Asymmetric debris flow gully bed deposit volume rapid estimation method and medium
By constructing a univariate quadratic function equation on both sides of the debris flow channel to generate DEM data of the channel bed base, the error problem of estimating the volume of asymmetric channel bed deposits in the existing technology is solved, and efficient and accurate channel bed deposit volume calculation is achieved.
Patent Information
- Application Number
- CN202411419223.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-12
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing technologies struggle to accurately estimate the volume of deposits in asymmetric gully beds, especially when sampling point density is insufficient or distribution is asymmetrical, resulting in errors and overfitting in the calculations.
A quadratic function equation was constructed on both sides of the debris flow channel to generate DEM data of the channel bed base. The volume of the channel bed deposits was calculated by combining the DEM data, and the fitting accuracy was improved by using profile points and threshold control.
It improves the accuracy and efficiency of debris flow gully deposit volume calculation and is suitable for rapid estimation in complex geological areas.
Smart Images

Figure CN118941615A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method and medium for quickly estimating the volume of deposits in an asymmetric debris flow ditch bed, and belongs to the field of debris flow investigation. Background Art
[0002] Debris flow is a common natural disaster that threatens the lives and property safety of mountain residents all year round. Due to the large extension of debris flow channels, steep terrain and huge drop, it is difficult to carry out detailed surveys and measurements on the spot. For debris flow channels with ditch bed deposits, the DEM data of the bottom of the ditch bed is mainly fitted based on the slope of the ditch bank terrain on both sides of the ditch. In the current research, there are two main fitting functions: 1. One-variable linear function construction method. For the ditch bank terrain on both sides of the ditch, a one-variable linear function equation is used to construct the slope trend of the ditch bank on both sides, and the elevation of the bottom of the ditch bed is determined according to the intersection of the slope trend lines of the ditch bank on both sides. However, the fitting degree of the trend line depends on the density of the sampling points. When there are fewer sampling points, the slope of the ditch bank on both sides cannot be accurately characterized. When there are more sampling points, the fitting accuracy cannot be guaranteed, and the fitting value is higher or lower than the measured value. 2. One-variable quadratic function construction method. The profile slopes on both sides of the debris flow channel are affected by tectonic effects and are not symmetrically distributed. When constructing the function, only one quadratic equation is used, which cannot reflect the bottom condition of the channel. Actual investigations have found that the slopes on both sides of typical channels such as mountain debris channels and glacial trough channels do not completely show the left-right symmetric trend of a quadratic function. The existing research methods have overfitting phenomena, and the estimated values are often higher than the measured values. Summary of the invention
[0003] The present invention proposes a method and medium for quickly estimating the volume of asymmetric debris flow ditch bed deposits, which can construct a quadratic function equation according to different profiles on the left and right banks of the debris flow main ditch, quickly and accurately obtain the debris flow ditch bed base DEM, and calculate the ditch bed deposit volume in combination with the ditch DEM data.
[0004] In a first aspect, an embodiment provides a method for quickly estimating the volume of asymmetric debris flow ditch bed deposits, comprising:
[0005] After obtaining the DEM data of the debris flow main ditch, ditch boundary, ditch bed accumulation area boundary and ditch according to the field investigation and remote sensing interpretation, a profile perpendicular to the main ditch is generated on the ditch banks on both sides of the main ditch, and profile points are generated on the profile. The distances between profiles and profile points are controlled by the threshold.
[0006] The elevation and coordinates of each profile point outside the ditch bed accumulation area within the ditch boundary are obtained, and quadratic function equations are constructed for the profiles on the left and right sides of the main ditch respectively.
[0007] According to the quadratic function equation constructed for each profile, the elevation value of the profile point located within the ditch bed accumulation area is calculated.
[0008] The ditch bed base DEM data are generated according to the elevation values of the ditch banks on the left and right sides of the ditch bed, and the volume of ditch bed deposits is calculated based on the ditch DEM data and the ditch bed base DEM data.
[0009] In one embodiment, a method and medium for quickly estimating the volume of asymmetric debris flow ditch bed deposits are provided, including:
[0010] According to the threshold, profiles and profile points are automatically generated on the left and right sides of the main channel of the debris flow.
[0011] In one embodiment, the elevation and coordinates of each profile point outside the channel bed accumulation area within the channel boundary are obtained, and a quadratic function equation is constructed according to the left and right side profiles, including:
[0012]
[0013] in, is the elevation value of the profile point, is the horizontal distance between the profile point and the channel boundary, is the coefficient of the quadratic term, is the coefficient of the first-order term, is a constant.
[0014] In one embodiment, the elevation difference is calculated pixel by pixel based on the channel DEM data and the channel bed base DEM data, including:
[0015]
[0016] in, is the elevation difference, It is the channel DEM data. It is the gully bed basement DEM data, and the elevation unit is meter;
[0017] In one embodiment, the pixel volume is calculated according to the pixel area and the pixel elevation difference, including:
[0018]
[0019] in, is the pixel volume (m 3 ), is the pixel elevation difference (m), is the pixel area (m 2 ).
[0020] In one embodiment, the volume of the ditch bed deposits is calculated based on the sum of the volumes of all pixels in the ditch bed deposit area, including:
[0021]
[0022] in, is the pixel volume (m 3 ), is the volume of the ditch bed deposit (m 3 ), is the number of pixels in the gully bed accumulation area.
[0023] In a second aspect, an embodiment provides a computer-readable storage medium, in which a program is stored, and the program can be loaded by a processor to execute the method for estimating the volume of debris flow gully bed deposits described in any one of the above embodiments.
[0024] The beneficial effects of the present invention are:
[0025] The present invention proposes a method for quickly estimating the volume of asymmetric debris flow ditch bed deposits, which can quickly calculate the thickness and volume of debris flow ditch bed deposits. Different from the existing technical methods, the method adopted by the present invention to fit the profiles on the left and right sides of the debris flow ditch with a quadratic function equation improves the accuracy and efficiency of the calculation, and can play an efficient role in conducting regional debris flow source surveys. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 is a schematic cross-sectional diagram of a channel of an embodiment of the present application;
[0027] Figure 2 is a schematic diagram of different fitting functions of an embodiment of the present application;
[0028] Figure 3 This is a schematic diagram of a flow chart of a method for estimating debris flow ditch bed deposits according to an embodiment of the present application; DETAILED DESCRIPTION
[0029] The present invention is further described in detail below by specific embodiments in conjunction with the accompanying drawings. Wherein similar elements in different embodiments adopt associated similar element numbers. In the following embodiments, many detailed descriptions are for making the present application better understood. However, those skilled in the art can effortlessly recognize and understand that some features can be omitted in different situations, or can be replaced by other elements, materials, methods. In some cases, some operations related to the present application are not shown or described in the specification, this is to avoid the core part of the present application being overwhelmed by too much description, and for those skilled in the art, it is not necessary to describe these related operations in detail, and they can fully understand the related operations according to the description in the specification and the general technical knowledge in the art.
[0030] In addition, the features, operations or characteristics described in the specification can be combined in any appropriate manner to form various implementations. At the same time, the steps or actions in the method description can also be interchanged or adjusted in a manner that is obvious to those skilled in the art. Therefore, the various sequences in the specification and the drawings are only for the purpose of clearly describing a certain embodiment and are not meant to be a required sequence, unless otherwise specified that a certain sequence must be followed.
[0031] The serial numbers assigned to the components in this article, such as "first", "second", etc., are only used to distinguish the objects described and do not have any order or technical meaning.
[0032] To facilitate the description of the inventive concept of the present application, the estimation effect evaluation technology is briefly described below.
[0033] The source of debris flow deposits in the gully bed is mainly estimated based on the thickness between the gully bed and the bottom bedrock. When estimating in complex geological areas, it is necessary to consider the profile conditions at different positions of the gully bed. The denser the profile, the richer the collected data, and the more accurate the fitted basement data. Therefore, the present invention fully considers the subjectivity of manually setting the profile, and automatically generates profiles and profile points between profiles and profile points by setting thresholds.
[0034] For each profile point in the ditch bed, the present invention establishes a quadratic function equation on the left and right banks of the main ditch to fit the ditch bed bottom elevation, taking into full account the different terrains of the ditch banks on both sides of the ditch. Please refer to Figure 1 In the present invention, for the left bank profile, the elevation and coordinates of the profile points of the ab section are read, and the elevation of the ditch bed basement of the bd section is fitted; for the right bank profile, the elevation and coordinates of the profile points of the ed section are read, and the elevation of the ditch bed basement of the db section is fitted, and then the ditch bed basement DEM data of the profile position is calculated according to the fitted basement elevations of the ditch banks on both sides of the ditch bed, and the material source quantity is calculated by the ditch bed basement DEM data and the current DEM data.
[0035] The applicant found in the study that there are two main problems with the existing curve fitting method. On the one hand, for large ditches, the method of manually establishing profiles and profile lines will obtain fewer data samples, especially in areas with significant terrain changes, where sparse profiles are difficult to fit the actual ditch bed base. On the other hand, for asymmetric ditches with large differences in the slopes of the left and right banks, only establishing a quadratic function equation based on the profile points of the left and right banks will result in inaccurate calculation results. Please refer to Figure 2 The ditch bed base height calculated by the quadratic function equation established in this profile is higher than the actual ditch bed height, and the result obtained is unreasonable.
[0036] In view of this, the present application provides a method and medium for quickly estimating the volume of asymmetric debris flow ditch bed deposits, which can quickly calculate the thickness and volume of debris flow ditch bed deposits. The method used is to construct a quadratic function to fit the elevation of the ditch bed accumulation area for the ditch banks on the left and right sides of the ditch. The method has strong operability and improves the calculation efficiency and accuracy compared with existing patents and methods.
[0037] The present application provides a profile fitting method based on a univariate quadratic function curve, please refer to Figure 3 , the steps include:
[0038] Step S10, data preparation. Ensure the accuracy of the channel main channel, channel bed accumulation area, channel boundary, and DEM data, and keep the data space coordinates consistent. Figure 1 Take this as an example to illustrate: Figure 1 The schematic diagram in Figure A lists the spatial data of the main ditch, ditch bed boundary and channel boundary. Figure 1 The diagram B on the right is shown. Figure 1 In the figure, point a and point e are the channel boundaries, that is, the watershed boundaries of the debris flow channel, point b and point d are the boundaries of the channel bed accumulation area, and point c is a point in the main channel of the channel.
[0039] Step S20, generate a cross section perpendicular to the main ditch on the left and right sides of the main ditch, generate cross section points on the cross section, and the distance between cross sections and cross section points is controlled by a threshold. Cross section points located outside the ditch bed accumulation area and within the ditch boundary are input points for fitting a one-dimensional quadratic function, and cross section points located within the ditch bed accumulation area are cross section points to be fitted. Figure 1 Take the example of the example, two sections ac and ce perpendicular to the main ditch are generated on the left and right sides of the ditch bank at point c in the schematic diagram A. Among them, in the left bank section, the section points in the ab section are outside the ditch bed accumulation area and inside the ditch boundary, and the section points in the bd section are inside the ditch bed accumulation area; in the right bank section, the section points in the ed section are outside the ditch bed accumulation area and inside the ditch boundary, and the section points in the db section are inside the ditch bed accumulation area.
[0040] Step S30, obtaining the elevation and coordinates of each profile point outside the channel bed accumulation area within the channel boundary, and constructing a quadratic function equation according to the left and right side profiles. The constructed quadratic function equation includes:
[0041]
[0042] in, is the elevation value of the profile point, is the horizontal distance between the profile point and the channel boundary, is the coefficient of the quadratic term, is the coefficient of the first-order term, is a constant.
[0043] Step S40, based on the quadratic function equation constructed for each profile, calculate the elevation value of the profile point located within the ditch bed accumulation area. Figure 1 Take the schematic diagram B in the figure as an example to illustrate. The dotted parts in the left bank profile and the right bank profile represent the basement characteristics of the ditch bed accumulation area constructed using a quadratic function equation.
[0044] Step S50, generating ditch bed basement DEM data covering the ditch bed accumulation area according to the calculated elevation values of the profile points within the ditch bed accumulation area.
[0045] Step S60, calculate the elevation difference pixel by pixel based on the channel DEM data and the ditch bed base DEM data; obtain the volume of each pixel based on the pixel area and the pixel elevation difference, and calculate the volume of the ditch bed deposits based on the sum of the volumes of all pixels in the ditch bed accumulation area.
[0046] According to the channel DEM data and the channel bed base DEM data, the elevation difference is calculated pixel by pixel, including:
[0047]
[0048] in, is the elevation difference, It is the channel DEM data. It is the gully bed basement DEM data, and the elevation unit is meter;
[0049] Calculate the pixel volume based on the pixel area and pixel elevation difference, including:
[0050]
[0051] in, is the pixel volume (m 3 ), is the pixel elevation difference (m), is the pixel area (m 2 );
[0052] The volume of ditch bed deposits is calculated based on the sum of the volumes of all pixels in the ditch bed deposit area, including:
[0053]
[0054] in, is the pixel volume (m 3 ), is the volume of the ditch bed deposit (m 3 ), is the number of pixels in the gully bed accumulation area.
[0055] In one embodiment of the present application, a computer-readable storage medium is provided, on which a program is stored. The stored program includes a method for quickly estimating the volume of asymmetric debris flow ditch bed deposits that can be loaded by a processor and processed in any of the above embodiments.
[0056] Those skilled in the art will appreciate that all or part of the functions of the various methods in the above-mentioned embodiments can be implemented by hardware or by computer programs. When all or part of the functions in the above-mentioned embodiments are implemented by computer programs, the program can be stored in a computer-readable storage medium, and the storage medium can include: read-only memory, random access memory, disk, optical disk, hard disk, etc., and the program is executed by a computer to implement the above-mentioned functions. For example, the program is stored in the memory of the device, and when the program in the memory is executed by the processor, all or part of the above-mentioned functions can be implemented. In addition, when all or part of the functions in the above-mentioned embodiments are implemented by computer programs, the program can also be stored in a storage medium such as a server, another computer, disk, optical disk, flash disk or mobile hard disk, and can be downloaded or copied and saved in the memory of the local device, or the system of the local device is updated, and when the program in the memory is executed by the processor, all or part of the functions in the above-mentioned embodiments can be implemented.
[0057] The above specific examples are used to illustrate the present invention, which is only used to help understand the present invention and is not intended to limit the present invention. For those skilled in the art, according to the concept of the present invention, some simple deductions, modifications or substitutions can be made.
Claims
1. A method for quickly estimating the volume of asymmetric debris flow ditch bed deposits, characterized in that: include: After obtaining the main ditch, ditch boundary, ditch bed accumulation area boundary and ditch DEM data of debris flow through field investigation and remote sensing interpretation, a profile perpendicular to the main ditch is generated on the left and right sides of the main ditch, and profile points are generated on the profile. The distance between profiles and profile points is controlled by the threshold. Obtain the elevation and coordinates of each profile point outside the channel bed accumulation area within the channel boundary, and construct a quadratic function equation for the profiles on the left and right sides of the main channel respectively; According to the quadratic function equation constructed for each profile, the elevation value of the profile point located within the ditch bed accumulation area is calculated; The ditch bed base DEM data are generated according to the elevation values of the ditch banks on the left and right sides of the ditch bed, and the volume of ditch bed deposits is calculated based on the ditch DEM data and the ditch bed base DEM data.
2. A method for rapidly estimating the volume of asymmetric debris flow ditch bed deposits as claimed in claim 1, characterized in that: According to the threshold, profiles and profile points are automatically generated on the left and right sides of the main channel of the debris flow.
3. A method for rapidly estimating the volume of asymmetric debris flow ditch bed deposits as claimed in claim 1, characterized in that: Obtain the elevation and coordinates of each profile point outside the channel bed accumulation area within the channel boundary, and construct a quadratic function equation based on the left and right side profiles, including: in, is the elevation value of the profile point, is the horizontal distance between the profile point and the channel boundary, is the coefficient of the quadratic term, is the coefficient of the first-order term, is a constant.
4. A method for rapidly estimating the volume of asymmetric debris flow ditch bed deposits as claimed in claim 1, characterized in that: According to the quadratic function equation constructed for each profile, the elevation value of the profile point located within the ditch bed accumulation area is calculated.
5. The method for rapidly estimating the volume of asymmetric debris flow ditch bed deposits according to claim 1, characterized in that: Based on the calculated elevation values of the profile points within the gully bed accumulation area, the gully bed basement DEM data covering the gully bed accumulation area is generated.
6. A method for rapidly estimating the volume of asymmetric debris flow ditch bed deposits as claimed in claim 1, characterized in that: According to the channel DEM data and the channel bed base DEM data, the elevation difference is calculated to obtain the channel bed accumulation area thickness, including: in, is the elevation difference, It is the channel DEM data. It is the gully bed base DEM data, and the elevation unit is meter.
7. A method for rapidly estimating the volume of asymmetric debris flow ditch bed deposits as claimed in claim 1, characterized in that: Calculate the pixel volume based on the pixel area and pixel elevation difference, including: in, is the pixel volume (m 3 ), is the pixel elevation difference (m), is the pixel area (m 2 ).
8. A method for rapidly estimating the volume of asymmetric debris flow ditch bed deposits as claimed in claim 1, characterized in that: The volume of ditch bed deposits is calculated based on the sum of the volumes of all pixels in the ditch bed deposit area, including: in, is the pixel volume (m 3 ), is the volume of the ditch bed deposit (m 3 ), is the number of pixels in the gully bed accumulation area.
9. A computer-readable storage medium, characterized in that: The medium stores a program, which can be loaded by a processor and execute a method for quickly estimating the volume of asymmetric debris flow ditch bed deposits as described in any one of claims 1 to 8.
Citation Information
Patent Citations
Slope stability simulation analysis method based on seepage model
CN112255157A
Glacier debris flow source reserve calculation method
CN118211008A
Method for calculating a regression function for estimating flow rate in mountain river basins, method for selecting the same function, and method for estimating the annual average flow rate in mountain river basins.
JP5593459B1
Cited By
Debris flow channel deposit source reserve estimation method, device, equipment, medium and product
CN120318719A
Methods, devices, equipment, media and products for estimating source reserves of debris flow channel deposits
CN120318719B