Prefabricated power module

By optimizing the modular design and cable management system, and integrating equipment such as transformers, low-voltage distribution cabinets, and UPS, the problems of large footprint and long cycle of data center power supply and distribution systems are solved, enabling rapid deployment and high-reliability power supply.

CN119009722APending Publication Date: 2024-11-22ZHONGLIAN YUNGANG DATA TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411082279.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Traditional power supply and distribution systems for data centers suffer from problems such as large footprint, long deployment cycle, low energy efficiency, high operation and maintenance costs, unclear reliability, and poor component compatibility, making them unable to be put into production quickly.

Method used

The modular design of the prefabricated power module integrates the transformer, low-voltage distribution cabinet, UPS, and UPS output distribution cabinet into a whole. Through factory prefabrication and testing, it enables rapid deployment and simplified installation, and introduces a cable management system to optimize cable layout.

Benefits of technology

It shortens the data center construction cycle, saves land area, reduces construction costs, improves system reliability and security, and ensures that critical equipment can still operate normally during power outages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119009722A_ABST
    Figure CN119009722A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of electric power, and discloses a prefabricated electric power module, which comprises a transformer, a low-voltage power distribution cabinet, a UPS (Uninterrupted Power Supply) and a UPS output power distribution cabinet, the principle is simple and mature, all components adopted in the scheme are mature in technology, high reliability and stability are achieved, the implementation difficulty is low, and application and popularization are easy. Resources are saved, the total investment cost of a project is saved by reducing the occupied area and optimizing cable wiring, and the utilization efficiency and sustainability of energy equipment are improved. The scheme is simple in principle, mature in component technology and low in implementation difficulty. The construction period is shortened. The problem of non-uniform current caused by different lengths of cables between different UPSs is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of electric power technology, and in particular relates to a prefabricated electric power module. Background Art

[0002] With the rapid development of 5G, cloud computing, the Internet of Everything, and driverless cars, big data centers have become a hot spot for new infrastructure. As a national basic strategic resource, big data centers have become one of the strategic commanding heights of national competitiveness, and the scale and number of data center construction have shown rapid growth.

[0003] However, there are three technical difficulties in the early planning and construction stages of data centers: first, the construction period is long and the construction is complex, making it impossible to achieve the goal of rapid production; second, the business demand for data centers is growing, and existing buildings are being expanded or renovated, but are limited by space and power supply capacity; third, there is a risk of over-investment.

[0004] The intelligent integrated power module is an innovative form of power supply and distribution system for data centers. It uses modular design to decompose the power supply and distribution of data centers into multiple prefabricated structures and then prefabricate and assemble the power supply and distribution system. Standardized production turns complex projects into unified products, realizes the rapid deployment of power supply and distribution systems, shortens the deployment cycle, and reduces the floor space. It has certain advantages in terms of time cost, space cost, and reliability.

[0005] Through the above analysis, the problems and defects of the prior art are as follows:

[0006] (1) Traditional power supply and distribution systems in data centers have many challenges, such as large footprint, long deployment cycle, low energy efficiency, high operation and maintenance costs, unknown reliability, and poor component compatibility. Intelligent fusion power module technology integrates UPS and low-voltage power distribution, making the system simpler and easier to install;

[0007] (2) Compared with traditional power supply and distribution systems, it saves more land and electricity, has more advantages in construction cycle, safety and reliability, operation and maintenance, and TCO, and is widely recognized by the industry. Summary of the invention

[0008] In view of the problems existing in the prior art, the present invention provides a prefabricated power module.

[0009] The present invention is implemented as follows: a prefabricated power module, the prefabricated power module comprising:

[0010] Transformer, low voltage distribution cabinet, UPS, UPS output distribution cabinet;

[0011] A low-voltage distribution cabinet is fixed to the right end of the transformer by screws; a UPS is fixed to the right end of the low-voltage distribution cabinet by screws, and a UPS output distribution cabinet is fixed to the right end of the UPS by screws.

[0012] Furthermore, the transformer is connected to a low-voltage distribution cabinet via a circuit line.

[0013] Furthermore, the low voltage distribution cabinet is connected to the UPS via a circuit line.

[0014] Furthermore, the UPS is connected to a UPS output distribution cabinet via a circuit line.

[0015] Furthermore, the transformer is responsible for converting high voltage electricity into low voltage electricity suitable for use, and its main working steps are as follows:

[0016] S1: The input terminal receives high voltage power (such as 10kV or 20kV);

[0017] S2: Through the principle of electromagnetic induction, the transformer converts high-voltage power into low-voltage power (such as 400V or 220V) suitable for use in low-voltage distribution cabinets;

[0018] S3: The output end transmits low-voltage power to the low-voltage distribution cabinet through the circuit line.

[0019] Furthermore, the main function of the low-voltage distribution cabinet is to distribute and manage the low-voltage power provided by the transformer, and its working steps are as follows:

[0020] S11: receiving low voltage power output by the transformer;

[0021] S12: distributes power to different electrical equipment through internal circuit breakers and switches;

[0022] S13: Provides power protection and management functions to prevent overload, short circuit and other faults;

[0023] S14: The output terminal transmits the power to the UPS through the circuit line.

[0024] Furthermore, the main function of the UPS is to provide stable uninterrupted power to prevent the impact of power outages on key equipment. Its working steps are as follows:

[0025] (1) Receive power output from the low-voltage distribution cabinet;

[0026] (2) Through the internal battery and inverter, the electricity is stored in the battery and converted into stable AC output when needed;

[0027] (3) When the power supply is normal, the UPS is charged and remains in standby mode;

[0028] (4) When power is interrupted or abnormal, the UPS starts immediately and converts the power in the battery into AC power to continue supplying power;

[0029] (5) The output end transmits power to the UPS output distribution cabinet through the circuit line.

[0030] Furthermore, the UPS output distribution cabinet is responsible for distributing and managing the uninterruptible power provided by the UPS, and its working steps are as follows:

[0031] (1) Receive stable power output from UPS;

[0032] (2) Distribute power to different key devices, such as servers and communication equipment, through internal circuit breakers and switches;

[0033] (3) Provide power protection and management functions to prevent overload, short circuit and other faults;

[0034] (4) Ensure that critical equipment can continue to operate normally during power outages.

[0035] Another object of the present invention is to provide a prefabricated power module design method for implementing the prefabricated power module, the prefabricated power module design method comprising:

[0036] Step 1: Integrate equipment modular design:

[0037] Equipment integration: Integrate key equipment such as transformer, low voltage distribution cabinet, UPS, and UPS output distribution cabinet into a solid skid structure;

[0038] Modular design: The modular design principle is adopted to make the installation, maintenance and upgrade of each component easier;

[0039] Step 2, Cable Management Optimization:

[0040] Cable length optimization: Optimize the length of UPS input and output cables through internal wiring design;

[0041] Cable Management System: Introducing advanced cable management system;

[0042] Step 3, construction cycle optimization:

[0043] Fast delivery: equipment is pre-integrated and tested;

[0044] Simplified installation steps: Simplified installation steps through standardized interface design and pre-installed modules.

[0045] In combination with the above technical solutions and the technical problems solved, please analyze the advantages and positive effects of the technical solutions to be protected by the present invention from the following aspects:

[0046] First, the present invention designs a new type of power skid that can be delivered quickly and saves floor space. The skid integrates transformers, low-voltage distribution cabinets, UPS, UPS output distribution cabinets and other equipment. It saves floor space and reduces the construction period. The new power skid can integrate transformers, low-voltage distribution cabinets, UPS, UPS output distribution cabinets and other equipment into a whole, which can greatly save UPS input cables and UPS output cables, and solve the problem of uneven current when 4 UPSs are connected in parallel.

[0047] Second, as auxiliary evidence of the inventiveness of the claims of the present invention, it is also reflected in the following important aspects:

[0048] (1) The expected benefits and commercial value of the technical solution of the present invention after transformation are:

[0049] In terms of economic benefits, the present invention adopts an assembled structure, through factory prefabrication and mechanized installation, to achieve large-scale production, integrated debugging, modular distribution, reduce on-site installation, wiring, and debugging work, thereby saving time and cost; the centralized design makes the overall structure more compact, reduces the number of distribution cabinets, and makes space utilization more efficient.

[0050] In terms of commercial value, the construction of data centers is transitioning from physical buildings to modular assembly. At the same time, the cloud computing model is also accelerating the deployment of prefabricated modular data centers in the market. The present invention adopts a highly integrated architecture to maximize cost and technical advantages and provide reliable power support and security for modular data centers.

[0051] (2) Whether the technical solution of the present invention solves the technical problems that people have been eager to solve but have never been able to solve successfully:

[0052] The intelligent integrated power module is prefabricated in the factory and tested to achieve rapid deployment of the power supply and distribution system, greatly shortening the construction period of the data center and enabling rapid project delivery.

[0053] (3) Whether the technical solution of the present invention overcomes technical prejudice:

[0054] In terms of cost, after the implementation of factory prefabrication, the labor construction costs are much lower than on-site, saving construction costs.

[0055] In terms of quality, through standardized production at the factory side, the construction process is strictly controlled to improve the process level;

[0056] In terms of safety, it reduces on-site labor input, lowers on-site safety risks, and improves project quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1 It is a structural block diagram of a prefabricated power module system provided by an embodiment of the present invention.

[0058] Figure 2 It is a flow chart of a prefabricated power module design method provided by an embodiment of the present invention.

[0059] Figure 3 This is a wiring diagram of a prefabricated power module provided in an embodiment of the present invention.

[0060] Figure 4 It is a front view of a prefabricated power module provided by an embodiment of the present invention.

[0061] Figure 5 It is a top view of a prefabricated power module provided by an embodiment of the present invention.

[0062] Figure 6 It is a flow chart of the working steps of the transformer provided by an embodiment of the present invention.

[0063] Figure 7 It is a flow chart of the working steps of the low-voltage distribution cabinet provided by an embodiment of the present invention.

[0064] Figure 1 In: 1. Transformer; 2. Low-voltage distribution cabinet; 3. UPS; 4. UPS output distribution cabinet. DETAILED DESCRIPTION

[0065] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0066] like Figure 1 As shown, a prefabricated power module provided by an embodiment of the present invention includes:

[0067] Transformer 1, low voltage distribution cabinet 2, UPS 3, UPS output distribution cabinet 4;

[0068] A low-voltage distribution cabinet 2 is fixed to the right end of the transformer 1 by screws; a UPS 3 is fixed to the right end of the low-voltage distribution cabinet 2 by screws, and a UPS output distribution cabinet 4 is fixed to the right end of the UPS 3 by screws.

[0069] The transformer 1 provided in the embodiment of the present invention is connected to the low-voltage power distribution cabinet 2 through a circuit line;

[0070] The low voltage distribution cabinet 2 provided in the embodiment of the present invention is connected to the UPS 3 through a circuit line.

[0071] The UPS 3 provided in the embodiment of the present invention is connected to the UPS output distribution cabinet 4 via a circuit line.

[0072] The prefabricated power module provided in the embodiment of the present invention includes a transformer, a low-voltage distribution cabinet, a UPS and a UPS output distribution cabinet, forming an integrated power supply and distribution system. First, the transformer converts the high-voltage power provided by the power grid into an adaptive low-voltage power and outputs it to the low-voltage distribution cabinet. The low-voltage distribution cabinet is responsible for the initial power distribution and protection. Through its internal circuit breakers and disconnectors, it ensures the safe distribution of power and transmits power to the UPS equipment.

[0073] When the power grid is functioning normally, the UPS (uninterruptible power supply) directly outputs stable AC power and charges its internal battery. When the grid fails or a power outage occurs, the UPS will immediately switch to battery power mode to ensure that the load equipment has an uninterrupted power supply. The inverter and voltage stabilizer inside the UPS further ensure the stability of the output voltage and frequency, preventing voltage fluctuations from affecting the load equipment.

[0074] Finally, the UPS output distribution cabinet receives the power output by the UPS and distributes and protects the power of the terminal. The circuit breaker and protection device in the distribution cabinet further ensure the safety and stability of power distribution. The power is transmitted to each terminal load device through the circuit line, realizing remote monitoring and management, and improving the management efficiency of the system.

[0075] The entire prefabricated power module is fixed with screws to form an overall modular structure, which is easy to install and maintain. This modular design not only simplifies the deployment of the power system, but also improves the reliability and safety of the system, ensuring stable and reliable power supply in various scenarios.

[0076] like Figure 2 As shown, the prefabricated power module design method provided by the embodiment of the present invention includes:

[0077] S101, integrated equipment modular design:

[0078] Equipment integration: Integrate key equipment such as transformers, low-voltage distribution cabinets, UPS, uninterruptible power supply, and UPS output distribution cabinets into a solid skid structure;

[0079] Modular design: The modular design principle is adopted to make the installation, maintenance and upgrade of each component easier;

[0080] S102, Cable Management Optimized:

[0081] Cable length optimization: Optimize the length of UPS input and output cables through internal wiring design;

[0082] Cable Management System: Introducing advanced cable management system;

[0083] S103, construction cycle optimization:

[0084] Fast delivery: equipment is pre-integrated and tested;

[0085] Simplified installation steps: Simplified installation steps through standardized interface design and pre-installed modules.

[0086] like Figure 6 As shown, the transformer is responsible for converting high voltage electricity into low voltage electricity suitable for use. Its main working steps are as follows:

[0087] S1: The input terminal receives high voltage power (such as 10kV or 20kV);

[0088] S2: Through the principle of electromagnetic induction, the transformer converts high-voltage power into low-voltage power (such as 400V or 220V) suitable for use in low-voltage distribution cabinets;

[0089] S3: The output end transmits low-voltage power to the low-voltage distribution cabinet through the circuit line.

[0090] like Figure 7 As shown, the main function of the low-voltage distribution cabinet is to distribute and manage the low-voltage power provided by the transformer, and its working steps are as follows:

[0091] S11: receiving low voltage power output by the transformer;

[0092] S12: distributes power to different electrical equipment through internal circuit breakers and switches;

[0093] S13: Provides power protection and management functions to prevent overload, short circuit and other faults;

[0094] S14: The output terminal transmits the power to the UPS through the circuit line.

[0095] The main function of the UPS is to provide stable and uninterrupted power to prevent the impact of power outages on key equipment. Its working steps are as follows:

[0096] (1) Receive power output from the low-voltage distribution cabinet;

[0097] (2) Through the internal battery and inverter, the electricity is stored in the battery and converted into stable AC output when needed;

[0098] (3) When the power supply is normal, the UPS is charged and remains in standby mode;

[0099] (4) When power is interrupted or abnormal, the UPS starts immediately and converts the power in the battery into AC power to continue supplying power;

[0100] (5) The output end transmits power to the UPS output distribution cabinet through the circuit line.

[0101] The UPS output distribution cabinet is responsible for distributing and managing the uninterruptible power provided by the UPS. Its working steps are as follows:

[0102] (1) Receive stable power output from UPS;

[0103] (2) Distribute power to different key devices, such as servers and communication equipment, through internal circuit breakers and switches;

[0104] (3) Provide power protection and management functions to prevent overload, short circuit and other faults;

[0105] (4) Ensure that critical equipment can continue to operate normally during power outages.

[0106] The present invention is specifically implemented:

[0107] Wiring diagram Figure 3 , front view Figure 4 , top view Figure 5 :

[0108] The specific implementation scheme of the new power skid design can be broken down as follows:

[0109] Implementation details: New power skid design

[0110] 1.Integrated equipment modular design:

[0111] Equipment integration: Integrate key equipment such as transformers, low-voltage distribution cabinets, UPS (uninterruptible power supply), UPS output distribution cabinets, etc. into a solid skid structure. These equipment can be optimized through internal layout to operate efficiently in a compact space, saving floor space.

[0112] Modular design: The modular design principle allows each component to be easily installed, maintained and upgraded, while reducing the manufacturing cost of the overall skid.

[0113] 2. Cable management optimization:

[0114] Cable length optimization: Through internal wiring design, the length of UPS input and output cables is optimized to ensure uniform current distribution when different UPS devices are connected in parallel, solve the problem of uneven current flow, and improve the stability and reliability of the system.

[0115] Cable management system: Introduce advanced cable management system to ensure neat and orderly cable layout, reduce cable maintenance and management costs, and improve the overall manageability and safety of the system.

[0116] 3. Construction cycle optimization:

[0117] Fast delivery: Since the equipment has been pre-integrated and tested, on-site installation and commissioning time is reduced, greatly shortening the project construction period.

[0118] Simplified installation steps: Through standardized interface design and pre-installed modules, the installation steps are simplified, reducing the operational complexity and uncertainty of manual errors during construction.

[0119] 4.Technical advantages and application effects:

[0120] The principle is simple and mature: The components used in this solution are of mature technology, have high reliability and stability, are easy to implement, and are easy to promote and apply.

[0121] Save resources: By reducing floor space and optimizing cable routing, the overall investment cost of the project is saved and the utilization efficiency and sustainability of energy equipment are improved. Specific embodiments

[0123] Example 1: Power skid design for data center

[0124] 1. Background: A data center needs to upgrade its power system to cope with the increasing server load and energy consumption requirements.

[0125] 2. Implementation plan:

[0126] Equipment integration: Transformers, low-voltage distribution cabinets, multiple UPS and output distribution cabinets are integrated into one skid. The internal layout is optimized to maximize the use of limited space.

[0127] Cable management: Adopt an efficient cable management system to ensure that all cables are arranged neatly and orderly, reduce cable length and avoid current unevenness.

[0128] Modular design: Each component adopts standardized modules, which is convenient for quick replacement and upgrading, and improves the convenience of system maintenance.

[0129] 3. Application effect: The data center has successfully shortened the upgrade cycle, improved the stability and reliability of the power system, and saved a lot of space and cost.

[0130] Example 2: Emergency power skid design for a hospital

[0131] 1. Background: A hospital needs a stable and reliable emergency power system to ensure the continuous operation of key medical equipment during power outages.

[0132] 2. Implementation plan:

[0133] Equipment integration: High-efficiency transformers, low-voltage distribution cabinets, UPS systems, and corresponding output distribution cabinets are integrated into one skid to ensure rapid switching to backup power in an emergency.

[0134] Cable management: Optimize internal cable routing to ensure even current distribution during UPS switching, improving system reliability.

[0135] Optimized construction period: All equipment has been tested and integrated before leaving the factory, and only simple connection and debugging are required on site, which greatly shortens the construction period.

[0136] 3. Application effect: The hospital's emergency power system has been rapidly deployed, significantly improving the power supply guarantee capability in emergency situations, ensuring the stable operation of medical equipment and protecting patient safety.

[0137] Through these two examples, we can see the flexibility and efficiency of the new power skid design in different application scenarios, providing a reliable power solution for various projects.

[0138] Through the above implementation scheme, the new power skid can not only effectively solve the problems of large footprint and long construction period in the traditional power distribution mode, but also improve the integration and operation efficiency of the overall power equipment. It is suitable for various scenarios that require efficient power supply, such as industrial plants, commercial buildings, etc.

[0139] Compared with the prior art, the beneficial effects of this solution are as follows:

[0140] 1. The principle of this solution is simple, the technology of each component is mature, and the implementation difficulty is low.

[0141] 2. Reduce the construction period.

[0142] 3. Solve the problem of uneven current caused by different cable lengths between different UPS.

[0143] It should be noted that the embodiments of the present invention can be implemented by hardware, software, or a combination of software and hardware. The hardware part can be implemented using dedicated logic; the software part can be stored in a memory and executed by an appropriate instruction execution system, such as a microprocessor or dedicated design hardware. It can be understood by a person of ordinary skill in the art that the above-mentioned devices and methods can be implemented using computer executable instructions and / or contained in a processor control code, such as a carrier medium such as a disk, CD or DVD-ROM, a programmable memory such as a read-only memory (firmware), or a data carrier such as an optical or electronic signal carrier. Such code is provided on the carrier medium. The device and its modules of the present invention can be implemented by hardware circuits such as very large-scale integrated circuits or gate arrays, semiconductors such as logic chips, transistors, etc., or programmable hardware devices such as field programmable gate arrays, programmable logic devices, etc., can also be implemented by software executed by various types of processors, and can also be implemented by a combination of the above-mentioned hardware circuits and software, such as firmware.

[0144] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any modifications, equivalent substitutions and improvements made by any technician familiar with the technical field within the technical scope disclosed by the present invention and within the spirit and principle of the present invention should be covered by the protection scope of the present invention.

Claims

1. A prefabricated power module, characterized in that: The prefabricated power module comprises: Transformer, low voltage distribution cabinet, UPS, UPS output distribution cabinet; A low-voltage distribution cabinet is fixed to the right end of the transformer by screws; a UPS is fixed to the right end of the low-voltage distribution cabinet by screws, and a UPS output distribution cabinet is fixed to the right end of the UPS by screws.

2. The prefabricated power module according to claim 1, characterized in that: The transformer is connected to the low voltage distribution cabinet via a circuit line.

3. The prefabricated power module according to claim 1, characterized in that: The low voltage distribution cabinet is connected to the UPS via a circuit line.

4. The prefabricated power module according to claim 1, characterized in that: The UPS is connected to the UPS output distribution cabinet via a circuit line.

5. The prefabricated power module according to claim 1, characterized in that: The transformer is responsible for converting high voltage electricity into low voltage electricity suitable for use. Its main working steps are as follows: S1: The input terminal receives high voltage power (such as 10kV or 20kV); S2: Through the principle of electromagnetic induction, the transformer converts high-voltage power into low-voltage power (such as 400V or 220V) suitable for use in low-voltage distribution cabinets; S3: The output end transmits low-voltage power to the low-voltage distribution cabinet through the circuit line.

6. The prefabricated power module according to claim 1, characterized in that: The main function of the low-voltage distribution cabinet is to distribute and manage the low-voltage power provided by the transformer. Its working steps are as follows: S11: receiving low voltage power output by the transformer; S12: distributes power to different electrical equipment through internal circuit breakers and switches; S13: Provides power protection and management functions to prevent overload, short circuit and other faults; S14: The output terminal transmits the power to the UPS through the circuit line.

7. The prefabricated power module according to claim 1, characterized in that: The main function of the UPS is to provide stable and uninterrupted power to prevent the impact of power outages on key equipment. Its working steps are as follows: (1) Receive power output from the low-voltage distribution cabinet; (2) Through the internal battery and inverter, the electricity is stored in the battery and converted into stable AC output when needed; (3) When the power supply is normal, the UPS is charged and remains in standby mode; (4) When power is interrupted or abnormal, the UPS starts immediately and converts the power in the battery into AC power to continue supplying power; (5) The output end transmits power to the UPS output distribution cabinet through the circuit line.

8. The prefabricated power module according to claim 1, characterized in that: The UPS output distribution cabinet is responsible for distributing and managing the uninterruptible power provided by the UPS. Its working steps are as follows: (1) Receive stable power output from UPS; (2) Distribute power to different key devices, such as servers and communication equipment, through internal circuit breakers and switches; (3) Provide power protection and management functions to prevent overload, short circuit and other faults; (4) Ensure that critical equipment can continue to operate normally during power outages.

9. A method for designing a prefabricated power module according to any one of claims 1 to 8, characterized in that: The prefabricated power module design method comprises: Step 1: Integrate equipment modular design: Equipment integration: Integrate key equipment such as transformer, low voltage distribution cabinet, UPS, and UPS output distribution cabinet into a solid skid structure; Modular design: The modular design principle is adopted to make the installation, maintenance and upgrade of each component easier; Step 2, Cable Management Optimization: Cable length optimization: Optimize the length of UPS input and output cables through internal wiring design; Cable Management System: Introducing advanced cable management system; Step 3, construction cycle optimization: Fast delivery: equipment is pre-integrated and tested; Simplified installation steps: Simplified installation steps through standardized interface design and pre-installed modules.