Composite filling construction system and method for water drainage and drainage of complex karst tunnel
Through the complex filling construction method of water drainage and drainage in complex karst tunnels, the difficulty of energy release and pressure reduction in water-rich high-pressure cavity and column construction in tunnel construction under complex karst geological conditions is solved, safety risks are reduced, and construction efficiency and cost-effectiveness are improved. .
Patent Information
- Application Number
- CN202411001256.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-15
AI Technical Summary
Under complex karst geological conditions, tunnel construction faces problems such as energy release and pressure reduction in water-rich high-pressure caverns, difficulty in constructing column support formwork, and high safety risks. The construction progress is slow and the cost is high.
The complex karst tunnel water drainage and drainage composite filling construction method is adopted, including tunnel horizontal guide tunnels, water drainage and pressure reduction, column construction and karst cave hall section construction. By setting up transverse channels, horizontal drainage devices, non-removal sealing plates and The large-scale cavity filling structure simplifies the construction process, reduces safety risks, and improves construction efficiency.
It effectively reduces the difficulty of energy release and decompression in the water-rich high-pressure solution cavity and the difficulty of column construction, reduces construction safety risks, significantly saves construction costs, improves the construction efficiency of steel stiff pile retaining walls, and speeds up the construction progress.
Smart Images

Figure CN118774837A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a complex karst tunnel drainage and composite filling construction system and method, which is mainly suitable for tunnel excavation construction in complex environments. Background Art
[0002] There are a large number of karst landforms in the mountainous areas of western my country. In the process of large-scale highway construction and rapid development, highway tunnels will inevitably pass through caves. Due to the complexity of hydrogeological and engineering geological conditions, large caves bring great difficulties to the design and construction of tunnels. Among the many karst disposal solutions, cave-type karst tunnels are generally treated by backfilling.
[0003] The following difficulties are encountered when constructing tunnels through complex lava geological conditions: (1) How to release energy and reduce pressure in water-rich high-pressure cavity; (2) The formwork and filling construction is difficult and the safety risk is high when supporting the top with columns in the lava area; (3) How to quickly deal with the cave hall.
[0004] In view of this, in order to address a series of problems arising from tunnel construction under complex karst geological conditions, it is urgent to invent a simple and effective underground cavity foam concrete composite filling system in the tunnel crossing area to reduce the difficulty of energy release and pressure reduction in the water-rich high-pressure cavity and column construction, reduce construction safety risks, and speed up construction progress. Summary of the invention
[0005] The purpose of the present invention is to reduce the difficulty of energy release and pressure reduction in water-rich high-pressure dissolution chambers and column construction, reduce construction safety risks, and has the advantages of significantly saving construction costs and improving the construction efficiency of steel-type rigid pile retaining walls.
[0006] In order to achieve the above technical objectives, the present invention adopts the following technical solutions:
[0007] A composite filling construction method for drainage and drainage of a complex karst tunnel comprises the following specific steps:
[0008] Step 2) Construction of tunnel horizontal guide branch tunnels; constructing a transverse passage between the left-line tunnel and the right-line tunnel, and setting a drainage branch tunnel on one side of the right-line tunnel; one end of the drainage branch tunnel is connected to the water-rich cavity;
[0009] Step 2), tunnel drainage and pressure reduction construction; fracture channels are distributed along the cavity contour line on the right-line tunnel, a drainage branch tunnel is set on the rear of the right-line tunnel, a flange is set at the tunnel opening of the drainage branch tunnel, a hose is set in the flange, the flange is fixed by a diagonal bracing steel pipe, and the diagonal bracing steel pipe is reinforced by a vertical bracing steel pipe; the diagonal bracing steel pipe and the vertical bracing steel pipe are connected by a flexible connector; one end of the hose extends into the water-rich cave;
[0010] Step 3), construction of columns in the karst cave area of the tunnel; the karst cavity is reinforced by injecting mortar, a plugging plate is arranged outside the karst cavity, steel bars are welded on the upper and lower sides of the plugging plate, grouting holes and air outlets are arranged on the plugging plate, the plugging plate is fixed to the rock mass by bolts, a special-shaped casing is arranged under the plugging plate, and a vibration port and a pumping port are arranged on the special-shaped casing; an upper steel template is arranged at the lower end of the special-shaped casing, and a lower steel template is arranged below the upper steel template; a steel block is welded on the upper steel template; the upper part of the fixing rod is inserted into the fixing hole; the lower part of the fixing rod is fixed on the self-supporting hoop, and the self-supporting hoop is fixedly arranged on the lower steel template, a triangular ear plate is arranged on the self-supporting hoop, and a telescopic rod is arranged at the bottom of the triangular ear plate; a cross brace is arranged on the concrete base, the lower end of the telescopic rod is connected to the cross brace, and the lower end of the lower steel template is fixedly arranged on the concrete base; a casting space is arranged in the upper steel template and the lower steel template, concrete is cast into the casting space, and a column is formed after the concrete solidifies;
[0011] Step 4), construction of the cave hall section; the cave hall section is divided into a shallow buried tunnel and a deep buried tunnel, and columns are used for support on both sides of the deep buried tunnel, and the columns are constructed by the construction method of step 4); polymer and brick walls are set on the top of the deep buried tunnel, and the polymer is laid on the upper end of the brick wall; steel pipe piles are driven at the bottom of the deep buried tunnel, and the cavity area under the deep buried tunnel is filled with grouting and foam concrete; block stones and crushed stones are replaced from bottom to top above the cavity contour line at the bottom of the cave hall of the shallow buried tunnel, and the shallow buried tunnel is filled with block stones and crushed stones. Brick walls are built on both sides, and concrete slabs are set on the upper ends of the brick walls; grouting equipment is set on the ground, and grouting is injected into the karst hall of the shallow buried tunnel through the grouting pipe on the grouting equipment, and the grouting pipe passes through the rock mass and extends into the karst hall of the shallow buried tunnel; C10 concrete and foam concrete are injected into the karst hall of the shallow buried tunnel in sequence through the grouting pipe, and the C10 concrete is filled in the area below the concrete slab and a C10 concrete layer is formed below the concrete slab; the foam concrete is filled in the area above the concrete slab and a foam concrete layer is formed above the concrete slab.
[0012] Preferably, in step 1), the transverse channel is arranged in front of the rock mass to be excavated, and the drainage branch tunnel is located behind the rock mass to be excavated.
[0013] Preferably, in step 2), movable grooves are set on the diagonal bracing steel pipes and the vertical bracing steel pipes, pads are set at the bottom of the diagonal bracing steel pipes and the vertical bracing steel pipes, and the bottoms of the diagonal bracing steel pipes and the vertical bracing steel pipes are supported on the bottom of the drainage branch hole; a connecting cross bar is installed between the diagonal bracing steel pipes and the vertical bracing steel pipes, the connecting cross bar passes through the movable grooves on the diagonal bracing steel pipes and the vertical bracing steel pipes at the same time, and the connecting cross bar is fixedly connected to the diagonal bracing steel pipes and the vertical bracing steel pipes by fixing bolts.
[0014] Preferably, in step 3), a clamp is provided on the periphery of the steel block for fixing, and the steel block is reinforced on the outside of the upper formwork through the clamp.
[0015] Preferably, in step 4), an anchor spraying protection system is set up at the top of the shallow buried tunnel cave hall, and the anchor spraying protection system includes anchor rods arranged in sequence along the cavity contour line at the top of the shallow buried tunnel cave hall, and the anchor rods are partially inserted into the rock mass.
[0016] Preferably, in step 4), when grouting is injected into the cave hall of the shallow buried tunnel through the grouting pipe on the grouting equipment, grouting holes and air outlet holes are drilled on the ground, and the grouting holes and air outlet holes are connected to the cave hall of the shallow buried tunnel.
[0017] Preferably, in step 3), ear plates are welded on the special-shaped casing, and the ear plates are arranged on both sides of the special-shaped casing; special-shaped steel bars are implanted in the rock mass, and the special-shaped steel bars and the ear plates are welded.
[0018] A complex karst tunnel drainage and diversion composite filling construction system is obtained by a complex karst tunnel drainage and diversion composite filling construction method.
[0019] The present invention has the following characteristics and beneficial effects:
[0020] 1. A cavity energy release and pressure reduction technology was proposed, and a transverse channel was set up in a detour manner to solve the construction difficulties of the tunnel to be excavated and avoid construction safety risks.
[0021] 2. A flat-guided water discharge and pressure reduction technology was proposed. The flat-guided water discharge device composed of vertical support steel pipes and diagonal support steel pipes simplified the construction process and accelerated the construction progress.
[0022] 3. A technology for protecting the dissolution cavity on the top of the column was proposed, and a non-dismantling sealing plate was used for dissolution cavity filling construction, which accelerated the construction progress and reduced safety risks.
[0023] 4. A column-supported top formwork system was proposed. The formwork system, which is composed of special-shaped casing, upper steel formwork, lower steel formwork, etc., solves the problems of bringing large formwork into a narrow space and fixing the formwork, and reduces the difficulty of construction.
[0024] 5. A composite filling technology for cave halls was proposed, and a large-scale cavity filling structure and construction system were proposed for tunnels of different burial depths, which solved the construction difficulties in cave areas. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a current state diagram of the complex environment of the tunnel crossing area of the present invention;
[0026] Figure 2 This is a schematic diagram of the construction of dissolution cavity energy release and pressure reduction;
[0027] Figure 3 This is a schematic diagram of the flat-guided water discharge and pressure reduction construction;
[0028] Figure 4It is a schematic diagram of a horizontal guide water discharge device;
[0029] Figure 5 It is a schematic diagram of the top protection of the column support;
[0030] Figure 6 It is a schematic diagram of a self-supporting clamp;
[0031] Figure 7 It is a schematic diagram of a special-shaped casing;
[0032] Figure 8 This is a schematic diagram of the construction of the deep buried tunnel cavity hall;
[0033] Fig. 9 This is a schematic diagram of the construction of the cavernous hall of the shallow buried tunnel;
[0034] Among them: 1-new tunnel, 2-crack channel, 3-underground river, 4-cystic cavity, 5-stone accumulation, 6-block stone, 7-karst cavity, 8-rock mass, 9-tunnel excavation contour, 10-cavity contour, 11-gravel, 12-C10 concrete, 13-foam concrete, 14-left line tunnel, 15-horizontal channel, 16-rock mass to be excavated, 17-water-rich cavity, 18-drainage branch tunnel, 19-right line tunnel, 20-diagonal brace steel pipe, 21-active connector, 22-fixing bolt, 23-vertical brace steel pipe, 24-connecting cross bar, 25-pad, 26-movable groove, 27-hose, 28-galvanized steel pipe, 29-flange, 30-blocking plate, 31-exit Air hole, 32-mortar, 33-rebar, 34-grouting hole, 35-bolt, 36-special-shaped rebar, 37-vibration port, 38-special-shaped casing, 39-pumping port, 40-ear plate, 41-upper steel formwork, 42-steel block, 43-hoop, 44-fixing hole, 45-fixing rod, 46-triangular ear plate, 47-telescopic rod, 48-lower steel formwork, 49-concrete base, 50-self-supporting hoop, 51-active end, 52-cross brace, 53-column, 54-dissolution cavity boundary, 55-polymer, 56-brick wall, 57-steel pipe pile, 58-grouting body, 59-anchor rod, 60-concrete slab, 61-ground, 62-grouting pipe, 63-grouting hole. DETAILED DESCRIPTION
[0035] Embodiment 1
[0036] like Figure 1 As shown, the composite filling construction system for drainage and diversion of complex karst tunnels consists of a newly built tunnel 1, a fissure channel 2, a cystic cavity 4, an underground river 3 and stone piles 5.
[0037] like Figure 2As shown, the right-line tunnel 19 has a water-rich cavity 17, and a transverse channel 15 is arranged between the left-line tunnel 14 and the right-line tunnel 19, and the transverse channel 15 connects the left-line tunnel 14 and the right-line tunnel 19; the transverse channel 15 is arranged in front of the rock mass 16 to be excavated, and a drainage branch tunnel 18 is arranged on one side of the right-line tunnel 19, and the drainage branch tunnel 18 is located behind the rock mass 16 to be excavated.
[0038] like Figure 3 , 4 As shown, the right-line tunnel 19 has fracture channels 2 distributed along the cavity contour line 10, and a drainage branch tunnel 18 is provided on one side of the right-line tunnel 19. One end of the drainage branch tunnel 18 is connected to the water-rich cavity 17, and the other end is the tunnel opening of the drainage branch tunnel. A flange 29 is provided at the tunnel opening of the drainage branch tunnel 18, and a hose 27 is provided in the flange 29. The flange 29 is fixed by an oblique brace steel pipe 20 and a vertical brace steel pipe 23. The oblique brace steel pipe 20 and the vertical brace steel pipe 23 are connected. The diagonal brace steel pipe 20 and the vertical brace steel pipe 23 are connected by a flexible connector 20, movable grooves 26 are arranged on the diagonal brace steel pipe 20 and the vertical brace steel pipe 23, cushion blocks 25 are arranged at the bottom of the diagonal brace steel pipe 20 and the vertical brace steel pipe 23, a connecting cross bar 24 is arranged between the diagonal brace steel pipe 20 and the vertical brace steel pipe 23, the connecting cross bar 24 passes through the movable grooves 26 on the diagonal brace steel pipe 20 and the vertical brace steel pipe 23 at the same time, and the connecting cross bar 24 is fixedly connected to the diagonal brace steel pipe 20 and the vertical brace steel pipe 23 by fixing bolts 22.
[0039] like Figure 5 , 6As shown in Figure 7, the karst cavity 7 is reinforced by injecting mortar 32, and a plugging plate 30 is arranged outside the karst cavity 7. Steel bars 33 are welded to the upper and lower sides of the plugging plate 30, respectively. Grouting holes 34 and air outlets 31 are arranged on the plugging plate 30. The plugging plate 30 is fixed to the rock mass by bolts 35. A special-shaped casing 38 is arranged under the plugging plate 30. A vibrating port 37 and a pumping port 39 are arranged on the special-shaped casing 38. Ear plates 40 are welded to the special-shaped casing 38, and the ear plates 40 are located on both sides of the special-shaped casing 38. Special-shaped steel bars 36 are implanted in the rock mass, and the special-shaped steel bars 36 are welded to the ear plates 40. An upper steel template 41 is arranged at the lower end of the special-shaped casing 38, and a lower steel template 48 is arranged below the upper steel template 41. A steel block 42 is welded to the upper steel template 41, and the steel block 45 is welded to the outer side of the upper steel template 41. A clamp 43 is provided on the steel block 42, and the clamp 43 is provided on the periphery of the steel block 42. The clamp 43 clamps the steel block 42 to the outer side of the upper steel template 41. A fixing hole 44 is provided on the steel block 42, and the upper part of the fixing rod 45 is inserted into the fixing hole 44, and the upper part of the fixing rod 45 is locked and fixed in the fixing hole 44 by a bolt 35. The lower part of the fixing rod 45 is fixed on the self-supporting clamp 50, and the self-supporting clamp 50 is provided on the lower steel template 48. The self-supporting clamp 50 is provided with a triangular ear plate 46, and a telescopic rod 47 is provided at the bottom of the triangular ear plate 46. The lower end of the telescopic rod 47 is connected to the cross brace 52, and the cross brace 52 is fixed on the concrete base 49. The lower end of the lower steel template 48 is fixedly provided on the concrete base 49.
[0040] like Figure 8 , 9As shown, the cave hall section is divided into a shallow buried tunnel and a deep buried tunnel. Pillars 53 are set on both sides of the deep buried tunnel, and support is provided by the pillars 53. A polymer 55 and a brick wall 56 are set on the top of the deep buried tunnel, and the polymer 55 is laid on the top of the brick wall 56. A steel pipe pile 57 is driven at the bottom of the deep buried tunnel, and the cavity area below the deep buried tunnel is filled with grouting 58 and foam concrete 13. Block stone 6 and crushed stone 11 are replaced from bottom to top above the cavity contour line 10 at the bottom of the cave hall of the shallow buried tunnel, so that a block stone layer and a crushed stone layer are formed from bottom to top in the cavity area at the bottom of the cave hall of the shallow buried tunnel. The shallow buried tunnel is located above the crushed stone layer. An anchor spraying protection system is set up on the top of the cave hall of the shallow buried section tunnel. The anchor spraying protection system includes anchor rods 59 arranged in sequence along the cavity contour line on the top of the cave hall of the shallow buried section tunnel. The anchor rods 59 are partially inserted into the rock mass. Brick walls 56 are built on both sides of the shallow buried section tunnel. Concrete slabs 60 are set up on the upper ends of the brick walls 56. Grouting equipment is set up on the ground 61. Grouting is injected into the tunnel through a grouting pipe 62 on the grouting equipment. The grouting pipe 62 passes through the rock mass and extends into the cave hall of the shallow buried section tunnel. Grouting holes 63 and air outlets 31 are drilled on the ground. Grouting holes 63 and air outlets 31 are connected to the cave hall of the shallow buried section tunnel. C10 concrete 12 and foam concrete 13 are injected into the cave hall of the shallow buried section tunnel in sequence through the grouting pipe 62. The C10 concrete is filled in the area below the concrete slab 60 and forms a C10 concrete layer below the concrete slab 60; the foam concrete 13 is filled in the area above the concrete slab 60 and forms a foam concrete layer above the concrete slab 60.
[0041] Embodiment 2
[0042] The composite filling construction method for drainage and drainage of complex karst tunnels includes the following steps:
[0043] (1) Construction of tunnel guide tunnels; the right-line tunnel 19 has a water-rich cavity 17. A transverse passage 15 is constructed between the left-line tunnel 14 and the right-line tunnel 19. The transverse passage 15 is arranged in front of the rock mass 16 to be excavated. A drainage branch tunnel 18 is arranged on one side of the right-line tunnel 19. One end of the drainage branch tunnel 18 is connected to the water-rich cavity 17.
[0044] (2) Tunnel drainage and pressure reduction construction; a fissure channel 2 is distributed along the cavity contour line 10 on the right-line tunnel 19, a drainage branch tunnel 18 is set on the rear of the right-line tunnel 19, a flange 29 is set at the tunnel opening of the drainage branch tunnel 18, a hose 27 is set in the flange 29, the flange 29 is fixed by a diagonal brace steel pipe 20, and the diagonal brace steel pipe 20 is reinforced by a vertical brace steel pipe 23; the diagonal brace steel pipe 20 and the vertical brace steel pipe 23 are connected by a flexible connector 20, and movable grooves 26 are set on the diagonal brace steel pipe 20 and the vertical brace steel pipe 23, and pads 25 are set at the bottom of the diagonal brace steel pipe 20 and the vertical brace steel pipe 23. The bottom of the steel pipe 23 is supported at the bottom of the drainage branch tunnel 18; a connecting cross bar 24 is installed between the diagonal bracing steel pipe 20 and the vertical bracing steel pipe 23, and the connecting cross bar 24 passes through the movable grooves 26 on the diagonal bracing steel pipe 20 and the vertical bracing steel pipe 23 at the same time. The connecting cross bar 24 is fixedly connected to the diagonal bracing steel pipe 20 and the vertical bracing steel pipe 23 by fixing bolts 22; the hose is fixed to the tunnel entrance of the drainage branch tunnel 18 by a flange 29, and one end of the hose 27 extends into the water-rich cave 18. Water in the water-rich cave 18 can be pumped out by a water pump and discharged through the hose 27, thereby draining water and reducing the pressure of the water-rich cave 17.
[0045] (3) Construction of columns in the tunnel karst cave area: mortar 32 is injected into the karst cavity 7 for reinforcement, a plugging plate 30 is arranged outside the karst cavity 7, steel bars 33 are welded to the upper and lower sides of the plugging plate 30, grouting holes 34 and air outlets 31 are arranged on the plugging plate 30, the plugging plate 30 is fixed to the rock mass by bolts 35, a special-shaped casing 38 is arranged under the plugging plate 30, a vibrating port 37 and a pumping port 39 are arranged on the special-shaped casing 38, and a special-shaped casing 38 is provided with a plurality of holes 34 and a plurality of holes 31. Ear plates 40 are welded on the upper surface of the special-shaped casing 38, and the ear plates 40 are welded on both sides of the special-shaped casing 38; special-shaped steel bars 36 are implanted in the rock mass, and the special-shaped steel bars 36 and the ear plates 40 are welded. An upper steel template 41 is arranged at the lower end of the special-shaped casing 38, and a lower steel template 48 is arranged below the upper steel template 41; a steel block 42 is welded on the upper steel template 41, and a hoop 43 is arranged on the periphery of the steel block 42 to fix it, and the hoop 43 is used to fix the steel block 42 in the upper template The outer side of the plate 41; insert the upper part of the fixing rod 45 into the fixing hole 44, and lock and fix the upper part of the fixing rod 45 in the fixing hole 44 by the bolt 35; the lower part of the fixing rod 45 is fixed on the self-supporting clamp 50, and the self-supporting clamp 50 is fixedly set on the lower steel template 48, and a triangular ear plate 46 is set on the self-supporting clamp 50, and a telescopic rod 47 is set at the bottom of the triangular ear plate 46, and the upper end of the telescopic rod 47 is a flexible end 51, and the telescopic rod 47 is connected to the triangular ear plate 46 through the flexible end 51; a cross brace 53 is set on the concrete base 49, and the lower end of the telescopic rod 47 is connected to the cross brace 53, and the lower end of the lower steel template 48 is fixedly set on the concrete base 49; a casting space is set in the upper steel template 41 and the lower steel template 48, and concrete is cast into the casting space. After the concrete solidifies, a column 53 is formed, and the column 53 is used to support the inside of the karst cavity 7.
[0046] (4) Construction of the cave hall section; the cave hall section is divided into a shallow buried tunnel section and a deep buried tunnel section. Pillars 53 are used to support both sides of the deep buried tunnel section. The pillars 53 are constructed by the construction method of step (3); polymer 55 and brick wall 56 are set at the top of the deep buried tunnel section, and the polymer 55 is laid on the upper end of the brick wall 56; steel pipe piles 57 are driven at the bottom of the deep buried tunnel section, and the cavity area below the deep buried tunnel section is filled with grouting 58 and foam concrete 13; blocks 6 and crushed stones 11 are replaced from bottom to top above the cavity contour line 10 at the bottom of the cave hall of the shallow buried tunnel section, and an anchor spraying protection system is set at the top of the cave hall of the shallow buried tunnel section. The anchor spraying protection system includes anchor rods 59 arranged in sequence along the cavity contour line at the top of the cave hall of the shallow buried tunnel section, and the anchor rods 59 are partially inserted into the rock mass. Brick walls 56 are built on both sides of the shallow buried tunnel, and concrete slabs 60 are arranged on the upper ends of the brick walls 56; grouting equipment is arranged on the ground 61, and grouting is injected into the karst cave hall of the shallow buried tunnel through a grouting pipe 62 on the grouting equipment, and the grouting pipe 62 passes through the rock mass and extends into the karst cave hall of the shallow buried tunnel; grouting holes 63 and air outlet holes 31 are drilled on the ground, and the grouting holes 63 and the air outlet holes 31 are connected to the karst cave hall of the shallow buried tunnel; C10 concrete 12 and foam concrete 13 are injected into the karst cave hall of the shallow buried tunnel in sequence through the grouting pipe 62, and the C10 concrete is filled in the area below the concrete slab 60 and a C10 concrete layer is formed below the concrete slab 60; the foam concrete 13 is filled in the area above the concrete slab 60 and a foam concrete layer is formed above the concrete slab 60.
[0047] A complex karst tunnel drainage and diversion composite filling construction system is obtained by constructing the complex karst tunnel drainage and diversion composite filling construction method.
Claims
1. A composite filling construction method for drainage and drainage of complex karst tunnels, characterized in that: The specific steps include: Step 1), constructing a tunnel guide branch tunnel; constructing a transverse passage (15) between the left tunnel (14) and the right tunnel (19), and setting a drainage branch tunnel (18) on one side of the right tunnel (19); one end of the drainage branch tunnel (18) is connected to the water-rich cavity (17); Step 2), tunnel water discharge and pressure reduction construction; a fissure channel (2) is distributed along the cavity contour line (10) on the right-line tunnel (19); a drainage branch tunnel (18) is arranged on the rear of the right-line tunnel (19); a flange (29) is arranged at the tunnel opening of the drainage branch tunnel (18); a hose (27) is arranged in the flange (29); the flange (29) is fixed by a diagonal bracing steel pipe (20); the diagonal bracing steel pipe (20) is reinforced by a vertical bracing steel pipe (23); the diagonal bracing steel pipe (20) and the vertical bracing steel pipe (23) are connected by a flexible connector (20); one end of the hose (27) extends into the water-rich cave (18); Step 3), construction of columns in the tunnel karst cave area; mortar (32) is injected into the karst cavity (7) for reinforcement, a plugging plate (30) is arranged outside the karst cavity (7), steel bars (33) are welded to the upper and lower sides of the plugging plate (30), grouting holes (34) and air outlet holes (31) are arranged on the plugging plate (30), the plugging plate (30) is fixed to the rock mass by bolts (35), a special-shaped casing (38) is arranged under the plugging plate (30), and a vibration port (37) and a pumping port (39) are arranged on the special-shaped casing (38); an upper steel template (41) is arranged at the lower end of the special-shaped casing (38), and a lower steel template (48) is arranged below the upper steel template (41); a steel block (42) is welded on the upper steel template (41); ); insert the upper part of the fixing rod (45) into the fixing hole (44); fix the lower part of the fixing rod (45) on the self-supporting hoop (50), fix the self-supporting hoop (50) on the lower steel template (48), set a triangular ear plate (46) on the self-supporting hoop (50), and set a telescopic rod (47) at the bottom of the triangular ear plate (46); set a cross brace (53) on the concrete base (49), connect the lower end of the telescopic rod (47) to the cross brace (53), and fix the lower end of the lower steel template (48) on the concrete base (49); a casting space is set in the upper steel template (41) and the lower steel template (48), and concrete is cast into the casting space, and the concrete is solidified to form a column (53); Step 4), construction of the cave hall section; the cave hall section is divided into a shallow buried tunnel section and a deep buried tunnel section, and pillars (53) are used for support on both sides of the deep buried tunnel section, and the pillars (53) are constructed by the construction method of step (3)); polymer (55) and brick wall (56) are arranged on the top of the deep buried tunnel section, and the polymer (55) is laid on the upper end of the brick wall (56); steel pipe piles (57) are driven at the bottom of the deep buried tunnel section, and the cavity area below the deep buried tunnel section is filled with grouting (58) and foam concrete (13); above the cavity contour line (10) at the bottom of the cave hall of the shallow buried tunnel section, block stones (6) and crushed stones (11) are replaced in sequence from bottom to top, and on both sides of the shallow buried tunnel section, a concrete grout (58) is built. A brick wall (56) is built, and a concrete slab (60) is arranged on the upper end of the brick wall (56); a grouting device is arranged on the ground (61), and grouting is performed into the shallow buried tunnel cave hall through a grouting pipe (62) on the grouting device, and the grouting pipe (62) passes through the rock mass and extends into the shallow buried tunnel cave hall; C10 concrete (12) and foam concrete (13) are sequentially injected into the shallow buried tunnel cave hall through the grouting pipe (62), and the C10 concrete is filled in the area below the concrete slab (60) and forms a C10 concrete layer below the concrete slab (60); and the foam concrete (13) is filled in the area above the concrete slab (60) and forms a foam concrete layer above the concrete slab (60).
2. The complex karst tunnel drainage and drainage composite filling construction method according to claim 1 is characterized in that: In step 1), the transverse channel (15) is arranged in front of the rock mass (16) to be excavated, and the drainage branch tunnel (18) is located behind the rock mass (16) to be excavated.
3. The complex karst tunnel drainage and drainage composite filling construction method according to claim 1 is characterized in that: In step 2), movable grooves (26) are provided on the diagonal bracing steel pipe (20) and the vertical bracing steel pipe (23), cushion blocks (25) are provided at the bottom of the diagonal bracing steel pipe (20) and the vertical bracing steel pipe (23), and the bottoms of the diagonal bracing steel pipe (20) and the vertical bracing steel pipe (23) are supported at the bottom of the drainage branch hole (18); a connecting cross bar (24) is installed between the diagonal bracing steel pipe (20) and the vertical bracing steel pipe (23), and the connecting cross bar (24) passes through the movable grooves (26) on the diagonal bracing steel pipe (20) and the vertical bracing steel pipe (23) at the same time, and the connecting cross bar (24) is fixedly connected to the diagonal bracing steel pipe (20) and the vertical bracing steel pipe (23) by fixing bolts (22).
4. The complex karst tunnel drainage and drainage composite filling construction method according to claim 1 is characterized in that: In step 3), a clamp (43) is arranged on the periphery of the steel block (42) for fixing, and the steel block (42) is reinforced on the outer side of the upper template (41) by the clamp (43).
5. The complex karst tunnel drainage and drainage composite filling construction method according to claim 1 is characterized in that: In step 4), an anchor spraying protection system is set up on the top of the shallow buried tunnel cave hall, and the anchor spraying protection system includes anchor rods (59) arranged in sequence along the cavity contour line on the top of the shallow buried tunnel cave hall, and the anchor rods (59) are partially inserted into the rock mass.
6. The complex karst tunnel drainage and drainage composite filling construction method according to claim 1 is characterized in that: In step 4), when grouting is performed into the cave hall of the shallow buried tunnel through the grouting pipe (62) on the grouting equipment, a grouting hole (63) and an air outlet (31) are drilled on the ground, and the grouting hole (63) and the air outlet (31) are connected to the cave hall of the shallow buried tunnel.
7. The complex karst tunnel drainage and drainage composite filling construction method according to claim 1 is characterized in that: In step 3), ear plates (40) are welded on the special-shaped casing (38), and the ear plates (40) are arranged on both sides of the special-shaped casing (38); special-shaped steel bars (36) are implanted in the rock mass, and the special-shaped steel bars (36) and the ear plates (40) are welded.
8. A composite filling construction system for drainage and drainage of complex karst tunnels, characterized in that: The invention is obtained by the composite filling construction method for drainage and diversion of complex karst tunnels as described in any one of claims 1 to 7.