Multistage linkage work order processing method
Through work order data analysis and dynamic sorting mechanism, the problem of abnormal priority ordering in multi-level work order processing is solved, accurate classification of work orders and resource optimization are achieved, and processing efficiency and system transparency are improved.
Patent Information
- Application Number
- CN202411111293.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-08-14
AI Technical Summary
In the multi-level linkage work order processing method, abnormal prioritization leads to delays in key tasks, improper resource allocation, and extended response times, reducing customer satisfaction and work efficiency, affecting team collaboration and decision-making accuracy, and increasing business interruption and compliance risks. , the overall operation and service quality declined.
Classify and match processing departments and personnel by obtaining work order data information, calculate work order urgency, establish regular and emergency sorting queues, dynamically adjust sorting, set work order time progress blocks and load monitoring modules, and use optimistic joint work order sorting Module to ensure reasonable resource allocation and processing priority.
It achieves accurate classification and sorting of work orders, improves resource utilization efficiency, reduces processing delays and resource waste, improves emergency response capabilities, enhances system transparency and traceability, and solves the problem of abnormal ordering of joint work orders.
Smart Images

Figure CN118863458A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of information management, and in particular to a multi-level linkage work order processing method. Background Art
[0002] The work order processing system plays a key role in enterprise management, improving work efficiency and service quality through automation and intelligence. It realizes efficient task allocation and priority management, and promotes cross-departmental collaboration and information sharing. The system ensures the consistency and high quality of task processing through standardized processes and real-time monitoring, while providing data support to help management make decisions. Work order processing optimizes resource utilization, reduces costs, prevents problems by recording and analyzing historical data, quickly responds to emergencies, ensures business continuity, and promotes continuous improvement and innovation of enterprises.
[0003] In the multi-level linkage work order processing method, abnormal priority sorting will lead to delays in key tasks, improper resource allocation and extended response time, which will reduce customer satisfaction and work efficiency. At the same time, it will affect team collaboration and decision-making accuracy, increase business interruption and compliance risks, and significantly reduce overall operations and service quality. Summary of the invention
[0004] The purpose of the present invention is to provide a multi-level linkage work order processing method to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solution: a multi-level linkage work order processing method.
[0006] The work order processing method includes the following steps:
[0007] Step S1, obtain work order data information, classify the work order data information into types, and then match the corresponding work order processing department and processing personnel;
[0008] Step S1-1, obtaining work order data information, and classifying each work order data into different types;
[0009] Step S1-2: Match the appropriate work order processing department and processing personnel after classification by work order type.
[0010] By classifying work order data into types, we ensure that each work order is accurately classified according to its corresponding needs, avoiding processing delays or errors caused by improper work order allocation. By matching the appropriate processing departments and personnel after type classification, work orders can be quickly handed over to the most appropriate department or personnel for processing, improving the efficiency and accuracy of work order processing.
[0011] Step S2: Obtain historical work order processing data information, obtain the processing time, processing success rate, work order load, work order-related resource loss and special emergency parameters of similar work orders, and work order regional data information, and calculate the urgency of the work order based on the data of similar work orders;
[0012] Step S2-1: Obtain the processing data information of the same type of historical work orders according to the work order type classification in step S1, obtain the processing time, processing success rate, work order load, work order-related resource loss and special emergency parameters of the corresponding work order, and regional data information of the work order, and the work order-related resource loss is calculated using the following formula:
[0013]
[0014] In the formula, Loss represents the amount of resource loss associated with the work order; n represents the total number of work orders; Ri represents the resource consumption of the i-th work order; Ci represents the resource unit cost of the i-th work order; Ti represents the total loss time of the i-th work order; Di represents the delay impact of the i-th work order; Qi represents the indirect loss of the i-th work order; Ri*Ci*Ti represents the direct resource loss of the i-th work order; Di*Ti represents the delay impact loss of the i-th work order;
[0015] Step S2-2: After cleaning and standardizing the acquired data, the urgency of the work order is calculated. The urgency calculation uses the following formula:
[0016] URG=TTR×β TTR +(1-SR)×β SR +WL×β WL +RI×β RI +LF+RE
[0017] In the formula, URG represents the urgency of the work order, TTR represents the processing time of similar work orders; SR represents the success rate of historical processing of similar work orders; WL represents the load of similar work orders; RI represents the loss of associated resources of similar work orders; LF represents the special emergency parameter of similar work orders; RE represents a constant set according to the region; β TTR , β SR , β WL , β RI It is represented by the weight corresponding to each feature, and (1-SR) is represented by the impact of the failure rate, that is, the higher the success rate, the lower the urgency.
[0018] The LF parameter is an emergency parameter. When the work order data information obtained in step S1 contains a LF parameter value, the work order with the corresponding LF parameter value will be added to the emergency sorting by default and added to the corresponding regional work order preprocessing queue. RE is regional data information, which is used to distinguish the urgency of the same type of work orders applied for in different regions. When the urgency calculated by the processing time, processing success rate, work order load, and work order-related resource loss of the work order is the same, it will be affected by the RE value, thereby distinguishing the urgency of the regional work orders.
[0019] Step S3: Establish a corresponding work order pre-processing queue according to the work order regional data information, and divide the work order pre-processing queue into regular sorting and emergency sorting. The work order sorting in the regular sorting is adjusted in real time and dynamically, and is sorted from high to low according to the urgency. The sorting method in the emergency sorting is a fixed first-in-first-out sorting. According to the work order urgency result calculated in step S2, the work order is sorted in the corresponding work order pre-processing queue in descending order of urgency.
[0020] Step S3-1, establish a corresponding work order pre-processing queue according to the work order regional data information. Each region has a regular sort and an emergency sort. The regular sort is used to sort non-urgent work orders, and the work order sort position is adjusted in real time according to the urgency. The emergency sort is used to store work orders that need to be processed urgently, and is sorted in a stack storage manner, following the first-in-first-out principle;
[0021] Step S3-2: According to the urgency of the work order calculated in step S2, the corresponding work order is sorted into a regular sort and an emergency sort according to the urgency.
[0022] Accurately classify and sort work orders according to their region and urgency to achieve more efficient resource allocation and processing. By establishing regular sorting and emergency sorting, and dynamically adjusting the sorting of work orders in the regular sorting, it is ensured that work orders in each region can be processed in order of priority, reducing the situation where low-priority work orders occupy key resources. At the same time, emergency work orders use a fixed first-in-first-out sorting method to ensure that the most urgent work orders can be responded to in a timely manner, greatly improving the ability to respond to emergencies and emergency needs.
[0023] Step S4: Set a work order time block. The initial value of the work order time block is 0. Use the work order time block to time the work order processing. The difference between the work order limit time and the work order processing time is the countdown duration. The countdown starts when the work order first participates in the urgency calculation.
[0024] Step S4-1, set the work order time progress block, and assign a corresponding work order time progress block to each added work order, and set the initial value of the work order time progress block to 0;
[0025] Step S4-2, read the limit time and corresponding processing time of each work order, subtract the corresponding processing time of the work order from the limit time of the work order, and use the calculated result as the countdown time of the corresponding work order;
[0026] Step S4-3: After the work order is included in the urgency calculation, the countdown starts. When the countdown reaches 0, the work order is added to the urgency ranking in sequence.
[0027] By setting the work order time progress block, we can effectively avoid the problem of work order timeouts due to low urgency values and being ranked at the back, reduce work order processing exceptions, and greatly improve user satisfaction.
[0028] Step S5: Set a work order load monitoring module and a load threshold, monitor the load situation in real time through the work order load monitoring module, and when the load value is lower than the load threshold, obtain the work order of the corresponding type, adjust the load value of the corresponding type, recalculate the urgency of the corresponding work order, and reorder according to the new urgency of the work order;
[0029] Step S6: extract the combined limit time of the combined work orders and the work order with the lowest urgency among the combined work orders according to the work order data information obtained in step S2, record it as the optimistic combined work order, calculate the processing time of the work orders that have been sorted in the urgent sorting, and the processing time of each work order of the combined work order, calculate the optimistic insertion time of the optimistic combined work order according to the processing time of the work orders that have been sorted in the urgent sorting and the processing time of each work order of the combined work order, and judge whether the combined work order meets the work order sorting condition;
[0030] Step S6-1, extracting the joint limit time of the joint work orders and the work order with the lowest urgency among the joint work orders through the work order data information obtained in step S2, and recording the work order with the lowest urgency as an optimistic joint work order;
[0031] Step S6-2, calculating the optimistic insertion time of the optimistic joint work order according to the joint limit time of the joint work order, the processing time of each work order and the processing time of the work order in the emergency sorting;
[0032] Step S6-3: determine whether the combined restriction time of the newly added combined work order is normal based on the calculated optimistic insertion time. If it is abnormal, the combined work order adding condition is not met, and the combined work order is prohibited from being added.
[0033] A joint work order is a set of work tasks composed of multiple related work orders. These work orders have dependencies or common processing goals. According to the joint work order judgment result of step S6, it is ensured that when a new joint work order is added, no timeout exception or other problems will occur after it is added to the work order sorting.
[0034] Step S7, setting an optimistic sorting module for joint work orders, using the optimistic sorting module for joint work orders to sort the optimistic joint work orders according to the optimistic insertion time, the sorting method of the optimistic sorting module for joint work orders is that the optimistic joint work orders do not cross each other, the first optimistic joint work order uses the sorting position of the sorted work orders in the emergency sorting as a reference, and the subsequent optimistic joint work orders all use the sorting position of their previous optimistic joint work orders as a reference, and the optimistic sorting module for joint work orders stores the number, sorting position and sorting position of each optimistic joint work order;
[0035] Step S7-1, setting a joint work order optimistic sorting module, and using the joint work order optimistic sorting module to sort the optimistic joint work orders according to the optimistic insertion time;
[0036] Step S7-2, optimistic joint work orders follow the non-crossing rule. The first optimistic joint work order in the work order pre-processing queue uses the sorting position of the sorted work orders in the emergency sorting as a reference, and the subsequently added joint work orders are sorted with reference to the previous optimistic joint work order;
[0037] The non-crossing rule means that during the execution of multiple optimistic joint work orders, they are all carried out in a predetermined order. No work order can be skipped before its predecessor optimistic joint work order is completed, ensuring the execution order and process integrity of the joint work orders. The non-crossing rule is only effective for optimistic joint work orders.
[0038] Step S7-3, the optimistic sorting module for the joint work orders stores the work order number of each joint work order, the corresponding sorting position, and the sorting position of the previous optimistic joint work order;
[0039] Step S7-4: when adjusting the work order, the processing time of the work order to be adjusted and the optimistic insertion time of the optimistic joint work order to be adjusted are judged. The work order adjustment condition is when the processing time of the adjusted work order is greater than the optimistic insertion time of the optimistic joint work order to be adjusted.
[0040] When the processing time of the reordering work order is greater than the optimistic insertion time of the optimistic joint work order being reordered, the reordering work order is reordered behind the optimistic joint work order being reordered until the reordering conditions are met and the work order is inserted;
[0041] When the processing time of the reordering work order is less than the optimistic insertion time of the optimistic joint work order being reordered, the reordering work order is inserted into the corresponding position before the optimistic joint work order being reordered;
[0042] Step S7-5: When the optimistic joint work order is in urgent sorting, clear the optimistic insertion time.
[0043] Dynamically sorting work orders will not affect the processing efficiency of joint work orders. By setting the optimistic joint work orders not to cross each other, the sorting stability between work orders is effectively guaranteed. The optimistic sorting module of joint work orders is used to store the work order numbers of each joint work order, the corresponding sorting positions and the sorting positions of the previous optimistic joint work order. According to the structure of array storage, the positions of work orders can be manipulated quickly, orderly and in a timely manner to ensure the normal sorting between each work order.
[0044] Step S8: Set up a work order progress monitoring module and a work order processing archiving storage, use the work order progress monitoring to monitor the work order processing progress in real time, and trace the monitoring results back level by level, and use the work order processing archiving storage to archive and store the processing results of the work order;
[0045] Step S8-1, setting a work order progress monitoring module to monitor the processing progress of the work order in real time, and providing feedback on the processing status according to the regional data information of the work order;
[0046] Step S8-2: Set up work order processing archiving storage to archive and store the work order processing data, processing records and work order processing results.
[0047] Step S9: Set a dynamic work order optimization model, dynamically adjust the work order load weights under different categories according to different scenarios, obtain the load value of the work order through the work order load monitoring module, set the expected load value of the work order, and dynamically adjust the work order load weight according to the work order load value and the expected load value of the work order. The calculation formula is as follows:
[0048]
[0049] In the formula, β` WL Represented as the adjusted work order load weight; β WL It is represented as the original load weight; WL represents the actual load of the work order, and WLL represents the expected load of the work order.
[0050] Furthermore, a work order load monitoring module and a load threshold Fmax are set, the work order load monitoring module is used to obtain the load value, and the impact of the load on resource utilization is calculated using the following formula:
[0051] Y=a*L+b
[0052] In the formula, Y represents the impact of load on resource utilization; a represents the degree of impact of load on resource utilization; b represents the basic resource utilization when the load is zero;
[0053] When Y>Fmax, obtain the work order of the corresponding type, adjust its load value, recalculate the urgency according to the new load value, and re-arrange it in the work order preprocessing queue according to the new urgency.
[0054] Monitor the load of work orders in real time and calculate its impact on resource utilization. Dynamically adjust the urgency and sorting position of work orders to ensure that resources are still optimally utilized when the load changes. When the load value is lower than or higher than the set threshold, the system will automatically recalculate the urgency of the work order and sort it according to the new urgency, thereby ensuring that high-priority and urgent work orders are processed in a timely manner and avoiding processing delays or resource waste due to improper resource allocation.
[0055] Furthermore, in step S9, a dynamic work order optimization model is set, and the utilization rate of the load weight planning resources is dynamically adjusted according to the value monitored and calculated by the work order load monitoring module in step S5. The dynamic work order optimization model adjusts the load weight using the following formula:
[0056]
[0057] In the formula, β` WL Represented as the adjusted work order load weight; β WL It is represented as the original load weight; WL represents the actual load of the work order, and WLL represents the expected load of the work order.
[0058] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention calculates the urgency of the work order by extracting historical work order data and regional data. The method can accurately calculate the urgency of the work order and optimize the processing strategy in real time according to the work order classification in different scenarios. This dynamic adjustment and optimization mechanism can not only effectively respond to emergencies and urgent needs, but also improve the utilization efficiency of resources in daily operations, reduce processing delays and resource waste. In addition to the setting of the work order progress monitoring module and the processing archive storage, the entire system has stronger transparency and traceability. The manager can monitor the processing progress of the work order in real time, and analyze and optimize the decision based on historical data. By setting an optimistic joint work order, the sorting problem caused by the joint work order being affected by the urgency sorting is effectively solved. Adding a work order time progress block solves the problem of the work order being timed out due to low urgency sorting. The method has significant advantages in flexibility, resource optimization, processing efficiency and joint work order sorting anomalies. BRIEF DESCRIPTION OF THE DRAWINGS
[0059] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0060] Figure 1 It is a flow chart of the multi-level linkage work order processing method of the present invention. DETAILED DESCRIPTION
[0061] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0062] See also Figure 1 The present invention provides a technical solution: a multi-level linkage work order processing method
[0063] The work order processing method includes the following steps:
[0064] Step S1, obtain work order data information, classify the work order data information into types, and then match the corresponding work order processing department and processing personnel;
[0065] Step S1-1, obtaining work order data information, and classifying each work order data into different types;
[0066] Step S1-2: Match the appropriate work order processing department and processing personnel after classification by work order type.
[0067] For example, Ticket 1: Customer B requests contract renewal. Ticket 2: Customer C has a billing inquiry question.
[0068] Work Order 1 (Contract Renewal) is classified as the "Contract Management" type.
[0069] Ticket 2 (Billing Inquiry) is classified as the "Financial Support" type.
[0070] The system identifies work order 1 as a "contract management" type, matches it to the contract management department, and assigns it to the specialist who handles contracts. The system identifies work order 2 as a "financial support" type, matches it to the finance department, and assigns it to the finance staff who handles bill inquiries.
[0071] Step S2: Obtain historical work order processing data information, obtain the processing time, processing success rate, work order load, work order-related resource loss and special emergency parameters of similar work orders, and work order regional data information, and calculate the urgency of the work order based on the data of similar work orders;
[0072] Step S2-1: Obtain the processing data information of the same type of historical work orders according to the work order type classification in step S1, obtain the processing time, processing success rate, work order load, work order-related resource loss and special emergency parameters of the corresponding work order, and regional data information of the work order, and the work order-related resource loss is calculated using the following formula:
[0073]
[0074] In the formula, Loss represents the amount of resource loss associated with the work order; n represents the total number of work orders; Ri represents the resource consumption of the i-th work order; Ci represents the resource unit cost of the i-th work order; Ti represents the total loss time of the i-th work order; Di represents the delay impact of the i-th work order; Qi represents the indirect loss of the i-th work order; Ri*Ci*Ti represents the direct resource loss of the i-th work order; Di*Ti represents the delay impact loss of the i-th work order;
[0075] For example, to calculate the loss of resources associated with a work order i, the following data is obtained:
[0076] Resource consumption Ri = 8 units; resource unit cost Ci = 6 yuan / unit; total loss time Ti = 2 hours; delay impact Di = 1.5 yuan / hour; indirect loss Qi = 30 yuan;
[0077] Loss = (8 × 6 × 2) + (1.5 × 2) + 30 = 96 + 3 + 30 = 129 yuan
[0078] That is, the loss of the work order-related resources of work order i is 129 yuan;
[0079] Step S2-2: After cleaning and standardizing the acquired data, the urgency of the work order is calculated. The urgency calculation uses the following formula:
[0080] URG=TTR×β TTR +(1-SR)×β SR +WL×β WL +RI×β RI +LF+RE
[0081] In the formula, URG represents the urgency of the work order, TTR represents the processing time of similar work orders; SR represents the success rate of historical processing of similar work orders; WL represents the load of similar work orders; RI represents the loss of associated resources of similar work orders; LF represents the special emergency parameter of similar work orders; RE represents a constant set according to the region; β TTR , β SR , β WL , β RI It is represented by the weight corresponding to each feature, and (1-SR) is represented by the impact of the failure rate, that is, the higher the success rate, the lower the urgency.
[0082] For example, the ratio of new work orders to the historical ratio of similar work orders is 1:1;
[0083] Work Order A: TTR = 5 hours, SR = 90%, WL = 50, RI = 1000 yuan, LF = (urgent parameter value), RE = 50 (urban area);
[0084] Work Order B: TTR = 8 hours, SR = 85%, WL = 60, RI = 800 yuan, LF = (urgent parameter value), RE = 25 (township)
[0085] Set the weight β corresponding to the feature TTR , β SR , β WL , β RI The values are 0.3, 0.2, 0.4, and 0.1 respectively. According to the formula:
[0086] URG=TTR×β TTR +(1-SR)×β SR +WL×β WL +RI×β RI +LF+RE
[0087] The urgency of the work order added by work order A is calculated as:
[0088] URG=0.3*8+0.2*0.15+0.4*60+0.1*800+0+25=226.02
[0089] The urgency of the work order added by work order B is calculated as:
[0090] URG=0.3*5+0.2*0.1+0.4*50+0.1*1000+0+50=131.43
[0091] Then the sorting position of work order B takes precedence over the sorting position of work order A.
[0092] Step S3: Establish a corresponding work order pre-processing queue according to the work order regional data information, and divide the work order pre-processing queue into regular sorting and emergency sorting. The work order sorting in the regular sorting is adjusted in real time and dynamically, and is sorted from high to low according to the urgency. The sorting method in the emergency sorting is a fixed first-in-first-out sorting. According to the work order urgency result calculated in step S2, the work order is sorted in the corresponding work order pre-processing queue in descending order of urgency.
[0093] Step S3-1, establish a corresponding work order pre-processing queue according to the work order regional data information. Each region has a regular sort and an emergency sort. The regular sort is used to sort non-urgent work orders, and the work order sort position is adjusted in real time according to the urgency. The emergency sort is used to store work orders that need to be processed urgently, and is sorted in a stack storage manner, following the first-in-first-out principle;
[0094] Step S3-2: According to the urgency of the work order calculated in step S2, the corresponding work order is sorted into a regular sort and an emergency sort according to the urgency.
[0095] Step S4: Set a work order time block. The initial value of the work order time block is 0. Use the work order time block to time the work order processing. The difference between the work order limit time and the work order processing time is the countdown duration. The countdown starts when the work order first participates in the urgency calculation.
[0096] Step S4-1, set the work order time progress block, and assign a corresponding work order time progress block to each added work order, and set the initial value of the work order time progress block to 0;
[0097] Step S4-2, read the limit time and corresponding processing time of each work order, subtract the corresponding processing time of the work order from the limit time of the work order, and use the calculated result as the countdown time of the corresponding work order;
[0098] Step S4-3: After the work order is included in the urgency calculation, the countdown starts. When the countdown reaches 0, the work order is added to the urgency ranking in sequence.
[0099] Step S5: Set a work order load monitoring module and a load threshold, monitor the load situation in real time through the work order load monitoring module, and when the load value is lower than the load threshold, obtain the work order of the corresponding type, adjust the load value of the corresponding type, recalculate the urgency of the corresponding work order, and reorder according to the new urgency of the work order;
[0100] Set up the work order load monitoring module and load threshold Fmax, use the work order load monitoring module to obtain the load value, and calculate the impact of the load on resource utilization using the following formula:
[0101] Y=a*L+b
[0102] In the formula, Y represents the impact of load on resource utilization; a represents the degree of impact of load on resource utilization; b represents the basic resource utilization when the load is zero;
[0103] When Y>Fmax, obtain the work order of the corresponding type, adjust its load value, recalculate the urgency according to the new load value, and re-arrange it into the work order pre-processing queue according to the new urgency;
[0104] For example, the basic resource utilization b when the load is zero is 20, the influence of the load on the resource utilization a is 0.8, and there are three load values: L1 = 50, L2 = 80, and L3 = 0.
[0105] Substitute it into the formula and calculate:
[0106] Y1=60,Y2=84,Y3=20Through the above calculation,
[0107] When the load is 50%, the resource utilization is 60%;
[0108] When the load is 80%, the resource utilization is 84%;
[0109] When the load is 20%, the resource utilization is 20%;
[0110] Step S6: extract the combined limit time of the combined work orders and the work order with the lowest urgency among the combined work orders according to the work order data information obtained in step S2, record it as the optimistic combined work order, calculate the processing time of the work orders that have been sorted in the urgent sorting, and the processing time of each work order of the combined work order, calculate the optimistic insertion time of the optimistic combined work order according to the processing time of the work orders that have been sorted in the urgent sorting and the processing time of each work order of the combined work order, and judge whether the combined work order meets the work order sorting condition;
[0111] Step S6-1, extracting the joint limit time of the joint work orders and the work order with the lowest urgency among the joint work orders through the work order data information obtained in step S2, and recording the work order with the lowest urgency as an optimistic joint work order;
[0112] Step S6-2, calculating the optimistic insertion time of the optimistic joint work order according to the joint limit time of the joint work order, the processing time of each work order and the processing time of the work order in the emergency sorting;
[0113] Step S6-3: determine whether the combined restriction time of the newly added combined work order is normal based on the calculated optimistic insertion time. If it is abnormal, the combined work order adding condition is not met, and the combined work order is prohibited from being added.
[0114] Step S7, setting an optimistic sorting module for joint work orders, using the optimistic sorting module for joint work orders to sort the optimistic joint work orders according to the optimistic insertion time, the sorting method of the optimistic sorting module for joint work orders is that the optimistic joint work orders do not cross each other, the first optimistic joint work order uses the sorting position of the sorted work orders in the emergency sorting as a reference, and the subsequent optimistic joint work orders all use the sorting position of their previous optimistic joint work orders as a reference, and the optimistic sorting module for joint work orders stores the number, sorting position and sorting position of each optimistic joint work order;
[0115] Step S7-1, setting a joint work order optimistic sorting module, and using the joint work order optimistic sorting module to sort the optimistic joint work orders according to the optimistic insertion time;
[0116] Step S7-2, optimistic joint work orders follow the non-crossing rule. The first optimistic joint work order in the work order pre-processing queue uses the sorting position of the sorted work orders in the emergency sorting as a reference, and the subsequently added joint work orders are sorted with reference to the previous optimistic joint work order;
[0117] Step S7-3, the optimistic sorting module for the joint work orders stores the work order number of each joint work order, the corresponding sorting position, and the sorting position of the previous optimistic joint work order;
[0118] Step S7-4: when adjusting the work order, the processing time of the work order to be adjusted and the optimistic insertion time of the optimistic joint work order to be adjusted are judged. The work order adjustment condition is when the processing time of the adjusted work order is greater than the optimistic insertion time of the optimistic joint work order to be adjusted.
[0119] When the processing time of the reordering work order is greater than the optimistic insertion time of the optimistic joint work order being reordered, the reordering work order is reordered behind the optimistic joint work order being reordered until the reordering conditions are met and the work order is inserted;
[0120] When the processing time of the reordering work order is less than the optimistic insertion time of the optimistic joint work order being reordered, the reordering work order is inserted into the corresponding position before the optimistic joint work order being reordered;
[0121] Step S7-5: when the optimistic joint work order is in urgent sorting, clear the optimistic insertion time;
[0122] For example, the time limit of the joint work order Dd is 10 hours, the number is 20230809-TS-00045, it takes 1 hour to process work order D, and it takes 1 hour to process work order d. There are work orders E and F in the urgency sorting. The processing time of work order E is 0.5 hours, and the processing time of work order F is 1.5 hours. The urgency of the joint work order D is 88, and the urgency of the joint work order d is 150;
[0123] Then the optimistic insertion time is calculated as 10-0.5-1.5-1-1=6. There is no work order between work order E, work order F and joint work order Dd. Joint work order D is recorded as an optimistic joint work order with a sorting position of 4. The work order optimistic sorting module stores data (20230809-TS-00045, 4, 2).
[0124] Added joint work order Rr, with a time limit of 20 hours, numbered 20230809-TS-00046, it takes 2 hours to process work order R, and 3 hours to process work order r, the urgency of joint work order R is 50, and the urgency of joint work order r is 160;
[0125] The urgency of work order r is higher than that of work order d. We determine whether the insertion of work order r meets the conditions. According to the optimistic insertion time of the joint work order Dd, it is calculated to be 6 hours. It takes 3 hours to process work order r, which meets the insertion conditions. The order is:
[0126] Work Order E, Work Order F, Work Order R, Work Order D, Work Order D, Work Order R;
[0127] And the optimistic sorting module of work order R stores data (20230809-TS-00046, 6, 4).
[0128] Step S8: Set up a work order progress monitoring module and a work order processing archiving storage, use the work order progress monitoring to monitor the work order processing progress in real time, and trace the monitoring results back level by level, and use the work order processing archiving storage to archive and store the processing results of the work order;
[0129] Step S8-1, setting a work order progress monitoring module to monitor the processing progress of the work order in real time, and providing feedback on the processing status according to the regional data information of the work order;
[0130] Step S8-2: Set up work order processing archiving storage to archive and store the work order processing data, processing records and work order processing results.
[0131] Step S9: Set a dynamic work order optimization model, dynamically adjust the work order load weights under different categories according to different scenarios, obtain the load value of the work order through the work order load monitoring module, set the expected load value of the work order, and dynamically adjust the work order load weight according to the work order load value and the expected load value of the work order. The calculation formula is as follows:
[0132]
[0133] In the formula, β` WL Represented as the adjusted work order load weight; β WL It is represented as the original load weight; WL represents the actual load of the work order, and WLL represents the expected load of the work order;
[0134] For example, the original load weight of the type to which work order K belongs is 0.4. The work order load monitoring module is used to monitor work order K. The load value of work order K is 10, and the expected load value is 8. The dynamic work order optimization model is used to adjust the weight of the type to which work order K belongs. The weight adjustment calculation formula is as follows:
[0135] β` WL =0.4+(1+2 / 8)=0.5
[0136] After adjusting the load weight of the type to which work order K belongs through the dynamic work order optimization model, the load weight in the calculation of this type of work order is adjusted from 0.4 to 0.5.
[0137] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0138] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A multi-level linkage work order processing method, characterized in that: The work order processing method comprises the following steps: Step S1, obtain work order data information, classify the work order data information into types, and then match the corresponding work order processing department and processing personnel; Step S2: Obtain historical work order processing data information, obtain the processing time, processing success rate, work order load, work order-related resource loss and special emergency parameters of similar work orders, and work order regional data information, and calculate the urgency of the work order based on the data of similar work orders; Step S3: Establish a corresponding work order pre-processing queue according to the work order regional data information, and divide the work order pre-processing queue into regular sorting and emergency sorting. The work order sorting in the regular sorting is adjusted in real time and dynamically, and is sorted from high to low according to the urgency. The sorting method in the emergency sorting is a fixed first-in-first-out sorting. According to the work order urgency result calculated in step S2, the work order is sorted in the corresponding work order pre-processing queue in descending order of urgency. Step S4: Set a work order time block. The initial value of the work order time block is 0. Use the work order time block to time the work order processing. The difference between the work order limit time and the work order processing time is the countdown duration. The countdown starts when the work order first participates in the urgency calculation. Step S5: Set a work order load monitoring module and a load threshold, monitor the load situation in real time through the work order load monitoring module, and when the load value is lower than the load threshold, obtain the work order of the corresponding type, adjust the load value of the corresponding type, recalculate the urgency of the corresponding work order, and reorder according to the new urgency of the work order; Step S6: extract the combined limit time of the combined work orders and the work order with the lowest urgency among the combined work orders according to the work order data information obtained in step S2, record it as the optimistic combined work order, calculate the processing time of the work orders that have been sorted in the urgent sorting, and the processing time of each work order of the combined work order, calculate the optimistic insertion time of the optimistic combined work order according to the processing time of the work orders that have been sorted in the urgent sorting and the processing time of each work order of the combined work order, and judge whether the combined work order meets the work order sorting condition; Step S7, setting an optimistic sorting module for joint work orders, using the optimistic sorting module for joint work orders to sort the optimistic joint work orders according to the optimistic insertion time, the sorting method of the optimistic sorting module for joint work orders is that the optimistic joint work orders do not cross each other, the first optimistic joint work order uses the sorting position of the sorted work orders in the emergency sorting as a reference, and the subsequent optimistic joint work orders all use the sorting position of their previous optimistic joint work orders as a reference, and the optimistic sorting module for joint work orders stores the number, sorting position and sorting position of each optimistic joint work order; Step S8: Set up a work order progress monitoring module and a work order processing archiving storage, use the work order progress monitoring to monitor the work order processing progress in real time, and trace the monitoring results back level by level, and use the work order processing archiving storage to archive and store the processing results of the work order; Step S9: Set a dynamic work order optimization model to dynamically adjust the work order load weights of each type according to different scenarios.
2. The multi-level linkage work order processing method according to claim 1, characterized in that: The specific steps of step S1 are as follows: Step S1-1, obtain work order data information, and classify the work order data into six categories: maintenance, installation, upgrade, emergency, optimization and support; Step S1-2: Match the appropriate work order processing department and processing personnel after classification by work order type.
3. The multi-level linkage work order processing method according to claim 2, characterized in that: In step S2, the specific process of calculating the urgency of the work order based on the data of the same type of work orders is as follows: Step S2-1: Obtain the processing data information of the same type of historical work orders according to the work order type classification in step S1, obtain the processing time, processing success rate, work order load, work order-related resource loss and special emergency parameters of the corresponding work order, and regional data information of the work order, and the work order-related resource loss is calculated using the following formula: In the formula, Loss represents the amount of resource loss associated with the work order; n represents the total number of work orders; Ri represents the resource consumption of the i-th work order; Ci represents the resource unit cost of the i-th work order; Ti represents the total loss time of the i-th work order; Di represents the delay impact of the i-th work order; Qi represents the indirect loss of the i-th work order; Ri*Ci*Ti represents the direct resource loss of the i-th work order; Di*Ti represents the delay impact loss of the i-th work order; Step S2-2: After cleaning and standardizing the acquired data, the urgency of the work order is calculated. The urgency calculation uses the following formula: URG=TTR×β TTR +(1-SR)×β SR +WL×β WL +RI×β RI +LF+RE In the formula, URG represents the urgency of the work order, TTR represents the processing time of similar work orders; SR represents the success rate of historical processing of similar work orders; WL represents the load of similar work orders; RI represents the loss of associated resources of similar work orders; LF represents the special emergency parameter of similar work orders; RE represents a constant set according to the region; β TTR , β SR , β WL , β RI It is represented by the weight corresponding to each feature, and (1-SR) is represented by the impact of the failure rate, that is, the higher the success rate, the lower the urgency.
4. The multi-level linkage work order processing method according to claim 1, characterized in that: In step S3, the specific steps of establishing the work order pre-processing queue and sorting division are as follows: Step S3-1, establish a corresponding work order pre-processing queue according to the work order regional data information. Each region has a regular sort and an emergency sort. The regular sort is used to sort non-urgent work orders, and the work order sort position is adjusted in real time according to the urgency. The emergency sort is used to store work orders that need to be processed urgently, and is sorted in a stack storage manner, following the first-in-first-out principle; Step S3-2: According to the urgency of the work order calculated in step S2, the corresponding work order is sorted into a regular sort and an emergency sort according to the urgency.
5. The multi-level linkage work order processing method according to claim 1, characterized in that: In step S4, the specific process of setting the work order time progress block is as follows: Step S4-1, set the work order time progress block, and assign a corresponding work order time progress block to each added work order, and set the initial value of the work order time progress block to 0; Step S4-2, read the limit time and corresponding processing time of each work order, subtract the corresponding processing time of the work order from the limit time of the work order, and use the calculated result as the countdown time of the corresponding work order; Step S4-3: After the work order is included in the urgency calculation, the countdown starts. When the countdown reaches 0, the work order is added to the urgency ranking in sequence.
6. The multi-level linkage work order processing method according to claim 1, characterized in that: In step S5, a work order load monitoring module and a load threshold Fmax are set, the work order load monitoring module is used to obtain the load value, and the impact of the load on the resource utilization is calculated using the following formula: Y=a*L+b In the formula, Y represents the impact of load on resource utilization; a represents the degree of impact of load on resource utilization; b represents the basic resource utilization when the load is zero; When Y>Fmax, obtain the work order of the corresponding type, adjust its load value, recalculate the urgency according to the new load value, and re-arrange it in the work order preprocessing queue according to the new urgency.
7. The multi-level linkage work order processing method according to claim 1, characterized in that: In step S6, the joint work order is a set of work tasks composed of multiple related work orders, which have dependencies or common processing goals. The steps for sorting the joint work orders are as follows: Step S6-1, extracting the joint limit time of the joint work orders and the work order with the lowest urgency among the joint work orders through the work order data information obtained in step S2, and recording the work order with the lowest urgency as an optimistic joint work order; Step S6-2, calculating the optimistic insertion time of the optimistic joint work order according to the joint limit time of the joint work order, the processing time of each work order and the processing time of the work order in the emergency sorting; Step S6-3: determine whether the combined restriction time of the newly added combined work order is normal based on the calculated optimistic insertion time. If it is abnormal, the combined work order adding condition is not met, and the combined work order is prohibited from being added.
8. The multi-level linkage work order processing method according to claim 7 is characterized in that: In step S7, the specific steps of combining work orders are as follows: Step S7-1, setting a joint work order optimistic sorting module, and using the joint work order optimistic sorting module to sort the optimistic joint work orders according to the optimistic insertion time; Step S7-2, optimistic joint work orders follow the non-crossing rule. The first optimistic joint work order in the work order pre-processing queue uses the sorting position of the sorted work orders in the emergency sorting as a reference, and the subsequently added joint work orders are sorted with reference to the previous optimistic joint work order; Step S7-3, the optimistic sorting module for the joint work orders stores the work order number of each joint work order, the corresponding sorting position, and the sorting position of the previous optimistic joint work order; Step S7-4: when adjusting the work order, the processing time of the work order to be adjusted and the optimistic insertion time of the optimistic joint work order to be adjusted are judged. The work order adjustment condition is when the processing time of the adjusted work order is greater than the optimistic insertion time of the optimistic joint work order to be adjusted. When the processing time of the reordering work order is greater than the optimistic insertion time of the optimistic joint work order being reordered, the reordering work order is reordered behind the optimistic joint work order being reordered until the reordering conditions are met and the work order is inserted; When the processing time of the reordering work order is less than the optimistic insertion time of the optimistic joint work order being reordered, the reordering work order is inserted into the corresponding position before the optimistic joint work order being reordered; Step S7-5: When the optimistic joint work order is in urgent sorting, clear the optimistic insertion time.
9. The multi-level linkage work order processing method according to claim 1, characterized in that: In step S8, a work order progress monitoring module and work order processing archive storage are set up; Step S8-1, setting a work order progress monitoring module to monitor the processing progress of the work order in real time, and providing feedback on the processing status according to the regional data information of the work order; Step S8-2: Set up work order processing archiving storage to archive and store the work order processing data, processing records and work order processing results.
10. The multi-level linkage work order processing method according to claim 6, characterized in that: In step S9, a dynamic work order optimization model is set, and the work order load weights under different categories are dynamically adjusted according to different scenarios. The load value of the work order is obtained through the work order load monitoring module, and the expected load value of the work order is set. The work order load weight is dynamically adjusted according to the work order load value and the expected load value of the work order. The calculation formula is as follows: In the formula, β` WL Represented as the adjusted work order load weight; β WL It is represented as the original load weight; WL represents the actual load of the work order, and WLL represents the expected load of the work order.
Citation Information
Patent Citations
A method and apparatus for implement intelligent service
CN109508843A
Work order priority processing method and device, apparatus and computer readable storage medium
CN110111026A
Multi-dimensional optimized electric power work order intelligent distribution method
CN113298322A
Work order management method and system of intelligent digital platform
CN117474223A
Emergency intelligent order priority management system for work orders of operation and maintenance department
CN117592736A
Cited By
Work order problem analysis processing system and method combined with production management
CN118863457A
Work order problem analysis and processing system and method combined with production management
CN118863457B
Multi-level receipt dependent freight trial data linkage calculation method and system
CN120494454A
Multi-level document-dependent freight trial calculation data linkage calculation method and system
CN120494454B
Production work order traceability management system
CN121212770A