61. The water ecological parameter values determined by field monitoring of the status of fish and habitats before water ecological compensation are P12, P22, P32, P42, P52 and P62. The annual water ecological parameter value determined by field monitoring of the status of fish and habitats after water ecological compensation is P1 Y 、P2 Y 、P3 Y 、P4 Y 、P5 Y and P6 Y ; Evaluate the water ecological compensation effect according to the following method;
[0045] P1 Y <P12, then the P1 water ecological compensation effect evaluation level is poor, P12≤P1 Y <P11, then the evaluation level of water ecological compensation effect of P1 is medium, and P1 Y =P11, then the evaluation level of water ecological compensation effect of P1 is excellent;
[0046] P2 Y <P22, then the P2 water ecological compensation effect evaluation level is poor, P22≤P2 Y <P21, then the evaluation level of water ecological compensation effect of P1 is medium, and P2 Y =P21, then the P2 water ecological compensation effect evaluation level is excellent;
[0047] P3 Y <P32, then the P3 water ecological compensation effect evaluation level is poor, P32≤P3 Y <P31, then the P3 water ecological compensation effect evaluation level is medium, P3 Y =P31, then the P3 water ecological compensation effect evaluation level is excellent;
[0048] P4 Y <P12, then the P4 water ecological compensation effect evaluation level is poor, P42≤P4 Y <P41, then the P4 water ecological compensation effect evaluation level is medium, P4 Y =P41, then the evaluation level of water ecological compensation effect of P14 is excellent;
[0049] P5 Y<P52, then the P5 water ecological compensation effect evaluation level is poor, P52≤P5 Y <P51, then the P5 water ecological compensation effect evaluation level is medium, P5 Y =P51, then the P5 water ecological compensation effect evaluation level is excellent;
[0050] P6 Y <P62, then the P6 water ecological compensation effect evaluation level is poor, P62≤P6 Y <P61, then the P6 water ecological compensation effect evaluation level is medium, P6 Y =P61, then the P6 water ecological compensation effect evaluation level is excellent;
[0051] The subscript Y indicates the Yth year after water ecological compensation;
[0052] The calculation formula for evaluating the water ecological compensation effect of a single cascade of a river is: H = H A *0+H B *0.5+H C *1;
[0053] Among them, H A The sum of the number of water ecological compensation effect evaluation grades of P1, P2, P3, P4, P5, and P6 that are excellent; H B is the sum of the water ecological compensation effect evaluation levels of P1, P2, P3, P4, P5, and P6; H C It is the sum of the number of poor water ecological compensation effect evaluation grades of P1, P2, P3, P4, P5, and P6;
[0054] If H<2, the water ecological compensation effect evaluation level is excellent; if 2≤H<4, the water ecological compensation effect evaluation level is medium; if H≥4, the water ecological compensation effect evaluation level is poor;
[0055] On the basis of the compensation period determined in step S3, the added value of the water ecological compensation period for the nth water engineering facility is: J=H.
[0056] According to the above technical scheme, the present invention provides a method for compensating rivers affected by water projects by collecting water ecological parameters by determining the scope of rivers affected by water projects, determining the water ecological compensation period according to the degree of influence of water project facilities, and then determining the compensation form and compensation method according to the scope of the water project and water ecological parameters; determining the annual independent compensation amount and annual joint compensation amount of water ecology that the rivers affected by water projects deserve according to the unit price of the water ecological compensation method and the usage of the river compensation method, and then performing water ecological compensation for the rivers according to the water ecological compensation method, compensation form and compensation amount; finally, inspecting the water ecological compensation effect of water project facilities and increasing the compensation period according to the effect. Compared with the prior art, the present invention has the following advantages:
[0057] (1) Because the technical solution adopted by the present invention is based on the river section where the basin cascade is located to determine the scope of the river section affected by the water project, the present invention can determine the scope of water ecological compensation based on the scope of the river section affected by the project.
[0058] (2) Because the technical solution adopted by the present invention collects and organizes historical water ecological data and determines the water ecological compensation method through field monitoring of the status of fish and habitats, the present invention can determine different compensation methods according to the results of the impact of water projects and carry out water ecological compensation more effectively.
[0059] (3) Because the technical solution adopted by the present invention determines the compensation behavior according to the scope of the water ecological compensation method, the present invention can accurately compensate for the ecological environment between river basins, meet the compensation needs of different river basins, and avoid excessive compensation resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 A flow chart of a method for compensating river water ecology under the influence of water projects. DETAILED DESCRIPTION
[0061] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited to the following embodiments.
[0062] In the technical solution provided by the present invention, a method for compensating river water ecology under the influence of water engineering is provided. The flow chart of the method is as follows: Figure 1 As shown, it includes:
[0063] S1. Based on the river section where the water project is located, determine the river section that is mainly affected by the water project facilities;
[0064] In this embodiment, the river section mainly affected by the water engineering facility is D; the river section governed by the water engineering facility is D g In addition to the river section governed by the water engineering facilities, the river section from the farthest reach of migratory fish in the river section to the estuary is the other river section D h ; Among them, the river section governed by the water project facilities is D g , including the reservoir area D under its jurisdiction q 、Upstream of the reservoir areaD s and the downstream area of the reservoir x The range of the river section. That is, D = D g +D h ;D g =D q +D s +D x .
[0065] If the river section governed by the water project has no historical distribution of migratory fish, then D h =0, only the scope of the river section under jurisdiction is affected.
[0066] S2. Determine the degree to which the river is affected by the nth water project facility;
[0067] In this embodiment, the corresponding relationship between the main influencing factors of water engineering facilities, the weights of the main influencing factors, the impact degree scores of the main influencing factors and the links affected by the main influencing factors is shown in Table 1;
[0068] Table 1
[0069]
[0070]
[0071] The specific formula for determining the degree of influence of the nth water project facility on a river is as follows: n =Q1 n *0.2+Q2 n *0.2+Q3 n *0.2+Q4 n *0.2+Q5 n *0.2;
[0072] Among them, R n Indicates the total score of the impact of the nth water project facility on the river, Q1 n It represents the impact score of the dam height of the nth water project facility on the river, Q2 n Indicates the impact score of the regulation performance of the nth water engineering facility in the river, Q3 n Indicates the impact score of the location of the nth water project facility on the river, Q4 n Indicates the impact score of the reservoir area of the nth water project facility in the river, Q5 n It represents the water storage operation time score of the nth water engineering facility in the river.
[0073] S3. Determine the water ecological compensation period for the nth water project facility;
[0074] In this embodiment, the impact level is determined according to the impact of the nth water project facility on the river, and the compensation principle and compensation period are determined. The specific corresponding relationship is shown in Table 2;
[0075] Table 2
[0076] Impact score <![CDATA[R n ≥8.5]]> <![CDATA[6≤R n <8.5]]> <![CDATA[R n <6]]> Impact level high middle Low Compensation Principle Mandatory Semi-mandatory, semi-voluntary (negotiation + mandatory) Voluntariness Compensation period 15 years 10 years 5 years
[0077] If R n ≥8.5, the compensation period is 15 years; 6≤R n<8.5, the compensation period is 10 years; R n <6, the compensation period is 5 years.
[0078] S4. Collect water ecological parameters according to the river section that is mainly affected by the water project facilities, including the species diversity of flowing fish and migratory fish P1, the biomass of flowing fish and migratory fish P2, the early fish resource P3, the river connectivity P4, the spawning ground area P5 and the floodplain area P6. The historical water ecological parameter values collected are P11, P21, P31, P41, P51 and P61; determine the current water ecological parameter values of P12, P22, P32, P42, P52 and P62 through field monitoring of the status of fish and habitats, and determine the water ecological compensation method according to A, B, C, D, E and / or F below; when the difference between the current parameter values of fish and habitats based on field monitoring and the historical parameter values is greater than or equal to 0, the form of ecological compensation is that no compensation is made in the area affected by the water project; when the difference between the current results based on field monitoring and the historical benchmark values is less than 0, the form of ecological compensation is that ecological compensation is made in the area affected by the water project;
[0079] A. When P12-P11 < 0, implement the construction of fish conservation centers to carry out artificial breeding, conservation, rescue and monitoring of fish within the river section, provide comprehensive protection for fish within the river section, improve the diversity of fish at each cascade of the river, and achieve water ecological management;
[0080] In this embodiment, fish conservation is implemented, and the system carries out river fish breeding, conservation, rescue and monitoring specifically as follows:
[0081] Reproduction: In view of the ecological impact of water projects on fish resources, fish parent collection, domestication, full artificial reproduction, large-scale seedling cultivation, feed nutrition regulation, disease prevention and control, breeding condition control and reproduction and release are carried out;
[0082] Conservation: In view of the ecological impact of river water projects on fish resources, fish parents within the river range are collected, and a fish germplasm resource bank is built based on the germplasm resources of genes, cells, fertilized eggs, embryos, individuals, and populations;
[0083] Rescue: Select rescue methods based on the ecological impact characteristics and methods of river water projects on fish resources and the biological characteristics of the fish that need to be rescued;
[0084] Monitoring: In view of the ecological impact of river water projects on fish, a river biodiversity and biological integrity monitoring network will be established to carry out aquatic biodiversity monitoring and assessment, investigation and restoration of important fish habitats, and monitoring of the impact of cascade water project operations on fish and the effectiveness of water ecological protection measures.
[0085] B. When P22-P21 < 0, implement fish enhancement and release, artificially breed and release fish that need protection, reduce the impact of water-related projects on aquatic biological resources, replenish and restore rare and unique biological resources, and promote the sustainable development of river ecosystems;
[0086] C. When P32-P31 < 0, the dam group is ecologically dispatched from the perspectives of water ecology and water environment quality. In terms of water ecology, in order to maintain the health of the river, the amount of water discharged during the dry season is guaranteed according to the ecological water demand of the downstream during the dam dispatching. For rivers with multiple dams, the upstream and downstream dams are jointly dispatched to replenish the river water volume between the dams and maintain the ecological water use in the river. In terms of water environment, on the basis of jointly dispatching the water quality and quantity of the dams and ensuring the discharge of small flows, the water environment capacity of the river section is increased according to the water storage conditions between the dams and some dam areas.
[0087] D. When P42-P41<0, build fish-passing facilities; after the sluice dam cuts off the river channel, it blocks the natural migration channel of fish. Build fish-passing facilities to facilitate fish to pass through the dam while overcoming the water drop. According to the migratory characteristics of fish, set up upstream migration fish-passing facilities and / or downstream migration fish-passing facilities;
[0088] In this embodiment, a detailed survey of the reservoir dam in the river is conducted to collect and analyze data such as topography, elevation, slope, water collection, high and low values of inundation, dam discharge, siltation, wind speed, etc. At the same time, the key fish species, habits, upstream migration ability, fish season and other ecological factors related to fish are investigated to determine the type of fish facilities.
[0089] When assisting fish to go upstream, if the fish completely rely on their upstream motivation, swimming ability and swimming behavior to pass through obstacles, autonomous upstream fish passage facilities should be established; otherwise, non-autonomous upstream fish passage facilities should be established; autonomous upstream fish passage facilities include pond-type fishways, ice port-type fishways, vertical slit-type fishways and Daniel-type fishways; non-autonomous upstream fish passage facilities include fish lifts, fish locks and transport vessels;
[0090] When assisting fish to move downward, build fish-friendly turbines and physical interceptors, and set up sensory and behavioral barriers to prevent fish from entering threatening areas;
[0091] When it is necessary to assist fish to move both upward and downward, a natural-like fishway is established, including natural-like fish ladders, fish slopes and fish bypasses.
[0092] E. When P52-P51 < 0, artificial spawning grounds are used to compensate for the adverse effects of water projects on the ecological environment and aquatic biological species resources. In suitable river sections, artificial flowing fish spawning grounds are constructed based on the spawning characteristics of fish in the natural environment to create a suitable breeding place for flowing fish and continue the survival of some fish populations within the river section.
[0093] F. When P62-P61<0, adopt the protection measures of river morphology diversification restoration, ecological bank protection and internal habitat improvement to build artificial wetlands;
[0094] S5. Determine whether water ecological compensation can be implemented independently. If the water project is within the scope of the river section under the jurisdiction of the cascade, independent compensation will be carried out. If the water project is within the scope of other affected river sections outside the scope of the river section under the jurisdiction of the cascade, joint compensation will be carried out. In this embodiment, the corresponding relationship between the compensation method, compensation scope and compensation form is shown in Table 3.
[0095] Table 3
[0096] Compensation Method Compensation range Compensation Form Fish Conservation Center <![CDATA[D h ]]> Joint compensation Enhancement and release <![CDATA[D g ]]> Independent compensation Ecological Dispatch <![CDATA[D h and D g ]]> Joint compensation and independent compensation Fish passing facilities <![CDATA[D g ]]> Independent compensation Artificial spawning grounds <![CDATA[D g ]]> Independent compensation Constructed Wetlands <![CDATA[D g ]]> Independent compensation
[0097] Among them, ecological regulation is divided into river cascade joint ecological regulation and single cascade independent ecological regulation, and the corresponding compensation ranges are D h and D g , the corresponding compensation forms are joint compensation and independent compensation. g The river section governed by the water conservancy project; D h It refers to the river section from the farthest river section to the estuary where migratory fish have historically reached, excluding the river section under the jurisdiction of water engineering facilities.
[0098] S6. Determine the annual independent compensation amount and annual joint compensation amount for water ecology that the rivers affected by the water project deserve based on the unit price of the water ecological compensation method and the usage of the river compensation method; in this embodiment, the corresponding relationship between the annual compensation amount, compensation form, compensation method, compensation unit price and compensation method usage is shown in Table 4.
[0099] Table 4
[0100]
[0101]
[0102] The compensation amount formula is as follows:
[0103] The total annual compensation amount for all tiers: ∑X = annual compensation amount for fish conservation center + annual compensation amount for ecological scheduling = B*1+T*1;
[0104] Total annual independent compensation amount for a single level: V m = Annual compensation for stocking and releasing + annual compensation for ecological regulation + annual compensation for fish-passing facilities + annual compensation for artificial spawning grounds + annual compensation for fish-passing facilities = Z*2+L*1+G*1+C*S+W*M;
[0105] Annual compensation amount for stock enhancement and release = Z*2;
[0106] Annual compensation amount for ecological dispatch = L*1;
[0107] Annual compensation amount for fish passage facilities = G*1;
[0108] Annual compensation amount for artificial spawning grounds = C*S;
[0109] Annual compensation amount for artificial wetlands = W*M;
[0110] Among them, ∑X is the total annual joint compensation amount of all cascades; B is the sum of the annual construction fee, annual management fee and annual operating fee of the river conservation center; T is the total annual compensation fee for the joint ecological dispatch of the river cascades; V m Represents the sum of independent compensation funds for the mth level.
[0111] In this embodiment, B≥2000; T≥100; Z≥50; L≥80; G≥200; C≥5; and W≥3.
[0112] S7. Determine the compensation allocation method based on the compensation form and the total compensation amount. The compensation amount for independent compensation shall be borne by each cascade, and the joint compensation amount shall be determined based on the relationship between the installed capacity ratio of each cascade and the joint compensation amount. The annual operating expenses of the conservation center and the annual joint compensation expenses of the river cascade joint ecological dispatch shall be shared according to the installed capacity of each cascade power station to ensure the normal operation of the conservation center and the normal joint implementation of the river cascade joint ecological dispatch.
[0113] The calculation formula for sharing the annual common compensation amount for a single tier is: m =∑X*(Y m / ∑Y); the annual compensation amount for water ecology of a single cascade is calculated as follows: Z m =M m +V m ;
[0114] Among them, M m represents the annual contribution funds in the annual common compensation funds of the mth echelon, ∑X is the annual common compensation amount of all echelons, and Y m represents the installed capacity of the mth cascade, ∑Y represents the installed capacity of all cascades of the river, and Z m V represents the total annual compensation amount of water ecology in the mth cascade. m Represents the sum of annual independent compensation funds for the mth level.
[0115] S8. Carry out water ecological compensation for rivers in accordance with the water ecological compensation method, compensation form and compensation amount.
[0116] S9. Check the water ecological compensation effect of the nth water project facility and increase the compensation period based on the effect.
[0117] After water ecological compensation is carried out on the river cascade, water ecological parameters are collected every year within the river section determined to be mainly affected by the water engineering facilities, including the species diversity of flowing fish and migratory fish P1, the biomass of flowing fish and migratory fish P2, the early fish resource quantity P3, the river connectivity P4, the spawning ground area P5 and the floodplain area P6. The historical water ecological parameter values are P11, P21, P31, P41, P51 and P61. The water ecological parameter values determined by field monitoring of the status of fish and habitats before water ecological compensation are P12, P22, P32, P42, P52 and P62. The annual water ecological parameter value determined by field monitoring of the status of fish and habitats after water ecological compensation is P1 Y 、P2 Y 、P3 Y 、P4 Y 、P5 Y and P6 Y ; Evaluate the water ecological compensation effect according to the following method;
[0118] P1 Y <P12, then the P1 water ecological compensation effect evaluation level is poor, P12≤P1 Y <P11, then the evaluation level of water ecological compensation effect of P1 is medium, and P1 Y =P11, then the evaluation level of water ecological compensation effect of P1 is excellent;
[0119] P2 Y <P22, then the P2 water ecological compensation effect evaluation level is poor, P22≤P2 Y <P21, then the evaluation level of water ecological compensation effect of P1 is medium, and P2 Y =P21, then the P2 water ecological compensation effect evaluation level is excellent;
[0120] P3 Y <P32, then the P3 water ecological compensation effect evaluation level is poor, P32≤P3 Y <P31, then the P3 water ecological compensation effect evaluation level is medium, P3 Y =P31, then the P3 water ecological compensation effect evaluation level is excellent;
[0121] P4 Y <P12, then the P4 water ecological compensation effect evaluation level is poor, P42≤P4 Y <P41, then the P4 water ecological compensation effect evaluation level is medium, P4 Y =P41, then the evaluation level of water ecological compensation effect of P14 is excellent;
[0122] P5 Y <P52, then the P5 water ecological compensation effect evaluation level is poor, P52≤P5 Y <P51, then the P5 water ecological compensation effect evaluation level is medium, P5 Y =P51, then the P5 water ecological compensation effect evaluation level is excellent;
[0123] P6 Y <P62, then the P6 water ecological compensation effect evaluation level is poor, P62≤P6 Y <P61, then the P6 water ecological compensation effect evaluation level is medium, P6 Y =P61, the evaluation grade of water ecological compensation effect of P6 is excellent.
[0124] The subscript Y represents the Yth year after water ecological compensation.
[0125] The calculation formula for evaluating the water ecological compensation effect of a single cascade of a river is: H = H A *0+H B *0.5+H C *1;
[0126] Among them, H A The sum of the number of water ecological compensation effect evaluation grades of P1, P2, P3, P4, P5, and P6 that are excellent; H B is the sum of the water ecological compensation effect evaluation levels of P1, P2, P3, P4, P5, and P6; H C It is the sum of the number of poor water ecological compensation effect evaluation grades of P1, P2, P3, P4, P5, and P6.
[0127] If H<2, the water ecological compensation effect evaluation level is excellent; if 2≤H<4, the water ecological compensation effect evaluation level is medium; if H≥4, the water ecological compensation effect evaluation level is poor.
[0128] On the basis of the compensation period determined in step S3, the added value of the water ecological compensation period for the nth water engineering facility is: J=H.
[0129] In this example, it was previously determined that compensation was required for 15 years. After the first year of water ecological compensation measures, an assessment was conducted and it was found that there was no complete improvement, and the H score was 4, so 4 years were added, and the total restoration period was 19 years. After the second year of water ecological compensation measures, an assessment was conducted and it was found that there was no complete improvement, and the H score was 2, so 2 years were added, and the total restoration period was 21 years. And so on.
[0130] The embodiments of the present invention provide a method for compensating river water ecology under the influence of water engineering projects, a method for scoring the degree of impact of water engineering facilities on fish, a method for determining the water ecological compensation period, and a method for calculating the amount of water ecological compensation payable by river cascades, which ensure the rationality and operability of determining the water ecological compensation plan in the river.
Claims
1. A method for compensating river water ecology under the influence of water projects, characterized in that The following steps are involved: S1. Based on the river section where the water project is located, determine the river section that is mainly affected by the water project facilities; S2. Determine the degree to which the river is affected by the nth water project facility; S3. Determine the water ecological compensation period for the nth water project facility; S4. Collect water ecological parameters according to the river section that is mainly affected by the water project facilities, including the species diversity of flowing fish and migratory fish P1, the biomass of flowing fish and migratory fish P2, the early fish resource P3, the river connectivity P4, the spawning ground area P5 and the floodplain area P6. The historical water ecological parameter values collected are P11, P21, P31, P41, P51 and P61; determine the current water ecological parameter values of P12, P22, P32, P42, P52 and P62 through field monitoring of the status of fish and habitats, and determine the water ecological compensation method according to A, B, C, D, E and / or F below; when the difference between the current parameter values of fish and habitats based on field monitoring and the historical parameter values is greater than or equal to 0, the form of ecological compensation is that no compensation is made in the area affected by the water project; when the difference between the current results based on field monitoring and the historical benchmark values is less than 0, the form of ecological compensation is that ecological compensation is made in the area affected by the water project; A. When P12-P11 < 0, implement the construction of fish conservation centers to carry out artificial breeding, conservation, rescue and monitoring of fish within the river section, provide comprehensive protection for fish within the river section, improve the diversity of fish at each cascade of the river, and achieve water ecological management; B. When P22-P21 < 0, implement fish enhancement and release, artificially breed and release fish that need protection, reduce the impact of water-related projects on aquatic biological resources, replenish and restore rare and unique biological resources, and promote the sustainable development of river ecosystems; C. When P32-P31 < 0, the dam group is ecologically dispatched from the perspectives of water ecology and water environment quality. In terms of water ecology, in order to maintain the health of the river, the amount of water discharged during the dry season is guaranteed according to the ecological water demand of the downstream during the dam dispatching. For rivers with multiple dams, the upstream and downstream dams are jointly dispatched to replenish the river water volume between the dams and maintain the ecological water use in the river. In terms of water environment, on the basis of jointly dispatching the water quality and quantity of the dams and ensuring the discharge of small flows, the water environment capacity of the river section is increased according to the water storage conditions between the dams and some dam areas. D. When P42-P41<0, build fish-passing facilities; after the sluice dam cuts off the river channel, it blocks the natural migration channel of fish. Build fish-passing facilities to facilitate fish to pass through the dam while overcoming the water drop. According to the migratory characteristics of fish, set up upstream migration fish-passing facilities and / or downstream migration fish-passing facilities; When assisting fish to go upstream, if the fish completely rely on their motivation, swimming ability and swimming behavior to pass through obstacles, then autonomous upstream fish passing facilities should be established; otherwise, non-autonomous upstream fish passing facilities should be established; When assisting fish to move downward, build fish-friendly turbines and physical interceptors, and set up sensory and behavioral barriers to prevent fish from entering threatening areas; Establish natural-style fishways, including natural-style fish ladders, fish ramps and fish bypasses, to help fish swim up and down; E. When P52-P51 < 0, artificial spawning grounds are used to compensate for the adverse effects of water projects on the ecological environment and aquatic biological species resources. In suitable river sections, artificial flowing fish spawning grounds are constructed based on the spawning characteristics of fish in the natural environment to create a suitable breeding place for flowing fish and continue the survival of some fish populations within the river section. F. When P62-P61<0, adopt the protection measures of river morphology diversification restoration, ecological bank protection and internal habitat improvement to build artificial wetlands; S5. Determine whether water ecological compensation can be implemented independently. If the water project is within the river section under the jurisdiction of the cascade, independent compensation will be carried out. If the water project is within other affected river sections outside the river section under the jurisdiction of the cascade, joint compensation will be carried out. S6. Determine the annual independent compensation amount and annual joint compensation amount for water ecology that the rivers affected by the water project should receive based on the unit price of the water ecology compensation method and the usage of the river compensation method; S7. Determine the compensation allocation method based on the compensation form and the total compensation amount. The compensation amount for independent compensation shall be borne by each cascade, and the joint compensation amount shall be determined based on the relationship between the installed capacity ratio of each cascade and the joint compensation amount. The annual operating expenses of the conservation center and the annual joint compensation expenses of the river cascade joint ecological dispatch shall be shared according to the installed capacity of each cascade power station to ensure the normal operation of the conservation center and the normal joint implementation of the river cascade joint ecological dispatch. S8. Carry out water ecological compensation for rivers according to the water ecological compensation method, compensation form and compensation amount; S9. Check the water ecological compensation effect of the nth water project facility and increase the compensation period based on the effect.
2. The method for compensating river water ecology under the influence of water projects according to claim 1, characterized in that: In step S1, the river section range mainly affected by the water engineering facility is: the river section range governed by the water engineering facility and other river sections from the river section to the estuary where the migratory fish historically distributed in the river section have reached the farthest, except for the river section range governed by the water engineering facility; wherein, the river section range governed by the water engineering facility includes the reservoir area, the upstream of the reservoir area and the downstream of the reservoir area under its jurisdiction; if the river section governed by the water engineering facility has not historically been distributed with migratory fish, only the scope of the governed river section will be affected.
3. The method for compensating river water ecology under the influence of water projects according to claim 1, characterized in that: The specific formula for determining the degree of influence of the river by the nth water project facility in step S2 is as follows: n =Q1 n *0.2+Q2 n *0.2+Q3 n *0.2+Q4 n *0.2+Q5 n *0.2; Among them, R n Indicates the total score of the impact of the nth water project facility on the river, Q1 n It represents the impact score of the dam height of the nth water project facility on the river, Q2 n Indicates the impact score of the regulation performance of the nth water engineering facility in the river, Q3 n Indicates the impact score of the location of the nth water project facility on the river, Q4 n Indicates the impact score of the reservoir area of the nth water project facility in the river, Q5 n It represents the water storage operation time score of the nth water engineering facility in the river.
4. The method for compensating river water ecology under the influence of water projects according to claim 1, characterized in that: In step S3, the water ecological compensation period for the nth water project facility is determined as follows: If R n ≥8.5, the compensation period is 15 years; 6≤R n <8.5, the compensation period is 10 years; R n <6, the compensation period is 5 years.
5. The method for compensating river water ecology under the influence of water projects according to claim 1, characterized in that: In step S4, fish conservation is implemented, and the system carries out fish breeding, conservation, rescue and monitoring in the basin, specifically: Reproduction: In view of the ecological impact of water projects on fish resources, fish parent collection, domestication, full artificial reproduction, large-scale seedling cultivation, feed nutrition regulation, disease prevention and control, breeding condition control and reproduction and release are carried out; Conservation: In view of the ecological impact of river water projects on fish resources, fish parents within the river range are collected, and a fish germplasm resource bank is built based on the germplasm resources of genes, cells, fertilized eggs, embryos, individuals, and populations; Rescue: Select rescue methods based on the ecological impact characteristics and methods of river water projects on fish resources and the biological characteristics of the fish that need to be rescued; Monitoring: In view of the ecological impact of river water projects on fish, a river biodiversity and biological integrity monitoring network will be established to carry out aquatic biodiversity monitoring and assessment, investigation and restoration of important fish habitats, and monitoring of the impact of cascade water project operations on fish and the effectiveness of water ecological protection measures.
6. The method for compensating river water ecology under the influence of water projects according to claim 1, characterized in that: The autonomous upstream fish passage facilities in step S4 include pond-type fishways, ice port-type fishways, vertical slot-type fishways and Daniel-type fishways; the non-autonomous upstream fish passage facilities include fish lifts, fish locks and transport fishing vessels.
7. The method for compensating river water ecology under the influence of water projects according to claim 1, characterized in that: The annual independent compensation amount and annual joint compensation amount in step S6 are specifically: The total annual compensation amount for all tiers ∑X = annual compensation amount for fish conservation center + annual compensation amount for ecological dispatch; Total annual independent compensation amount for a single level V m =Annual compensation amount for stocking and releasing + annual compensation amount for ecological scheduling + annual compensation amount for fish passing facilities + annual compensation amount for artificial spawning grounds + annual compensation amount for fish passing facilities.
8. The method for compensating river water ecology under the influence of water projects according to claim 1, characterized in that: The specific calculation formula for the common compensation fund sharing of each echelon in step S7 is: The calculation formula for sharing the annual common compensation amount for a single tier is: m =∑X*(Y m / ∑Y); the annual compensation amount for water ecology of a single cascade is calculated as follows: Z m =M m +V m ; Among them, M m represents the annual contribution funds in the annual joint compensation funds of the mth echelon, ∑X is the sum of the annual joint compensation amounts of all echelons, and Y m represents the installed capacity of the mth cascade, ∑Y represents the installed capacity of all cascades of the river, and Z m V represents the total annual compensation amount of water ecology in the mth cascade. m Represents the sum of annual independent compensation funds for the mth level.
9. The method for compensating river water ecology under the influence of water projects according to claim 1, characterized in that: Step S9 specifically includes: After water ecological compensation is carried out on the river cascade, water ecological parameters are collected every year within the river section determined to be mainly affected by the water engineering facilities, including the species diversity of flowing fish and migratory fish P1, the biomass of flowing fish and migratory fish P2, the early fish resource quantity P3, the river connectivity P4, the spawning ground area P5 and the floodplain area P6. The historical water ecological parameter values are P11, P21, P31, P41, P51 and P61. The water ecological parameter values determined by field monitoring of the status of fish and habitats before water ecological compensation are P12, P22, P32, P42, P52 and P62. The annual water ecological parameter value determined by field monitoring of the status of fish and habitats after water ecological compensation is P1 Y 、P2 Y 、P3 Y 、P4 Y 、P5 Y and P6 Y ; Evaluate the water ecological compensation effect according to the following method; P1 Y <P12, then the P1 water ecological compensation effect evaluation level is poor, P12≤P1 Y <P11, then the evaluation level of water ecological compensation effect of P1 is medium, and P1 Y =P11, then the evaluation level of water ecological compensation effect of P1 is excellent; P2 Y <P22, then the P2 water ecological compensation effect evaluation level is poor, P22≤P2 Y <P21, then the evaluation level of water ecological compensation effect of P1 is medium, and P2 Y =P21, then the P2 water ecological compensation effect evaluation level is excellent; P3 Y <P32, then the P3 water ecological compensation effect evaluation level is poor, P32≤P3 Y <P31, then the P3 water ecological compensation effect evaluation level is medium, P3 Y =P31, then the P3 water ecological compensation effect evaluation level is excellent; P4 Y <P12, then the P4 water ecological compensation effect evaluation level is poor, P42≤P4 Y <P41, then the P4 water ecological compensation effect evaluation level is medium, P4 Y =P41, then the evaluation level of water ecological compensation effect of P14 is excellent; P5 Y <P52, then the P5 water ecological compensation effect evaluation level is poor, P52≤P5 Y <P51, then the P5 water ecological compensation effect evaluation level is medium, P5 Y =P51, then the P5 water ecological compensation effect evaluation level is excellent; P6 Y <P62, then the P6 water ecological compensation effect evaluation level is poor, P62≤P6 Y <P61, then the P6 water ecological compensation effect evaluation level is medium, P6 Y =P61, then the P6 water ecological compensation effect evaluation level is excellent; The subscript Y indicates the Yth year after water ecological compensation; The calculation formula for evaluating the water ecological compensation effect of a single cascade of a river is: H = H A *0+H B *0.5+H C *1; Among them, H A The sum of the number of water ecological compensation effect evaluation grades of P1, P2, P3, P4, P5, and P6 that are excellent; H B is the sum of the water ecological compensation effect evaluation levels of P1, P2, P3, P4, P5, and P6; H C It is the sum of the number of poor water ecological compensation effect evaluation grades of P1, P2, P3, P4, P5, and P6; If H<2, the water ecological compensation effect evaluation level is excellent; if 2≤H<4, the water ecological compensation effect evaluation level is medium; if H≥4, the water ecological compensation effect evaluation level is poor; On the basis of the compensation period determined in step S3, the added value of the water ecological compensation period for the nth water engineering facility is: J=H.
Citation Information
Patent Citations
Method for evaluating influence of hydropower cascade development on watershed ecology safety
CN105005833A
Lake ecosystem health evaluation and restoration method
CN113095719A
Fish protection-based method for evaluating influence of power station dam removal on habitat quality
CN117668492A
