Multi-link intelligent cooperative power generation dispatching method for gas turbine combined cycle system
Through the multi-link intelligent collaborative power generation scheduling method, the mechanism model and deep reinforcement learning technology are used to solve the problem that traditional scheduling methods cannot meet the complex needs of modern power systems, and high-precision grid instruction tracking and cost reduction are achieved.
Patent Information
- Application Number
- CN202411200971.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-15
AI Technical Summary
The traditional gas turbine combined cycle system scheduling method cannot meet the complex needs of modern power systems and cannot achieve accurate tracking and response to power grid instructions, resulting in high operating costs and insufficient flexibility in the system.
Using multi-link intelligent collaborative power generation scheduling method, through the establishment of mechanism models, designing Markov decision-making process and layered deep reinforcement learning method, high-precision online tracking of power generation instructions and system adaptive training, reducing the combined cycle power generation system of gas turbines Running cost.
It realizes high-precision grid power generation instruction tracking and intelligent coordinated system scheduling, reduces the operating cost of the gas turbine combined cycle power generation system, and improves the system's response ability and operational flexibility to grid instructions.
Smart Images

Figure CN118966012A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to an intelligent collaborative power generation dispatching method, and more specifically, to a multi-link intelligent collaborative power generation dispatching method for a gas turbine combined cycle system, belonging to the technical field of gas turbine power generation control. Background Art
[0002] With the continuous growth of global energy demand and the enhancement of environmental protection awareness, the efficient management and low-carbon development of major power generation systems have become the focus of attention of all countries. Combined cycle gas turbine (CCGT) system occupies an important position in modern power production due to its high efficiency, flexibility and relatively clean characteristics. CCGT system improves energy utilization efficiency and reduces carbon emissions by combining the advantages of gas turbine and steam turbine. However, with the continuous development of the power market and the popularization of smart grids, the requirements for flexibility and accuracy of power system operation are increasing. Traditional dispatching methods can no longer meet the complex needs of modern power systems. It is urgent to introduce advanced intelligent dispatching technology to achieve accurate tracking and response to grid commands. Summary of the invention
[0003] The purpose of the present invention is to provide a multi-link intelligent collaborative power generation scheduling method for a gas turbine combined cycle system, which has the technical characteristics of being able to realize intelligent collaborative power generation scheduling of a gas turbine combined cycle power generation system and reduce the system operation cost.
[0004] In order to achieve the above object, the present invention is implemented by the following technical solutions:
[0005] The present invention provides a multi-link intelligent coordinated power generation scheduling method for a gas turbine combined cycle system, characterized in that the method comprises the following steps:
[0006] Step 1) establishing a mechanism model of each device in the gas turbine combined cycle power generation system, and comprehensively analyzing the operation and regulation characteristics of the equipment to determine the key monitoring state variables and power generation scheduling variables of the system; the operation and regulation characteristics of the equipment are the physical characteristics of each device in the gas turbine combined cycle power generation system under different operating states and the scheduling range that can be met;
[0007] Step 2) Taking grid command tracking accuracy and fuel consumption as the objectives, and taking power supply and demand balance and equipment safe operation boundary constraints as the constraints, a scheduling optimization problem for a gas turbine combined cycle power generation system is established;
[0008] Step 3) Design a reward function that includes an error tolerance mechanism and comprehensive energy efficiency, establish a Markov decision process for the gas turbine combined cycle power generation system (the sequential decision problem of power generation scheduling requires the establishment of a Markov decision process for system operation), and transform the optimization problem into a sequential decision problem of power generation scheduling;
[0009] Step 4) Design a hierarchical deep reinforcement learning method to perform adaptive and efficient training of the gas turbine combined cycle power generation system in a high-dimensional state decision space, perform high-precision online tracking of power grid power generation instructions, realize intelligent collaborative power generation scheduling of the gas turbine combined cycle power generation system, and reduce the operating cost of the gas turbine combined cycle power generation system.
[0010] Preferably, the equipment in the gas turbine combined cycle power generation system includes a gas turbine, a waste heat boiler (referred to as boiler), a steam drum, a steam turbine, and a generator. The rotating shafts of the gas turbine, steam turbine, and generator are connected in sequence. The steam drum includes a high-pressure drum, a medium-pressure drum, and a low-pressure drum. The steam turbine includes a high-pressure cylinder, a medium-pressure cylinder, and a low-pressure cylinder whose rotating shafts are connected in sequence. The waste heat boiler is connected to the high-pressure drum, the medium-pressure drum, and the low-pressure drum through an independent No. 1 pipeline connected to a feed water pump, respectively. The high-pressure drum, the medium-pressure drum, and the low-pressure drum are connected to the high-pressure cylinder, the medium-pressure cylinder, and the low-pressure cylinder through a No. 2 pipeline, respectively, and a steam regulating valve is connected to the No. 2 pipeline connected to the high-pressure cylinder and the medium-pressure cylinder; the steam drum is a heat energy storage device, which reflects the storage state of internal heat energy through the relative water level of the steam drum; the waste heat boiler utilizes the waste heat of flue gas by a separate heat pipe heat exchanger in the boiler;
[0011] Among them, the mechanism model of the gas turbine is:
[0012]
[0013] Among them, η GT is the power generation efficiency of the gas turbine, q fq is the natural gas consumption of the gas turbine, in m 3 / s; Q is the lower calorific value of natural gas, in J / m 3 ; The power generation power of the gas turbine is simulated according to the mechanism model of the gas turbine under variable operating conditions. The power generation efficiency characteristic curve of the gas turbine can be obtained by setting the equipment operation characteristic boundary. Then, the scheduling model can be obtained by fitting the characteristic curve based on the multivariate nonlinear regression method:
[0014] η GT =6.345·z 3 -187.495 z 2 +1841.712 z-59795.117
[0015] Where z is the compression ratio of the air.
[0016] Preferably, the mechanism model of the waste heat boiler is:
[0017] Q=kAΔt m
[0018] Q h =c p ·q m ·Δt
[0019]
[0020] Where A is the total surface area of the waste heat boiler with fins, and k is the heat transfer coefficient in m 2 ℃ / W, Δt m is the logarithmic mean temperature difference; c p is the specific heat capacity, the unit is KJ / (kg·℃), q m is the fluid mass flow rate, Δt is the temperature difference, Q h is the heat transfer between fluids; Δt max is the maximum temperature difference between the fluid inlet and outlet, Δt min is the minimum temperature difference between the fluid inlet and outlet; R b is the thermal resistance of the pipe wall, R w is the thermal resistance of dust accumulation, R h is the heat transfer resistance in the heat pipe, R r is the flue gas convection thermal resistance, in m 2 K / W, according to the mechanism model of the waste heat boiler, the equipment operation simulation is carried out. By setting the equipment operation characteristic boundary, the flue gas temperature-heat exchange characteristic curve of the waste heat boiler and the relationship diagram between the relative value of the heat exchange of steam and flue gas at each level and the load characteristic of the cycle unit can be obtained. Then, the scheduling model can be obtained by fitting the characteristic curve based on the multivariate nonlinear regression method:
[0021] T h =-0.000089Q h 2 +1.0086Q h +3.6703
[0022]
[0023] Among them, T h is the flue gas temperature, Q y,l , Q y,m and Q y,h are the proportion of heat absorption of low, medium and high pressure flue gas, Q z,l , Q z,m and Q z,h are the proportion of heat absorption of low, medium and high pressure steam, L R is the load of the circulating unit.
[0024] Preferably, the mechanism model of the steam drum satisfies:
[0025]
[0026] in, Indicates the relative change of liquid level, V W is the volume of liquid in the drum, I P is the thermal inertia of the evaporation system, which is related to the drum pressure, volume and metal mass, ρ W and ρ S are the densities of saturated water and saturated steam respectively; W is the feed water flow rate, D is the steam flow rate, Q is the heat absorbed from the boiler, T is the residence time of the bubbles in the water, v s is the saturated specific heat capacity of the gas, P b is the pressure inside the drum; h s and h w are the enthalpy values of saturated steam and saturated water, respectively, c j is the specific heat of metal, t j is the saturation temperature, m j is the effective metal mass, γ is the latent heat of vaporization; m1 and m2 are the amplification coefficients, u1 and u2 are the openings of the steam valve and the water inlet valve, and P1 is the pressure of the regulating stage.
[0027] Preferably, the mechanism model of the steam turbine satisfies:
[0028]
[0029] Where W is the work done by the steam turbine, η VT is the efficiency of the steam turbine, is the gas mass entering the steam turbine, h in and h out Respectively represent the enthalpy of steam at the inlet and outlet of the steam turbine, and the quality parameters of the steam turbine It is expressed as:
[0030]
[0031] Among them, T and P are the temperature and pressure of the gas at the steam turbine inlet, respectively. The equipment operation simulation is carried out according to the mechanism model of the steam turbine. The efficiency-quality parameter characteristic curve of the steam turbine can be obtained by setting the equipment operation characteristic boundary. Then, the scheduling model can be obtained by fitting the characteristic curve based on the multivariate nonlinear regression method:
[0032]
[0033] Preferably, the key monitoring state variables established in step 1) are:
[0034] State variables The state variable formula corresponds to time, electrical load, low-pressure drum relative water level, medium-pressure drum relative water level, and high-pressure drum relative water level in sequence;
[0035] The generation scheduling variables established in step 1) are:
[0036] Scheduling variable a t =[q fq ,q HP ,q IP ,q CP ,u HP ,u IP ] T The scheduling variable formula corresponds to the natural gas quality of the combustion chamber, the water supply of the high-pressure feedwater pump, the water supply of the medium-pressure feedwater pump, the water supply of the condensate pump, the opening of the high-pressure steam valve, and the opening of the medium-pressure steam valve.
[0037] Preferably, in step 2), a scheduling optimization problem of a gas turbine combined cycle power generation system is established, which includes establishing a power balance constraint, establishing a safe operation constraint, and establishing an objective function;
[0038] Among them, the power balance constraint is established:
[0039]
[0040] in, is the power generation capacity of the gas turbine, and They are the power generation of the low-pressure cylinder, medium-pressure cylinder and high-pressure cylinder respectively. is the electrical load, It is the situation of over-generation (positive) or under-generation (negative);
[0041] Establish safe operating constraints:
[0042] q fq,min ≤q fq ≤q fq,min
[0043] m LP,min ≤m LP ≤m LP,max
[0044] m IP,min ≤m IP ≤m IP,max
[0045] m HP,min ≤m HP ≤m HP,max
[0046] m b,min ≤mb ≤m b,max
[0047] h LP,min ≤h LP ≤h LP,max
[0048] h IP,min ≤h IP ≤h IP,max
[0049] h HP,min ≤h HP ≤h HP,max
[0050] Among them, q fq,min and q fq,min are the minimum and maximum values of natural gas input to the combustion chamber respectively; m LP,min , m IP,min and m HP,min are the minimum values of the three types of steam turbine inlet steam quality, low, medium and high, respectively, m LP,max , m IP,max and m HP,max are the maximum values of the inlet steam quality of the three steam turbines; m b,min and m b,max are the minimum and maximum values of the steam quality entering the waste heat boiler, h LP,min ,h IP,min and h HP,min are the minimum values of the relative water levels of the three drums, h LP,max ,h IP,max and h HP,max are the maximum values of the relative water levels of the three types of steam drums;
[0051] Establish the objective function:
[0052]
[0053] Where c0 is the penalty cost for excess or insufficient power generation in the system, c fq,t ·q fq is the cost of purchasing natural gas, c fq,t is the price of natural gas, T is the total dispatching time. By setting the objective function, the tracking accuracy of power grid power generation instructions can be improved, the amount of natural gas consumed by the system power generation can be reduced, and the power generation dispatching cost can be reduced.
[0054] Preferably, the error tolerance mechanism in the reward function in step 3) is to improve the training efficiency of the neural network. When the error between the system power generation and the grid signal is less than the preset tolerance condition, the current scheduling strategy is directly retained without adding action exploration noise; the comprehensive energy efficiency in the reward function in step 3) includes the system's power generation scheduling cost, the relative water level change of the medium and high pressure steam drums, and the power generation balance.
[0055] The setting of the reward function in this application can not only meet the optimization requirements of the objective function for the tracking accuracy of power grid power generation instructions and the dispatching cost, but also optimize the relative water level of the drum, thereby optimizing the overall energy efficiency of the system and maintaining continuous and stable operation capabilities. At the same time, the error tolerance mechanism is also more likely to retain the better dispatching strategy in the early stage of training, improve the training efficiency of the neural network, and ensure the adaptability of the gas turbine combined cycle power generation system to changes in power generation instructions.
[0056] Preferably, the Markov decision process of establishing the gas turbine combined cycle power generation system in step 3) includes: establishing a state space, establishing an action space, and establishing a reward function;
[0057] Create the state space:
[0058]
[0059] Among them, the state space s t Including time, electrical load, relative water level of low-pressure steam drum, relative water level of medium-pressure steam drum, and relative water level of high-pressure steam drum.
[0060] Building the action space:
[0061] a t =[q fq ,q HP ,q IP ,q CP ,u HP ,u IP ]
[0062] Among them, the action space includes the natural gas quality in the combustion chamber, the water supply of the high-pressure feed water pump, the water supply of the medium-pressure feed water pump, the water supply of the condensate pump, the opening of the high-pressure steam valve and the opening of the medium-pressure steam valve.
[0063] Create a reward function:
[0064]
[0065] Among them, the reward function r t Including system dispatch costs Cost of excess or insufficient generation High-pressure drum water level is too high or too low The water level of the medium-pressure drum is too high or too low and the relative water level status of the high-pressure and medium-pressure drums, and h HP,0 and h IP,0 are the initial relative water levels of the high-pressure drum and the medium-pressure drum, respectively, h HP,T and h IP,T They are the relative water levels of the high-pressure and medium-pressure drums after the scheduling is completed.
[0066] The setting of the reward function can not only meet the optimization requirements of the objective function for the tracking accuracy of the power grid power generation command and the dispatching cost, but also optimize the relative water level of the drum, thereby optimizing the overall energy efficiency of the system and maintaining continuous and stable operation capabilities. At the same time, the error tolerance mechanism is also more likely to retain the better dispatching strategy in the early stage of training, improve the training efficiency of the neural network, and ensure the adaptability of the gas turbine combined cycle power generation system to changes in power generation commands.
[0067] Based on the state space, action space and reward function of the above Markov decision process, the sequential decision problem of system power generation scheduling can be described as: at each time step of power generation scheduling, obtain the current key detection state s t , that is, time, electrical load, and relative water levels of high, medium and low drums, and output dispatch action a based on the dispatch decision rule t , namely the natural gas quality in the combustion chamber, the water supply of the high-pressure feed water pump, the water supply of the medium-pressure feed water pump, the water supply of the condensate pump, the opening of the high-pressure steam valve and the opening of the medium-pressure steam valve; after the system receives the dispatch instruction, the air compressor works first, absorbs and compresses air, and sends it into the combustion chamber, where the natural gas burns and produces high-temperature and high-pressure gas; at this time, the gas turbine begins to work and generate electricity due to gas expansion, and the exhaust gas is input into the boiler, becoming the heat source of the boiler, and the hot steam generated by the boiler is then input into the steam turbine to generate electricity, completing a combined cycle power generation process. After the dispatch instruction is executed, calculate the current reward r t , including dispatching cost, grid command tracking accuracy, drum water level, and new system status s t+1 The above process is repeated until the maximum number of training rounds is reached.
[0068] Preferably, step 4) includes establishing an upper strategy network P1, a lower strategy network P2, an evaluation network Q, and initializing a target upper strategy network P1' and a target lower strategy network P2' with the same weights, as well as a target evaluation network Q', wherein the input of the upper strategy network P1 is the key detection state of the gas turbine combined cycle power generation system, and the output is the power generation scheduling action (power generation strategy), the input of the evaluation network Q is the state and action, and the output is the power generation reward, including the scheduling cost, the power grid instruction tracking accuracy, and the drum water level, and the target network with the same weight is used to make the training process more stable and the convergence speed faster;
[0069] Design a hierarchical deep reinforcement learning method: decompose the single-step power generation decision-making task of the gas turbine combined cycle system into multiple subtasks, and form a top-bottom structure based on the upper strategy network P1 and the lower strategy network P2. The upper strategy network P1 is based on the key detection state s of the current gas turbine combined cycle system. t Select the best subtask π u After completing the single-step power generation decision task, the lower-level strategy network P2 outputs the power generation decision action a based on the current state and the best subtask output by the upper-level strategy network P1. t To execute subtasks; specifically, the upper network outputs the power generation strategy, and the lower network outputs the scheduling strategies of gas turbines, high-pressure drums and high-pressure feedwater pumps, medium-pressure drums and medium-pressure feedwater pumps, and condensate pumps; after executing the upper and lower layer decisions, the system generates electricity and interacts with the power grid to obtain feedback (reward) on the power generation situation and the new state of the system (St+1). For each time step of each training round, experience is stored based on the hierarchical deep reinforcement learning method, and judgment is made for the training network.
[0070] The neural network is trained in a large number of random scenarios. The average value of historical power grid power generation instruction data is used as a typical power generation scenario. Random normal distribution noise is added, and the noise value does not exceed 35% of the load value at the corresponding moment, thereby generating a set of power grid power generation instruction scenarios for training.
[0071] In order to improve the adaptability of the gas turbine combined cycle system to the changes in grid instructions during power generation, experience storage, environmental exploration, and network updates are performed based on the hierarchical deep reinforcement learning method for each time step of each training round. As the training continues, the parameters of the neural network are continuously optimized, the dispatching actions output by the strategy network are getting better and better, and the scoring of the evaluation network is getting more and more accurate. Correspondingly, the grid instruction tracking accuracy of the gas turbine combined cycle system is getting higher and higher, while the cost of power generation dispatching is continuously reduced.
[0072] After the neural network training is completed, the upper and lower strategy networks are saved to realize the multi-link intelligent collaborative power generation scheduling of the gas turbine combined cycle system. In the real-time operation scenario of the gas turbine combined cycle power generation system, the upper strategy network P1 decomposes the decision problem according to the current state of the gas turbine combined cycle power generation system and outputs the best sub-power generation strategy. The lower strategy network P2 makes a quick decision based on the best sub-power generation strategy and the current gas turbine combined cycle power generation system state input, outputs an efficient action strategy, tracks the power grid instructions in real time, realizes the intelligent collaborative power generation scheduling among the equipment in the gas turbine combined cycle power generation system, and reduces the system operation cost.
[0073] Beneficial effects: Compared with traditional scheduling methods, the present invention can transform the optimization problem into a sequential decision-making problem of power generation scheduling, can perform high-precision online tracking of power grid power generation instructions, realize intelligent collaborative power generation scheduling of the system, and reduce system operating costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0074] Figure 1 It is a schematic diagram of the structure of a gas turbine combined cycle power generation system in an embodiment of the present invention.
[0075] Figure 2 Schematic diagram of a hierarchical deep reinforcement learning algorithm in an embodiment of the present invention.
[0076] Figure 3 It is a typical daily power grid power generation command curve in an embodiment of the present invention.
[0077] Figure 4 It is the cumulative reward training result of the hierarchical deep reinforcement learning algorithm in the embodiment of the present invention.
[0078] Figure 5 This is a typical daily drum water level scheduling result in an embodiment of the present invention.
[0079] Figure 6 This is the power generation result of a typical Rixia gas turbine combined cycle system in an embodiment of the present invention.
[0080] Figure 7 This is a flow chart of the multi-link intelligent collaborative power generation scheduling method for the gas turbine system of the present invention. DETAILED DESCRIPTION
[0081] The following is in conjunction with the instruction manual Figure 1-7 , the present invention is further illustrated, but the present invention is not limited to the following embodiments.
[0082] Design principle of the present invention: The deep reinforcement learning technology in this application combines the data fitting ability of neural networks to realize power grid command tracking. Hierarchical deep reinforcement learning (HDRL) significantly reduces the complexity of the action space by decomposing complex decision-making tasks into several subtasks and constructing a policy network to respond to subtask requirements. Hierarchical deep reinforcement learning avoids the difficulties of traditional deep reinforcement learning in policy optimization, allowing the algorithm to learn more accurately and flexibly, thereby greatly improving the tracking accuracy of the gas turbine combined cycle system for power grid commands while reducing operating costs.
[0083] like Figure 1The figure shows a specific embodiment of a gas turbine combined cycle power generation system in the present invention, wherein the gas turbine combined cycle power generation system comprises a gas turbine, a waste heat boiler (with a flue gas outlet), a steam drum, a steam turbine, and a generator. The gas turbine is connected to a combustion chamber into which natural gas is introduced and an air compressor into which air is introduced. The rotating shafts of the gas turbine, the steam turbine, and the generator are connected in sequence to achieve coaxiality. The steam drum comprises a high-pressure drum, a medium-pressure drum, and a low-pressure drum. The steam turbine comprises a high-pressure cylinder, a medium-pressure cylinder, and a low-pressure cylinder connected in sequence by rotating shafts. The waste heat boiler is connected to the high-pressure drum, the medium-pressure drum, and the low-pressure drum through an independent No. 1 pipeline connected to a feed water pump. The low-pressure steam drum is connected, wherein the high-pressure steam drum is connected to a high-pressure water pump and is connected to a condensate pump, the medium-pressure steam drum is connected to a medium-pressure feed water pump and is connected to the condensate pump, the low-pressure steam drum is directly provided with pressure by the condensate pump, the condensate pump is connected to a condenser, the condenser is connected to the low-pressure cylinder, the high-pressure steam drum, the medium-pressure steam drum and the low-pressure steam drum are respectively connected to the high-pressure cylinder, the medium-pressure cylinder and the low-pressure cylinder through the No. 2 pipeline, and the No. 2 pipeline connected to the high-pressure cylinder and the medium-pressure cylinder is connected with a steam regulating valve, the high-pressure main steam enters the high-pressure cylinder, the medium-pressure main steam enters the medium-pressure cylinder, the low-pressure main steam enters the low-pressure cylinder, and the high-pressure main steam of the high-pressure cylinder is exhausted into the outlet end of the medium-pressure feed water pump.
[0084] The specifications and constraints of the main equipment are shown in Table 1, and the detailed specifications of the condenser are given in Table 2.
[0085] Table 1 Specifications of each device
[0086]
[0087] Table 2 Condenser structural parameters
[0088]
[0089]
[0090] The following specific embodiments are based on Figure 1 The structure is expanded.
[0091] In this embodiment, the gas turbine satisfies the Joule cycle and the Rankine cycle, and its mechanism model satisfies:
[0092]
[0093] Among them, η GT is the power generation efficiency of the gas turbine, q fq is the natural gas consumption of the gas turbine, in m 3 / s; Q is the lower calorific value of natural gas, in J / m 3 ; The power generation power of the gas turbine is simulated according to the mechanism model of the gas turbine under variable operating conditions. The power generation efficiency characteristic curve of the gas turbine can be obtained by setting the equipment operation characteristic boundary. Then, the scheduling model can be obtained by fitting the characteristic curve based on the multivariate nonlinear regression method:
[0094] η GT =6.345·z 3 -187.495 z 2 +1841.712 z-59795.117
[0095] Where z is the compression ratio of the air.
[0096] In this embodiment, the waste heat boiler is mainly a separate heat pipe heat exchanger in the boiler that utilizes the waste heat of flue gas, and its mechanism model satisfies:
[0097] Q=kAΔt m
[0098] Q h =c p ·q m ·Δt
[0099]
[0100] Where A is the total surface area of the waste heat boiler with fins, and k is the heat transfer coefficient in m 2 ℃ / W, Δt m is the logarithmic mean temperature difference; c p is the specific heat capacity, the unit is KJ / (kg·℃), q m is the fluid mass flow rate, Δt is the temperature difference, Q h is the heat transfer between fluids; Δt max is the maximum temperature difference between the fluid inlet and outlet, Δt min is the minimum temperature difference between the fluid inlet and outlet; R b is the thermal resistance of the pipe wall, R w is the thermal resistance of dust accumulation, R h is the heat transfer resistance in the heat pipe, R r is the flue gas convection thermal resistance, in m 2 K / W, according to the mechanism model of the waste heat boiler, the equipment operation simulation is carried out. By setting the equipment operation characteristic boundary, the flue gas temperature-heat exchange characteristic curve of the waste heat boiler and the relationship diagram between the relative value of the heat exchange of steam and flue gas at each level and the load characteristic of the cycle unit can be obtained. Then, the scheduling model can be obtained by fitting the characteristic curve based on the multivariate nonlinear regression method:
[0101] T h =-0.000089Q h 2 +1.0086Q h+3.6703
[0102]
[0103] Among them, T h is the flue gas temperature, Q y,l , Q y,m and Q y,h are the proportion of heat absorption of low, medium and high pressure flue gas, Q z,l , Q z,m and Q z,h are the proportion of heat absorption of low, medium and high pressure steam, L R is the load of the circulating unit.
[0104] In this embodiment, the mechanism model of the steam drum satisfies:
[0105]
[0106] in, Indicates the relative change of liquid level, V W is the volume of liquid in the drum, I P is the thermal inertia of the evaporation system, which is related to the drum pressure, volume and metal mass, ρ W and ρ S are the densities of saturated water and saturated steam respectively; W is the feed water flow rate, D is the steam flow rate, Q is the heat absorbed from the boiler, T is the residence time of the bubbles in the water, v s is the saturated specific heat capacity of the gas, P b is the pressure inside the drum; h s and h w are the enthalpy values of saturated steam and saturated water, respectively, c j is the specific heat of metal, t j is the saturation temperature, m j is the effective metal mass, γ is the latent heat of vaporization; m1 and m2 are the amplification coefficients, u1 and u2 are the openings of the steam valve and the water inlet valve, and P1 is the pressure of the regulating stage.
[0107] In this embodiment, the mechanism model of the steam turbine satisfies:
[0108]
[0109] Where W is the work done by the steam turbine, η VT is the efficiency of the steam turbine, is the gas mass entering the steam turbine, h in and h out Respectively represent the enthalpy of steam at the inlet and outlet of the steam turbine, and the quality parameters of the steam turbine It is expressed as:
[0110]
[0111] Among them, T and P are the temperature and pressure of the gas at the steam turbine inlet, respectively. The equipment operation simulation is carried out according to the mechanism model of the steam turbine. The efficiency-quality parameter characteristic curve of the steam turbine can be obtained by setting the equipment operation characteristic boundary. Then, the scheduling model can be obtained by fitting the characteristic curve based on the multivariate nonlinear regression method:
[0112]
[0113] In this embodiment, the steam drum can be regarded as a heat storage device, and its relative water level reflects the storage state of internal heat energy, which is affected by both the feed water flow rate and the steam flow rate. Among them, the feed water flow rate is determined by the pipeline flow rate determined by each feed water pump, and the steam flow rate is related to the opening and closing degree of the steam valve. In addition, the steam flow rate has a decisive influence on the power generation capacity of the steam turbine, so that the power generation power of the three steam turbines can be calculated. Based on this, the key monitoring state variables are established as:
[0114] State variables The state variables (on the right side of the formula) include the corresponding time, electrical load, low-pressure drum relative water level, medium-pressure drum relative water level, and high-pressure drum relative water level.
[0115] For gas turbine combined cycle power generation systems, the feedwater flow rate of the feedwater pump and the opening of the steam valve need to be regarded as scheduling variables to accurately control the relative water level of the drum. In addition, the consumption of natural gas directly affects the power generation efficiency of the gas turbine, and the power generation power of the gas turbine can be controlled by adjusting the combustion amount of natural gas. Considering that the low-pressure drum lacks a dedicated valve for water level regulation, the feedwater flow rate of the condensate pump is not only crucial to ensuring the power generation efficiency of the unit at a macro level, but also plays a key role in maintaining the low-pressure drum water level within the limited constraints at a micro level. Based on this, the power generation scheduling variable is established as:
[0116] Scheduling variable a t =[q fq ,q HP ,q IP ,q CP ,u HP ,u IP ] T The scheduling variables (on the right side of the formula) include the corresponding natural gas quality of the combustion chamber, the water supply of the high-pressure feedwater pump, the water supply of the medium-pressure feedwater pump, the water supply of the condensate pump, the opening of the high-pressure steam valve, and the opening of the medium-pressure steam valve.
[0117] In this embodiment, a scheduling optimization problem of a gas turbine combined cycle power generation system is established, which includes establishing a power balance constraint, establishing a safe operation constraint, and establishing an objective function;
[0118] Among them, the power balance constraint is established:
[0119]
[0120] in, is the power generation capacity of the gas turbine, and They are the power generation of the low-pressure cylinder, medium-pressure cylinder and high-pressure cylinder respectively. is the electrical load, For over- or under-generation situations;
[0121] Establish safe operating constraints:
[0122] q fq,min ≤q fq ≤q fq,min
[0123] m LP,min ≤m LP ≤m LP,max
[0124] m IP,min ≤m IP ≤m IP,max
[0125] m HP,min ≤m HP ≤m HP,max
[0126] m b,min ≤m b ≤m b,max
[0127] h LP,min ≤h LP ≤h LP,max
[0128] h IP,min ≤h IP ≤h IP,max
[0129] h HP,min ≤h HP ≤h HP,max
[0130] Among them, q fq,min and q fq,min are the minimum and maximum values of natural gas input to the combustion chamber respectively; m LP,min , m IP,min and m HP,min are the minimum values of the three types of steam turbine inlet steam quality, low, medium and high, respectively, m LP,max , m IP,max and m HP,maxare the maximum values of the inlet steam quality of the three steam turbines; m b,min and m b,max are the minimum and maximum values of the steam quality entering the waste heat boiler, h LP,min ,h IP,min and h HP,min are the minimum values of the relative water levels of the three drums, h LP,max ,h IP,max and h HP,max are the maximum values of the relative water levels of the three types of steam drums;
[0131] Establish the objective function:
[0132]
[0133] Where c0 is the penalty cost for excess or insufficient power generation in the system, c fq,t ·q fq is the cost of purchasing natural gas, c fq,t is the price of natural gas, T is the total dispatching time. By setting the objective function, the tracking accuracy of power grid power generation instructions can be improved, the amount of natural gas consumed by the system power generation can be reduced, and the power generation dispatching cost can be reduced.
[0134] In this embodiment, the error tolerance mechanism in the reward function is to improve the training efficiency of the neural network. When the error between the system power generation and the grid signal is less than the preset tolerance condition, the current scheduling strategy is directly retained without adding action exploration noise; the comprehensive energy efficiency in the reward function includes the system's power generation scheduling cost, the relative water level changes of the medium and high pressure steam drums, and the power generation balance.
[0135] In this embodiment, the sequential decision-making problem of power generation dispatching requires the establishment of a Markov decision process for system operation, including:
[0136] Create the state space:
[0137]
[0138] Among them, the state space s t Including the corresponding time, electrical load, low-pressure drum relative water level, medium-pressure drum relative water level, and high-pressure drum relative water level in sequence;
[0139] Building the action space:
[0140] a t =[q fq ,q HP ,q IP ,q CP ,u HP ,u IP ]
[0141] The corresponding action spaces include the natural gas quality of the combustion chamber, the water supply of the high-pressure feed water pump, the water supply of the medium-pressure feed water pump, the water supply of the condensate pump, the opening of the high-pressure steam valve and the opening of the medium-pressure steam valve;
[0142] Create a reward function:
[0143]
[0144] Among them, the reward function r t Including system dispatch costs Cost of excess or insufficient generation High-pressure drum water level is too high or too low The water level of the medium-pressure drum is too high or too low and the relative water level status of the high-pressure and medium-pressure drums, and h HP,0 and h IP,0 are the initial relative water levels of the high-pressure drum and the medium-pressure drum, respectively, h HP,T and h IP,T They are the relative water levels of the high-pressure and medium-pressure drums after the scheduling is completed.
[0145] Based on the state space, action space and reward function of the Markov decision process, the sequential decision problem of system power generation scheduling in this application can be described as:
[0146] At each time step of power generation scheduling, obtain the current key detection state s t , that is, time, electrical load, and relative water levels of high, medium and low drums, and output dispatch action a based on the dispatch decision rule t , namely the natural gas quality in the combustion chamber, the water supply of the high-pressure feed water pump, the water supply of the medium-pressure feed water pump, the water supply of the condensate pump, the opening of the high-pressure steam valve and the opening of the medium-pressure steam valve; after the system receives the dispatch instruction, the air compressor works first, absorbs and compresses air, and sends it into the combustion chamber, where the natural gas burns and produces high-temperature and high-pressure gas; at this time, the gas turbine begins to work and generate electricity due to gas expansion, and the exhaust gas is input into the boiler, becoming the heat source of the boiler, and the hot steam generated by the boiler is then input into the steam turbine to generate electricity, completing a combined cycle power generation process. After the dispatch instruction is executed, calculate the current reward r t , including dispatching cost, grid command tracking accuracy, drum water level, and new system status s t+1 The above process is repeated until the maximum number of training rounds is reached.
[0147] In this embodiment, the hierarchical deep reinforcement learning method includes: establishing an upper policy network P1, a lower policy network P2, an evaluation network Q, and initializing a target upper policy network P1' and a target lower policy network P2' with the same weights, as well as a target evaluation network Q'. The input of the upper policy network P1 is the key detection state of the gas turbine combined cycle power generation system, and the output is the power generation scheduling action. The input of the evaluation network Q is the state and action, and its output is the power generation reward, including the scheduling cost, the power grid instruction tracking accuracy, and the drum water level. The target network with the same weight is used to make the training process more stable and the convergence speed faster.
[0148] The hierarchical deep reinforcement learning algorithm decomposes the single-step power generation decision-making task of the gas turbine combined cycle system into multiple subtasks. Based on the upper strategy network P1 and the lower strategy network P2, the decision problem forms an upper and lower structure. The upper strategy network P1 is based on the key detection state s of the current gas turbine combined cycle system. t Select the best subtask π u After completing the single-step power generation decision task, the lower-level strategy network P2 outputs the power generation decision action a based on the current state and the best subtask output by the upper-level strategy network P1. t To perform specific subtasks.
[0149] In this embodiment, the parameters of the layered deep reinforcement learning algorithm are set as shown in Table 3. The calculation process of the algorithm is as follows: Figure 2 Given in.
[0150] Table 3. Parameter settings of layered deep reinforcement learning algorithm
[0151]
[0152]
[0153] In Table 3, in order to more accurately adjust the water supply of the feedwater pump and the steam valve and realize the fine scheduling of the drum water level, the learning rate of the lower network is and Should be lower than the learning rate of the upper network and
[0154] A specific implementation example: the learning rate of the upper network is set to 0.001, the learning rate of the lower network is 0.0001, and the soft update coefficient τ u and τ d are all set to 0.001. Considering the range of the output action of the lower network, the action noise of each component should be different. Specifically, the maximum fluctuation rate of the action noise of the combustion chamber natural gas quality δ fq,max is 0.08 to allow a larger adjustment range; the maximum value of the action noise fluctuation rate of the water supply pump is δwp,max is 0.03 to meet its relatively stable adjustment needs, and the corresponding minimum fluctuation rate is set to 0.01; due to the small value of the steam valve opening, the maximum value of its action noise fluctuation rate δ sv,max Should be set to 0.01, the minimum value is adjusted to δ sv,min 0.001 to ensure fine control. In addition, T decay is the decay period of the noise, γ is the discount factor that takes into account future rewards, T is the time step of one round of scheduling training, Episode is the training round, Buffer size is the capacity of the experience playback area, Batch size is the number of sampling updates, μ is the mean of the set noise, and θ is the mean reversion rate of the set noise. In the reward function, in order to bring all costs into the same order of magnitude, the coefficient λ1 of the natural gas cost should be set small, with 0.01 as the benchmark for other cost items. At the same time, the penalty coefficients λ2 and λ3 of the power generation shortage and drum water level constraints should be large to ensure that the algorithm gives priority to the control of power generation and drum water level in the early stage, and seeks the minimum energy consumption cost in the later stage of training. In order to enhance the sustainability of system operation, the penalty coefficients λ4 and λ5 for the drum water level status at the end of the system should also be large, which helps the algorithm to ensure that the drum water level can return to the initial water level at the end of training.
[0155] In this embodiment, in order to improve the adaptability of the gas turbine combined cycle system to the changes in the power grid command during power generation, the neural network is trained under a large number of random scenarios. The average value of the historical power grid power generation command data is used as a typical power generation scenario, and random normal distribution noise is added. The noise value does not exceed -25% and 25% of the load value at the corresponding moment, thereby generating a set of power grid power generation command scenarios for training. Among them, the power grid power generation command under a typical day is as follows Figure 3 shown.
[0156] For each time step of each training round, the environment is explored, experience is stored, and the network is updated based on the hierarchical deep reinforcement learning method. As the training progresses, the parameters of the neural network are continuously optimized, the dispatch actions output by the policy network are getting better and better, and the scores of the evaluation network are getting more and more accurate. Correspondingly, the grid command tracking accuracy of the gas turbine combined cycle system is getting higher and higher, while the cost of power generation dispatch is continuously reduced.
[0157] After the neural network training is completed, the upper and lower strategy networks are saved to realize the multi-link intelligent coordinated power generation scheduling of the gas turbine combined cycle system. The cumulative reward training curve of the hierarchical deep reinforcement learning algorithm is as follows: Figure 4As shown. The results show that at the initial stage of training of the hierarchical reinforcement learning algorithm, the initialization randomness of the network leads to the instability of the output action strategy, which makes it difficult to meet the established drum water level constraints and power supply requirements. Specifically, the opening adjustment accuracy of the feedwater pump and the steam valve is not enough, resulting in poor control of the drum water level, which in turn affects the reward distribution in the early stage of training, and the reward value is low. In order to enhance the exploration ability of the algorithm in the learning process, this application introduces noise in the action selection process. Although this increases the possibility of exploration, it also causes greater fluctuations in the reward curve during training. With the deepening of training, the advantages of the algorithm gradually become prominent, and the formulation of action strategies becomes more precise, which makes the opening adjustment of the feedwater pump and the steam valve more refined, and can effectively maintain the drum water level at all levels within the specified range. At the same time, with the continuous increase in training rounds, the algorithm can also be continuously optimized, and the reward value is gradually increased, and finally the stable convergence of the algorithm is achieved.
[0158] In the real-time operation scenario of the gas turbine combined cycle system, the upper-level strategy network decomposes the decision-making problem according to the current system state and outputs the optimal subtask strategy. The lower-level strategy network makes quick decisions based on the optimal subtask strategy and the current system state input, outputs efficient scheduling strategies, tracks power grid instructions in real time, realizes intelligent collaborative power generation scheduling of the system, and reduces system operating costs.
[0159] In a typical day scenario, power generation scheduling is performed based on the trained strategy network. The water level changes of the drum are as follows: Figure 5 As shown in Figure 2, the intelligent tracking and dispatching results of the power grid command of the gas turbine combined cycle system are Figure 6 Given in. Figure 5 The results show that after a typical day of dispatch, the water level of the drum can be restored to near the initial time, ensuring the continuous operation capability of the system. Figure 6 The results show that for the power generation instructions of the power grid, the strategy network trained based on the hierarchical deep reinforcement learning algorithm can reasonably dispatch the variables such as the natural gas quality of the combustion chamber, the water supply of the high-pressure feedwater pump, the water supply of the medium-pressure feedwater pump, the water supply of the condensate pump, the opening of the high-pressure steam valve and the opening of the medium-pressure steam valve at each moment, which can fully meet the power generation demand. There is no shortage of power generation in the entire scheduling cycle, and there is only a small amount of excess power generation at a few moments.
[0160] In summary, the hierarchical deep reinforcement learning method designed in this application can perform adaptive and efficient training of gas turbine combined cycle power generation systems in high-dimensional state decision spaces, achieve high-precision online tracking of power grid power generation instructions, intelligent collaborative power generation scheduling of the system, and reduce system operating costs.
[0161] Finally, it should be noted that the present invention is not limited to the above embodiments, and there are many variations. All variations that can be directly derived or associated with the content disclosed by ordinary technicians in this field should be considered as the protection scope of the present invention.
Claims
1. A multi-link intelligent collaborative power generation scheduling method for a gas turbine combined cycle system. Features The method comprises the following steps: Step 1) establishing a mechanism model of each device in the gas turbine combined cycle power generation system, and comprehensively analyzing the operation and regulation characteristics of the equipment to determine the key monitoring state variables and power generation scheduling variables of the system; the operation and regulation characteristics of the equipment are the physical characteristics of each device in the gas turbine combined cycle power generation system under different operating states and the scheduling range that can be met; Step 2) Taking grid command tracking accuracy and fuel consumption as the objectives, and taking power supply and demand balance and equipment safe operation boundary constraints as the constraints, a scheduling optimization problem for a gas turbine combined cycle power generation system is established; Step 3) Design a reward function that includes an error tolerance mechanism and comprehensive energy efficiency, establish a Markov decision process for a gas turbine combined cycle power generation system, and transform the optimization problem into a sequential decision problem for power generation scheduling; Step 4) Design a hierarchical deep reinforcement learning method to perform adaptive and efficient training of the gas turbine combined cycle power generation system in a high-dimensional state decision space, perform high-precision online tracking of power grid power generation instructions, realize intelligent collaborative power generation scheduling of the gas turbine combined cycle power generation system, and reduce the operating cost of the gas turbine combined cycle power generation system.
2. According to claim 1, a multi-link intelligent coordinated power generation scheduling method for a gas turbine combined cycle system, Features: The equipment in the gas turbine combined cycle power generation system includes a gas turbine, a waste heat boiler, a drum, a steam turbine, and a generator. The rotating shafts of the gas turbine, the steam turbine, and the generator are connected in sequence. The drum includes a high-pressure drum, a medium-pressure drum, and a low-pressure drum. The steam turbine includes a high-pressure cylinder, a medium-pressure cylinder, and a low-pressure cylinder whose rotating shafts are connected in sequence. The waste heat boiler is connected to the high-pressure drum, the medium-pressure drum, and the low-pressure drum through an independent No. 1 pipeline connected to a feed water pump, respectively. The high-pressure drum, the medium-pressure drum, and the low-pressure drum are connected to the high-pressure cylinder, the medium-pressure cylinder, and the low-pressure cylinder through a No. 2 pipeline, respectively, and a steam regulating valve is connected to the No. 2 pipeline connected to the high-pressure cylinder and the medium-pressure cylinder; the drum is a heat energy storage device, which reflects the storage state of internal heat energy through the relative water level of the drum. The waste heat boiler uses a separate heat pipe heat exchanger in the boiler to utilize the waste heat of flue gas; Among them, the mechanism model of the gas turbine is: Among them, η GT is the power generation efficiency of the gas turbine, q fq is the natural gas consumption of the gas turbine, in m 3 / s; Q is the lower calorific value of natural gas, in J / m 3 ; The power generation power of the gas turbine is simulated according to the mechanism model of the gas turbine under variable operating conditions. The power generation efficiency characteristic curve of the gas turbine can be obtained by setting the equipment operation characteristic boundary. Then, the scheduling model can be obtained by fitting the characteristic curve based on the multivariate nonlinear regression method: η GT =6.345·z 3 -187.495 from 2 +1841.712 from-59795.117 Where z is the compression ratio of the air.
3. According to claim 2, a multi-link intelligent coordinated power generation scheduling method for a gas turbine combined cycle system, Features: The mechanism model of the waste heat boiler: Q=kAΔt m Q h =c p ·q m ·Δt Where A is the total surface area of the waste heat boiler with fins, and k is the heat transfer coefficient in m 2 · o C / W, Δt m is the logarithmic mean temperature difference; c p is the specific heat capacity, the unit is KJ / (kg·oC), q m is the fluid mass flow rate, Δt is the temperature difference, Q h is the heat transfer between fluids; Δt max is the maximum temperature difference between the fluid inlet and outlet, Δt min is the minimum temperature difference between the fluid inlet and outlet; R b is the thermal resistance of the pipe wall, R w is the dust accumulation thermal resistance, R h is the heat transfer resistance in the heat pipe, R r is the flue gas convection thermal resistance, in m 2 K / W, according to the mechanism model of the waste heat boiler, the equipment operation simulation is carried out. By setting the equipment operation characteristic boundary, the flue gas temperature-heat exchange characteristic curve of the waste heat boiler and the relationship diagram between the relative value of the heat exchange of steam and flue gas at each level and the load characteristic of the cycle unit can be obtained. Then, the scheduling model can be obtained by fitting the characteristic curve based on the multivariate nonlinear regression method: T h =-0.000089Q h 2 +1.0086Q h +3.6703 Among them, T h is the flue gas temperature, Q y,l , Q y,m and Q y,h are the proportion of heat absorption of low, medium and high pressure flue gas, Q z,l , Q z,m and Q z,h are the proportion of heat absorption of low, medium and high pressure steam, L R is the load of the circulating unit.
4. A multi-link intelligent coordinated power generation scheduling method for a gas turbine combined cycle system according to claim 2, Features: The mechanism model of the steam drum satisfies: in, Indicates the relative change of liquid level, V W is the volume of liquid in the drum, I P is the thermal inertia of the evaporation system, which is related to the drum pressure, volume and metal mass, ρ W and ρ S are the densities of saturated water and saturated steam respectively; W is the feed water flow rate, D is the steam flow rate, Q is the heat absorbed from the boiler, T is the residence time of the bubbles in the water, v s is the saturated specific heat capacity of the gas, P b is the pressure inside the drum; h s and h w are the enthalpy values of saturated steam and saturated water, respectively, c j is the specific heat of metal, t j is the saturation temperature, m j is the effective metal mass, γ is the latent heat of vaporization; m 1 and m 2 are the magnification coefficient, u 1 and u 2 are the openings of the steam valve and the water inlet valve, respectively, P 1 is the pressure of the regulating stage.
5. A multi-link intelligent coordinated power generation scheduling method for a gas turbine combined cycle system according to claim 2, Features: The mechanism model of the steam turbine satisfies: Where W is the work done by the steam turbine, η VT is the efficiency of the steam turbine, is the gas mass entering the steam turbine, h in and h out Respectively represent the enthalpy of steam at the inlet and outlet of the steam turbine, and the quality parameters of the steam turbine It is expressed as: Among them, T and P are the temperature and pressure of the gas at the steam turbine inlet, respectively. The equipment operation simulation is carried out according to the mechanism model of the steam turbine. The efficiency-quality parameter characteristic curve of the steam turbine can be obtained by setting the equipment operation characteristic boundary. Then, the scheduling model can be obtained by fitting the characteristic curve based on the multivariate nonlinear regression method:
6. A multi-link intelligent coordinated power generation scheduling method for a gas turbine combined cycle system according to any one of claims 1 to 5, Features: The key monitoring state variables established in step 1) are: State variables The state variables include the corresponding time, electric load, low-pressure drum relative water level, medium-pressure drum relative water level, and high-pressure drum relative water level in sequence; The generation scheduling variables established in step 1) are: Scheduling variable a t =[q fq ,q HP ,q IP ,q CP ,u HP ,u IP ] T The scheduling variables include the corresponding natural gas quality of the combustion chamber, the water supply of the high-pressure feedwater pump, the water supply of the medium-pressure feedwater pump, the water supply of the condensate pump, the opening of the high-pressure steam valve, and the opening of the medium-pressure steam valve.
7. A multi-link intelligent coordinated power generation scheduling method for a gas turbine combined cycle system according to claim 2, Features: In step 2), a scheduling optimization problem of a gas turbine combined cycle power generation system is established, which includes establishing a power balance constraint, establishing a safe operation constraint, and establishing an objective function; Among them, the power balance constraint is established: in, is the power generation capacity of the gas turbine, and They are the power generation of the low-pressure cylinder, medium-pressure cylinder and high-pressure cylinder respectively. is the electrical load, For over- or under-generation situations; Establish safe operating constraints: q fq,min ≤q fq ≤q fq,min m LP,min ≤m LP ≤m LP,max m IP,min ≤m IP ≤m IP,max m HP,min ≤m HP ≤m HP,max m b,min ≤m b ≤m b,max h LP,min ≤h LP ≤h LP,max h IP,min ≤h IP ≤h IP,max h HP,min ≤h HP ≤h HP,max Among them, q fq,min and q fq,min are the minimum and maximum values of natural gas input to the combustion chamber respectively; m LP,min , m IP,min and m HP,min are the minimum values of the three types of steam turbine inlet steam quality, low, medium and high, respectively, m LP,max , m IP,max and m HP,max are the maximum values of the inlet steam quality of the three steam turbines; m b,min and m b,max are the minimum and maximum values of the steam quality entering the waste heat boiler, h LP,min ,h IP,min and h HP,min are the minimum values of the relative water levels of the three drums, h LP,max ,h IP,max and h HP,max are the maximum values of the relative water levels of the three types of steam drums; Establish the objective function: Among them, c 0 is the penalty cost for excess or insufficient power generation in the system, c fq,t ·q fq is the cost of purchasing natural gas, c fq,t is the price of natural gas, T is the total dispatching time. By setting the objective function, the tracking accuracy of power grid power generation instructions can be improved, the amount of natural gas consumed by the system power generation can be reduced, and the power generation dispatching cost can be reduced.
8. A multi-link intelligent coordinated power generation scheduling method for a gas turbine combined cycle system according to claim 1 or 2, Features: The error tolerance mechanism in the reward function in step 3) is to improve the training efficiency of the neural network. When the error between the system power generation and the grid signal is less than the preset tolerance condition, the current scheduling strategy is directly retained without adding action exploration noise; the comprehensive energy efficiency in the reward function in step 3) includes the system's power generation scheduling cost, the relative water level change of the medium and high pressure steam drums, and the power generation balance.
9. A multi-link intelligent coordinated power generation scheduling method for a gas turbine combined cycle system according to claim 8, Features: The Markov decision process of establishing the gas turbine combined cycle power generation system in step 3) includes: establishing a state space, establishing an action space, and establishing a reward function; Create the state space: Among them, the state space s t Including the corresponding time, electrical load, low-pressure drum relative water level, medium-pressure drum relative water level, and high-pressure drum relative water level in sequence; Building the action space: a t =[q fq ,q HP ,q IP ,q CP ,u HP ,u IP ] The corresponding action spaces include the natural gas quality of the combustion chamber, the water supply of the high-pressure feed water pump, the water supply of the medium-pressure feed water pump, the water supply of the condensate pump, the opening of the high-pressure steam valve and the opening of the medium-pressure steam valve; Create a reward function: Among them, the reward function r t Including system dispatch costs Cost of excess or insufficient generation High-pressure drum water level is too high or too low The water level of the medium-pressure drum is too high or too low and the relative water level status of the high-pressure and medium-pressure drums, and h HP,0 and h IP,0 are the initial relative water levels of the high-pressure drum and the medium-pressure drum, respectively, h HP,T and h IP,T They are the relative water levels of the high-pressure and medium-pressure drums after the scheduling is completed.
10. A multi-link intelligent coordinated power generation scheduling method for a gas turbine combined cycle system according to claim 1, Features: Step 4) includes establishing the upper layer strategy network P 1 , the lower layer strategy network P 2 , evaluate the network Q, and initialize the target upper policy network P with the same weights 1 ' and the target lower layer strategy network P 2 ', and the target evaluation network Q', the upper strategy network P 1 The input of is the key detection state of the gas turbine combined cycle power generation system, and the output is the power generation dispatching action. The input of the evaluation network Q is the state and action, and its output is the power generation reward, including the dispatching cost, the grid instruction tracking accuracy, and the drum water level. The target network with the same weight is used to make the training process more stable and converge faster. The neural network is trained in a random scenario, and the average value of the historical grid power generation instruction data is used as a typical power generation scenario. Random normal distribution noise is added, and the noise value does not exceed 35% of the load value at the corresponding moment, thereby generating a set of grid power generation instruction scenarios for training. Design a hierarchical deep reinforcement learning method: decompose the single-step power generation decision task of the gas turbine combined cycle system into multiple subtasks based on the upper-level policy network P 1 and the underlying policy network P 2 The decision problem forms a top-down structure, where the upper strategy network P 1 Based on the key detection status of the current gas turbine combined cycle system t Select the best subtask π u To complete the single-step power generation decision task, the lower-level strategy network P 2 Based on the current state and upper layer strategy network P 1 Output the best subtask output power generation decision action a t To carry out specific subtasks; For each time step of each training round, experience is stored based on the hierarchical deep reinforcement learning method, and judgment is made for the training network; after the neural network training is completed, the upper and lower strategy networks are saved to realize the multi-link intelligent collaborative power generation scheduling of the gas turbine combined cycle system. In the real-time operation scenario of the gas turbine combined cycle power generation system, the upper strategy network P 1 According to the current state of the gas turbine combined cycle power generation system, the decision problem is decomposed and the optimal sub-generation strategy is output. The lower strategy network P 2 Make quick decisions based on the optimal sub-generation strategy and the current gas turbine combined cycle power generation system status input, output efficient action strategies, track power grid instructions in real time, realize intelligent coordinated power generation scheduling among various devices in the gas turbine combined cycle power generation system, and reduce system operating costs.
Citation Information
Cited By
Community management method and system based on unmanned aerial vehicle, electronic equipment and storage medium
CN119558507A
