Window frame waterproof structure and construction method thereof

By designing connecting strips and cleaning components on the window frames, and using the sliding and lifting components of the lever and brush head to clean the drain holes, the problems of aging of sealing strips and inconvenient cleaning of drain holes in traditional window frame waterproof structures are solved. Improves waterproof performance and convenience.

CN118958824APending Publication Date: 2024-11-15BEIJING DONGFANG HUAHUI MUNICIPAL ENG GRP CO LTD

Patent Information

Application Number
CN202411038838.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The problems of aging sealant strips and inconvenient cleaning of drain holes in traditional window frame waterproof structures lead to a degradation of waterproof performance.

Method used

A waterproof structure of window frames is designed, using connecting strips and cleaning components, including lever, load-bearing strip and brush head. The lever drives the load-bearing strip and brush head to slide, and the lifting components are used to achieve lifting, cleaning and draining of the brush head. and accelerate drainage through the air pressure through the breathable tube.

Benefits of technology

It realizes convenient drainage hole cleaning, improves the waterproof performance of window frames, ensures the rainproof and waterproof effect of windows, and provides double guarantees through the design of double drainage holes and breathable pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958824A_ABST
    Figure CN118958824A_ABST
Patent Text Reader

Abstract

The invention relates to a window frame waterproof structure and a construction method thereof, and belongs to the technical field of window frames, the window frame waterproof structure comprises an outer frame, an inner frame and a connecting strip, the connecting strip is clamped and embedded on the outer frame and located between the outer frame and the inner frame, the connecting strip is matched with the vertical outer wall of the outer frame to form a water storage cavity, and a drainage hole is formed in the bottom wall of the water storage cavity; the drain holes are formed along the bottom length direction of the outer frame; the cleaning assembly is slidably arranged on the connecting strip and slides in the length direction of the drainage hole, the cleaning assembly comprises a shifting rod, a bearing strip and a first brush head, the shifting rod is slidably arranged on the connecting strip and slides in the length direction of the drainage hole, and the shifting rod penetrates through the bearing strip and slides relative to the connecting strip together with the bearing strip; the first brush head is arranged on the bearing strip in a sliding mode and slides in a reciprocating mode in the vertical direction. The first lifting assembly is arranged in the water storage cavity and used for controlling the first brush head to ascend and descend. The window drainage hole cleaning device has the effect of conveniently cleaning the drainage hole in the window frame.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of window frames, and in particular to a window frame waterproof structure and a construction method thereof. Background Art

[0002] Traditional window frame waterproofing mainly relies on sealing strips and sealants for waterproofing. These materials can indeed play a certain waterproof role in the early stage, but as time goes by, the sealing strips are prone to aging and deformation, and the sealants are prone to cracking and falling off, which leads to a significant decline in waterproof performance.

[0003] There are two types of window frame waterproofing: one is direct waterproofing, such as using sealing strips to seal the gaps, and the other is drainage, opening drainage holes to drain rainwater that enters the window frame immediately, so that the window can achieve the effect of rainproof and waterproofing relative to the room. Today's window frames are often a combination of the two methods, because there must be gaps when installing windows, whether it is the gap between the outer frame and the wall, or the gap between the outer frame and the inner frame (here refers to the open window), and drainage holes will be reserved on the outer frame.

[0004] The window frame is assembled from a variety of profiles, which are installed tightly together. When the inner frame is opened relative to the outer frame, it can be seen that the gap at the top of the outer frame is not large enough for the operator to easily place tools in, resulting in inconvenient cleaning and maintenance of the drainage holes. Summary of the invention

[0005] In order to facilitate the cleaning of the drainage holes on the window frame, the present application provides a window frame waterproof structure and a construction method thereof.

[0006] In a first aspect, the present application provides a window frame waterproof structure, which adopts the following technical solution: A window frame waterproof structure, comprising an outer frame and an inner frame, and also comprising a connecting strip, which is snap-fitted and connected to the outer frame and located between the outer frame and the inner frame, the connecting strip cooperates with the vertical outer wall of the outer frame to form a water storage cavity, the bottom wall of the water storage cavity is provided with a drainage hole, and the drainage hole is provided along the length direction of the bottom of the outer frame; A cleaning assembly is slidably arranged on the connecting strip and slides along the length direction of the drain hole. The cleaning assembly includes a lever, a bearing strip and a first brush head. The lever is slidably arranged on the connecting strip and slides along the length direction of the drain hole. The lever penetrates the bearing strip and slides with the bearing strip relative to the connecting strip. The first brush head is slidably arranged on the bearing strip and slides back and forth in the vertical direction. The first lifting component is arranged in the water storage cavity and is used for controlling the lifting of the first brush head.

[0007] By adopting the above technical scheme, when the rubber strip at the sealing part between the outer frame and the inner frame leaks due to aging, the penetrated rainwater will enter the water storage cavity, and the accumulated water in the water storage cavity will be discharged through the drainage hole, so that the window can achieve the effect of rainproof and waterproof relative to the room; after the window has been used for a long time, the inner window is opened, and the lever is manually moved, and the lever moves together with the first brush head through the bearing bar, and during the movement of the first brush head, due to the presence of the first lifting assembly, the first brush head will descend deep into the drainage hole to clean the drainage hole, and after cleaning, as the lever is pulled back and reset, the first brush head will also rise and come out of the drainage hole, which will not affect the subsequent drainage of the drainage hole, thereby achieving the effect of facilitating the cleaning of the drainage hole on the window frame.

[0008] Optionally, the first lifting assembly includes a gear, a rack, a vertical pipe, a screw and a limit rod. The vertical pipe vertically penetrates the support bar and is arranged to rotate relative to the support bar. The top of the vertical pipe is fixedly connected to the gear, and the bottom of the vertical pipe is threadedly connected to the screw. A slide groove is opened on the screw along its own length direction. One end of the limit rod is fixedly connected to the support bar, and the other end is located in the slide groove and is arranged to slide relative to the screw along the length direction of the slide groove. The end of the screw away from the vertical pipe is fixedly connected to the first brush head, and the rack is fixed on the inner wall of the water storage chamber facing the connecting bar. The rack is arranged along the length direction of the drainage hole, and the gear is meshed with the rack.

[0009] By adopting the above technical solution, the lever drives the supporting bar to move horizontally, and the supporting bar drives the gear to move through the vertical tube. Since the gear and the rack are meshing, the gear rotates while moving horizontally, so that the vertical tube rotates relative to the supporting bar. Since the limit rod limits the rotation of the screw rod and the opening of the slide groove forces the screw rod to slide relative to the vertical tube, the lifting and lowering of the first brush head is finally achieved.

[0010] Optionally, a ventilation tube is fixed on the inner wall of the bottom of the water storage chamber, and the ventilation tube connects the outside with the inside of the water storage chamber.

[0011] By adopting the above technical solution, the opening of the air vent allows external air to enter the water storage chamber, thereby balancing the air pressure inside the water storage chamber and facilitating the rapid discharge of accumulated water in the water storage chamber.

[0012] Optionally, two drainage holes are provided, and the air vent is located between the two drainage holes.

[0013] By adopting the above technical solution, when one of the drainage holes is blocked, the other drainage hole can still drain water, and cooperate with the cleaning component to achieve the effect of double drainage guarantee.

[0014] Optionally, a second brush head and a second lifting component are provided on the supporting bar, and the first brush head and the second brush head are distributed at both ends of the length direction of the supporting bar, and the second lifting component is used to control the lifting of the second brush head; the supporting bar is an arc-shaped bar with the arc-shaped concave surface facing the side of the air tube, the air tube is cylindrical, and the lever passes through the supporting bar and is located in the middle of the supporting bar, and the lever is the rotating axis of the supporting bar; after the supporting bar passes through the air tube and the connecting bar, the supporting bar changes from being close to the rack at one end to being close to the rack at the other end, and a magnetic suction component for maintaining the posture of the supporting bar is provided between the supporting bar and the connecting bar.

[0015] By adopting the above technical solution, since there are two drain holes and the air tube is located between the two drain holes, the cleaning component moves from the farthest end of the drain hole to the direction close to the air tube. At this time, the first brush head or the second brush head is initially located in one of the drain holes. For example, the first brush head is located in the drain hole. As it gradually approaches the air tube, the first brush head gradually rises while cleaning the drain hole. When the supporting bar passes between the air tube and the connecting bar, the first brush head has completely left the inside of the drain hole. After the supporting bar passes between the air tube and the connecting bar, the first brush head moves toward the connecting bar, and the second brush head moves away from the connecting bar and finally stops directly above the drain hole. As the supporting bar continues to move, the second brush head begins to descend and cleans the inside of the remaining drain hole, achieving the effect of cleaning both drain holes with a single-trip movement of the lever.

[0016] Optionally, the magnetic attraction component includes a magnet and a metal bar, the metal bar is fixed on the connecting bar, the length direction of the metal bar is arranged along the horizontal sliding direction of the supporting bar, and two magnets are respectively fixed at the ends of the supporting bar, and the magnets are magnetically attracted to the metal bar.

[0017] By adopting the above technical solution, whether the gear in the first lifting assembly is meshing with the rack or the gear in the second lifting assembly is meshing with the rack, the adsorption and sliding of the magnet and the metal strip can ensure the stable meshing of the gear and the rack.

[0018] Optionally, a positioning rubber seat is fixed on the inner frame, the positioning rubber seat is located between the inner frame and the outer frame, the positioning rubber seat is away from the end of the inner frame and abuts against the top of the connecting strip, and a slot for placing the lever is opened on the positioning rubber seat.

[0019] By adopting the above technical solution, when the lever does not need to be moved, the lever is placed in the slot, and the positioning rubber seat not only limits the position of the lever, but also strengthens the seal between the inner frame and the outer frame.

[0020] Optionally, the cleaning component, the first lifting component and the second lifting component are all made of plastic materials.

[0021] By adopting the above technical solution, the selection of plastic material can avoid the problem of being unable to rotate or slide due to rust, thereby ensuring the smooth use of the cleaning component, the first lifting component and the second lifting component.

[0022] Optionally, a friction pad is fixed to the upper ring sleeve of the riser, and the friction pad is located between the riser and the bearing bar.

[0023] By adopting the above technical solution, when the vertical pipe does not need to rotate relative to the bearing bar, the friction pad provides friction resistance, so that the vertical pipe can maintain a stable posture after the gear is separated from the rack, which is convenient for the next smooth engagement of the gear and the rack.

[0024] In a second aspect, the present application provides a construction method for a window frame waterproof structure, which adopts the following technical solution: A construction method for a window frame waterproof structure comprises the following steps: S1. A waterproof layer is applied on both the outer frame and the inner frame; S2, frame installation; S3, the first lifting assembly, the cleaning assembly and the connecting strip are installed at corresponding positions; S4, inner frame installation.

[0025] By adopting the above technical solution, the waterproof effect of the outer frame and the inner frame itself is increased by the waterproof layer. The inevitable problem of water seepage due to aging of the sealing strip is overcome by ensuring a smooth drainage channel and timely cleaning of the drainage holes on the outer frame by the cleaning component. The waterproofness of the window itself and the smooth drainage ensure the waterproof effect of the window on the interior.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. The setting of the cleaning component overcomes the problem that the gap at the top of the outer frame is not enough for the operator to easily place the tool for cleaning, so that the operator can easily clean the drainage hole; 2. The cleaning assembly, the second brush head, the air vent, the first lifting assembly and the second lifting assembly are arranged in coordination, so that the two drainage holes can be cleaned with one single movement of the lever; 3. The setting of the magnetic suction component ensures that the posture of the load-bearing bar is maintained stably during the sliding process. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application; Figure 2 is a vertical cross-sectional view of an embodiment of the present application; Figure 3 It is a partial structural schematic diagram showing only the connecting strip and part of the outer frame forming the water storage chamber; Figure 4This is a partial structural cross-sectional view showing the location of the drainage hole and the vent pipe; Figure 5 This is a schematic diagram showing the use of the first brush head; Figure 6 yes Figure 5 Enlarged view of part A; Figure 7 This is a partial structural diagram showing the location of the card slot.

[0028] Explanation of the reference numerals in the accompanying drawings: 1. outer frame; 11. drainage hole; 12. water storage chamber; 2. inner frame; 21. positioning rubber seat; 22. slot; 23. friction pad; 3. connecting strip; 31. long hole; 32. groove; 4. cleaning assembly; 41. lever; 42. bearing bar; 43. first brush head; 5. first lifting assembly; 51. gear; 52. rack; 53. vertical pipe; 54. screw; 541. slide groove; 55. limiting rod; 6. air vent; 7. second brush head; 71. second lifting assembly; 8. magnetic suction assembly; 81. magnet; 82. metal strip. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-Figure 7 This application is described in further detail.

[0030] The embodiment of the present application discloses a window frame waterproof structure.

[0031] refer to Figure 1 and Figure 2 A window frame waterproof structure includes an outer frame 1 and an inner frame 2, wherein the outer frame 1 is hinged with the inner frame 2, that is, the window frame is an open window. A connecting strip 3 is embedded and connected to the outer frame 1, wherein the length direction of the connecting strip 3 is arranged along the length direction of the bottom edge of the outer frame 1, and the connecting strip 3 is located between the outer frame 1 and the inner frame 2. A positioning rubber seat 21 is fixed to the inner frame 2, wherein the length direction of the positioning rubber seat 21 is arranged along the length direction of the connecting strip 3, and the positioning rubber seat 21 is arranged vertically and located between the inner frame 2 and the outer frame 1. The top of the positioning rubber seat 21 is fixedly connected to the inner frame 2, and the bottom abuts against the top of the connecting strip 3.

[0032] refer to Figure 2 , Figure 3 and Figure 4 The side wall of the connecting strip 3 cooperates with the vertical outer wall of the outer frame 1 and the horizontal partition inside the outer frame 1 to form a water storage chamber 12, and the top of the water storage chamber 12 is part of the bottom of the inner frame 2. A drainage hole 11 is provided on the outer frame 1, and the drainage hole 11 is located at the bottom of the water storage chamber 12. The length direction of the drainage hole 11 is opened along the length direction of the bottom edge of the outer frame 1. There are two drainage holes 11 and they are opened at intervals along the length direction of the bottom edge of the outer frame 1. A ventilation pipe 6 is provided between the two drainage holes 11. The ventilation pipe 6 is vertically fixed on the inner wall of the bottom of the water storage chamber 12, and the ventilation pipe 6 connects the inside of the water storage chamber 12 with the outside space. The ventilation pipe 6 is cylindrical.

[0033] refer to Figure 3 The connecting strip 3 is provided with a long hole 31 and a groove 32. The groove 32 is provided at the vertical side wall of the connecting strip 3 and is located at the vertical side wall of the water storage chamber 12. The notch of the groove 32 faces the inside of the water storage chamber 12. The groove 32 is provided along the length direction of the connecting strip 3. The long hole 31 is provided along the vertical direction. The long hole 31 passes through the top of the connecting strip 3 to the groove 32. The long hole 31 is provided along the length direction of the connecting strip 3.

[0034] refer to Figure 3 , Figure 4 and Figure 5 The connecting strip 3 is provided with a cleaning assembly 4, which includes a lever 41, a bearing strip 42 and a first brush head 43. The lever 41 is vertical, and passes through the long hole 31. The lever 41 slides in the long hole 31 along the length direction of the long hole 31. The bearing strip 42 is an arc-shaped strip, and the arc-shaped concave surface of the bearing strip 42 is arranged toward the inner side of the water storage chamber 12. The middle of the bearing strip 42 is always located in the groove 32. The lever 41 passes through the bearing strip 42 and the penetration position is located in the middle of the bearing strip 42. The bearing strip 42 rotates relative to the lever 41, that is, the lever 41 is the rotation axis of the bearing strip 42 relative to the connecting strip 3. The bearing strip 42 slides relative to the groove 32 following the lever 41 in the groove 32. The second brush head 7 is arranged on the supporting bar 42, and the first brush head 43 and the second brush head 7 are distributed at both ends of the supporting bar 42. The first brush head 43 and the second brush head 7 are both slidably arranged on the supporting bar 42, and the sliding direction is along the vertical direction.

[0035] refer to Figure 5 and Figure 6 A first lifting assembly 5 and a second lifting assembly 71 are provided on the supporting bar 42. The first lifting assembly 5 is located at the first brush head 43, and the second lifting assembly 71 is located at the second brush head 7. The first brush head 43 and the second brush head 7 have the same shape and structure.

[0036] refer to Figure 3 and Figure 5The first lifting assembly 5 includes a gear 51, a rack 52, a vertical pipe 53, a screw 54 and a limiting rod 55. The vertical pipe 53 vertically penetrates the bearing bar 42 and is arranged to rotate relative to the bearing bar 42. The top of the vertical pipe 53 is fixedly connected to the gear 51. The diameter of the gear 51 is larger than the diameter of the vertical pipe 53. The bottom of the vertical pipe 53 is threadedly connected to the screw 54, that is, the top of the screw 54 is located inside the vertical pipe 53. A slide groove 541 is provided on the screw 54 along its length direction. One end of the limiting rod 55 is fixedly connected to the bottom of the bearing bar 42, and the other end is located in the slide groove 541 and slides relative to the screw 54 along the length direction of the slide groove 541. The end of the screw 54 away from the vertical pipe 53 is fixedly connected to the first brush head 43. The rack 52 is fixed on the inner wall of the water storage chamber 12 facing the groove 32. The rack 52 is arranged along the length direction of the drainage hole 11. The gear 51 is meshed with the rack 52.

[0037] refer to Figure 5 and Figure 6 The difference between the second lifting assembly 71 and the first lifting assembly 5 is that the second lifting assembly 71 does not have a rack 52. The gear 51 in the second lifting assembly 71 is also used in conjunction with the rack 52 in the first lifting assembly 5, and the bottom end of the screw 54 in the second lifting assembly 71 is fixedly connected to the second brush head 7.

[0038] refer to Figure 3 , Figure 5 and Figure 6 A magnetic attraction component 8 is provided between the bearing bar 42 and the connecting bar 3, and the magnetic attraction component 8 includes a metal bar 82 and a magnet 81. The metal bar 82 is fixed at the bottom of the groove 32, and the metal bar 82 is arranged along the length direction of the connecting bar 3. The metal bar 82 can be made of iron, and the surface of the metal bar 82 is rust-proofed. Two magnets 81 are provided and distributed at both ends of the bearing bar 42, and the magnets 81 are fixed on the arc-shaped convex side wall of the bearing bar 42 facing the bottom of the groove 32.

[0039] refer to Figure 5 and Figure 6 A friction pad 23 is fixed to the upper ring of the vertical pipe 53, and the friction pad 23 is located between the vertical pipe 53 and the bearing bar 42. The cleaning assembly 4, the first lifting assembly 5 and the second lifting assembly 71 are all made of plastic materials.

[0040] refer to Figure 7 A slot 22 is provided on the positioning rubber seat 21 , and the slot 22 is used for the top end of the lever 41 to be inserted.

[0041] The following is an introduction to the usage status, initial status: the inner frame 2 is in a closed state relative to the outer frame 1, the top of the lever 41 is located in the slot 22, the first brush head 43 is located in one of the drainage holes 11 and is located at the farthest end of the drainage hole 11 from the air vent 6, the gear 51 in the first lifting assembly 5 is engaged with the rack 52, the second brush head 7 and the second lifting assembly 71 are both located in the groove 32 and the magnet 81 near the second brush head 7 is magnetically adsorbed to the metal strip 82.

[0042] Start cleaning: open the inner frame 2, at this time the lever 41 is passively disengaged from the slot 22, the operator pushes the lever 41, the lever 41 drives the supporting bar 42 to move toward the direction close to the air permeable tube 6, the first brush head 43 starts to slide in the corresponding drainage hole 11 and clean the inner wall of the drainage hole 11, the first brush head 43 starts to move upward while following the movement of the supporting bar 42, until the supporting bar 42 is about to abut against the outer wall of the permeable tube, the first brush head 43 is completely lifted out of the corresponding drainage hole 11. The bearing bar 42 continues to move and then passes through the water-permeable pipe and the connecting bar 3. The arc-shaped concave surface of the bearing bar 42 contacts the arc-shaped outer wall of the water-permeable pipe. The end of the bearing bar 42 where the first brush head 43 is located is pressed back into the groove 32, and the end where the second brush head 7 is located is turned out of the groove 32. At this time, the second brush head 7 is located above the corresponding drainage hole 11, and the magnet 81 near the first brush head 43 is magnetically adsorbed by the metal bar 82. The gear 51 in the second lifting component 71 is meshed with the rack 52 in the first lifting component 5. The lever 41 is continuously moved, and the second brush head 7 moves downward and enters the corresponding drainage hole 11 while following the movement of the bearing bar 42. The second brush head 7 cleans the inner wall of the corresponding drainage hole 11 until the lever 41 slides to the end of the long hole 31. At this time, the second brush head 7 also slides to the end of the corresponding drainage hole 11 away from the air-permeable pipe 6. A single-trip movement of the lever 41 cleans both drainage holes 11.

[0043] The embodiment of the present application also discloses a construction method of a window frame waterproof structure.

[0044] The following steps are involved: S1, the outer frame 1 and the inner frame 2 are all coated with a waterproof layer; the waterproof layer can be made of a polymer waterproof material, such as polyurethane or acrylate, to improve the weather resistance and aging resistance of the waterproof layer.

[0045] S2, outer frame 1 installation; S3, the first lifting assembly 5, the cleaning assembly 4 and the connecting strip 3 are installed in corresponding positions; S4, inner frame 2 installation.

[0046] The embodiments of this specific implementation method are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, all equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A window frame waterproof structure, comprising an outer frame (1) and an inner frame (2), characterized in that: Also includes A connecting strip (3) is snap-fitted and connected to the outer frame (1) and is located between the outer frame (1) and the inner frame (2); the connecting strip (3) cooperates with the vertical outer wall of the outer frame (1) to form a water storage cavity (12); a drainage hole (11) is provided at the bottom wall of the water storage cavity (12); and the drainage hole (11) is provided along the length direction of the bottom of the outer frame (1); A cleaning component (4) is slidably arranged on the connecting strip (3) and slides in a direction along the length of the drainage hole (11), the cleaning component (4) comprising a lever (41), a bearing strip (42) and a first brush head (43), the lever (41) being slidably arranged on the connecting strip (3) and sliding in a direction along the length of the drainage hole (11), the lever (41) penetrating the bearing strip (42) and sliding the bearing strip (42) relative to the connecting strip (3), the first brush head (43) being slidably arranged on the bearing strip (42) and sliding in a direction reciprocating in a vertical direction; The first lifting component (5) is arranged in the water storage chamber (12) and is used to control the lifting and lowering of the first brush head (43).

2. A window frame waterproof structure according to claim 1, characterized in that: The first lifting assembly (5) comprises a gear (51), a rack (52), a vertical pipe (53), a screw (54) and a limiting rod (55); the vertical pipe (53) vertically penetrates the bearing bar (42) and is arranged to rotate relative to the bearing bar (42); the top of the vertical pipe (53) is fixedly connected to the gear (51); the bottom of the vertical pipe (53) is threadedly connected to the screw (54); a slide groove (541) is provided on the screw (54) along its length direction; and the limiting rod (55) is provided with a screw rod (541). 5) one end is fixedly connected to the bearing bar (42), the other end is located in the slide groove (541) and is slidably arranged relative to the screw rod (54) along the length direction of the slide groove (541), the end of the screw rod (54) away from the vertical pipe (53) is fixedly connected to the first brush head (43), the rack (52) is fixed on the inner wall of the water storage chamber (12) facing the connecting bar (3), the rack (52) is arranged along the length direction of the drainage hole (11), and the gear (51) is meshed with the rack (52).

3. A window frame waterproof structure according to claim 2, characterized in that: A ventilation tube (6) is fixed on the inner wall of the bottom of the water storage chamber (12), and the ventilation tube (6) communicates the outside with the inside of the water storage chamber (12).

4. A window frame waterproof structure according to claim 3, characterized in that: Two drainage holes (11) are provided, and the air permeable tube (6) is located between the two drainage holes (11).

5. A window frame waterproof structure according to claim 4, characterized in that: The bearing bar (42) is provided with a second brush head (7) and a second lifting assembly (71); the first brush head (43) and the second brush head (7) are distributed at both ends of the bearing bar (42) in the length direction; the second lifting assembly (71) is used to control the lifting of the second brush head (7); the bearing bar (42) is in the shape of an arc strip, and the arc concave surface faces the side of the air vent (6); the air vent (6) is in the shape of a cylinder; the lever (41) passes through the bearing bar (42) and is located in the middle of the bearing bar (42); the lever (41) is the rotation axis of the bearing bar (42); after the bearing bar (42) passes through the air vent (6) and the connecting bar (3), the bearing bar (42) changes from a shape where one end is close to the rack (52) to a shape where the other end is close to the rack (52); a magnetic attraction assembly (8) for maintaining the posture of the bearing bar (42) is provided between the bearing bar (42) and the connecting bar (3).

6. A window frame waterproof structure according to claim 5, characterized in that: The magnetic attraction component (8) comprises a magnet (81) and a metal strip (82), wherein the metal strip (82) is fixed on the connecting strip (3), the length direction of the metal strip (82) is arranged along the horizontal sliding direction of the bearing strip (42), and the magnet (81) is provided with two portions respectively fixed on the ends of the bearing strip (42), and the magnet (81) and the metal strip (82) are magnetically attracted.

7. The window frame waterproof structure according to claim 1, characterized in that: A positioning rubber seat (21) is fixed on the inner frame (2), the positioning rubber seat (21) is located between the inner frame (2) and the outer frame (1), the positioning rubber seat (21) is away from the end of the inner frame (2) and abuts against the top of the connecting strip (3), and a slot (22) for placing the shifting rod (41) is provided on the positioning rubber seat (21).

8. The window frame waterproof structure according to claim 5, characterized in that: The cleaning component (4), the first lifting component (5) and the second lifting component (71) are all made of plastic material.

9. A window frame waterproof structure according to claim 2, characterized in that: A friction pad (23) is fixed to the upper ring sleeve of the stand pipe (53), and the friction pad (23) is located between the stand pipe (53) and the bearing bar (42).

10. A construction method for a window frame waterproof structure according to claim 1, characterized in that: The following steps are involved: S1, the outer frame (1) and the inner frame (2) are all coated with a waterproof layer; S2, outer frame (1) installation; S3, the first lifting assembly (5), the cleaning assembly (4) and the connecting strip (3) are installed in corresponding positions; S4. Install the inner frame (2).

Citation Information

Patent Citations

  • Windowsill waterproof building structure

    CN115898227A

  • Novel aluminum alloy door and window waterproof heat insulation structure

    CN210685734U

  • Energy-saving door and window device capable of draining water from outer side of lower opening of door and window

    CN213115979U

  • Hydrophobic aluminum alloy door and window

    CN213510210U

  • Anti-seepage aluminum alloy window convenient to drain water

    CN216130831U

Cited By

  • Waterproof door and window frames

    TWI915133B