Offshore floating type wind power concrete and steel structure combined system foundation and construction method
By using a concrete and steel structure combination system designed with prestressed steel bars and curved steel plates in offshore floating wind power, the problems of the traditional structure's susceptibility to corrosion and insufficient tensile performance in the marine environment are solved, and the tensile strength of the structure is improved. Durability, simplifying construction and maintenance.
Patent Information
- Application Number
- CN202410999953.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-08
AI Technical Summary
Traditional floating wind power infrastructures have problems such as steel structures being easily corroded and insufficient tensile performance of concrete structures in marine environments, which affects structural durability and safety.
Adopt the combination system of offshore floating wind power concrete and steel structure, and the overall tension system is formed through prestressed steel bars and curved steel plates, which improves the tensile strength and crack resistance of the concrete structure, and is set up through the connection components and mooring modules. , combine the compressive properties of concrete and the tensile properties of steel to form a structural system with comprehensive advantages.
It effectively improves the tensile strength and crack resistance of the concrete structure, enhances the fatigue resistance and durability of the overall structure, simplifies the construction and maintenance process, and has significant engineering application value.
Smart Images

Figure CN118907326A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of offshore wind power, and in particular to an offshore floating wind power concrete and steel structure combined system foundation and a construction method. Background Art
[0002] Floating wind power foundation structures have gradually attracted attention for research and application due to their advantages such as adaptability to deep-sea environments, easy installation, and low requirements for seabed conditions. However, steel structures and concrete structures each have their limitations. Traditional floating wind power foundation structures are mainly made of steel. Although steel structures have the advantages of high strength and easy processing, they have problems such as easy corrosion, node fatigue, high cost, high maintenance cost, and limited service life in the marine environment. Concrete structures are low in cost and have excellent corrosion resistance and freeze-thaw resistance. They are suitable for long-term exposure to the marine environment, but their tensile properties are weak. They are prone to cracks and brittle fractures under the dynamic tension of mooring cables, affecting the durability and safety of the structure. Summary of the invention
[0003] The purpose of the present invention is to overcome the deficiencies in the material properties of the prior art and to provide a foundation and construction method for an offshore floating wind power concrete and steel structure combined system.
[0004] In a first aspect, the present invention provides an offshore floating wind power concrete and steel structure combined system foundation, including a concrete pontoon;
[0005] The concrete pontoon is assembled from three horizontal pontoon wings and a pontoon center block, and the three horizontal pontoon wings are symmetrically arranged along the center of the pontoon center block;
[0006] The central block of the pontoon is centrally symmetrically provided with three connection member groups, each of which is arranged between two adjacent horizontal pontoon wings, each of which includes a plurality of connection members arranged at intervals, the connection members are steel structures, and each of which includes two arc-shaped steel plates arranged at intervals, a connection plate connecting the two arc-shaped steel plates, and two anchoring steel plates arranged between the arc-shaped steel plates, and the two anchoring steel plates are respectively provided with first anchoring holes;
[0007] A mooring module is provided at one end of the horizontal pontoon wing away from the pontoon center block. The mooring module is a box structure. The mooring module includes a first steel plate and a second steel plate. The first steel plate is provided with a second anchor hole. The second steel plate is provided with a cable guide hole. The cable guide hole is used to connect a mooring cable.
[0008] Two ends of the prestressed tendons of the horizontal pontoon wing are respectively anchored and connected to the first anchoring hole and the second anchoring hole.
[0009] Preferably, the bending angle of the arc-shaped steel plate is 120 degrees.
[0010] Preferably, a plurality of reinforcing ribs are provided between the two arc-shaped steel plates, and shear nails are provided on the surfaces of the arc-shaped steel plates.
[0011] Preferably, the first anchoring hole and the second anchoring hole are arranged collinearly.
[0012] Preferably, the second steel plate is a side plate of the mooring module, and the second steel plate is a curved plate.
[0013] Preferably, the connecting member is a steel structure, and the connecting member is embedded in the central block of the pontoon, or the central block of the pontoon reserves installation holes for the connecting member.
[0014] Preferably, each of the horizontal pontoon wings includes a plurality of pontoon modules, and the mooring module, the pontoon module and the central module are connected by the prestressed tendons.
[0015] Preferably, the buoyancy tank central block is assembled from a number of central modules.
[0016] Preferably, a sealing device is provided at the connection between two adjacent pontoon modules, a sealing device is provided at the connection between the pontoon module and the mooring module, and a sealing device is provided at the connection between the pontoon module and the central module.
[0017] Preferably, the foundation further comprises concrete columns, and the concrete columns comprise three outer columns and a central column, the three outer columns are respectively fixed to one end of the horizontal pontoon wing away from the pontoon central block, and the central column is fixed to the middle of the pontoon central block.
[0018] Preferably, each of the outer columns is assembled from a plurality of module units.
[0019] Preferably, each of the outer columns is anchored to the mooring module via prestressed tendons.
[0020] In a second aspect, the present invention provides an offshore floating wind power plant, comprising any of the above-mentioned offshore floating wind power plant concrete and steel structure combined system foundations.
[0021] In a third aspect, the present invention provides a construction method for an offshore floating wind power concrete and steel structure combined system foundation, which is used to construct any of the offshore floating wind power concrete and steel structure combined system foundations, comprising the following steps:
[0022] S1: prefabricate the mooring module and a plurality of pontoon modules, and reserve prestressed tendon channels in the pontoon modules;
[0023] Prefabricate the pontoon center block, embed the connection member group in the pontoon center block, and expose two anchoring steel plates of the connection member outside the pontoon center block;
[0024] S2: transporting the mooring module, the pontoon center block and a plurality of the pontoon modules to an assembly location;
[0025] S3: passing the prestressed tendon through the prestressed tendon channel of the pontoon module, anchoring one end of the prestressed tendon to the first anchor hole of the anchor steel plate, and extending the two ends of the connecting member into the widened channels of two adjacent pontoon modules respectively and sealingly connecting them;
[0026] Anchoring the other end of the prestressed tendon to the second anchor hole of the mooring module, and performing prestressing tensioning and hole grouting;
[0027] S4: Connect the mooring cable to the fairlead.
[0028] In a fourth aspect, the present invention provides a construction method for an offshore floating wind power concrete and steel structure combined system foundation, which is used to construct any of the offshore floating wind power concrete and steel structure combined system foundations, comprising the following steps:
[0029] S1: prefabricate the mooring module and a plurality of pontoon modules, and reserve prestressed tendon channels in the pontoon modules;
[0030] Prefabricate a number of central modules, each of which has a reserved hole for installing a connector;
[0031] S2: transporting the mooring module, the pontoon center block and a plurality of the pontoon modules to an assembly location;
[0032] S3: inserting the connection member group into the connection member installation hole, passing the prestressed tendon through the prestressed tendon channel of the pontoon module, anchoring one end of the prestressed tendon to the first anchor hole of the anchor steel plate and sealingly connecting them,
[0033] Anchoring the other end of the prestressed tendon to the second anchor hole of the mooring module, and performing prestressing tensioning and hole grouting;
[0034] S4: Connect the mooring cable to the fairlead.
[0035] In a fifth aspect, the present invention provides a construction method for an offshore floating wind power concrete and steel structure combined system foundation, which is used to construct any of the offshore floating wind power concrete and steel structure combined system foundations, comprising the following steps:
[0036] S1: prefabricate the mooring module and a plurality of pontoon modules, and reserve prestressed steel bar channels in the pontoon modules;
[0037] S2: transporting the mooring module and a plurality of the pontoon modules to an assembly position; setting up a template in the central block area of the pontoon, and pre-embedding the connecting component group in the template;
[0038] S3: Passing the prestressed tendon through the prestressed steel bar channel, anchoring one end of the prestressed tendon to the second anchor hole of the mooring module; anchoring one end of the prestressed tendon to the first anchor hole of the anchor steel plate;
[0039] S3: pouring the central block of the pontoon and performing prestressing and grouting of the duct;
[0040] S4: Connect the mooring cable to the fairlead.
[0041] Compared with the prior art, the present invention has the following beneficial effects:
[0042] 1. The present invention proposes a combined system foundation of offshore floating wind power concrete and steel structure based on prestressed steel bars and curved steel plates, which gives full play to the tensile characteristics of prestressed steel bars, connects the mooring system and prestressed steel bars into an integral tensile system through curved steel plates, and effectively improves the tensile strength and crack resistance of the concrete structure. The design of the curved steel plate disperses stress, reduces stress concentration, and enhances the fatigue resistance of the structure, thereby overcoming the shortcoming of concrete being prone to cracking under dynamic loads. This design not only optimizes the stress state of the structure, improves the overall strength and durability, but also simplifies the construction and maintenance process, and has significant engineering application value and promotion prospects.
[0043] 2. The present invention can facilitate the connection of the horizontal pontoon wing, the pontoon center block, and the mooring system by providing connecting components and mooring modules, and can form a tensile system with the mooring system and prestressed steel bars. Combining the high compressive resistance of concrete and the high tensile resistance of steel, a structural system with comprehensive advantages can be formed. The concrete pontoon foundation provides compression resistance and rigidity as the main structure, and the mooring module steel structure components provide tensile resistance and ductility. Furthermore, the prestressed tendons and steel structure components can transfer tensile stress from the concrete body, so that the concrete mainly bears compressive stress, thereby more effectively utilizing the characteristics of the material and improving the stress-bearing performance of the overall structure.
[0044] 3. The present invention ensures the close connection between the arc-shaped steel plate and the concrete by setting the connecting member, thereby enhancing the overall rigidity of the structure. By applying prestress, the crack resistance and bearing capacity of the concrete are improved, ensuring the long-term stability of the structure under dynamic loads. The prestressed steel bar is anchored to the anchor steel plate through the anchor hole of the connecting member, ensuring the effective transmission of the prestress and the overall stability of the structure.
[0045] 4. The present invention has higher bending and torsional resistance by providing a box-shaped mooring module, which can increase the structural rigidity and facilitate the conversion connection between the prestressed steel bars and the mooring system. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 This is a schematic diagram of the three-dimensional structure of the offshore floating wind power described in the present invention.
[0047] Figure 2 It is a cross-sectional top view of the foundation of the offshore floating wind power concrete and steel structure combined system according to the present invention.
[0048] Figure 3 It is a schematic diagram of the three-dimensional structure of the connecting component described in the present invention.
[0049] Figure 4 This is a schematic diagram of the connection of two buoyancy modules described in the present invention.
[0050] Figure 5 The figure is a schematic diagram of the installation of the mooring module of the present invention connected with the buoyancy box and the column.
[0051] Figure 6 A schematic diagram of the three-dimensional structure of an embodiment of the mooring module described in the present invention.
[0052] Figure 7 It is a schematic diagram of the three-dimensional structure of the central block of the buoyancy tank described in the present invention.
[0053] Figure 8 This is a schematic diagram of the assembly of the pontoon module described in Example 3 of the present invention.
[0054] Fig. 9 This is a schematic structural diagram of the buoyancy tank center block described in Example 3 of the present invention.
[0055] Fig.10 This is a schematic diagram of the assembly of the pontoon module and the pontoon center block described in Example 3 of the present invention.
[0056] Fig.11 This is a schematic diagram of the assembly of the mooring module, the pontoon module, and the pontoon center block described in Example 3 of the present invention.
[0057] Fig.12 This is a schematic diagram of the assembly of the pontoon module described in Example 4 of the present invention.
[0058] Fig.13 This is a schematic diagram of the assembly of the pontoon module and the central module described in Example 4 of the present invention.
[0059] Fig.14 This is a schematic diagram of the assembly between the horizontal pontoon wings described in Example 4 of the present invention.
[0060] Fig.15 This is a schematic diagram of the assembly of the pontoon module and the central module described in Example 4 of the present invention.
[0061] Fig.16 This is a schematic diagram of the assembly of the mooring module, pontoon module and central module described in Example 4 of the present invention.
[0062] Fig.17 This is a schematic diagram of assembling the mooring module and the pontoon module described in Example 5 of the present invention.
[0063] Fig.18 This is a schematic diagram of the structure for forming a horizontal pontoon wing as described in Example 5 of the present invention.
[0064] Fig.19 This is a schematic diagram of the structure of connecting three horizontal buoy wings together through a template as described in Example 5 of the present invention.
[0065] Fig. 20 This is a structural schematic diagram of the foundation of the offshore floating wind power concrete and steel structure combined system formed by casting the pontoon center block as described in Example 5 of the present invention.
[0066] Markings in the figure:
[0067] 1- Upper fan structure,
[0068] 2- horizontal pontoon wing, 21- pontoon module, 211- widened channel,
[0069] 3- pontoon center block, 31- center module,
[0070] 4-Center column,
[0071] 5-External columns,
[0072] 6- Mooring lines,
[0073] 7-connecting member, 71-arc steel plate, 72-connecting plate, 73-strengthening rib plate, 74-anchor steel plate, 75-shear nail, 76-first anchor hole,
[0074] 8- mooring module, 81- first steel plate, 82- second steel plate, 83- connection plate, 84- second anchor hole, 85- fairlead hole,
[0075] 9- Prestressed tendons,
[0076] 10- Prestressed steel bar duct,
[0077] 11- Sealing device,
[0078] 12- Template,
[0079] 13-Trolley. DETAILED DESCRIPTION
[0080] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0081] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all based on the expression of the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.
[0082] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.
[0083] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.
[0084] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.
[0085] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.
[0086] Example 1
[0087] like Figure 1 As shown, an offshore floating wind power concrete and steel structure combined system foundation includes a concrete pontoon and concrete columns.
[0088] The concrete pontoon is used to provide buoyancy and lower the center of gravity of the structure. In addition, the concrete pontoon can also act as a heave plate to reduce the rolling and significantly reduce the heave motion of the structure. The concrete pontoon is provided with a cabin, and the center of gravity of the structure can be adjusted by adjusting the ballast (seawater or solid ballast).
[0089] like Figure 2 As shown, the concrete pontoon is assembled from three horizontal pontoon wings 2 and a pontoon center block 3, and the three horizontal pontoon wings 2 are symmetrically arranged along the center of the pontoon center block 3, that is, the angle between two adjacent horizontal pontoon wings 2 is 120 degrees. Taking into account the construction error, the angle between two adjacent horizontal pontoon wings 2 is 120 degrees, which should be understood as the angle between the two adjacent horizontal pontoon wings 2 can have an error / deviation of ±10% relative to 120 degrees, more preferably an error / deviation within ±8%, more preferably within ±6%, more preferably within ±5%, and more preferably within ±4%.
[0090] The assembly of the three horizontal pontoon wings 2 and the one pontoon center block 3 is achieved in the following manner:
[0091] The pontoon central block 3 is centrally symmetrically provided with three connecting component groups, each of which includes a plurality of connecting components 7 arranged at intervals, and the connecting components 7 of the same connecting component group can be arranged in a linear array along the height direction of the pontoon central block 3, and each of the connecting component groups is arranged between two adjacent horizontal pontoon wings 2, that is, the three connecting component groups form a triangular arrangement.
[0092] like Figure 3As shown, each of the connecting members 7 includes an arc-shaped steel plate 71, a connecting plate 72 and an anchoring steel plate 74. The number of the arc-shaped steel plates 71 is at least two, and two adjacent arc-shaped steel plates 71 are arranged at intervals. It is further preferred that two adjacent arc-shaped steel plates 71 are arranged in concentric circles to improve the force-bearing and force-transmitting performance of the arc-shaped steel plates 71. The connecting plate 72 is used to connect two adjacent arc-shaped steel plates 71. The number of the connecting plates 72 is usually not less than two, and the connecting plates 72 are preferably arranged radially along the above-mentioned concentric circles to improve the force-bearing and force-transmitting performance. The number of the anchoring steel plates 74 is usually not less than two, and the anchoring steel plate 74 is usually arranged between the two arc-shaped steel plates 71. The anchoring steel plates 74 are respectively provided with first anchoring holes 76, and the anchoring holes 76 are used to anchor the prestressed tendons 9.
[0093] In a further preferred embodiment, the connecting member 7 may be a steel structure.
[0094] In some embodiments, the pontoon center block 3 may be a cast-in-place concrete structure, and the connection member 7 may be pre-embedded at a predetermined connection position of the template 12 of the pontoon center block 3. After the connection member 7 is pre-embedded, the prestressed concrete is poured and tensioned to ensure that the connection member 7 is tightly combined with the concrete.
[0095] In some embodiments, the pontoon center block 3 may also be a prefabricated structural member, and connection member installation holes may be reserved in the pontoon center block 3 for installing the connection member 7, thereby saving on-site construction time and improving construction efficiency.
[0096] In a further preferred embodiment, the buoyancy center block 3 can be assembled from a number of center modules 31, such as Figure 7 As shown, preferably three, a connection member installation hole can be reserved in each central module 31, and the connection member installation hole can be slightly larger than the connection member 7.
[0097] In a further preferred embodiment, the bending angle of the arc-shaped steel plate 71 can be 120 degrees. Considering the construction error, the bending angle of the arc-shaped steel plate 71 of 120 degrees should be understood as the bending angle of the arc-shaped steel plate 71 can have an error / deviation of ±10% relative to 120 degrees, more preferably within an error / deviation of ±8%, more preferably within an error / deviation of ±6%, more preferably within an error / deviation of ±5%, and more preferably within an error / deviation of ±4%. In this way, the bending angle of the arc-shaped steel plate 71 is basically consistent with the direction of the horizontal pontoon wing 2, ensuring the symmetry and stability of the structure, and reducing stress concentration and structural deformation.
[0098] In a further preferred embodiment, a plurality of reinforcing ribs 73 may be provided between the two arc-shaped steel plates 71. By arranging the reinforcing ribs 73, the bending and shearing resistance of the structure are enhanced, and the overall rigidity and stability are further improved.
[0099] In a further preferred embodiment, shear nails 75 may be provided on the surface of the arc-shaped steel plate 71, so as to ensure the close connection between the steel plate and the concrete and enhance the overall rigidity of the structure.
[0100] like Figure 4 As shown, in a further preferred embodiment, the horizontal pontoon wing 2 is an assembled prestressed concrete structure, and its concrete base material is preferably lightweight high-strength concrete or fiber reinforced (FRP) concrete. The horizontal pontoon wing 2 is a modular prefabricated assembly, and each of the horizontal pontoon wing 2 includes a plurality of pontoon modules 21, and the pontoon modules 21 are connected in series through the prestressed tendons 9. Prestressed steel bar channels 10 and grouting holes are reserved on the two pontoon modules 21 (concrete blocks), and the diameter of the grouting holes is larger than the steel bar channels. Then the prestressed tendons 9 are arranged between the two concrete blocks, the prestressed tendons 9 are passed through the channels, and fixed at one end. The prestressed tendons 9 can be evenly arranged along the connection interface and pass through the channels inside the pontoon module 21 (concrete block). Prestress is applied to the steel bars by tensioning equipment. Grouting material is injected through the grouting holes to ensure that the channels are full. Wait for the grouting material to solidify, and a strong connection can be formed. The grouting holes need to be designed at the connection interface of the pontoon module 21 (concrete block) to ensure that the grouting material can be fully filled and tightly combined with the prestressed tendons 9.
[0101] The structure uses prestressed technology to improve the crack resistance and durability of the pontoon, and uses lightweight high-strength concrete to reduce weight and improve bearing capacity. The pontoon adopts a modular design, and the combination of connecting components and prestressed concrete allows the connection structure to be prefabricated in the factory and quickly installed on site, improving construction efficiency and quality.
[0102] Furthermore, a sealing device 11 may be provided at the connection between two adjacent buoyancy modules 21 to prevent water from entering the interior of the floating body and ensure the buoyancy and stability of the entire floating body. The sealing ring is made of corrosion-resistant and highly elastic materials, such as chloroprene rubber (CR) or ethylene propylene diene monomer rubber (EPDM). For example, the sealing device 11 may be a sealing ring and / or a sealing groove, and the sealing ring is designed to be an "O"-shaped or "U"-shaped cross section to enhance the sealing effect; a sealing groove is provided on the connection surface to ensure accurate positioning of the sealing ring.
[0103] like Figure 5 As shown, the end of the horizontal pontoon wing 2 away from the pontoon center block 3 is provided with a mooring module 8, that is, the horizontal pontoon wing 2 can be composed of a plurality of pontoon modules 21 and a mooring module 8, and the mooring module 8 is a box-shaped structure, such as Figure 6 As shown, the mooring module 8 includes a first steel plate 81, a second steel plate 82, and a connecting plate 83. The connecting plate 83 is used to connect the first steel plate 81 and the second steel plate 82. The first steel plate 81, the second steel plate 82, and the connecting plate 83 can form a box section, so as to have high bending and torsion resistance, and to increase the structural rigidity. The first steel plate 81 is provided with a second anchor hole 84, and the second anchor hole 84 is used to anchor and connect the prestressed tendons 9. The two ends of the prestressed tendons 9 of the horizontal buoy wing 2 are anchored and connected to the first anchor hole 76 and the second anchor hole 84 respectively. The second steel plate 82 is provided with a cable guide hole 85, and the cable guide hole 85 is used to connect the mooring cable 6. The mooring cable 6 can be single-point or multi-point mooring, and can be connected to the floating platform by a catenary, a steel cable, a tension tendon, or a composite fiber cable to provide restoring force and tension.
[0104] Preferably, the first anchor hole 76 and the second anchor hole 84 are arranged in a collinear manner, and their tension centers can be collinear with the fairlead hole 85. This makes the force transmission more direct and efficient, and facilitates connecting the mooring system and the prestressed steel bar into an integral tension system through the arc steel plate.
[0105] Preferably, the second steel plate 82 may be an arc-shaped plate, so as to directly form the outer side plate of the horizontal pontoon wing 2. By providing an arc-shaped outer side plate, the hydrodynamic performance of the horizontal pontoon wing 2 can be improved.
[0106] Preferably, the mooring module 8 may be a steel structure, and more preferably a steel box.
[0107] The concrete columns include three outer columns 5 and a central column 4. The three outer columns 5 are respectively fixed to the mooring module 8 at one end of the horizontal pontoon wing 2 away from the pontoon central block 3, and the central column 4 is fixed to the middle of the pontoon central block 3. The function of the outer columns 5 is mainly to provide buoyancy, and the central column 4 can support the upper wind turbine structure 1. The upper wind turbine structure 1 includes a wind turbine tower, blades, a hub, a nacelle generator set, etc.
[0108] Preferably, the outer column 5 may also be an assembled prestressed concrete structure, and the prestressed tendons are anchored to the mooring module 8, so as to further realize the assembled construction of the wind power foundation and improve the construction efficiency.
[0109] In the application of the foundation of the combined system of concrete and steel structure of offshore floating wind power, traditional steel structure and concrete structure each have their limitations. Although steel structure has the advantages of high strength and easy processing, it is easy to corrode in the marine environment, resulting in high maintenance cost and limited service life. The concrete foundation improves the crack resistance by applying prestress, but its tensile performance is weak, and it is easy to crack under the dynamic tension of mooring cables, affecting the durability and safety of the structure. In order to solve these problems, the present invention proposes a design scheme of a tension system based on arc steel plates and prestressed steel bars. This scheme gives full play to the tensile characteristics of prestressed steel bars, connects the mooring system and prestressed steel bars into an integral tensile system through arc steel plates, and effectively improves the tensile strength and crack resistance of the concrete structure. The design of the arc steel plate disperses the stress, reduces the stress concentration phenomenon, and enhances the fatigue resistance of the structure, thereby overcoming the disadvantage that concrete is easy to crack under dynamic loads. This design not only optimizes the stress state of the structure, improves the overall strength and durability, but also simplifies the construction and maintenance process, and has significant engineering application value and promotion prospects.
[0110] Example 2
[0111] An offshore floating wind power station includes the offshore floating wind power station concrete and steel structure combined system foundation as described in Example 1.
[0112] Example 3
[0113] A construction method for an offshore floating wind power concrete and steel structure combined system foundation, used for constructing the offshore floating wind power concrete and steel structure combined system foundation as described in Example 1, comprises the following steps:
[0114] S1: Prefabricate the mooring module 8 and a plurality of the pontoon modules 21, and reserve a prestressed steel bar channel 10 in the pontoon module 21. The reserved channel must be smooth and barrier-free to facilitate the subsequent installation of prestressed steel bars. Figure 8 shown.
[0115] like Fig. 9 As shown, the pontoon center block 3 is prefabricated, and the connecting member group is pre-buried in the pontoon center block 3, ensuring that the position of each connecting member 7 is highly consistent with the corresponding prestressed tendon 9, and ensuring that the two can be accurately docked. In addition, the two anchoring steel plates 74 of the connecting member 7 are exposed outside the pontoon center block 3, which is convenient for docking and anchoring with the prestressed tendons 9 in the subsequent horizontal pontoon wing.
[0116] S2: transport the mooring module 8, the pontoon center block 3 and a plurality of pontoon modules 21 to the assembly location. Fig.10As shown, the trolley 13 can be used to transport the mooring module 8 and the pontoon module 21 from the production or storage site to the assembly position, accurately locate the module position, and drive the trolley 13 to the specified position to dock and assemble the modules to form a horizontal pontoon wing. The trolley 13 is used to transport the pontoon center block 3 from the production or storage site to the assembly position.
[0117] S3: Fig.11 As shown, the prestressed tendon 9 is passed through the prestressed tendon channel 10 of the pontoon module 21, one end of the prestressed tendon 9 is anchored to the first anchor hole 76 of the anchor steel plate 74, and the prestressed tendons 9 of the two pontoon wings are respectively anchored to the first anchor holes 76 of the anchor steel plate 74; after the three groups of connecting members 7 are respectively anchored to the prestressed tendons 9 of the pontoon wings at both ends, the two ends of the connecting member 7 are respectively extended into the widened channel 211 of the two adjacent pontoon modules 21 and sealed and connected.
[0118] Since the anchoring steel plates 74 at both ends of the connecting member 7 are exposed in the center block 13 of the pontoon, it is necessary to widen the reserved channel of the connected horizontal pontoon wing (i.e. widen the channel 211) to ensure that the arc-shaped steel member extends into the pontoon wing to form a tight connection. A sealing device is set at the connection position of the pontoon wing, and the joint gap is filled with sealing material to prevent water from entering the pontoon, and anti-corrosion materials are coated to ensure that the pontoon wing has good durability and wind and wave resistance in long-term use; check the assembly quality and water tightness of the horizontal pontoon wing 2 to ensure no water leakage and a stable structure.
[0119] Anchor the other end of the prestressed tendon 9 to the second anchor hole 84 of the mooring module 8, and perform prestressing tensioning and hole grouting; the grouting material is usually a high-performance grouting material or cement slurry, and a certain grouting pressure is maintained to ensure that the grouting material completely fills all gaps in the prestressed tendon hole. During the grouting process, open the exhaust pipe in time to remove the air and excess slurry in the prestressed tendon hole. After the grouting is completed, immediately close the ports of the grouting pipe and the exhaust pipe to prevent the slurry from flowing out and air from entering.
[0120] S4: Connect the mooring cable 6 to the fairlead hole 85.
[0121] In the construction method of this embodiment, the mooring module 8, the pontoon module 21, and the pontoon center block 3 are all prefabricated structural parts, and the connecting member 7 is pre-buried in the pontoon center block 3. The on-site construction only requires prestressing and anchoring, as well as sealing between modules. The connection is convenient, and the construction accuracy and efficiency are high.
[0122] Example 4
[0123] A construction method for an offshore floating wind power concrete and steel structure combined system foundation, used for constructing the offshore floating wind power concrete and steel structure combined system foundation as described in Example 1, comprises the following steps:
[0124] S1: Prefabricate the mooring module 8 and a plurality of the pontoon modules 21, and reserve prestressed steel bar channels 10 in the pontoon modules 21. The reserved channels must be smooth and barrier-free to facilitate the subsequent installation of prestressed steel bars.
[0125] A plurality of central modules 31 are prefabricated, and each central module 31 has a connection member installation hole reserved therefor, and the connection member installation hole is used to install a connection component group.
[0126] S2: transporting the mooring module 8, the pontoon center block 3 and a plurality of the pontoon modules 21 to an assembly location; for example, Figure 12-13 As shown, a trolley 13 is used to transport the mooring module 8 and the prefabricated pontoon module 21 from the production or storage site to the assembly position, the prefabricated module is accurately positioned, and the trolley 13 is driven to the designated position to carry out docking and assembly between the modules to form a horizontal pontoon wing, and the assembled pontoon module assembly is connected to the central module 31.
[0127] S3: Fig.14 As shown, the connecting member group is extended into the connecting member installation hole, the prestressed tendon 9 is passed through the prestressed tendon channel 10 of the pontoon module 21, one end of the prestressed tendon 9 is anchored to the first anchor hole 76 of the anchor steel plate 74 and sealed, and the first anchor holes of the anchor steel plates 74 at both ends of the connecting member 7 are respectively anchored to the prestressed steel bars of the two pontoon wings; after the three groups of connecting members 7 are respectively anchored to the prestressed tendons of the pontoon wings at both ends, the three horizontal pontoon wings 2 are assembled together through the trolley 13. A sealing device is provided at the connection position of the pontoon wing, and a sealing material is used to fill the splicing gap to prevent water from entering the interior of the pontoon, and an anti-corrosion material is applied to ensure that the pontoon wing has good durability and wind and wave resistance in long-term use; the assembly quality and water tightness of the horizontal pontoon wing 2 are checked to ensure that there is no water leakage and the structure is stable.
[0128] like Figure 15-16 As shown, the other end of the prestressed tendon 9 is anchored to the second anchor hole 84 of the mooring module 8, and prestressing and pore grouting are performed; the grouting material is usually a high-performance grouting material or cement slurry, and a certain grouting pressure is maintained to ensure that the grouting material completely fills all gaps in the prestressed tendon pore. During the grouting process, the exhaust pipe is opened in time to discharge the air and excess slurry in the prestressed tendon pore. After the grouting is completed, the ports of the grouting pipe and the exhaust pipe are immediately closed to prevent the slurry from flowing out and air from entering.
[0129] S4: Connect the mooring cable 6 to the fairlead hole 85.
[0130] In the construction method of this embodiment, the mooring module 8, the pontoon module 21, and the pontoon center block 3 are all prefabricated structural parts, and the pontoon center block 3 is assembled from several center modules 31. In this way, there is no need to pre-embed the connecting member 7 in the pontoon center block 3. It is only necessary to reserve the connecting member installation hole in the center module. The on-site construction only needs to plug in the connecting member 7, perform prestressing and anchoring, and seal between the modules. The connection is convenient, the construction accuracy is high, and the construction efficiency is high.
[0131] Example 5
[0132] A construction method for an offshore floating wind power concrete and steel structure combined system foundation, used for constructing the offshore floating wind power concrete and steel structure combined system foundation as described in Example 1, comprises the following steps:
[0133] S1: Prefabricate the mooring module 8 and a plurality of the pontoon modules 21, and reserve prestressed steel bar channels 10 in the pontoon modules 21. The reserved channels must be smooth and barrier-free to facilitate the subsequent installation of prestressed steel bars.
[0134] S2: transport the mooring module 8 and the plurality of pontoon modules 21 to the assembly position. For example, use a trolley 13 to transport the mooring module 8 and the prefabricated pontoon module 21 from the production or storage site to the assembly position, accurately locate the prefabricated module, and drive the trolley 13 to the designated position to dock and assemble the modules to form a horizontal pontoon wing, such as Figure 17-18 Check the assembly quality and water tightness of the horizontal buoy wing 2 to ensure there is no water leakage and the structure is stable.
[0135] like Fig.19 As shown, three horizontal pontoon wings 2 are assembled together by a trolley 13, and the pontoon wings are accurately positioned according to the design drawings and measuring tools to ensure that their relative positions and angles are accurate. A template 12 is set up in the central block area of the pontoon, and the connecting component group is pre-embedded in the template 12; the template 12 is a hollow prism structure, which can be a hexagonal prism or a triangular prism, etc. Its material can be a steel plate or a wooden temporary accessory component, etc.
[0136] S3: Pass the prestressed tendon 9 through the prestressed steel bar channel 10, and anchor one end of the prestressed tendon 9 to the second anchor hole 84 of the mooring module 8; anchor one end of the prestressed tendon 9 to the first anchor hole 76 of the anchor steel plate 74.
[0137] S3: Fig. 20As shown, the pontoon center block 3 is cast, and prestressing and hole grouting are performed to form the foundation of the offshore floating wind power concrete and steel structure combined system.
[0138] Pour concrete into the box center block 3 of the supporting formwork to ensure the anchorage of the prestressed steel bars and the curved steel plate and the quality of the concrete pouring. After the concrete reaches the designed strength, it is maintained and tested for strength. If a steel plate is used as a formwork, it does not need to be removed to form a steel-concrete structure that bears the load together; if a temporary formwork made of other materials is used, it should be removed after the concrete is formed. In addition, the integrity and water tightness of the bottom foundation should be checked to ensure that there is no water leakage and the structure is stable. At this point, the installation of the bottom foundation is completed.
[0139] S4: Connect the mooring cable 6 to the fairlead hole 85.
[0140] In a preferred embodiment, three outer columns 5 are respectively fixed to one end of the horizontal pontoon wing 2 away from the pontoon center block 3, and the center column 4 is fixed to the middle of the pontoon center block 3. The columns, mooring modules and pontoon modules can be connected by prestressed tendons.
[0141] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An offshore floating wind power concrete and steel structure combined system foundation, characterized in that: Includes concrete pontoons; The concrete pontoon is assembled from three horizontal pontoon wings (2) and a pontoon center block (3), and the three horizontal pontoon wings (2) are symmetrically arranged along the center of the pontoon center block (3); The pontoon central block (3) is centrally symmetrically provided with three connection member groups, each of which is arranged between two adjacent horizontal pontoon wings (2), each of which includes a plurality of connection members (7) arranged at intervals, the connection members (7) being steel structures, each of which includes two arc-shaped steel plates (71) arranged at intervals, a connection plate (72) connecting the two arc-shaped steel plates (71), and two anchoring steel plates (74) arranged between the arc-shaped steel plates (71), the two anchoring steel plates (74) being respectively provided with first anchoring holes (76); A mooring module (8) is provided at one end of the horizontal pontoon wing (2) away from the pontoon center block (3); the mooring module (8) is a box structure; the mooring module (8) comprises a first steel plate (81) and a second steel plate (82); the first steel plate (81) is provided with a second anchor hole (84); the second steel plate (82) is provided with a cable guide hole (85); the cable guide hole (85) is used to connect a mooring cable (6); Two ends of the prestressed tendons (9) of the horizontal buoy wing (2) are respectively anchored to the first anchoring hole (76) and the second anchoring hole (84).
2. The offshore floating wind power concrete and steel structure combined system foundation according to claim 1 is characterized in that: The bending angle of the arc-shaped steel plate (71) is 120 degrees.
3. The offshore floating wind power concrete and steel structure combined system foundation according to claim 1 is characterized in that: A plurality of reinforcing ribs (73) are provided between the two arc-shaped steel plates (71), and shear nails (75) are provided on the surface of the arc-shaped steel plates (71).
4. The offshore floating wind power concrete and steel structure combined system foundation according to claim 1 is characterized in that: The first anchoring hole (76) and the second anchoring hole (84) are arranged in a colinear manner.
5. The offshore floating wind power concrete and steel structure combined system foundation according to claim 1 is characterized in that: The second steel plate (82) is a side plate of the mooring module (8), and the second steel plate (82) is a curved plate.
6. The offshore floating wind power concrete and steel structure combined system foundation according to claim 1 is characterized in that: The connecting member (7) is pre-buried in the buoyancy center block (3), or the buoyancy center block (3) has reserved holes for installing the connecting member.
7. The offshore floating wind power concrete and steel structure combined system foundation according to any one of claims 1 to 6, characterized in that: Each of the horizontal pontoon wings (2) comprises a plurality of pontoon modules (21), and the mooring module (8), the pontoon module (21) and the central module (31) are connected via the prestressed tendons (9).
8. The offshore floating wind power concrete and steel structure combined system foundation according to claim 7 is characterized in that: The buoyancy tank central block (3) is assembled from a plurality of central modules (31).
9. The offshore floating wind power concrete and steel structure combined system foundation according to claim 7, characterized in that: A sealing device (11) is provided at the connection between two adjacent buoyancy modules (21), a sealing device (11) is provided at the connection between the buoyancy module (21) and the mooring module (8), and a sealing device (11) is provided at the connection between the buoyancy module (21) and the central module (31).
10. The offshore floating wind power concrete and steel structure combined system foundation according to claim 7, characterized in that: It also includes concrete columns, which include three outer columns (5) and a central column (4). The three outer columns (5) are respectively fixed to one end of the horizontal pontoon wing (2) away from the pontoon center block (3), and the central column (4) is fixed to the middle of the pontoon center block (3).
11. The offshore floating wind power concrete and steel structure combined system foundation according to claim 10, characterized in that: Each of the outer columns (5) is assembled from a number of module units.
12. The offshore floating wind power concrete and steel structure combined system foundation according to claim 10, characterized in that: Each of the outer columns (5) is anchored and connected to the mooring module (8) via prestressed tendons (9).
13. An offshore floating wind power plant, characterized in that: It comprises an offshore floating wind power concrete and steel structure combined system foundation as described in any one of claims 1-12.
14. A construction method for an offshore floating wind power concrete and steel structure combined system foundation, characterized in that: The method for constructing an offshore floating wind power concrete and steel structure combined system foundation as claimed in any one of claims 7 to 12 comprises the following steps: S1: prefabricate the mooring module (8) and a plurality of pontoon modules (21), and reserve prestressed tendon channels (10) in the pontoon modules (21); Prefabricate the pontoon center block (3), embed the connection component group in the pontoon center block (3), and expose the two anchoring steel plates (74) of the connection component (7) outside the pontoon center block (3); S2: transporting the mooring module (8), the pontoon center block (3) and a plurality of pontoon modules (21) to an assembly location; S3: passing the prestressed tendon (9) through the prestressed tendon channel (10) of the pontoon module (21), anchoring one end of the prestressed tendon (9) to the first anchor hole (76) of the anchor steel plate (74), and extending the two ends of the connecting member (7) into the widened channels (211) of two adjacent pontoon modules (21) and sealingly connecting them; Anchoring the other end of the prestressed tendon (9) to the second anchor hole (84) of the mooring module (8), and performing prestressing tensioning and hole grouting; S4: Connect the mooring cable (6) to the fairlead (85).
15. A construction method for an offshore floating wind power concrete and steel structure combined system foundation, characterized in that: The method for constructing an offshore floating wind power concrete and steel structure combined system foundation as claimed in any one of claims 7 to 12 comprises the following steps: S1: prefabricate the mooring module (8) and a plurality of pontoon modules (21), and reserve prestressed tendon channels (10) in the pontoon modules (21); Prefabricate a plurality of central modules (31), each central module (31) having a reserved hole for installing a connecting piece; S2: transporting the mooring module (8), the pontoon center block (3) and a plurality of pontoon modules (21) to an assembly location; S3: inserting the connection member group into the connection member installation hole, passing the prestressed tendon (9) through the prestressed tendon channel (10) of the buoyancy module (21), anchoring one end of the prestressed tendon (9) to the first anchor hole (76) of the anchor steel plate (74) and sealingly connecting them, Anchoring the other end of the prestressed tendon (9) to the second anchor hole (84) of the mooring module (8), and performing prestressing tensioning and hole grouting; S4: Connect the mooring cable (6) to the fairlead (85).
16. A construction method for an offshore floating wind power concrete and steel structure combined system foundation, characterized in that: The method for constructing an offshore floating wind power concrete and steel structure combined system foundation as claimed in any one of claims 7 to 12 comprises the following steps: S1: prefabricate the mooring module (8) and a plurality of pontoon modules (21), and reserve a prestressed steel bar channel (10) in the pontoon module (21); S2: transporting the mooring module (8) and a plurality of the pontoon modules (21) to an assembly position; setting up a template (12) in the central block area of the pontoon, and pre-embedding the connecting component group in the template (12); S3: passing the prestressed tendon (9) through the prestressed steel bar channel (10), anchoring one end of the prestressed tendon (9) to the second anchor hole (84) of the mooring module (8); anchoring one end of the prestressed tendon (9) to the first anchor hole (76) of the anchor steel plate (74); S3: pouring the pontoon center block (3) and performing prestressing and grouting of the duct; S4: Connect the mooring cable (6) to the fairlead (85).
Citation Information
Cited By
Method for assembling concrete prefabricated segments of floating body foundation of floating type fan platform
CN119659887A