Prefabricated corrugated steel pipe spiral stirrup cage confined concrete core column reinforced composite shear wall and assembling method thereof

The prefabricated corrugated steel pipe spiral stirrup cage restrains the concrete core column combination shear wall, which solves the problems of insufficient seismic performance and complex construction of traditional shear walls, achieving high redundancy and strong connectivity, reducing construction costs and Earthquake reaction.

CN118958533AActive Publication Date: 2024-11-15SOUTH CHINA UNIV OF TECH

Patent Information

Application Number
CN202411235154.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-15
Estimated Expiration
2044-09-04

AI Technical Summary

Technical Problem

The existing prefabricated concrete shear walls lack redundancy in the earthquake resistance process. Traditional vertical steel bar connection technology is difficult to meet the multi-dimensional performance enhancement needs of high-rise buildings, and the construction is complex and costly.

Method used

Prefabricated corrugated steel pipe spiral stirrup cage is used to constrain the concrete core column combination shear wall, and high redundancy and strong connectivity are achieved through horizontal rear cast connection layer and plug-in connection, reducing construction difficulty and cost.

Benefits of technology

The multi-dimensional seismic performance requirements for high-rise buildings have been achieved, construction efficiency and seismic performance have been improved, damage and damage of horizontal connecting layers have been delayed, structural self-weight and seismic reactions have been reduced, and seismic investment has been saved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958533A_ABST
    Figure CN118958533A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of prefabricated concrete structures, and particularly discloses a prefabricated assembly type corrugated steel pipe spiral stirrup cage confined concrete core column reinforced composite shear wall and an assembly method thereof.The composite shear wall comprises a prefabricated concrete wall and a corrugated steel pipe spiral stirrup cage compound confined high-strength concrete core column; the prefabricated concrete wall is divided into an upper-layer prefabricated concrete wall and a lower-layer prefabricated concrete wall, and a horizontal post-pouring connecting layer is arranged between the upper-layer prefabricated concrete wall and the lower-layer prefabricated concrete wall. The corrugated steel pipe spiral stirrup cage compound constraint high-strength concrete core column sequentially penetrates through the upper-layer prefabricated concrete wall, the horizontal post-pouring connecting layer and the lower-layer prefabricated concrete wall from top to bottom. A reinforcing mesh formed by interweaving vertically-distributed reinforcing steel bars, horizontally-distributed reinforcing steel bars and tie steel bars is embedded in the prefabricated concrete wall. When the upper-layer prefabricated concrete wall and the lower-layer prefabricated concrete wall are assembled, vertically-distributed steel bars in the upper-layer prefabricated concrete wall and the lower-layer prefabricated concrete wall are connected and anchored in a horizontal joint bar plug pin mode.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of precast concrete structures, and in particular to a prefabricated assembled corrugated steel tube spiral hoop cage-constrained concrete core column reinforced composite shear wall and an assembly method thereof. Background Art

[0002] Prefabricated concrete (PC) shear walls are very important components for high-rise buildings to achieve assembly. Their vertical reinforcement connection methods (such as sleeve grouting connection, constrained grout anchor lap connection, ring reinforcement buckle anchor connection, sleeve extrusion connection, etc.) can achieve the reliability requirements of PC shear wall assembly connection. However, the seismic damage evolution and failure mechanism of prefabricated high-rise concrete structures are very complex. PC shear walls require not only safe and reliable assembly connections, but also high redundancy and robustness. Redundancy emphasizes gradient capacity and multiple force transmission paths, and robustness emphasizes the controllable stability of expected performance. Existing PC shear walls and prefabricated steel tube concrete core column reinforced composite shear walls mostly focus on the mechanical properties of "equivalent to cast-in-place", and rarely involve the redundancy of the destruction process. The assembly connection technology based on vertical steel bar connection is still insufficient in achieving multi-dimensional performance enhancement of prefabricated high-rise concrete structures. Therefore, traditional PC shear walls do not have obvious redundant characteristics during seismic destruction. Actual earthquake damage surveys and experimental studies have shown that, especially under the axial tension-compression-bending / compression-shear composite stress state, the seismic performance of traditional PC shear walls is difficult to be fully guaranteed, and the connection performance of the horizontal post-cast connection layer deteriorates rapidly.

[0003] The mechanical properties of existing PC shear walls are overly dependent on the structural measures and construction quality of vertical steel bar connections, resulting in long construction periods and high costs. The embedded steel pipes of prefabricated assembled steel tube concrete core column reinforced composite shear walls are welded or semi-welded, or connected by threaded sleeve grouting, or by compound steel casing connections on site, resulting in a large workload on site, high positioning accuracy requirements for the embedded steel pipes, low assembly fault tolerance, and great difficulty in controlling the assembly quality of PC shear walls.

[0004] The present invention aims at the key technical problems existing in PC shear walls, and proposes a new type of prefabricated and assembled corrugated steel tube spiral hoop cage-constrained concrete core column reinforced composite shear wall to achieve the multi-dimensional seismic performance requirements of PC shear walls. Compared with traditional PC shear walls and existing prefabricated steel tube concrete core column reinforced composite shear walls, the new shear wall has the characteristics of "easy assembly, strong connection, high redundancy, and reduced cost". The "partial assembly, partial cast-in-place" nested system breaks through the conventional force transmission mechanism, and can form a multi-mechanism collaborative working system of load-bearing-energy consumption-gradient conversion, which is suitable for the application of high-rise and super-high-rise prefabricated and assembled building structures in high-intensity areas. Summary of the invention

[0005] The object of the present invention is to overcome the defects and shortcomings of the prior art and to provide a prefabricated assembled corrugated steel tube spiral hoop cage confined concrete core column reinforced composite shear wall and an assembly method thereof.

[0006] The purpose of the present invention can be achieved through the following technical solutions:

[0007] A prefabricated assembled corrugated steel tube spiral hoop cage-constrained concrete core column reinforced composite shear wall, comprising a prefabricated concrete wall and a corrugated steel tube spiral hoop cage-constrained high-strength concrete core column;

[0008] The precast concrete wall is divided into an upper precast concrete wall and a lower precast concrete wall. A horizontal post-cast connection layer is arranged between the upper precast concrete wall and the lower precast concrete wall. A corrugated steel tube spiral hoop cage compound restrained high-strength concrete core column runs through the upper precast concrete wall, the horizontal post-cast connection layer, and the lower precast concrete wall from top to bottom in sequence; a steel mesh composed of interweaving vertical distribution steel bars, horizontal distribution steel bars, and tie steel bars is embedded in the precast concrete wall; a steel mesh composed of interweaving dense horizontal distribution steel bars and tie steel bars is embedded in the horizontal post-cast connection layer;

[0009] The corrugated steel pipe spiral hoop cage compound restrained high-strength concrete core column comprises a corrugated steel pipe, a spiral hoop cage and high-strength concrete; a plurality of corrugated steel pipes are pre-buried in a precast concrete wall in a row and at intervals, the two ends of the corrugated steel pipe extend out of the upper end face and the lower end face of the precast concrete wall respectively, the spiral hoop cage is inserted into the corrugated steel pipe, and the high-strength concrete is poured into the corrugated steel pipe to form a corrugated steel pipe spiral hoop cage compound restrained high-strength concrete core column;

[0010] When the upper precast concrete wall and the lower precast concrete wall are assembled, the vertical distribution steel bars in the upper precast concrete wall and the lower precast concrete wall are connected and anchored by horizontal dowel pins.

[0011] As a preferred embodiment, the two ends of the vertical distribution steel bars extend out of the upper end face and the lower end face of the precast concrete wall respectively, and the vertical distribution steel bars are closed into a rectangular ring after the pairs of annular steel bar perforations are made; the annular steel bar perforations at the lower part of the vertical distribution steel bars located in the upper precast concrete wall are staggered and overlapped with the annular steel bar perforations at the upper part of the vertical distribution steel bars located in the lower precast concrete wall to form horizontal rows of through holes, and the horizontal dowel bars penetrate the horizontal rows of through holes to form a pin-type connection structure between the vertical distribution steel bars of the upper precast concrete wall and the vertical distribution steel bars of the lower precast concrete wall.

[0012] As a preferred embodiment, the diameter of the ring reinforcement holes of the vertical distribution reinforcement is required to be larger than the diameter of the horizontal inserted reinforcement, and the diameter and steel strength of the horizontal inserted reinforcement are required to be larger than the diameter and steel strength of the vertical distribution reinforcement.

[0013] As a preferred embodiment, the corrugated steel pipe is a thin-walled pipe. The corrugated steel pipe of the upper precast concrete wall is abutted against the corrugated steel pipe of the lower precast concrete wall in the horizontal post-cast connecting layer. The corrugated steel pipe is used to constrain the high-strength concrete poured in the corrugated steel pipe.

[0014] As a preferred embodiment, the spiral hoop reinforcement cage includes spiral hoop reinforcement and vertical frame steel bars, a plurality of vertical frame steel bars are arranged on the inner side of the spiral hoop reinforcement, and the vertical frame steel bars are fixed to the spiral hoop reinforcement by binding to form a spiral hoop reinforcement cage; the vertical frame steel bars are ordinary steel bars or fiber reinforced composite material bars; the spiral hoop reinforcement cage of the upper precast concrete wall is inserted into the corrugated steel pipe at the corresponding position of the lower precast concrete wall, and the spiral hoop reinforcement cage vertically penetrates the horizontal post-cast connecting layer, and the spiral hoop reinforcement cage of the upper precast concrete wall and the spiral hoop reinforcement cage of the lower precast concrete wall are close to each other in the middle part of the height direction of the corrugated steel pipe.

[0015] The assembly method of the prefabricated assembled corrugated steel tube spiral hoop cage confined concrete core column reinforced composite shear wall during construction comprises the following steps:

[0016] S1. Installation of spiral hoop reinforcement cage: The spiral hoop reinforcement cage of the upper precast concrete wall is inserted into the corrugated steel pipe of the lower precast concrete wall from the upper end surface of the lower precast concrete wall, wherein half of the spiral hoop reinforcement cage of the upper precast concrete wall is inside the corrugated steel pipe of the lower precast concrete wall, and the other half is outside the corrugated steel pipe of the lower precast concrete wall;

[0017] S2. Installation of precast concrete wall: hoist the precast concrete wall, the corrugated steel pipe of the upper precast concrete wall covers the other half of the spiral stirrup cage outside the corrugated steel pipe of the lower precast concrete wall, the spiral stirrup cage guides the positioning of the upper precast concrete wall, and the upper precast concrete wall is lowered until half of the spiral stirrup cage is inside the corrugated steel pipe of the upper precast concrete wall; the corrugated steel pipe of the upper precast concrete wall is close to the corrugated steel pipe at the corresponding position of the lower precast concrete wall;

[0018] S3. Connection of vertical distribution steel bars: The lower ring steel bar perforations of the vertical distribution steel bars of the upper precast concrete wall and the upper ring steel bar perforations of the vertical distribution steel bars of the lower precast concrete wall are staggered and overlapped to form horizontal rows of through holes, and the horizontal dowel bars penetrate the horizontal rows of through holes to form a pin-type connection of the vertical distribution steel bars of the upper and lower precast concrete walls;

[0019] S4, grouting connection of horizontal post-cast connection layer: tie and intensify horizontal distribution steel bars and tie steel bars to form a steel mesh of horizontal post-cast connection layer, install a template for pouring horizontal post-cast connection layer outside the steel mesh, pour grouting concrete in the template to form a horizontal post-cast connection layer;

[0020] S5. Casting of high-strength concrete column core with corrugated steel pipe spiral hoop cage duplex restraint: pour high-strength concrete from the upper opening of the corrugated steel pipe of the upper precast concrete wall, and cast the high-strength concrete to 2 / 5 of the height of the corrugated steel pipe of the upper precast concrete wall, leaving part of the spiral hoop cage outside the high-strength concrete;

[0021] The cycle is repeated successively to complete the assembly and construction of each layer of prefabricated and assembled corrugated steel tube spiral stirrup cage-constrained high-strength concrete core column reinforced composite shear walls.

[0022] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0023] 1) Easy to assemble: The vertical distribution steel bars of the precast concrete wall are made into closed rectangular rings with ring steel bar perforations, and are connected by horizontal dowel pins to realize the anchoring of the vertical distribution steel bars in the upper precast concrete wall and the vertical distribution steel bars in the lower precast concrete wall, eliminating the complicated connection process of the vertical distribution steel bars on site; the thin-walled corrugated steel pipe only considers the role of restraining high-strength concrete, and the corrugated steel pipe of the upper precast concrete wall and the corrugated steel pipe at the corresponding position of the lower precast concrete wall are close to each other in the horizontal post-cast connection layer without any connection; the spiral hoop reinforcement cage of the upper precast concrete wall and the spiral hoop reinforcement cage of the lower precast concrete wall are close to each other in the middle part of the height direction of the corrugated steel pipe, and the spiral hoop reinforcement cage has sufficient anchorage length in the high-strength concrete in the corrugated steel pipe, without any additional connection or binding. The connection process between vertical reinforcement and corrugated steel pipes can be eliminated on site. The spiral stirrup cage has low lateral stiffness, which is convenient for correcting or compensating construction errors. It can also guide the rapid positioning and assembly of precast concrete walls, greatly reducing the difficulty of assembly and improving construction efficiency.

[0024] 2) Strong connection: The high-strength concrete core column with corrugated steel tube spiral hoop cage has high stiffness and bearing capacity. The horizontal post-cast connection layer contains a high-strength concrete column core with continuous stiffness and bearing capacity, which greatly enhances the horizontal connection performance and reduces the dependence on the vertical distribution steel bar connection structure and construction quality of the precast concrete wall. It effectively solves the technical problems of weak integrity and low out-of-plane stability of the horizontal connection of the traditional PC shear wall, delays the damage of the horizontal post-cast connection layer under the action of axial tension-compression bending / compression-shear composite load, and ensures its plastic deformation development ability and seismic ductility. The horizontal dowel pin connection anchors the vertical distribution steel bars of the precast concrete wall, forming a reliable pin structure to transmit vertical tension and lateral bending moment. Even under extreme axial tension-compression bending / compression-shear composite loads, the vertical distribution steel bars can maintain high tensile and bending resistance.

[0025] 3) High redundancy: The corrugations of the corrugated steel pipe inhibit the bond slip between the concrete of the precast concrete wall and the outer wall of the high-strength concrete core column constrained by the corrugated steel pipe spiral hoop cage, ensuring that the high-strength concrete core column constrained by the corrugated steel pipe spiral hoop cage works in coordination with the precast concrete wall; the vertical frame steel bars of the spiral hoop cage are ordinary steel bars, fiber-reinforced composite steel bars or a mixture of the two, giving them high elastic strain capacity, which can partially enhance the self-repair ability of the precast concrete wall and the horizontal post-cast connection layer to damage the cracks; multiple corrugated steel pipe spiral hoop cages are complex The high-strength concrete core column with corrugated steel tube spiral hoop cage is embedded in the precast concrete wall to form a poor capacity. The nested system of different energy dissipation mechanisms can break through the conventional force transmission mechanism and form a multiple seismic defense line with coordinated work of multiple mechanisms of load-bearing-energy dissipation-gradient conversion; in the damage evolution process at different stress stages, the high-strength concrete core column with corrugated steel tube spiral hoop cage gradually shares part of the load internal force of the horizontal post-cast connection layer damage and unloading, forming a significant hierarchical performance degradation, changing the overall seismic damage mode and energy dissipation mechanism of the composite shear wall, and obtaining the high redundancy characteristics of gradient defense.

[0026] 4) Cost reduction: The easy assembly characteristics of this composite shear wall can improve construction efficiency and reduce construction costs; the strong connection and high redundancy characteristics can appropriately relax the technical indicators of the axial compression ratio, height-to-thickness ratio and other technical indicators of the precast concrete shear wall in the current specifications, thereby reducing the deadweight of the structure, reducing the seismic response, saving seismic investment, and increasing the effective building area. The various components of this composite shear wall are standardized and have strong industrial applicability; compared with the existing prefabricated steel tube concrete core column reinforced composite shear wall, the steel content of the thin-walled corrugated steel pipe and spiral hoop cage combined structure is significantly reduced, and the connection of the composite shear wall is concentratedly strengthened by relying on the corrugated steel pipe spiral hoop cage compound constraint high-strength concrete core column, which can reduce the vertical distribution of steel content of the precast concrete shear wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a structural schematic diagram of a prefabricated corrugated steel tube spiral stirrup cage confined concrete core column reinforced composite shear wall.

[0028] Figure 2 Schematic diagram of the cross section of the composite shear wall reinforced with a prefabricated corrugated steel tube spiral stirrup cage confining a concrete core column.

[0029] Figure 3 This is a schematic cross-sectional diagram of a high-strength concrete core column confined by a corrugated steel tube spiral stirrup cage.

[0030] Figure 4 This is a structural schematic diagram of a spiral stirrup cage inserted into a corrugated steel pipe.

[0031] Figure 5 This is a schematic diagram of the structure of vertically distributed steel bars.

[0032] Figure 6 It is a schematic diagram of the structure in which the vertical distribution steel bars in the upper precast concrete wall and the vertical distribution steel bars in the lower precast concrete wall are staggered and overlapped.

[0033] Among them: 1: precast concrete wall, 2: corrugated steel pipe, 3: spiral stirrup cage, 31: spiral stirrup, 32: vertical frame steel bars, 4: high-strength concrete, 5: vertical distribution steel bars, 51: perforated circular steel bars, 6: horizontal distribution steel bars, 7: tie steel bars, 8: horizontal dowel bars, 9: encrypted horizontal distribution steel bars. DETAILED DESCRIPTION

[0034] The present invention is further described in detail below in conjunction with embodiments and drawings, but the embodiments of the present invention are not limited thereto.

[0035] like Figure 1 and Figure 2 As shown, a prefabricated assembled corrugated steel tube spiral stirrup cage confined concrete core column reinforced composite shear wall comprises a prefabricated concrete wall and a corrugated steel tube spiral stirrup cage compound confined high-strength concrete core column.

[0036] The precast concrete wall is divided into an upper precast concrete wall and a lower precast concrete wall. A horizontal post-cast connection layer is set between the upper precast concrete wall and the lower precast concrete wall. The corrugated steel tube spiral hoop cage compound restrained high-strength concrete core column runs through the upper precast concrete wall, the horizontal post-cast connection layer, and the lower precast concrete wall from top to bottom. A steel mesh composed of vertical distribution steel bars, horizontal distribution steel bars, and tie steel bars is embedded in the precast concrete wall. A steel mesh composed of dense horizontal distribution steel bars and tie steel bars is embedded in the horizontal post-cast connection layer. In the process of manufacturing the steel mesh, ensure that the density and distribution of the steel mesh meet the design requirements to ensure the bearing capacity and stiffness requirements of the precast concrete wall and the horizontal post-cast connection layer.

[0037] like Figure 2 , Figure 3 and Figure 4 As shown, the corrugated steel pipe spiral hoop cage compound restrained high-strength concrete core column includes a corrugated steel pipe, a spiral hoop cage and high-strength concrete; a plurality of corrugated steel pipes are pre-buried in a precast concrete wall in a row and at intervals with each other, the two ends of the corrugated steel pipe extend out of the upper end surface and the lower end surface of the precast concrete wall respectively, the spiral hoop cage is inserted into the corrugated steel pipe, and the high-strength concrete is poured into the corrugated steel pipe to form a corrugated steel pipe spiral hoop cage compound restrained high-strength concrete core column.

[0038] The corrugated steel pipe is a thin-walled pipe. The corrugated steel pipe of the upper precast concrete wall is abutted against the corrugated steel pipe of the lower precast concrete wall in the horizontal post-cast connecting layer. The corrugated steel pipe is used to constrain the high-strength concrete poured in the corrugated steel pipe.

[0039] The spiral hoop cage includes spiral hoop and vertical erecting steel bars. A plurality of vertical erecting steel bars are arranged on the inner side of the spiral hoop. The vertical erecting steel bars are fixed to the spiral hoop by binding to form a spiral hoop cage. Each spiral hoop cage includes at least two vertical erecting steel bars with certain lateral and compressive stiffness. In this embodiment, the vertical erecting steel bars are ordinary steel bars or fiber reinforced composite bars. The two vertical erecting steel bars are arranged along the width direction of the precast concrete wall. The vertical erecting steel bars are convenient for binding with the spiral hoop, maintaining the spacing of the spiral hoop, locating the position of the spiral hoop, and also easy to correct or compensate for the deviation of the assembly construction.

[0040] The spiral stirrup cage of the upper precast concrete wall is inserted into the corrugated steel pipe at the corresponding position of the lower precast concrete wall, and the spiral stirrup cage vertically penetrates the horizontal post-cast connection layer, and the spiral stirrup cage of the upper precast concrete wall and the spiral stirrup cage of the lower precast concrete wall are close to each other in the middle of the height direction of the corrugated steel pipe. Ensure that the spiral stirrup cage is accurately positioned in the corrugated steel pipe.

[0041] like Figure 1 , Figure 5 and Figure 6 As shown, when the upper precast concrete wall and the lower precast concrete wall are assembled, the vertical distribution steel bars in the upper precast concrete wall and the lower precast concrete wall are connected and anchored by horizontal dowel pins.

[0042] The two ends of the vertical distribution steel bars extend out of the upper end face and the lower end face of the precast concrete wall respectively. The vertical distribution steel bars are closed into a rectangular ring after making a pair of annular steel bar perforations. The annular steel bar perforations at the lower part of the vertical distribution steel bars located in the upper precast concrete wall are staggered and overlapped with the annular steel bar perforations at the upper part of the vertical distribution steel bars located in the lower precast concrete wall to form a horizontal row of through holes. The rows of through holes are coaxially arranged, and the horizontal dowel bars penetrate the horizontal rows of through holes to form a pin-type connection structure between the vertical distribution steel bars of the upper precast concrete wall and the vertical distribution steel bars of the lower precast concrete wall.

[0043] The diameter of the ring steel bar perforations of the vertical distribution steel bars is required to be larger than the diameter of the horizontal dowel bars. The diameter and steel strength of the horizontal dowel bars are required to be larger than the diameter and steel strength of the vertical distribution steel bars to ensure the reliability and bearing capacity of the horizontal dowel bar connection structure.

[0044] The assembly method of the prefabricated assembled corrugated steel tube spiral hoop cage confined concrete core column reinforced composite shear wall during construction comprises the following steps:

[0045] S1. Installation of spiral hoop reinforcement cage: The spiral hoop reinforcement cage of the upper precast concrete wall is inserted into the corrugated steel pipe of the lower precast concrete wall from the upper end surface of the lower precast concrete wall, wherein half of the spiral hoop reinforcement cage of the upper precast concrete wall is inside the corrugated steel pipe of the lower precast concrete wall, and the other half is outside the corrugated steel pipe of the lower precast concrete wall. When installing the spiral hoop reinforcement cage, ensure that it is correctly aligned with the corrugated steel pipe to ensure the smooth progress of subsequent construction.

[0046] S2. Installation of precast concrete wall: lift the precast concrete wall, the corrugated steel pipe of the upper precast concrete wall covers the other half of the spiral stirrup cage outside the corrugated steel pipe of the lower precast concrete wall, the spiral stirrup cage guides the positioning of the upper precast concrete wall, the upper precast concrete wall is lowered until half the length of the spiral stirrup cage is inside the corrugated steel pipe of the upper precast concrete wall; the corrugated steel pipe of the upper precast concrete wall is close to the corrugated steel pipe at the corresponding position of the lower precast concrete wall.

[0047] S3. Connection of vertical distribution steel bars: The lower ring steel bar perforations of the vertical distribution steel bars of the upper precast concrete wall and the upper ring steel bar perforations of the vertical distribution steel bars of the lower precast concrete wall are offset and overlapped to form horizontal rows of through holes, and the horizontal dowel bars penetrate the horizontal rows of through holes to form a pin-type connection of the vertical distribution steel bars of the upper and lower precast concrete walls. When connecting the vertical distribution steel bars, ensure that the horizontal rows of through holes are coaxial and the horizontal dowel bars accurately pass through the rows of through holes to ensure the firmness of the connection and the integrity of the structure.

[0048] S4. Grouting connection of horizontal post-cast connection layer: Tie and intensify horizontal distribution steel bars and tie steel bars to form a steel mesh of horizontal post-cast connection layer, install a template for pouring horizontal post-cast connection layer outside the steel mesh, pour grouting concrete in the template to form a horizontal post-cast connection layer. When tying, ensure that the density of horizontal distribution steel bars and tie steel bars meets the design requirements to ensure the structural strength and durability of the connection layer.

[0049] S5. Casting of high-strength concrete column core with corrugated steel pipe spiral hoop cage duplex restraint: Pour high-strength concrete from the upper opening of the corrugated steel pipe of the upper precast concrete wall, and cast the high-strength concrete to 2 / 5 of the height of the corrugated steel pipe of the upper precast concrete wall, leaving part of the spiral hoop cage outside the high-strength concrete. When casting high-strength concrete, ensure that the casting process is continuous and uniform to ensure the density and uniformity of the core column.

[0050] The cycle is repeated successively to complete the assembly and construction of each layer of prefabricated and assembled corrugated steel tube spiral stirrup cage-constrained high-strength concrete core column reinforced composite shear walls.

[0051] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A prefabricated assembled corrugated steel tube spiral hoop cage confined concrete core column reinforced composite shear wall, characterized by: It includes precast concrete walls and corrugated steel tube spiral stirrup cages with compound confined high-strength concrete core columns; The precast concrete wall is divided into an upper precast concrete wall and a lower precast concrete wall. A horizontal post-cast connection layer is arranged between the upper precast concrete wall and the lower precast concrete wall. A corrugated steel tube spiral hoop cage compound restrained high-strength concrete core column runs through the upper precast concrete wall, the horizontal post-cast connection layer, and the lower precast concrete wall from top to bottom in sequence; a steel mesh composed of interweaving vertical distribution steel bars, horizontal distribution steel bars, and tie steel bars is embedded in the precast concrete wall; a steel mesh composed of interweaving dense horizontal distribution steel bars and tie steel bars is embedded in the horizontal post-cast connection layer; The corrugated steel pipe spiral hoop cage compound restrained high-strength concrete core column comprises a corrugated steel pipe, a spiral hoop cage and high-strength concrete; a plurality of corrugated steel pipes are pre-buried in a precast concrete wall in a row and at intervals, the two ends of the corrugated steel pipe extend out of the upper end face and the lower end face of the precast concrete wall respectively, the spiral hoop cage is inserted into the corrugated steel pipe, and the high-strength concrete is poured into the corrugated steel pipe to form a corrugated steel pipe spiral hoop cage compound restrained high-strength concrete core column; When the upper precast concrete wall and the lower precast concrete wall are assembled, the vertical distribution steel bars in the upper precast concrete wall and the lower precast concrete wall are connected and anchored by horizontal dowel pins.

2. The prefabricated assembled corrugated steel tube spiral hoop cage-confined concrete core column reinforced composite shear wall according to claim 1, characterized in that: The two ends of the vertical distribution steel bars extend out of the upper end face and the lower end face of the precast concrete wall respectively. The vertical distribution steel bars are closed into a rectangular ring after making pairs of annular steel bar perforations. The annular steel bar perforations at the lower part of the vertical distribution steel bars located in the upper precast concrete wall are staggered and overlapped with the annular steel bar perforations at the upper part of the vertical distribution steel bars located in the lower precast concrete wall to form horizontal rows of through holes. The horizontal dowel bars penetrate the horizontal rows of through holes to form a pin-type connection structure between the vertical distribution steel bars of the upper precast concrete wall and the vertical distribution steel bars of the lower precast concrete wall.

3. The prefabricated assembled corrugated steel tube spiral hoop cage-confined concrete core column reinforced composite shear wall according to claim 2, characterized in that: The diameter of the ring steel bar perforations of the vertical distribution steel bars is required to be larger than the diameter of the horizontal inserted steel bars, and the diameter and steel strength of the horizontal inserted steel bars are required to be larger than the diameter and steel strength of the vertical distribution steel bars.

4. The prefabricated assembled corrugated steel tube spiral hoop cage-confined concrete core column reinforced composite shear wall according to claim 3, characterized in that: The corrugated steel pipe is a thin-walled pipe. The corrugated steel pipe of the upper precast concrete wall is abutted against the corrugated steel pipe of the lower precast concrete wall in the horizontal post-cast connecting layer. The corrugated steel pipe is used to constrain the high-strength concrete poured in the corrugated steel pipe.

5. The prefabricated assembled corrugated steel tube spiral hoop cage-confined concrete core column reinforced composite shear wall according to claim 4, characterized in that: The spiral hoop reinforcement cage includes spiral hoop reinforcement and vertical frame steel bars. A plurality of vertical frame steel bars are arranged on the inner side of the spiral hoop reinforcement. The vertical frame steel bars are fixed to the spiral hoop reinforcement by binding to form a spiral hoop reinforcement cage. The vertical frame steel bars are ordinary steel bars or fiber reinforced composite material bars. The spiral hoop reinforcement cage of the upper precast concrete wall is inserted into the corrugated steel pipe at the corresponding position of the lower precast concrete wall, and the spiral hoop reinforcement cage vertically penetrates the horizontal post-cast connecting layer. The spiral hoop reinforcement cage of the upper precast concrete wall and the spiral hoop reinforcement cage of the lower precast concrete wall are close to each other in the middle part of the height direction of the corrugated steel pipe.

6. The method for assembling a prefabricated assembled corrugated steel tube spiral hoop cage-confined concrete core column reinforced composite shear wall during construction according to any one of claims 2 to 5, characterized in that The steps include: S1. Installation of spiral hoop reinforcement cage: The spiral hoop reinforcement cage of the upper precast concrete wall is inserted into the corrugated steel pipe of the lower precast concrete wall from the upper end surface of the lower precast concrete wall, wherein half of the spiral hoop reinforcement cage of the upper precast concrete wall is inside the corrugated steel pipe of the lower precast concrete wall, and the other half is outside the corrugated steel pipe of the lower precast concrete wall; S2. Installation of precast concrete wall: hoist the precast concrete wall, the corrugated steel pipe of the upper precast concrete wall covers the other half of the spiral stirrup cage outside the corrugated steel pipe of the lower precast concrete wall, the spiral stirrup cage guides the positioning of the upper precast concrete wall, and the upper precast concrete wall is lowered until half of the spiral stirrup cage is inside the corrugated steel pipe of the upper precast concrete wall; the corrugated steel pipe of the upper precast concrete wall is close to the corrugated steel pipe at the corresponding position of the lower precast concrete wall; S3. Connection of vertical distribution steel bars: The lower ring steel bar perforations of the vertical distribution steel bars of the upper precast concrete wall and the upper ring steel bar perforations of the vertical distribution steel bars of the lower precast concrete wall are staggered and overlapped to form horizontal rows of through holes, and the horizontal dowel bars penetrate the horizontal rows of through holes to form a pin-type connection of the vertical distribution steel bars of the upper and lower precast concrete walls; S4, grouting connection of horizontal post-cast connection layer: tie and intensify horizontal distribution steel bars and tie steel bars to form a steel mesh of horizontal post-cast connection layer, install a template for pouring horizontal post-cast connection layer outside the steel mesh, pour grouting concrete in the template to form a horizontal post-cast connection layer; S5. Casting of high-strength concrete column core with corrugated steel pipe spiral hoop cage duplex restraint: pour high-strength concrete from the upper opening of the corrugated steel pipe of the upper precast concrete wall, and cast the high-strength concrete to 2 / 5 of the height of the corrugated steel pipe of the upper precast concrete wall, leaving part of the spiral hoop cage outside the high-strength concrete; The cycle is repeated successively to complete the assembly and construction of each layer of prefabricated and assembled corrugated steel tube spiral stirrup cage-constrained high-strength concrete core column reinforced composite shear walls.

Citation Information

Patent Citations

  • Concrete shear wall with continuous annular steel bar structures

    CN102979222A

  • Method for manufacturing and assembling prefabricated concrete filled steel tube core column stiffening shear wall

    CN103790265A

  • Vertical connection structure for precast concrete shear walls and construction method

    CN104847014A

  • Reinforcing bar pin jointing element for superimposed slab shear wall

    CN204252327U

Cited By

  • Double-bar sleeve device and system and method of construction

    WO2026222362A1