River crossing pipeline revetment structure

By designing the bank guard structure of retaining walls, pile foundations and protective components in the river channel, the problems of river guards being difficult to relocate and wave erosion are solved, the stability and ecological improvement of the bank guards are achieved, the service life is extended, and flood prevention is met and landscape needs.

CN118997062APending Publication Date: 2024-11-22SHANGHAI INVESTIGATION DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411394462.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In the prior art, river bank protection is difficult to implement under the influence of pipelines with difficult relocation, and is prone to damage due to wave impact and erosion, shortening service life.

Method used

A river channel crossing pipeline bank guard structure is designed, including retaining wall, pile foundation and protective components. The base plate of the retaining wall is the same as the bottom of the river channel, the top plate of the retaining wall is higher than the normal water level, the pile foundation is set on both sides of the pipeline, and the protective components are on the retaining wall The bottom extends towards the river channel, preventing the flow of water from eroding, and aquatic plants can be planted.

Benefits of technology

There is no need to relocate pipelines, extend the life of the bank protection, improve the ecology of the river, meet flood control safety and landscape greening effects, and enhance the support and stability of the retaining wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997062A_ABST
    Figure CN118997062A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of river channel bank protection, and discloses a river channel crossing pipeline bank protection structure which comprises a retaining wall, pile foundations and a protection assembly, the top face of a retaining wall bottom plate is the same as the river channel bottom elevation, the retaining wall is adjacent to a bank protection, a retaining wall top plate is higher than the river channel normal water level, and the multiple pile foundations are arranged at the bottom of the retaining wall and located on the two sides of a pipeline. The pile foundations at the bottom of the retaining wall are arranged on the two sides, the pipeline protection range is reserved, pipeline moving is not needed, the protection assembly is arranged on the side, facing the riverway, of the bottom of the retaining wall, water flow in the riverway can be prevented from scouring the toe of the retaining wall, and the retaining wall can be used for protecting the riverway. And meanwhile, aquatic plants can be planted in the protection assemblies, so that the ecological property of the river channel is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of river bank protection, and in particular to a river bank protection structure for crossing a pipeline. Background Art

[0002] With the rapid development of urban construction, more and more pipelines are buried across rivers.

[0003] In the existing technology, in river and waterway regulation projects, if the original pipelines and cables across the river are relocated during the project implementation, it will increase the project investment and affect the construction period. For pipelines that are difficult to relocate, the pipelines will affect the implementation of river bank protection. At the same time, affected by the scouring of waves in the river, the bank protection is easily damaged by wave impact and erosion, which greatly shortens the service life of the bank protection. Summary of the invention

[0004] In view of this, the present invention provides a river-crossing pipeline revetment structure to solve the problems in the prior art that pipelines that are difficult to relocate affect the implementation of river revetments, and that the revetments are easily damaged by wave impact and erosion.

[0005] The present invention provides a bank protection structure for a pipeline crossing a river, comprising a retaining wall, a pile foundation and a protection component, wherein the top surface of a bottom plate of the retaining wall is at the same elevation as the bottom of the river, the retaining wall is adjacent to the bank protection, the top plate of the retaining wall is higher than the normal water level of the river, a plurality of pile foundations are arranged at the bottom of the retaining wall, the pile foundations are located on both sides of the pipeline, and the protection component is arranged at the side of the bottom of the retaining wall facing the river and extends into the river along the bottom of the river.

[0006] Beneficial effects: The present invention arranges the pile foundation at the bottom of the retaining wall outside a certain protection range on both sides of the pipeline, eliminating the need to relocate the pipeline, and provides a protective component on the bottom of the retaining wall facing the river channel, thereby preventing the water flow in the river channel from scouring the toe of the retaining wall, thereby extending the service life of the revetment. At the same time, aquatic plants can also be planted in the protective component to improve the ecology of the river channel.

[0007] In an optional embodiment, the protection assembly includes a protection member and in-situ sponge soil. The protection member is arranged on the side of the bottom of the retaining wall facing the river channel and extends into the river channel along the bottom of the river channel. The in-situ sponge soil is adjacent to the side of the protection member away from the retaining wall and extends into the river channel along the bottom of the river channel.

[0008] Beneficial effect: The protective member in the present invention can prevent water flow from scouring the toe of the retaining wall. There are gaps in the in-situ sponge soil set in front of the protective member, which can be used to plant aquatic plants. This not only improves the ecology of the river channel, but also prevents riverbed scouring. This structure can meet both flood control safety and landscape greening effects.

[0009] In an optional embodiment, the interior of the retaining wall is a cavity, and at least one partition is vertically arranged in the cavity.

[0010] Beneficial effect: The present invention arranges partitions in the retaining wall to improve the support of the retaining wall.

[0011] In an optional embodiment, a filling piece is provided in the cavity.

[0012] Beneficial effect: The present invention arranges filling pieces in the retaining wall, which can increase the deadweight of the retaining wall, make the retaining wall more stable at the river bank, and reduce the impact of water flow and waves in the river on the bank protection.

[0013] In an optional embodiment, the river channel crossing pipeline bank protection structure further includes a levee top road, which is arranged on the top of the retaining wall and extends in a direction away from the river channel.

[0014] Beneficial effects: The present invention increases the convenience of passage by arranging a dike road on the top of the retaining wall, and the need for passage on the river bank side can be met through the support of the retaining wall on the river bank side.

[0015] In an optional embodiment, the river crossing pipeline bank protection structure also includes a hydrophilic walkway, which is arranged on the top of the retaining wall, adjacent to the embankment road, and located on the side close to the river.

[0016] Beneficial effects: The present invention sets a hydrophilic trail on the river side, which increases the functional demand for hydrophilic communication between pedestrians and the river ecology.

[0017] In an optional embodiment, the height of the embankment top road is not less than the height of the hydrophilic trail.

[0018] Beneficial effect: The present invention arranges the hydrophilic walkway below the embankment top road. When the water level in the river channel is too high, the hydrophilic walkway can play a buffering role to prevent the water flow in the river channel from overflowing the embankment top road.

[0019] In an optional embodiment, the river crossing pipeline bank protection structure also includes a planting trough, which is arranged on the top of the retaining wall and is located between the embankment road and the hydrophilic trail.

[0020] Beneficial effect: The present invention can improve the greening effect of the riverside road by planting plants in the planting trough.

[0021] In an optional embodiment, the height of the planting trough is not less than the height of the hydrophilic walkway and not greater than the height of the embankment top road.

[0022] Beneficial effect: The present invention sets the height of the planting trough between the hydrophilic walkway and the embankment road. When the water level in the river channel is too high, the planting trough can play a buffering role to prevent the water flow in the river channel from overflowing the embankment road.

[0023] In an optional embodiment, the river crossing pipeline bank protection structure further includes a guardrail, which is arranged on the top of the retaining wall and is located on the side close to the river.

[0024] Beneficial effect: The present invention provides a guardrail on the side of the top of the retaining wall close to the river channel, which can increase the safety protection of pedestrians in the hydrophilic trail where the river channel crosses the pipeline bank protection structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0026] Figure 1 This is a front cross-sectional view of a river crossing pipeline bank protection structure according to an embodiment of the present invention;

[0027] Figure 2 A top view of a pile foundation in a river crossing pipeline bank protection structure according to an embodiment of the present invention;

[0028] Figure 3 for Figure 1 A is a partial enlarged schematic diagram of the middle part.

[0029] Description of reference numerals:

[0030] 1. retaining wall; 11. partition; 12. filling piece;

[0031] 2. Pile foundation;

[0032] 3. Protective components; 31. Protective parts; 311. Foot guard; 312. Graded crushed stone; 313. Coarse sand cushion; 314. Geotextile; 315. Plain concrete grid; 32. In-situ sponge soil;

[0033] 4. Road on the top of the embankment;

[0034] 5. Waterfront trail;

[0035] 6. Planting trough;

[0036] 7. Guardrail;

[0037] 8. Pipeline. DETAILED DESCRIPTION

[0038] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0039] Combine the following Figures 1 to 3 , describing an embodiment of the present invention.

[0040] According to an embodiment of the present invention, Figures 1 to 3 As shown, a river channel crossing pipeline bank protection structure is provided, including a retaining wall 1, a pile foundation 2 and a protection component 3, the retaining wall 1 is arranged at the bottom of the river channel, the top surface of the bottom plate of the retaining wall 1 is at the same elevation as the bottom of the river channel, the retaining wall 1 is adjacent to the bank protection, the top plate of the retaining wall 1 is higher than the normal water level of the river channel, a plurality of pile foundations 2 are arranged at the bottom of the retaining wall 1, the pile foundations 2 are located on both sides of the pipeline 8, and the protection component 3 is arranged on the side of the bottom of the retaining wall 1 facing the river channel and extends into the river channel along the bottom of the river channel.

[0041] Specifically, in this embodiment, the pipeline 8 passing through the bottom of the river channel remains unchanged, the retaining wall 1 is set at the bottom of the river channel and connected to the river bank on one side, a plurality of pile foundations 2 are set at the bottom of the retaining wall 1, and the pile foundations 2 are located on both sides of the pipeline 8. One end of the protection component 3 is connected to the toe of the bottom of the retaining wall 1, and the other end extends into the river channel.

[0042] In this embodiment, the retaining wall 1 is a retaining wall 1 made of concrete with a cavity inside. The retaining wall 1 has a cubic structure. To conform to the actual situation, the bottom plate of the retaining wall 1 in this embodiment is 8m wide and 1m thick. The top elevation of the retaining wall 1 is 2.7m, and the top is 50cm higher than the normal water level. The side of the retaining wall 1 close to the river channel is the designed estuary line.

[0043] In this embodiment, the pile foundation 2 is not specifically limited. To conform to the actual situation, the pile foundation 2 in this embodiment is a C30 reinforced concrete bored pile with a diameter of 1m and a length of 35 meters. The pile foundation 2 is arranged on both sides of the pipeline 8. Three columns and four rows of 12 pile foundations 2 are arranged on each side of the pipeline 8. The column spacing and row spacing of the pile foundation 2 are both 3m, and the spacing between the pile foundations 2 on both sides of the pipeline 8 is 10m.

[0044] The present invention can prevent the water flow in the river from scouring the toe of the retaining wall 1, thereby extending the service life of the revetment, and can also plant aquatic plants in the protective assembly 3 to improve the ecological nature of the river. The pile foundation 2 is arranged on both sides of the pipeline 8, which does not affect the implementation of the revetment structure.

[0045] In one embodiment, Figure 1 and Figure 3As shown, the protection assembly 3 includes a protection member 31 and an in-situ sponge soil 32. The protection member 31 is arranged on the side of the bottom of the retaining wall 1 facing the river channel and extends into the river channel along the bottom of the river channel. The in-situ sponge soil 32 is adjacent to the side of the protection member 31 away from the retaining wall 1 and extends into the river channel along the bottom of the river channel.

[0046] Specifically, in this embodiment, the protective member 31 extends from the bottom of the retaining wall 1 toward the center of the river channel with a width of 5m. The protective member 31 includes a foot guard 311, graded gravel 312, a coarse sand cushion layer 313 and a geotextile 314 arranged in sequence from top to bottom. To conform to the actual situation, in this embodiment, the foot guard 311 is a C20 concrete foot guard with a thickness of 120mm, the graded gravel 312 has a thickness of 200mm, the coarse sand cushion layer 313 has a thickness of 50mm, and the tensile strength of the geotextile 314 is 10kn / m.

[0047] In this embodiment, a plain concrete grid 315 is provided at one end of the protective member 31 away from the retaining wall 1. The cross-sectional size of the plain concrete grid 315 is 300mm×500mm. The plain concrete grid 315 is used to enhance the stability and waterproof performance of the protective member 31 structure, and is made of concrete.

[0048] In this embodiment, the in-situ sponge soil 32 is a mixture of river dredging mud and inorganic consolidation materials for in-situ ecological remediation (ISER) of sediment. To meet the actual situation, the in-situ sponge soil 32 in this embodiment is 60 cm thick and 14 m wide. The surface of the in-situ sponge soil 32 is smooth and the porosity is greater than 20%, which provides a good base for the growth of aquatic plants. At the same time, combined with the protective element 31, the exchange of matter and energy between the two domains of the waterway is guaranteed, providing a good habitat for animals and plants.

[0049] The protective member 31 in the present invention can prevent water flow from scouring the toe of the retaining wall. There are gaps in the in-situ sponge soil 32 set in front of the protective member 31, which can be used to plant aquatic plants, thereby improving the ecology of the river channel and preventing scouring of the riverbed. This structure can meet both flood control safety and landscape greening effects.

[0050] In one embodiment, Figure 1 As shown, the interior of the retaining wall 1 is a cavity, and at least one partition 11 is vertically arranged in the cavity.

[0051] Specifically, in this embodiment, the number of partitions 11 is not specifically limited. To meet the actual situation, in this embodiment, one partition 11 is provided, and the partition 11 divides the retaining wall 1 into two cavities. In some other embodiments, a plurality of partitions 11 may also be provided.

[0052] In the present invention, the partition plate 11 is arranged in the retaining wall 1 to improve the support of the retaining wall 1 .

[0053] In one embodiment, Figure 1 As shown, a filling piece 12 is arranged in the cavity.

[0054] Specifically, in this embodiment, the filling member 12 is gravel, soil, etc.

[0055] In the present invention, a filling piece 12 is arranged in the retaining wall 1, which can increase the deadweight of the retaining wall 1, make the retaining wall 1 more stable at the river bank, and reduce the impact of water flow and waves in the river on the bank protection.

[0056] In one embodiment, Figure 1 As shown, the river channel crossing pipeline bank protection structure also includes a levee top road 4, which is arranged on the top of the retaining wall 1 and extends in a direction away from the river channel.

[0057] Specifically, in this embodiment, there is no specific limitation on the width of the embankment road 4. To conform to the actual situation, in this embodiment, the width of the embankment road 4 is 14m. The embankment road 4 is set as a two-way driving lane, and a green belt is set on the river side of the embankment road 4.

[0058] The present invention provides a crest road 4 on the top of the retaining wall 1 to increase the convenience of passage, and the need for passage on the river bank can be met through the support of the retaining wall 1 on the river bank side.

[0059] In one embodiment, Figure 1 As shown, the river crossing pipeline bank protection structure also includes a hydrophilic walkway 5, which is arranged on the top of the retaining wall 1, adjacent to the embankment road 4, and located on the side close to the river.

[0060] Specifically, in this embodiment, there is no specific limitation on the width of the hydrophilic walkway 5. To conform to the actual situation, in this embodiment, the width of the hydrophilic walkway 5 is 2.5m to 5m, and the hydrophilic walkway 5 is used for pedestrians to visit.

[0061] The present invention arranges a hydrophilic walkway 5 on the river side, which increases the functional requirements for hydrophilic communication between pedestrians and the river ecology.

[0062] In one embodiment, Figure 1 As shown, the height of the embankment road 4 is not less than the height of the hydrophilic walkway 5 .

[0063] Specifically, in this embodiment, the hydrophilic walkway 5 is located at the top of the retaining wall 1, the embankment road 4 is located at the top of the retaining wall 1, adjacent to the hydrophilic walkway 5, the height of the embankment road 4 is greater than the height of the hydrophilic walkway 5, and the height of the embankment road 4 is not less than the highest water level of the river.

[0064] The present invention arranges the hydrophilic walkway 5 below the embankment top road 4 . When the water level in the river channel is too high, the hydrophilic walkway 5 can play a buffering role to prevent the water flow in the river channel from overflowing the embankment top road 4 .

[0065] In one embodiment, Figure 1 As shown, the river channel crossing pipeline bank protection structure also includes a planting trough 6, which is arranged on the top of the retaining wall 1, and the planting trough 6 is located between the embankment road 4 and the hydrophilic walkway 5.

[0066] Specifically, in this embodiment, both sides of the planting trough 6 are concrete walls, which can be integrally formed on the top plate of the retaining wall 1, and nutrient soil is laid in the middle of the concrete walls on both sides. To conform to the actual situation, the thickness of the concrete wall in this embodiment is 0.4m.

[0067] The present invention can improve the greening effect of the road near the river by planting plants in the planting groove 6.

[0068] In one embodiment, Figure 1 As shown, the height of the planting trough 6 is not less than the height of the hydrophilic walkway 5 and is not greater than the height of the embankment top road 4.

[0069] Specifically, in this embodiment, the heights of the hydrophilic walkway 5, the planting troughs 6 and the embankment top road 4 are arranged in increasing order.

[0070] The present invention sets the planting trough 6 at a height between the hydrophilic walkway 5 and the embankment road 4. When the water level in the river channel is too high, the planting trough 6 can play a buffering role to prevent the water flow in the river channel from overflowing the embankment road 4.

[0071] In one embodiment, Figure 1 As shown, the river crossing pipeline bank protection structure also includes a guardrail 7, which is arranged on the top of the retaining wall 1 and is located on the side close to the river.

[0072] Specifically, in this embodiment, the guardrail 7 is a wooden railing, and the guardrail 7 is arranged along the river channel on the top side of the retaining wall 1 close to the river channel, and the height of the guardrail 7 is not higher than the height of the embankment top road 4.

[0073] In the present invention, a guardrail 7 is arranged on the top of the retaining wall 1 near the river channel to increase the safety of pedestrians in the hydrophilic walkway 5 of the river channel crossing the pipeline bank protection structure.

[0074] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A river crossing pipeline bank protection structure, characterized in that: include: A retaining wall (1), wherein the top surface of the bottom plate of the retaining wall (1) is at the same elevation as the bottom of the river channel, the retaining wall (1) is adjacent to the revetment, and the top plate of the retaining wall (1) is higher than the normal water level of the river channel; Pile foundations (2), a plurality of the pile foundations (2) are arranged at the bottom of the retaining wall (1), and the pile foundations (2) are located on both sides of the pipeline (8); A protection component (3), wherein the protection component (3) is arranged on a side of the bottom of the retaining wall (1) facing the river channel and extends along the bottom of the river channel into the river channel.

2. The river crossing pipeline bank protection structure according to claim 1 is characterized in that: The protection component (3) comprises: A protective member (31), the protective member (31) being arranged on a side of the bottom of the retaining wall (1) facing the river channel and extending along the bottom of the river channel into the river channel; In-situ sponge soil (32), the in-situ sponge soil (32) is adjacent to a side of the protective element (31) away from the retaining wall (1), and extends along the bottom of the river channel into the river channel.

3. The river crossing pipeline bank protection structure according to claim 1 or 2, characterized in that: The interior of the retaining wall (1) is a cavity, and at least one partition (11) is vertically arranged in the cavity.

4. The river crossing pipeline bank protection structure according to claim 3 is characterized in that: A filling piece (12) is arranged in the cavity.

5. The river crossing pipeline bank protection structure according to claim 1 is characterized in that: Also includes: A dike top road (4), wherein the dike top road (4) is arranged on the top of the retaining wall (1) and extends in a direction away from the river channel.

6. The river crossing pipeline bank protection structure according to claim 5 is characterized in that: Also includes: A hydrophilic walkway (5), wherein the hydrophilic walkway (5) is arranged on the top of the retaining wall (1), the hydrophilic walkway (5) is adjacent to the embankment top road (4), and the hydrophilic walkway (5) is located on the side close to the river channel.

7. The river crossing pipeline bank protection structure according to claim 6 is characterized in that: The height of the embankment top road (4) is not less than the height of the hydrophilic walkway (5).

8. The river crossing pipeline bank protection structure according to claim 6 or 7, characterized in that: Also includes: A planting trough (6), wherein the planting trough (6) is arranged on the top of the retaining wall (1), and the planting trough (6) is located between the embankment road (4) and the hydrophilic walkway (5).

9. The river crossing pipeline bank protection structure according to claim 8 is characterized in that: The height of the planting trough (6) is not less than the height of the hydrophilic walkway (5) and is not greater than the height of the embankment top road (4).

10. The river crossing pipeline bank protection structure according to claim 1 is characterized in that: Also includes: A guardrail (7), wherein the guardrail (7) is arranged on the top of the retaining wall (1) and is located on a side close to the river channel.