Instrument state monitoring method and system and storage device

By comparing the real-time data monitoring of the instrument with standard data, the problem of real-time monitoring and diagnosis in the existing technology is solved, and the accurate identification and precise maintenance of the instrument status is achieved, which reduces maintenance costs.

CN119043396APending Publication Date: 2024-11-29SICHUAN LUTIANHUA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411092026.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing technology cannot conduct real-time monitoring and diagnostic analysis of the operating status of the instrument, resulting in high maintenance costs and the inability to replace the faulty instrument in advance to affect production.

Method used

By recording the measurement data of the instrument to be tested in real time and comparing it with the standard data at the standard output end, using digital, intelligent and informatized technologies to monitor and diagnose the instrument status in real time, discover defects in advance and carry out precise repairs, reducing maintenance costs.

Benefits of technology

Real-time monitoring and diagnostic analysis of the operating status of the instrument is realized, defects are discovered in advance, and parking caused by instrument failure is avoided, and maintenance costs are significantly reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119043396A_ABST
    Figure CN119043396A_ABST
Patent Text Reader

Abstract

The invention discloses an instrument state monitoring method and system and a storage device. The method comprises the following steps: recording measurement values of n instruments to be measured in real time to obtain n groups of measurement data; recording standard data of a standard output end in real time; one detection period is divided into k time periods T, each time period T is divided into n time slices t, and error values of n groups of measurement data and standard data are sequentially calculated in the n time slices t; and in k time periods T corresponding to the to-be-tested instrument, if the error values are all in a limited range, the to-be-tested instrument is qualified. According to the invention, by using digital, intelligent and informatization technologies, old instruments are accurately identified, the operation states of the instruments are monitored, diagnosed and analyzed in real time, the operation states of the instruments are mastered, defects are found in advance, predictive maintenance and accurate maintenance can be realized, parking caused by instrument faults is avoided to a great extent, and the maintenance cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of instrument maintenance, and in particular to an instrument status monitoring method, system and storage device. Background Art

[0002] An instrument is a device that can determine the size of the measured variable. It can be a sensor, a transmitter, or a device that has both a detection element and a display device. Instruments are widely used in chemical production. The production process is controlled by the measured values ​​of the instrument. The measurement accuracy of the instrument will affect the production process. The current instrument maintenance method uses preventive maintenance as the main means, and replaces old instruments in advance based on production experience to ensure that the production process is not affected.

[0003] The existing instrument maintenance methods have the following problems: it is impossible to monitor and diagnose the instrument operation status in real time, replace the instrument in advance or replace it after the instrument failure affects production, and the maintenance cost is high.

[0004] Based on the above situation, there is an urgent need for an instrument status monitoring method, system and storage device to solve the problem of high maintenance cost. Summary of the invention

[0005] The purpose of the present invention is to solve the problem of high maintenance cost by targeting the existing instrument maintenance method, which is unable to monitor and diagnose the instrument operation status in real time, replace the instrument in advance or replace it after the instrument failure affects production.

[0006] The technical solution of the present invention is as follows:

[0007] An instrument status monitoring method, comprising:

[0008] Record the measurement values ​​of n instruments to be tested in real time to obtain n groups of measurement data;

[0009] Real-time recording of standard data at standard output terminals;

[0010] A detection cycle is divided into k time periods T, each time period T is divided into n time segments t, and the error values ​​of n groups of measurement data and standard data are calculated in sequence in the n time segments t;

[0011] In the k time periods T corresponding to the instrument under test, if the error values ​​are all within the specified range, the instrument under test is qualified.

[0012] Existing instrument maintenance methods cannot monitor and diagnose the operating status of instruments in real time, and the maintenance cost is high if instruments are replaced in advance or replaced after instrument failures affect production. In this solution, the measurement data of n instruments to be tested are recorded in real time and compared with the standard data of the standard output end. Based on the comparison results, it is determined whether the specified instrument is qualified. Digital, intelligent and information technology are used to accurately identify old instruments. Real-time monitoring and diagnostic analysis of the operating status of instruments can grasp the operating status of instruments and discover defects in advance, so as to achieve predictive maintenance and precise maintenance, greatly avoid shutdowns caused by instrument failures, and reduce maintenance costs.

[0013] Furthermore, in order to facilitate the rapid comparison of the measured data with the standard data, one feasible solution is: the error values ​​of n groups of measured data and standard data are calculated, the measured data and the standard data are calculated within the time segment t for processing to obtain the measured characteristic value a and the standard characteristic value b respectively, and the error E of the measured characteristic value a relative to the standard characteristic value b is calculated. When this solution is adopted, since the measured value does not change suddenly when the instrument is operating normally, the measured characteristic value a is used to replace the corresponding measured data counted within a certain time segment t, and the standard characteristic value b is used to replace the standard data counted within the same time segment t. By comparing the measured characteristic value a and the standard characteristic value b, computing power can be saved, thereby reducing the load on the processor.

[0014] Furthermore, the present solution does not limit the specific calculation method of the measured characteristic value a and the standard characteristic value b. One feasible solution is that the measured characteristic value a and the standard characteristic value b both include one or more of an average value, a maximum value, a minimum value, and an integral value. The average value, the maximum value, the minimum value and / or the integral value can reflect the characteristics of the measured data or the standard data.

[0015] Furthermore, this solution does not limit the calculation method of the error value. One feasible solution is: the error E of the calculated measured characteristic value a relative to the standard characteristic value b is expressed as When this solution is adopted, the error value E is converted into a positive number and calculated with the allowable error value.

[0016] Furthermore, in order to record the historical data of each instrument to be tested, one feasible solution is: calculate the error values ​​of n groups of measurement data and standard data, establish a statistical matrix, and update the statistical matrix after each time segment t. When this solution is adopted, since the matrix can be read through the index, the measurement data of the specified instrument to be tested or the specified time period can be read conveniently and quickly.

[0017] Furthermore, the statistical matrix is ​​processed to determine whether each instrument to be tested is qualified. When this solution is adopted, historical data of the designated instrument to be tested is analyzed to determine whether the historical measurement value of the instrument is qualified.

[0018] Furthermore, in order to ensure the accuracy of the error value, one feasible solution is that the value of k is not less than 10. When this solution is adopted, the error values ​​obtained in at least 10 consecutive time periods T are analyzed to avoid contingency and ensure the accuracy of the analysis results.

[0019] The present invention also provides an instrument status monitoring system, which executes the above-mentioned instrument status monitoring method, comprising:

[0020] The acquisition end is used to record measurement data and standard data in real time;

[0021] A processing end, used for receiving the measurement data and / or standard data transmitted by the acquisition end, and performing data processing;

[0022] The user end is used to display the processing results of the processing end to the user.

[0023] The measurement data and standard data are transmitted to the processing end through the acquisition end, and the processing result is fed back to the user end under the action of the processing end, so as to facilitate the formulation of a maintenance plan.

[0024] Furthermore, the processing end includes at least n+1 processing modules, and the processing modules are used to process standard data or corresponding measurement data. When this solution is adopted, multiple processing programs can be run simultaneously through parallel processing by n+1 processing modules, which can improve data processing efficiency.

[0025] In one embodiment, the i-th processing module is used to store the i-th group of measurement data, the n+1-th processing module is used to store standard data, the processing end includes a processor and the processor threads are at least 2, one of which is always connected to the n+1-th processing module and is used to process standard data, and the other thread is sequentially connected to the n processing modules in an orderly manner within a time period T and is used to process standard data. When this solution is adopted, the computing power of the processor can be fully and effectively utilized.

[0026] The present invention also provides a storage device for storing one or more programs, including an instrument status monitoring program. When the one or more programs are executed by a processor, the above-mentioned instrument status monitoring method is implemented.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] 1. Record the measurement data of n instruments to be tested in real time and compare them with the standard data of the standard output end. Determine whether the specified instrument is qualified based on the comparison results. Use digital, intelligent and information technology to accurately identify old instruments. Real-time monitoring and diagnostic analysis of the instrument operation status can grasp the instrument operation status and discover defects in advance. Predictive maintenance and accurate maintenance can be performed, which can greatly avoid shutdown caused by instrument failure and reduce maintenance costs.

[0029] Second, since the measured values ​​do not change suddenly when the instrument is operating normally, the corresponding measured data counted in a certain time segment t is replaced by the measured characteristic value a, and the standard characteristic value b is replaced by the standard data counted in the same time segment t. By comparing the measured characteristic value a and the standard characteristic value b, computing power can be saved, thereby reducing the load on the processor;

[0030] Third, by establishing a statistical matrix, the statistical matrix is ​​updated after each time segment t. Since the matrix can be read through an index, the measurement data of a specified instrument to be tested or a specified time period can be read conveniently and quickly. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 A schematic diagram of a flow chart of an instrument status monitoring method provided in an embodiment of the present invention;

[0032] Figure 2 A schematic diagram of an instrument status monitoring system provided in an embodiment of the present invention;

[0033] Figure 3 A schematic diagram of a processing end of an instrument status monitoring system provided in an embodiment of the present invention.

[0034] Reference numerals:

[0035] 100, acquisition end; 200, processing end; 300, user end;

[0036] 210. Processing module; 220. Cache. DETAILED DESCRIPTION

[0037] It should be noted that relational terms such as "first" and "second" are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.

[0038] The features and performance of the present invention are further described in detail below in conjunction with the embodiments.

[0039] Please refer to Figure 1 , an instrument status monitoring method, comprising:

[0040] S110, recording the measurement values ​​of n instruments to be tested in real time to obtain n groups of measurement data;

[0041] S120, recording standard data of the standard output terminal in real time;

[0042] S200, dividing a detection cycle into k time periods T, dividing each time period T into n time segments t, and sequentially calculating the error values ​​between n groups of measurement data and standard data in the n time segments t;

[0043] In the k time periods T corresponding to the instrument under test, if the error values ​​are all within the specified range, the instrument under test is qualified.

[0044] Existing instrument maintenance methods cannot monitor and diagnose the operating status of instruments in real time, and the maintenance cost is high if instruments are replaced in advance or replaced after instrument failures affect production. In this solution, the measurement data of n instruments to be tested are recorded in real time and compared with the standard data of the standard output end. Based on the comparison results, it is determined whether the specified instrument is qualified. Digital, intelligent and information technology are used to accurately identify old instruments. Real-time monitoring and diagnostic analysis of the operating status of instruments can grasp the operating status of instruments and discover defects in advance, so as to achieve predictive maintenance and precise maintenance, greatly avoid shutdowns caused by instrument failures, and reduce maintenance costs.

[0045] In one embodiment, the main pipeline flow is used as the standard output end, and the several branch pipelines connected to the main pipeline are installed with instruments to be tested and corresponding valves. When the main pipeline flow meter is normal, its measurement data can be directly used as standard data. At this time, the measurement value data of all the instruments to be tested are accumulated as measurement data;

[0046] Optionally, if the standard data error range exceeds the preset value, the valves corresponding to some branch pipelines are closed. At this time, the measurement values ​​of all branch pipelines with closed valves should be zero. The branch pipelines with open valves are measured again, and the above steps are repeated until the faulty instrument is found.

[0047] In order to facilitate the rapid comparison of measurement data with standard data, one feasible solution is: after calculating the error values ​​of n groups of measurement data and standard data, execute S300, calculate the measurement data and standard data within the time segment t, process them to obtain the measurement characteristic value a and the standard characteristic value b respectively, and then execute S400, calculate the error E of the measurement characteristic value a relative to the standard characteristic value b. When this solution is adopted, since the measurement value does not change suddenly when the instrument is operating normally, the measurement characteristic value a is used to replace the corresponding measurement data counted within a certain time segment t, and the standard characteristic value b is used to replace the standard data counted within the same time segment t. By comparing the measurement characteristic value a and the standard characteristic value b, computing power can be saved, thereby reducing the load on the processor.

[0048] This scheme does not uniquely limit the specific calculation method of the measured eigenvalue a and the standard eigenvalue b. One feasible scheme is: the measured eigenvalue a and the standard eigenvalue b both include one or more of the average value, maximum value, minimum value, and integral value. Specifically, the measured eigenvalue a and the standard eigenvalue b are both vectors, and the average value, maximum value, minimum value, and integral value are recorded respectively in different dimensions. The average value, maximum value, minimum value and / or integral value can reflect the characteristics of the measured data or standard data.

[0049] This solution does not limit the calculation method of the error value. One feasible solution is to calculate the error E of the measured characteristic value a relative to the standard characteristic value b, and its expression is: When this solution is adopted, the error value E is converted into a positive number and calculated with the allowable error value.

[0050] In order to record the historical data of each instrument to be tested, one feasible solution is: after calculating the error value between n groups of measurement data and standard data, execute S500, and transmit the measurement eigenvalue a, standard eigenvalue b and error E to the statistical matrix A to establish the statistical matrix A, and update the statistical matrix A after each time segment t. When adopting this solution, since the matrix can be read through the index, the measurement data of the specified instrument to be tested or the specified time period can be read conveniently and quickly.

[0051] Execute S600, process the statistical matrix A and determine whether each instrument to be tested is qualified. When this solution is adopted, the historical data of the specified instrument to be tested is analyzed to determine whether the historical measurement value of the instrument is qualified.

[0052] In order to ensure the accuracy of the error value, one feasible solution is that the value of k is not less than 10. When this solution is adopted, the error values ​​obtained in at least 10 consecutive time periods T are analyzed to avoid contingency and ensure the accuracy of the analysis results.

[0053] Reference Figure 2 This embodiment further provides an instrument status monitoring system, which executes the above-mentioned instrument status monitoring method, including:

[0054] The collection terminal 100 is used to record the measurement data and standard data in real time;

[0055] The processing end 200 is used to receive the measurement data and / or standard data transmitted by the acquisition end and perform data processing;

[0056] The user terminal 300 is used to display the processing result of the processing terminal to the user.

[0057] The measurement data and standard data are transmitted to the processing end through the acquisition end, and the processing results are fed back to the user end under the action of the processing end to facilitate the formulation of maintenance plans.

[0058] The processing end 200 includes at least n+1 processing modules 210, which are used to process standard data or corresponding measurement data. When this solution is adopted, the measurement data and standard data are processed in parallel by n+1 processing modules 210, and multiple processing programs are run at the same time, which can improve data processing efficiency.

[0059] In one embodiment, T=1s, starting from the first second, the acquisition end records the measurement data of n instruments and the output data of the standard output end in the time period, and transmits them to the processing end; starting from the second second, the eigenvalue of the i-th group of data in the i-th (where i=1, 2, 3...n) time segment t (t=0.1s) of the previous second is calculated, and the eigenvalue is transmitted to the statistical matrix A, and this is repeated;

[0060] Specifically, the eigenvalues ​​of the i-th group of data in the j-th (where j=1, 2, 3, ... k) time period are transmitted to A[j][i], and the eigenvalues ​​of the historical measurement values ​​can be obtained by accessing the matrix values ​​at the user end.

[0061] Preferably, the processing end 200 further includes a cache 220, which is used to store n groups of measurement data and output data within a time period T, and transmit the data to corresponding processing modules after the time period T ends.

[0062] The present invention also provides a storage device for storing one or more programs, including an instrument status monitoring program. When the one or more programs are executed by a processor, the above-mentioned instrument status monitoring method is implemented.

[0063] The above-mentioned storage device may adopt any combination of one or more computer-readable media. The computer-readable medium may be a computer-readable signal medium or a computer-readable storage medium. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination thereof. More specific examples (a non-exhaustive list) of computer-readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In this document, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in conjunction with an instruction execution system, device or device.

[0064] Computer-readable signal media may include data signals propagated in baseband or as part of a carrier wave, which carry computer-readable program code. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than a computer-readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device.

[0065] The program code embodied on the computer readable medium may be transmitted using any appropriate medium, including but not limited to wireless, wireline, optical fiber cable, RF, etc., or any suitable combination of the foregoing.

[0066] Computer program code for performing the operations of the present invention may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or terminal. In cases involving a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., through the Internet using an Internet service provider).

[0067] In order to reduce maintenance costs, in this solution, the measurement data of n instruments to be tested are recorded in real time and compared with the standard data of the standard output end. The qualification of the specified instrument is determined based on the comparison results. Digital, intelligent and information technology are used to accurately identify old instruments. Real-time monitoring and diagnostic analysis of the instrument operating status are carried out to grasp the instrument operating status and discover defects in advance, so as to achieve predictive maintenance and precise maintenance, greatly avoid shutdowns caused by instrument failures, and reduce maintenance costs.

[0068] In order to reduce the processor load, in this scheme, since the measured values ​​do not change suddenly when the instrument is operating normally, the measured characteristic value a is used to replace the corresponding measured data counted within a certain time segment t, and the standard characteristic value b is used to replace the standard data counted within the same time segment t. By comparing the measured characteristic value a and the standard characteristic value b, computing power can be saved, thereby reducing the processor load.

[0069] In order to facilitate reading of measurement data, in this solution, a statistical matrix is ​​established and updated after each time segment t. Since the matrix can be read by index, the measurement data of a specified instrument to be tested or a specified time period can be read conveniently and quickly.

[0070] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. An instrument status monitoring method, characterized in that: include: Record the measurement values ​​of n instruments to be tested in real time to obtain n groups of measurement data; Real-time recording of standard data at standard output terminals; A detection cycle is divided into k time periods T, each time period T is divided into n time segments t, and the error values ​​of n groups of measurement data and standard data are calculated in sequence in the n time segments t; In the k time periods T corresponding to the instrument under test, if the error values ​​are all within the specified range, the instrument under test is qualified.

2. According to the instrument status monitoring method of claim 1, the calculation of the error value between n sets of measurement data and standard data is characterized in that: The measured data and the standard data are calculated and processed within the time segment t to obtain the measured characteristic value a and the standard characteristic value b respectively, and the error E of the measured characteristic value a relative to the standard characteristic value b is calculated.

3. The instrument status monitoring method according to claim 2, characterized in that: The measured characteristic value a and the standard characteristic value b both include one or more of an average value, a maximum value, a minimum value, and an integral value.

4. According to the instrument status monitoring method of claim 2, the error E of the calculated measured characteristic value a relative to the standard characteristic value b is characterized by: The error is calculated by the following formula:

5. The instrument status monitoring method according to claim 1, wherein the error values ​​of n groups of measurement data and standard data are calculated, characterized in that: A statistical matrix is ​​established and updated after each time segment t.

6. The instrument status monitoring method according to claim 5, characterized in that: The statistical matrix is ​​processed to determine whether each instrument to be tested is qualified.

7. The instrument status monitoring method according to claim 1, characterized in that: The value of k is not less than 10.

8. An instrument status monitoring system, based on any one of the instrument status monitoring methods according to claims 1-7, characterized in that: include: The acquisition end is used to record measurement data and standard data in real time; A processing end, used for receiving the measurement data and / or standard data transmitted by the acquisition end, and performing data processing; The user end is used to display the processing results of the processing end to the user.

9. An instrument status monitoring system, according to claim 8, characterized in that: The processing end includes at least n+1 processing modules, and the processing modules are used to process standard data or corresponding measurement data.

10. A storage device having an instrument status monitoring program stored thereon, characterized in that: When the program is executed by a processor, any one of the instrument status monitoring methods described in claims 1-7 is implemented.