Prefabricated concrete primary and secondary beam rigid connection joint and support-free construction method
Through the design of the rigid connection node of the precast concrete primary and secondary beams, the use of embedded steel plate support and double-angle steel beef legs, combined with mechanical sleeves and special steel molds, the lack of connection stiffness and high construction difficulty of primary and secondary beams in traditional connection methods is solved. The problem of this problem has achieved an efficient and stable connection structure and simplified construction process, reducing costs and improving construction efficiency.
Patent Information
- Application Number
- CN202411386047.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2024-11-15
AI Technical Summary
In traditional prefabricated concrete structures, the connection method of primary and secondary beams has weakened stiffness, prone to cracks, and the failure to achieve support and formwork construction, and it cannot meet the high requirements of complex structural systems for connecting nodes.
A prefabricated concrete primary and secondary beam rigid connection node was designed, using the embedded steel plate support and double-angle steel beef legs inside the prefabricated main beam. The stressed steel bars at the bottom of the prefabricated secondary beam were connected by mechanical sleeves, combined with special steel molds and casting. Holes, realize anchor connection and casting nodes.
It realizes efficient and stable rigid connections of primary and secondary beams, ensures excellent rigidity of prefabricated beams in the production, transportation and installation stages, reduces maintenance costs, simplifies construction processes, improves construction efficiency and flexibility, and achieves complete exemption. Formwork is supported without support.
Smart Images

Figure CN118958489A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of prefabricated house connecting parts, and relates to a rigid connection node of a precast concrete primary and secondary beam and a support-free construction method. Background Art
[0002] In the development of prefabricated concrete structures, the connection nodes of the main and secondary beams of the frame have always been a key link in structural design and construction. Although traditional connection methods, such as reserved gaps and post-casting and bulldozer shelving, have achieved the connection of the main and secondary beams to a certain extent, they each have significant limitations.
[0003] Although the method of pre-casting after leaving a gap can achieve the connection between the main and secondary beams, its weakening effect on the stiffness of the main beam cannot be ignored. This method is very likely to cause cracks during the production, transportation and hoisting of prefabricated components, and it is impossible to achieve support-free and formwork-free construction of prefabricated beams, thereby increasing the difficulty and cost of construction.
[0004] On the other hand, although the oxcart board placement method is simple and easy to use, it cannot achieve a rigid connection between the primary and secondary beams. In terms of structural stress, this method can only be defined as a hinge, so its application scenarios are severely limited and cannot meet the higher requirements of complex structural systems for connection nodes. Summary of the invention
[0005] In view of this, the purpose of the present invention is to provide a precast concrete primary and secondary beam rigid connection node and a support-free construction method, aiming to overcome the defects of traditional connection methods and provide a more reliable, efficient and economical primary and secondary beam connection solution.
[0006] To achieve the above object, the present invention provides the following technical solutions: a precast concrete main-secondary beam rigid connection node, comprising a precast main beam and a precast secondary beam, wherein a steel plate support is embedded in the precast main beam, and a double angle steel is fixedly installed on the outside of the steel plate support as a supporting bracket; the lower part of the end section of the precast secondary beam is retracted to form a tongue and groove, and the lower stress-bearing steel bars of the precast secondary beam pass through the concrete;
[0007] The precast main beam is also equipped with a hole that penetrates the cross section at the position of the stress-bearing reinforcement at the bottom of the precast secondary beam. After the precast secondary beam is placed and installed on the angle steel corbel, the stress-bearing reinforcement at the bottom of the precast secondary beam is connected to the short reinforcement extending into the hole through a mechanical sleeve, and the anchoring connection is completed after the concrete is poured in the node area.
[0008] Optionally, a casting hole is obliquely opened at the top of the prefabricated secondary beam toward the tongue and groove direction, and a corrugated pipe can be pre-embedded in the casting hole, and the outlet of the casting hole is arranged at the lower tongue and groove of the prefabricated secondary beam.
[0009] Optionally, a special steel mold may be detachably installed on the outer side of the tongue-and-groove end of the prefabricated secondary beam to seal the tongue-and-groove of the prefabricated secondary beam.
[0010] Optionally, waist reinforcement and reinforcing diagonal reinforcement are provided in the prefabricated secondary beam, and prestressed steel bars are provided at the bottom of the prefabricated secondary beam.
[0011] A support-free construction method for a precast concrete primary and secondary beam rigid connection node, applicable to a precast concrete primary and secondary beam rigid connection node as described above, comprises the following steps:
[0012] a) Prefabricate the main concrete beam and secondary beam in the factory, where the lower part of the first stirrup at one end of the prefabricated secondary beam is tongue-and-groove, and the lower stress-bearing steel bars of the prefabricated secondary beam are in an extended state;
[0013] b) Embed a steel plate support inside the prefabricated main beam, and weld a double angle steel to the steel plate support as a supporting bracket; at the same time, reserve a hole that penetrates the cross section in the prefabricated main beam;
[0014] c) After hoisting the prefabricated main beam to the designated position, place the prefabricated secondary beam on the supporting bracket formed by the double angle steel on the prefabricated main beam;
[0015] d) Install a mechanical sleeve at the front end of the stress-bearing steel bar at the lower part of the prefabricated secondary beam, then install a short steel bar at the front end of the mechanical sleeve to complete the mechanical connection, and then extend the short steel bar into the opening in the prefabricated main beam;
[0016] e) Install a special steel mold at the end of the precast secondary beam, and pour concrete at the tongue and groove of the precast secondary beam through the pouring holes on the precast secondary beam to form an integral connection node;
[0017] f) After the concrete pouring is completed, the special steel mold is disassembled so that it can be reused for the next node.
[0018] The beneficial effects of the present invention are:
[0019] 1) The present invention ingeniously realizes the rigid connection between the upper and lower stress-bearing steel bars of the primary and secondary beams, perfectly conforming to the core concept of "equivalent cast-in-place", thereby constructing an efficient and stable rigid connection structure of the primary and secondary beams;
[0020] 2) This design effectively ensures the excellent rigidity of the prefabricated main beam during production, transportation and installation, making large-span support-free construction possible, greatly improving the flexibility and efficiency of construction;
[0021] 3) The double-angle steel bracket design does not require additional fireproofing and anti-corrosion treatment after the post-cast concrete is poured, which significantly reduces maintenance costs and demonstrates excellent economic efficiency;
[0022] 4) The present invention also provides a detachable special mold for the secondary beam end, which can realize the rapid and accurate casting of the node; at the same time, its reusable feature not only conforms to the concept of green environmental protection, but also further improves the economic efficiency of construction. More importantly, this design enables the lower part of the primary and secondary beams to achieve complete formwork-free and support-free construction, providing strong technical support for the optimization of prefabricated concrete structures.
[0023] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:
[0025] Figure 1 It is a schematic diagram of the overall assembly of the present invention;
[0026] Figure 2 This is a schematic diagram of the assembly of the present invention without a dedicated steel mold;
[0027] Figure 3 for Figure 2 A cross-sectional view of
[0028] Figure 4 It is a schematic diagram of the prefabricated main beam of the present invention;
[0029] Figure 5 It is a schematic diagram of a steel plate support of the present invention;
[0030] Figure 6 It is a schematic diagram of the prefabricated secondary beam of the present invention;
[0031] Figure 7 It is a schematic diagram of the special steel mold of the present invention.
[0032] Figure numerals: prefabricated main beam 1, prefabricated secondary beam 2, steel plate support 3, double angle steel 4, stress-bearing steel bars 5, short steel bars 6, opening 7, mechanical sleeve 8, casting hole 9, special steel mold 10, waist reinforcement 11, reinforcing diagonal reinforcement 12, prestressed steel bars 13. DETAILED DESCRIPTION
[0033] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.
[0034] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.
[0035] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "back" and the like indicate directions or positional relationships, they are based on the directions or positional relationships shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0036] See also Figure 1 to Figure 7 , which is a precast concrete main and secondary beam rigid connection node, including a precast main beam 1 and a precast secondary beam 2. A steel plate support 3 is embedded in the precast main beam 1, and a double angle steel 4 is fixedly installed on the outside of the steel plate support 3 as a supporting bracket; the lower part of the end section of the precast secondary beam 2 is retracted to form a tongue and groove, and the lower stress-bearing steel bar 5 of the precast secondary beam 2 passes through the concrete; the precast main beam 1 is also reserved with a hole 7 that penetrates the cross section at the position of the stress-bearing steel bar 5 at the bottom of the precast secondary beam 2. After the precast secondary beam 2 is placed on the angle steel bracket, the stress-bearing steel bar 5 at the bottom of the precast secondary beam 2 The reinforcement 5 is connected to the short reinforcement 6 extending into the hole through a mechanical sleeve 8, and the anchoring connection is completed after the concrete is poured in the node area. A casting hole 9 is also obliquely opened at the top of the precast secondary beam 2 toward the tongue and groove. The casting hole 9 can be pre-buried with a corrugated pipe, and its outlet is arranged at the lower tongue and groove of the precast secondary beam 2. The precast secondary beam 2 is also detachably installed with a special steel mold 10 on the outside of the tongue and groove end to seal the tongue and groove of the precast secondary beam 2. Waist reinforcement 11 and strengthening oblique reinforcement 12 are arranged in the precast secondary beam 2, and prestressed steel bars 13 are arranged at the bottom of the precast secondary beam 2.
[0037] A support-free construction method for a precast concrete primary and secondary beam rigid connection node, applicable to a precast concrete primary and secondary beam rigid connection node as described above, comprises the following steps:
[0038] a) Prefabricate the concrete main beam and secondary beam in the factory, wherein the lower part of the first stirrup at one end of the prefabricated secondary beam 2 is tongue-and-groove, and the lower stress-bearing steel bar 5 of the prefabricated secondary beam 2 is in an extended state;
[0039] b) embedding a steel plate support 3 inside the prefabricated main beam 1, and welding a double angle steel 4 to the steel plate support 3 as a supporting corbel; at the same time, reserving a hole 7 that penetrates the cross section in the prefabricated main beam 1;
[0040] c) After hoisting the prefabricated main beam 1 to the designated position, place the prefabricated secondary beam 2 on the supporting bracket formed by the double angle steel 4 on the prefabricated main beam 1;
[0041] d) Install a mechanical sleeve 8 at the front end of the stress-bearing steel bar 5 at the lower part of the prefabricated secondary beam 2, and then install a short steel bar 6 at the front end of the mechanical sleeve 8 to complete the mechanical connection, and then extend the short steel bar 6 into the opening 7 in the prefabricated main beam 1;
[0042] e) Installing a special steel mold 10 at the end of the precast secondary beam 2, and pouring concrete at the tongue and groove of the precast secondary beam 2 through the pouring holes 9 on the precast secondary beam 2 to form an integral connection node;
[0043] f) After the concrete pouring is completed, the special steel mold 10 is disassembled so that it can be reused for the next node.
[0044] The beneficial effects of the present invention are mainly reflected in the following aspects:
[0045] 1) Improve the overall performance of the structure: Through the design of the embedded steel plate support 3 and the double angle steel 4 supporting the corbel, as well as the anchor connection between the stress-bearing steel bars 5 at the bottom of the prefabricated secondary beam 2 and the opening 7 in the prefabricated main beam 1, the rigid connection between the main and secondary beams is achieved, which significantly improves the overall stability and bearing capacity of the structure and meets the higher requirements of the complex structural system for the connection nodes.
[0046] 2) Optimize the construction process and reduce costs: The connection structure and its construction method realize the support-free and formwork-free construction of prefabricated beams, reduce the support and formwork materials required in the traditional connection method, simplify the construction process, and reduce the construction difficulty and cost. At the same time, the detachable design of the special steel mold 10 is convenient for reuse, further saving material costs.
[0047] 3) Enhanced node durability: The tongue-and-groove design at the end of the prefabricated secondary beam 2 and the pre-embedded casting holes 9 and corrugated pipes ensure the compactness and uniformity of concrete pouring, effectively avoid the generation of cracks, and enhance the durability and seismic resistance of the node.
[0048] 4) Improve construction efficiency: The connection structure and its construction method adopt factory prefabrication and on-site assembly, which reduces the amount of wet work on site, shortens the construction period, and improves construction efficiency. At the same time, the use of mechanical sleeve 8 connection also improves the reliability and construction speed of the steel bar connection.
[0049] In summary, the precast concrete main and secondary beam rigid connection structure and its support-free construction method have shown significant beneficial effects in improving structural performance, optimizing construction process, reducing costs, enhancing node durability, improving construction efficiency, and environmental protection and energy saving.
[0050] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.
Claims
1. A precast concrete main and secondary beam rigid connection node, comprising a precast main beam and a precast secondary beam, characterized in that: A steel plate support is embedded inside the prefabricated main beam, and a double angle steel is fixedly installed on the outside of the steel plate support as a supporting bracket; the lower part of the end section of the prefabricated secondary beam is retracted to form a tongue and groove, and the lower stress-bearing steel bars of the prefabricated secondary beam pass through the concrete; The precast main beam is also equipped with a hole that penetrates the cross section at the position of the stress-bearing reinforcement at the bottom of the precast secondary beam. After the precast secondary beam is placed and installed on the angle steel corbel, the stress-bearing reinforcement at the bottom of the precast secondary beam is connected to the short reinforcement extending into the hole through a mechanical sleeve, and the anchoring connection is completed after the concrete is poured in the node area.
2. A precast concrete primary and secondary beam rigid connection node according to claim 1, characterized in that: A casting hole is obliquely opened at the top of the prefabricated secondary beam toward the tongue and groove direction. The casting hole can be pre-buried with a corrugated pipe, and its outlet is arranged at the lower tongue and groove of the prefabricated secondary beam.
3. The precast concrete primary and secondary beam rigid connection node according to claim 1, characterized in that: A special steel mould is detachably installed on the outer side of the tongue-and-groove end of the prefabricated secondary beam, which is used to seal the tongue-and-groove of the prefabricated secondary beam.
4. The precast concrete primary and secondary beam rigid connection node according to claim 1, characterized in that: Waist bars and reinforcing diagonal bars are arranged in the precast secondary beam, and prestressed steel bars are arranged at the bottom of the precast secondary beam.
5. A support-free construction method for a precast concrete primary and secondary beam rigid connection node, applicable to a precast concrete primary and secondary beam rigid connection node as claimed in any one of claims 1 to 4, characterized in that: The following steps are involved: a) Prefabricate the main concrete beam and secondary beam in the factory, where the lower part of the first stirrup at one end of the prefabricated secondary beam is tongue-and-groove, and the lower stress-bearing steel bars of the prefabricated secondary beam are in an extended state; b) Embed a steel plate support inside the prefabricated main beam, and weld a double angle steel to the steel plate support as a supporting bracket; at the same time, reserve a hole that penetrates the cross section in the prefabricated main beam; c) After hoisting the prefabricated main beam to the designated position, place the prefabricated secondary beam on the supporting bracket formed by the double angle steel on the prefabricated main beam; d) Install a mechanical sleeve at the front end of the stress-bearing steel bar at the lower part of the prefabricated secondary beam, then install a short steel bar at the front end of the mechanical sleeve to complete the mechanical connection, and then extend the short steel bar into the opening in the prefabricated main beam; e) Install a special steel mold at the end of the precast secondary beam, and pour concrete at the tongue and groove of the precast secondary beam through the pouring holes on the precast secondary beam to form an integral connection node; f) After the concrete pouring is completed, the special steel mold is disassembled so that it can be reused for the next node.