Mechanical mining method of shallow hole shrinkage method

By using mechanical equipment and specific mining structures in shallow hole mine retention method, mechanized mining with sharp-tilt thin and extremely thin ore veins is achieved, mining efficiency and safety are improved, and the low degree of mechanization and high cost in traditional methods are solved. question.

CN118911683APending Publication Date: 2024-11-08GANZHOU NONFERROUS METALLURGICAL RES INST
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411323697.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The traditional shallow hole mine retention method has low mechanization when mining sharp inclines and extremely thin ore veins, which has high labor intensity, poor operating safety, small production capacity, and high cost, which affects the development of mining enterprises.

Method used

Mechanized mining methods using mechanical equipment for shallow hole mine retention method, including the mining and cutting project using rock drilling trolleys and trolleys, through the road patio, leading patio, transportation tunnels, and contact channels. , cut tunnels and turn-in chambers for rock drilling, loading blasting, ventilation, local ore release and hair-blade flat field, mining layer by layer and transportation and filling of ore through filling wells.

Benefits of technology

It significantly improves mining efficiency, reduces labor intensity, reduces mining costs, improves operational safety and production efficiency, adapts to the construction needs of mechanical equipment, and solves the inability to turn around and avoid mechanical equipment with sharp inclined and thin ore veins. question.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911683A_ABST
    Figure CN118911683A_ABST
Patent Text Reader

Abstract

The invention relates to a mechanical mining method of a shallow hole shrinkage method, which aims at an underground mine adopting a mining process of the shallow hole shrinkage method, provides a multifunctional trolley which adopts a drill jumbo for rock drilling and integrates the functions of warping and leveling, and adopts equipment to enter a stope to replace the original manual operation, so that the working time of workers exposed in the stope is greatly shortened, and the working efficiency is improved. And the labor intensity of workers is reduced, the operation safety of the workers is improved, the working efficiency of rock drilling and burr warping and field leveling is improved, mechanical mining of a shallow hole shrinkage method is achieved, and the efficient and safe production target is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of underground mining of metal mines, and in particular relates to a mechanized mining method of a shallow hole ore retention method. Background Art

[0002] At present, in my country's non-ferrous metal mines, especially tungsten, tin, gold and other mines, the ore body occurrence varies greatly, faults and joints are developed, branches are complex, and pinch-out reappearance is common. They are typical steeply inclined, thin and difficult-to-mine ore bodies. Depending on the occurrence of the ore bodies, they can be roughly divided into three categories: medium-thick, thin and extremely thin. Among them, the shallow hole ore retention method is still the best mining method for thin and extremely thin ore bodies; however, today's traditional shallow hole ore retention method has problems such as low mechanization in the mining process, high labor intensity of workers, poor operating safety, and manual operation. Each mining site is equipped with a large number of personnel, small production capacity, high production costs, and affecting the development scale and benefits of mining enterprises. Therefore, a mechanized mining method of the shallow hole ore retention method is urgently needed to solve the above technical problems. Summary of the invention

[0003] The present invention solves the shortcomings of the prior art and provides a mechanized mining method using mechanical equipment in tungsten, tin, gold and other ore bodies, which reduces the labor intensity of workers and is suitable for steeply inclined thin and extremely thin ore veins.

[0004] To achieve the above object, the present invention first proposes a mechanized mining method of shallow hole ore retention method, which specifically comprises the following steps:

[0005] S1. Arrange the stope according to the shallow hole ore-leaving method, arrange the mine rooms along the direction of the ore vein, and each mine room serves as a stope. The stope has top and bottom pillars, and there are pillars between the mine rooms;

[0006] S2. The mining and cutting project includes the vein tunnel, the roadside shaft, the advance shaft, the transport tunnel, the funnel shaft, the connecting road, the cutting tunnel and the turning chamber. The roadside shaft is arranged in the pillar on one side of the mine room, and the advance shaft is arranged in the pillar on the other side. The advance shaft passes through the top pillar of the mine room roof and is connected with the upper and middle sections of the vein tunnel; multiple filling shafts are reserved on the top pillar, and the filling shafts connect the upper and middle sections of the vein tunnel with the mining area. The cutting tunnel is cut above the bottom pillar, and multiple funnel shafts are set up. The funnel shafts connect the cutting tunnel with the vein tunnel; on the pillars on both sides of the mine room, along the height direction of the mining area, multiple connecting roads are set up to connect the roadside shaft and the advance shaft with the mining area, and the spacing between adjacent connecting roads matches the height of each layer of the mining area; the cutting project includes opening a cutting tunnel and a turning chamber in the mining area, the turning chamber is connected with the cutting tunnel, and the turning chamber is mined synchronously in layers;

[0007] S3. After the mining and cutting project is completed, the drilling trolley and the warping trolley are hoisted into the stope from the advance shaft or the side shaft, and mining is started from bottom to top according to the layers. Mining includes rock drilling, charging blasting, ventilation, local ore placement and warping leveling;

[0008] S4, after each layer is mined, step S3 is repeated. When the mining reaches the roof position, the mining work of the mine is completed. At this time, the drilling trolley and the lifting trolley are hoisted out of the filling shaft into the upper and middle sections of the vein tunnel, and then enter the next mine through the transport tunnel; after the drilling trolley and the lifting trolley are transported out of the mining area, a large amount of ore is discharged to discharge all the ore in the mining area, and finally the mined-out area of ​​the mining area is filled through the filling shaft.

[0009] In this embodiment, in step S1, the mining height is 40-60m, the mining length is 50-80m, and the mining width is determined by the ore vein: when the ore vein width is less than 1.2m, the mining width is 1.2m; when the ore vein width is greater than 1.2m and less than or equal to 4m, the mining width is equal to the ore vein width.

[0010] In this embodiment, in step S2, the layer height is 2.0 to 2.5 m, and the connecting paths in the same layer are staggered by a height of 2.0 to 2.5 m.

[0011] In this implementation manner, step S3 specifically includes the following steps:

[0012] S31, rock drilling: the rock drilling trolley and the warping trolley are hoisted from the road ceiling to the bottom of the connecting road, the rock drilling trolley enters the cutting roadway through the connecting road with the warping trolley, the warping trolley first enters the turning chamber, and then the drill arm of the rock drilling trolley is first placed on the side away from the forward direction of the rock drilling trolley, so that the body of the rock drilling trolley first enters the cutting roadway, and then the drill arm enters the cutting roadway, the rock drilling trolley controls the drill arm to drill upward into the blasthole, and the blastholes are arranged in a staggered manner. After the rock drilling trolley passes through the turning chamber, the warping trolley travels from the turning chamber to the connecting road on the side where the rock drilling trolley has completed the construction, and then the rock drilling trolley uses the turning chamber to turn the drill arm direction so that the drill arm of the rock drilling trolley is on the side of the forward direction, and completes the drilling work on the other side of the cutting roadway. After completing rock drilling, the trolley returns to the turning chamber;

[0013] S32, Charge blasting: Install explosives in the blasthole, and then blast after charging. Before blasting, check the safety of the drilling trolley and the warping trolley;

[0014] S33, ventilation: after each blasting, the fan needs to be turned on to discharge fresh air from the down-the-way skylight into the stope. After cleaning the working face, the polluted air is discharged from the leading skylight to the upper and middle sections of the vein tunnel, and finally discharged from the return air skylight;

[0015] S34, local ore discharge: After ventilation is completed, the ore is locally discharged by its own weight on the funnel shaft where the blasting section is located. The mine car is loaded with ore below the funnel shaft mouth and then transported out along the vein lane into the transport road;

[0016] S35, warping and leveling: After local ore placement, use a warping trolley to warp and level the site, pry off the loose ore on the top and both sides, and level the ore pile to form the working face for the next layer of rock drilling;

[0017] S36. Recovery of remaining ore in the same layer: Divide each layer of the mining area into 2 to 3 times for recovery.

[0018] In this embodiment, in step S31, the spacing between blast holes and the spacing between rows are both 0.6-0.8 m, the depth of the blast holes is 1.8 m-2.2 m, and the diameter of the blast holes is 40-45 mm.

[0019] In this embodiment, in step S32, the length of each blasting is 15 to 25 m.

[0020] In this embodiment, in step S34, the requirement for local ore discharge is to make the height of the subsequent working space 2 to 2.5 m.

[0021] In this embodiment, in step S2, workers reach the working face of the mining field through the pedestrian shaft via the connecting road, and the drilling trolley and the lifting trolley enter the working face of the mining field through the advance shaft or the accompanying shaft via the connecting road.

[0022] Due to the above structure, the present invention has the following beneficial effects:

[0023] 1. The present invention adopts mechanized operation, which significantly improves mining efficiency, reduces manual labor intensity, and reduces mining costs. Mechanized operation can achieve continuous and efficient production, reduce the time and errors of manual operation, and thus improve the efficiency of the entire mining process. At the same time, mechanized operation reduces the labor intensity of workers, improves the working environment, and reduces labor costs.

[0024] 2. Adjust the size of the vein tunnels, road patios, advance patios, transport tunnels, connecting roads, and filling wells according to the size of the mechanical equipment to accommodate the construction of the mechanical equipment.

[0025] 3. A turning chamber is arranged in the mining area. Due to the narrowness of the cutting tunnel, the turning chamber is used. On the one hand, it is convenient for the drilling rig to turn around or rotate the drill arm in the cutting tunnel, so as to facilitate the drilling of blast holes near the connecting road by the drilling rig, thereby improving the construction efficiency of the drilling rig. On the other hand, it is convenient for the deployment and construction of the drilling rig and the warping rig to prevent interference between the two rigs during operation.

[0026] 4. During blasting, the rock drilling trolley and the warping trolley can use the connecting road and the turning chamber for avoidance. This solves the problem in the prior art that mechanical equipment cannot turn around and avoid steeply inclined thin and extremely thin veins, and also ensures the coordination of the two vehicles during work.

[0027] In summary, the present invention proposes to use a rock drilling trolley for rock drilling and a warping trolley for warping and leveling, and adopts mechanical equipment to enter the mining area to replace the original manual operation, which greatly reduces the working time of workers exposed in the mining area, reduces the labor intensity of workers, improves the safety of workers' operations, and improves the work efficiency of rock drilling and warping and leveling, realizes the mechanized mining of shallow hole ore retention method, and achieves the goal of efficient and safe production. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 A front view of the method of the present invention;

[0029] Figure 2 for Figure 1 Schematic diagram of the II-II direction;

[0030] Figure 3 for Figure 1 Schematic diagram of the III-III direction;

[0031] In the figure: 1. Tunnel along the vein; 2. Pedestrian shaft; 3. Funnel shaft; 4. Advance shaft; 5. Connecting road; 6. Turning chamber; 7. Intermediate pillar; 8. Top pillar; 9. Tunnel along the vein in the upper and middle sections; 10. Filling shaft; 11. Working face of the mining area; 12. Shaft along the way. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] In addition, the technical solutions between the various embodiments of the present invention can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0034] like Figures 1 to 3 , a mechanized mining method of shallow hole ore retention method, specifically comprising the following steps:

[0035] S1. Arrange the stope according to the shallow hole ore-leaving method. In this embodiment, the stope height is 40-60m, the stope length is 50-80m, and the stope width is determined by the ore vein: when the ore vein width is less than 1.2m, the stope width is 1.2m; when the ore vein width is greater than 1.2m and less than or equal to 4m, the stope width is equal to the ore vein width;

[0036] The mine rooms are arranged along the direction of the ore vein, and each mine room is used as a stope. The stope is provided with a top pillar 8 and a bottom pillar. There are intermediate pillars 7 between the mine rooms, and the width of the intermediate pillars 7 is 4 to 6 meters.

[0037] S2. The mining approval project includes a vein tunnel 1, a road shaft 12, a leading shaft 4, a transport tunnel, a hopper shaft 3, a connecting road 5, a cutting tunnel and a turning chamber 6. The road shaft 12 is arranged in the intermediate pillar 7 on one side of the mine room, and the leading shaft 4 is arranged in the intermediate pillar 7 on the other side. The leading shaft 4 passes through the top pillar 8 of the mine room roof and is connected with the upper and middle sections of the vein tunnel 1; the top pillar 8 is 3 to 5 meters thick, and 2 to 3 filling shafts are reserved on the top pillar 8. The filling shaft 10 connects the upper and middle sections of the vein tunnel with the mining area. The bottom pillar is 3 to 5 meters thick, and a cutting tunnel is cut above the bottom pillar, and a hopper shaft 3 is arranged every 3 to 4 meters. The hopper shaft 3 connects the cutting tunnel with the vein tunnel 1, and the vein tunnel 1 is parallel to the ore vein.

[0038] A plurality of communication roads 5 are arranged on the pillars 7 on both sides of the mine room along the height direction of the mining field. The communication roads 5 on both sides of the mining field respectively connect the en route shaft 12 and the advance shaft 4 with the mining field. The spacing between adjacent communication roads 5 matches the height of each layer of the mining field. The layer height is 2.0 to 2.5 m. Moreover, the communication roads 5 at the same level connected with the advance shaft 4 and the en route shaft 12 are staggered by 2.0 to 2.5 m. The purpose of staggering the communication roads 5 here is to prevent the communication roads 5 from being blocked by the ore pile after blasting the location of the communication roads 5 at this level, thereby reserving a safe exit.

[0039] Cutting project: a cutting tunnel and a turning chamber 6 are opened in the stope above the bottom pillar. The turning chamber 6 is connected with the cutting tunnel. The turning chamber 6 is located above the funnel shaft 3. The turning chamber 6 is mined synchronously in layers. The turning chamber 6 is 3.3 to 3.8 m long, 1.2 to 1.5 m wide, and 2.0 to 2.5 m high, which is the same as the height of each layer of the stope. The turning radius of the turning chamber 6 and the cutting tunnel is 3.0 to 3.5 m.

[0040] S3. After the completion of the mining and cutting project, mining will start from bottom to top according to the layers. Mining includes rock drilling, blasting, ventilation, local ore placement and roughing and leveling. The details are as follows:

[0041] S31, rock drilling: the rock drilling trolley and the warping trolley are hoisted from the advance shaft 4 to the bottommost connecting road 5 (here, the rock drilling trolley and the warping trolley refer to small rock drilling trolleys and small warping trolleys with a width of less than 0.8m, a length of less than 4m, and a height of less than 2m). The rock drilling trolley and the warping trolley enter the cutting tunnel of the mining area through the connecting road 5. The warping trolley first enters the turning chamber 6, and then the drill arm of the rock drilling trolley is first placed on the side away from the forward direction of the rock drilling trolley, so that the body of the rock drilling trolley enters the cutting tunnel first, and then the drill arm enters the cutting tunnel, and the rock drilling trolley drills upward into the blasting chamber 6. The holes are arranged in a staggered manner, the spacing between holes and the row spacing are 0.6-0.8m, the depth of the holes is 1.8m-2.2m, and the diameter of the holes is 40-45mm. After the drilling rig passes through the turning chamber, the warping rig travels from the turning chamber to the connecting road 5 on the side where the drilling rig has completed the construction. Then the drilling rig uses the turning chamber to turn the direction of the drill arm so that the drill arm of the drilling rig is on the side of the forward direction to complete the drilling work on the other side of the cutting tunnel. After completing the rock drilling, the drilling rig returns to the turning chamber.

[0042] S32, blasting: install explosives in the blasthole, each blasting length is 15 to 25m, use manual charging, and then blast after the charging is completed. Before blasting, check the safety of the rock drilling trolley and the warping trolley;

[0043] S33, ventilation: after each blasting, the fan needs to be turned on to discharge fresh air from the down-the-way skylight 12 into the stope. After cleaning the working face, the polluted air is discharged from the leading skylight 4 to the upper middle section of the vein roadway 9, and finally discharged to the surface from the return air skylight;

[0044] S34, local ore discharge: after the ventilation is completed, the ore is discharged by self-weight on the funnel shaft 3 where the blasting section is located. The mine car is loaded with ore below the funnel shaft 3 and transported out along the vein tunnel 1. After the ore is discharged, the height of the subsequent working space is 2 to 2.5 m;

[0045] S35, warping and leveling: After partial ore discharge, the warping trolley is used to warp and level the site, loose ore on the top and both sides is pried off, and the ore pile is leveled to form the mining working face 11, ensuring that the rock drilling trolley and the warping trolley can move on the mining working face 11.

[0046] S36, mining of the remaining ore in the same layer: each layer of the mining area is divided into 2 to 3 times for mining.

[0047] S4, after each layer is mined, step S3 is repeated, and the mining work of the mine room is completed when the top plate position is mined. At this time, the drilling trolley and the lifting trolley are hoisted out of the filling shaft 10, and the drilling trolley and the lifting trolley enter the upper and middle sections of the vein tunnel, and then enter the next mine room through the transportation tunnel; after the drilling trolley and the lifting trolley are transported out of the mining area, a large amount of ore is discharged, and all the ore in the mining area is discharged, and finally the mined-out area of ​​the mining area is filled through the filling shaft 10.

[0048] In step S2 , workers reach the working face of the mining field through the pedestrian shaft 2 via the connecting road 5 , and mechanical equipment enters the working face of the mining field through the advance shaft 4 or the accompanying shaft 12 via the connecting road 5 .

[0049] In step S32, during blasting, the drilling trolley and the warping trolley avoidance method is: if the drilling trolley and the warping trolley are avoiding in the connecting road 5 on one side of the mining field, the warping trolley needs to be placed close to the blasting side; if the drilling trolley and the warping trolley are located in the turning chamber and the connecting road 5 of the mining field respectively, the drilling trolley is placed in the turning chamber and the warping trolley is placed in the connecting road 5 of the mining field.

[0050] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. All equivalent structural changes made using the contents of the present invention's specification and drawings, or directly / indirectly applied in other related technical fields, are included in the patent protection scope of the present invention.

Claims

1. A mechanized mining method using a shallow hole ore retention method. Features: The specific steps include: S1. Arrange the stope according to the shallow hole ore-leaving method, arrange the mine rooms along the direction of the ore vein, and each mine room serves as a stope. The stope has top and bottom pillars, and there are pillars between the mine rooms; S2. The mining and cutting project includes the vein tunnel, the roadside shaft, the advance shaft, the transport tunnel, the funnel shaft, the connecting road, the cutting tunnel and the turning chamber. The roadside shaft is arranged in the pillar on one side of the mine room, and the advance shaft is arranged in the pillar on the other side. The advance shaft passes through the top pillar of the mine room roof and is connected with the upper and middle sections of the vein tunnel; multiple filling shafts are reserved on the top pillar, and the filling shafts connect the upper and middle sections of the vein tunnel with the mining area. The cutting tunnel is cut above the bottom pillar, and multiple funnel shafts are set up. The funnel shafts connect the cutting tunnel with the vein tunnel; on the pillars on both sides of the mine room, along the height direction of the mining area, multiple connecting roads are set up to connect the roadside shaft and the advance shaft with the mining area, and the spacing between adjacent connecting roads matches the height of each layer of the mining area; the cutting project includes opening a cutting tunnel and a turning chamber in the mining area, the turning chamber is connected with the cutting tunnel, and the turning chamber is mined synchronously in layers; S3. After the mining and cutting project is completed, the drilling trolley and the warping trolley are hoisted into the stope from the advance shaft or the side shaft, and mining is started from bottom to top according to the layers. Mining includes rock drilling, charging blasting, ventilation, local ore placement and warping leveling; S4, after each layer is mined, step S3 is repeated. When the mining reaches the roof position, the mining work of the mine is completed. At this time, the drilling trolley and the lifting trolley are hoisted out of the filling shaft into the upper and middle sections of the vein tunnel, and then enter the next mine through the transport tunnel; after the drilling trolley and the lifting trolley are transported out of the mining area, a large amount of ore is discharged to discharge all the ore in the mining area, and finally the mined-out area of ​​the mining area is filled through the filling shaft.

2. The mechanized mining method of the shallow hole ore retention method according to claim 1, Features: In step S1, the stope height is 40-60m, the stope length is 50-80m, and the stope width is determined by the ore vein: when the ore vein width is less than 1.2m, the stope width is 1.2m; when the ore vein width is greater than 1.2m and less than or equal to 4m, the stope width is equal to the ore vein width.

3. The mechanized mining method of the shallow hole ore retention method according to claim 1, Features: In step S2, the layer height is 2.0 to 2.5 m, and the connecting paths in the same layer are staggered by 2.0 to 2.5 m.

4. The mechanized mining method of shallow hole ore retention method according to claim 1, Features: Step S3 specifically includes the following steps: S31, rock drilling: the rock drilling trolley and the warping trolley are hoisted from the road ceiling to the bottom of the connecting road, the rock drilling trolley enters the cutting roadway through the connecting road with the warping trolley, the warping trolley first enters the turning chamber, and then the drill arm of the rock drilling trolley is first placed on the side away from the forward direction of the rock drilling trolley, so that the body of the rock drilling trolley first enters the cutting roadway, and then the drill arm enters the cutting roadway, the rock drilling trolley controls the drill arm to drill upward into the blasthole, and the blastholes are arranged in a staggered manner. After the rock drilling trolley passes through the turning chamber, the warping trolley travels from the turning chamber to the connecting road on the side where the rock drilling trolley has completed the construction, and then the rock drilling trolley uses the turning chamber to turn the drill arm direction so that the drill arm of the rock drilling trolley is on the side of the forward direction, and completes the drilling work on the other side of the cutting roadway. After completing rock drilling, the trolley returns to the turning chamber; S32, Charge blasting: Install explosives in the blasthole, and then blast after charging. Before blasting, check the safety of the drilling trolley and the warping trolley; S33, ventilation: after each blasting, the fan needs to be turned on to discharge fresh air from the down-the-way skylight into the stope. After cleaning the working face, the polluted air is discharged from the leading skylight to the upper and middle sections of the vein tunnel, and finally discharged from the return air skylight; S34, local ore discharge: After ventilation is completed, the ore is locally discharged by its own weight on the funnel shaft where the blasting section is located. The mine car is loaded with ore below the funnel shaft mouth and then transported out along the vein lane into the transport road; S35, warping and leveling: After local ore placement, use a warping trolley to warp and level the site, pry off the loose ore on the top and both sides, and level the ore pile to form the working face for the next layer of rock drilling; S36. Recovery of remaining ore in the same layer: Divide each layer of the mining area into 2 to 3 times for recovery.

5. The mechanized mining method of shallow hole ore retention method according to claim 4, Features: In step S31, the spacing between blast holes and the spacing between rows are both 0.6-0.8 m, the depth of the blast holes is 1.8 m-2.2 m, and the diameter of the blast holes is 40-45 mm.

6. The mechanized mining method of shallow hole ore retention method according to claim 4, Features: In step S32, the length of each blasting is 15 to 25 m.

7. The mechanized mining method of shallow hole ore retention method according to claim 4, Features: In step S34, the requirement for local ore placement is to make the subsequent working space height 2 to 2.5 m.

8. The mechanized mining method of shallow hole ore retention method according to claim 4, Features: In step S2, workers reach the working face of the mining field through the pedestrian shaft and the connecting road, and the rock drilling trolley and the lifting trolley enter the working face of the mining field through the first shaft or the side shaft and the connecting road.

Citation Information

Cited By

  • Shallow hole shrinkage mining method for accurate mining of slope ramp outside mine mountain range