Cascading failure risk assessment method and system for accessing large-scale wind power into power grid

By establishing a transmission line break probability model and node loss model, and combining the wind turbine fault failure model for chain fault simulation analysis, the problem of chain fault risk assessment when large-scale wind power is connected to the power grid is solved, and the operation safety and fault of the power grid are improved Coping ability.

CN119004754APending Publication Date: 2024-11-22GUIZHOU POWER GRID CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410880059.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

When large-scale wind power is connected to the power grid, output power fluctuations caused by changes in wind speed cause system frequency and voltage fluctuations, increasing the risk of chain failures, and it is difficult for the existing technology to effectively evaluate and prevent these failures.

Method used

The transmission line break probability model is established based on thermal effects, and combined with a segmented linear model, the transmission line break probability is modeled, and the chain fault simulation analysis is carried out through the node loss model and the wind turbine fault model to evaluate the grid risks.

Benefits of technology

It improves the operational safety and power supply reliability after wind power is connected to the power grid, provides a comprehensive evaluation and fault prevention reference for power grid chain faults, and enhances the fault response capabilities of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119004754A_ABST
    Figure CN119004754A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power grid risk assessment, in particular to a cascading failure risk assessment method and system for large-scale wind power access to a power grid, and the assessment method comprises the steps: building a power transmission line breakage probability model; establishing a load loss model according to the node load loss amount; constructing a fault model of the wind turbine generator; performing cascading failure simulation analysis based on the established model; according to the method, the power transmission line breakage probability model is established, so that the power transmission line breakage probability is accurately evaluated; the power transmission line breakage probability is modeled by adopting the piecewise linear model, the breakage risks of the power transmission line in different load states are effectively simulated, and a powerful guarantee is provided for safe operation of a power grid; through cascading failure simulation analysis, whether power flow of a power transmission line is out of limit is taken as a termination condition of failure evolution, and the cascading failure risk after wind power is connected into a power grid can be comprehensively evaluated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid risk assessment, and in particular to a method and system for assessing the cascading failure risk of large-scale wind power access to a power grid. Background Art

[0003] Large-scale wind power access will have many impacts on the operation of the power system. In terms of reliability, changes in wind speed will cause fluctuations in the output power of wind turbines, which in turn will cause fluctuations in system frequency and voltage, reducing the quality of power. Since wind turbine operation has stricter requirements on voltage and frequency, when the system frequency and voltage deviations exceed the allowable range, it will cause the wind turbine to be disconnected from the grid, thereby causing more serious chain failures. Therefore, large-scale wind power access has put forward new requirements for the dispatching operation and risk assessment of the power grid, especially the need to carry out research on power grid security assessment under the impact of chain failures.

[0004] When large-scale wind power is connected, the branch current and node voltage amplitude have stronger volatility. The branch disconnection model and node load loss model in the conventional power system must be modified accordingly while taking into account the randomness of the output of new energy. The present invention proposes a risk assessment method for grid cascading failures considering large-scale wind power access, establishes a comprehensive assessment system from risk sources, failure processes and failure consequences, increases the safety resource investment of vulnerable components in the power system, and takes precautions before they occur. Summary of the invention

[0005] In view of the above-mentioned problems, the present invention is proposed.

[0006] Therefore, the present invention provides a method for assessing the risk of cascading failures of large-scale wind power access to the power grid. By establishing a transmission line disconnection probability model and building it based on the thermal effect of the transmission line, an accurate assessment of the probability of transmission line disconnection is achieved, thereby improving the operational safety after wind power is connected to the power grid; by adopting a piecewise linear model to model the probability of transmission line disconnection, the flow limit per unit time is used as a factor affecting the probability of disconnection, and the risk of transmission line disconnection under different load conditions is effectively simulated, providing a strong guarantee for the safe operation of the power grid.

[0007] To solve the above technical problems, the present invention provides the following technical solutions: A method for assessing the cascading failure risk of large-scale wind power access to a power grid, comprising the following steps:

[0008] Establish a transmission line disconnection probability model;

[0009] Establish a load loss model according to the node load loss amount;

[0010] Construct fault models for wind turbines;

[0011] Carry out cascading failure simulation analysis based on the established model.

[0012] As a preferred solution of the cascading failure risk assessment method for large-scale wind power access to the power grid described in the present invention, the transmission line disconnection probability model is established based on the thermal effect of the transmission line. The thermal effect of the transmission line refers to the heat generated when the current passes through the conductor, which can cause the temperature of the conductor to rise. The conductor with increased temperature can increase the disconnection probability of the transmission line. The specific calculation formula of the disconnection probability of the transmission line is as follows:

[0013]

[0014] Among them, P l represents the power of the transmission line, f represents the function of the power of the transmission line changing with time, and k represents the normalization factor;

[0015] The thermal effect of the transmission line refers to that when current passes through the transmission line, the conductor through which the current passes will generate heat, and the generated heat can cause the temperature of the conductor to rise. When the temperature of the conductor rises, the probability of disconnection of the transmission line increases.

[0016] As a preferred solution of the method for assessing the risk of cascading failures of large-scale wind power access to the power grid described in the present invention, the transmission line disconnection probability model takes the power flow limit per unit time as a factor affecting the probability of transmission line disconnection, and adopts a piecewise linear model to model the probability of transmission line disconnection. The specific modeling is as follows:

[0017]

[0018] Among them, P l represents the power flow of the transmission line at the simulation time, P m It indicates the upper limit of the power flow of the transmission line. The probability of disconnection of the transmission line is linearly related to the power flow of the transmission line. The specific relationship is as follows:

[0019] When the power flow of the transmission line at the simulation time satisfies the formula P m ≤P l ≤2P m When , it means that the disconnection probability of the transmission line will change with the transmission line power flow P at the simulation time. l Linear increase;

[0020] When the power flow of the transmission line at the simulation time satisfies the formula P l =2P m When , it means that the probability of the transmission line being disconnected reaches 100%, and the transmission line will definitely be disconnected at this time.

[0021] As a preferred solution of the method for assessing the risk of cascading failures of large-scale wind power access to the power grid described in the present invention, wherein: the load loss model established according to the node load loss amount is to construct the load loss model using the node load loss characteristics, the node load loss characteristics means that after the node voltage amplitude deviates from the rated value, the load will be disconnected from the grid once according to the voltage requirements during normal operation, the load loss model established according to the node load loss amount is to establish the load loss model according to the characteristic load, the characteristic load is divided according to the different tolerance capabilities to voltage deviation, including precision equipment and instrument load, household appliance load and industrial equipment load;

[0022] The precision equipment load refers to the maximum voltage offset V max_os Satisfy formula V max_os =V e_os ±0.05pu load, V e_os Indicates the standard load offset, and when the voltage offset V os Satisfy formula V os =V e_os When ±0.1pu, all current precision equipment and instrument loads are disconnected from the grid;

[0023] The household appliance load refers to the maximum voltage deviation V max_os Satisfy formula V max_os =V e_os ±0.1pu load, V e_os Indicates the standard load offset, and when the voltage offset V os Satisfy formula V os =V e_os When ±0.25pu, all current household electrical appliance loads are disconnected from the grid;

[0024] The industrial equipment load refers to the maximum voltage deviation V max_os Satisfy formula V max_os =V e_os ±0.15pu load, V e_os Indicates the standard load offset, and when the voltage offset V os Satisfy formula V os =V e_os When the load is ±0.4pu, all current industrial equipment loads are disconnected from the grid.

[0025] As a preferred solution of the method for assessing the risk of cascading failures of large-scale wind power access to the power grid described in the present invention, the load loss model is constructed based on the node load loss rate, and the node load loss rate is calculated based on the node voltage amplitude. The specific calculation formula is as follows:

[0026]

[0027] Among them, V max 、V min Indicates the limit value of the current type of load. When the node voltage exceeds the limit value, all the current node loads are disconnected from the grid. lb 、V ub It indicates the upper and lower limits of the current node load. When the node voltage exceeds the upper and lower limits, part of the current node load is disconnected from the grid. c1 and c2 represent correction coefficients. When the node voltage amplitude is between the acceptance value and the limit value, the load loss rate is linearly related to the node voltage amplitude.

[0028] As a preferred solution of the method for assessing the risk of cascading failures of large-scale wind power access to the power grid described in the present invention, wherein: the fault model of the wind turbine set is constructed according to the output power of the wind turbine set, the wind turbine motor comprises a voltage protection device and a control device, the voltage protection device comprises an overvoltage protection device and a low voltage protection device, when the voltage deviates from the allowable range, the control device reduces the power injected by the wind turbine set into the power grid by adjusting the blade angle, when the voltage is too high, the wind turbine set triggers the overvoltage protection device, when the voltage is too low, the wind turbine set triggers the low voltage protection device;

[0029] The fault model of the wind turbine generator set is constructed according to the output power of the turbine generator set. The output power of the wind turbine generator set is corrected based on the node voltage amplitude. The specific implementation formula is as follows:

[0030]

[0031] in, represents the corrected wind turbine output power, k represents the conversion coefficient, V ub 、V lb Indicates the upper and lower limits allowed for the wind turbine voltage.

[0032] As a preferred solution of the cascading failure risk assessment method for large-scale wind power access to the power grid described in the present invention, the cascading failure simulation analysis based on the established model is performed by calculating the injected power of the node, and taking whether the power flow of the transmission line exceeds the limit as the termination condition of the fault evolution. When all the power flows of the transmission lines are within the allowable range, the cascading failure simulation analysis ends;

[0033] The specific process of the cascading failure simulation analysis is as follows:

[0034] Discretize the wind speed of the input wind turbine, and use the fault model of the wind turbine to calculate the state transition probability between different wind speeds, and then generate the state transfer matrix P; determine the wind turbine access node and wind power access ratio, randomly generate the initial wind speed v of each node and the corresponding state probability vector ω; initialize the fault input; execute the chain fault simulation analysis mechanism;

[0035] The specific execution process of the cascading failure simulation analysis mechanism is as follows:

[0036] Calculate the wind power access power of each node, and then obtain the node power injection vector;

[0037] The power flow calculation is performed using the transmission line disconnection probability model to calculate the transmission line power flow and node load;

[0038] Determine whether the power flow of the transmission line exceeds the limit. When the power flow of the transmission line exceeds the limit, use the constructed power line disconnection probability model to calculate the power line disconnection probability, and at the same time use Monte Carlo sampling to randomly disconnect the power line with the power flow exceeding the limit, and update the power system topology map; when the power flow of the transmission line does not exceed the limit, continue to execute the subsequent steps;

[0039] Determine whether the node voltage exceeds the limit. When the node voltage exceeds the limit, use the load loss model to calculate the node load loss rate. When the node voltage does not exceed the limit, continue to execute the subsequent steps.

[0040] Using the formula v t+1 =Pv t The wind speed state probability vector at the next moment is calculated, and the calculated result is compared with the fault model of the wind turbine. If the calculated result is within the allowable range of the fault model of the wind turbine, it means that the current cascading fault simulation analysis is completed; if the calculated result exceeds the allowable range of the fault model of the wind turbine, the cascading fault simulation analysis mechanism is repeatedly executed until the termination condition of the cascading fault simulation analysis mechanism is met.

[0041] Another object of the present invention is to provide a cascading failure risk assessment system for large-scale wind power access to the power grid, which can establish a load loss model based on the node load loss amount, and by considering the tolerance of different load types to voltage deviation, it can achieve accurate simulation of node load loss conditions, which is helpful to optimize the load distribution of the power grid and improve the power supply reliability of the power grid; by performing cascading failure simulation analysis, whether the transmission line current exceeds the limit is used as the termination condition of the fault evolution, it can comprehensively assess the cascading failure risk after wind power is connected to the power grid, which provides an important reference for fault prevention and emergency handling of the power grid, and further enhances the fault response capability of the power grid.

[0042] As a preferred solution of the cascading failure risk assessment system for large-scale wind power access to the power grid described in the present invention, it includes: a transmission line disconnection probability model building module, a load loss model building module, a wind turbine fault model building module and a cascading failure simulation analysis module; the transmission line disconnection probability model building module builds a transmission line disconnection probability model based on the transmission line power; the load loss model building module builds a load loss model based on the node load loss amount; the wind turbine fault model building module builds a wind turbine fault model based on the wind turbine output power; the cascading failure simulation analysis module uses the built model to perform cascading failure simulation analysis.

[0043] A computer device comprises a memory and a processor, wherein the memory stores a computer program, and is characterized in that when the processor executes the computer program, steps of a method for assessing the risk of cascading failures of large-scale wind power access to a power grid are implemented.

[0044] A computer-readable storage medium having a computer program stored thereon, characterized in that when the computer program is executed by a processor, the steps of a method for assessing the risk of cascading failures of large-scale wind power access to a power grid are implemented.

[0045] Beneficial effects of the present invention: The present invention establishes a transmission line disconnection probability model and builds it based on the thermal effect of the transmission line, thereby realizing an accurate assessment of the transmission line disconnection probability, thereby improving the operational safety after wind power is connected to the power grid; by adopting a piecewise linear model to model the transmission line disconnection probability, the power flow limit per unit time is used as a factor affecting the disconnection probability, and the disconnection risk of the transmission line under different load conditions is effectively simulated, providing a strong guarantee for the safe operation of the power grid; a load loss model is established based on the node load loss amount, and by considering the tolerance of different load types to voltage deviation, an accurate simulation of the node load loss situation is achieved, which is helpful to optimize the load distribution of the power grid and improve the power supply reliability of the power grid; by performing a chain failure simulation analysis, whether the transmission line power flow exceeds the limit is used as the termination condition of the fault evolution, the chain failure risk after the wind power is connected to the power grid can be comprehensively assessed, which provides an important reference for the fault prevention and emergency handling of the power grid, and further enhances the fault response capability of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0047] Figure 1The present invention is a schematic diagram of the overall method steps of a method for assessing the risk of cascading failures of large-scale wind power access to a power grid.

[0048] Figure 2 The present invention is a schematic diagram of the overall composition structure of a cascading failure risk assessment system for large-scale wind power access to a power grid.

[0049] Figure 3 It is a schematic diagram of load loss caused by combined disconnection when the wind power penetration rate is 30% in a cascading failure risk assessment system for large-scale wind power access to a power grid according to the present invention.

[0050] Figure 4 It is a schematic diagram of load loss caused by combined disconnection when the wind power penetration rate is 50% in a cascading failure risk assessment system for large-scale wind power access to a power grid according to the present invention.

[0051] Figure 5 It is a schematic diagram of load loss caused by combined disconnection when the wind power penetration rate is 70% in a cascading failure risk assessment system for large-scale wind power access to a power grid according to the present invention. DETAILED DESCRIPTION

[0052] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0053] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0054] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0055] The present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0056] At the same time, in the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0057] In the present invention, unless otherwise clearly specified and limited, the terms "install, connect, connect" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0058] Example 1

[0059] Reference Figure 1 , which is the first embodiment of the present invention, provides a method for assessing the cascading failure risk of large-scale wind power access to the power grid, comprising the following steps:

[0060] S1: Establish a transmission line disconnection probability model.

[0061] Specifically, the transmission line disconnection probability model is established based on the thermal effect of the transmission line. The thermal effect of the transmission line refers to the fact that the heat generated when the current passes through the conductor can cause the temperature of the conductor to rise; the conductor with increased temperature can increase the disconnection probability of the transmission line. The specific calculation formula of the disconnection probability of the transmission line is as follows:

[0062]

[0063] Among them, P l represents the power of the transmission line, f represents the function of the transmission line power changing with time, and k represents the normalization factor.

[0064] It should be noted that the thermal effect of a transmission line means that when current passes through the transmission line, the conductor through which the current passes will generate heat. The heat generated can cause the temperature of the conductor to rise. When the temperature of the conductor rises, the probability of a transmission line break will increase accordingly.

[0065] Furthermore, the transmission line disconnection probability model takes the power flow limit per unit time as a factor affecting the transmission line disconnection probability, and uses a piecewise linear model to model the transmission line disconnection probability. The specific modeling is as follows:

[0066]

[0067] Among them, P l represents the power flow of the transmission line at the simulation time, P m It indicates the upper limit of the power flow of the transmission line. The probability of disconnection of the transmission line is linearly related to the power flow of the transmission line. The specific relationship is as follows:

[0068] When the power flow of the transmission line at the simulation time satisfies the formula P m ≤P l ≤2P m When , it means that the disconnection probability of the transmission line will change with the transmission line power flow P at the simulation time. l Linear increase;

[0069] When the power flow of the transmission line at the simulation time satisfies the formula P l =2P m When , it means that the probability of the transmission line being disconnected reaches 100%, and the transmission line will definitely be disconnected at this time.

[0070] It should be noted that in order to further construct an accurate transmission line disconnection probability model, the influence of the over-limit duration on the transmission line disconnection probability is taken into account, as follows:

[0071] When the power flow of the transmission line at the simulation time satisfies the formula P l ≥2P m , and when three simulation time steps are run continuously, it means that the probability of disconnection is 100%. The model constructed at this time is as follows:

[0072]

[0073] Among them, P l (t) It represents the branch power flow at the t-th simulation time step. When the subsequent chain simulation analysis is carried out, when the branch power flow returns to the allowable range, the disconnection probability of the transmission line is recalculated from t=1.

[0074] S2: Establish a load loss model based on the node load loss amount.

[0075] Specifically, the load loss model established according to the node load loss amount is to construct the load loss model using the node load loss characteristics. The node load loss characteristics mean that after the node voltage amplitude deviates from the rated value, the load will be disconnected from the grid once according to the voltage requirements during normal operation. The load loss model established according to the node load loss amount is to establish the load loss model according to the characteristic load. The characteristic load is divided according to the different tolerance capabilities to voltage deviation, including precision equipment and instrument load, household appliance load and industrial equipment load.

[0076] Furthermore, the precision equipment load refers to the maximum voltage offset V max_os Satisfy formula V max_os =V e_os ±0.05pu load, V e_os Indicates the standard load offset, and when the voltage offset V os Satisfy formula V os =V e_os When ±0.1pu, all current precision equipment and instrument loads are disconnected from the grid;

[0077] The household appliance load refers to the maximum voltage deviation V max_os Satisfy formula V max_os =V e_os ±0.1pu load, V e_os Indicates the standard load offset, and when the voltage offset V os Satisfy formula V os =V e_os When ±0.25pu, all current household electrical appliance loads are disconnected from the grid;

[0078] The industrial equipment load refers to the maximum voltage deviation V max_os Satisfy formula V max_os =V e_os ±0.15pu load, V e_os Indicates the standard load offset, and when the voltage offset V os Satisfy formula V os =V e_os When the load is ±0.4pu, all current industrial equipment loads are disconnected from the grid.

[0079] Furthermore, the load loss model is constructed based on the node load loss rate, and the node load loss rate is calculated based on the node voltage amplitude. The specific calculation formula is as follows:

[0080]

[0081] Among them, V max 、V min Indicates the limit value of the current type of load. When the node voltage exceeds the limit value, all the current node loads are disconnected from the grid. lb 、V ub It indicates the upper and lower limits of the current node load. When the node voltage exceeds the upper and lower limits, part of the current node load is disconnected from the grid. c1 and c2 represent correction coefficients. When the node voltage amplitude is between the acceptance value and the limit value, the load loss rate is linearly related to the node voltage amplitude.

[0082] It should be noted that in order to further refine the load loss model and take into account the impact of auxiliary fluctuations in node voltage caused by wind power access, the load loss rate of the node voltage limit value for three consecutive simulation time steps is calculated. The specific calculation formula is as follows:

[0083]

[0084] Among them, L i It represents the loss of different types of loads. When faults occur continuously, the off-grid loads cannot be reconnected to the power system, and the node load loss rate does not need to be calculated repeatedly.

[0085] S3: Construct a fault model for wind turbines.

[0086] Specifically, the fault model of the wind turbine is constructed according to the output power of the wind turbine. The wind turbine motor includes a voltage protection device and a control device. The voltage protection device includes an overvoltage protection device and a low voltage protection device. When the voltage deviates from the allowable range, the control device reduces the power injected by the wind turbine into the power grid by adjusting the blade angle. When the voltage is too high, the wind turbine triggers the overvoltage protection device. When the voltage is too low, the wind turbine triggers the low voltage protection device.

[0087] Furthermore, the fault model of the wind turbine generator set is constructed according to the output power of the turbine generator set. The output power of the wind turbine generator set is corrected based on the node voltage amplitude. The specific implementation formula is as follows:

[0088]

[0089] in, represents the corrected wind turbine output power, k represents the conversion coefficient, V ub 、V lb Indicates the upper and lower limits allowed for the wind turbine voltage.

[0090] It should be noted that when the voltage of the wind turbine exceeds the limit value, the protection mechanism will be triggered. The specific protection mechanism is as follows:

[0091] When the voltage of the wind turbine drops below 0.7pu, the voltage of the wind turbine is too low, triggering the protection mechanism, and the wind turbine is immediately disconnected from the grid;

[0092] When the voltage of the wind turbine generator set rises to 1.3pu, the voltage of the wind turbine generator set is too high, triggering the protection mechanism, and the wind turbine generator set is immediately disconnected from the grid.

[0093] S4: Conduct cascading failure simulation analysis based on the established model.

[0094] Specifically, the cascading failure simulation analysis based on the established model is performed by calculating the injected power of the node, and taking whether the power flow of the transmission line exceeds the limit as the termination condition of the fault evolution. When all the power flows of the transmission lines are within the allowable range, the cascading failure simulation analysis ends.

[0095] Furthermore, the specific process of the cascading failure simulation analysis is as follows:

[0096] The wind speed of the input wind turbine is discretized, and the state transition probability between different wind speeds is calculated using the fault model of the wind turbine, thereby generating a state transfer matrix P; the wind turbine access nodes and wind power access ratio are determined, and the initial wind speed v of each node and the corresponding state probability vector ω are randomly generated; the fault input is initialized; and a chain failure simulation analysis mechanism is executed.

[0097] Furthermore, the specific execution process of the cascading failure simulation analysis mechanism is as follows:

[0098] Calculate the wind power access power of each node, and then obtain the node power injection vector;

[0099] The power flow calculation is performed using the transmission line disconnection probability model to calculate the transmission line power flow and node load;

[0100] Determine whether the power flow of the transmission line exceeds the limit. When the power flow of the transmission line exceeds the limit, use the constructed power line disconnection probability model to calculate the power line disconnection probability, and at the same time use Monte Carlo sampling to randomly disconnect the power line with the power flow exceeding the limit, and update the power system topology map; when the power flow of the transmission line does not exceed the limit, continue to execute the subsequent steps;

[0101] Determine whether the node voltage exceeds the limit. When the node voltage exceeds the limit, use the load loss model to calculate the node load loss rate. When the node voltage does not exceed the limit, continue to execute the subsequent steps.

[0102] Using the formula v t+1 =Pv t The wind speed state probability vector at the next moment is calculated, and the calculated result is compared with the fault model of the wind turbine. If the calculated result is within the allowable range of the fault model of the wind turbine, it means that the current cascading fault simulation analysis is completed; if the calculated result exceeds the allowable range of the fault model of the wind turbine, the cascading fault simulation analysis mechanism is repeatedly executed until the termination condition of the cascading fault simulation analysis mechanism is met.

[0103] Example 2

[0104] Reference Figure 2-Figure 5, which is the second embodiment of the present invention, provides a cascading failure risk assessment system for large-scale wind power access to the power grid, including a transmission line disconnection probability model building module, a load loss model building module, a wind turbine fault model building module and a cascading failure simulation analysis module;

[0105] Specifically, the transmission line disconnection probability model building module builds a transmission line disconnection probability model based on the transmission line power; the load loss model building module builds a load loss model based on the node load loss amount; the wind turbine fault model building module builds a wind turbine fault model based on the wind turbine output power; the cascading failure simulation analysis module uses the built model to perform cascading failure simulation analysis.

[0106] Furthermore, the transmission line disconnection probability model building module is based on the thermal effect of the transmission line. By analyzing the function of the transmission line power changing with time and combining the normalization factor, a transmission line disconnection probability model is constructed. When the current passes through the transmission line, the heat generated by the conductor will cause the conductor temperature to rise, thereby increasing the disconnection probability. The model established by the transmission line disconnection probability model building module can predict the disconnection risk of the transmission line in real time, providing an important basis for the stable operation of the power grid.

[0107] The load loss model building module builds a load loss model based on the node load loss amount and the node load loss characteristics; the load loss model takes into account the tolerance of different types of loads to voltage deviation, including precision equipment and instrument loads, household appliance loads, and industrial equipment loads; by accurately analyzing the impact of node voltage amplitude changes on loads, the load loss model building module can accurately evaluate the node load loss situation and provide strong support for power grid dispatching;

[0108] The wind turbine fault model building module is based on the output power of the wind turbine and combines the working principles of the voltage protection device and the control device to build a wind turbine fault model; when the grid voltage deviates from the allowable range, the wind turbine can reduce the output power by adjusting the blade angle, or trigger the corresponding protection device; the model established by the wind turbine fault model building module can realize real-time monitoring and early warning of wind turbine fault conditions, ensuring the stability and safety of wind power access to the grid;

[0109] The cascading failure simulation analysis module uses the model built by the previous three modules to perform cascading failure simulation analysis; by calculating the injected power of the node and taking whether the transmission line current exceeds the limit as the termination condition of the fault evolution, the cascading failure simulation analysis can simulate the chain reaction process of the power grid after the fault occurs; when all the transmission line currents are within the allowable range, the simulation analysis ends; through the simulation analysis of the cascading failure simulation analysis module, the cascading failure risk of wind power access to the power grid can be accurately evaluated, providing an important reference for fault prevention and emergency handling of the power grid.

[0110] It should be noted that this system realizes a comprehensive assessment of the risk of cascading failures of large-scale wind power access to the power grid by constructing multiple key modules; the modules are closely linked and interact with each other to jointly ensure the stable operation of the power grid; by real-time prediction of the risk of transmission line disconnection, accurate assessment of node load loss, and real-time monitoring of wind turbine failures, this system can promptly discover potential hidden dangers of power grid failures and provide strong support for power grid dispatch and fault handling; at the same time, through the cascading failure simulation and analysis module, this system can simulate the chain reaction process of the power grid after a failure occurs, providing an important reference for power grid fault prevention and emergency handling, helping to reduce power grid failure losses and improve the reliability and stability of the power grid.

[0111] Furthermore, in order to further verify the beneficial effects of the present invention, a practical application case is first provided for verification, as follows:

[0112] First, wind turbines with output ratios of 30%, 50%, and 70% were connected to the grid, simulating a wildfire that randomly disconnected four transmission lines. The curves of the system load loss rate and the number of transmission line losses changing with time during the cascading failure were plotted.

[0113] In order to avoid the influence of randomness of fault line selection on the cascading failure process, six groups of fault lines are selected, and the curves of system load loss rate changing with time under each group of attack targets are plotted, as shown in Figure 2. Figures 3 to 5 As shown;

[0114] It is not difficult to find from the attached figure that according to the above simulation results, it can be found that with the increase of wind power penetration rate, the chain damage effect caused by line failure will increase significantly;

[0115] When the wind power penetration rate is 30%, only one disconnection combination will cause significant load loss. At this time, the system can still maintain sufficient stability margin under the action of recovery control, and the fluctuation of wind power will not cause further spread of the fault.

[0116] When the wind power penetration rate reaches 50%, the risk of fault spread increases sharply; the power system recovers to a critical stable state under the control measures, but this stability is fragile. The fluctuation of wind power output may still cause the power flow of some transmission lines to exceed the limit again and disconnect with a certain probability at the next moment, leading to further spread of the fault;

[0117] When the wind power penetration rate reaches 50%, the duration of fault evolution is prolonged, and the resulting load loss increases significantly;

[0118] When the wind power penetration rate reaches 70%, the initial attack is more destructive, but the duration of fault evolution is slightly reduced. This is because the increased volatility of wind power output makes the system less likely to be in a critical state between stability and instability. The system state often reaches stability after the fault spreads rapidly.

[0119] Furthermore, if the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0120] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0121] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0122] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.

[0123] It will be appreciated that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but will be a routine task of design, fabrication, and production for those of ordinary skill having the benefit of this disclosure without undue experimentation.

[0124] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A method for assessing the risk of cascading failures of large-scale wind power access to a power grid, characterized by: The following steps are included: Establish a transmission line disconnection probability model; Establish a load loss model according to the node load loss amount; Construct fault models for wind turbines; Carry out cascading failure simulation analysis based on the established model.

2. A method for assessing the risk of cascading failures of large-scale wind power access to a power grid as claimed in claim 1, characterized in that: The transmission line disconnection probability model is established based on the thermal effect of the transmission line. The thermal effect of the transmission line refers to the fact that the heat generated when the current passes through the conductor can cause the temperature of the conductor to rise; the conductor with increased temperature can increase the disconnection probability of the transmission line. The specific calculation formula of the disconnection probability of the transmission line is as follows: Among them, P l represents the power of the transmission line, f represents the function of the power of the transmission line changing with time, and k represents the normalization factor; The thermal effect of the transmission line refers to that when current passes through the transmission line, the conductor through which the current passes will generate heat, and the generated heat can cause the temperature of the conductor to rise. When the temperature of the conductor rises, the probability of disconnection of the transmission line increases.

3. A method for assessing the risk of cascading failures of large-scale wind power access to a power grid as claimed in claim 2, characterized in that: The transmission line disconnection probability model takes the power flow limit per unit time as a factor affecting the transmission line disconnection probability, and uses a piecewise linear model to model the transmission line disconnection probability. The specific modeling is as follows: Among them, P l represents the power flow of the transmission line at the simulation time, P m It indicates the upper limit of the power flow of the transmission line. The probability of disconnection of the transmission line is linearly related to the power flow of the transmission line. The specific relationship is as follows: When the power flow of the transmission line at the simulation time satisfies the formula P m ≤P l ≤2P m When , it means that the disconnection probability of the transmission line will change with the transmission line power flow P at the simulation time. l Linear increase; When the power flow of the transmission line at the simulation time satisfies the formula P l =2P m When , it means that the probability of the transmission line being disconnected reaches 100%, and the transmission line will definitely be disconnected at this time.

4. A method for assessing the risk of cascading failures of large-scale wind power access to a power grid as claimed in claim 3, characterized in that: The load loss model established according to the node load loss amount is to construct the load loss model using the node load loss characteristics, the node load loss characteristics means that after the node voltage amplitude deviates from the rated value, the load will be disconnected from the grid once according to the voltage requirement during normal operation, the load loss model established according to the node load loss amount is to establish the load loss model according to the characteristic load, the characteristic load is divided according to the different tolerance capabilities to voltage deviation, including precision equipment and instrument load, household appliance load and industrial equipment load; The precision equipment load refers to the maximum voltage offset V max_os Satisfy formula V max_os =V e_os ±0.05pu load, V e_os Indicates the standard load offset, and when the voltage offset V os Satisfy formula V os =V e_os When ±0.1pu, all current precision equipment and instrument loads are disconnected from the grid; The household appliance load refers to the maximum voltage deviation V max_os Satisfy formula V max_os =V e_os ±0.1pu load, V e_os Indicates the standard load offset, and when the voltage offset V os Satisfy formula V os =V e_os When ±0.25pu, all current household electrical appliance loads are disconnected from the grid; The industrial equipment load refers to the maximum voltage deviation V max_os Satisfy formula V max_os =V e_os ±0.15pu load, V e_os Indicates the standard load offset, and when the voltage offset V os Satisfy formula V os =V e_os When the load is ±0.4pu, all current industrial equipment loads are disconnected from the grid.

5. A method for assessing the risk of cascading failures of large-scale wind power access to a power grid as claimed in claim 4, characterized in that: The load loss model is constructed based on the node load loss rate, which is calculated based on the node voltage amplitude. The specific calculation formula is as follows: Among them, V max 、V min Indicates the limit value of the current type of load. When the node voltage exceeds the limit value, all the current node loads are disconnected from the grid. lb 、V ub It indicates the upper and lower limits of the current node load. When the node voltage exceeds the upper and lower limits, part of the current node load is disconnected from the grid. c1 and c2 represent correction coefficients. When the node voltage amplitude is between the acceptance value and the limit value, the load loss rate is linearly related to the node voltage amplitude.

6. A method for assessing the risk of cascading failures of large-scale wind power access to a power grid as claimed in claim 5, characterized in that: The fault model of the wind turbine generator set is constructed according to the output power of the wind turbine generator set. The wind turbine motor includes a voltage protection device and a control device. The voltage protection device includes an overvoltage protection device and a low voltage protection device. When the voltage deviates from the allowable range, the control device reduces the power injected by the wind turbine generator set into the power grid by adjusting the blade angle. When the voltage is too high, the wind turbine generator set triggers the overvoltage protection device. When the voltage is too low, the wind turbine generator set triggers the low voltage protection device. The fault model of the wind turbine generator set is constructed according to the output power of the turbine generator set. The output power of the wind turbine generator set is corrected based on the node voltage amplitude. The specific implementation formula is as follows: in, represents the corrected wind turbine output power, k represents the conversion coefficient, V ub 、V lb Indicates the upper and lower limits allowed for the wind turbine voltage.

7. A method for assessing the risk of cascading failures of large-scale wind power access to a power grid as claimed in claim 6, characterized in that: The cascading failure simulation analysis based on the established model is performed by calculating the injected power of the node, and taking whether the power flow of the transmission line exceeds the limit as the termination condition of the fault evolution. When all the power flows of the transmission lines are within the allowable range, the cascading failure simulation analysis ends; The specific process of the cascading failure simulation analysis is as follows: The wind speed of the input wind turbine is discretized, and the state transition probability between different wind speeds is calculated using the fault model of the wind turbine, thereby generating a state transition matrix P; the wind turbine access node and wind power access ratio are determined, and the initial wind speed v of each node and the corresponding state probability vector are randomly generated. ; Initialize fault input quantity; Execute cascading fault simulation analysis mechanism; The specific execution process of the cascading failure simulation analysis mechanism is as follows: Calculate the wind power access power of each node, and then obtain the node power injection vector; The power flow calculation is performed using the transmission line disconnection probability model to calculate the transmission line power flow and node load; Determine whether the power flow of the transmission line exceeds the limit. When the power flow of the transmission line exceeds the limit, use the constructed transmission line disconnection probability model to calculate the probability of transmission line disconnection, and at the same time use Monte Carlo sampling to randomly disconnect the transmission line with excessive power flow, and update the power system topology map; When there is no transmission line power flow exceeding the limit, continue to execute the subsequent steps; Determine whether the node voltage exceeds the limit. When the node voltage exceeds the limit, use the load loss model to calculate the node load loss rate. When the node voltage does not exceed the limit, continue to execute the subsequent steps. Using the formula v t+1 =Pv t Calculate the wind speed state probability vector at the next moment, and compare the calculated result with the fault model of the wind turbine. If the calculated result is within the allowable range of the fault model of the wind turbine, it means that the current cascading fault simulation analysis is completed. If the calculation result exceeds the allowable range of the fault model of the wind turbine generator set, the cascading failure simulation analysis mechanism is repeatedly executed until the termination condition of the cascading failure simulation analysis mechanism is met.

8. A system using the method for assessing the cascading failure risk of large-scale wind power access to a power grid as claimed in any one of claims 1 to 7, characterized in that: Including, transmission line disconnection probability model building module, load loss model building module, wind turbine fault model building module and cascading fault simulation analysis module; The transmission line disconnection probability model building module builds a transmission line disconnection probability model based on the transmission line power; The load loss model building module builds the load loss model based on the node load loss amount; The wind turbine fault model building module builds a wind turbine fault model based on the wind turbine output power; The cascading failure simulation analysis module uses the constructed model to perform cascading failure simulation analysis.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.