Method for supporting soft rock roadway of coal mine

By combining the fast support technology of the autistic system with active and passive support theory, the double thin-walled cylinder and deformation damping layer are used to solve the problems of high support costs and slow excavation speed of soft rock tunnels in coal mines, and the stability of the tunnel is achieved and Improved safety.

CN119041944APending Publication Date: 2024-11-29HEBEI TONGSHUN SAFETY TECH CONSULTING CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411292147.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The soft rock support in underground tunnels of coal mine mines has the problems of high cost, slow excavation speed and difficulty in controlling tunnel deformation. The existing support methods cannot effectively utilize the strength of soft rock, resulting in the impact of safety and smoothness.

Method used

Using the fast support technology of autistic system that combines active support theory and passive support theory, the extruded support ring and buffer layer are formed through double thin-walled cylinders and deformation damping layers, combined with anchor rods, anchor cables and anti-corrosion hardwood blocks. , ensure the stability and deformation of surrounding rocks.

Benefits of technology

It realizes stable support of soft rock tunnels, reduces cost and excavation speed, improves the safety and smoothness of the tunnels, and avoids the disintegration of the support system and excessive deformation of the surrounding rock.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041944A_ABST
    Figure CN119041944A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of coal mines, and discloses a coal mine soft rock roadway supporting method which comprises the following steps: step 1, after a roadway is rapidly tunneled or brushed and expanded by a roadheader, temporary supporting is firstly carried out, anchor net supporting is adopted, and then concrete is sprayed; 2, prestressed reinforced concrete double-thin-wall cylinder type building block supporting is adopted, a deformation damping layer is additionally arranged between cylinders, and round holes are reserved in outer thin-wall cylinders for driving anchor rods and anchor cables; 3, cement and water glass double-liquid slurry is injected between the concrete building blocks and between the concrete and the roadway wall, all gaps are sealed and separated from air and water, and the strength of the surrounding rock is improved; and 4, C40 prestressed reinforced concrete thin-wall cylindrical building blocks are built in the roadway, a 100 mm gap is reserved between the two layers of concrete building blocks, and the gap is filled with anti-corrosion hardwood blocks. The inner-layer concrete building blocks are arranged, so that the safety protection effect is mainly achieved, the buffering layer wood board is stably protected, and a damping system for final roadway deformation of a soft rock roadway self-closing system support is mainly achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mines, and in particular to a soft rock tunnel supporting method for coal mines. Background Art

[0002] The underground tunnel of a coal mine is an important part of the underground space. It is a passage connecting the ground and the underground mining area. It is the main space with mine ventilation, transportation and pedestrian functions. The stability and firmness of the underground tunnel are related to the safety of underground workers and the smooth operation of the mine. Therefore, controlling the changes in the floor of the underground tunnel is a prerequisite for safe production in the mine.

[0003] The support of underground tunnels is based on the natural arch theory. At present, most underground tunnels in coal mines are supported by anchor rods and anchor cables combined with shotcrete support, that is, anchor shotcrete support is a support form under the active support theory. The surrounding rock of the tunnel is tightened by anchor rods (cables) to form a stress circle, so as to form a relatively stable support circle by utilizing the strength of the surrounding rock itself. If the surrounding rock of the tunnel is soft rock, it will become soft when it encounters water and wind, and the purpose of active support using the surrounding rock cannot be achieved.

[0004] At present, most of the soft rock support in underground tunnels is combined support. First, anchor rods (cables) are used to seal the surrounding rock for reinforcement. Some of them are grouting the surrounding rock to achieve the purpose of sealing water. Then, metal sheds are used for support and concrete slurry is sprayed as permanent support. This support method is expensive, the tunnel excavation speed is slow, and sometimes the deformation of the tunnel cannot be controlled. There are also support forms under passive support theory such as metal sheds and stone masonry in underground tunnels. These support forms of underground tunnels are no longer used on a large scale and are only used for local support. To this end, we provide a support method for soft rock tunnels in coal mines. The self-closing system fast support technology combining active support theory with passive support theory is adopted. Double thin-walled cylinders are added with deformation damping layers between the cylinders. The thin-walled cylinders are used for anchor rods and anchor cables (anchor rods Φ20mm, length 2500mm, anchor cables Φ34mm, length determined by the position of the anchoring layer) with round holes, which play a strong supporting force integrated with the surrounding rock. Summary of the invention

[0005] The object of the present invention is to provide a method for supporting soft rock tunnels in coal mines to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above object, the present invention provides the following technical solution: a method for supporting soft rock tunnels in a coal mine, comprising the following steps: Step 1: After the tunnel is quickly excavated or expanded by a multi-purpose excavator, temporary support is first carried out, using anchor net support and then spraying concrete; Step 2: Use prestressed reinforced concrete double thin-walled cylindrical blocks for support, add a deformation damping layer between the cylinders, and leave circular holes in the outer thin-walled cylinder for anchor rods and anchor cables; Step 3: Inject cement and water glass double liquid slurry between concrete blocks and between concrete and tunnel walls to seal all gaps from air and water, thereby increasing the strength of the surrounding rock; Step 4: Build C40 prestressed reinforced concrete thin-walled cylindrical blocks in the tunnel, leaving a 100mm gap between two layers of concrete blocks, and fill them with antiseptic hardwood blocks as a stress and deformation buffer layer; Step 5: The outer layer of concrete blocks is anchored together with the softer surrounding rock to form an extrusion support ring with greater support capacity. The concrete blocks, as fully enclosed anchor rods (cables), play an extrusion role on the entire section of the surrounding rock to form a stress concentration distribution circle. The concrete blocks (prestressed concrete) themselves form a complete support ring and are in seamless contact with the surrounding rock. In addition, the concrete blocks have a large bearing pressure. If the reinforced concrete blocks are not completely destroyed, the support system with the surrounding rock will not disintegrate. Step 6. When the surrounding rock pressure of the soft rock tunnel is large, the concrete blocks are subjected to shear pressure, and cracks may occur between the concrete blocks and they are squeezed and deformed toward the center of the tunnel. The anti-corrosion hardwood blocks support the cracked concrete and can also maintain the support system. When the pressure of the soft rock tunnel is greater than the existing support system, the concrete blocks of the outer concrete support system gradually squeeze the wooden boards toward the center of the tunnel. Due to the outer concrete blocks, the wooden boards form a buffer layer, allowing the surrounding rock to deform to a certain extent, and the inner concrete blocks can be stable for a long time.

[0007] Preferably, the anchor net is a metal net welded with steel bars with a diameter of φ6mm. The metal net should be close to the rock surface with an overlap of not less than 80mm. Steel wire is used for auxiliary tying every 180mm. Fast or medium-speed (waterproof) resin anchors must be used for end anchoring, and the anchoring force must be not less than 60KN.

[0008] Preferably, the anchor rod has a specification of Φ20mm and a length of 2500mm, and the anchor cable has a specification of Φ34mm, and the length is determined according to the position of the anchoring layer.

[0009] Preferably, the anchor rod spacing is 600×500mm; the anchor cable spacing is 1200×1000mm or as appropriate.

[0010] Preferably, the concrete blocks have a thickness of ≥350 mm, a length of 1000 mm, and a height of one quarter of the circumference.

[0011] Preferably, the joints between the concrete blocks are covered with iron plates as locking devices.

[0012] The present invention provides a method for supporting soft rock tunnels in coal mines. It has the following beneficial effects: (1) The present invention provides an outer layer of concrete blocks as a fully enclosed anchor (cable) support to exert full-section compression on the surrounding rock, thereby forming a stress concentration distribution circle; the concrete blocks (prestressed concrete) themselves form a complete support circle and are in seamless contact with the surrounding rock. In addition, the concrete blocks have a large bearing pressure, and the prestressed reinforced concrete blocks are not completely destroyed, so the support system with the surrounding rock will not disintegrate. Because the soft surrounding rock cannot flow and creep due to the compression of the full-section anchor support, the formed support system is relatively stable. A 100mm gap is left between two layers of reinforced concrete thin-walled cylindrical blocks, which are filled with anti-corrosion hardwood blocks as a stress and deformation buffer layer; when the surrounding rock pressure of the soft rock tunnel is large, the concrete blocks may crack and be squeezed and deformed toward the center of the tunnel. The anti-corrosion hardwood blocks support the cracked concrete and can also maintain the support system; when the pressure of the soft rock tunnel is greater than the outer concrete support system, the concrete blocks gradually squeeze the wooden boards toward the center of the tunnel, and the wooden boards form a buffer layer, allowing the surrounding rock to deform to a certain extent, and the inner layer of prestressed reinforced concrete thin-walled cylindrical blocks can be stable for a long time.

[0013] (2) The present invention mainly plays a safety protection role by setting the inner layer of concrete blocks, and plays a stable protection role for the buffer layer wood board and a damping system for the final deformation of the soft rock tunnel self-closing system support. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the cross-sectional structure of the soft rock tunnel support of the present invention; Figure 2 This is a schematic diagram of the structure of building block No. 5 of the present invention; Figure 3 For the present invention Figure 2 The schematic diagram of the angle steel plate structure is enlarged at point A; Figure 4 For the present invention Figure 2 Enlarge the schematic diagram of the angle steel plate structure at point B. DETAILED DESCRIPTION

[0015] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0016] Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0017] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0018] A preferred embodiment of a method for supporting soft rock tunnels in a coal mine provided by the present invention is as follows: Figure 1-4 As shown: A method for supporting soft rock tunnels in a coal mine, comprising the following steps: Step 1: After the tunnel is quickly excavated or expanded by a tunnel boring machine, temporary support is first carried out using anchor net support, and then concrete is sprayed; the anchor net is a metal net welded with steel bars with a diameter of φ6mm. The metal net should be close to the rock surface, with an overlap of not less than 80mm, and steel wire should be used for help every 180mm. Fast or medium-speed (waterproof) resin anchoring agents must be used for end anchoring, and the anchoring force should be not less than 60KN; Step 2: Use double thin-walled prestressed reinforced concrete cylinders, add a deformation damping layer between the cylinders, and leave round holes in the thin-walled cylinders for anchor rods and anchor cables; the anchor rods are Φ20mm in size and 2500mm in length, and the anchor cables are Φ34mm in size, and the length is determined according to the position of the anchoring layer; the spacing between anchor rods is 600×500mm; the spacing between anchor cables is 1200×1000mm or as required; Step 3: Inject cement and water glass double liquid slurry between concrete blocks and between concrete and tunnel walls to seal all gaps from air and water, thereby increasing the strength of the surrounding rock; Step 4: Build C40 prestressed reinforced concrete blocks in the tunnel, leaving a 100mm gap between two layers of concrete blocks, and fill them with antiseptic hardwood blocks as a stress and deformation buffer layer; the specifications of the concrete blocks are ≥350mm thick, 1000mm long, and one-quarter of the circumference in height; Step 5. The outer layer of concrete blocks is anchored together with the softer surrounding rock to form an extrusion support ring with greater support capacity. The outer layer of concrete blocks is set up as a fully enclosed anchor (cable) support to squeeze the entire section of the surrounding rock to form a stress concentration distribution circle. The concrete blocks (prestressed concrete) themselves form a complete support ring and are in seamless contact with the surrounding rock. In addition, the concrete blocks have a large bearing pressure. If the reinforced concrete blocks are not completely destroyed, the support system with the surrounding rock will not disintegrate. This is because the soft surrounding rock cannot flow and creep due to the squeezing effect of the full-section anchor support, and the formed support system is relatively stable.

[0019] Step 6: When the surrounding rock pressure of the soft rock tunnel is large, the concrete blocks are subjected to shear pressure, and the concrete blocks may crack and deform toward the center of the tunnel. The anti-corrosion hardwood blocks support the cracked concrete, which can also maintain the support system. When the pressure of the soft rock tunnel is greater than the existing support system, the concrete blocks of the outer concrete support system gradually squeeze the wooden boards toward the center of the tunnel. Due to the outer concrete blocks, the wooden boards form a buffer layer, allowing the surrounding rock to deform to a certain extent, and the inner concrete blocks can be stable for a long time. By setting the inner concrete blocks, it mainly plays a role in safety protection, stability protection of the wooden boards in the buffer layer, and the damping system of the final tunnel deformation of the soft rock tunnel self-closing system support.

[0020] It is further found that the joints between concrete blocks are wrapped with iron plates as locking devices.

[0021] In summary, the present application adopts the self-closing system quick support technology for soft rock tunnels in coal mines, and utilizes the self-closing system quick support technology that combines active support theory with passive support theory, double thin-walled cylinders, and a deformation damping layer between the cylinders. The outer thin-walled cylinder is used to drive anchor rods and anchor cables (anchor rods are Φ20mm and 2500mm long, anchor cables are Φ34mm, and the length is determined according to the position of the anchoring layer), and circular holes are left in the cylinders to provide a strong support force that is integrated with the surrounding rock.

[0022] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0023] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for supporting soft rock tunnels in coal mines, characterized in that: The following steps are involved: Step 1: After the tunnel is quickly excavated or expanded by a multi-purpose excavator, temporary support is first carried out, using anchor net support and then spraying concrete; Step 2: Use prestressed reinforced concrete double thin-walled cylindrical blocks for support, add a deformation damping layer between the cylinders, and leave circular holes in the outer thin-walled cylinder for anchor rods and anchor cables; Step 3: Inject cement and water glass double liquid slurry between concrete blocks and between concrete and tunnel walls to seal all gaps from air and water, thereby increasing the strength of the surrounding rock; Step 4: Build C40 prestressed reinforced concrete thin-walled cylindrical blocks in the tunnel, leaving a 100mm gap between two layers of concrete blocks, and fill them with antiseptic hardwood blocks as a stress and deformation buffer layer; Step 5: The outer concrete blocks are anchored together with the softer surrounding rock to form an extrusion support ring with greater support capacity. The concrete blocks, as fully enclosed anchor rods (cables), play an extrusion role on the entire section of the surrounding rock to form a stress concentration distribution circle. The concrete blocks (prestressed concrete) themselves form a complete support ring and are in seamless contact with the surrounding rock. In addition, the concrete blocks have a large bearing pressure. If the prestressed reinforced concrete blocks are not completely destroyed, the support system with the surrounding rock will not disintegrate. Step 6. When the surrounding rock pressure of the soft rock tunnel is large, the concrete blocks are subjected to shear pressure, and cracks may occur between the concrete blocks and they are squeezed and deformed toward the center of the tunnel. The anti-corrosion hardwood blocks support the cracked concrete and can also maintain the support system. When the pressure of the soft rock tunnel is greater than the existing support system, the concrete blocks of the outer concrete support system gradually squeeze the wooden boards toward the center of the tunnel. Due to the outer concrete blocks, the wooden boards form a buffer layer, allowing the surrounding rock to deform to a certain extent, and the inner concrete blocks can be stable for a long time.

2. A method for supporting soft rock tunnels in a coal mine according to claim 1, characterized in that: The anchor net is a metal net welded with steel bars with a diameter of φ6mm. The metal net should be close to the rock surface with an overlap of not less than 80mm. Steel wire is used for auxiliary tying every 180mm. Fast or medium-speed (waterproof) resin anchors must be used for end anchoring, and the anchoring force must be not less than 60KN.

3. A method for supporting soft rock tunnels in a coal mine according to claim 1, characterized in that: The anchor rod has a specification of Φ20mm and a length of 2500mm, and the anchor cable has a specification of Φ34mm, and the length is determined according to the position of the anchoring layer.

4. A method for supporting soft rock tunnels in a coal mine according to claim 1, characterized in that: The spacing between the anchor rods is 600×500mm; the spacing between the anchor cables is 1200×1000mm or as appropriate.

5. A method for supporting soft rock tunnels in a coal mine according to claim 1, characterized in that: The specifications of the concrete blocks are thickness ≥350mm, length 1000mm, and height of one quarter of the circumference.

6. A method for supporting soft rock tunnels in a coal mine according to claim 1, characterized in that: The joints between the concrete blocks are wrapped with iron plates, which serve as locking devices.

Citation Information

Cited By

  • Anchor cable and vertical shaft supporting structure

    CN120520629A

  • Anchorage cable and shaft support structure

    CN120520629B