System and method for accurately repairing underground water by using in-situ injection underground dispersion PRB (Permeable Reactive Barrier)
Patent Information
- Application Number
- CN202410724372.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2024-05-22
- Filing Date
- 2024-06-05
- Publication Date
- 2024-11-22
AI Technical Summary
[0009]PRB技术也有一些缺点,如地下反应墙介质容量有限,不可能无限制地对污染物进行去除,对于高浓度的污染物,需要考虑污染物的去除能量和容量,有时会缩短PRB的使用寿命
[0062] (1) The precise groundwater restoration method of the present invention utilizes in-situ injection of underground dispersed PRB. The restoration filler is pressurized and injected into the ground through a columnar well chamber. The filler diffuses to form a virtual filler reaction wall, so that the contaminated groundwater in the groundwater is mixed with the filler agent. It flows downstream, thereby using the underground dispersion PRB to repair contaminated groundwater bodies, and the repair efficiency of contaminated groundwater is as high as 80%-99%;
Smart Images

Figure HDA0004878158860000011
Abstract
Description
Technical Field
[0001] The present invention relates to the field of contaminated groundwater treatment technology in the field of environmental protection technology, and in particular to a groundwater precision repair system and repair method using in-situ injection of underground dispersed PRB. Background Art
[0003] Permeable reactive barrier (PRB) technology plays an increasingly important role in groundwater modification. Permeable reactive barrier is a passive in-situ groundwater treatment technology with a filling medium.
[0004] The permeable reaction wall is set on the cross section of the contaminated groundwater flow path. Through the contact between the reaction material filled in the wall and the groundwater, the polluted components in the water are degraded and retained, achieving the purpose of repairing the contaminated groundwater. According to the structure, it can be divided into two types: continuous wall PRB and water-blocking funnel-water gate type.
[0005] The continuous wall PRB is to install a permeable wall in the downstream area of the contaminated groundwater. This structure is suitable for dealing with small groundwater contamination plumes. The wall must cover the width and depth of the entire plume.
[0006] The impermeable funnel-gate PRB embeds the impermeable funnel into the impermeable layer to guide the groundwater flow into the gate, converge the water flow and then treat it through the infiltration reaction medium, thereby preventing the pollution plume from entering the downstream uncontaminated area through seepage.
[0007] The reaction materials of PRB include zero-valent iron, organic waste, clay minerals, phosphates, etc., and the treatment includes physical, chemical or biological processes. This technology is often used to treat chlorine-containing organic pollutants, arsenic, heavy metals, etc.
[0008] The treatment principle of PRB technology for pollutants in groundwater is closely related to the filled reaction medium. For example, when the reaction medium is zero-valent iron (ZVI), its reducing property is mainly used to reduce the valence of heavy metals or degrade organic matter, thereby reducing the mobility or toxicity of pollutants. The reaction performance of ZVI is affected by the following factors: specific surface area, pretreatment and repair operation process, alloys and impurities, etc. When the reaction medium is a mineral such as apatite, zeolite, slag (volcanic slag) or organic clay, its adsorption and precipitation effects are mainly used. When the reaction medium is a carbon source, nutrient or microbial carrier, it is mainly used to enhance the microbial reaction activity and degrade organic pollutants.
[0009] PRB technology also has some disadvantages, such as the limited capacity of underground reaction wall media, which makes it impossible to remove pollutants indefinitely. For high-concentration pollutants, it is necessary to consider the removal energy and capacity of pollutants, which sometimes shortens the service life of PRB. In addition, the action in the reaction medium may lead to the precipitation of substances. For example, for contaminated groundwater with high carbonate content, the formation of precipitation changes the flow field of groundwater in the reaction wall and its vicinity. The blockage of the reaction medium will cause the failure of PRB. The conventional PRB repair effect needs to be improved.
[0010] In addition, the existing system for repairing contaminated groundwater not only requires the establishment of a large-diameter well group, but also a large number of well groups, which results in high construction costs. At the same time, there are repair blind spots between the well groups, which affects the repair effect. Summary of the invention
[0011] Based on the above technical background, the inventors have made great efforts and provided a precise groundwater remediation system and remediation method for in-situ injection of underground diffuse PRB. The remediation system includes a monitoring unit and a monitoring well group. The monitoring unit is arranged on the surface, and the monitoring well group is arranged underground. The injection unit includes a remediation agent storage tank and a high-pressure pump. The remediation agent is pressurized by the high-pressure pump and output to the monitoring well group. The pressurized remediation agent is sprayed and diffused from the water outlet below the monitoring well. The remediation agents sprayed out from adjacent monitoring wells diffuse and overlap with each other to form an agent reaction wall, which mixes with the contaminated groundwater and flows downstream, thereby remediating the contaminated groundwater and effectively avoiding the problem of blind spots in remediation between well groups. At the same time, the remediation system has a small number of monitoring well groups and a small inner diameter of the wellhead, and does not require deep trenching, which effectively shortens the construction period and reduces the construction cost. In addition, the remediation system can realize automatic remediation by arranging a flow meter, a pressure sensor and an electronic control unit on the pressure pump, and the remediation efficiency and remediation effect are greatly improved, thereby completing the present invention.
[0012] The first aspect of the present invention is to provide a groundwater precision remediation system for in-situ injection of underground dispersed PRB, the PRB groundwater precision remediation system includes a monitoring link and an injection link, wherein the monitoring link includes a monitoring unit and a monitoring well group, the monitoring unit is arranged on the surface, the monitoring well group is arranged underground, and the monitoring unit is connected to the monitoring well group;
[0013] The injection unit in the injection link includes a repair agent storage tank 1 and a high-pressure pump 2, and the liquid outlet of the repair agent storage tank 1 is connected to the inlet of the high-pressure pump 2 through a pipeline;
[0014] The monitoring well group includes one or more rows of evenly distributed monitoring wells 3, and the inlet of the monitoring well 3 is connected to the outlet of the high-pressure pump 2 through a pipeline.
[0015] The second aspect of the present invention is to provide a method for groundwater remediation using the in-situ injection underground dispersed PRB groundwater precision remediation system described in the first aspect of the present invention;
[0016] The method comprises pressurizing the repair agent in the repair agent storage tank 1 by a high-pressure pump 2 and injecting the pressurized repair agent into the monitoring well pipe 31 . BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 A schematic diagram of the structure of a groundwater precision remediation device for in-situ injection of underground dispersed PRB according to a preferred embodiment of the present invention is shown.
[0018] Description of Figure Numbers
[0019] 1-Repair the potion storage tank;
[0020] 2- High pressure pump;
[0021] 3- Monitoring wells;
[0022] 31-well pipe;
[0023] 32-filling layer;
[0024] 4- Monitoring wells. DETAILED DESCRIPTION
[0025] The present invention will be described in detail below, and the characteristics and advantages of the present invention will become clearer and more distinct with the description.
[0026] The first aspect of the present invention is to provide a precise groundwater remediation system for in-situ injection of underground dispersed PRB. The PRB precise groundwater remediation system includes a monitoring link and an injection link, wherein the monitoring link includes a monitoring unit and a monitoring well group. The monitoring unit is arranged on the surface, and the monitoring well group is arranged underground, and the monitoring unit is connected to the monitoring well group.
[0027] The injection unit in the injection link includes a repair agent storage tank 1 and a high-pressure pump 2. The repair agent tank 1 is used to store the repair agent. The high-pressure pump 2 pressurizes the repair agent introduced into the monitoring well 3. The liquid outlet of the repair agent storage tank 1 is connected to the inlet of the high-pressure pump 2 through a pipeline. The repair agent in the repair agent storage tank 1 is pressurized by the high-pressure pump 2 and then injected into the monitoring well group.
[0028] The monitoring well group includes one or more rows of evenly distributed monitoring wells 3, and the inlet of the monitoring well 3 is connected to the outlet of the high-pressure pump 2 through a pipeline.
[0029] The repair agent includes one or more of hydrogen peroxide, a hydrogen peroxide precursor, a ferrous iron mineral and a bicarbonate, preferably a mixture of hydrogen peroxide, a ferrous iron mineral and a bicarbonate, more preferably a mixture of hydrogen peroxide, ferrous iron mineral (calculated as ferrous oxide) and bicarbonate in a molar ratio of 1:1:1.
[0030] The repair agent also includes a solvent, which is water, and is injected into the well in the form of a solution with a concentration of 0.1 to 50%, preferably 20 to 30%. The injection flow rate of the repair agent is 0.1 to 10 m 3 / h, preferably 0.5 to 5m 3 / h.
[0031] After the remediation agent is injected into the contaminated groundwater, H2O2 and bicarbonate are used to generate percarbonate (HCO4 - ), which produces hydroxyl radicals (·OH) and carbonate radicals (·CO3 - ) and other active oxygen substances, effectively removing halogenated hydrocarbons, and the reaction efficiency of the repair agent exceeds 90%.
[0032] The reaction process is as follows:
[0033]
[0034] Fe 2+ +2HCO4 - →Fe 3+ +2·CO3 - + OH+OH -
[0035] The monitoring well 3 is a vertical well, which is vertically arranged underground. The monitoring well 3 comprises a well pipe 31 and a filler layer 32 located outside the well pipe 31. The middle and lower part of the well pipe 31 is provided with water outlet holes, which are evenly distributed.
[0036] The repair agent is placed in the repair agent storage tank 1. The repair agent is pressurized by the high-pressure pump 2 and then input into the monitoring well pipe 31. The groundwater contaminated area is monitored from the water outlet in the lower part of the well pipe 31. After the pressurized repair agent is sprayed out from the water outlet, it diffuses to form a virtual filler reaction wall, so that the contaminated groundwater and the repair agent mix while flowing downstream, thereby utilizing the underground diffuse PRB to repair the contaminated groundwater body.
[0037] Preferably, from the wellhead to the bottom of the monitoring well 3, the filler layer 32 includes, from top to bottom, a concrete casting section, a concrete section, a bentonite mixed casting section, a bentonite casting section, and a quartz sand section.
[0038] The filler of the concrete pouring section is crushed stone with a particle size of 10-20mm.
[0039] The filler of the concrete section is gravel with a particle size of 20-30mm.
[0040] The filler of the bentonite mixed casting section is a mixture of bentonite and sand with a particle size of 0.5-1mm.
[0041] The filler of the bentonite casting section is bentonite with a particle size of 0.1-0.3mm.
[0042] The filler of the quartz sand section is quartz sand, the particle size of the quartz sand is 0.5-1mm, the quartz sand section is located in the underground aquifer, and water outlet holes are evenly arranged on the well pipe inside the quartz sand section.
[0043] More preferably, the height ratio of the concrete pouring section, the concrete section, the bentonite mixed pouring section, the bentonite pouring section and the quartz sand section is 1:(1-4):(1-4):(1-25):(1-10), preferably 1:(1-2):(1-2):(1-20):(1-8).
[0044] In a preferred embodiment of the present invention, the inner diameter of the monitoring well pipe 31 is 20 to 80 mm, preferably 25 to 50 mm.
[0045] The existing technology has too many well groups, large inner diameters, high construction costs, and blind spots for repair. The groundwater repair system described in the present invention can achieve better groundwater repair effects when the inner diameter of the monitoring well is small.
[0046] The monitoring well group of the present invention includes 1 to 5 rows of monitoring wells 3, preferably includes 2 rows of monitoring wells 3, and more preferably, 2 rows of monitoring wells 3 are arranged perpendicular to the water flow direction.
[0047] In a preferred embodiment of the present invention, the distance between two adjacent rows of monitoring wells 3 is 2 to 30 m, preferably 3 to 18 m.
[0048] The distance between two adjacent monitoring wells 3 in the same row is 2 to 30 m, preferably 3 to 15 m.
[0049] The number of monitoring well groups in the repair system of the present invention is relatively small. It has been found through experiments that when the distance between the monitoring wells is within the above range, a good repair effect can be achieved with a relatively small number of monitoring well groups, and there is no repair blind area. In addition, the monitoring well group does not require deep trenching, which greatly shortens the construction period and reduces the cost.
[0050] In the present invention, the in-situ injection underground diffuse PRB groundwater precision remediation system also includes monitoring wells 4, which are located upstream and downstream of the monitored well group.
[0051] The monitoring well 4 is used to monitor whether the concentration of pollutants in the groundwater flowing through the remediation system exceeds the standard, so as to effectively evaluate the remediation system.
[0052] In a further preferred embodiment of the present invention, the in-situ injection underground diffuse PRB groundwater precision remediation system also includes a flow meter, a pressure sensor and an electronic control unit, and the flow meter, pressure sensor and electronic control unit are all located at the outlet end of the high-pressure pump 2.
[0053] The pressure sensor is used to monitor the injection pressure of the repair agent, and the flow meter is used to monitor the flow of the repair agent into the monitoring well. The electronic control unit collects information from the pressure sensor and the flow meter and controls the high-pressure pump, so that the high-pressure pump can adjust the pressure of the repair agent and the flow of the monitoring well in time according to the feedback information, thereby realizing automatic control and greatly improving the efficiency of underground sewage repair.
[0054] The second aspect of the present invention is to provide a method for groundwater remediation using the in-situ injection underground dispersed PRB groundwater precision remediation system described in the first aspect of the present invention.
[0055] The method comprises pressurizing the repair agent in the repair agent storage tank 1 by a high-pressure pump 2 and injecting the pressurized repair agent into the monitoring well pipe 31 .
[0056] After the repair agent is injected, it is sprayed out from the water outlet of the monitoring well pipe 31 and evenly diffused to the surroundings. After the repair agent sprayed out from the adjacent monitoring wells diffuses, the diffusion areas overlap each other to form a repair reaction wall similar to a wall perpendicular to the flow direction of the groundwater, thereby repairing the contaminated groundwater. The monitoring wells located upstream and downstream of the monitoring well group monitor the contaminated groundwater flowing through the repair system to evaluate whether the pollutant concentration exceeds the standard.
[0057] The electronic control unit installed at the outlet of the high-pressure pump 2 obtains information from the pressure sensor and the flow meter, and timely adjusts the injection pressure of the high-pressure pump for the repair agent and the flow rate into the monitoring well according to the feedback information, thereby realizing automatic control and greatly improving the repair efficiency of contaminated groundwater.
[0058] The flow rate of the repair agent in the monitoring well pipe 31 is 0.1~10m 3 / h, preferably 0.5 to 5m 3 / h.
[0059] The injection pressure of the repair agent is 0.05 to 20 MPa, preferably 0.1 to 15 MPa.
[0060] It has been found through experiments that when the injection rate and pressure of the repair agent are within the above range, the repair agents sprayed from the well pipes 31 of each monitoring well diffuse and overlap with each other to form a wall-like repair reaction zone perpendicular to the direction of groundwater flow. There is no repair blind spot, and the contaminated groundwater can be efficiently and accurately repaired, with a repair efficiency of more than 80%.
[0061] The beneficial effects of the present invention are:
[0062] (1) The method for accurate groundwater remediation using in-situ injection of underground dispersed PRB described in the present invention injects the repair filler into the ground through a columnar well chamber with pressure, and the filler diffuses to form a virtual filler reaction wall, so that the contaminated groundwater and the filler agent in the groundwater mix while flowing downstream, thereby using the underground dispersed PRB to repair the contaminated groundwater body, and the remediation efficiency of the contaminated groundwater is as high as 80%-99%;
[0063] (2) The present invention provides a filler agent for in-situ injection of underground dispersed PRB, the filler agent comprising independent hydrogen peroxide or its precursor, ferrous iron mineral and bicarbonate, and injecting the filler agent into groundwater to generate percarbonate (HCO4 - ), which produces hydroxyl radicals (·OH) and carbonate radicals (·CO3 - ) and other active oxygen species, effectively removing halogenated hydrocarbons with a reaction efficiency of over 90%;
[0064] (3) The method for accurate groundwater remediation using in-situ injection of underground dispersed PRB of the present invention sets monitoring wells both upstream and downstream of the monitoring well group to monitor whether the concentration of pollutants in the groundwater flowing through the discontinuous permeable reaction wall exceeds the standard, thereby effectively evaluating the remediation effect of the discontinuous permeable reaction wall;
[0065] (4) The method for accurate groundwater remediation using in-situ injection of underground dispersed PRB of the present invention connects a flow meter, a pressure sensor and an electronic control unit to the outlet of the high-pressure pump. The electronic control unit collects information from the pressure sensor and the flow meter and controls the high-pressure pump, so that the high-pressure pump adjusts the flow rate and pressure of the remediation agent in time according to the feedback information, thereby realizing automatic control and greatly improving the remediation efficiency.
[0066] (5) The precise groundwater remediation device for in-situ injection of underground dispersed PRB described in the present invention does not require deep trenching, which greatly shortens the construction period and saves costs. When the remediation agent is exhausted or ineffective, the remediation agent can be easily and quickly injected again, which effectively solves the problem that the groundwater remediation system in the prior art needs to establish a large-diameter well group, the number of well groups is large, the construction cost is high, and there are blind spots for remediation between well groups.
[0067] Example
[0068] The present invention is further described below by means of specific examples. These embodiments are only intended to illustrate the present invention but are not intended to limit the scope of the present invention.
[0069] Example 1
[0070] Use Figure 1 The groundwater precision remediation system of in-situ injection of underground dispersed PRB shown in the figure remediates groundwater. The remediation system includes a monitoring link and an injection link, wherein the monitoring link includes a monitoring unit and a monitoring well group, the monitoring unit is arranged on the surface, and the monitoring well group is arranged underground, the injection unit in the injection link includes a remediation agent storage tank 1 and a high-pressure pump 2, the high-pressure pump 2 is located between the remediation agent storage tank 1 and the monitoring well group, the liquid outlet of the remediation agent storage tank 1 is connected with the inlet of the high-pressure pump 2 through a pipeline, the monitoring well group includes 2 rows of monitoring wells 3, the 2 rows of monitoring wells are arranged perpendicular to the water flow direction, the distance between two adjacent rows of monitoring wells 3 is 3m, and the distance between two adjacent monitoring wells 3 in the same row is 3m, the monitoring well 3 includes a well pipe 31 and a filling layer 32 located outside the well pipe 31, the inlet of the well pipe 31 is connected with the outlet of the high-pressure pump 2 through a pipeline, and from the wellhead to the bottom of the monitoring well 3, the filling layer 32 includes a concrete casting section, a bentonite ... The height ratio of the concrete pouring section, bentonite pouring section and quartz sand section is 1:2:2:18:8. The filler of the concrete pouring section is crushed stone with a particle size of 10-20mm. The filler of the concrete section is gravel with a particle size of 20-30mm. The filler of the bentonite mixed pouring section is a mixture of bentonite and sand with a particle size of 0.5-1mm. The filler of the bentonite pouring section is bentonite with a particle size of 0.5-1mm. The filler of the quartz sand section is quartz sand. The particle size is 0.5-1mm, the inner diameter of the monitoring well pipe 31 is 35mm, monitoring wells 4 are set upstream and downstream of the monitoring well group, a flow meter, a pressure sensor and an electronic control unit are set at the outlet end of the high-pressure pump 2, and the repair agent in the repair agent storage tank 1 is a solution, a mixture of hydrogen peroxide, ferrous iron ore and sodium bicarbonate is dissolved in solvent water, and the concentration of the repair agent is 25%, wherein the molar ratio of hydrogen peroxide, ferrous oxide (calculated as ferrous oxide) and bicarbonate is 1:1:1.
[0071] The repair agent in the repair agent storage tank 1 is pressurized by the high-pressure pump 2 and then monitored into the monitoring well pipe 31. The flow rate of the repair agent in the monitoring well pipe 31 is 5m 3 / h, the injection pressure of the repair agent is 10MPa.
[0072] According to monitoring well 4, the removal rate of organic pollutants such as 1,3-dinitrobenzene, 1,4-dichlorobenzene, benzene, o-(p-) nitrochlorobenzene, and chlorobenzene in groundwater by the remediation system is over 90%, and the content of pollutants in the treated soil is not higher than the control value of the "Standards for Risk Control of Soil Pollution in Construction Land for Soil Environmental Quality (Trial)" (GB36600-2018). The remediation system can be used for contaminated groundwater treatment, groundwater resource protection, gas stations, chemical plants and other places, groundwater remediation in mining areas, groundwater reservoirs, underground storage facilities, urban groundwater resource remediation, contaminated site remediation, ecologically sensitive areas, water conservancy projects, and groundwater monitoring points.
[0073] The present invention has been described above in conjunction with preferred embodiments, but these embodiments are only exemplary and serve only as an illustration. On this basis, the present invention may be subjected to a variety of substitutions and improvements, all of which fall within the scope of protection of the present invention.
Claims
1. A precise groundwater remediation system for in-situ injection of underground dispersed PRB, characterized in that: The PRB groundwater precision remediation system includes a monitoring link and an injection link. The monitoring unit in the monitoring link is arranged on the surface, the monitoring well group is arranged underground, and the monitoring unit is connected to the monitoring well group. The injection unit in the injection link comprises a repair agent storage tank (1) and a high-pressure pump (2), and the liquid outlet of the repair agent storage tank (1) is connected to the inlet of the high-pressure pump (2) through a pipeline; The monitoring well group comprises one or more rows of evenly distributed monitoring wells (3), and the inlet of the monitoring well (3) is connected to the outlet of the high-pressure pump (2) through a pipeline.
2. The groundwater precision remediation system of in-situ injection of underground dispersed PRB according to claim 1 is characterized in that: The repair agent includes one or more of hydrogen peroxide, hydrogen peroxide precursor, peroxymonosulfate, ferrous iron mineral powder and iron-rich biochar powder, preferably hydrogen peroxide, ferrous iron mineral and bicarbonate.
3. The groundwater precision remediation system of in-situ injection of underground dispersed PRB according to claim 1 is characterized in that: The monitoring well (3) is a vertical well, which is vertically arranged underground. The monitoring well (3) comprises a well pipe (31) and a filler layer (32) located outside the well pipe. A water outlet is provided in the middle and lower part of the well pipe (31).
4. The groundwater precision remediation system of in-situ injection of underground dispersed PRB according to claim 3 is characterized in that: From the wellhead to the bottom of the monitoring well, the filling layer (32) includes, from top to bottom, a concrete pouring section, a concrete and bentonite mixed pouring section, a bentonite pouring section and a quartz sand section.
5. The groundwater precision remediation system of in-situ injection of underground dispersed PRB according to claim 4 is characterized in that: The height ratio of the concrete pouring section, the concrete section, the bentonite mixed pouring section, the bentonite pouring section and the quartz sand section is 1:(1-4):(1-4):(1-25):(1-10).
6. The groundwater precision remediation system of in-situ injection of underground dispersed PRB according to claim 1 is characterized in that: The inner diameter of the monitoring well pipe (31) is 20 to 80 mm, and the monitoring well group comprises 1 to 5 rows of monitoring wells (3).
7. The groundwater precision remediation system of in-situ injection of underground dispersed PRB according to claim 1 is characterized in that: The distance between two adjacent rows of monitoring wells (3) is 2 to 30 m, and the distance between two adjacent monitoring wells (3) in the same row is 2 to 30 m.
8. The groundwater precision remediation system of in-situ injection of underground dispersed PRB according to claim 1 is characterized in that: The in-situ injection underground diffuse PRB groundwater precision remediation system also includes a flow meter, a pressure sensor and an electronic control unit, and the flow meter, pressure sensor and electronic control unit are all located at the outlet end of the high-pressure pump.
9. A method for groundwater remediation using the in-situ injection underground dispersed PRB groundwater precision remediation system according to any one of claims 1 to 8, characterized in that: The method comprises pressurizing a repair agent in a repair agent storage tank (1) by means of a high-pressure pump (2) and injecting the pressurized repair agent into a monitoring well pipe (31).
10. The repair method according to claim 9, characterized in that: The flow rate of the repair agent in the monitoring well pipe (31) is 0.1 to 10 m 3 / h, the injection pressure of the repair agent is 0.05~20MPa.
Citation Information
Patent Citations
System and method for repairing polluted underground water by using discontinuous permeation reaction walls
CN106145335A
Method for treating alkaline wastewater by using Fenton system
CN115745137A
Wastewater treatment method of Fenton system under bicarbonate coexistence condition
CN115872516A
PRB (permeable reactive barrier) construction system for repairing polluted underground water