Power distribution area operation control method and device based on flexible direct current interconnection
By adopting the flexible DC interconnection control method in the distribution station area, the steady-state optimization and flexible interconnection optimization models are established, which solves the problem that the traditional power distribution system is difficult to adapt to distributed resource access, and achieves resource balance and utilization among stations. Energy efficiency can be improved.
Patent Information
- Application Number
- CN202410834578.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-29
AI Technical Summary
The traditional power distribution system is difficult to adapt to the high proportion of distributed new energy and the access of electric vehicle DC charging piles, resulting in a surge in system complexity and unstable operation. It is also unable to effectively balance the imbalance between stations and solve the problem of massive distributed resource access. brought about heavy overload problems.
A distribution station area operation control method based on flexible DC interconnection is adopted. By establishing a steady-state optimization control model and a flexible interconnection optimization control model, the operation cost and equipment utilization of the distribution station area are optimized, and the particle swarm optimization algorithm is used to solve the optimal control The solution realizes flexible interconnection and coordinated power flow control between multiple stations.
It reduces the number of converters in the station area, reduces equipment losses, improves the energy efficiency and resource utilization rate of the distribution station area, balances the imbalance between stations, and solves the heavy load caused by massive distributed resource access. Overload problem, power flow distribution and operating environment are optimized.
Smart Images

Figure CN118868094A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power distribution technology, and in particular to a method and device for controlling operation of a power distribution station area based on flexible direct current interconnection. Background Art
[0002] With the deepening of the concept of green, low-carbon and environmental protection, DC charging piles for electric vehicles, distributed new energy, energy storage, flexible loads, etc. on the load side are showing a rapid growth trend. These new elements are connected to the traditional AC distribution substation, and a large number of inverter conversion links are required to achieve grid-connected operation, making the distribution network present the "double high" characteristics of a high proportion of distributed energy and a high proportion of power electronic devices. At the same time, the charging of electric vehicles by users on the distribution side is related to travel activities, and is characterized by randomness and high charging power; distributed new energy power generation depends on meteorological conditions, and has strong volatility and intermittency. These two characteristics will increase the uncertainty and complexity of the substation operation status, and put forward higher requirements for the comprehensive management of power quality and energy management in the substation.
[0003] With the high proportion of access to distributed new energy, electric vehicles, and energy storage systems, the power supply mode of the distribution system has been significantly changed. The distribution technology has changed from "centralized" to "centralized + decentralized", which has brought huge challenges to the stable operation of the distribution system, mainly in two aspects: First, the traditional distribution system structure mode and traditional rigid distribution equipment are difficult to adapt to the large-scale access of distributed new energy and electric vehicle DC charging piles with strong randomness; second, the high proportion of new elements access has led to a surge in the complexity of the traditional distribution system. The installation of various converters, controllers, etc. on the already complex distribution system has made the distribution system more complex, and the complexity and difficulty of system operation control have also increased greatly. At the same time, with the increasing number of nonlinear loads, precision manufacturing loads and DC loads, users have increasingly strong demands for high-quality, diversified, and high-reliability power in the distribution system. The current way of relying on a large number of decentralized conversion devices to supply power to DC loads is no longer the best and economical choice. It not only increases costs and easily causes power quality problems, but also seriously reduces energy efficiency. At the same time, with the development and progress of power electronics technology, the realization of a flexible interconnected system of multiple stations through flexible power electronic equipment has become an effective means to solve the access and consumption of massive distributed resources on the distribution network side. For example, the patent (CN117039892B) discloses a method, system, device and storage medium for optimizing the dispatching of a flexible interconnection system in a distribution substation area, including: under the optimization constraint condition, with the power purchase cost of the flexible interconnection system in the distribution substation area being minimized, constructing a day-ahead optimization dispatching model for the flexible interconnection system in the distribution substation area; performing linear equivalent processing on the nonlinear terms in the day-ahead optimization dispatching model for the flexible interconnection system in the distribution substation area, and obtaining a mixed integer linear programming model for the flexible interconnection system in the distribution substation area; obtaining an optimal dispatching operation plan by solving the mixed integer linear programming model; and dispatching and operating the flexible interconnection system in the distribution substation area according to the optimal dispatching operation plan. However, in this method, the active power of the distribution transformer is mainly used as the optimization object, and the minimum power purchase cost is only used as the optimization goal. It is not possible to balance the imbalance between substations, and it is not possible to solve the heavy overload problem caused by the access of massive distributed resources in the context of the new power system. Summary of the invention
[0004] The present invention provides a distribution station area operation control method and device based on flexible DC interconnection, which can effectively balance the imbalance between distribution stations and solve the heavy overload problem caused by the access of massive distributed resources in the context of new power systems.
[0005] A distribution substation operation control method based on flexible direct current interconnection is applied to a flexible direct current interconnection distribution substation system, the method comprising:
[0006] Taking the minimum operation cost of the distribution area as the objective function and considering the operation constraints of the distribution area, a steady-state optimization control model of the distribution area is established.
[0007] Collecting transformer operation data of the distribution substation area, and establishing a transformer operation efficiency calculation model according to the transformer operation data;
[0008] According to the transformer operation efficiency calculation model, a flexible interconnection optimization control model is established with the power of the flexible DC interconnection devices in different distribution substations as the optimization target;
[0009] The steady-state optimization control model and the flexible interconnection optimization control model are solved respectively to obtain the optimal operation control solution.
[0010] Furthermore, the flexible DC interconnection distribution substation system includes a plurality of distribution substations, and adjacent distribution substations are interconnected via a flexible DC interconnection device.
[0011] Furthermore, the operation cost of the distribution station area includes the operation cost of the distribution station area transformer, the operation cost of the power electronic device and the operation cost of the energy storage system;
[0012] The operating constraints of the distribution station area include power balance constraints, transformer operation constraints, flexible DC interconnection device operation constraints and energy storage system operation constraints.
[0013] Furthermore, a transformer operation efficiency calculation model is established according to the transformer operation data, including:
[0014] Calculate the total transformer loss based on the no-load loss and load loss of the transformer;
[0015] According to the total loss of transformer, a transformer operation efficiency calculation model is established.
[0016] Furthermore, according to the transformer operation efficiency calculation model, taking the power of the flexible DC interconnection devices in different distribution substations as the optimization target, a flexible interconnection optimization control model is established, including:
[0017] In an optimization cycle, it is determined whether the operating efficiency and load rate of the transformer at the current moment exceed the efficiency threshold and the load rate threshold. If so, the transformer operating efficiency curves of different distribution substations are calculated according to the transformer operating efficiency calculation model;
[0018] Obtain the operation information of flexible DC interconnection devices in different distribution substation areas;
[0019] The flexible interconnection optimization control model is established according to the transformer operation efficiency curve and the operation information of the flexible DC interconnection device.
[0020] Furthermore, the flexible interconnection optimization control model includes an objective function with the goal of minimizing the operating power of the flexible DC interconnection device, a power flow balance equation, and operating constraints.
[0021] Furthermore, the objective function is as follows:
[0022]
[0023] Among them, S T,i is the capacity of the distribution transformer in the ith distribution station area, λ i is the weight coefficient, η b,i is the optimal load factor of the distribution transformer in the ith distribution area, P i represents the actual operating power of the distribution transformer in the ith distribution substation, and N represents the number of distribution substations;
[0024] The power flow balance equation is as follows:
[0025] P i =P ac,i +P dc,i ;
[0026]
[0027] Among them, P ac,i is the load power on the low voltage AC side of the distribution station area, P dc,i is the AC port power of the flexible DC interconnection device, are the input and output power of the flexible DC interconnection device interacting with the grid, They represent the efficiency of interaction between the flexible DC interconnection device and the power grid, and are 0-1 variables, representing the state of the flexible DC interconnection device. or When is 1, it means that the ith distribution station injects power into the flexible DC interconnection device; otherwise, or When it is 0, it means that the i-th distribution station area absorbs power from the flexible interconnection area, η +,i represents the interface efficiency of the power output of the flexible interconnection device, η -,i represents the interface efficiency of the power input of the flexible interconnection device, P max,i Indicates the maximum power of the flexible interconnection device port;
[0028] The operation constraints include power constraints of the flexible DC interconnection device, safe operation constraints, power balance constraints of the flexible interconnection area, and voltage constraints of the flexible interconnection area.
[0029] Furthermore, the steady-state optimization control model and the flexible interconnection optimization control model are solved to obtain an optimal operation control solution, including:
[0030] Solving the steady-state optimization control model to obtain an operation plan with the minimum comprehensive operation cost;
[0031] Standardizing the flexible interconnection optimization control model;
[0032] A mixed integer nonlinear constrained quadratic programming problem is established, and the particle swarm optimization algorithm is used to solve the optimization model.
[0033] A distribution substation operation control device based on flexible DC interconnection is applied to a flexible DC interconnection distribution substation system, and the device comprises:
[0034] The first model building module is used to establish a steady-state optimization control model of the distribution substation area by taking the minimum operation cost of the distribution substation area as the objective function and considering the operation constraints of the distribution substation area;
[0035] A calculation module, used to collect transformer operation data of the distribution station area and establish a transformer operation efficiency calculation model according to the transformer operation data;
[0036] The second model building module is used to build a flexible interconnection optimization control model based on the transformer operation efficiency calculation model and taking the power of the flexible DC interconnection devices in different distribution substations as the optimization target;
[0037] The solution module is used to solve the steady-state optimization control model and the flexible interconnection optimization control model respectively to obtain the optimal operation control solution.
[0038] Furthermore, the flexible DC interconnection distribution substation system includes a plurality of distribution substations, and adjacent distribution substations are interconnected via a flexible DC interconnection device.
[0039] Furthermore, the operation cost of the distribution station area includes the operation cost of the distribution station area transformer, the operation cost of the flexible DC interconnection device and the operation cost of the energy storage system;
[0040] The operating constraints of the distribution station area include power balance constraints, transformer operation constraints, flexible DC interconnection device operation constraints and energy storage system operation constraints.
[0041] Furthermore, the calculation module establishes a transformer operation efficiency calculation model according to the transformer operation data, including:
[0042] Calculate the total transformer loss based on the no-load loss and load loss of the transformer;
[0043] According to the total loss of transformer, a transformer operation efficiency calculation model is established.
[0044] Furthermore, the second model building module establishes a flexible interconnection optimization control model based on the transformer operation efficiency calculation model and taking the power of the flexible DC interconnection devices in different distribution substations as the optimization target, including:
[0045] In an optimization cycle, it is determined whether the operating efficiency and load rate of the transformer at the current moment exceed the efficiency threshold and the load rate threshold. If so, the transformer operating efficiency curves of different distribution substations are calculated according to the transformer operating efficiency calculation model;
[0046] Obtain the operation information of flexible DC interconnection devices in different distribution substation areas;
[0047] The flexible interconnection optimization control model is established according to the transformer operation efficiency curve and the operation information of the flexible DC interconnection device.
[0048] Furthermore, the flexible interconnection optimization control model includes an objective function with the goal of minimizing the operating power of the flexible DC interconnection device, a power flow balance equation, and operating constraints.
[0049] Furthermore, the objective function is as follows:
[0050]
[0051] Among them, S T,i is the capacity of the distribution transformer in the ith distribution station area, λ i is the weight coefficient, η b,i is the optimal load factor of the distribution transformer in the ith distribution area, P i represents the actual operating power of the distribution transformer in the ith distribution substation, and N represents the number of distribution substations;
[0052] The power flow balance equation is as follows:
[0053] P i =P ac,i +P dc,i ;
[0054]
[0055] Among them, P ac,i is the load power on the low voltage AC side of the distribution station area, P dc,i is the AC port power of the flexible DC interconnection device, are the input and output power of the flexible DC interconnection device interacting with the grid, They represent the efficiency of interaction between the flexible DC interconnection device and the power grid, and are 0-1 variables, representing the state of the flexible DC interconnection device. or When is 1, it means that the ith distribution station injects power into the flexible DC interconnection device; otherwise, or When it is 0, it means that the i-th distribution station area absorbs power from the flexible interconnection area, η +,irepresents the interface efficiency of the power output of the flexible interconnection device, η -,i represents the interface efficiency of the power input of the flexible interconnection device, P max,i Indicates the maximum power of the flexible interconnection device port;
[0056] The operation constraints include power constraints of the flexible DC interconnection device, safe operation constraints, power balance constraints of the flexible interconnection area, and voltage constraints of the flexible interconnection area.
[0057] Furthermore, the solving module solves the steady-state optimization control model and the flexible interconnection optimization control model to obtain an optimal operation control solution, including:
[0058] Solving the steady-state optimization control model to obtain an operation plan with the minimum comprehensive operation cost;
[0059] Standardizing the flexible interconnection optimization control model;
[0060] A mixed integer nonlinear constrained quadratic programming problem is established, and the particle swarm optimization algorithm is used to solve the optimization model.
[0061] A computer storage medium stores computer instructions, which are used to execute the above method when called.
[0062] The method and device for controlling the operation of a distribution substation area based on flexible DC interconnection provided by the present invention have at least the following beneficial effects:
[0063] (1) In traditional AC distribution substations, flexible interconnection devices are installed and used as the hub of flexible distribution substations to achieve flexible interconnection between multiple substations. Through the stable operation control strategy of distribution substations based on flexible DC interconnection, not only can the number of converters in the substation be reduced, thereby reducing the loss of distribution equipment in the substation, but also the flexible interconnection power flow collaborative control strategy can be used to achieve effective interaction between energy flow routing and source-load-storage in the power electronic distribution substation, improve the coordinated control level of adjustable resources in the substation, realize the reasonable configuration of multi-aggregation, improve the comprehensive utilization rate and utilization effect of substation resources, thereby optimizing the power flow distribution and operating environment of the substation and improving the overall energy efficiency of the distribution substation.
[0064] (2) In response to the demand for access and absorption of massive distributed resources on the distribution network side, the two dimensions of internal self-discipline control in the distribution station area and coordinated regulation of multiple stations based on flexible interconnection are comprehensively considered. A steady-state optimization control model of the distribution system in the substation area is constructed with the goal of stable economic operation of the substation area, and a flexible interconnection optimization control model of the substation area is constructed with the goal of utilizing and operating efficiency of the distribution and transformation equipment in the substation area. This model can not only meet the needs of efficient access of massive distributed resources to the power grid and economic operation of the substation area on the distribution network side, but also balance the imbalance between substations, solve the heavy overload problem caused by the access of massive distributed resources in the context of the new power system, realize the high-reliability absorption and utilization of distributed resources, optimize the power flow distribution and operating environment of the substation area, and improve the overall energy efficiency of the distribution station area. BRIEF DESCRIPTION OF THE DRAWINGS
[0065] Figure 1 The present invention provides a flow chart of an embodiment of a method for controlling operation of a distribution station area based on flexible DC interconnection.
[0066] Figure 2 A structural schematic diagram of an embodiment of a flexible DC interconnection distribution station area system in the distribution station area operation control method based on flexible DC interconnection provided by the present invention.
[0067] Figure 3 A schematic diagram of an embodiment of a distribution transformer efficiency curve in a distribution station area operation control method based on flexible DC interconnection provided by the present invention.
[0068] Figure 4 The present invention provides a flow chart of an embodiment of a distribution station area operation control device based on flexible DC interconnection. DETAILED DESCRIPTION
[0069] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0070] refer to Figure 1 In some embodiments, a method for controlling the operation of a distribution substation based on flexible DC interconnection is provided, which is applied to a flexible DC interconnection distribution substation system. The method includes:
[0071] S1. Taking the minimum operation cost of the distribution area as the objective function and considering the operation constraints of the distribution area, a steady-state optimization control model of the distribution area is established;
[0072] S2. Collect transformer operation data of the distribution substation area, and establish a transformer operation efficiency calculation model based on the transformer operation data;
[0073] S3. According to the transformer operation efficiency calculation model, a flexible interconnection optimization control model is established with the power of the flexible DC interconnection devices in different distribution substations as the optimization target;
[0074] S4. Solve the steady-state optimization control model and the flexible interconnection optimization control model respectively to obtain an optimal operation control solution.
[0075] Further, refer to Figure 2 The flexible DC interconnected distribution substation system includes multiple distribution substations, and adjacent distribution substations are interconnected through flexible DC interconnection devices.
[0076] Furthermore, in step S1, the operation cost of the distribution station area includes the operation cost of the distribution station area transformer, the operation cost of the flexible DC interconnection device and the operation cost of the energy storage system;
[0077] The operating constraints of the distribution station area include power balance constraints, transformer operation constraints, flexible DC interconnection device operation constraints and energy storage system operation constraints.
[0078] Specifically, the objective function of minimizing the comprehensive operating cost is established by considering the distribution transformers, flexible DC interconnection devices, energy storage and other equipment in the distribution station area.
[0079] min C=min{C ope}; (1)
[0080] Among them, the operating cost of the distribution station area is C ope Including the operating cost of the distribution station area transformer C tr.ope , Distributed resource grid-connected AC / DC converter operating cost C VSC.ope 、DC / DC converter operating cost C DC / DC.ope And the energy storage system operating cost C bat.ope , the calculation formula of the distribution station area operation cost is as follows:
[0081] C ope =C tr.ope +C VSC.ope +C DC / DC.ope +C bat.ope ; (2)
[0082] The operating cost of the transformer in the distribution area is composed of the transformer operating loss cost C loss And the power limiting loss C lim The operating loss cost of the transformer includes iron loss and copper loss. In addition, due to the limited transmission capacity of the distribution transformer, when the load in the distribution area is too high, the adjustable load in the distribution area needs to be limited, and the electricity loss is recorded as power limiting loss. The operating cost of the AC / DC converter, DC / DC converter and energy storage system for distributed resources to access the power grid depends on the energy loss generated by the three in the transmission of power.
[0083] C tr.ope =Closs +C lim ; (3)
[0084]
[0085] Among them, c cost (t) is the real-time electricity price, T is the total number of time periods in the configuration cycle, P0 is the no-load loss of the transformer, P k is the transformer short-circuit loss, β is the transformer load rate, Δt is the time step, P T (t) is the power delivered by the distribution transformer to the distribution area during period t, S TN is the rated capacity of the distribution transformer, is the power factor, P lim (t) is the power loss, β max is the upper limit of load rate, P rec (t) is the 400V AC port input power during period t, P inv (t) is the output power of 400V AC port, η VSC is the AC / DC converter efficiency, P L.DCL (t) is the load power of 220V DC port, η DC / DC is the DC / DC converter efficiency, η bat is the DC / DC interface efficiency of the energy storage battery, P ch (t) is the charging power of the energy storage battery, P dis (t) is the discharge power of the energy storage battery.
[0086] Power balance constraints in distribution station areas:
[0087] The power balance constraints include the 400V AC bus power balance constraints in the distribution area, the 750V DC bus power balance constraints in the distribution area, the 220V DC bus power balance constraints in the distribution area, and the 750V DC bus power balance constraints inside the flexible DC interconnection device:
[0088] P T (t) = P rec (t)-P inv (t)+P L.AC (t); (11)
[0089] P DCH (t)+P G (t)-P lim (t) = P L.DCH (t); (12)
[0090] P DCL (t) = P L.DCL (t); (13)
[0091]
[0092] Among them, P T (t) is the power delivered by the distribution transformer to the distribution area during period t, P rec (t) is the 400V AC port input power during period t, P inv (t) is the output power of 400V AC port, P L.AC (t) is the load power of 400V AC port, P DCH (t) is the 750V DC port output power, P G (t) is the output of distributed power generation, P L.DCH (t) is the load power of 750V DC port, P DCL (t) is the output power of 220V DC port, P L.DCL (t) is the load power of 220V DC port, P dis (t) is the discharge power of the energy storage battery, P ch (t) is the charging power of the energy storage battery, η VSC is the AC / DC converter efficiency, P lim (t) is the power loss.
[0093] Transformer operation constraints:
[0094] 0≤β≤β max ; (15)
[0095] Among them, β is the load factor of the distribution transformer, β max The upper limit of the load factor.
[0096] The operation constraints of the flexible DC interconnection device include the AC / DC converter capacity constraint and the DC / DC converter capacity constraint, where the AC / DC converter capacity constraint is:
[0097] 0≤P rec (t)≤U VSC (t)P VSC.max ; (16)
[0098] 0≤P inv (t)≤(1-U VSC (t))P VSC.max ; (17)
[0099]
[0100] Among them, U VSC (t) is the operating state variable of the AC / DC converter, which takes 1 when the AC / DC converter works in the rectification state and takes 0 when the AC / DC converter works in the inverter state; P VCS.max Indicates the maximum transmission power of the AC / DC converter, P rec(t) is the 400V AC port input power during period t, P inv (t) is the output power of the 400V AC port, △ represents the difference between the load and the power supply power of the distribution station area, P L.DCL (t) is the load power of 220V DC port, P L.DCH (t) is the load power of 750V DC port, P L.DCL (t) is the load power of 220V DC port, η DC / DC is the DC / DC converter efficiency, P ch (t) is the charging power of the energy storage battery, P dis (t) is the discharge power of the energy storage battery.
[0101] DC / DC converter capacity constraints:
[0102] 0≤P L.DCL (t)≤P DC / DC.max ; (19)
[0103] Among them, P DC / DC.max Indicates the maximum transmission power of the DC / DC converter, P L.DCL (t) is the load power of 220V DC port.
[0104] The energy storage constraints in the distribution station area include energy storage DC / DC interface capacity constraints, energy storage battery charge state constraints, energy storage battery power balance constraints, and energy storage battery cycle life constraints.
[0105] Energy storage DC / DC interface capacity constraints:
[0106] 0≤P ch (t)≤U bat (t)P bat.max ; (20)
[0107] 0≤P dis (t)≤[1-U bat (t)]P bat.max ; (twenty one)
[0108] Among them, U bat (t) represents the voltage of the energy storage battery at time t, P ch (t) is the charging power of the energy storage battery, P bat.max Indicates the maximum power of the energy storage battery, P dis (t) is the discharge power of the energy storage battery.
[0109] Energy storage battery state of charge constraints:
[0110] SOC min ≤SOC(t)≤SOC max ; (twenty two)
[0111]
[0112] Among them, SOC max , SOC min are the upper and lower limits of the state of charge of the energy storage battery, E(0) is the initial charge of the energy storage battery, and E bat.max represents the maximum rated capacity of the energy storage battery, SOC(t) represents the state of charge of the energy storage battery, P ch (t) is the charging power of the energy storage battery, P dis (t) is the discharge power of the energy storage battery, η bat It is the DC / DC interface efficiency of the energy storage battery.
[0113] Energy storage battery power balance constraints:
[0114]
[0115] Among them, P ch (t) is the charging power of the energy storage battery, P dis (t) is the discharge power of the energy storage battery, η bat is the DC / DC interface efficiency of the energy storage battery, and Δt is the time step.
[0116] Energy storage battery cycle life constraints:
[0117] S bat (t)≤S bat.life ; (25)
[0118] S bat (t) = max{U bat (t)-U bat (t-1),0}; (26)
[0119] Among them, S bat (t) is the charge and discharge cycle count variable of the energy storage battery. When the energy storage battery starts to charge at time t, it takes 1, otherwise it takes 0. bat.life is the charge and discharge cycle life of the energy storage battery, U bat (t) represents the voltage of the energy storage battery at time t, U bat (t-1) represents the voltage of the energy storage battery at time t-1.
[0120] Furthermore, in step S2, a transformer operation efficiency calculation model is established according to the transformer operation data, including:
[0121] S21, calculating the transformer load loss according to the voltage data, current data, no-load loss and short-circuit loss of the transformer;
[0122] S22. Establish a transformer operation efficiency calculation model based on the transformer load loss and no-load loss.
[0123] Transformer loss includes the loss of the effective value of the fundamental current on the transformer winding resistance, core loss, and stray loss; transformer loss includes no-load loss and load loss. No-load loss is a kind of loss consumed by the transformer over a long period of time. The transformer loss calculation formula is as follows:
[0124]
[0125] Where: P0 is the transformer no-load loss; I t is the current passing through the high voltage side of the transformer; P t is the transformer load loss; U N is the rated voltage of the transformer; S N is the rated capacity of the transformer, P k is the short-circuit loss of the transformer.
[0126] Based on the economic operation characteristics of transformers, it can be seen that when the distribution transformer in the substation is lightly loaded or heavily loaded, its distribution transformer efficiency is not optimal. Considering copper loss and iron loss, the transformer operation efficiency is shown in the following formula, and the characteristic curve is as follows: Figure 3 As shown:
[0127]
[0128] Among them, β is the load factor of the distribution transformer, P0 is the no-load loss, P t is the load loss, S N is the rated capacity, is the load power factor, and η is the transformer operating efficiency.
[0129] As an important indicator of economic and safe operation of distribution substations, the load rate has a significant impact on the operating efficiency of distribution substations. Too large or too small load rate is not conducive to the efficient operation of distribution substation transformers. At the same time, excessive load rate will also cause the distribution substation to be in a heavy overload operation state, resulting in heating, reduced safety margin and other problems. When the distribution transformer in the distribution substation is in heavy overload operation for a long time, it will seriously affect the life, operating margin and power supply safety of the distribution transformer in the substation; when the distribution transformer in the distribution substation is in light load operation for a long time, on the one hand, the equipment operation efficiency is not high, and on the other hand, the equipment utilization rate causes the waste of distribution transformer equipment assets. Therefore, adjusting the distribution transformer operation point in the substation is of great significance to the safe and economic operation of the substation. By adjusting the power size or direction of the flexible DC interconnection device in the distribution substation, the power obtained by the distribution transformer in the distribution substation from the power grid can be flexibly changed, thereby changing the load rate of the distribution transformer in the distribution substation, and realizing the distribution transformer in the distribution substation close to the optimal efficiency point, thereby improving the economic operation of multiple substations. In the new form of interconnection of distribution substations, mutual interconnection and mutual assistance can facilitate online adjustment of the interconnection power of the distribution substation, thereby dynamically adjusting the load rate of different distribution substations, thereby improving the operating efficiency of the distribution substation group.
[0130] Furthermore, in step S3, according to the transformer operation efficiency calculation model, taking the power of the flexible DC interconnection devices in different distribution substations as the optimization target, a flexible interconnection optimization control model is established, including:
[0131] S31. In one optimization cycle, determine whether the operating efficiency and load rate of the transformer at the current moment exceed the efficiency threshold and the load rate threshold. If so, calculate and obtain the transformer operating efficiency curves of different distribution substations according to the transformer operating efficiency calculation model;
[0132] S32, obtaining operation information of flexible DC interconnection devices in different distribution substations;
[0133] S33. Establishing the flexible interconnection optimization control model according to the transformer operation efficiency curve and the operation information of the flexible DC interconnection device.
[0134] Among them, the optimization cycle is determined according to the actual operating conditions.
[0135] The interconnection power decision between distribution substations is the key to improving the power flow distribution between substations. The power exchange instructions of the substations are decided by the low-voltage flexible DC interconnection management system of the distribution substation, and then issued to the flexible DC interconnection devices in different substations.
[0136] The above-mentioned flexible interconnection optimization control model takes the interconnection power of different substations as the research object, and aims to improve the utilization rate and operation efficiency of the distribution and transformation equipment in the substation. It establishes a flexible interconnection optimization control model for the distribution substation, decides the interconnection power command according to the operating status of the substation, and promotes the improvement of the flexible interconnection and mutual assistance operation level on the substation side under the new power system.
[0137] The flexible interconnection optimization control model includes an objective function with the goal of minimizing the operating power of the flexible DC interconnection device, a power flow balance equation, and operating constraints.
[0138] Furthermore, the objective function is as follows:
[0139]
[0140] Among them, S T,i is the capacity of the distribution transformer in the ith distribution station area, λ i is the weight coefficient, η b,i is the optimal load factor of the distribution transformer in the ith distribution area, P i represents the actual operating power of the distribution transformer in the ith distribution substation, and N represents the number of distribution substations;
[0141] The power flow balance equation is as follows:
[0142] Pi =P ac,i +P dc,i ; (31)
[0143]
[0144] Among them, P ac,i is the load power on the low voltage AC side of the distribution station area, P dc,i is the AC port power of the flexible DC interconnection device, are the input and output power of the flexible DC interconnection device interacting with the grid, They represent the efficiency of interaction between the flexible DC interconnection device and the power grid, and are 0-1 variables, representing the state of the flexible DC interconnection device. or When is 1, it means that the ith distribution station injects power into the flexible DC interconnection device; otherwise, or When it is 0, it means that the i-th distribution station area absorbs power from the flexible interconnection area, η +,i represents the interface efficiency of the power output of the flexible interconnection device, η -,i represents the interface efficiency of the power input of the flexible interconnection device, P max,i Indicates the maximum power of the flexible interconnection device port;
[0145] The operation constraints include power constraints of the flexible DC interconnection device, safe operation constraints, power balance constraints of the flexible interconnection area, and voltage constraints of the flexible interconnection area.
[0146] Consider the safe operation constraints of the distribution transformer in the substation:
[0147] 0≤P i ≤ηS T,i ; (41)
[0148] Among them, η i is the heavy load warning value of the distribution transformer in the ith distribution station area, S T,i Represents the distribution transformer capacity of the ith substation.
[0149] Flexible DC interconnection device constraints:
[0150] Considering the capacity limitation and power direction of the flexible DC interconnection device, the operation constraints of the flexible DC interconnection device in the distribution station area are constructed as shown in the following formula.
[0151] -P ei,rated ≤P ei,i ≤P ei,rated ; (42)
[0152] Among them, P ei is the power of the flexible DC interconnection device, P ei,ratedIndicates the maximum power limit of the flexible DC interconnection device.
[0153] Flexible interconnection area power balance constraints:
[0154]
[0155] Among them, U ii,jj is the node voltage of the flexible DC interconnection device in the ith distribution station area connected to the flexible DC interconnection area; G ij is the mutual conductance between node ii and node j in the flexible interconnection region. When node ii is equal to node mm, G ii,mm is the self-conductance of node ii, P lvde,i represents the power of the flexible DC interconnection device in the ith distribution station area connected to the DC bus of the grid, U i represents the node voltage of the ith node, U j represents the node voltage of the jth node;
[0156] Flexible interconnection area voltage constraints:
[0157] DC voltage safety is a key factor for the reliable operation of the flexible interconnection area. In order to ensure the safe operation range of DC voltage in the flexible interconnection area, the following operating constraints are established:
[0158] U ii,jj,min ≤U ii,jj ≤U ii,jj,max ; (44)
[0159] Among them, U ii,jj is the node voltage of the flexible DC interconnection device in the ith distribution station area connected to the flexible DC interconnection area, U ii,jj,min represents the lower limit of the node voltage between node ii and node jj, U ii,jj,max Represents the node voltage upper limit of node ii and node jj.
[0160] Furthermore, in step S4, the steady-state optimization control model and the flexible interconnection optimization control model are solved respectively to obtain an optimal operation control solution, including:
[0161] S41, solving the steady-state optimization control model to obtain an operation plan with the minimum comprehensive operation cost;
[0162] S42, standardizing the flexible interconnection optimization control model;
[0163] S43, establishing a mixed integer nonlinear constrained quadratic programming problem, and using a particle swarm optimization algorithm to solve the flexible interconnection optimization control model.
[0164] Furthermore, in step S2, the objective function of the flexible interconnection device is a quadratic function, and the constraint condition is a linear constraint, so it can be standardized as a nonlinear quadratic programming problem. The standard nonlinear quadratic programming form is as follows:
[0165]
[0166] sA ineq x≤b ineq
[0167] A eq x≤b eq
[0168] lx+x T Gx≤c
[0169] x l ≤ x ≤x u ; (45)
[0170] Among them, H, h, Aineq, bineq, Aeq, beq, l, G, c, x1 and xu are model coefficient matrices or vectors, which are obtained by equations (41) to (43).
[0171] Furthermore, in step S3, after obtaining the standardized nonlinear quadratic programming model, the particle swarm optimization algorithm is used to solve it. The particle swarm algorithm simulates the birds in the flock by designing a massless particle. The particle has only two properties: speed and position. The speed represents the speed of movement, and the position represents the direction of movement. Each particle searches for the optimal solution in the search space separately, and records it as the current individual extreme value, and shares the individual extreme value with other particles in the entire particle swarm. The best individual extreme value is found as the current global optimal solution of the entire particle swarm. All particles in the particle swarm adjust their speed and position according to the current individual extreme value they have found and the current global optimal solution shared by the entire particle swarm. The specific steps are as follows:
[0172] Initialize particle swarm: set the swarm size and maximum speed range to prevent exceeding the maximum range. The position information is the entire search space, and the speed and position are randomly initialized in the speed range and search space;
[0173] Evaluate particles and find individual extreme values: individual extreme values are the historically optimal position information found for each particle;
[0174] Find the global optimal solution: Find a global optimal solution from these individual historical optimal solutions, compare it with the historical optimal solution, and select the best one as the current historical optimal solution;
[0175] Update the particle swarm velocity and position: Use the following formula to solve iteratively:
[0176]
[0177] In the formula, i represents the particle number, d represents the particle dimension, k represents the number of iterations, w represents the inertia weight, c1 represents the individual learning factor, c2 represents the group learning factor, r1 and r2 represent random numbers in the interval [0,1] to increase the randomness of the exploration. is the velocity vector of particle i in the kth iteration, is the position vector of particle i in the dth dimension in the kth iteration, is the historical optimal position of particle i in the dth dimension in the kth iteration, that is, the optimal solution searched by the i-th particle (individual) after the kth iteration, is the historical optimal position of the swarm in the dth dimension in the kth iteration, that is, the optimal solution in the entire particle swarm after the kth iteration.
[0178] Set termination conditions: set the maximum number of iterations, complete iterative optimization, and output the results.
[0179] refer to Figure 4 In some embodiments, a distribution substation operation control device based on flexible DC interconnection is also provided, which is applied to a flexible DC interconnection distribution substation system, and the device includes:
[0180] The first model building module 201 is used to establish a steady-state optimization control model of the distribution station area by taking the minimum operation cost of the distribution station area as the objective function and considering the operation constraints of the distribution station area;
[0181] A calculation module 202 is used to collect transformer operation data of the distribution substation area and establish a transformer operation efficiency calculation model according to the transformer operation data;
[0182] The second model building module 203 is used to build a flexible interconnection optimization control model based on the transformer operation efficiency calculation model and taking the power of the flexible DC interconnection devices in different distribution substations as the optimization target;
[0183] The solving module 204 is used to solve the steady-state optimization control model and the flexible interconnection optimization control model respectively to obtain an optimal operation control solution.
[0184] Furthermore, the flexible DC interconnection distribution substation system includes a plurality of distribution substations, and adjacent distribution substations are interconnected via a flexible DC interconnection device.
[0185] Furthermore, the operation cost of the distribution station area includes the operation cost of the distribution station area transformer, the operation cost of the power electronic device and the operation cost of the energy storage system;
[0186] The operating constraints of the distribution station area include power balance constraints, transformer operation constraints, flexible DC interconnection device operation constraints and energy storage system operation constraints.
[0187] Furthermore, the calculation module 202 establishes a transformer operation efficiency calculation model according to the transformer operation data, including:
[0188] Calculate the total transformer loss based on the no-load loss and load loss of the transformer;
[0189] According to the total loss of transformer, a transformer operation efficiency calculation model is established.
[0190] Furthermore, the second model building module 203 builds a flexible interconnection optimization control model based on the transformer operation efficiency calculation model and taking the power of the flexible DC interconnection devices in different distribution substations as the optimization target, including:
[0191] In an optimization cycle, it is determined whether the operating efficiency and load rate of the transformer at the current moment exceed the efficiency threshold and the load rate threshold. If so, the transformer operating efficiency curves of different distribution substations are calculated according to the transformer operating efficiency calculation model;
[0192] Obtain the operation information of flexible DC interconnection devices in different distribution substation areas;
[0193] The flexible interconnection optimization control model is established according to the transformer operation efficiency curve and the operation information of the flexible DC interconnection device.
[0194] Furthermore, the flexible interconnection optimization control model includes an objective function with the goal of minimizing the operating power of the flexible DC interconnection device, a power flow balance equation, and operating constraints.
[0195] Furthermore, the objective function is as follows:
[0196]
[0197] Among them, S T,i is the capacity of the distribution transformer in the ith distribution station area, λ i is the weight coefficient, η b,i is the optimal load factor of the distribution transformer in the ith distribution area, P i represents the actual operating power of the distribution transformer in the ith distribution substation, and N represents the number of distribution substations;
[0198] The power flow balance equation is as follows:
[0199] P i =P ac,i +P dc,i ;
[0200]
[0201] Among them, P ac,i is the load power on the low voltage AC side of the distribution station area, P dc,i is the AC port power of the flexible DC interconnection device, are the input and output power of the flexible DC interconnection device interacting with the grid, They represent the efficiency of interaction between the flexible DC interconnection device and the power grid, and are 0-1 variables, representing the state of the flexible DC interconnection device. or When is 1, it means that the ith distribution station injects power into the flexible DC interconnection device; otherwise, or When it is 0, it means that the i-th distribution station area absorbs power from the flexible interconnection area, η +,i represents the interface efficiency of the power output of the flexible interconnection device, η -,i represents the interface efficiency of the power input of the flexible interconnection device, P max,i Indicates the maximum power of the flexible interconnect device port.
[0202] The operation constraints include power constraints of the flexible DC interconnection device, safe operation constraints, power balance constraints of the flexible interconnection area, and voltage constraints of the flexible interconnection area.
[0203] Furthermore, the solving module 204 solves the steady-state optimization control model and the flexible interconnection optimization control model to obtain an optimal operation control solution, including:
[0204] Solving the steady-state optimization control model to obtain an operation plan with the minimum comprehensive operation cost;
[0205] Standardizing the flexible interconnection optimization control model;
[0206] A mixed integer nonlinear constrained quadratic programming problem is established, and the particle swarm optimization algorithm is used to solve the optimization model.
[0207] Specifically, the objective function of the flexible interconnection device is a quadratic function, and the constraint condition is a linear constraint, so it can be standardized as a nonlinear quadratic programming problem. The standard nonlinear quadratic programming form is as follows:
[0208]
[0209] sA ineq x≤b ineq
[0210] A eq x≤b eq
[0211] lx+x T Gx≤c
[0212] x l ≤ x ≤x u ; (45)
[0213] Among them, H, h, Aineq, bineq, Aeq, beq, l, G, c, x1 and xu are model coefficient matrices or vectors, which are obtained by equations (41) to (43).
[0214] Furthermore, in step S3, after obtaining the standardized nonlinear quadratic programming model, the particle swarm optimization algorithm is used to solve it. The particle swarm algorithm simulates the birds in the flock by designing a massless particle. The particle has only two properties: speed and position. The speed represents the speed of movement, and the position represents the direction of movement. Each particle searches for the optimal solution in the search space separately, and records it as the current individual extreme value, and shares the individual extreme value with other particles in the entire particle swarm. The best individual extreme value is found as the current global optimal solution of the entire particle swarm. All particles in the particle swarm adjust their speed and position according to the current individual extreme value they have found and the current global optimal solution shared by the entire particle swarm. The specific steps are as follows:
[0215] Initialize particle swarm: set the swarm size and maximum speed range to prevent exceeding the maximum range. The position information is the entire search space, and the speed and position are randomly initialized in the speed range and search space;
[0216] Evaluate particles and find individual extreme values: individual extreme values are the historically optimal position information found for each particle;
[0217] Find the global optimal solution: Find a global optimal solution from these individual historical optimal solutions, compare it with the historical optimal solution, and select the best one as the current historical optimal solution;
[0218] Update the particle swarm velocity and position: Use the following formula to solve iteratively:
[0219]
[0220] In the formula, i represents the particle number, d represents the particle dimension, k represents the number of iterations, w represents the inertia weight, c1 represents the individual learning factor, c2 represents the group learning factor, r1 and r2 represent random numbers in the interval [0,1] to increase the randomness of the exploration. is the velocity vector of particle i in the kth iteration, is the position vector of particle i in the dth dimension in the kth iteration, is the historical optimal position of particle i in the dth dimension in the kth iteration, that is, the optimal solution searched by the i-th particle (individual) after the kth iteration, is the historical optimal position of the swarm in the dth dimension in the kth iteration, that is, the optimal solution in the entire particle swarm after the kth iteration.
[0221] Set termination conditions: set the maximum number of iterations, complete iterative optimization, and output the results.
[0222] The distribution substation operation control method and device based on flexible DC interconnection provided in the above embodiment have at least the following beneficial effects:
[0223] (1) In traditional AC distribution substations, flexible interconnection devices are installed and used as the hub of flexible distribution substations to achieve flexible interconnection between multiple substations. Through the stable operation control strategy of distribution substations based on flexible DC interconnection, not only can the number of converters in the substation be reduced, thereby reducing the loss of distribution equipment in the substation, but also the flexible interconnection power flow collaborative control strategy can be used to achieve effective interaction between energy flow routing and source-load-storage in the power electronic distribution substation, improve the coordinated control level of adjustable resources in the substation, realize the reasonable configuration of multi-aggregation, improve the comprehensive utilization rate and utilization effect of substation resources, thereby optimizing the power flow distribution and operating environment of the substation and improving the overall energy efficiency of the distribution substation.
[0224] (2) In response to the demand for access and absorption of massive distributed resources on the distribution network side, the two dimensions of internal self-discipline control in the distribution station area and coordinated regulation of multiple stations based on flexible interconnection are comprehensively considered. A steady-state optimization control model of the distribution system in the substation area is constructed with the goal of stable economic operation of the substation area, and a flexible interconnection optimization control model of the substation area is constructed with the goal of utilizing and operating efficiency of the distribution and transformation equipment in the substation area. This model can not only meet the needs of efficient access of massive distributed resources to the power grid and economic operation of the substation area on the distribution network side, but also balance the imbalance between substations, solve the heavy overload problem caused by the access of massive distributed resources in the context of the new power system, realize the high-reliability absorption and utilization of distributed resources, optimize the power flow distribution and operating environment of the substation area, and improve the overall energy efficiency of the distribution station area.
[0225] Although preferred embodiments of the present invention have been described, additional changes and modifications may be made to these embodiments by those skilled in the art once the basic inventive concepts are known. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention. Obviously, those skilled in the art may make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A distribution substation operation control method based on flexible DC interconnection, It is characterized in that Applied to a flexible DC interconnected distribution substation system, the method comprises: Taking the minimum operation cost of the distribution area as the objective function and considering the operation constraints of the distribution area, a steady-state optimization control model of the distribution area is established. Collecting transformer operation data of the distribution substation area, and establishing a transformer operation efficiency calculation model according to the transformer operation data; According to the transformer operation efficiency calculation model, a flexible interconnection optimization control model is established with the power of the flexible DC interconnection devices in different distribution substations as the optimization target; The steady-state optimization control model and the flexible interconnection optimization control model are solved respectively to obtain the optimal operation control solution.
2. The method according to claim 1, It is characterized in that The flexible DC interconnection distribution substation system comprises a plurality of distribution substations, and adjacent distribution substations are interconnected via a flexible DC interconnection device.
3. The method according to claim 1, It is characterized in that The distribution area operation cost includes the distribution area transformer operation cost, the flexible DC interconnection device operation cost and the energy storage system operation cost; The operating constraints of the distribution station area include power balance constraints, transformer operation constraints, flexible DC interconnection device operation constraints and energy storage system operation constraints.
4. The method according to claim 1, It is characterized in that A transformer operation efficiency calculation model is established according to the transformer operation data, including: Calculate the total transformer loss based on the no-load loss and load loss of the transformer; According to the total loss of transformer, a transformer operation efficiency calculation model is established.
5. The method according to claim 2, It is characterized in that According to the transformer operation efficiency calculation model, taking the power of the flexible DC interconnection devices in different distribution substations as the optimization target, a flexible interconnection optimization control model is established, including: In an optimization cycle, it is determined whether the operating efficiency and load rate of the transformer at the current moment exceed the efficiency threshold and the load rate threshold. If so, the transformer operating efficiency curves of different distribution substations are calculated according to the transformer operating efficiency calculation model; Obtain the operation information of flexible DC interconnection devices in different distribution substation areas; The flexible interconnection optimization control model is established according to the transformer operation efficiency curve and the operation information of the flexible DC interconnection device.
6. The method according to claim 5, It is characterized in that The flexible interconnection optimization control model includes an objective function with the goal of minimizing the operating power of the flexible DC interconnection device, a power flow balance equation, and operating constraints.
7. The method according to claim 6, It is characterized in that The objective function is as follows: Among them, S T,i is the capacity of the distribution transformer in the ith distribution station area, λ i is the weight coefficient, η b,i is the optimal load factor of the distribution transformer in the ith distribution area; P i represents the actual operating power of the distribution transformer in the ith distribution substation, and N represents the number of distribution substations; The power flow balance equation is as follows: P i =P ac,i +P dc,i ; Among them, P ac,i is the load power on the low voltage AC side of the distribution station area, P dc,i is the AC port power of the flexible DC interconnection device, are the input and output power of the flexible DC interconnection device interacting with the grid, They represent the efficiency of interaction between the flexible DC interconnection device and the power grid, and are 0-1 variables, representing the state of the flexible DC interconnection device. or When is 1, it means that the ith distribution station injects power into the flexible DC interconnection device; otherwise, or When it is 0, it means that the i-th distribution station area absorbs power from the flexible DC interconnection device, η +,i represents the interface efficiency of the power output of the flexible interconnection device, η -,i represents the interface efficiency of the power input of the flexible interconnection device, P max,i Indicates the maximum power of the flexible interconnection device port; The operation constraints include power constraints of the flexible DC interconnection device, safe operation constraints, power balance constraints of the flexible interconnection area, and voltage constraints of the flexible interconnection area.
8. The method according to claim 6, It is characterized in that Solving the steady-state optimization control model and the flexible interconnection optimization control model to obtain an optimal operation control solution includes: Solving the steady-state optimization control model to obtain an operation plan with the minimum comprehensive operation cost; Standardizing the flexible interconnection optimization control model; A mixed integer nonlinear constrained quadratic programming problem is established, and the particle swarm optimization algorithm is used to solve the standardized flexible interconnection optimization control model.
9. A distribution substation operation control device based on flexible DC interconnection, It is characterized in that Applied to a flexible DC interconnected distribution substation system, the device comprises: The first model building module is used to establish a steady-state optimization control model of the distribution substation area by taking the minimum operation cost of the distribution substation area as the objective function and considering the operation constraints of the distribution substation area; A calculation module, used to collect transformer operation data of the distribution station area and establish a transformer operation efficiency calculation model according to the transformer operation data; The second model building module is used to build a flexible interconnection optimization control model based on the transformer operation efficiency calculation model and taking the power of the flexible DC interconnection devices in different distribution substations as the optimization target; The solution module is used to solve the steady-state optimization control model and the flexible interconnection optimization control model respectively to obtain the optimal operation control solution.
10. A computer storage medium, It is characterized in that The computer storage medium stores computer instructions, and when the computer instructions are called, they are used to execute the method according to any one of claims 1 to 8.
Citation Information
Cited By
Flexible interconnection device control method, device, equipment and medium
CN119651789A
Mutual aid regulation and control method and system for multiple power distribution areas considering capacity margin
CN120473987A
Operation control method for flexible interconnection device of transformer station area in service area
CN120566459A