Control method suitable for thrust external circulation oil pump of large water-turbine generator set

By adopting the control methods of manual start pump, self-start pump and regular automatic rotation process in the thrust external circulation oil pump of large water turbine generator sets, the problems of simultaneous failure and misstart of the oil pump are solved, and the reliability and stability of the system are improved , ensuring the safe operation of the unit.

CN118998026APending Publication Date: 2024-11-22CHINA YANGTZE POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411024774.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In actual operation, the thrust external circulation oil pump of large water turbine generator sets is prone to failure of the start-up caused by the simultaneous failure or misstarting of the two oil pumps and the problem of low oil level of the thrust oil tank, which increases the risk of reliable operation of the unit.

Method used

A control method is adopted, including manual pump start process, self-starting pump start process during unit operation, and regular automatic rotation process of thrust external circulation oil pump. By detecting multiple conditions and logical judgments, the normal operation and standby state of the oil pump are ensured, and the Incorrect start and failure, realize self-starting and regular rotation of the oil pump.

Benefits of technology

It increases the fault tolerance rate of oil pumps, improves the stable operation reliability of the thrust external circulation system, and ensures the long-term safe operation of the unit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118998026A_ABST
    Figure CN118998026A_ABST
Patent Text Reader

Abstract

The invention discloses a control method suitable for a thrust external circulation oil pump of a large water-turbine generator set. The control method comprises the following steps: S1, manually starting a pump; s2, a self-starting pump starting process is carried out during unit operation; s3, the thrust external circulation oil pump regularly and automatically turns the process; self-starting and regular automatic rotation operation of the thrust external circulation oil pump are achieved, the situation that the standby oil pump is started by mistake or the main pump and the standby pump are not started at the same time during normal operation is avoided, the oil pump operation working condition is improved, the reliability of stable operation of the thrust external circulation system is improved, and guarantee is provided for long-period safe operation of a unit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of thrust external circulation oil pumps for large-scale water turbine generator sets, in particular to a control method suitable for thrust external circulation oil pumps for large-scale water turbine generator sets. Background Art

[0002] The thrust bearing of a large hydro-turbine generator set is an important component to ensure the safe and stable operation of the unit, and the thrust external circulation oil pump, as one of the important auxiliary equipment, directly affects the normal operation of the bearing cooling system during actual production and operation. The phenomenon of excessive bearing temperature or even burning caused by poor heat dissipation of the bearing system poses a serious threat to the safe production of electricity. Whether the thrust external circulation oil pump can operate normally is also related to the success rate of the unit startup. Therefore, it is particularly important to improve the operating conditions of the oil pump and reduce the failure rate of the oil pump. Therefore, it is proposed to add a spare pump for the thrust external circulation oil pump, as well as optimize the logic of starting and regular rotation of the oil pump.

[0003] The working principle of thrust external circulation cooling is to use an external oil pump to extract the hot oil from the thrust oil tank, exchange heat through the thrust cooler, and then send the cold oil back to the thrust oil tank to reduce the temperature of the thrust bearing and the oil tank, ensuring that the thrust bearing temperature and oil temperature of the unit are within the specified range. At present, hydropower station units are generally equipped with two thrust external circulation oil pumps. When the unit is operating normally, one oil pump is started and the other pump is on standby.

[0004] The configuration of two thrust external circulation oil pumps as backup for each other in large hydropower station units has the following problems in actual operation: 1. Both oil pumps fail at the same time, causing startup failure or affecting the normal operation of the unit; 2. During normal operation, the backup oil pump is mistakenly started, causing the two oil pumps to run at the same time, causing the thrust oil tank oil level to be too low. The above situations greatly increase the risk of reliable operation of the unit. Summary of the invention

[0005] The purpose of the present invention is to overcome the above-mentioned shortcomings and provide a control method for a thrust external circulation oil pump suitable for a large-scale hydro-generator set to solve the problems raised in the background technology.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: a control method for a thrust external circulation oil pump of a large-scale hydro-generator set, which comprises the following steps: S1, Manual command to start the pump process; S2. Automatic pump start-up command process during unit operation; S3. Regular automatic rotation process of thrust external circulation oil pump.

[0007] Furthermore, the step S1 specifically includes the following steps: Step 1.1: After receiving the process start command, check whether the following conditions are met: the local control unit is in automatic control mode, the thrust external circulation oil pump is in automatic control and not in manual control mode, at least one of the two thrust oil external circulation power supplies is fault-free, and at least one of the six thrust external circulation oil pumps is fault-free; if all the above conditions are met, proceed to the next step; if not, alarm and exit the pump start process; Step 1.2: Issue a command to open two cooling water valves and two groups of branch oil circuits. The groups are started according to the thrust oil pump groups running when the machine is shut down. Check that two of the three pumps are started and only one pump in each group is running, and the cooling water flow and branch oil flow are normal. If all the above conditions are met, the pump is started successfully. If not, an alarm is triggered and the pump start process is exited. Furthermore, the step S2 specifically includes the following steps: Step 2.1: Check whether the following conditions are met: the upstream water inlet gate is not fully closed and the guide vane is not in the fully closed position, the speed is <10% and not in motion, and none of the 6 thrust external circulation oil pumps are running; if all the above conditions are met, the process start command is automatically issued and the next step is carried out; if not, an alarm is issued and the self-starting pump process is exited; Step 2.2: After receiving the process start command, check whether the following conditions are met: the local control unit is in automatic control mode, the thrust external circulation oil pump is in automatic control and not in manual control mode, at least one of the two thrust oil external circulation power supplies is fault-free, and at least one of the six thrust external circulation oil pumps is fault-free; if all the above conditions are met, proceed to the next step; if not, alarm and exit the self-starting pump process; Step 2.3: Issue a command to open two cooling water valves and two groups of branch oil circuits. The groups are started according to the thrust oil pump groups running when the machine is shut down. Check that two of the three pumps are started and only one pump in each group is running, and the cooling water flow and branch oil flow are normal. If all the above conditions are met, the pump is started successfully. If not, an alarm is triggered and the pump start process is exited.

[0008] Furthermore, the step S3 specifically includes the following steps: Step 3.1: Check that two of the three pump groups are started and only one pump in each group is running. The groups are started according to the thrust oil pump group that was running when the machine was shut down; Step 3.2: Determine whether the 84h rotation timing of the operation group has ended; if "No", the "Xth group oil pump device active and standby status bit" is set to 1, and the 84h rotation timing continues, and the next step is performed; the 84h rotation timing is the difference between 84 hours and the last selected group operation time; Step 3.3: Determine whether the "Interlocking position of the two oil pumps in the Xth group" is set to "0"; if "yes", select the N# pump as the main pump; if "no", select the N+1# pump as the main pump and proceed to the next step; Step 3.4: Select according to step 3.3 to determine whether the selected main pump is faulty; if "No", start the corresponding selected main pump. At this time, start the N# pump and set the "Xth group of two oil pumps rotation interlocking position" to "1", start the N+1# pump and set the "Xth group of two oil pumps rotation interlocking position" to "0", and then jump to step 3.6; if "Yes", proceed to the next step; Step 3.5: If a fault is detected in the selected main pump, start another standby pump in the same group. When starting the N# pump, set the "Xth group two oil pump rotation interlock position" to "1", and when starting the N+1# pump, set the "Xth group two oil pump rotation interlock position" to "0", and then proceed to the next step; Step 3.6: Start the 84h rotation timer and proceed to the next step; Step 3.7: Determine whether the 84h rotation timing of this group has ended; if "No", the "Xth group oil pump device active and standby status bit" is set to 1, the current operating state is maintained and the 84h rotation timing continues; if "Yes", the "Xth group oil pump device active and standby status bit" is set to "0", the operation of the two oil pumps of the Xth group is stopped, the Xth group oil pump is on standby, and the "Xth group oil pump device active and standby status bit" is set to "1", and the standby group oil pump is started according to the methods of steps 3.3 and step 3.4, and the 84h rotation timing is started.

[0009] Furthermore, in step 3.2, it is determined whether the operation group 84h rotation timing is completed. If "yes", it is processed according to the "yes" situation in step 3.7.

[0010] Furthermore, in step 3.3, the Xth group represents the first group, the second group, and the third group respectively. The first group of oil pumps corresponds to the 1# pump and the 2# pump when N=1, the second group of oil pumps corresponds to the 3# pump and the 4# pump when N=3, and the third group of oil pumps corresponds to the 5# pump and the 6# pump when N=5.

[0011] Furthermore, in step 3.4, when starting pumps 1# / 3# / 5#, the "first / second / third group of two oil pumps rotation interlock position" is set to "1" respectively; when starting pumps 4# / 5# / 6#, the "first / second / third group of two oil pumps rotation interlock position" is set to "0".

[0012] Furthermore, in step 3.7, if the 84h rotation timing of the operating group is over: assuming that the first and second groups of oil pumps are running, and the third group of oil pumps are on standby, the 84h rotation timing of the first group is over, then the "first group of oil pump device active-standby status bit" is set to "0", the operation of the two oil pumps in the first group is stopped, and the first group of oil pumps is on standby. At the same time, the "third group of oil pump device active-standby status bit" is set to "1", and the third group of oil pumps is started according to the methods of steps 3.3 and 3.4, and the 84h rotation timing is started.

[0013] Beneficial effects of the present invention: (1) In view of the problem that two thrust external circulation oil pumps of large hydropower station units serve as backup for each other and both oil pumps may fail at the same time, the present invention proposes to add external circulation backup oil pumps, and configure a total of 6 derived external circulation oil pumps, which are divided into three groups, 1# and 2# pumps are the first group, 3# and 4# pumps are the second group, and 5# and 6# pumps are the third group; after the derived external circulation system is started, it is ensured that two of the three groups of oil pumps are started, and only one pump is started in each group, and the other oil pump is on standby, and the 1 / 2 group, 2 / 3 group, and 3 / 1 group are rotated every 84 hours, and the single pump operation time is 168 hours. After the above addition, the backup redundancy of the derived external circulation oil pump is increased, the oil pump fault tolerance rate is increased, and the normal and reliable operation of the unit is guaranteed.

[0014] (2) Aiming at the problem that the oil level in the thrust oil tank is too low due to the simultaneous start-up of two thrust external circulation oil pumps during normal operation of a large hydropower station unit, the present invention proposes a control method for the thrust external circulation oil pump of a large hydro-turbine generator unit, which realizes the self-start and periodic automatic rotation operation of the thrust external circulation oil pump, and adds the "rotation interlock position of the two oil pumps of the Xth group" and "the main and standby status position of the oil pump device of the Xth group" in the logic judgment, so as to avoid the situation that the standby oil pump is started by mistake or the main and standby pumps are not started at the same time during normal operation, thereby improving the operating conditions of the oil pump, improving the reliability of the stable operation of the thrust external circulation system, and providing a guarantee for the long-term safe operation of the unit. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a flowchart of the periodic automatic rotation of the thrust external circulation oil pump; Figure 2 This is a flowchart of manually starting the pump; Figure 3 This is a flowchart of the automatic pump start command during the unit operation; Figure 4 The rotation curve of the thrust external circulation oil pump of a certain unit Figure 1 ; Figure 5 The rotation curve of the thrust external circulation oil pump of a certain unit Figure 2 ; Figure 6 The rotation curve of the thrust external circulation oil pump of a certain unit Figure 3 . DETAILED DESCRIPTION

[0016] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0017] Example 1: Figures 1 to 3 As shown, a control method for a thrust external circulation oil pump of a large hydro-generator set comprises the following steps: S1, manual command to start the pump process; Figure 2 As shown; Step 1.1: After receiving the process start command, check whether the following conditions are met: the local control unit is in automatic control mode, the thrust external circulation oil pump is in automatic control and not in manual control mode, at least one of the two thrust oil external circulation power supplies is fault-free, and at least one of the six thrust external circulation oil pumps is fault-free; if all the above conditions are met, proceed to the next step; if not, alarm and exit the pump start process; Step 1.2: Issue a command to open two cooling water valves and two groups of branch oil circuits. The groups are started according to the thrust oil pump groups running when the machine is shut down. Check that two of the three pumps are started and only one pump in each group is running, and the cooling water flow and branch oil flow are normal. If all the above conditions are met, the pump is started successfully. If not, an alarm is triggered and the pump start process is exited. S2, the process of issuing commands for the automatic pump start during the operation of the unit; Figure 3 As shown; A-the main and standby status position of the first group of oil pump devices; B-the rotation interlocking position of the two oil pumps in the first group; C-the main and standby status position of the second group of oil pump devices; D-the rotation interlocking position of the two oil pumps in the second group; E-the main and standby status position of the third group of oil pump devices; F-the rotation interlocking position of the two oil pumps in the third group.

[0018] Step 2.1: Check whether the following conditions are met: the upstream water inlet gate is not fully closed and the guide vane is not in the fully closed position, the speed is <10% and not in motion, and none of the 6 thrust external circulation oil pumps are running; if all the above conditions are met, the process start command is automatically issued and the next step is carried out; if not, an alarm is issued and the self-starting pump process is exited; Step 2.2: After receiving the process start command, check whether the following conditions are met: the local control unit is in automatic control mode, the thrust external circulation oil pump is in automatic control and not in manual control mode, at least one of the two thrust oil external circulation power supplies is fault-free, and at least one of the six thrust external circulation oil pumps is fault-free; if all the above conditions are met, proceed to the next step; if not, alarm and exit the self-starting pump process; Step 2.3: Issue a command to open two cooling water valves and two groups of branch oil circuits. The groups are started according to the thrust oil pump groups running when the machine is shut down. Check that two of the three pumps are started and only one pump in each group is running, and the cooling water flow and branch oil flow are normal. If all the above conditions are met, the pump is started successfully. If the above conditions are not met, an alarm is issued and the pump start process is exited. S3, the thrust external circulation oil pump regular automatic rotation process. Figure 1 As shown, Step 3.1: Check that two of the three pump groups are started and only one pump in each group is running. The groups are started according to the thrust oil pump group that was running when the machine was shut down; Step 3.2: Determine whether the 84h rotation timing of the operation group has ended; if "No", the "Xth group oil pump device active and standby status bit" is set to 1, and the 84h rotation timing continues, and the next step is performed; the 84h rotation timing is the difference between 84 hours and the last selected group operation time; Step 3.3: Determine whether the "Interlocking position of the two oil pumps in the Xth group" is set to "0"; if "yes", select the N# pump as the main pump; if "no", select the N+1# pump as the main pump and proceed to the next step; Step 3.4: Select according to step 3.3 to determine whether the selected main pump is faulty; if "No", start the corresponding selected main pump. At this time, start the N# pump and set the "Xth group of two oil pumps rotation interlocking position" to "1", start the N+1# pump and set the "Xth group of two oil pumps rotation interlocking position" to "0", and then jump to step 3.6; if "Yes", proceed to the next step; Step 3.5: If a fault is detected in the selected main pump, start another standby pump in the same group. When starting the N# pump, set the "Xth group two oil pump rotation interlock position" to "1", and when starting the N+1# pump, set the "Xth group two oil pump rotation interlock position" to "0", and then proceed to the next step; Step 3.6: Start the 84h rotation timer and proceed to the next step; Step 3.7: Determine whether the 84h rotation timing of this group has ended; if "No", then the "Xth group oil pump device active and standby status bit" is set to 1, the current operating state is maintained and the 84h rotation timing continues; if "Yes", then the "Xth group oil pump device active and standby status bit" is set to "0", the operation of the two oil pumps of the Xth group is stopped, the Xth group oil pump is on standby, and at the same time, the "Xth group oil pump device active and standby status bit" is set to "1" (here "Xth group" refers to the standby group), start the standby group oil pump according to the methods of steps 3.3 and step 3.4, and start the 84h rotation timing.

[0019] Furthermore, in step 3.2, it is determined whether the operation group 84h rotation timing is completed. If "yes", it is processed according to the "yes" situation in step 3.7.

[0020] Furthermore, in step 3.3, the Xth group represents the first group, the second group, and the third group respectively. The first group of oil pumps corresponds to the 1# pump and the 2# pump when N=1, the second group of oil pumps corresponds to the 3# pump and the 4# pump when N=3, and the third group of oil pumps corresponds to the 5# pump and the 6# pump when N=5.

[0021] Furthermore, in step 3.4, when starting pumps 1# / 3# / 5#, the "first / second / third group of two oil pumps rotation interlock position" is set to "1" respectively; when starting pumps 4# / 5# / 6#, the "first / second / third group of two oil pumps rotation interlock position" is set to "0".

[0022] Furthermore, in step 3.7, if the 84h rotation timing of the operating group is over: assuming that the first and second groups of oil pumps are running, and the third group of oil pumps is on standby, the 84h rotation timing of the first group is over, then the "first group of oil pump device active-standby status bit" is set to "0", the operation of the two oil pumps in the first group is stopped, the first group of oil pumps is on standby, and at the same time, the "third group of oil pump device active-standby status bit" is set to "1" (here "the third group" refers to the standby group), start the third group of oil pumps according to the methods in steps 3.3 and 3.4, and start the 84h rotation timing.

[0023] Example 2: This example demonstrates a new control process for the thrust external circulation oil pump of a large hydro-turbine generator set. Taking a unit of a hydropower station as an example, a total of 6 derivation external circulation oil pumps are configured, which are divided into three groups. Pumps 1# and 2# are the first group, pumps 3# and 4# are the second group, and pumps 5# and 6# are the third group. After the derivation external circulation system is started, two of the three groups of oil pumps are started, and only one pump is started in each group. The other oil pump is on standby. The rotation operation of groups 1 / 2, 2 / 3, and 3 / 1 is completed at intervals of 84 hours. The operation time of a single pump is 168 hours, and the thrust external circulation oil pump is self-starting and regularly rotated. Automatic operation. In addition, there are "the rotation interlock position of the two oil pumps of the Xth group" and "the main and standby status position of the oil pump device of the Xth group" in the process logic judgment, which avoids the situation in which the standby oil pump is mistakenly started or the main and standby pumps are not started at the same time during normal operation. For example: At 7 o'clock on July 9, the first group 1# pump and the third group 6# pump of a certain unit started and operated (see Figure 4 ); At 19:00 on July 12, the third group 6# pump stopped running and the second group 4# pump started (see Figure 5 ); At 7:00 on July 16, the first group 1# pump stopped running, and the third group 5# pump started (see Figure 6 ). Among them, the rotation time interval from the third group 6# pump to the second group 4# pump is 84h, and the single pump operation time of the first group 1# pump is 168h (the slight time error in the figure is the fixed-point screenshot error). For specific flow charts and conditional judgment block diagrams, see Figure 1-Figure 3 .

[0024] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A control method for the thrust external circulation oil pump of a large hydro-generator set, Features: It includes the following steps: S1, manual command to start the pump process; S2. Automatic pump start-up command process during unit operation; S3. Regular automatic rotation process of thrust external circulation oil pump.

2. A control method for a thrust external circulation oil pump of a large hydro-generator set according to claim 1, Features: The step S1 specifically includes the following steps: Step 1.1: After receiving the process start command, check whether the following conditions are met: the local control unit is in automatic control mode, the thrust external circulation oil pump is in automatic control and not in manual control mode, at least one of the two thrust oil external circulation power supplies is fault-free, and at least one of the six thrust external circulation oil pumps is fault-free; if all the above conditions are met, proceed to the next step; if not, alarm and exit the pump start process; Step 1.2: Issue a command to open two cooling water valves and two groups of branch oil circuits. The groups are started according to the thrust oil pump groups running when the machine is shut down. Check that two of the three pumps are started and only one pump in each group is running, and the cooling water flow and branch oil flow are normal. If all the above conditions are met, the pump is started successfully. If not, an alarm is triggered and the pump start process is exited.

3. A control method for a thrust external circulation oil pump of a large hydro-generator set according to claim 1, Features: The step S2 specifically includes the following steps: Step 2.1: Check whether the following conditions are met: the upstream water inlet gate is not fully closed and the guide vane is not in the fully closed position, the speed is <10% and not in motion, and none of the 6 thrust external circulation oil pumps are running; if all the above conditions are met, the process start command is automatically issued and the next step is carried out; if not, an alarm is issued and the self-starting pump process is exited; Step 2.2: After receiving the process start command, check whether the following conditions are met: the local control unit is in automatic control mode, the thrust external circulation oil pump is in automatic control and not in manual control mode, at least one of the two thrust oil external circulation power supplies is fault-free, and at least one of the six thrust external circulation oil pumps is fault-free; if all the above conditions are met, proceed to the next step; if not, alarm and exit the self-starting pump process; Step 2.3: Issue a command to open two cooling water valves and two groups of branch oil circuits. The groups are started according to the thrust oil pump groups running when the machine is shut down. Check that two of the three pumps are started and only one pump in each group is running, and the cooling water flow and branch oil flow are normal. If all the above conditions are met, the pump is started successfully. If not, an alarm is triggered and the pump start process is exited.

4. A control method for a thrust external circulation oil pump of a large hydro-generator set according to claim 1, Features: The step S3 specifically comprises the following steps: Step 3.1: Check that two of the three pump groups are started and only one pump in each group is running. The groups are started according to the thrust oil pump group that was running when the machine was shut down; Step 3.2: Determine whether the 84h rotation timing of the operation group has ended; if "No", then the "Xth group oil pump device active and standby status bit" is set to 1, continue the 84h rotation timing, and proceed to the next step; the 84h rotation timing is the difference between 84 hours and the last selected group operation time; Step 3.3: Determine whether the "Xth group of two oil pumps rotation interlock position" is set to "0"; if "yes", select the N# pump as the main pump; if "no", select the N+1# pump as the main pump and proceed to the next step; Step 3.4: According to step 3.3, determine whether the selected main pump is faulty; if "No", start the corresponding selected main pump. At this time, start the N# pump and set the "Xth group of two oil pumps rotation interlocking position" to "1", start the N+1# pump and set the "Xth group of two oil pumps rotation interlocking position" to "0", and then jump to step 3.6; if "Yes", proceed to the next step; Step 3.5: If a fault is detected in the selected main pump, start another standby pump in the same group. When starting the N# pump, set the "Xth group of two oil pumps rotation interlock position" to "1", and when starting the N+1# pump, set the "Xth group of two oil pumps rotation interlock position" to "0", and then proceed to the next step; Step 3.6: Start the 84h rotation timer and proceed to the next step; Step 3.7: Determine whether the 84h rotation timing of this group has ended; if "No", then the "Xth group oil pump device active and standby status bit" is set to 1, the current operating state is maintained and the 84h rotation timing continues; if "Yes", then the "Xth group oil pump device active and standby status bit" is set to "0", the operation of the two oil pumps of the Xth group is stopped, the Xth group oil pump is on standby, and at the same time, the "Xth group oil pump device active and standby status bit" is set to "1", and the standby group oil pump is started according to the methods of steps 3.3 and step 3.4, and the 84h rotation timing is started.

5. A control method for a thrust external circulation oil pump of a large hydro-generator set according to claim 4, Features: In step 3.2, it is determined whether the operation group 84h rotation timing is completed. If "yes", it is processed according to the "yes" situation in step 3.

7.

6. A control method for a thrust external circulation oil pump of a large hydro-generator set according to claim 4, Features: In step 3.3, the Xth group represents the first group, the second group, and the third group respectively. The first group of oil pumps corresponds to the 1# pump and the 2# pump when N=1, the second group of oil pumps corresponds to the 3# pump and the 4# pump when N=3, and the third group of oil pumps corresponds to the 5# pump and the 6# pump when N=5.

7. A control method for a thrust external circulation oil pump of a large hydro-generator set according to claim 4, Features: In step 3.4, when starting pumps 1# / 3# / 5#, set the "first / second / third group of two oil pumps rotation interlock position" to "1" respectively; when starting pumps 4# / 5# / 6#, set the "first / second / third group of two oil pumps rotation interlock position" to "0".

8. A control method for a thrust external circulation oil pump of a large hydro-generator set according to claim 4, Features: In step 3.7, if the 84h rotation timing of the running group has ended: assuming that the first and second oil pumps are running, and the third oil pump is on standby, the 84h rotation timing of the first group has ended, then the "first group oil pump device active-standby status bit" is set to "0", the operation of the first two oil pumps is stopped, the first group oil pump is on standby, and at the same time, the "third group oil pump device active-standby status bit" is set to "1", and the third group oil pump is started according to the methods of steps 3.3 and 3.4, and the 84h rotation timing is started.